TABULATION OF BIDS DODGE CITY REGIONAL AIRPORT DODGE CITY, KANSAS RECONSTRUCT RUNWAY 14-32: SUMMARY PROJECT NO.: AIP

Size: px
Start display at page:

Download "TABULATION OF BIDS DODGE CITY REGIONAL AIRPORT DODGE CITY, KANSAS RECONSTRUCT RUNWAY 14-32: SUMMARY PROJECT NO.: AIP"

Transcription

1 RECONSTRUCT RUNWAY 14-32: SUMMARY., BID SUMMARY TOTAL COST TOTAL COST TOTAL COST TOTAL COST TOTAL COST Schedule 1 Cost of Construction $4,717, $5,106, $5,697, $4,430, $4,640, Schedule 2 Cost of Construction $1,687, $1,554, $1,785, $1,463, $1,505, Schedule 3 Cost of Construction $5,556, $5,610, $5,960, $4,766, $4,628, Total Cost of Construction $11,961, $12,271, $13,442, $10,660, $10,773,951.05

2 RECONSTRUCT RUNWAY 14-32: SCHEDULE 1 FAA DESCRIPTION OF WORK UNITS 1 Item 105 Mobilization LS 1 $500, $500, $743, $743, $966, $966, $624, $624, $790, $790, P Asphalt Pavement Removal, Full Depth (8" to 17") SY 32,900 $5.50 $180, $5.15 $169, $6.00 $197, $3.95 $129, $5.85 $192, P PCC Pavement Removal (7") SY 1,450 $5.00 $7, $6.30 $9, $16.00 $23, $2.78 $4, $6.00 $8, P Miscellaneous Pavement Removal, PCC or AC - Full Depth SY 660 $4.00 $2, $5.50 $3, $16.00 $10, $2.47 $1, $6.00 $3, P " Cold Milling of Asphalt Pavement SY 2,400 $6.50 $15, $5.50 $13, $14.50 $34, $4.40 $10, $4.30 $10, P Joint and Crack Repair LF 500 $3.00 $1, $3.84 $1, $12.00 $6, $17.29 $8, $11.15 $5, P Paint and Rubber Removal SF 2,950 $3.00 $8, $1.10 $3, $1.00 $2, $1.22 $3, $1.05 $3, P " Reinforced Concrete Pipe Removal LF 450 $30.00 $13, $8.50 $3, $32.00 $14, $6.79 $3, $17.15 $7, P " Corrugated Metal Pipe Removal LF 732 $20.00 $14, $7.00 $5, $15.00 $10, $6.79 $4, $17.15 $12, P Storm Drainage Inlet Removal 3 $ $2, $ $2, $1, $4, $ $1, $1, $3, P Temporary Pavement Marking Obliteration SF 2,200 $1.50 $3, $1.10 $2, $1.00 $2, $1.22 $2, $1.05 $2, P Traffic Control LS 1 $30, $30, $125, $125, $95, $95, $116, $116, $102, $102, P Temporary Runway Relocated Threshold, Phase 1 & 2 LS 1 $30, $30, $22, $22, $22, $22, $23, $23, $21, $21, P Unclassified Excavation CY 62,500 $5.00 $312, $5.10 $318, $5.70 $356, $3.21 $200, $6.70 $418, P Unsuitable Excavation CY 3,000 $10.00 $30, $10.45 $31, $5.50 $16, $8.03 $24, $3.20 $9, P " Lime-Treated Subgrade SY 35,700 $6.00 $214, $9.55 $340, $8.65 $308, $3.58 $127, $4.65 $166, P Lime TON 1,170 $ $234, $ $328, $ $181, $ $322, $ $257, P Installation and Removal of Silt Fence LF 5,800 $3.00 $17, $1.40 $8, $4.00 $23, $4.91 $28, $2.80 $16, P Compost Filter Sock LF 160 $7.50 $1, $5.00 $ $6.00 $ $15.97 $2, $5.00 $ P Riprap 3 $ $ $ $2, $1, $3, $ $ $ $2, P Stabilized Construction Entrance 2 $2, $4, $2, $4, $5, $10, $2, $4, $2, $5, P Temporary Seeding AC 3 $1, $4, $ $2, $ $1, $1, $5, $ $2, P " Crushed Aggregate Base Course SY 35,700 $10.00 $357, $15.45 $551, $16.50 $589, $13.58 $484, $12.75 $455, P " Bituminous Surface Overlay TON 560 $ $67, $ $80, $ $64, $ $77, $96.30 $53, P Bituminous Leveling Course (0-2") TON 275 $80.00 $22, $ $33, $ $30, $ $36, $ $35, P b-1 8" Portland Cement Concrete Pavement SY 34,800 $55.00 $1,914, $46.55 $1,619, $60.00 $2,088, $39.19 $1,363, $41.00 $1,426, P b-2 6" Portland Cement Concrete Pavement SY 100 $50.00 $5, $46.30 $4, $70.00 $7, $36.28 $3, $61.90 $6, P Bituminous Tack Coat GAL 750 $3.00 $2, $4.50 $3, $2.85 $2, $3.45 $2, $5.15 $3, P Compression Joint Seals for Concrete Pavements LF 46,750 $3.50 $163, $3.40 $158, $2.75 $128, $3.93 $183, $2.78 $129, P Joint Sealing Filler LF 1,500 $1.50 $2, $2.74 $4, $3.00 $4, $1.74 $2, $2.15 $3, P Reflectorized Pavement Marking, White SF 28,800 $2.50 $72, $1.10 $31, $1.00 $28, $1.22 $35, $1.05 $30, P Reflectorized Pavement Marking, Yellow SF 4,650 $2.50 $11, $1.10 $5, $1.00 $4, $1.22 $5, $1.05 $4, P Reflectorized Pavement Marking, Red SF 900 $2.50 $2, $1.10 $ $1.00 $ $1.22 $1, $1.05 $ P Non-Reflectorized Pavement Marking, Black SF 14,000 $1.50 $21, $1.00 $14, $0.90 $12, $1.10 $15, $0.95 $13, P Pavement Surface Grooving SY 23,500 $1.75 $41, $2.00 $47, $1.59 $37, $3.21 $75, $1.70 $39, P Concrete Pavement Repairs SY 250 $40.00 $10, $ $27, $ $62, $88.23 $22, $80.25 $20, D inch Class IV Reinforced Concrete Pipe LF 695 $65.00 $45, $45.00 $31, $43.00 $29, $55.56 $38, $53.40 $37, D inch Class IV Reinforced Concrete Pipe LF 82 $75.00 $6, $94.00 $7, $77.00 $6, $80.26 $6, $75.90 $6, D inch Class IV Reinforced Concrete Pipe End Section 2 $1, $2, $1, $2, $2, $4, $1, $2, $1, $2, D inch Class IV Reinforced Concrete Pipe End Section 1 $1, $1, $1, $1, $2, $2, $1, $1, $1, $1, D inch Perforated Pipe LF 2,400 $16.00 $38, $17.35 $41, $15.80 $37, $19.41 $46, $16.90 $40, D inch PE Outlet Pipe LF 1,750 $14.00 $24, $6.00 $10, $5.35 $9, $6.57 $11, $5.75 $10, D Underdrain Concrete Splash Pad 5 $1, $5, $ $1, $ $1, $ $1, $ $1, D Underdrain Connection to RCP 2 $1, $2, $1, $2, $1, $2, $1, $2, $1, $2, D Manhole 1 $3, $3, $5, $5, $4, $4, $4, $4, $5, $5, T Seeding AC 29 $1, $34, $ $25, $ $18, $1, $44, $ $25, T Sodding SY 1,250 $8.00 $10, $8.78 $10, $4.50 $5, $10.13 $12, $8.55 $10, T Mulching AC 29 $1, $29, $1, $33, $ $24, $ $15, $1, $32, L No. 8 AWG, 5kV, L-824, Type C Cable, Installed in Trench, Duct Bank, or Conduit LF 8,800 $1.25 $11, $0.82 $7, $0.80 $7, $1.23 $10, $0.80 $7, L No. 6 AWG, Solid, Bare Counterpoise Wire, Installed in Trench, Above the Duct Bank LF 8,800 or Conduit, Including Ground Rods and Ground Connectors $1.00 $8, $0.82 $7, $0.80 $7, $3.07 $27, $0.80 $7, L Concrete Encased Electrical Duct Bank, 2-2" PVC LF 500 $18.00 $9, $4.40 $2, $4.50 $2, $49.14 $24, $4.30 $2, L Non-Encased Electrical Conduit, 1-2" HDPE LF 8,800 $6.00 $52, $2.45 $21, $2.50 $22, $5.53 $48, $2.40 $21,120.00

3 RECONSTRUCT RUNWAY 14-32: SCHEDULE 1 FAA DESCRIPTION OF WORK UNITS New L-861-T, LED, Elevated Taxiway Edge Light (Without Arctic Kit), Blue Lens to be 53 L Installed on New L-867-B Galvanized Base Can (Includes Fixtures, Transformer, and 32 Base Plate w/ Gasket $1, $35, $1, $37, $1, $36, $1, $51, $1, $36, New L-861(L) LED Elevated Runway Edge Light, (without Artic Kit), White Lens, 54 L White/Yellow Lens or Red/Yellow Lens to be Installed on New L-867-B Galvanized 18 Base Can (Includes Fixtures, Transformer, Base Can, and Conduit) $1, $19, $1, $21, $1, $20, $1, $33, $1, $20, New L-861E LED Elevated Runway Threshold Light, (without Artic Kit), Red Lens or 55 L Green/Yellow Lens to be Installed on New L-867-B Galvanized Base Can (Includes 16 Fixtures, Transformer, Base Can, and Conduit) $1, $17, $1, $18, $1, $18, $1, $29, $1, $18, L New L-858 Guidance Sign LED, Size 1, Including New Foundation, Isolation 2 Transformer, Cable, Base Can, and Conduit $4, $9, $4, $8, $4, $8, $4, $8, $4, $8, L New L-849I REIL LED, Including New Foundation, Isolation Transformer, Cable, Base 2 Can, and Conduit $8, $17, $21, $42, $20, $40, $11, $23, $20, $41, L Removal of Existing REIL Including Foundation 2 $1, $2, $3, $7, $1, $3, $1, $2, $1, $3, L Existing Guidance Sign to be Removed Including Foundation 2 $2, $4, $1, $3, $1, $3, $ $1, $1, $3, L Remove Existing Taxiway or Runway Fixture and Transformer and Deliver to Owner LS 1 $ $ $11, $11, $11, $11, $5, $5, $10, $10, L New L-861 Light Globe for Existing Bi-Directional Light Fixture 17 $50.00 $ $ $7, $ $6, $61.42 $1, $ $6, L Existing Taxiway Edge Light Fixture Installed on New L-867-B Galvanized Base Can 10 (Includes Transformer, Base Can, and Conduit) $ $8, $ $9, $ $9, $1, $11, $ $8, TOTAL COST OF SCHEDULE 1 (Calculated) $4,717, $5,106, $5,697, $4,430, $4,640, TOTAL COST OF SCHEDULE 1 (As Read to the Public) $4,717, $5,106, $5,661, $4,430, $4,640,166.10

4 RECONSTRUCT RUNWAY 14-32: SCHEDULE 2 FAA DESCRIPTION OF WORK UNITS 1 P Asphalt Pavement Removal, Full Depth (8" to 17") SY 13,200 $5.50 $72, $6.44 $85, $6.00 $79, $3.95 $52, $5.85 $77, P PCC Pavement Removal (7") SY 250 $5.00 $1, $11.00 $2, $16.00 $4, $2.78 $ $6.00 $1, P Paint and Rubber Removal SF 2,750 $3.00 $8, $1.10 $3, $1.00 $2, $1.22 $3, $1.05 $2, P " Reinforced Concrete Pipe Removal LF 406 $45.00 $18, $11.00 $4, $36.00 $14, $1.85 $ $21.40 $8, P Storm Drainage Inlet Removal 2 $ $1, $ $1, $1, $3, $ $ $1, $2, P Traffic Control LS 1 $10, $10, $32, $32, $11, $11, $13, $13, $12, $12, P Unclassified Excavation CY 39,940 $5.00 $199, $4.30 $171, $5.70 $227, $3.70 $147, $6.15 $245, P Unsuitable Excavation CY 2,000 $10.00 $20, $5.86 $11, $5.50 $11, $8.03 $16, $3.20 $6, P " Lime-Treated Subgrade SY 13,800 $6.00 $82, $9.60 $132, $8.65 $119, $3.58 $49, $4.85 $66, P Lime TON 450 $ $90, $ $126, $ $69, $ $123, $ $99, P Installation and Removal of Silt Fence LF 3,850 $3.00 $11, $3.00 $11, $4.00 $15, $4.91 $18, $2.80 $10, P Compost Filter Sock LF 80 $7.50 $ $5.00 $ $6.00 $ $15.97 $1, $5.00 $ P Riprap 1 $ $ $ $ $1, $1, $ $ $ $ P Temporary Seeding AC 2 $1, $2, $ $1, $ $1, $1, $3, $ $1, P " Crushed Aggregate Base Course SY 13,800 $10.00 $138, $16.86 $232, $15.50 $213, $13.58 $187, $13.00 $179, P b-1 8" Portland Cement Concrete Pavement SY 13,500 $55.00 $742, $35.34 $477, $57.00 $769, $38.65 $521, $41.00 $553, P Compression Joint Seals for Concrete Pavements LF 17,900 $3.50 $62, $3.40 $60, $2.75 $49, $3.93 $70, $2.78 $49, P Joint Sealing Filler LF 620 $1.50 $ $2.70 $1, $3.00 $1, $1.74 $1, $2.15 $1, P Reflectorized Pavement Marking, White SF 9,500 $2.50 $23, $1.10 $10, $1.00 $9, $1.22 $11, $1.05 $9, P Reflectorized Pavement Marking, Yellow SF 1,500 $2.50 $3, $1.10 $1, $1.00 $1, $1.22 $1, $1.05 $1, P Reflectorized Pavement Marking, Red SF 300 $2.50 $ $1.10 $ $1.00 $ $1.22 $ $1.05 $ P Non-Reflectorized Pavement Marking, Black SF 5,600 $1.50 $8, $0.99 $5, $0.90 $5, $1.10 $6, $0.95 $5, P Pavement Surface Grooving SY 10,600 $1.75 $18, $2.00 $21, $1.59 $16, $4.34 $46, $1.70 $18, P Concrete Pavement Repairs SY 110 $40.00 $4, $ $12, $ $27, $88.03 $9, $80.25 $8, D inch Class IV Reinforced Concrete Pipe End Section 1 $1, $1, $1, $1, $2, $2, $1, $1, $1, $1, D inch Perforated Pipe LF 2,100 $16.00 $33, $17.35 $36, $15.80 $33, $19.41 $40, $16.90 $35, D inch PE Outlet Pipe LF 1,000 $14.00 $14, $5.87 $5, $5.35 $5, $6.57 $6, $5.75 $5, D Underdrain Concrete Splash Pad 4 $1, $4, $ $1, $ $1, $ $1, $ $1, T Seeding AC 16 $1, $19, $ $14, $ $10, $1, $24, $ $13, T Sodding SY 500 $8.00 $4, $8.78 $4, $4.50 $2, $10.13 $5, $8.55 $4, T Mulching AC 16 $1, $16, $1, $18, $ $13, $ $8, $1, $18, L No. 8 AWG, 5kV, L-824, Type C Cable, Installed in Trench, Duct Bank, or Conduit LF 3,700 $ 1.25 $4, $0.82 $3, $0.80 $2, $1.23 $4, $0.80 $2, L No. 6 AWG, Solid, Bare Counterpoise Wire, Installed in Trench, Above the Duct Bank LF or Conduit, Including Ground Rods and Ground Connectors 3,700 $ 1.00 $3, $0.82 $3, $0.80 $2, $3.07 $11, $0.80 $2, L Concrete Encased Electrical Duct Bank, 2-2" PVC LF 120 $ $2, $4.40 $ $4.50 $ $49.14 $5, $4.30 $ L Non-Encased Electrical Conduit, 1-2" HDPE LF 3,700 $ 6.00 $22, $2.47 $9, $2.50 $9, $5.53 $20, $2.40 $8, L New L-861(L) LED Elevated Runway Edge Light, (without Artic Kit), White Lens, White/Yellow Lens or Red/Yellow Lens to be Installed on New L-867-B Galvanized Base Can (Includes Fixtures, Transformer, Base Can, and Conduit) New L-858 Guidance Sign LED, Size 1, Including New Foundation, Isolation Transformer, Cable, Base Can, and Conduit 12 $ 1, $13, $1, $14, $1, $13, $1, $19, $1, $13, L $ 4, $18, $4, $16, $4, $16, $4, $17, $4, $16, L Existing Guidance Sign to be Removed Including Foundation 3 $ 2, $6, $1, $5, $1, $5, $ $2, $1, $5, L Remove Existing Taxiway or Runway Fixture and Transformer and Deliver to Owner LS 1 $ $ $5, $5, $6, $6, $2, $2, $5, $5, L Existing Guidance Sign to be Relocated Including New Foundation and Demolition of Existing Foundation 1 $ 2, $2, $3, $3, $4, $4, $2, $2, $3, $3, TOTAL COST OF SCHEDULE 2 (Calculated) $1,687, $1,554, $1,785, $1,463, $1,505, TOTAL COST OF SCHEDULE 2 (As Read to the Public) $1,687, $1,554, $1,785, $1,463, $1,505,120.40

5 RECONSTRUCT RUNWAY 14-32: SCHEDULE 3 FAA DESCRIPTION OF WORK UNITS 1 Item 105 Mobilization LS 1 $500, $500, $703, $703, $846, $846, $434, $434, $385, $385, P Asphalt Pavement Removal, Full Depth (8" to 17") SY 42,800 $5.50 $235, $4.97 $212, $6.00 $256, $3.95 $169, $5.86 $250, P PCC Pavement Removal (7") SY 260 $5.00 $1, $11.70 $3, $16.00 $4, $2.78 $ $6.00 $1, P Miscellaneous Pavement Removal, PCC or AC - Full Depth SY 1,350 $4.00 $5, $4.50 $6, $16.00 $21, $2.78 $3, $6.00 $8, P Paint and Rubber Removal SF 160 $5.00 $ $1.10 $ $1.00 $ $1.22 $ $1.05 $ P "x30" Reinforced Concrete Elliptical Pipe Removal LF 472 $45.00 $21, $11.50 $5, $45.00 $21, $6.17 $2, $29.95 $14, P " Reinforced Concrete Pipe Removal LF 61 $45.00 $2, $24.00 $1, $36.00 $2, $8.64 $ $21.40 $1, P Storm Drainage Inlet Removal 2 $ $1, $ $1, $1, $3, $ $ $1, $2, P Traffic Control LS 1 $30, $30, $32, $32, $11, $11, $13, $13, $12, $12, P Unclassified Excavation CY 47,200 $5.50 $259, $7.14 $337, $5.70 $269, $5.12 $241, $5.90 $278, P Unsuitable Excavation CY 2,200 $12.00 $26, $5.37 $11, $5.50 $12, $8.03 $17, $3.20 $7, P " Lime-Treated Subgrade SY 43,200 $6.50 $280, $9.56 $412, $8.65 $373, $3.58 $154, $4.60 $198, P Lime TON 1,430 $ $300, $ $401, $ $221, $ $393, $ $308, P Installation and Removal of Silt Fence LF 10,750 $3.00 $32, $3.00 $32, $4.00 $43, $4.91 $52, $2.75 $29, P Compost Filter Sock LF 600 $7.50 $4, $5.00 $3, $6.00 $3, $15.97 $9, $5.00 $3, P Riprap 5 $ $1, $ $4, $1, $6, $ $1, $ $4, P Riprap (Ditch) SY 125 $40.00 $5, $43.00 $5, $95.00 $11, $80.26 $10, $58.75 $7, P Temporary Seeding AC 4 $1, $6, $ $3, $ $2, $1, $6, $ $2, P " Crushed Aggregate Base Course SY 43,700 $11.00 $480, $17.34 $757, $15.50 $677, $13.58 $593, $12.75 $557, P b-1 8" Portland Cement Concrete Pavement SY 42,300 $57.00 $2,411, $42.44 $1,795, $55.00 $2,326, $38.57 $1,631, $41.00 $1,734, P b-2 6" Portland Cement Concrete Pavement SY 300 $55.00 $16, $46.30 $13, $70.00 $21, $36.17 $10, $62.25 $18, P Compression Joint Seals for Concrete Pavements LF 57,250 $3.50 $200, $3.40 $194, $2.75 $157, $3.93 $224, $2.75 $157, P Joint Sealing Filler LF 500 $1.50 $ $2.74 $1, $3.00 $1, $1.74 $ $2.15 $1, P Reflectorized Pavement Marking, White SF 45,500 $2.50 $113, $1.10 $50, $1.00 $45, $1.22 $55, $1.05 $47, P Reflectorized Pavement Marking, Yellow SF 2,000 $2.50 $5, $1.10 $2, $1.00 $2, $1.22 $2, $1.05 $2, P Reflectorized Pavement Marking, Red SF 270 $2.50 $ $1.10 $ $1.00 $ $1.22 $ $1.05 $ P Non-Reflectorized Pavement Marking, Black SF 12,000 $1.50 $18, $0.99 $11, $0.90 $10, $1.10 $13, $0.95 $11, P Pavement Surface Grooving SY 30,245 $1.75 $52, $2.00 $60, $1.59 $48, $3.00 $90, $1.70 $51, P Concrete Pavement Repairs SY 300 $40.00 $12, $ $33, $ $75, $88.10 $26, $80.25 $24, D inch Class IV Reinforced Concrete Pipe LF 60 $65.00 $3, $45.00 $2, $43.00 $2, $55.56 $3, $53.25 $3, D inch Class IV Reinforced Concrete Pipe LF 645 $90.00 $58, $ $70, $ $68, $ $67, $ $74, D inch Class IV Reinforced Concrete Pipe End Section 2 $1, $2, $1, $2, $2, $4, $1, $2, $1, $2, D inch Class IV Reinforced Concrete Pipe End Section 1 $1, $1, $1, $1, $2, $2, $1, $1, $1, $1, D inch Class IV Reinforced Concrete Pipe End Section 2 $1, $2, $2, $4, $3, $7, $1, $2, $2, $4, D inch Perforated Pipe LF 7,800 $16.00 $124, $17.35 $135, $15.80 $123, $19.41 $151, $16.90 $131, D inch PE Outlet Pipe LF 2,200 $14.00 $30, $5.87 $12, $5.35 $11, $6.57 $14, $5.75 $12, D Underdrain Concrete Splash Pad 11 $1, $11, $ $3, $ $3, $ $3, $ $3, D Underdrain Connection to RCP 2 $1, $2, $1, $2, $1, $2, $1, $2, $1, $2, T Seeding AC 42 $1, $50, $ $37, $ $26, $1, $64, $ $36, T Sodding SY 1,500 $8.00 $12, $8.78 $13, $4.50 $6, $10.13 $15, $8.55 $12, T Mulching AC 42 $1, $42, $1, $48, $ $35, $ $22, $1, $47, L No. 8 AWG, 5kV, L-824, Type C Cable, Installed in Trench, Duct Bank, or Conduit LF 10,000 $ 1.25 $12, $0.82 $8, $0.80 $8, $1.23 $12, $0.80 $8, L No. 6 AWG, Solid, Bare Counterpoise Wire, Installed in Trench, Above the Duct Bank LF or Conduit, Including Ground Rods and Ground Connectors 10,000 $ 1.00 $10, $0.82 $8, $0.80 $8, $3.07 $30, $0.80 $8, L Concrete Encased Electrical Duct Bank, 2-2" PVC LF 200 $ $3, $4.39 $ $5.00 $1, $49.14 $9, $4.30 $ L Non-Encased Electrical Conduit, 1-2" HDPE LF 10,000 $ 6.00 $60, $2.47 $24, $2.50 $25, $5.53 $55, $2.40 $24, L New L-861-T, LED, Elevated Taxiway Edge Light (Without Arctic Kit), Blue Lens to be Installed on New L-867-B Galvanized Base Can (Includes Fixtures, Transformer, and Base Plate w/ Gasket 26 $ 1, $28, $1, $35, $1, $39, $1, $41, $1, $34, L New L-861(L) LED Elevated Runway Edge Light, (without Artic Kit), White Lens, White/Yellow Lens or Red/Yellow Lens to be Installed on New L-867-B Galvanized Base Can (Includes Fixtures, Transformer, Base Can, and Conduit) 34 $ 1, $37, $1, $46, $1, $51, $1, $62, $1, $45,220.00

6 48 L RECONSTRUCT RUNWAY 14-32: SCHEDULE 3 New L-861E LED Elevated Runway Threshold Light, (without Artic Kit), Red Lens or Green/Yellow Lens to be Installed on New L-867-B Galvanized Base Can (Includes Fixtures, Transformer, Base Can, and Conduit) New L-858 Guidance Sign LED, Size 1, Including New Foundation, Isolation Transformer, Cable, Base Can, and Conduit 8 $ 1, $8, $1, $10, $1, $12, $1, $14, $1, $10, L $ 4, $13, $4, $14, $5, $16, $4, $12, $4, $14, L Existing Guidance Sign to be Removed Including Foundation 7 $ 2, $14, $2, $19, $3, $21, $ $4, $2, $18, L Remove Existing Taxiway or Runway Fixture and Transformer and Deliver to Owner LS 1 $ $ $8, $8, $10, $10, $3, $3, $8, $8, TOTAL COST OF SCHEDULE 3 (Calculated) $5,556, $5,610, $5,960, $4,766, $4,628, TOTAL COST OF SCHEDULE 3 (As Read to the Public) $5,556, $5,610, $6,037, $4,766, $4,628,664.55