DHUKWAN SHEP (24 MW) (UNDER CONSTRUCTION ON RIVER BETWA IN BABINA, DISTT. JHANSI, UP)

Size: px
Start display at page:

Download "DHUKWAN SHEP (24 MW) (UNDER CONSTRUCTION ON RIVER BETWA IN BABINA, DISTT. JHANSI, UP)"

Transcription

1 DHUKWAN SHEP (24 MW) (UNDER CONSTRUCTION ON RIVER BETWA IN BABINA, DISTT. JHANSI, UP) Dhukwan HEP is being constructed at the toe of existing Dhukwan masonry cum earthen dam across Betwa river. The 8.22 M high existing dam is 2972 M long of which 1172 M length is constructed in masonry/lime concrete while the remaining 1800 M length is made of earthen. The masonry part of the dam is fitted with 383 no. of gates 8 feet high, capable to pass a discharge of Cumecs. Annual Energy Generation shall be MU at 46.53% load factor (as per availability of water). 1.0 PROJECT APPROVALS: SL. No. Date Description of Approvals 1 2 nd Sep 09 Implementation agreement was signed with Govt of U.P. to take up DPR updation work of Dhukwan Small Hydro Project (24 MW) 2 30 th Jun 10. DPR was submitted to GOUP 3 20 th Dec-10 DPR was cleared by MANIT on for techno-commercial vetting and for getting qualified for subsidy benefits th Mar 11 THDCIL Board approved DPR of the project including investment at estimated cost of ` Cr including ` Cr IDC at April-2010 PL as per the provisions of DPR. Equity portion i.e. 30% of the project cost shall be funded by the corporation from its internal resources th Apr 12. Combined proposalfor Stage-I Forest Clearance of 39 Ha land was submitted to State unit of MOEF 6 23 rd May 12 State Advisory Group (SAG) cleared the proposal 7 27 th Nov 12 Stage-1 clearance of 39 Ha. Land with fulfillment of certain conditions th Sep-13 2 nd Stage Forest diversion has been cleared by Central Nodal Forest officer, Lucknow 9 2 nd June-14. Gazette Notification for 39 Ha. forest land was issued 10 5 th Dec-16 PPA signed with UPPCL th Mar-17 THDCIL Board in its 185 th meeting approved RCE amounting to ` Cr including IDC of ` Cr at Jul-16 PL th May-17 MOU for transmission system signed with UPPTCL th May-17 Connection Agreement signed with UPPTCL 2.0 MAJOR WORKS TO BE EXECUTED: Approach Channel approx. 502 M long, 4 no. RCC Barrels, Intake works, HRC approx M long, Forebay, Spillway with spill channels, Surface Power House (64x24x37m), TRC approx. 919 M long, Cross Drainage Works and Switchyard. 3.0 INFRASTRUCTURE WORKS: All Infrastructure works for Type-II Quarters, Office building and Field Hostel/Guest House are complete and started functioning. 4.0 Progress of Works against Contract Value: Sl. No. Contract Value Executed amount Upto 15 th Jun 2018 (Excluding Price adjustment, refund of taxes etc.) 29 % age

2 1 2 Civil Work Contract (M/s SEW Infrastructure Limited) HM Contract (M/s Aarti Infra Projects Pvt. Ltd., Nagpur) ` Cr ` Crs ` Cr (1. INR 9.41 Crs (2. INR 1.83 (Services) ` Crs % 3 EM Contract M/s Hunan Allonward Hydro Generating Co. Ltd., China (Lead Partner) & M/s Sh. Saravana Industries Pvt. Limited, Trichy Overall Contract ` Cr (1. US $0.43crs+ INR 6.54 Crs.(Off-shore supply) (2. INR Crs.(On-shore supply) (3. INR 4.66Crs (Service Portion) INR Crs. ` Cr % Crs CIVIL WORKS:Layout of Dhukwan SHP is enclosed at Exhibit VI. Structure wise progress of Civil works is enclosed at Exhibit-VII. HYDRO- MECHANICAL WORKS : I. HRC Barrel Gate: Erection & Commissioning of Barrel gate in all 04 nos. barrel has been completed. II. III. Automatic Tilting Gate: Erection of 1 st stage embedment has been completed. Erection of 2 nd stage embedment is in progress. Erection of Base plates for counter weights in both bays has been completed. Power Intake Structure: Erection & Commissioning of Power Intake Gates in all 03 units have been completed. Erection of 2 nd stage embedment of Trash Rack has been completed in Unit 1 & 2 and in Unit-3 is in progress. IV. Erection of Penstock Steel Liners Erection of Penstock in all 03 units has been completed, while erection of additional length of Penstock in Unit-1 is in progress. v. Fixing of 1 st Stage embedment in Draft Tube Gates in Unit 1& 2 completed and in unit-3 is in progress. Note: All HM Equipment supplies except Trash Rack winch have been completed. ELECTRO- MECHANICAL WORKS : Power House: 1) Laying of Earthmat in Power House area has been completed and raising of risers along with the civil works is under progress. 2) Erection of DT elbow liner in all 03 Units including alignment has been completed. The fixing of Cooling water, Dewatering & Drainage pipes in MIV area & DT area have also been completed. 3) Erection & commissioning of EOT rail upto Unit-2 has been completed. 4) Erection of DT Cone including upper cone & Runner Chamber in Unit-1 completed and erection of Stay ring is in progress. 5) Erection of DT Cone in Unit-2 completed. Fixing of pedestal plates for Stay ring/spiral case/runner Chamber is in progress. 30

3 Switchyard: 1) Laying of earthmat at Switchyard area (Bay-4, 5 & 6) has been completed (except batching plant area, Bay-1, 2 & 3 and same shall be taken up after removal of batching plant). Control Room area handed over to Civil on for Building works. Fixing and alignment of Gantry structure foundation is under progress with civil works. Supply Status : Supply of following items has been completed: 1) Turbine parts All turbine parts of all three units have been reached at site except runner assembly & Guide vanes. 2) Generator Parts i) Generator Embedment (all 03 units) 3) Electrical Panels i) LV switchgears (UAB, SSB 1, 2 &3) ii) MV switchgears (SSB A & SSB B) iii) Protection system for PH and Switchyard iv) Automatic Energy Metering System v) Unit Control Board and synchronizing Panels 4) Switchyard Equipment i) Foundation bolts of all equipment and foundation parts of all Gantry Structure ii) Circuit Breakers (all three Units & 02 Nos Lines) 5) Other Mechanical equipment i) MIV Embedment (all 03 Units) ii) Cooling water system (all 03 units) iii) Dewatering, Drainage and Flood Protection Pumps iv) Governor Embedment (all 03 units) 6) Other electrical Equipment i) Generator Transformers Embedment (all 03 units) ii) Earth-mat material for Switchyard iii) Dry Type Transformer (UAT & SAT) iv) Generator Transformer (Unit-1,2 & 3) 5.0 ISSUE TO BE RESOLVED 5.1 Land required for Power evacuation: Land transfer proposal of 1.39 Ha. land of Dhukwa - Sukhwa village required for compensatory afforestation has been approved by ADM, Jhansi. A sum of Rs lacs has been deposited against land for compensatory afforestation. After availability of above land, IInd stage clearance of the 1.39 Ha. forest land required for laying of transmission line shall be granted by regional office of MoEF. 6.0 Commissioning Schedule: The Project was scheduled to be commissioned by Feb However, delay in submission of EM Design & Drawing by EM Contractor and finalization of the same affected supply of EM equipment and Civil works of Power House, resulting delay in availability of EOT crane in Unit Area. Scarcity of sand has also affected the schedule. Based on present outlook, the project is expected to be commissioned by Mar EXPENDITURE ON THE PROJECT: Expenditure incurred by the corporation on Dhukwan HEP till Jun 18 is ` Cr (62%) out of approved cost of ` Cr including IDC of ` Cr at Jul-16 PL. 8.0 BUDGET ESTIMATE v/s EXPENDITURE During Jun 18, an expenditure of ` 5.42 Cr. has been incurred on Dhukwan HEP against budget estimate provision of ` 8.27 Cr. 31

4 Exhibit VI 32

5 N. Structure Unit 1 APPROACH CHANNEL (C-Civil Works) Excavation 2 INTAKE STRUCTURE (J-Power Plant) Total Qty In May-18 Executed up to May-18 In Jun-18 Cum Total Achieved (%) (92%) Balance Qty 2000 Remarks Foundation Excavation Cum Completed Concreting in Foundation, Raft, 4 Nos. RCC Cum Barrels & transition Portion - Completed 3 HEAD RACE CHANNEL(1451 RM) - - Excavation (Common & Rock) Cum Completed Embankment Filling Cum Completed CC Lining by Paver Cum (55.5%) 2670 Exhibit-VII Concrete lining by Paver is in progress.completed. in 600 (Left side) and 1438 m (Right Side). 4 CONSTRUCTION OF BRIDGE - Completed and in use since a Excavation Cum b Concreting Cum Cross Drainage Work - Work for aqua ducts falling a Excavation Cum in HRC area at Kappa Nala b Concreting and Nala-1 & Nala-2 Cum completed. 7 FOREBAY Excavation Cum Completed Side walls (RR masonry) Fore bay CR Masonry wall Cum (93.5%) in a total length of Power Intake - Concreting in Raft, Intake Piers, Walls & Slabs etc Cum Compacted Earthfill behind forebay Walls Cum nd stage concreting completed. Site handed over for HM works. 33

6 8.0 Spillway, Plunge Pool including Spill Channel Excavation RCC works Cum Cum (78.33%) (50%) 8560 (85.6%) 8 PENSTOCKS Excavation Cum Completed Concreting around ferrules along with base concrete 9 POWER HOUSE (74X27X34 M ) Excavation & Side stabilization 9.1 SERVICE BAY AREA a Concreting 9.2 UNIT AREA a Concreting (Crane beam top at EL m) Cum Cum Cum (89.77%) Cum (76.58%) nd stage Concreting of Spillway Intake, Plunge pool is in progress and site has been handed over to HM for Further works. - Completed - Completed After completion of civil works, erection of EOT crane beam has been completed. Truss erection has also been completed in Service bay area. Casting of Crane beam including casting of Truss column upt RL (Final Level) have been completed in Unit-1 & 2 and in Unit-3 concreting upto RL 258 m has been completed. Concreting around DT cone including 26 nos spiral 34

7 9.3 SWITCHYARD a Excavation 10 TAIL RACE CHANNEL (919 RM) Excavation Cum Cum (91.53%) (99.2%) casing pedestals for Unit-1 and 2 has been completed and site has been handed over to EM works. Excavation of Switchyard including trenches, foundations, Control Block etc. completed (except Batching Plant Area) and site have been handed over to EM for further EM works. Nearing completion except dyke portion 35