1 Page 1 of 11 SECTION: 01 COMMON ITEMS CONTRACTOR CONSTRUCTION STAKING FIELD OFFICE AND LABORATORY (TYPE A) MOBILIZATION MOBILIZATION (DBE) REMOVAL OF EXISTING STRUCTURES FLAGGER (SET PRICE) EACH HOUR 7, , , , , , , , , , , , , , ,2000 2, , , $43, $104, Section Total with LCC: $43, $104,869.28

2 Page 2 of 11 SECTION: 02 ROAD ITEMS CLEARING AND GRUBBING COMMON EXCAVATION (URB) ROCK EXCAVATION COMPACTION OF EARTHWORK (TYPE B) (MR-90) SELECT SOIL (CONTRACTOR FURNISHED) WATER (GRADING) (SET PRICE) ADJUSTMENT OF MANHOLES ADJUSTMENT OF VALVE BOX (WATER) SLOPE DRAIN (SPECIAL) SIDEWALK CONSTRUCTION ( 4") (AE) 1, CUYD CUYD 3 CUYD CUYD MGAL EACH EACH SQYD 1, , , , , , , , , , , , , , , , , ,214.00

3 Page 3 of 11 SECTION: 02 ROAD ITEMS SIDEWALK RAMP AGGREGATE FOR BLANKET UNDERDRAINS " PIPE UNDERDRAINS (J) MAILBOX INSTALLATION (SET PRICE) SQYD CUYD EACH , , , , , $127, $140, Section Total with LCC: $127, $140,431.00

4 Page 4 of 11 SECTION: 03 TEMP PRJ WTR POL CTL SEDIMENT REMOVAL (SET PRICE) TEMPORARY BERM (SET PRICE) FILTER SOCK ( 8") WATER (EROSION CONTROL) (SET PRICE) CUYD MGAL $1, $ Section Total with LCC: $1, $671.00

5 Page 5 of 11 SECTION: 04 CONCRETE SURFACING ITEMS CURB AND GUTTER, COMBINED (AE) CONCRETE PAVEMENT ( 6" UNIFORM) (AE) CONCRETE PAVEMENT (10.5" UNIFORM) (AE) GRANULAR BASE ( 6") WATER (GRANULAR BASE) (SET PRICE) PAVING BRICK , SQYD SQYD 4, SQYD MGAL 3, SQYD , , , , , , , , , , $595, $567, Section Total with LCC: $595, $567,427.02

6 Page 6 of 11 SECTION: 05 SIGNING ITEMS SIGN (FLAT SHEET) (HIGH PERFORMANCE) SIGN POST (1-3/4" PERFORATED SQUARE STEEL TUBE) SIGN POST FOOTING ( 1-3/4" PERFORATED SQUARE STEEL TUBE) SIGN (REMOVE AND RESET) SQFT EACH , , , , $4, $4, Section Total with LCC: $4, $4,321.00

7 Page 7 of 11 SECTION: 06 PAVEMENT MARKING ITEMS PAVEMENT MARKING (MULTI- COMPONENT) (WHITE) ( 4") PAVEMENT MARKING (INTERSECTION GRADE) (WHITE) (24") PAVEMENT MRK SYM (INTERSECTION GRADE) (WHITE) (HANDICAP) 1, EACH , , , , $11, $10, Section Total with LCC: $11, $10,291.25

8 Page 8 of 11 SECTION: 07 SEEDING ITEMS , , , , SEEDING $4, $1, Section Total with LCC: $4, $1,500.00

9 Page 9 of 11 SECTION: 08 TRAFFIC CONTROL ITEMS WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) WORK ZONE SIGNS ( 9.26 TO SQ.FT.) WORK ZONE BARRICADES (TYPE 3-4 TO 12 LIN. FT.) WORK ZONE BARRICADES (PEDESTRIAN) CHANNELIZER (PORTABLE) CHANNELIZER (PEDESTRIAN) WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) TRAFFIC CONTROL (INITIAL SETUP) 1, , , , , , , , , , , , , , , , , $11, $10, Section Total with LCC: $11, $10,276.50

10 Page 10 of 11 Contract Item Totals $799, $839, Contract Time Totals Contract Life Cycle Costs Totals $0.00 $0.00 Contract Grand Totals $799, $839, ( ) indicates item is bid as Lump Sum

11 Page 11 of 11

12 Vendor Ranking Page 1 of 1 TA-T045 (501) Rank Vendor ID/Name Total Bid Percent Of Low Bid AMINO BROTHERS $799, % BRYANT & BRYANT $839, %