1 10 September 2018 ADDENDUM NUMBER 2 To the Contract Documents for the Construction of Locker Room Corona High School (Bid No. 17/18-008) (DSA A# ) Corona-Norco Unified School District Corona, California NOTICE TO BIDDERS It is intended that all work affected by the following provisions shall conform to the original Plans and Specifications. Delete or modify each of the following items wherever appearing on the Drawings and/or Specifications. Acknowledge receipt of this Addendum in the space provided on the Contractor's Proposal. Failure to do so may subject bidder to disqualification. DRAWINGS: Item 1: Refer to Sheet A-203 and modify Floor Plan Demolition Keynote #23 as follows: 23. No Demolition in this Room except as required by work shown on Plumbing, Mechanical, Electrical, Fire Alarm, Fire Sprinkler, or Structural Drawings. Item 2: Refer to Sheet A-203 Enlarged Demo Floor Plan Girls Locker Room and refer to the (E) Mechanical Room in the southeast corner of the Building. Remove Floor Plan Demolition Keynote #23 and provide new Floor Plan Demolition Keynote #58 as follows: 58. Verify with District and remove all existing mechanical, plumbing, and/or electrical equipment that is no longer in service, typical entire room. Item 3: Refer to Sheet A-204 and Modify Floor Plan Demolition Keynote #23 as follows: 23. No Demolition in this Room except as required by work shown on Plumbing, Mechanical, Electrical, Fire Aalrm, Fire Sprinkler, or Structural Drawings.

2 Addendum Number 2 Locker Room Corona High School (Bid No. 17/18-008) (DSA A# ) Corona-Norco Unified School District 10 September 2018 Page 2 Item 4: Refer to Sheet A-204 Enlarged Demo Floor Plan Boys Locker Room and refer to the (E) Mechanical Room in the southwest corner of the Building. Remove Floor Plan Demolition Keynote #23 and provide new Floor Plan Demolition Keynote #55 as follows: 55. Verify with District and remove all existing mechanical, plumbing, and/or electrical equipment that is no longer in service, typical entire room. Item 5: Refer to Sheet A-205 Enlarged Floor Plan Girls Locker Room and refer to the (E) Mechanical Room in the southeast corner of the Building. Remove Floor Plan New Work Keynote #33 and provide new Floor Plan New Work Keynote #39 as follows: 39. Patch and repair all finishes where existing mechanical, plumbing, and/or electrical equipment was removed. Paint all walls. Item 6: Item 7: Refer to Sheet A-205 Enlarged Floor Plan Girls Locker Room. As a clarification in the Girls Large Locker Room, the south wall at the ramp/landings and the wall containing Door #A108B shall receive gwb wall finish and rubber base. Refer to Sheet A-206 Enlarged Floor Plan Boys Locker Room and refer to the (E) Mechanical Room in the southwest corner of the Building. Remove Floor Plan New Work Keynote #33 and provide new Floor Plan New Work Keynote #39 as follows: 39. Patch and repair all finishes where existing mechanical, plumbing, and/or electrical equipment was removed. Paint all walls. Item 8: Item 9: Refer to Sheet A-205 Enlarged Floor Plan Boys Locker Room. As a clarification in the Boys Large Locker Room, the south wall at the ramp/landings and the wall containing Door #A203B shall receive gwb wall finish and rubber base. Refer to Sheets A-701, A-702, A-703, A-704 and revise Interior Elevation Keynote #17 as follows: 17. (N) Exposed Concrete. Finish and polish to match adjacent finish floor. Item 10: Refer to Details 13/A-904, 15/A-904, 16/A-904, and 30/A-905. All faces of the concrete locker curbs shall be polished to match the finish concrete floor.

3 Addendum Number 2 Locker Room Corona High School (Bid No. 17/18-008) (DSA A# ) Corona-Norco Unified School District 10 September 2018 Page 3 Item 11: Refer to attached Sheet P-001, revised date, Addendum #2. a. Revise Model Number of DF-1. b. Add Demolition symbol to Legend. Item 12: Refer to attached Sheet P-101, revised date, Addendum #2. a. Remove existing drinking fountain and denote demolition in existing Mechanical Rooms, typical 2 locations as shown. b. Add Demolition Key Notes #12 and #13. Item 13: Item 14: Item 15: Refer to attached Sheet P-201, revised date, Addendum #2. Add locations of exterior drinking fountain DF-1, typical 2 locations as shown. Refer to attached Sheet P-401, revised date, Addendum #2. Provide new exterior drinking fountain DF-1 and connect as shown. Refer to attached Sheet P-402, revised date, Addendum #2. Provide new exterior drinking fountain DF-1 and connect as shown. END OF ADDENDUM Greg Chapman Principal Architect AIA, NCARB, LEED AP BD+C \\Addenda\Addendum-02\Add-02

4 : PLUMBING LEGEND, SCHEDULES, & GENERAL NOTES P-001

5 GIRLS SOUTH VESTIBULE BOYS SOUTH VESTIBULE GIRLS SOUTH SHOWER GIRLS NORTH SHOWER GIRLS LARGE LOCKER (E) STORAGE GIRLS NORTH VESTIBULE (E) TEAM EAST GIRLS INTERIOR VESTIBULE (E) TEAM WEST (E) CORRIDOR (E) GYMNASIUM (E) MEN REST (E) WOMEN REST (E) BOYS INTERIOR VESTIBULE (E) MEDIA EQUIPMENT (E) LOBBY (E) CONCESSIONS BOYS LARGE LOCKER (E) STORAGE BOYS NORTH VESTIBULE BOYS SHOWER BOYS SHOWER (E) TICKETS (E) DRY STORAGE : PLUMBING DEMOLITION FLOOR PLAN P-101

6 GIRLS COACH REST A102 GIRLS COACH LOCKER A101 GIRLS SOUTH VESTIBULE A103 BOYS COACH REST A212 BOYS SOUTH VESTIBULE A213 BOYS COACH SHOWER A210 BOYS COACH LOCKER A211 GIRLS COACH SHOWER A104 A214 GIRLS COACH OFFICE A113 GIRLS SMALL A105 BOYS SMALL LOCKER A208 A209 GIRLS SOUTH A109 GIRLS NORTH A110 GIRLS LARGE LOCKER A108 (E) STORAGE GIRLS NORTH VESTIBULE A112 GIRLS WORK A107 GIRLS REST A111 (E) TEAM EAST GIRLS INTERIOR A106 (E) TEAM WEST (E) CORRIDOR (E) GYMNASIUM (E) MEN REST (E) WOMEN REST (E) TICKETS (E) LOBBY MEDIA EQUIPMENT A206 BOYS STORAGE A205 (E) CONCESSIONS BOYS INTERIOR A207 BOYS REST A204 (E) DRY STORAGE BOYS LARGE LOCKER A203 (E) STORAGE BOYS NORTH VESTIBULE A201 BOYS SH A202 : PLUMBING FLOOR PLAN P-201

7 GIRLS COACH LOCKER A101 GIRLS COACH REST A102 GIRLS COACH SHOWER A104 GIRLS SOUTH VESTIBULE A103 GIRLS SMALL A105 GIRLS SOUTH A109 GIRLS NORTH A110 GIRLS COACH OFFICE A113 GIRLS LARGE LOCKER A108 GIRLS WORK A107 GIRLS INTERIOR A106 GIRLS REST A111 : PLUMBING ENLARGED FLOOR PLAN P-401

8 BOYS COACH REST A212 BOYS SOUTH VESTIBULE A213 BOYS COACH SHOWER A210 BOYS COACH LOCKER A211 A214 S SMALL LOCKER A208 BOYS STORAGE A205 BOYS REST A204 MEDIA EQUIPMENT A206 BOYS INTERIOR A207 A209 BOYS LARGE LOCKER A203 BOYS SHOWER A202 : PLUMBING ENLARGED FLOOR PLAN P-402