1 Page 1 of 6 ADCI Bulletin No. 01 Date: March 30, 2015 Renovation for New Apartment Units Address: 580 Walnut Street Cincinnati, OH Commission: Prepared For: Prepared By: PDT P266 Cincinnati Development I, LLC 301 Pennsylvania Parkway Suite 301 Indianapolis, IN David Breda PDT Architects, LLC TO ALL BIDDERS: This addendum supplements and amends the original Specifications and Drawings and shall be taken into account in preparing proposals and shall become a part of the Contract Documents. Bidders shall indicate receipt of the addendum in their bids. GENERAL Reason for Change Identifiers: OR= Owner Request; FC= Field Condition; AJ= Requirement of Local Authority CL= Clarification (No Scope Change) 1. All changes to the Drawings are clouded based on original revision release to Owner. 2. Major Items included in this Bulletin are: a. Revisions to address IBI Comments. Identified by AHJ Requirements 12/31/2014 b. Sheet M121 added Inadvertently omitted from Construction Set. c. Coordination between ID drawings and PDT drawings occurred for Public Spaces within Annex Area. 3. Bulletin also captures majority of RFI responses accepted by Owner from Oct 29, 2014 thru March 12, a. RFI s included in this Bulletin are: i. 61, 65, 80, 84, 91, 94, 95, 96, 97, 106, 107, 108, 110, 113, 114, 115, 118, 119, 124, 125, 136, 137, 138, 139, 141, 143, 144, 145, 146, 153, 155, 156, and 158 SPECIFICATIONS 1. No Specification Items. DRAWINGS 1. OR- PDT Bulletin #1- NEW SHEET M121- HVAC Level 2 Partial Piping Plan HAS BEEN ISSUED a. Sheet was intended to be issued with Construction Set. It was errantly omitted from that set. 2. OR- PDT Bulletin #1 Power for Equipment at Annex Roof Level has been modified to coordinate with reduced mechanical scope previously shown in Construction Set. a. Program change occurred prior to release of Construction Set. Electrical Coordination for this item was not included in Construction Set.

2 Page 2 of 6 b. See reissued Sheet E106A. 3. AJ- IBI Code Review Response- PDT Bulletin 2- AHJ Response. a. Electrical Sheets have been revised as part of the Code Review process. b. Items tagged with AHJ Response have been revised to conform to comments made by IBI during its initial review of the electrical drawings. c. The following sheets have been reissued to address IBI comments. i. E101A, E102B, E103B, E104B, E105B, E106B, E154, E155, E156, E157, E158, E159, E160, E161, E162, E163, E164, E166, E167, E168, E169, E600, E601A, E602, E603, E604, E605, E606, E607, E608, E609, E610, E611, E612, E613, E614, E615, E616, E617, E618, and E FC- RFI 036- Revise Interior Lighting Schedule per Shop Drawing Comments a. See Sheet ID CL- RFI 061: Some locations where floor slabs required concrete infill were identified at request of Owner. a. Coded Note Added to Clarify location of infill detail. b. See reissued Sheets A104, A105, and A OR- RFI 065 Demo Existing Corridor Doors in Annex. Replace with new. a. See Sheets A103, A104, A105, and A CL- RFI 080: Location of Details associated with 14 th Level exterior screen walls was not readily identified. a. Coded Note Added to plans to direct contractor to correct detail was added. b. See reissued Sheet A OR- RFI 084 Apt E-1 Layout a. See Sheets A111, A112, A113, A114, A115, A116, A117, A118, A160, A166 and A OR- RFI Revised Terrace screen a. See Sheets A104, A105, A111, A112, A113, A114, A115, A116, and A FC- RFI 094 Reconciliation of Existing Asbestos Walls a. See Sheets A111, A112, A113, A114, A115, A116, A117, A163, E154, and E OR- RFI 095 Apt #51 Master Bathroom Layout a. See Sheet A OR- RFI 096 Apt #41 Master Bathroom Layout a. See Sheet A OR- RFI 097 Apt W-1 Layout a. See Sheets A111, A112, A113, A114, A115, A116, A117, A163, A411, P110, P112A, P112B, P117A, P310A-1, P312A-1, P312B-1, P317A-1, M117, M157, and E OR- RFI 106- Scope of Sprinklers at Balconies Confirmed a. See Sheets A166, A203, A419, A OR- RFI 107- Scope of Fire Dampers in West Tower Clarified a. See Sheets M107 and M OR- RFI 108- Tower Dryer Vents Relocated to avoid Glazing a. See Sheets M107, M157, M OR-RFI 110- Added Condensate Pumps in lieu of Floor Drains to avoid Core Drilling a. See Sheet E102A, M CL-RFI 113- Scope of Wall Type K Clarified a. See Sheets A150, A156, A161, A OR- RFI 114- Floor Drains Revised in Annex to avoid further Core Drilling a. See Sheets M104, M105, P102A, P102B, P103A, P103B, P302A, P303A 20. OR- RFI 115- Public Restroom Scopes Coordinated between PDT and ID on Levels 2, 4, and 5 of Annex a. See Sheets A601, M104, P101, P102A, P102B, P103A, P104A, P104B, P105A, P105B, P301A, P302A, P303A, P303B, P304A, P304B, P305A, P305B, E104A, E105A, IDO-01, ID1-01, ID1-02, ID1-05, ID1-06, ID1-07, ID1-08, ID2-01, ID2-02, ID3-01, ID3-02, ID3-04, ID3-05, ID3-06, ID3-07, ID3-08, ID4-05, ID4-06, ID5-01, ID5-02, ID FC- RFI 118- Apt 24 layout revised to accommodate errant Core Drilling. a. See Sheet A170, A402, E159

3 Page 3 of AJ- RFI 119- Piping Associated with Clothes Dryer Sanitary Drains Adjusted to meet Code Requirements. a. See Sheets P102A, P103A, P104A, P105A, P302A, P303A, P304A, P305A 23. OR- RFI 124- Fry Reglets at Corridor Ceilings Deleted. a. See Sheets A404, A405, A411, A FC- RFI 125- Elevation of Parapet Revised to Maintain existing Electric Service. a. See Sheet A FC- RFI th Level Ceilings Modified to accommodate Existing Beams. a. See Sheets G001, A411, A412, 26. CL- RFI 137- Scope of Outlets at Bathrooms Clarified a. See Sheet A FC- RFI 138- Hotel OAL-2 Relocated a. See Sheets A531, M OR- RFI 139- Fitness OAL-2 Relocated a. See Sheet M OR- RFI 141- Door Schedule for Annex Public Areas Coordinated with rest of set a. See Sheets ID1-01, ID1-02, ID1-06, ID3-02, ID4-01, ID4-06, ID6-01, ID FC- RFI 143- Revise Ceilings in Amenity Spaces to Coordinate with Existing Piping a. See Sheets ID3-01, ID4-04, ID4-05, ID OR- RFI 144- Amenity Center Ductwork Coordinated with ID drawings a. See Sheet M OR- RFI 145- Annex Lighting Coordinated between ID and PDT a. See Sheets E104B, E105B, ID3-01, ID3-02, ID3-03, ID AJ- RFI 146- Typical Curtain Wall Detail Amended for Life Safety a. See Sheet A OR- RFI 153- UBD and Electrical Panels Relocated at Annex Unit 46 and 56. a. See Sheet E162, E OR- RFI 155- Missing D1 Laundry Rooms Lights Added. a. See Sheet E CL- RFI 156- Door swings revised at Apt 48 and 58 Bedrooms a. See Sheets A155, E162, E CL- RFI 158- Elevation Mark at Kitchen Ceiling Corrected at Apts 51 and 52. a. See Sheet A405 ATTACHMENTS- Sheets G001 DRAWING INDEX A103 A104 A105 A106 A111 A112 A113 A114 A115 A116 A117 A118 ANNEX LEVEL THREE PLAN ANNEX LEVEL FOUR PLAN ANNEX LEVEL FIVE PLAN ANNEX LEVEL PENTHOUSE PLAN OFFICE TOWER FLOOR 07 PLAN OFFICE TOWER FLOOR 08 PLAN OFFICE TOWER FLOOR 09 PLAN OFFICE TOWER FLOOR 10 PLAN OFFICE TOWER FLOOR 11 PLAN OFFICE TOWER FLOOR 12 PLAN OFFICE TOWER FLOOR 13 PLAN OFFICE TOWER FLOOR 14 PLAN

4 A150 A153 A155 A156 A160 A161 A163 A166 A170 A171 A203 A402 A404 A405 A411 A412 A418 A419 A520 A530 A531 A601 A740 ID0-01 ID1-01 ID1-02 ID1-05 ID1-06 ID1-07 ID1-08 ID2-01 ID2-02 ID3-01 ID3-02 ID3-03 ID3-04 ID3-05 ID3-06 ID3-07 ID3-08 ID4-01 ID4-04 ID4-05 ID4-06 ID5-01 ID5-02 ANNEX PLAZA LEVEL TYPICAL UNIT PLANS ANNEX LEVEL FOUR TYPICAL UNIT PLANS ANNEX LEVEL FOUR AND FIVE TYPICAL UNIT PLANS ANNEX LEVEL FIVE TYPICAL UNIT PLANS EAST TOWER TYPICAL UNIT PLANS EAST TOWER TYPICAL UNIT PLANS WEST TOWER TYPICAL UNIT PLANS MEZZANINE TYPICAL UNIT PLANS TYPE A UNIT PLANS TYPICAL TYPE A AND E UNIT PLANS OVERALL SOUTH ELEVATION ANNEX PLAZA LEVEL REFLECTED CEILING PLAN ANNEX LEVEL FOUR REFLECTED CEILING PLAN ANNEX LEVEL FIVE REFLECTED CEILING PLAN TYPICAL OFFICE TOWER LEVEL RCP RESIDENTIAL TOWER ENLGARGED RCP OFFICE LEVEL 14 REFLECTED CEILING PLAN OFFICE LEVEL 14 MEZZANINE REFLECTED CEILING PLAN EXTERIOR TOWER DETAILS EXTERIOR DETAILS INTERIOR DETAILS DOOR SCHEDULE TYPICAL TITLE SHEET PLAZA LEVEL FLOOR PLAN ANNEX LEVEL 3 FLOOR PLAN PLAZA LEVEL FINISH PLAN ANNEX LEVEL 3 FINISH PLAN ANNEX LEVEL 4 FINISH PLAN ANNEX LEVEL 5 FINISH PLAN PLAZA LEVEL POWER ANNEX LEVEL 3 POWER PLAZA LEVEL REFLECTED CEILING PLAN ANNEX LEVEL 3 REFLECTED CEILING PLAN ANNEX LEVEL 4 REFLECTED CEILING PLAN ANNEX LEVEL 5 REFLECTED CEILING PLAN PLAZA SWITCHING PLAN ANNEX LEVEL 3 SWITCHING PLAN ANNEX LEVEL 4 SWITCHING PLAN ANNEX LEVEL 5 SWITCHING PLAN ENLARGED PLANS ENLARGED PLANS Page 4 of 6

5 ID5-07 ID6-01 ID6-02 DETAILS SCHEDULE SCHEDULE Page 5 of 6 P101 PLUMBING ANNEX STREET LEVEL 01 P102A PLUMBING SANITARY ANNEX PLAZA LEVEL 02 P102B PLUMBING WATER ANNEX PLAZA LEVEL 02 P103A PLUMBING SANITARY ANNEX LEVEL 03 P103B PLUBMING WATER ANNEX LEVEL 03 P104A PLUMBING SANITARY ANNEX LEVEL 04 P104B PLUMBING WATER ANNEX LEVEL 04 P105A PLUMBING SANITARY ANNEX LEVEL 05 P105B PLUMBING WATER ANNEX LEVEL 05 P110 PLUMBING EAST AND WEST WING FLOOR 06 P112A PLUMBING SANITARY EAST AND WEST WING TOWER FLOOR 08, 10, & 12 P112B PLUMBING WATER EAST AND WEST WING TOWER FLOOR 08, 10, & 12 P117A PLUMBING SANITARY EAST AND WEST WING TOWER ABOVE CEILING FLOOR 13 P301A P302A P303A P303B P304A P304B P305A P305B PLUMBING SANITARY ANNEX STREET LEVEL 01 ISOMETRIC PLUMBING SANITARY ANNEX PLAZA LEVEL 02 ISOMETRIC PLUMBING SANITARY ANNEX LEVEL 3 ISOMETRIC PLUMBING WATER ANNEX LEVEL 3 ISOMETRIC PLUMBING SANITARY ANNEX LEVEL 4 ISOMETRIC PLUMBING WATER ANNEX LEVEL 4 ISOMETRIC PLUMBING SANITARY ANNEX LEVEL 5 ISOMETRIC PLUMBING WATER ANNEX LEVEL 5 ISOMETRIC P310A-1 PLUMBING SANITARY WEST TOWER ISOMETRIC LEVEL 06 P312A-1 PLUMBING SANITARY WEST TOWER ISOMETRIC LEVEL P312B-1 PLUMBING WATER EAST TOWER ISOMETRIC LEVEL P317A-1 PLUMBING SANITARY WEST TOWER ABOVE CLG ISO LEVEL 13 M102 M103 M104 M105 M107 M117 M121 M157 M203 M501 E101A E102A E102B E103B E104A E104B E105A E105B HVAC ANNEX PLAZA LEVEL DUCTWORK PLAN HVAC ANNEX LEVEL 3 DUCTWORK PLAN HVAC ANNEX LEVEL 4 DUCTWORK PLAN HVAC ANNEX LEVEL 5 DUCTWORK PLAN HVAC TOWER FLOORS 7-13 DUCTWORK PLAN HVAC TOWER FLOORS 7-13 PIPING PLAN HAVC LEVEL 2 PARTIAL PIPING PLAN HVAC WEST TOWER ENLARGED FLOOR PLANS HVAC PARTIAL PLANS HVAC EQUIPMENT SCHEDULES PARTIAL ANNEX STREET LEVEL EAST- ELECTRICAL PARITAL ANNEX PLAZA LEVEL EAST - ELECTRICAL PARTIAL ANNEX PLAZA LEVEL EAST- LIGHTING PARTIAL ANNEX LEVEL 3 EAST- LIGHTING PARTIAL ANNELS LEVEL 4 EAST - ELECTRICAL PARTIAL ANNEX LEVEL 4 EAST- LIGHTING PARTIAL ANNEX LEVEL 5 EAST -ELECTRICAL ANNEX LEVEL 5 EAST- LIGHTING

6 E106A E106B ANNEX ROOF LEVEL EAST- ELECTRICAL ANNEX ROOF LEVEL EAST- LIGHTING Page 6 of 6 E154 TOWER FLOOR 10 COMMON SPACES ELECTRICAL PLANS E155 EAST TOWER ENLARGED ELECTRIC TYPICAL UNIT PLANS E156 EAST TOWER ENLARGED ELECTRIC TYPICAL UNIT PLANS E157 WEST TOWER ENLARGED ELECTRIC TYPICAL UNIT PLANS E158 WEST TOWER ENLARGED ELECTRIC TYPICAL UNIT PLANS E159 ANNEX ENLARGED ELECTRIC PLANS LEVEL 2 E160 ANNEX ENLARGED ELECTRIC PLANS LEVEL 3 E161 ANNEX ENLARGED ELECTRIC PLANS LEVEL 4 E162 ANNEX ENLARGED ELECTRIC PLANS LEVEL 4 E163 ANNEX ENLARGED ELECTRIC PLANS LEVEL 5 E164 TOWER- FLOOR 14 COMMON AREA ELECTRICAL PLANS E166 ENLARGED PLANS PENTHOUSE/MEZZANINE WEST 14 TH FLOOR E167 ENLARGED PLANS PENTHOUSE/MEZZANINE WEST 14 TH FLOOR E168 ENLARGED PLANS PENTHOUSE/MEZZANINE EAST 14 TH FLOOR E169 ENLARGED PLANS PENTHOUSE/MEZZANINE EAST 14 TH FLOOR E600 RISER DIAGRAM E601A RISER DIAGRAM E602 RISER DIAGRAM E603 SCHEDULES ANNEX TENANTS E604 SCHEDULE EAST TOWER FLOOR 7 E605 SCHEDULE EAST TOWER FLOOR 8 E606 SCHEDULE EAST TOWER FLOOR 9 E607 SCHEDULE EAST TOWER FLOOR 10 E608 SCHEDULE EAST TOWER FLOOR 11 E609 SCHEDULE EAST TOWER FLOOR 12 E610 SCHEDULE EAST TOWER FLOOR 13 E611 SCHEDULE EAST TOWER FLOOR 14 E612 SCHEDULE WEST TOWER FLOOR 7 E613 SCHEDULE WEST TOWER FLOOR 8 E614 SCHEDULE WEST TOWER FLOOR 9 E615 SCHEDULE WEST TOWER FLOOR 10 E616 SCHEDULE WEST TOWER FLOOR 11 E617 SCHEDULE WEST TOWER FLOOR 12 E618 SCHEDULE WEST TOWER FLOOR 13 E619 SCHEDULE WEST TOWER FLOOR 14 END