1 SF Walls & Ceiling 1.67 SY Flooring SF Long Wall LF Ceil. Perimeter SF Floor LF Floor Perimeter SF Short Wall 1-5'0" X 4'0" Opens into 0 Goes to neither Floor/Ceiling 04/07/2008 Page: 2 Insured: OMEGA VILLAS CONDO ASSOC. (954) Property: 1713NW 72NDAVE PLANTATION, FL Claim Rep.: Bill Harbour@Citizens Estimator: JEFF CRAWLEY, GENERAL MANAGER Contractor: Company: Florida Executive Builders, LLC (954) N.W 18th Street Pompano Beach, FL Claim Number Policy Number Type of Loss Fire Deductible $ Date of Loss: Date Inspected: )ate Est. Completed: 04/ / / :39 PM Date Received: Date Entered: 04/03/ /03/ :04 AM Price List: Estimate: FLFL4B8B RestorationlServicelRemodel

2 Includes custom storage doors over kitchen area and the stage and soffit Seal & paint paneling SF Includes custom storage doors over kitchen area and the stage and soffit Clean patio door (sliding glass) -Large (per side) 6.00 EA Inside and out of each, includes frame and track as well. heavy cleaning. Clean window unit (per side) SF EA -- Heavy /07/2008 Page: 4 Subroom 3: Entry/Foyer LxWxH 7'0" x 3'3" X8'0" "@.....'... '_H"t <..'./,- ;>- IN SF Walls SF Walls & Ceiling 2.53 SY Flooring SF Long Wall LF Ceil. Perimeter SF Ceiling SF Floor 7.50 LF Floor Perimeter SF Short Wall '0" X 8'0" 6'0" X 6'8" Opens into 0 Opens into 0 Goes to Floor/Ceiling Goes to Floor Subroom 4: Kitchen Area LxWxH 11'4" x 3'3" x 8'0" SF Walls SF Walls & Ceiling 4.09 SY Flooring SF Long Wall LF Ceil. Perimeter SF Ceiling SF Floor LF Floor Perimeter SF Short Wall DESCRIPTION 1-11'4" X 8'0" Opens into 0 Goes to Floor/Ceiling 1-6'0" X 3'6" Opens into 0 Goes to neither Floor/Ceiling QNTY REMOVE REPLACE TOTAL R&R 5/8" drywall- hung, taped, ready for 1, SF 0.43 texture , Acoustic ceiling (popcorn) texture 1, SF , Mask per square foot for drywall or plaster 1, SF 0.24 work Mask wall - plastic, paper, tape (per LF) LF R&R Blown-in insulation - 12" depth - R30 1,337.45SF , Clean floor or roof joist system 1,337.45SF Seal floor or ceilingjoist sys. (white 1,337.45SF , pigmented shellac) R&R II2" drywall- hung, taped, heavy 1, SF , texture, ready for paint Apply odor counteractant - liquid spray 1,426.23SF SeaVprimethe walls - one coat (white 1,426.23SF pigmented shellac) Remove Glue down carpet - Commercial 1, SF grade 04/07/2008 Page: 3

3 CONTINUED -Clubhouse DESCRIPTION QNTY REMOVE REPLACE TOTAL Inside and out of each, includes frame and track as well. heavy cleaning. - for the window over the sink R&R Specialty aluminum window unit 8.00 EA For two crank awning windows to match existing. Special order. Additional charge for a retrofit window, EA 23 sf 3 LF JR&R Sill- cultured marble on 2" x 4" wall R&R Exterior door -metal -insulated / wood -High grade R&R Door hinges -High grade (set of 3) Panic hardware -rim series (bar and latch,,, no rods) Deadbolt - Heavy duty -Commercial R&R Door closer -Heavy duty - Commercial grade R&R Cabinetry -laminate units upper (wall) R&R Cabinetry -laminate lower (base) units R&R Backsplash - plastic laminate grade R&R Countertop - Flat laid plastic laminate R&R Sink -double Sink faucet - Kitchen LF LF SF 6.00 LF R&R Angle stop R&R Range hood Garbage disposer R&R Bypass (sliding) door set - lauanlmahogany 3.00 EA R&R Door opening (jamb & casing) "t060"wide -paint grade Paint door slab only -2 coats (per side) 4.00 EA Paint door/window trim & jamb -Large EA r" coats (per side) 04/07/2008 Page: ,

4 CONTINUED -Clubhouse DESCRIPTION QNTY REMOVE REPLACE TOTAL R&R Window blind -horizontal or vertical EA , Extra large R&R Window blind - horizontal or vertical Room Totals: Clubhouse 40, Room: Electrical DESCRIPTION QNTY REMOVE REPLACE TOTAL R&R Commercial electrical (SF of bid g) - Heavy load 1, SF Includes: Conduit, boxes, panels, switches/plugs, wire, power distribution, breakers, lighting fixtures, all materials needed to install an average load electrical/lighting system in a commercial structure and installation labor. Excludes: Alarm, smoke/fire detection, intercom/pa, phone/lan, or security systems. Includes: two ceiling fans with light fixtures, (10) 4 bulb 4' fluorescent lights in metal framing, (4) 4 bulb 2' fluorescent lights in metal framing, 3' track light with three attached light fixtures, a hanging billiard light fixture 4' long, 2 exit signs, two emergency flood lights. 1 light installed on wall by front door, connections running to pool, and a 10' track light with three hanging fixtures. All standard grade. R&R Phone, TV, or speaker outlet R&R Phone/low voltage outlet rough-in R&R Smoke detector - Premium grade 4.00 EA 4.00 EA 2.00 EA Room Totals: Electrical 24, /07/2008 Page: 6

5 Room: Heat, Vent, & Cool DESCRIPTION R&R Ductwork system - hot or cold air to 1599SF home QNTY REMOVE REPLACE 3, TOTAL 4, Includes: Trunk and branch lines, registers, return air covers, furnace plenum, return air duct, duct tape, and installation labor. Quality: Ductwork for a 1,200 to 1,599 SF residence. R&R Thermostat 2.00 EA HVAC Technician - per hour 16.00HR , To detach and then reset two air handlers. Includes cleaning of the air handler on the inside and outside. Room Totals: Heat, Vent, & Cool Room: Exterior "... FioQnH,/ /'>.,...- <,- -- DESCRIPTION QNTY Stucco repair around doors, windows, etc - 1st floor LF Clean with pressure/chemical spray 2,40 SF For pavers at pool area and entry way. Clean with pressure/chemical spray 2, SF For the fire damaged building only. Complete cleaning. Seal & paint stucco 2, SF For the fire damaged building only. Complete sealing and painting. REMOVE REPLACE TOTAL , , /07/2008 Page: 7

6 CONTINUED -Exterior DESCRIPTION QNTY REMOVE REPLACE TOTAL Clean with pressure/chemical spray 1,424.50SF For the wood covered patio and trim. Complete cleaning. Seal then paint the surface area twice (3 1, SF coats) For the wood covered patio and trim. Complete cleaning , Room Totals: Exterior 7, Room: General DESCRIPTION QNTY REMOVE REPLACE TOTAL General clean-up 4 HR , Dumpster load - Approx. 40 yards, 7-8 tons 2.00 EA , of debris Architectural/Drafting fees (Bid item) Taxes, insurance, pennits & fees (Bid item) Room Totals: General 2, Line Item Totals: 79, /07/2008 Page: 8

7 Grand Total Areas: 1, SF Walls 1, SF Floor SF Long Wall Floor Area Exterior Wall Area 1, SF Ceiling SY Flooring SF Short Wall Total Area Exterior Perimeter of Walls 2, SF Walls and Ceiling LF Floor Perimeter LF Ceil. Perimeter Interior Wall Area Surface Area Total Ridge Length Number of Squares Total Hip Length Total Perimeter Length 04/07/2008 Page: 9

8 Summary for Fire Line Item Total 79, Material Sales 6.000% x 22, Subtotal 81, , , , , Replacement Cost Value 93, NetClaim 93, \Q JEFF CRAWLEY, GENERAL MANAGER 04/07/2008 Page: 10

9 ----- Insured: OMEGA VILLAS CONDO ASSOC. (954) Property: 1713 NW 72ND AVE PLANTATION, FL Claim Rep.: Bill Estimator: JEFF CRAWLEY, GENERAL MANAGER Contractor: Company: Florida Executive Builders, LLC (954) N.W 18th Street Pompano Beach, FL Claim Number Policy Number Type of Loss Fire Deductible $ Date of Loss: Date Inspected: )ate Est. Completed: 04/01/ /03/ /07/200812:39 PM Date Received: Date Entered: 04/03/ /03/ :04 AM Price List: Estimate: FLFL4B8B RestorationlServicelRemodel,,-...

10 r '''WIll. l- -- 1m UUUUh.J I WtI ",-1 I Room: Clubhouse SF Walls 2, SF Walls & Ceiling SY Flooring LF Ceil. Perimeter Formula Sloped Ceiling 39'9" x 30'9" x 14'0" 1, SF Ceiling 1, SF Floor LF Floor Perimeter '0" X 6'8" 3'0" X 6'0" 3'0" X 6'8" Opens into E Opens into E Opens into E Goes to Floor Goes to neither Floor/Ceiling Goes to Floor )." 1.' ", ---.,/ >>. <, -l-./' -- Subroom 1: Closet LxWxH 5'10" x 3'0" x 9'0" SF Walls SF Walls & Ceiling 1.94 SY Flooring SF Long Wall LF Ceil. Perimeter SF Ceiling SF Floor LF Floor Perimeter SF Short Wall 1-5'10" X 6'8" Opens into 0 Goes to Floor. _#.> "'$ ,? Subroom 2: HVAC Closet LxWxH 5'0" x 3'0" X11'0" SF Walls SF Walls & Ceiling 1.67 SY Flooring SF Long Wall LF Ceil. Perimeter SF Ceiling SF Floor LF Floor Perimeter SF Short Wall 1-5'0" X 4'0" Opens into 0 Goes to neither Floor/Ceiling /07/2008 Page: 2

11 CONTINUED -Clubhouse DESCRIPTION QNTY REMOVE REPLACE TOTAL Glue down carpet- Commercial grade 1,250.51SF , R&R Vinyl tile SF , Clean concrete on the floor 1,314.40SF R&R Baseboard - 3 1/4" LF Paint baseboard- two coats LF Clean door (per side) 4.00 EA Inside and out. Clean door / window opening (per side) 2.00 EA Inside and out. Paint door slab only -2 coats (per side) 6.00 EA Inside and out. Paint door/windowtrim & jamb -2 coats 2.00 EA (per side) Inside and out. Paint door/windowtrim & jamb -Large EA coats (per side) Inside and out. Paint the walls -two coats 1,426.23SF , R&R Stud wall- 2" x 4" - 12" oc SF Includes stage and soffit area above stage R&R Sheathing-plywood - 5/8"-treated SF Includes custom storage doors over kitchen area and the stage and soffit R&R Board & batten style wall covering SF , Includes custom storage doors over kitchen area and the stage and soffit Seal & paint paneling SF Includes custom storage doors over kitchen area and the stage and soffit Clean patio door (sliding glass) - Large (per 6.00 EA side) Inside and out of each, includes frame and track as well. heavy cleaning. -- Clean window unit (per side) SF EA Heavy 04/07/2008 Page: 4