1 MS 360 SLIDING MALL FRONT INSTALLATION INSTRUCTION MANUAL

2 MS 360 SLIDING MALL FRONT INSTALLATION INSTRUCTION MANUAL 1

3 CONTENTS General Information Page 2 Assembly Drawing Page 3 Frame Assembly Page 4 5 Glass Installation Page 6 7 Parts List Page 7 GENERAL INFORMATION: The Vistawall MS 360 Mall Slider represents the latest in product development technology complemented by dealer on-the-job input and experience. Proper use of these systems will assure optimum results in erection and long term performance. Vistawall does not control the application nor selection of its product configurations, sealant or glazing materials and assumes no responsibility thereof. It is the responsibility of the owner, architect and installer to make these selections in strict compliance with applicable laws and building codes. PROTECTION AND STORAGE: Handle the material carefully. Do not drop from the truck. Stack with adequate separation so that the material will not rub together. Store material off the ground. Protect against the elements and other construction hazards by using a well ventilated covering. Remove material from package if it is wet or is located in a damp area. CHECK MATERIAL: Check all material upon arrival for quality and to assure against shipping damage. Any visible damage must be noted on the freight bill at the time of receipt. If a claim is required, then the receiving party must process a claim with the freight company. Completely check construction which will receive your materials against contract documents. Notify the general contractor by letter of any discrepancies before proceeding with the work. Failure to do so constitutes acceptance of work by other trades. Check shop drawings and installation instructions to become familiar with the project. The shop drawings take precedence and include specific details for the project. The installation instructions are of a general nature and cover the most common conditions. Due to varying job conditions, all sealants used should be approved by the sealant manufacturer to insure they will function for conditions shown on instructions and shop drawings. They must be compatible with all surfaces in which adhesion is required including other sealant surfaces. Use primers where directed by manufacturer of sealants. Be sure to properly store sealants at recommended temperatures and check sealant for remainder of shelf life before using. FIELD CONDITIONS: Not recommended for exterior use where door must be watertight. All materials to be installed plumb, level, and true. Aluminum to be placed in direct contact with the masonry or incompatible materials should be isolated with a heavy coat of zinc-chromate or bituminous paint. Coordinate protection of installed materials with general contractors and other trades. CLEANING MATERIALS: Cement, plaster, terrazzo, alkaline and acid based materials used to clean masonry are very harmful to finishes and should be removed with water and a mild soap immediately or permanent staining will occur. A spot test is recommended before any cleaning agent is used. MAINTENANCE: Keep tracks free of debris, including areas where panels stack. Wax tracks periodically using wax stick. Actual waxing schedule depends on door use factors, including traffic, season and climate, but once a week in high traffic areas should keep panels operating smoothly. 2

4 ASSEMBLY /4-20 X 3" PFHMS X 5/8 PPHSMS X SEMS /4-20 x 2-1/4" PFHMS (2) INSTALL (2) 5968 NEOPRENE BUMPERS AT INTERLOCK HEEL END OF EACH SLIDING PANEL 1/4-20 X 3" PFHMS (2) INTERMEDIATE HORIZONTAL (if required) shown with glazing beads /4-20 x 2-1/4" PFHMS (2) 5957 ANCHOR FIXED PANEL INTO TRACK Alumiline 3

5 FRAME ASSEMBLY NOTE: TRACK & HEAD MUST BE LEVEL AND JAMBS MUST BE PLUMB 1. ANCHOR STARTER TRACK USING FS 273, #10 X 1-1/2 PFHWS. SHIM LEVEL. 5963R #10 x 1-1/2" PFHWS 2. ADD TRACKS AS REQUIRED. ANCHOR USING FS 273 #10 X 1-1/2 PFHWS. SHIM LEVEL 5964R 3. IF SURFACE TRACK, INSTALL TRACK ADAPTERS USING FS 273 #10 X 1-1/2 PFHWS LOCATE AND ANCHOR HEAD TRACKS. PLUMB WITH SILL TRACKS. "V" GROOVE IN HEAD TRACK INSTALL TRACK 5961 LAST USING FS 269 #10 X 1-1/2 PRHWS. 5. INSTALL JAMB ADAPTER USING #10 X 2 PFHWS. CENTER ON HEAD AND SILL TRACKS. SHIM PLUMB. NOTE: LOCK JAMB HAS LOCKBOLT CUTOUT. JAMB ADAPTOR EXTENDS INTO HEAD TRACK 4

6 FRAME ASSEMBLY 6. JAMB INTERLOCK (IF REQUIRED) WALL WALL INSTALL FIXED PANEL OVER TRACK FIXED PANEL 8. INSTALL FIXED PANEL CLIP AT HEAD 5966 #10 x 1/2" PPHSMS 9. INSTALL SLIDING PANELS INSTALL LOCK PANEL LAST 5

7 GLASS INSTALLATION NOTE: GLASS CAN BE INSTALLED PRIOR TO INSTALLING PANELS OR AFTER PANELS ARE IN PLACE 10. FOLLOW STEPS 1 THROUGH 5 BELOW * NOTE: 1. Silicone type sealants are recommended due to their short curing time NEOPRENE SETTING BLOCKS 2 PER LITE (TYP.) * 6" STRIPS OF SILICONE GLAZING REQUIRED AT TOP AND BOTTOM RAILS TO PREVENT LATERAL MOVEMENT (TYP. ALL LITES) 1/4" GLASS 2. Sealants are not supplied by Vistawall. INTERMEDIATE HORIZONTAL 1. INSERT EXTERIOR VINYL 2.SET GLASS 3. INSTALL SILICONE Install silicone under glass only Do not overflow into bead interlock INSTALL INTERIOR NEOPRENE 4. INSTALL INTERIOR GLAZING BEAD

8 GLASS INSTALLATION 11. ADJUST ROLLERS ON SLIDING PANELS UP DOWN 12. INSTALL ANTI-LIFT BLOCKS AT MEETING RAILS 5967 #10 x 1/2" PPHSMS 13. INSTALL PANEL BUMPER STOP 5986 ONE PANEL BUMPER PER SLIDING PANEL CUSTOMER TO FIELD POSITION STOP AT DESIRED LOCATION PARTS LIST BOTTOM TRACK Starter Track R Add On Track R Bevel Trim Stainless Guide (installed) Aluminum Filler (installed) Screw #10 X 1-1/2 PFHWS TOP TRACK Starter Track Add On Track Screw #10 x 1-1/2 PRHWS JAMB Jamb Interlock Jamb Adapter Screw #10 x 2 FFHWS PANEL Head Rail Head Guide Bottom Rail Fixed Bottom Rail Jamb/Meeting Stile Interlock Jamb Muntin R Glazing Bead Neoprene Bumpers ACCESSORIES Panel Bumper Neoprene Panel Clip Anti-Lift Block Screw /4-20 x 2-1/4 PFHMS Screw /4-20 x 3 PFHMS Screw #10 x 1/2 PPHSMS 7

9 MS 360 INSTALLATION INSTRUCTIONS VISTAWALL HEADQUARTERS AND CENTRAL OPERATIONS P.O. Box 629/803 Airport Road Terrell, TX (972) W. Mockingbird Lane Dallas, TX (214) Garden Oaks Boulevard Houston, TX (713) Fairgrove Maryland Heights (St. Louis), MO (314) N. Greenbriar, #E Addison (Chicago), IL (630) Havana Street Unit B Denver, CO (303) NORTHEAST OPERATIONS 333 Strawberry Field Road, Ste. 3 Warwick, RI (401) SOUTHEAST OPERATIONS 214 Walt Sanders Memorial Boulevard Newnan, GA (770) A South Royal Atlanta Drive Tucker, GA (770) Elm Fair Blvd. Tampa, FL (813) WESTERN OPERATIONS 816 Kiernan Avenue Modesto, CA (209) Commerce Place Hayward, CA (510) B Street, NW #102 Auburn (Seattle), WA (206) Hyssop Drive Rancho Cucamonga, CA (909) Palace Drive Cincinnati, OH (513) Walden Lane Lanham (Washington, D.C.), MD (301) Englewood Dr, Suite L Middleburg Heights, (Cleveland), OH (216)