100 S Ashley Dr Suite 600 Tampa, FL Phone: Fax:

Size: px
Start display at page:

Download "100 S Ashley Dr Suite 600 Tampa, FL Phone: Fax:"

Transcription

1 9/21/ S Ashley Dr Suite 600 Tampa, FL Phone: Fax: Ben Roddey (813) N Woodward Ave #88120 Tallahassee, FL Print date: Jobsite Address: Price Breakdown Code Description Quantity Price Roofing Labor Roof patching includes materials 10 $ Drywall Labor Drywall repair ceiling and walls, fix water damage in living room walls includes materials. 100 $5, Resilent Floor Labor Finish Plumbing Labor Subfloor repair, VCT install, materials included 1400 $9, Tub repair, new sinks, toilets, materials included 1 $2, Finish HVAC Labor HVAC repair, frame repair, caulking of holes. 1 $ Demolition Labor Trash out and exterior clean up 1 $1, Landscaping Labor New mulch, railroad ties, weeding and landscaping clean up. 1 $1, Interior Doors Door repair of front entryway and replacement of two interior doors. Materials included. 3 $ Bathroom Cabinets Install new vanity and countertop. Materials included. 1 $ Interior Paint Labor Interior paint, includes materials $1, Exterior Painting Labor Exterior paint, includes materials $1, Appliance Interior New refrigerator, stove, microwave. 1 $1, Finish Electrical Labor New interior lighting kitchen, bedrooms and living room. Materials included. Rewire of broken areas. 10 $1, Windows and Doors Labor Finish Plumbing Labor Jalousie window repair. Includes materials 5 $ Plumbing repairs to kitchen and bathroom. Materials included. 5 $ Total Price: $28, Signature 1/2

2 9/21/ Print Name: Date: 2/2

3 100 S Ashley Dr Suite 600 Tampa, FL Phone: Fax: Print date: Daily Logs List I had bolts for toilet repaired it she's Happy stop leak /10

4 Sanded down ceiling added a little more mud caulking in each corners and cracks tomorrow we'll paint /10

5 Clean property and picked up palm fronds Someone painted over the drain I cleaned it out look how pretty it looks Clean Ac inside and out and repairs around the window and sealed around window just have to go back in a little bit to paint also before it was 69 now it's blowing /10

6 Helped Angel with Dry wall /10

7 Clean up new sheet metal and flashing on the roof silicone the screws Clean the gutters off and off the roof Cut trees and cleaned gutters and roof /10

8 4 Clean and made more room to walk clean the property Lane Bennett 4 Made mulch beds around the house Robert Turner 5 6/10

9 Mulch bed complete Clean the house is a few things in the house replace a lock put up a door paint the floor and repaired it and took out the plastic and tape out the windows % of the floor is done I just need the Edge I took down plastic from windows and pick up trash put lock on the door in the kitchen 7/10

10 RobertTurner 6 8/10

11 Pulled toilet. Installed flange and wax ring. New bolts reinstalled toilet and sealed in. New toilet seat. installed gas pipeline to oven. Cleaned bathroom and second bedroom. waxed floor. Assisted installing doors with Ishmael. Caulked in bathroom vanity.full house sweep and mop. Ready for wax. Home depot trip RobertTurner 4 Also cleaned whole home of trash preparing for tomorrow RobertTurner 2 Cleaned laundry room and installed blinds. 4 hours. Room was extremely dirty. installed tile repair in living room and painted trim 3 hours. scrubbed over spray off of tile in master bedroom. Every single tile on my hands and knees.2 hours. assisted Ishmael installing doors 2 hours. 9/10

12 Tom Hancock Finishing vct.trim and paint..need to clean floors install ac units IsmaelMartinez Vct.Blind drywall paint Weather Notes Hi: 66 Lo: /10