CSO / BSU NW2 NORTH RESIDENTIAL NEIGHBORHOOD PHASE #2 VOLUME 1 PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

Size: px
Start display at page:

Download "CSO / BSU NW2 NORTH RESIDENTIAL NEIGHBORHOOD PHASE #2 VOLUME 1 PROCUREMENT AND CONTRACTING DOCUMENTS GROUP"

Transcription

1 VOLUME 1 PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS Project Title Page Table of Contents List of Drawing Sheets Notice to Bid Instructions to Bidders AIA A Supplementary Instructions to Bidders BSU A (BID-LD) Existing Hazardous Material Information Geotechnical Data Bid Form Indiana Form 96 Revised Bid Form Supplements (BID-LD) Bid Security Form AIA A Representations and Certifications (BID-LD) MBE/WBE/Veteran Participation Plan Agreement Form - AIA A Owner Contractor Agreement Insurance and Bonds AIA A Exhibit A Building Information Modeling and Digital Data Exhibit AIA E Sustainable Projects Exhibit AIA E Project Digital Data Protocol Form AIA G Agreement Form Supplements BSU A (BID-LD) Bond Forms AIA A312 Performance Bond and Payment Bond Request for Substitution General Conditions - AIA A General Conditions of the Contract for Construction Escrow Agreement Bidding, Contract and Administration Documents and Forms (BID-LD) SPECIFICATIONS GROUP General Requirements Subgroup DIVISION 01 - GENERAL REQUIREMENTS Summary Price and Payment Procedures Alternates Substitution Procedures Contract Modification Procedures Project Management and Coordination Photographic Documentation Submittal Procedures Submittal Cover Sheet Quality Requirements References Mockups Temporary Facilities and Controls Temporary Tree and Plant Protection 01/10/2019 1

2 Temporary Indoor Air Quality Controls Product Requirements Execution and Closeout Requirements Construction Waste Management and Disposal Operation and Maintenance Data Project Record Documents Demonstration and Training Sustainable Design Requirements Commissioning Commissioning of Building Envelope Systems Mechanical/Electrical Current Facilities Requirements and Maintenance DIVISION 02 - EXISTING CONDITIONS Selective Site Utility Demolition Structure Demolition Selective Demolition DIVISION 03 - CONCRETE Concrete Formwork Concrete Reinforcement Cast-In-Place Concrete Concrete Surface Treatment Hydraulic Cement Underlayment DIVISION 04 - MASONRY Unit Masonry Anchored Stone Masonry Veneer Facility Construction Subgroup DIVISION 05 - METALS Structural Steel Steel Roof Deck Composite Steel Floor Deck Structural Cold-Formed Metal Bearing Wall Framing Metal Fabrications Metal Stairs Stainless Steel Pipe and Tube Railings Steel Pipe And Tube Railings Aluminum Pipe And Tube Railings Metal Gratings Decorative Metal Railings 01/10/2019 2

3 DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES Wood Blocking Sheathing Interior Architectural Woodwork Wood-veneer-faced architectural cabinets Plastic-laminate-faced architectural cabinets Flush Wood Paneling Solid Surface Shower Surround and Base Plastic Paneling 01/10/2019 3

4 VOLUME 2 DIVISION 07 - THERMAL AND MOISTURE PROTECTION Self-Adhering Sheet Waterproofing Thermoplastic Sheet Waterproofing Traffic Coatings Thermal Insulation Spray Foam Insulation Modified Bituminous Sheet Air Barriers Fluid-applied Membrane Air Barriers Formed Metal Wall Panels Metal Composite Material Wall Panels Aluminum Siding Polyvinyl-Chloride (PVC) Roofing Sheet Metal Flashing and Trim Roof Specialties Manufactured Roof Expansion Joints Roof Accessories Vegetated Roof Systems Applied Fireproofing Penetration Firestopping Fire-resistive Joint Systems Joint Sealants Expansion Control DIVISION 08 - OPENINGS Hollow Metal Doors and Frames Interior Aluminum Doors And Frames Flush Wood Doors Fiberglass Doors and Frames Access Doors and Frames Floor Drains Aluminum-framed Entrances and Storefronts Revolving Door Entrances Glazed Aluminum Curtain Walls Aluminum Windows Door Hardware Glazing Mirrors Decorative Plastic Glazing Glazing Film Fire-Resistant Glazing Fixed Louvers Interior Fixed Louvers 01/10/2019 4

5 DIVISION 09 - FINISHES Moisture Vapor Emission Control Gypsum Board Shaft Wall Assemblies Non-structural Metal Framing Gypsum Board Tiling Acoustical Panel Ceilings Wood Slat Ceilings Wood Flooring Resilient Base and Accessories Resilient Tile Flooring Luxury Vinyl Tile Flooring Resilient Athletic Flooring Sheet Carpeting Wall Coverings Digital Wall Coverings Fabric-Wrapped Panels Interior Painting Staining and Transparent Finishing High Performance Coatings Elastomeric Coatings Dry Erase Coating DIVISION 10 - SPECIALTIES Visual Display Surfaces Operable Panel Partitions Wall and Door Protection Toilet, Bath, and Laundry Accessories Fire Extinguishers and Cabinets Postal Specialties Electronic Package Depositories Closet Doors Exterior Sun Control Devices DIVISION 11 - EQUIPMENT Loading Dock Equipment Fall Protection Equipment DIVISION 12 - FURNISHINGS Roller Window Shades Manufactured Plastic-Laminate-Faced Casework Simulated Stone Countertops 01/10/2019 5

6 DIVISION 13 - SPECIAL CONSTRUCTION NOT APPLICABLE DIVISION 14 - CONVEYING EQUIPMENT Hydraulic Elevators Chain Hoist and Trolley Facility Services Subgroup DIVISION 21 - FIRE SUPPRESSION Basic Fire Protection Requirements Common Work Results for Fire Suppression Identification for Fire-Suppression Piping and Equipment Wet-Pipe Sprinkler Systems Electrical Drive Centrifugal Fire Pump Pressure Maintenance Pumps Controllers for Fire Pump Drivers DIVISION 22 - PLUMBING Basic Plumbing Requirements Basic Plumbing Materials and Methods Meters and Gages Valves Hangers and Supports for Plumbing Identification for Piping Plumbing Pipe Insulation Commissioning of Plumbing Systems Domestic Water Piping Domestic Water Piping Specialties Domestic Water Pumps Domestic Water Packaged Booster Pumps Sanitary Waste and Vent Piping Sanitary Waste and Piping Specialties Sanitary Sewerage Pumps Storm Drainage Piping Storm Drainage Piping Specialties Sump Pumps 01/10/2019 6

7 VOLUME 3 DIVISION 22 PLUMBING (CONT.) Domestic Water Softeners Remote Brine Make-Up & Delivery System Fuel-Fired, Domestic-Water Heaters Plumbing Fixtures Natural-Gas Piping DIVISION 23 - HEATING VENTILATING AND AIR CONDITIONING Basic Mechanical Requirements Basic Mechanical Materials and Methods Motors Variable Frequency Drives Pipe Expansion Fittings Meters and Gages Valves Hangers and Supports Testing, Adjusting, and Balancing Mechanical Insulation Commissioning of HVAC Systems HVAC Instrumentation and Controls Hydronic Piping Hydronic Pumps HVAC Water Treatment Metal Ducts Duct Accessories Fans and Ventilators Air Terminal Units Diffusers, Registers, and Grilles Breechings, Chimneys, and Stacks Hydronic Boilers Heat Exchangers Custom Air-Handling Units Radiant Heating Panels Fan Coil Units Finned-Tube Radiation Heaters Propeller Unit Heaters In-Room Terminal Equipment Snow Melt DIVISION 25 - INTEGRATED AUTOMATION NOT APPLICABLE 01/10/2019 7

8 DIVISION 26 - ELECTRICAL Common Work Results for Electrical Conductors and Cables Grounding and Bonding Hangers and Supports Raceways Boxes, Cabinets, and Enclosures Underground Ducts and Raceways Identification for Electrical Systems Short-Circuit Coordination Arc Flash Commissioning of Electrical Systems Lighting Control Devices Low-Voltage Transformers Switchboards Panelboards Wiring Devices Fuses Enclosed Switches Engine Generators Static Uninterruptible Power Supply Transfer Switches Surge Protection Devices Lighting DIVISION 27 - COMMUNICATIONS Common Work Results for Communications Pathways for Communications Systems Identification for Communications Systems Verification Testing of Structured Cabling Telecommunications Room Equipment Communications Copper Backbone Cabling Communications Fiber Optic Backbone Cabling Communications Copper Horizontal Cabling DIVISION 28 - ELECTRONIC SAFETY AND SECURITY Digital Addressable Fire Alarm System DIVISION 31 - EARTHWORK Site Clearing Earth Moving Dewatering Erosion Control Structural Soil Temporary Excavation Support Aggregate Piers Site and Infrastructure Subgroup 01/10/2019 8

9 DIVISION 32 - EXTERIOR IMPROVEMENTS Asphalt Paving Concrete Paving Decorative Concrete Paving Concrete Paving Joint Sealants Unit Paving Chain Link Fences and Gates Site Furnishings Soil Preparation DIVISION 33 - UTILITIES Laying and Jointing Buried Pipelines Water Distribution Sanitary Sewage Storm Drainage Subdrainage Sewer Flow Control DIVISION 34 WORK ASSOCIATED WITH PLULMBING DEMOLITION Plumbing Demolition DIVISION 35 WORK ASSOCIATED WITH HVAC DEMOLITION HVAC Demolition DIVISION 36 WORK ASSOCIATED WITH ELECTRICAL DEMOLITION Common Work Results for Electrical Electrical Demolition Low-Voltage Electrical Power Conductors and Cables Grounding and Bonding for Electrical Systems Hangers and Supports for Electrical Systems Raceways and Boxes for Electrical Systems Sleeves and Sleeve Seals For Electrical Raceways And Cabling identification for Electrical Systems Lighting Control Devices Panelboards Switches and Circuit Breakers END OF 01/10/2019 9