Décor Design Construction llc

Size: px
Start display at page:

Download "Décor Design Construction llc"

Transcription

1 Décor Design Construction llc Exhibit a Standard features Includes: excavating & regrading (extra dirt or not enough dirt is owners cost) blueprints sewer & water hookups 1. Foundation 8 x 20 concrete footers 8 block walls 12- course high waterproofing below grade basements only footer drains 24 high gravel backfill 4 concrete basement & garage floor 2. Framing 2 x 8 cca treated sliplates w/sillseal 8 steel beam on 3 steel posts 2 x 10 floor 16 o.c. ¾ osb t & g subfloor glued & nailed ext. & int. Walls 2 x 4 16 o.c. 1 st floor 9 standard ceiling 2 nd floor 8 standard ceiling house wrap on entire house and garage 7/16 osb ext. Wall sheating 1/2 osb roof sheating 30 year warranty on shingles over 15 year synthetic felt air vent & ridge vent, ice guard bottoms and valleys 3. Exterior finish aluminum ventilated soffit seamless aluminum spouting atrium vinyl clad tilt windows single hung (white) atrium vinyl patio insulated fiberglass entrance doors insulated steel overhead garage door ( chi ) model 2283 concrete drive & walks on city approved lots (only)

2 4. Insulation r 15 insulation in all exterior walls r-49 blown fiberglass in house ceiling with seal package 5. Interior walls & trim 5/8 textured drywall on garage walls & ceiling ½ drywall on house walls 5/8 ceilings painting on allowance 6 panel masonite doors 2-1/4 wood casing & windowsills or 3 mdf casing 3-1/2 wood baseboards or 5 ½ mdf baseboards closetmaid vinyl coated shelves & rods kitchen and bath cabinets per plan stained merillat 6. Plumbing abs schedule 40 waste lines pex plastic water lines 50 gallon gas _ water heater garage & basement floor drains 2 frost proof exterior hydrants washer box hookup & dryer vent stainless steel kitchen sink granite counter tops entry level throughout mansfield porcelain toilets comfort height aker fiberglass tubs & showers eva brushed nickel faucets by moen mirrors in all bathrooms, towel bars, and tp holder shower doors not included 7. Heating carrier 95% hi-efficiency gas forced air heating & air conditioning system 8. Electric 200 amp electric service range & dryer outlets outlets & switches per code lighting fixtures & fans on allowance recessed lights each installed on allowance Smoke detectors per code and co2 plus photo eye 1 telephone outlet 4 television outlets Recessed lighting included kitchen

3 9. Floor covering on allowance 10. Painting on allowance 2 colors per house per color after Grass and landscaping is not included list of allowances included in cost: light fixtures & fans. 2, floor coverings per house appliances. 2, It is the homeowners responsibility to have appliances installed. 12. Well & septic if needed off site projects that require well and septic will be based on the requirements of the county health department. Wells will have an allowance of 6, that will be paid to the homeowner. the builder is not responsible for the water or the (quality of water the well supplies.) utility suppliers knox gas columbia gas ohio edison medina sanitary national carpet for flooring set meeting with dave english lighting at medina lighting terry shepler at carter lumber for cabinets On final walk through there is a 6 foot rule that applies on paint blemish

4 Design choices and options Front elevations, grids, s/l, address Appliances: Stove Dryer gas/electric gas/electric items (yes/no) size/spec/color/etc. Price Basement-extra window Microwave Vaulted bedrooms Bump-out bay Shingles Exterior vinyl siding Shutters Outside brick or stone Fireplace deck Fireplace (gas direct vent) Front door Glass block Plumbing Air-conditioning 150 amp or 200 amp service Recessed cans Whirlpool Outside post light Wiring for ceiling fan Interior paint Oak/painted/woodwork Colonist/other/int. Doors Cabinets and vanities Wood edge color Cabinet knobs Inside spindles Outside spindles Posts Patio/deck Lighting allowance Flooring allowance Landscaping Lot upgrade

5 Credit& change request From: number: To: décor design construction llc 6880 millers pass spencer, oh date: job site:.. Credit&change request description: amount: presented by: total amount of this order accepted by: date accepted