Procedures for an Application For Building Permit (SFD/Cottage/Additions)

Size: px
Start display at page:

Download "Procedures for an Application For Building Permit (SFD/Cottage/Additions)"

Transcription

1 Updated October 23, 2014 Procedures for an Application For Building Permit (SFD/Cottage/Additions) The following items are required and form part of a complete application: 1. If you are doing any new construction or additions to an existing structure within the shoreline activity area, you will require a Development Permit; 2. A Township of Lake of Bays building permit application fully completed including Roll No.; 3. You will be required to submit the following plans: o Site plan showing all structures, proposed structures, wells, and septic system, with dimensions and setbacks; o Building plans (2 sets of each) including o Floor plans o Cross sections (including air barrier location and details) o Elevations o Truss plans o Engineered floor systems o Plumbing o Heating systems, duct work plans(including Heat loss calculations) o Electrical drawings o Any engineered documents o Samples of the above are available at the Township office or on our web page at under Building Department. 4. Ensure that the Schedule 1 Designer sheet is completed by each individual who has completed any of the above noted designs, ie) plumbing, heating, floor plans, etc. 5. Permit fees; 6. A completed septic calculation sheet, if applicable. The performance level of a septic system must be evaluated if one or more of the following are proposed; 1. Adding bedrooms, 2. Adding fixtures, or 3. Increasing floor area by 15% or greater. The daily design flow of the septic system must meet Division B of the Ontario Building Code. AND 7. Development charges, if applicable. *NEW* 8. Cottage Declaration signed by the property owner if applicable. 9. Completed Energy Efficiency Design Summary The Building Department can only accept and review complete applications and plans. The review is to ensure that they meet Ontario Building Codes, Municipal by-laws and other applicable law. If the project requires a septic approval, the building permit will not be issued until such approval is granted.

2 TOWNSHIP OF LAKE OF BAYS PERMIT APPLICATIONS WORK SHEET Project: Address: Date of Application: 2 nd 3 rd 4 th The following documents must be provided with your completed permit application. To ensure that the permit can be processed as efficiently as possible, the application will not be accepted if any documents are missing or incomplete. For further clarification, reference can be made to the Building Code Act. ALL FIELDS OF APPLICATION ARE FILLED IN YES or NO and REASON DESIGNER SHEET YES NO REASON HOUSE PLUMBING HVAC OTHER: Incomplete drawings create long delays in obtaining a building permit. Please ensure that all the drawings provide sufficient detail to allow the design to be assessed for compliance with the Building Code Act and Ontario Building Code. [BCA S. 1.1(2)] Drawings must be to scale and accurately dimensioned. Below is a checklist to help ensure that the drawings are complete. DESIGNER SHEET YES NO REASON Site plan to scale (2 copies) House drawings (2 copies) Plumbing drawings (2 copies) HVAC design and drawings (2 copies) Complete floor plans with all rooms labelled Foundation plans detailing all footings and foundations with reinforcing details. Cross section detailing all building elements, including details and location of air barrier. Framing plans for all floors and roof Engineered product layout and design Building elevation drawings Electrical information OTHER REQUIRED DOCUMENTS YES NO REASON Deed or survey Entrance permit Sewer/sewage permit (Permit # ) OHHWP (if new home) Zoning compliance Site plan control applies Compliance with other applicable law Fees Refer to attached Fee Schedule By-Law # Civic Address Fee (If required) $60 + HST District Development Fee (If required) Township Development Fee (If required) 10/23/2014

3 THE CORPORATION OF THE TOWNSHIP OF LAKE OF BAYS FEES & CHARGES BY-LAW SCHEDULE D TO BY-LAW NUMBER BUILDING DEPARTMENT PERMIT FEES Construction (new, addition, renovations, plumbing, heating etc.) Per Sq.Ft. Minimum Charge Building Permit $ The greater of $12/$1,000 of estimated construction value or per sq.ft. New or addition(s) less than 3000 sq. ft. in gross area as defined in OBC New or addition(s) larger than 3000 sq. ft. or log structure floor area as defined in OBC Group C Occupancies (single family dwellings) $1.50 $1.85 Internal renovations $0.65 Decks $0.50 Garages $0.75 Muskoka/ Screen Room $0.60 Bunkie s $1.10 Car port and storage buildings $0.50 Replacement or repair of foundation and roofs $ flat rate Shoreline Structures Floating or post dock $0.50 Crib Dock $0.50 Steel Dock $0.75 Boat port $0.60 Boathouse $0.85 Group C Occupancies (other than single family dwellings) $1.60 All other Occupancies, New or Addition and Renovation (i.e. commercial, industrial and institutional) An additional fee for each required inspection may be require for water access properties at the discretion of the Chief Building Official Foundation permit $1.60 Flat fee $25.00 $ above the normal fees Inspection fee for re-inspection $75.00 to $ Special inspection: fee to inspect buildings or structures where a request has been made for a final inspection or for an Occupancy/Use where the permit has been inactive for one year and/or the permit three years or older. $ Demolition of building or structure Part 3 buildings Part 9 buildings $ $ Outdoor swimming pools together with the required fencing $ Tents (over 645 square fee) and temporary structures such as greenhouses or other $ temporary special event structures Change of Use Permits (Non-Refundable) Part 9 of OBC Part 3 of OBC $ $ Transfer of Active Permit $ Completion Permit Double the above fees Min. $ Conditional Permit Double the above fees Min. $ Demo Permit for a dwelling or cottage which will remain until the replacement new structure is habitable. Signed agreement, letter of credit and a Remedy Unsafe permit Review fee for permits which are denied or submitted incomplete fee of $ Double the above fees Min. $ % of permit fee max of $1,000.00

4 Cont d ADMINISTRATION FEES Application for alternative design $ Review revised plans or application $50.00 per page or $ per page if required after an inspection Liquor license (2 inspections) and completion of form $ Building, septic and zoning information reports $ (for non property owners) Faxed reply requested $5.00 General Inquiry letter $50.00 Non compliance with the Building Code Act Administration fee, plus any funds spent by the $ municipality for it s investigation If other administrative action is required exceeding the initial fee, an additional hourly fee will $ be applied (per hour). Abatement for septic systems (per hour) $ SEPTIC SYSTEM PERMIT FEES New or Replacement Class 1 System NO CHARGE (Privy) Code Section 8.3 (no permit required) New of Replacement Class 2 System $ (Greywater System) Code Section 8.4 (2 inspections) New System Class 4 System (3 inspections) $ Existing System Repairs Class 4 System Tank Replacement (min. tank size 3600 L) 800 Gal (2 inspections) $ Bed Replacement (3 inspections) $ Extension of Bed (2 inspections) $ Lot Suitability $ New or Replacement Class 5 System Pre-Inspection per lot $50.00 Water and sewage connections $ CIVIC ADDRESSING SIGNAGE (subject to HST) New $60.00 Replacement sign $50.00 Replacement post $20.00 Note: All fees are at the discretion of the Chief Building Official.

5 COTTAGE DECLARATION Ontario Building Code SB-12 Article Compliance Options (2) The energy efficiency of a building or part of a building of residential occupancy that is within the scope of Part 9 of Division B in the Building Code and is intended for occupancy on a continuing basis during the winter months shall comply with: (a) Subsection (Prescriptive Compliance Packages) of Chapter 2, (b) Subsection (Performance Compliance) of Chapter 2, or (c) Subsection (Other Acceptable Compliance Methods) of Chapter 2. If this application is for a cottage or an addition to a cottage and it is not intended to be occupied on a continuous basis during the winter months it may be exempt from the requirements of SB-12 Energy Efficiency for Housing. The property owner is required to complete and sign the statement below for all cottages and additions to cottages for all applications that do not conform to SB-12. I, am the owner of property roll number 4427-, at (print name). I understand that the proposed cottage does not comply with the energy (civic address) efficiency requirements as set out in SB-12 of Ontario Building Code. I acknowledge that the proposed cottage or addition to a cottage is not intended to be occupied on a continuous basis during the winter months. I understand that the statement below will be on the Occupancy and Final inspection report. This dwelling is a cottage NOT intended to be occupied on a continuous basis during the winter months. Date Signature

6 Energy Efficiency Design Summary (Part 9 Residential) This form is used to summarize the energy efficiency design of the project. Information on completing this form is on the reverse. Application No: For use by Principal Authority Model/Certification Number A. Project Information Building Number, street name Unit number Lot/Con Municipality Postal Code Reg. Plan number/other description B. Compliance Option SB-12 Prescriptive [SB ] Table: Package: A B C D E F G H I J K L M (circle one) SB-12 Performance* [SB ] Energy Star * [SB ] *Attach energy performance calculations using an approved software *Attach BOP form. House must be labelled on completion by Energy Star EnerGuide 80 * *House must be evaluated by NRCan advisor and meet a rating of 80 C. Project Design Conditions Climatic Zone (SB-1): Heating Equipment Efficiency Space Heating Fuel Source Zone 1 (< 5000 degree days) 90% AFUE Gas Propane Solid Fuel Zone 2 ( 5000 degree days 78% < 90% AFUE Oil Electric Earth Energy Windows+Skylights+Glass Doors Other Building Conditions Gross Wall Area = m 2 % Windows + % ICF Basement Walkout Basement Log/Post&Beam Gross Window+ Area = m 2 ICF Above Grade Slab on Grade D. Building Specifications Building Component RSI / R values Building Component Efficiency Ratings Thermal Insulation Windows & Doors 1 Ceiling with Attic Space Ceiling without Attic Space Exposed Floor Windows/Sliding Glass Doors Skylights Mechanicals Walls Above Grade Space Heating Equip. 2 Basement Walls HRV Efficiency (%) Slab (all >600mm below grade) Slab (edge only 600mm below grade) Slab (all 600mm below grade, or heated) DHW Heater (EF) NOTES 1. Provide U-Value in W/m2.K, or ER rating 2. Provide AFUE or indicate if condensing type combined system used E. Performance Design Verification [complete applicable sections if SB-12 Performance, Energy Star or EnerGuide 80 options used] SB-12 Performance: The annual energy consumption using Subsection SB-12 Package is Gj (1 Gj = 1000Mj) The annual energy consumption of this house as designed is Gj The software used to simulate the annual energy use of the building is: The building is being designed using an air leakage of air changes per 50Pa. Energy Star: BOP form attached. The house will be labelled on completion by: Energy Star and EnerGuide80: Evaluator/Advisor/Rater Name: Evaluator/Advisor/Rater Licence #: F. Declaration [names of designers who are responsible for the building code design and whose plans accompany the permit application] I certify that I have reviewed the design documents submitted with the permit application, that the information contained on this form is consistent with the design documents, and that information used in any annual energy use calculations, if applicable, is a true representation of the design documents. Architectural Mechanical

7

8 Guide to the Energy Efficiency Design Summary Form The Energy Efficiency Design Summary form summarizes the compliance path used by a house designer to comply with energy efficiency requirements of the Ontario Building Code. This form is completed by the person responsible for the energy efficiency design of the project, and must be submitted with the building permit application. The information on this form MUST reflect the drawings and specifications being submitted, or the building permit will be refused. Refer to Supplementary Standard SB-12 for details about building code compliance requirements. Further information about energy efficiency requirements for new buildings is available from the provincial building code website at or the municipal building department. Beginning January 1, 2012, a house designer must use one of four energy efficiency compliance options in the building code: 1. Comply with the SB-12 Prescriptive design tables, 2. Use the SB-12 Performance compliance method, and model the design against the prescriptive standards, 3. Design to Energy Star standards, or 4. Evaluate the design according to EnerGuide technical procedures and achieve a rating of 80 or more. COMPLETING THE FORM B. Compliance Options Indicate the compliance option being used. SB-12 Prescriptive requires that the building conforms to a package of thermal insulation, window and mechanical system efficiency requirements set out in Subsection of SB-12. Energy efficiency design modeling and testing of the building is not required under this option. SB-12 Performance refers to the alternative method of compliance set out in Subsection of SB-12. Using this approach the designer must use recognized energy simulation software (HOT2000 V9.34c1.2 or newer), and submit documents which show that the annual energy use of the building is equal to a prescriptive package. Energy Star houses must be designed to Energy Star requirements and be labelled on completion by Enerquality or other agency. The Energy Star BOP form must be submitted with the permit documents. EnerGuide80 houses are validated by NRCan authorized energy advisors and must achieve a rating of 80 or more when evaluated in accordance with EnerGuide administrative and technical procedures. C. Project Design Conditions Climatic Zone: The number of degree days for Ontario cities is contained in Supplementary Standard SB-1 Windows, Skylights and Glass Doors: If the ratio of the total gross area of windows, sidelights, skylights and glass doors to the total gross area of walls is more than 17%, higher efficiency glazing is required. If the ratio is more than 22% the SB-12 Prescriptive option may not be used. The total area is the sum of all the structural rough openings. Some exceptions apply. Refer to of SB-12 for further details. Fuel Source and Heating Equipment Efficiency: The fuel source and efficiency of the proposed heating equipment must be specified in order to determine which SB-12 Prescriptive compliance package table applies. Other Building Conditions: These construction conditions affect SB-12 Prescriptive compliance requirements. D. Building Specifications Thermal Insulation: Indicate the RSI or R-value being proposed where they apply to the house design. Under the SB-12 Prescriptive option, RSI 3.52 wall insulation is permitted in certain conditions where other design elements meet higher standards. Refer to SB-12 for further details. E. Performance Design Summary This section is not required to be completed if the SB-12 Prescriptive option is being used. AIRTIGHTNESS REQUIREMENTS FOR NEW HOUSES All houses must comply with increased air barrier requirements in the building code. Notice of air barrier completion must be provided and an inspection conducted prior to it being covered. A blower door test to verify the air tightness of the house must be conducted during construction if the NRCan EnerGuide80 option is used, or if the SB-12 Performance or Energy Star options are used and an air tightness of less than Pa in the case of detached houses, or Pa in the case of attached houses is necessary to meet the required energy efficiency standard. ENERGY EFFICIENCY LABELING FOR NEW HOUSES Energy Star and EnerGuide issue labels for new homes constructed under their energy efficiency programs. The building code does not regulate new home labelling.

9 Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act. Application number: For use by Principal Authority Permit number (if different): Date received: Roll number: Application submitted to: Township Of Lake of Bays 1012 Dwight Beach Rd. Dwight ON. P0A 1H Fax Building Code Identification Number A. Project information Building number, street name Unit number Lot/con. Municipality Postal code Plan number/other description Project value est. $ Area of work (m 2 ) B. Purpose of Application New construction Proposed use of building Addition to an existing building Alteration/repair Demolition Conditional Permit Current use of building Description of proposed work C. Applicant Applicant is: Owner or Authorized agent of owner Last name First name Corporation or partnership Street address Unit number Lot/con. Municipality Postal code Province Telephone number Fax Cell number D. Owner (if different from applicant) Last name First name Corporation or partnership (if applicable) Street address Unit number Lot/con. Municipality Postal code Province Telephone number Fax Cell number Application for Permit to Construct or Demolish Effective January 1, 2014

10 E. Builder (optional) Last name First name Corporation or partnership (if applicable) Street address Unit number Lot/Con. Municipality Postal code Province Telephone number Fax Cell number F. Tarion Warranty Corporation (Ontario New Home Warranty Program) i. Is proposed construction for a new home as defined in the Ontario New Home Warranties Plan Act? If no, go to section G. Yes No ii. Is registration required under the Ontario New Home Warranties Plan Act? Yes No iii. If yes to (ii) provide registration number(s): G. Required Schedules i. Attach Schedule 1 for each individual who reviews and takes responsibility for design activities. ii. Attach Schedule 2 where application is to construct on-site, install or repair a sewage system. H. Completeness and compliance with applicable law i) This application meets all the requirements of clauses (5) (a) to (d) of Division C of the Building Code (the application is made in the correct form and by the owner or authorized agent, all applicable fields have been completed on the application and required schedules, and all required schedules are submitted). Payment has been made of all fess that are required, under the applicable by-law, resolution or regulation made under clause 7(1)(c) of the Building Code Act, 1992, ii) iii) iv) to be paid when the application is made. This application is accompanied by the plans and specifications prescribed by the applicable by-law, resolution or regulation made under clause 7(1)(b) of the Building Code Act, This application is accompanied by the information and documents prescribed by the applicable by-law, resolution or regulation made under clause 7(1)(b) of the Building Code Act, 1992 which enable the chief building official to determine whether the proposed building, construction or demolition will contravene any applicable law. The proposed building, construction or demolition will not contravene any applicable law. I. Declaration of applicant Yes Yes Yes Yes Yes No No No No No I declare that: (print name) 1. The information contained in this application, attached schedules, attached plans and specifications, and other attached documentation is true to the best of my knowledge. 2. If the owner is a corporation or partnership, I have the authority to bind the corporation or partnership. Date Signature of applicant Application for Permit to Construct or Demolish Effective January 1, 2014

11 Schedule 1: Designer Information Use one form for each individual who reviews and takes responsibility for design activities with respect to the project. A. Project Information Building number, street name Unit no. Lot/con. Municipality Postal code Plan number/ other description B. Individual who reviews and takes responsibility for design activities Name Firm Street address Unit no. Lot/con. Municipality Postal code Province Telephone number Fax number Cell number C. Design activities undertaken by individual identified in Section B. [Building Code Table of Division C] House Small Buildings Large Buildings Complex Buildings Description of designer s work HVAC House Building Services Detection, Lighting and Power Fire Protection Building Structural Plumbing House Plumbing All Buildings On-site Sewage Systems D. Declaration of Designer I declare that (choose one as appropriate): (print name) I review and take responsibility for the design work on behalf of a firm registered under subsection of Division C, of the Building Code. I am qualified, and the firm is registered, in the appropriate classes/categories. Individual BCIN: Firm BCIN: I review and take responsibility for the design and am qualified in the appropriate category as an other designer under subsection of Division C, of the Building Code. Individual BCIN: Basis for exemption from registration: The design work is exempt from the registration and qualification requirements of the Building Code. Basis for exemption from registration and qualification: I certify that: 1. The information contained in this schedule is true to the best of my knowledge. 2. I have submitted this application with the knowledge and consent of the firm. Date Signature of Designer NOTE: 1. For the purposes of this form, individual means the person referred to in Clause (1) d). of Division C, Article of Division C, and all other persons who are exempt from qualification under Subsections and of Divison C. 2. Schedule 1 is not required to be completed by a holder of a license, temporary license, or a certificate of practice, issued by the Ontario Association of Architects. Schedule 1 is also not required to be completed by a holder of a license to practise, a limited license to practise, or a certificate of authorization, issued by the Association of Professional Engineers of Ontario. Application for Permit to Construct or Demolish Effective January 1, 2014

12 Schedule 2: Sewage System Installer Information A. Project Information Building number, street name Unit number Lot/con. Municipality Postal code Plan number/ other description B. Sewage system installer Is the installer of the sewage system engaged in the business of constructing on-site, installing, repairing, servicing, cleaning or emptying sewage systems, in accordance with Building Code Article , Division C? Yes (Continue to Section C) No (Continue to Section E) Installer unknown at time of application (Continue to Section E) C. Registered installer information (where answer to B is Yes ) Name BCIN Street address Unit number Lot/con. Municipality Postal code Province Telephone number Fax Cell number D. Qualified supervisor information (where answer to section B is Yes ) Name of qualified supervisor(s) Building Code Identification Number (BCIN) E. Declaration of Applicant: I declare that: (print name) I am the applicant for the permit to construct the sewage system. If the installer is unknown at time of application, I shall submit a new Schedule 2 prior to construction when the installer is known; OR I am the holder of the permit to construct the sewage system, and am submitting a new Schedule 2, now that the installer is known. I certify that: 1. The information contained in this schedule is true to the best of my knowledge. 2. If the owner is a corporation or partnership, I have the authority to bind the corporation or partnership. Date Signature of applicant Application for Permit to Construct or Demolish Effective January 1, 2014

13 SEWAGE SYSTEM INSTALLATION PROPOSAL TOTAL # OF BEDROOMS : TOTAL FLOOR AREA : m² TOTAL PLUMBING FIXTURE UNITS: TOTAL DAILY DESIGN FLOW RATE (Expressed in Litres/day): Q = Calculations for proposal must be provided on a separate sheet TEST HOLE Sub-surface conditions encountered Rock & G.W.T. Depth (m) Soil Type T Time PROPOSE TO CONSTRUCT: CLASS 4 FILTER BED Dug Into Existing Soil Raised PROOF OF APPROVED FILTER MATERIAL MUST BE PROVIDED PRIOR TO FINALINSPECTION If Raised, How Far Above Existing Soils? m Contact Area m² CLASS 4 TRENCH BED Dug Into Existing Soil Raised If Raised, How Far Above Existing Soils? # Of Runs Of Tile Length of Runs m m Total length of Tile m CLASS 2 GREY-WATER PIT or CLASS 3 CESSPOOL Wall Structure -- Concrete Block Rock Other: Dimensions Of Pit: Length: Width: Height: Type Of Cover: Type Of Class 1 To Be Used Privy Composting Chemical Electrical Other: CLASS 5 - HOLDING TANK - PUMP OUT CONTRACT MUST BE PROVIDED (District Approval Required) Concrete Polyethylene Other: Size (L) Alarm Is Audio And Visual Describe Platform: IS A PUMP REQUIRED? Yes No Raw Sewage Effluent

14 SEWAGE SYSTEM CALCULATIONS (to be submitted with application)(see Chart on reverse) Q = Total Daily Design Sewage Flow in Litres T = Percolation Time of Soil SEPTIC TANK SIZE = Note: Working Capacity of Septic Tank Residential = Q x 2 = Litres Commercial = Q x 3 = Litres In no case shall the working capacity of septic tank be less than 3600 litres. ABSORPTION TRENCHES = L = Q x T 200 = x Length of Distribution Pipe (for systems with septic tank) 200 = Metres Note: The total length of distribution pipe shall be not less than 40 metres. Loading Rate Area (unsaturated suitable soil in area of bed and mantle) Loading Rate Area required = Q 6 = 6 = Sq. Metres FILTER BED = Size of filter required If Q is 3000 litres or less = Q = Sq. Metres If Q is more than 3000 litres = Q = Sq. Metres Base of Filter Medium - shall extend to a thickness of 250mm over the following area: AREA = Q x T 850 x _ 850 = Sq. Metres NOTE: T is the Percolation Time of the Native Soil upon which the filter material is placed. Loading Rate Area (unsaturated suitable soil in area of bed and mantle) Loading Rate Area Required = Q Loading Rate (based on T Time of native soil) = Sq. Metres NOTE: Suitable soil, existing or imported, in the loading rate area must have a T of 15 minutes or less, if imported material is used for the leaching bed or filter.

15 You Should Always Refer To The Ontario Building Code For Current Regulations TOTAL DAILY DESIGN FLOW RATES FOR RESIDENTIAL OCCUPANCY Q (Litres/Day) Example of how to determine daily design flow rate: Dwellings: a) 1 bedroom dwelling b) 2 bedroom dwelling c) 3 bedroom dwelling d) 4 bedroom dwelling e) 5 bedroom dwelling f) Additional flow for i) each bedroom over 5 ii) A) each 10m² (or part thereof) over 200m², up to 400m²(³) B) each 10m² (or part thereof) over 400m² up to 600m²(³)and C) each 10m² (or part of it) over 600m²(³), or iii) each fixture unit over 20 fixture units (³) Total finished area, excluding the area of the finished basement Using a 4 bedroom, 235m² home with 22 fixture units. From Chart on left: 4 bedroom home > 200m² or > 20 fixture units = 2,000 /day additional 35m² = 400 /day (additional 2 fixture units = 100 /day) Q (total daily design flow rate) = 2,400 litres/day If, as in the example above, there is a choice in arriving at the flow rate (e.g., fixture units vs. floor area) use the one calculation that provides the greatest daily flow rate value. APPROXIMATE SOIL PERCOLATION RATES T The following are estimated typical ranges of T times. Actual T times may vary significantly due to on-site soil conditions. Soil Type Clean Med - Course Sand Silty Gravely Sands Silty Sands Sandy Silts Sandy Silty Clays Silty Clays Clay T (min/cm) CLEARANCE DISTANCES FOR COMPONENTS OF SEWAGE SYSTEMS (metres) If the bed is raised, add 2 metres for every 1 metre of rise Wells (with 6 m casing) Wells (not 6 m casing) Springs Potable Springs Not Potable Surface Water (lake, river, etc.) Property Lines Dwellings Structures Class 4 Distribution Pipe Class 4 Septic Tank Class 5 Holding Tank Class 1 Privy Class 2 Grey-Water Pit

16 RESIDENTIAL PLUMBING WORKSHEET Description # Units per Fixture DWELLING #1 # of Fixtures Fixture Units DWELLING #2 # of Fixtures Fixture Units SLEEPING CABIN # of Fixtures Fixture Units OTHER # of Fixtures Fixture Units Bathroom Group 6 Toilet 4 Wash Basin (Lavatory) 1.5 Bathtub or Shower 1.5 Bidet 1 Kitchen Sink (single or double) 1.5 Bar Sink 1.5 Washing Machine Domestic 1.5 Other TOTAL FIXTURE UNITS FINISHED FLOOR AREA # OF BEDROOMS Table Loading Rates for Fill Based Absorption Trenches and Filter Beds Forming Part of Sentences (1) and (2) Percolation Time (T) of Soil (min/cm) Loading Rates (L/m 2 /day) 1 < T < < T < < T < 50 6 T < 50 4 Column 1 2

17 SAMPLE of a Tile Bed Cross Section 100mm Topsoil & Grass 300mm Porous Backfill 75mm Perforated Distribution Piping 1.2m (max) spacing 50mm Distribution Pipe 300mm Clear Stone Layer 150mm Approved Filter Sand 750mm Existing Medium Sand 900mm Water Table 50mm = 2 Backfill to Distribution Piping 75mm = 3 Perforated Distribution Piping 100mm = 4 Top Soil/Grass 150mm = 6 Clearance for Distribution Piping to Clear Stone 300mm = 1 Clear Stone 750mm = 2 6 Approved Filter Sand 900mm = 3 Clearance to Water Table 1.2m = 3.93 Maximum Typical Spacing for Distribution Piping

18

19

Procedures for an Application For Septic Permit

Procedures for an Application For Septic Permit Updated October 1, 2014 Procedures for an Application For Septic Permit The following items are required and form part of a complete application: 1. If you are doing any new construction or additions to

More information

APPLICATION FOR BUILDING PERMIT CHECKLIST

APPLICATION FOR BUILDING PERMIT CHECKLIST 2012 APPLICATION FOR BUILDING PERMIT CHECKLIST Checklist Must Be Completed and Submitted In Order To Process Application Yes No N/A Description Completed Permit Application for Construction or Demolition

More information

REQUIRED SEPTIC DRAWINGS

REQUIRED SEPTIC DRAWINGS REQUIRED SEPTIC DRAWINGS The following list of drawings should be used as a guide when preparing drawings for submission for a septic permit, for a project designed under (Part Eight) of the Ontario Building

More information

Township of Otonabee-South Monaghan

Township of Otonabee-South Monaghan Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act. Application number: For use by Principal Authority Permit number (if different):

More information

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992 The Municipality of West Elgin Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992 Application number: For use by Principal Authority

More information

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992 Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992 For use by Principal Authority Application number: Permit number (if different):

More information

Sewage System Installation Proposal

Sewage System Installation Proposal Sewage System Installation Proposal This sheet to be submitted with Sewage Permit Application. Provide to the Huntsville Building Department. Dwelling Details # of Bedrooms Floor Area m² Plumbing Fixture

More information

Procedure for an Application for an Garage, Gazebo, Sauna, Pump House, Shed

Procedure for an Application for an Garage, Gazebo, Sauna, Pump House, Shed Procedure for an Application for an Garage, Gazebo, Sauna, Pump House, Shed The following items are required and form part of a complete application: 1. If you are doing any new construction or additions

More information

Sewage System Permit Instructions

Sewage System Permit Instructions Municipality of Dysart et al Building Department 135 Maple Avenue, Box 389 Haliburton, Ontario, K0M 1S0 Tel.: (705) 457-1740 Fax: (705) 457-1964 Website: www.dysartetal.ca Sewage System Permit Instructions

More information

For use by Principal Authority. A. Project information Building number, street name Unit number Lot/con.

For use by Principal Authority. A. Project information Building number, street name Unit number Lot/con. MUNICIPALITY OF BROCKTON Application for a Septic System 100 Scott St, PO Box 68, WALKERTON, On NOG 2V0 This form is authorized under subsection 8(1.1) of the Building Code Act. Application number: For

More information

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992 Application number: Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992 For use by Principal Authority Permit number (if different):

More information

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992 Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992 Application number: For use by Principal Authority Permit number (if different):

More information

Permit Application Guide For a Dwelling, Cottage, Sleeping Cabin or Additions to Dwelling or Cottage

Permit Application Guide For a Dwelling, Cottage, Sleeping Cabin or Additions to Dwelling or Cottage Permit Application Guide For a Dwelling, Cottage, Sleeping Cabin or Additions to Dwelling or Cottage The following pages contain the permit application, as well as other forms that may be required for

More information

Permit Application Guide For a Dwelling, Cottage, Sleeping Cabin or Additions to Dwelling or Cottage

Permit Application Guide For a Dwelling, Cottage, Sleeping Cabin or Additions to Dwelling or Cottage Permit Application Guide For a Dwelling, Cottage, Sleeping Cabin or Additions to Dwelling or Cottage The following pages contain the permit application, as well as other forms that may be required for

More information

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act.

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act. Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act. For use by Principal Authority Application number: Permit number (if different):

More information

For use by Principal Authority. A. Project information Building number, street name Unit number Lot/con. Street address Unit number Lot/con.

For use by Principal Authority. A. Project information Building number, street name Unit number Lot/con. Street address Unit number Lot/con. Application number: Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act. For use by Principal Authority Permit number (if different):

More information

Instructions to Building Permit Applicants

Instructions to Building Permit Applicants Municipality of Dysart et al Instructions to Building Permit Applicants In order for the building department to continue to serve you in the most efficient manner the following strict guidelines must be

More information

Application for a Permit to Construct or Demolish This form is authorized under section 8(1.1) of the Building Code Act

Application for a Permit to Construct or Demolish This form is authorized under section 8(1.1) of the Building Code Act The Building Code Act stipulates that a permit can be issued only when the requirements of the Act, the Ontario Building Code, all other applicable laws and/or legal requirements have been met and all

More information

Township of Georgian Bluffs

Township of Georgian Bluffs Township of Georgian Bluffs This package contains: Septic Permit application Sewage System Specifications Site Plan and Cross Section Forms Office of the Chief Building Official Sewage System Permits These

More information

ACCESS RISERS & EFFLUENT FILTER

ACCESS RISERS & EFFLUENT FILTER Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act. For use by Principal Authority Application number: Permit number (if different):

More information

Application for a Sewage System Permit

Application for a Sewage System Permit Application for a Sewage System Permit Sewage System Inspectors can only provide comments based on completed applications and plans. Once a completed application has been received and reviewed, an inspector

More information

BUILDING DIVISION SEPTIC SYSTEM APPLICATION / INFORMATION PACKAGE. Septic System Info. 8 Schellburg Avenue 22 Albert Street, P.O.

BUILDING DIVISION SEPTIC SYSTEM APPLICATION / INFORMATION PACKAGE. Septic System Info. 8 Schellburg Avenue 22 Albert Street, P.O. Septic System Info Norfolk County Building Division BUILDING DIVISION SEPTIC SYSTEM APPLICATION / INFORMATION PACKAGE THIS APPLICATION CONTAINS THE FOLLOWING REQUIRED DOCUMENTS: Application for a permit

More information

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992 Application number: Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992 For use by Principal Authority Permit number (if different):

More information

Application for a Sewage System Permit

Application for a Sewage System Permit Application for a Sewage System Permit The following forms must be completed and returned with the appropriate fee. 1. Application for a Permit to Construct or Demolish; 2. Schedule 1: Designer Information;

More information

SEWAGE SYSTEM PERMIT APPLICATION INSTRUCTIONS FOR COMPLETION

SEWAGE SYSTEM PERMIT APPLICATION INSTRUCTIONS FOR COMPLETION SEWAGE SYSTEM PERMIT APPLICATION INSTRUCTIONS FOR COMPLETION Incomplete applications will not be processed. Accepted applications must include the following completed forms: o Provincial Forms: Application

More information

Procedure for an Application for a Sewage System Permit

Procedure for an Application for a Sewage System Permit Procedure for an Application for a Sewage System Permit The following guidelines summarize the minimum information and documentation required to obtain a septic permit in accordance with the BCA and Town

More information

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) ofthe Building Code Act, 7992

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) ofthe Building Code Act, 7992 Application number: Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) ofthe Building Code Act, 7992 For use by Principal Authority Permit number (if different):

More information

Procedure to Obtain a Sewage System Building Permit

Procedure to Obtain a Sewage System Building Permit Public Health & Emergency Services 410 Buller Street, Woodstock, Ontario N4S 4N2 Phone: 519-539-9800 Fax: 519-539-6206 www.oxfordcounty.ca/health Procedure to Obtain a Sewage System Building Permit 1.

More information

SEWAGE SYSTEM PERMIT GUIDELINES

SEWAGE SYSTEM PERMIT GUIDELINES Forms Applicable Law SEWAGE SYSTEM PERMIT GUIDELINES Description Required Submission Status Comments County of Simcoe If applicable Ministry of Transportation (MTO) If applicable Building Permit Application

More information

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992 Application number: Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act,1992 For use by Principal Authority Permit number (if different):

More information

Zoning- check the zoning on the property you are planning to build on, this can be done at the municipal office.

Zoning- check the zoning on the property you are planning to build on, this can be done at the municipal office. SINGLE DETACHED DWELLING Before your application can be deemed complete and ready for processing you will need the following: (Please hand in entire application package including this cover sheet) Zoning-

More information

Procedure for Uncovered Deck Dock, or Shoreline Storage Building:- Shed, Boathouse, Dryland Boathouse or Boatport

Procedure for Uncovered Deck Dock, or Shoreline Storage Building:- Shed, Boathouse, Dryland Boathouse or Boatport Procedure for Uncovered Deck Dock, or Shoreline Storage Building:- Shed, Boathouse, Dryland Boathouse or Boatport Note: A Maximum of two (2) Docks or one (1) Dock and one (1) Shoreline Storage Building

More information

Building Permit Guide & Application (House, Cottage, Additions to a House or Cottage & Sleeping Cabin)

Building Permit Guide & Application (House, Cottage, Additions to a House or Cottage & Sleeping Cabin) Building Permit Guide & Application (House, Cottage, Additions to a House or Cottage & Sleeping Cabin) The following pages contain the permit application, as well as other forms that may be required for

More information

Building number, street name Unit no. Postal code

Building number, street name Unit no. Postal code APPLICATION ON-SITE SEWAGE SYSTEM PERMIT NOTE: The applicant, designer and installer of the sewage system retain full responsibility for knowing the requirements of the Ontario Building Code and ensuring

More information

Building Permit Requirements Septic System

Building Permit Requirements Septic System Building Permit Requirements Septic System Building Permit Application The following information is required at submission. Incomplete applications cannot be accepted. 1. Completed building permit application

More information

BUILDING PERMIT GUIDELINES - RESIDENTIAL

BUILDING PERMIT GUIDELINES - RESIDENTIAL TOWN OF MIDLAND 575 Dominion Avenue Midland, ON L4R 1R2 Phone: 705-526-4275 Fax: 705-526-9971 building@midland.ca BUILDING PERMIT GUIDELINES - RESIDENTIAL Applicable Law Description Required Zoning Certificate

More information

Septic Permit Application

Septic Permit Application BUILDING SERVICES DEPARTMENT 789 Broadway Street, Box 3000 Wyoming, ON N0N 1T0 Tel.: 519 845-5420 Toll Free: 1-866-324-6912 Fax: 519 845-3817 www.lambtononline.ca Septic Permit Application a) This application

More information

TOWNSHIP OF DRUMMOND/NORTH ELMSLEY. Deck/Porch Guide & Permit

TOWNSHIP OF DRUMMOND/NORTH ELMSLEY. Deck/Porch Guide & Permit TOWNSHIP OF DRUMMOND/NORTH ELMSLEY Deck/Porch Guide & Permit New Dwelling Living Space Additions to Dwelling Living Space Summary of Building Permit Rates (calculations are based on outside dimensions)

More information

Septic Permit Application

Septic Permit Application Building Services Department 789 Broadway Street, Box 3000 Wyoming, ON N0N 1T0 Telephone: 519-845-5420 Toll-free: 1-866-324-6912 Fax: 519-845-3817 Septic Permit Application a) This application applies

More information

SEWAGE SYSTEM PERMIT APPLICATION INSTRUCTIONS FOR COMPLETION

SEWAGE SYSTEM PERMIT APPLICATION INSTRUCTIONS FOR COMPLETION SEWAGE SYSTEM PERMIT APPLICATION INSTRUCTIONS FOR COMPLETION Incomplete applications will not be processed. Accepted applications must include the following completed forms: o Provincial Forms: Application

More information

Application for a Permit to Construct or Demolish - SEPTIC

Application for a Permit to Construct or Demolish - SEPTIC Application for a Permit to Construct or Demolish - SEPTIC This form is authorized under subsection 8(1.1) of the Building Code Act, 1992 For use by Principal Authority Application number: Date received:

More information

BUILDING DEPARTMEN T

BUILDING DEPARTMEN T 271 Sandwich St. South Amherstburg, Ontario N9V 2A5 Website: www.amherstburg.ca Phone: 519-736-5408 Fax: 519-736-7111 GUIDE TO ACCESSORY STRUCTURES AND DECKS GARAGES SHEDS DECKS BUILDING DEPARTMEN T www.amherstburg.ca

More information

New Door and Window Openings - Building Permit Application Requirements

New Door and Window Openings - Building Permit Application Requirements New Door and Window Openings - Building Permit Application Requirements A building permit is required when installing a new door or window opening in an exterior wall (e.g. new side door) or when increasing

More information

Township Of Blandford-Blenheim Permit Guide

Township Of Blandford-Blenheim Permit Guide Township Of Blandford-Blenheim Permit Guide When do I require a building permit? Building Permits are required before any construction can begin. The following is a typical list of project that DO REQUIRE

More information

BUILDING PERMIT APPLICATION GUIDE FOR HOMEOWNERS

BUILDING PERMIT APPLICATION GUIDE FOR HOMEOWNERS BUILDING PERMIT APPLICATION GUIDE FOR HOMEOWNERS Introduction Application Form Schedule 1 Authorization Building Permit Fees Required Drawings Contact Information FAQs Building Department 613-632-0106,

More information

Zoning- check the zoning on the property you are planning to build on, this can be done at the municipal office.

Zoning- check the zoning on the property you are planning to build on, this can be done at the municipal office. SINGLE DETACHED DWELLING Before your application can be deemed complete and ready for processing you will need the following: (Please hand in entire application package including this cover sheet) Zoning-

More information

Building Department. For inspections and inquiries call (705) ext. 208

Building Department. For inspections and inquiries call (705) ext. 208 894 South Street, P.O. Box 92, Warsaw, Ontario K0L 3A0 Telephone: (705) 652 8392 Fax: (705) 652 5044 Toll Free: 1-800-899-8785 (705 Exchange only) E-mail: info@dourodummer.on.ca Website: www.dourodummer.on.ca

More information

APPLICATION FOR A CLASS 2, 3, 4, 5 SEWAGE SYSTEM PERMIT

APPLICATION FOR A CLASS 2, 3, 4, 5 SEWAGE SYSTEM PERMIT Mailing address: PO Box 1090, New Liskeard, ON P0J 1P0 705-647-4305 705-647-5779 Branch offices: 31 Station Road North, Kirkland Lake, ON P2N 3M6 705-567-9355 705-567-5476 81 63 Fifth Street, Englehart,

More information

Building Permit Requirements Production Residential Homes

Building Permit Requirements Production Residential Homes Building Permit Requirements Production Residential Homes Note: All condominium developments and all freehold townhouse projects located in an assumed subdivision are subject to Site Plan Approval prior

More information

The Corporation of the Township of Malahide

The Corporation of the Township of Malahide The Corporation of the Township of Malahide Additional information for permit: Demolish 87 John Street, South Construct Aylmer, ON N5H 2C3 Alter/Repair Ph: 519-773-5344 : 519-773-5334 Township of Malahide

More information

Porch Enclosure - Building Permit Application Requirements

Porch Enclosure - Building Permit Application Requirements Porch Enclosure - Building Permit Application Requirements The following information is required with all porch enclosure building permit applications: Designer Requirements All drawings submitted for

More information

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act.

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act. Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act. For use by Principal Authority Application number: Permit number (if different):

More information

TOWN OF AMHERSTBURG BUILDING DEPARTMENT 271 Sandwich Street S. Amherstburg ON N9V 2A5 Ph Fax

TOWN OF AMHERSTBURG BUILDING DEPARTMENT 271 Sandwich Street S. Amherstburg ON N9V 2A5 Ph Fax TOWN OF AMHERSTBURG BUILDING DEPARTMENT 271 Sandwich Street S. Amherstburg ON N9V 2A5 Ph. 519-736-5408 Fax 519-736-9859 www.amherstburg.ca BUILDING PERMIT GENERAL INFORMATION FOR ACCESSORY STRUCTURES (SHEDS,

More information

Permit Application Checklist Pursuant to Section G of an application to Construct or Demolish

Permit Application Checklist Pursuant to Section G of an application to Construct or Demolish Permit Application no.: Address: Permit Application Checklist Pursuant to Section G of an application to Construct or Demolish Inspector: All Permit applications must be accompanied by drawings and other

More information

Infrastructure and Development Department Building Division

Infrastructure and Development Department Building Division Infrastructure and Development Department Building Division PLEASE COMPLETE ALL SECTIONS OF THIS APPLICATION AND SCHEDULES 1 THROUGH 5 ATTACHED Application number: For use by Principal Authority The Corporation

More information

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act.

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act. Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act. For use by Principal Authority Application number: Permit number (if different):

More information

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012

2012 Ontario Building Code Requirements for New Construction. Bradford West Gwillimbury Building Division March 5, 2012 2012 Ontario Building Code Requirements for New Construction Bradford West Gwillimbury Building Division March 5, 2012 1 Ontario Building Code changes Applicable to permits applied for after December 31,

More information

Procedures for an Application for a Sewage System Permit

Procedures for an Application for a Sewage System Permit 7 Creswell Drive Trenton, Ontario K8V 5R6 www.quintewest.ca Tel: 613-392-2841 Toll Free: 1-866-485-2841 Fax: 613-392-7151 building@quintewest.ca Planning & Development Services Procedures for an Application

More information

BUILDING PERMIT APPLICATION GUIDE FOR INDUSTRIAL COMMERCIAL & INSTITUTIONAL PROJECTS

BUILDING PERMIT APPLICATION GUIDE FOR INDUSTRIAL COMMERCIAL & INSTITUTIONAL PROJECTS TOWN OF CARLETON PLACE 175 Bridge Street Carleton Place, ON K7C 2V8 Building Permit Application Kit BUILDING PERMIT APPLICATION GUIDE FOR INDUSTRIAL COMMERCIAL & INSTITUTIONAL PROJECTS This package is

More information

Building Permit Requirements Custom Built Homes

Building Permit Requirements Custom Built Homes Building Permit Requirements Custom Built Homes Pre-application Approvals Checklist Before finalizing the design ensure that the house you wish to build either meets the requirements of or is not affected

More information

Sudbury & District Health Unit

Sudbury & District Health Unit Sudbury & District Health Unit Environmental Health Division 1300 Paris Street Sudbury, ON P3E 3A3 Telephone: 705.522.9200 ext. 398 Fax: 705.677.9607 OBCEnquiries@sdhu.com INFORMATION PACKAGE FOR A SEWAGE

More information

SEWAGE PERMIT APPLICATION

SEWAGE PERMIT APPLICATION SEWAGE PERMIT APPLICATION PERMIT NUMBER: RECEIPT NUMBER: AMOUNT PAID: DATE: SECTION 1: OWNER - APPLICANT INFORMATION Registered Owner - Last Name First Name Corporation or partnership Mailing Address Email

More information

Procedures for an Application for a Sewage System Permit

Procedures for an Application for a Sewage System Permit Procedures for an Application for a Sewage System Permit This Package Contains: 1. Northumberland County Application for a Sewage System Permit 2. Ontario Building Code Application for a Permit to Construct

More information

Small Business Permit Service

Small Business Permit Service Small Business Permit Service Building Permit Requirements Change of Use (Under Section 10 of Building Code Act) NOTE TO APPLICANTS: Please check with the Zoning Plans Examiner of the Building Division

More information

Woodstoves, Fireplaces, Chimneys & Outdoor Solid Fuel Combustion Appliances

Woodstoves, Fireplaces, Chimneys & Outdoor Solid Fuel Combustion Appliances Woodstoves, Fireplaces, Chimneys & Outdoor Solid Fuel Combustion Appliances Building Permit Information Guide Municipal Office Box 70, 263 Main St. Odessa, Ontario K0H 2H0 Phone: 613-386-7351 www.loyalisttownship.ca

More information

Schedule 2A: Sewage System Information

Schedule 2A: Sewage System Information Schedule 2A: Sewage System Information A. Proposed sewage system System is for: Residential Use Commercial or Industrial or Agricultural Use The installation is: New Replacement Alteration/Repair B. Type

More information

Building Permit Requirements New Industrial, Commercial or Institutional Projects or High-Rise Residential Buildings

Building Permit Requirements New Industrial, Commercial or Institutional Projects or High-Rise Residential Buildings Building Permit Requirements New Industrial, Commercial or Institutional Projects or High-Rise Residential Buildings Building Permit Application The following is required at submission. Incomplete applications

More information

INCLUDED: LIST OF REQUIREMENTS

INCLUDED: LIST OF REQUIREMENTS CONCRETE PORCHES INCLUDED: LIST OF REQUIREMENTS SAMPLE DRAWINGS Planning & Development Services Tel. 905-683-4550 Fax. 905-686-0360 TOWN OF AJAX 65 Harwood Ave South Ajax ON L1S 2H9 www.ajax.ca Permit

More information

BY-LAW NUMBER xxx-xxxx A By-Law Respecting the Issuance of Various Permits and the Scheduling of Inspections

BY-LAW NUMBER xxx-xxxx A By-Law Respecting the Issuance of Various Permits and the Scheduling of Inspections BY-LAW NUMBER xxx-xxxx A By-Law Respecting the Issuance of Various Permits and the Scheduling of Inspections Index / Table of Contents PART 1 Definitions of Words and Phrases 1.1 Non-Defined Terms 1.2

More information

DEVELOPMENT REVIEW FORM: Demolish Construct Alter/Repair

DEVELOPMENT REVIEW FORM: Demolish Construct Alter/Repair The Building Code Act requires compliance to other applicable law and items identified under the Municipal Building By-law prior to issuance of a building permit. In order to determine compliance the City

More information

Supplementary Standard SB-12. Energy Efficiency For Housing

Supplementary Standard SB-12. Energy Efficiency For Housing OBC Excerpt: SB 12 Ministry of Municipal Affairs and Housing Building and Development Branch 2006 Building Code - Supplementary Standards Supplementary Standard SB-12 Energy Efficiency For Housing November

More information

Supplementary Standard SB-12. Energy Efficiency For Housing

Supplementary Standard SB-12. Energy Efficiency For Housing Ministry of Municipal Affairs and Housing Building and Development Branch 2006 Building Code - Supplementary Standards Supplementary Standard SB-12 Energy Efficiency For Housing January 1, 2012 update

More information

TITE CORPORATION OF THE TOWN OF LAKESHORE. Application for a Permit to Construct or Demolish

TITE CORPORATION OF THE TOWN OF LAKESHORE. Application for a Permit to Construct or Demolish Unit Application number: Permit number (if different): For use by Principal Authority This form is authorized under subsection 8(1.1) of the Building Code Act. Municipality (Name of municipality, upper-tier

More information

HOW TO OBTAIN A BUILDING PERMIT

HOW TO OBTAIN A BUILDING PERMIT HOW TO OBTAIN A BUILDING PERMIT A GUIDE TO THE HOMEOWNER Copies of this Guide can be obtained from the Building Department upon request THE CORPORATION OF THE TOWNSHIP OF GEORGIAN BAY BUILDING DEPARTMENT

More information

Municipality of Neebing

Municipality of Neebing Rosalie Evans, Solicitor-Clerk Erika Kromm, Treasurer/Deputy Clerk THE CORPORATION OF THE Municipality of Neebing 4766 Highway 61 Neebing, Ontario P7L 0B5 TELEPHONE (807) 474-5331 FAX (807) 474-5332 E

More information

GUIDELINES FOR SUBMISSION OF AN APPLICATION FOR A SEWAGE SYSTEM PERMIT

GUIDELINES FOR SUBMISSION OF AN APPLICATION FOR A SEWAGE SYSTEM PERMIT GREY BRUCE HEALTH UNIT Owen Sound (Head Office) 920 1st Ave. W. N4K 4K5 (519) 376-9420 (800)-263-3456 Durham P.O. Box 417 N0G 1R0 (519) 369-3318 (800) 394-6643 Southampton P.O. Box 213 N0H 2L0 (519) 797-2010

More information

Building Permit Requirements

Building Permit Requirements Building Permit Requirements Township of Havelock-Belmont-Methuen Prior to the issuance of a Building or Demolition Permit, one or more of the following may be required in addition to the application,

More information

SEWAGE SYSTEM PERMIT GUIDELINES

SEWAGE SYSTEM PERMIT GUIDELINES SEWAGE SYSTEM PERMIT GUIDELINES Description Required Submission Status Comments Applicable Law Conservation Authority Nottawasaga Valley Conservation Authority (NVCA) Lake Simcoe Conservation Authority

More information

Trailer Park Decks and Add on Rooms

Trailer Park Decks and Add on Rooms Trailer Park Decks and Add on Rooms The Township of Selwyn has put together this guide to help Trailer Park owners and tenants through the Building Permit Process. Trailer Park By-law Criteria: No person

More information

DECKS INCLUDED: LIST OF REQUIREMENTS DECK DESIGN MATRIX APPLICATION FORM SAMPLE DRAWINGS

DECKS INCLUDED: LIST OF REQUIREMENTS DECK DESIGN MATRIX APPLICATION FORM SAMPLE DRAWINGS DECKS INCLUDED: LIST OF REQUIREMENTS DECK DESIGN MATRIX APPLICATION FORM SAMPLE DRAWINGS This content is available in alternative formats upon request by contacting 905-683-4550 or emailing contactus@ajax.ca.

More information

CORPORATION OF THE CITY OF PEMBROKE BUILDING DEPARTMENT

CORPORATION OF THE CITY OF PEMBROKE BUILDING DEPARTMENT CORPORATION OF THE CITY OF PEMBROKE BUILDING DEPARTMENT 1 PEMBROKE STREET EAST PEMBROKE ON K8A 3J5 PHONE 613-735-6821 x1304 FAX 613-735-3660 www.pembroke.ca DECK GUIDELINES All decks require a building

More information

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act.

Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act. Application for a Permit to Construct or Demolish This form is authorized under subsection 8(1.1) of the Building Code Act. App~~ca~ion number: COI` USA' b~' ~~111C1~'?~~ AC~~~1~3~#~y Per~mi~ number cif

More information

Clarifying the Fenestration Energy Performance requirement in the Ontario Building Code Supplementary Standard SB12

Clarifying the Fenestration Energy Performance requirement in the Ontario Building Code Supplementary Standard SB12 Clarifying the Fenestration Energy Performance requirement in the Ontario Building Code Supplementary Standard SB12 February 2012 Legal Notice - Disclaimer and exclusion of liability This document is provided

More information

INTRODUCTION. A complete application will allow the building 10 business days for most single family dwelling projects).

INTRODUCTION. A complete application will allow the building 10 business days for most single family dwelling projects). Building Permit Application Guide for Homeowners INTRODUCTION Building and Plumbing permits are required to make sure construction is done to a safe level as prescribed by the Ontario Building Code Code.

More information

GUIDELINES FOR SUBMISSION OF AN APPLICATION FOR A SEWAGE SYSTEM PERMIT

GUIDELINES FOR SUBMISSION OF AN APPLICATION FOR A SEWAGE SYSTEM PERMIT Municipality of Northern Bruce Peninsula Building Department 56 Lindsay Rd 5 RR#2 Lion s Head, ON N0H 1W0 T: 519-793-3522 F: 519-793-3823 www.northbrucepeninsula.ca GUIDELINES FOR SUBMISSION OF AN APPLICATION

More information

A homeowners/applicants guide to understanding and making application for a building permit.

A homeowners/applicants guide to understanding and making application for a building permit. Building Standards Department Administration Centre 10 Wellington St. E. Alliston, ON L9R 1A1 Web Address: www.newtecumseth.ca Email: building@newtecumseth.ca Phone: 705-435-3900 or 905-729-0057 Fax: 705-435-1689

More information

GUIDE FOR APPLYING FOR A BUILDING PERMIT

GUIDE FOR APPLYING FOR A BUILDING PERMIT Township Of Perry/Township Of Armour Township of McMurrich/Monteith GUIDE FOR APPLYING FOR A BUILDING PERMIT These next few pages are designed to assist you in applying for a building permit. This guide

More information

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit: TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be

More information

Energy Conservation Amendments to the Ontario Building Code

Energy Conservation Amendments to the Ontario Building Code Ministry of Municipal Affairs and Housing Ministère des Affaires municipales et du Logement Energy Conservation Amendments to the Ontario Building Code OBOA 54 Annual Meeting & Training Sessions October

More information

Energy Efficiency For Housing

Energy Efficiency For Housing Ministry of Municipal Affairs and Housing Building and Development Branch MMAH Supplementary Standard SB-12 MMAH Supplementary Standard SB-12 Energy Efficiency For Housing 2016 update Draft for stakeholder

More information

SB-12, Chapter 3. Applicable to all building permit applications submitted after December 23, 2016

SB-12, Chapter 3. Applicable to all building permit applications submitted after December 23, 2016 Updated: July 7, 2016 Effective: January 1, 2017 Applicable to all building permit applications submitted after December 23, 2016 Building permit applications submitted before December 24, 2016 are regulated

More information

I/We propose to install enlarge replace a sewage system to serve a: proposed single family dwelling existing single family dwelling other premises.

I/We propose to install enlarge replace a sewage system to serve a: proposed single family dwelling existing single family dwelling other premises. CORPORATION OF THE CITY OF PEMBROKE BUILDING DEPARTMENT 1 PEMBROKE STREET EAST PEMBROKE ON K8A 3J5 PHONE 613-735-6821 x1304 FAX 613-735-3660 www.pembroke.ca mschultz@pembroke.ca APPLICATION FOR A SEWAGE

More information

Sewage System Inspection Requirements and Reporting Form Algonquin Provincial Park Cottage Lot Program

Sewage System Inspection Requirements and Reporting Form Algonquin Provincial Park Cottage Lot Program Sewage System Inspection Requirements and Reporting Form Algonquin Provincial Park Cottage Lot Program As outlined in section 4.3 of the Algonquin Provincial Park Cottage Lot Policy (2018-2038), all sewage

More information

Last Updated March 15, 2016

Last Updated March 15, 2016 CASS COUNTY, MISSOURI BUILDING CODES, ENVIRONMENTAL HEALTH AND ZONING DEPARTMENT 30508 S. West Outer Road, Harrisonville, MO 64701 P- (816) 380-8134 F- (816) 380-8130 Last Updated March 15, 2016 Information

More information

A Homeowner s Guide to Renovation and Addition Permits

A Homeowner s Guide to Renovation and Addition Permits A Homeowner s Guide to Renovation and Addition Permits What is a Building? The Building Code Act of Ontario defines a building as: 1. A structure occupying an area greater than 10 m2 (108 sq. ft.) consisting

More information

Sewage System Inspection Requirements and Reporting Form Rondeau Provincial Park Cottage Lot Program

Sewage System Inspection Requirements and Reporting Form Rondeau Provincial Park Cottage Lot Program Sewage System Inspection Requirements and Reporting Form Rondeau Provincial Park Cottage Lot Program Section 6 of the Lease Extension Agreement which extends each Rondeau cottage lot until December 31,

More information

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE I MUNICIPAL SITE PLAN & LOT GRADING REQUIREMENTS (SUBDIVISION LOTS) Revised: July 27, 2017 1. INTRODUCTION This guide is intended to advise

More information

THE CORPORATION OF THE UNITED TOWNSHIPS OF DYSART, DUDLEY, HARCOURT, GUILFORD, HARBURN, BRUTON, HAVELOCK, EYRE AND CLYDE BY-LAW NO.

THE CORPORATION OF THE UNITED TOWNSHIPS OF DYSART, DUDLEY, HARCOURT, GUILFORD, HARBURN, BRUTON, HAVELOCK, EYRE AND CLYDE BY-LAW NO. THE CORPORATION OF THE UNITED TOWNSHIPS OF DYSART, DUDLEY, HARCOURT, GUILFORD, HARBURN, BRUTON, HAVELOCK, EYRE AND CLYDE BY-LAW NO. 2014-30 BEING A BY-LAW RESPECTING CONSTRUCTION, DEMOLITION AND CHANGE

More information

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS

THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE PART I MUNICIPAL BUILDING REQUIREMENTS THE CORPORATION OF THE TOWNSHIP OF HAMILTON HOME BUILDER S GUIDE I MUNICIPAL SITE PLAN & LOT GRADING REQUIREMENTS (SUBDIVISION LOTS) Revised: November 18, 2014 1. INTRODUCTION This guide is intended to

More information

- A Notice - To all Building Permit Applicants choosing to commence Construction prior to the issuance of a Permit

- A Notice - To all Building Permit Applicants choosing to commence Construction prior to the issuance of a Permit The Corporation of the Township of Malahide 87 John Street, South Aylmer, ON N5H 2C3 Ph: 519-773-5344 Fax: 519-773-5334 - A Notice - To all Building Permit Applicants choosing to commence Construction

More information