1 NORTH SHORE CONNECTOR TUNNELS AND STATION SHELL LIGHT RAIL PROJECT PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV

2 North Shore Connector Alignment 7300 lf Extension to existing 25 mile system 18 Contracts $435 Million

3 Funding $ 435 Million 80% 17% 3%

4 Project Location Future- to Airport North Shore Connector Light Rail Expansion 004 New Gateway Station 003 EXISTING GATEWAY STATION Existing Light Rail System

5 Project Team Owner Port Authority of Allegheny County Construction Manager TriGold Jacobs Civil HDR Kwame

6 Project Team Design Engineer DMJM Contractor North Shore Constructors JV Obayashi Corp. Trumbull Corp.

7 What we are building Two Contracts Combined Contract Value - $156,500, Time NTP Oct 2, Tunnels 1243 days Feb 26, Station / C&C 870 days Feb 18, 2009

8 Four Major Structure Types Boat Section 340 lf SOE - Steel Soldier Piles and Wood Lagging g Cut and Cover 1200 lf SOE - Cement Deep Soil Mixing i Wall (CDSM) SOE Cement Bentonite Wall (CB) Top Down Construction - Station SOE - Slurry Wall Bored Tunnel 2240 lf SOE - Precast Concrete Segmental Lining i

9 Boat Section Soldier pile and lagging Excavation 0 to 35 feet Soldier Piles and Wood Lagging Above or at the water table Deep Wells Walls and Waterproofing EXISTING SOILS

10 Boat Section - SOE - Soldier Piles & Lagging Soldier Piles and Lagging

11 Cut & Cover SOE CDSM Walls 60 +/- BACKFILL CDSM Walls Cut off ground water ROCK

12 Cut & Cover / Launch Pit CDSM Walls

13 Cut & Cover / Launch Pit - CDSM WALLS In place soils mixed with Bentonite Slurry going down Insert Steel Soldier Piles Cement Slurry mixed going up

14 CDSM SOE Drill Rock Socket

15 CDSM WALLS Temporary Bridge

16 Excavation / Mud Slab / WP/ Base Slab ROCK

17 Structural Concrete Waterproofing ROCK

18 Structural Concrete Cut and Cover

19 Backfill BACKFILL ROCK

20 Bridge to hold the Bridge Support two Bents

21 Cut & Cover Instrumentation Instruments Stain gauges Weather Tilt Meters Motorized Total Station

22 Underpinning SR-65 Drilled Pier Drilled Pier

23 Underpinning SR-65 ROCK

24 Underpinning SR-65 Drilled Pier

25 Underpinning SR-65 ROCK

26 Underpinning SR-65 ROCK

27 North Side Station Shell

28 North Shore Station - Slurry Walls SEA PARKING GARAGE Concourse

29 North Shore Station - Slurry Walls

30 North Shore Station Slurry Walls DESANDING Pi Primary Excavate Slot Panel Secondary Panel Pi Primary Panel Pi Primary Panel

31 North Side Station Slurry walls Concrete Pi Primary Panel Secondary Tremie pipe Panel Rebar Pi Primary Panel Secondary Panel Pi Primary Panel

32 Slurry Walls - Rebar Cage

33 North Side Station Top Down ROCK

34 North Side Station Pour Roof Slab Roof Slab ROCK

35 Excavate to Concourse Backfill Roof Slab CONCOURSE ROCK

36 Excavate to Concourse CONCOURSE Soldier Backfill Piles installed by building Roof Slab contractor ROCK

37 Excavate to first row of struts Backfill Roof Slab CONCOURSE ROCK

38 Station Roof Slab Excavation 60 ft 40 ft

39 Excavate to Invert Pour Base Slab Backfill Roof Slab CONCOURSE SLAB ANCHORS ROCK

40 Station Ground Anchors Ground Anchors

41 Construct Platform & Deck Backfill Roof Slab CONCOURSE ROCK

42 TBM Launch Pit - SOE CDSM WALL

43 TBM Launch Pit - SOE Tie Backs

44 Launch Pit - SOE Tie Backs TIE BACKS TBM TIE BACKS ROCK

45 Ground Improvement - Jet Grouting

46 Launch Pit - Jet Grout Jet Grout column construction Drill Down Grout bottom up

47 Launch Pit Entrance Packing Soft Eye

48 TBM Move to Launch Pit

49 TBM Move to Launch Pit 150 feet fully assembled

50 Launch Pit TBM Launch JET JET GROUT GROUT 1 3 2

51 Launch Pit Structure Work JET GROUT

52 Stanwix St. Receiving Pit Location GATEWAY II HORNE BUILDING RECEIVING PIT

53 Ground Improvement - Jet Grout Receiving Pit 75% COVERAGE 100% 100% Coverage 6 Around Tunnel

54 Ground Improvement - Jet Grout 75% HORNE BLG. Minimize Angular Distortion due to ground loss

55 Jet Grouting Stanwix Street

56 Stanwix Street Receiving Pit CB Wall

57 Bored Tunnels Tunnel Boring Machine Launch Pit NORTH SHORE TBM Tunnels 2200 lf SOUTH SHORE Receiving Pit

58 Bored Tunnel Section PRECAST SEGMENT LINING Segment Lining 20 inside diameter CAST IN PLACE INVERT

59 TBM Tunnels Slurry Pressure Balance TBM (SPBTBM) Mixed Shield (Soft Ground and Rock) Working Pressure 3 bar

60 Mining Cycle Mine 4 & Grout Mine 4 GROUT MAINTAINED GROUT MAINTAINED BEHIND SHIELD

61 Mining Cycle Install 4 Segment Ring Build 4 Ring

62 Mining Cycle Ring Complete - Mine Mine 4 GROUT MAINTAINED GROUT MAINTAINED BEHIND SHIELD

63 Segment Grouting Segments Grout Nozzle Grout

64 TBM SLURRY MIX SHIELD 22-9

65 SPTBM Mixed Shield

66 Slurry TBM 22-9 dia (6.92 m) inch twin disk cutters 20 - Scrapers Bucket lips 3 - Wear detection devices rpm Left or Right

67 Cutting Tools After first tunnel Disk Cutters Scrappers Bucket Lips

68 Rock Crusher

69 TBM Assembly Man Locks 3 Bar (45 psi) Material Lock

70 Cutter Head Drive Motors hp Total hp Variable Frequency Drive (VFD) 480 v AC rpm (l or r) Main bearing 85ft 8.5

71 TBM Rear of Middle Shield 5 Cylinders 4 Steering Groups 6 Cylinders 7 Cylinders

72 TBM Rear of Middle Shield Propel Cylinders - 24 Piston Diameter mm Rod Diameter mm Max Stroke mm Advance force kn (4,296 tn)

73 TBM Operation Excavation Chamber Working Chamber Hydrostatic and Soil Pressure Slurry In Slurry Out

74 TBM Operation Plan SLURRY IN 455 hp PUMP SLURRY OUT 2 EA hp PUMPS

75 Slurry Separation Plant Plant Capacity 1000 m 3 /hr

76 Segment Erector Hydraulic telescopic arm type 6 ranges of movement Telescope Rotation ti Travel Independent Roll & Yaw Controlled by joy stick

77 Segment Erector Thrust rams retracted 4-6

78 Segment Installation BOLT Segment Erector

79 Key Segment Installation TBM Shield

80 Key Segment Installation MOVE OUT KEY SEGMENT MOVE FORWARD

81 TBM Mining Start North Side SOUTH SHORE NORTH SHORE Equitable Resources Building Soft Ground

82 Fluvioglacial Material Gravel 40% - 57% Sand 50% - 38% Fines 10% - 5% Cobbles - up to 2

83 TBM Mining - River Crossing SOUTH SHORE NORTH SHORE Equitable Resources Building Mixed Face

84 TBM North River Wall Alluvium Fluvioglacial Claystone Siltstone

85 TBM North River Wall - Grouting Alluvium Fluvioglacial Claystone Siltstone

86 River Crossing SOUTH SHORE NORTH SHORE Equitable Resources Building Rock

87 River Crossing 25 feet ALLEGHENY RIVER 22 feet RIVER SILTS (ALLUVIAL) ) Top of Rock FLUVIOGLACIAL 10 feet SILTY SHALE (5,400 11,800 psi) COAL CLAYSTONE (200-4, psi) SILTSTONE (3,400-11, psi)

88 River Crossing SOUTH SHORE NORTH SHORE Well Horne Blg. Equitable Resources Building Jet Grout Soft Ground Mixed Face

89 TBM Guidance System VMT Total Station Operator s Display 80 mm Target

90 Precast Segments Universal Ring Six pieces + Key 4 Long 20 ID Bolted Two tapers 2-3/8 & 1-5/8

91 Segment Rebar Cages

92 Seg Plant cycle 4 rings X 2/ day

93 Segment Finishing Line Rotate Segments curve up Repair Surfaces Add Gasket Add Joint Packing Stack in reverse order of installation

94 Secondary Steam Curing 5 day Secondary Cure 8000 psi

95 Multi Purpose Vehicle (MVP)

96 Multi Purpose Vehicle (MVP)

97 Heading Segment Unloading

98 Heading Segment Unloading

99 Segment Erection

100 Tunnel Infrastructure Temporary Lighting 50,000 CFM Ventilation 2-4 water 8 Discharge Walkway

101 First Tunnel to Receiving Pit - July 10, 2008 Soft eye Fiberglass piles

102 First Tunnel to Receiving Pit - July 10, 2008 Containment Wall

103 TBM U-Turn

104 TBM U-Turn- Rotate 180 deg

105 TBM U-Turn- Rotate 180 deg

106 TBM U-Turn- Rotate 180 deg

107 TBM U-Turn- Rotate 180 deg

108 Invert Clean Up

109 Invert Placement

110 Thank You Questions?

Bonner Bridge Replacement Update:

Bonner Bridge Replacement Update: Bonner Bridge Replacement Update: Jerry D. Jennings, PE - NCDOT Division 1 Engineer Pablo A. Hernandez, - NCDOT Resident Engineer September 18, 2017 Bonner Bridge Replacement Timeline Refresher Bonner

More information

Ø1.8m Double Shield TBM for Mixed Ground Sewer Tunnels in Cincinnati

Ø1.8m Double Shield TBM for Mixed Ground Sewer Tunnels in Cincinnati Ø1.8m Double Shield TBM for Mixed Ground Sewer Tunnels in Cincinnati Steve Lamb The Robbins Company, Solon, Ohio, USA Steve Abernathy Midwest Mole, Inc., Indianapolis, Indiana, USA ABSTRACT: A Robbins

More information

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.

Pipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo. Pipe Jacking/Microtunnelling Dr. Mark Knight Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo 1 New Installations New Installations Non-Steering Methods Steering Methods

More information

Pushing the Envelope For 100 Years

Pushing the Envelope For 100 Years Pushing the Envelope For 100 Years Tunneling under the Chesapeake Bay The Parallel Thimble Shoal Highway Tunnel Presented by: Kevin Abt, PE Chesepeake Bay Bridge and Tunnel District Mike Kling, PE, PTOE

More information

2008 Underground Construction Technology International Conference & Exhibition, Cobb County Galleria Center, Atlanta, GA - January

2008 Underground Construction Technology International Conference & Exhibition, Cobb County Galleria Center, Atlanta, GA - January Program: Title: Author: 2008 Underground Construction Technology International Conference & Exhibition, Cobb County Galleria Center, Atlanta, GA - January 29-31. Successful Technology for Utility Installations

More information

BREAKTHROUGH AND BURIAL OF TBMS ON THE BRISBANE AIRPORT LINK PROJECT

BREAKTHROUGH AND BURIAL OF TBMS ON THE BRISBANE AIRPORT LINK PROJECT BREAKTHROUGH AND BURIAL OF TBMS ON THE BRISBANE AIRPORT LINK PROJECT Russell Connors 1 ABSTRACT The Airport Link Project (APL) was constructed in the Northern Suburbs of Brisbane and connects the Central

More information

King County Uses Trenchless Methods to Construct a Large Siphon Under Seattle s Ship Canal

King County Uses Trenchless Methods to Construct a Large Siphon Under Seattle s Ship Canal North American Society for Trenchless Technology (NASTT) NASTT s 2013 No-Dig Show Sacramento, California March 3-7, 2013 TA-T1-03 King County Uses Trenchless Methods to Construct a Large Siphon Under Seattle

More information

DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS

DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS Implenia Spezialtiefbau GmbH Robert Bosch Straße 25 D-63225 Langen Phone: +49 6103 988 345 Fax: +49 6103 988 277 Email: info.spezialtiefbau@implenia.com

More information

7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by

7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by Construction Technology B (CON4313) Self Assessment Questions: Chapter 1 Prestressed Concrete 1. How does the prestressing of steel tendons in prestressed concrete offer a higher loading capacity than

More information

Presented by: Frank Guyamier

Presented by: Frank Guyamier FTBA Orlando Tuesday, March 20, 2012 Presented by: Frank Guyamier Project Engineer P3 PROJECT PARTNERS Public Sponsors 90% Equity Partner Design/Build Contractor 10% Equity Partner VMS Operator Federal

More information

Alaska Way Viaduct Replacement Project

Alaska Way Viaduct Replacement Project Alaska Way Viaduct Replacement Project Presented by Gregory Hauser, PE Former VP Underground Operations Retired Jan. 8, 2018 Currently Senior Technical Advisor for JCK Underground, Inc. The Existing Alaska

More information

Construction Technology B (CON4313)

Construction Technology B (CON4313) 3 - Basement 1 Quick Revision 1.1 Problems arising from basement construction a. Excavation method. b. Surface and ground water control c. Lateral stability of basement excavation. d. Stability of adjoining

More information

Civil Engineering Construction I (CBE5031)

Civil Engineering Construction I (CBE5031) Civil Engineering Construction I (CBE5031) Basement 1 1 Quick Revision 1.1 Problems arising from basement construction a) Excavation method. b) Surface and ground water control c) Lateral stability of

More information

COMMUNITY BOARD EIGHT

COMMUNITY BOARD EIGHT SECOND AVENUE SUBWAY PROJECT COMMUNITY BOARD EIGHT PROJECT UPDATE SEPTEMBER 26, 2011 Scope: SECOND AVENUE SUBWAY - PHASE 1 Tunnels from 92 nd St to 63 rd St Stations at 96 th St, 86 th St, 72 nd St and

More information

Principles for Tunnel Design

Principles for Tunnel Design 20th to 21st April 2017 Kuala Lumpur Tunnel Design Philosophy Bored Tunnel, Segmental Lining Design 20th to 21st April 2017 Kuala Lumpur Disclaimer a) The speakers are presenting their own personal views

More information

Underpinning. Underpinning

Underpinning. Underpinning is the installation of temporary or permanent support to an existing foundation to provide either additional depth or an increase in bearing capacity. There are several existing conditions which may lead

More information

Design and Implementation of the South Hartford CSO Tunnel

Design and Implementation of the South Hartford CSO Tunnel Design and Implementation of the South Hartford CSO Tunnel Brian Canterbury, P.E., AECOM James Sullivan, P.E., AECOM Andrew Perham, The Metropolitan District The Metropolitan District NEWEA January 22,

More information

UNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION

UNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION UNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION Effective September 9, 2014 The General Trade Knowledge portion of the examination is administered daily in Computer

More information

Bi-Directional Static Load Testing of Driven Piles

Bi-Directional Static Load Testing of Driven Piles Bi-Directional Static Load Testing of Driven Piles Paul J. Bullock, PhD Fugro Consultants Inc. Loadtest Bi-Directional Osterberg Cell Testing Specialized jack in pile uses bearing to mobilize side shear

More information

Hudson River Tunnels, Mega Projects, and Risk A Designer s Perspective

Hudson River Tunnels, Mega Projects, and Risk A Designer s Perspective Purdue Geotechnical Society Workshop Digging Deep April 8, 2011 Hudson River Tunnels, Mega Projects, and Risk A Designer s Perspective David Chapman, P.E. Lachel & Associates, Inc. Morristown, NJ Hudson

More information

BRADSHAW CONSTRUCTION CORPORATION

BRADSHAW CONSTRUCTION CORPORATION BRADSHAW CONSTRUCTION CORPORATION TUNNELING SPECIALISTS From a Contractor s Perspective Bradshaw s Experience 54 years as a tunneling contractor 26 years as a microtunneling contractor 25 years using conventional

More information

Diaphragm wall Construction

Diaphragm wall Construction Diaphragm wall Construction Diaphragm wall is a continuous wall constructed in ground in to facilitate certain construction activities, such as: a) As a retaining wall b) As a cut-off provision to support

More information

HIGH PERFORMANCE TUNNEL BORING MACHINE FOR QUEENS WATER TUNNEL, NO. 3: A DESIGN AND CASE HISTORY

HIGH PERFORMANCE TUNNEL BORING MACHINE FOR QUEENS WATER TUNNEL, NO. 3: A DESIGN AND CASE HISTORY Chapter 11 HIGH PERFORMANCE TUNNEL BORING MACHINE FOR QUEENS WATER TUNNEL, NO. 3: A DESIGN AND CASE HISTORY Brian B. Khalighi and Joseph J. Diehl Atlas Copco Robbins Inc. and Grow Tunneling Corp. ABSTRACT

More information

ESTABLISHING A SOLID FOUNDATION FOR NEW BRIDGE CONSTRUCTION REPLACEMENT OF BRIDGE OVER THE SOUTH CANADIAN RIVER NEAR PURCELL, OKLAHOMA

ESTABLISHING A SOLID FOUNDATION FOR NEW BRIDGE CONSTRUCTION REPLACEMENT OF BRIDGE OVER THE SOUTH CANADIAN RIVER NEAR PURCELL, OKLAHOMA ESTABLISHING A SOLID FOUNDATION FOR NEW BRIDGE CONSTRUCTION REPLACEMENT OF BRIDGE 412.1 OVER THE SOUTH CANADIAN RIVER NEAR PURCELL, OKLAHOMA BURLINGTON NORTHERN AND SANTA FE RAILWAY By: John W. Hronek

More information

Presentation Outline

Presentation Outline St. John s Tunnel Rehabilitation A Demonstration of Successful Fast- Track Design and Construction Christopher P. Russell, P.E. Shannon & Wilson Inc., Staff Engineer Gregory R. Fischer, Ph.D., P.E. Shannon

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update September 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: September

More information

6 Preliminary Assessment of Construction Method and Constructability Issues

6 Preliminary Assessment of Construction Method and Constructability Issues 6 Preliminary Assessment of Construction Method and Constructability Issues 6.1 Construction Approach Appendix C includes conceptual designs of the alternatives discussed below. Generally, the conceptual

More information

Design Data 4. Jacking Concrete Pipe

Design Data 4. Jacking Concrete Pipe Design Data 4 Jacking Concrete Pipe FOREWORD Jacking or tunneling concrete pipe is an increasingly important construction method for installing concrete pipelines without interrupting commerce, or disturbing

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update July 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The entails the construction of a cast in place

More information

SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE

SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE Keith Donington, P.E. October 2012 1 Sibley Pond - Bridge Elevation 2 Bridge Open to Traffic November 2011 3 Bridge Highlights

More information

Stabilization of Running Granular Soils in TBM Alignment with Sodium Silicate Grout

Stabilization of Running Granular Soils in TBM Alignment with Sodium Silicate Grout Stabilization of Running Granular Soils in TBM Alignment with Sodium Silicate Grout Brendan P. Harkins 1, E.I.T.; Dominic M. Parmantier 2, M. ASCE, P.E. 1 Project Engineer, Condon-Johnson & Associates,

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2014

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update March 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: March 1, 2014

More information

MICROTUNNELING SYSTEMS DRIVEN FOR CUSTOMER SUCCESS

MICROTUNNELING SYSTEMS DRIVEN FOR CUSTOMER SUCCESS MICROTUNNELING SYSTEMS DRIVEN FOR CUSTOMER SUCCESS OUR EQUIPMENT SYSTEMS Since inception, Akkerman has grown with the evolution of industry demands. We offer pipe jacking, microtunneling, guided boring

More information

PIPE JACKING & TUNNELING SYSTEMS DRIVEN FOR CUSTOMER SUCCESS

PIPE JACKING & TUNNELING SYSTEMS DRIVEN FOR CUSTOMER SUCCESS PIPE JACKING & TUNNELING SYSTEMS 6(721 6(*'( 35$+6 '1$ 6558% //$ (920(5 DRIVEN FOR CUSTOMER SUCCESS OUR EQUIPMENT SYSTEMS Since inception, Akkerman has grown with the evolution of industry demands. We

More information

Experts in tunneling with Tunnel Boring Machines

Experts in tunneling with Tunnel Boring Machines www.eurohinca.com www.terratest.es Experts in tunneling with Tunnel Boring Machines info@eurohinca.com EUROHINCA Europea de Hincas Teledirigidas, S.A., EUROHINCA, was incorporated in 1996 for the execution

More information

USE OF MICROTUNNELING TO INSTALL PIPES IN AN ENVIRONMENTALLY SENSISTIVE AREA. Miranda Roman D. *, LaFaso Edward

USE OF MICROTUNNELING TO INSTALL PIPES IN AN ENVIRONMENTALLY SENSISTIVE AREA. Miranda Roman D. *, LaFaso Edward USE OF MICROTUNNELING TO INSTALL PIPES IN AN ENVIRONMENTALLY SENSISTIVE AREA Miranda Roman D. *, LaFaso Edward Iseki, Inc. 7518 Carroll Road, San Diego, Calif. 92121-2402 USA This paper will discuss the

More information

Construction of a Semi-Buried Building A Super-sized Shopping Mall : The Festival Walk

Construction of a Semi-Buried Building A Super-sized Shopping Mall : The Festival Walk Construction of a Semi-Buried Building A Super-sized Shopping Mall : The Festival Walk Presented by Raymond Wong Wai Man, Division of Building Science & Technology, City University of Hong Kong Raymond

More information

D7: TUNNEL CONSTRUCTION AND METHODOLOGY

D7: TUNNEL CONSTRUCTION AND METHODOLOGY HIGH SPEED TWO INFORMATION PAPER D7: TUNNEL CONSTRUCTION AND METHODOLOGY This paper outlines the proposed tunnelling methodology. It will be of particular interest to those potentially affected by the

More information

SECTION PRECAST CONCRETE SEGMENTAL TUNNEL LINING

SECTION PRECAST CONCRETE SEGMENTAL TUNNEL LINING SECTION 31 74 16 PRECAST CONCRETE SEGMENTAL TUNNEL LINING PART 1 - GENERAL 1.1 DESCRIPTION A. The Work specified in this Section consists of the requirements for manufacturing, installing, erecting and

More information

Misan University - College of Engineering Civil Engineering Department

Misan University - College of Engineering Civil Engineering Department CHAPTER 2 Soil and Excavations Soil investigation including two phases: surface investigation and subsurface investigation Surface investigation involves making a preliminary judgment about the site s

More information

2013 ASCE Agenda. Microtunneling in Difficult Ground Craig Camp. Microtunneling Characteristics (NASTT) Akkerman MTBM Introduced 1995

2013 ASCE Agenda. Microtunneling in Difficult Ground Craig Camp. Microtunneling Characteristics (NASTT) Akkerman MTBM Introduced 1995 2013 ASCE Agenda Introduction Difficult Ground Microtunneling in Difficult Ground Craig Camp July 31, 2013 Microtunneling Characteristics (NASTT) Earth pressure balancing Hydrostatic pressure balancing

More information

FOUNDATIONS. Foundations Copyright G G Schierle, 2006 Press Esc to end, for next, for previous slide 1

FOUNDATIONS. Foundations Copyright G G Schierle, 2006 Press Esc to end, for next, for previous slide 1 FOUNDATIONS Foundations Copyright G G Schierle, 2006 Press Esc to end, for next, for previous slide 1 Liquefaction reduced the soil strength under these apartment buildings in Niigata (Japan) 1964. Liquefaction

More information

ALMEDA TUNNEL PAST, PRESENT AND FUTURE

ALMEDA TUNNEL PAST, PRESENT AND FUTURE ALMEDA TUNNEL PAST, PRESENT AND FUTURE Ravi Kaleyatodi, P.E., CPM Senior Assistant Director, City of Houston Ravi.kaleyatodi@cityofhouston.net Paul C. Wallick, P.E., Senior Project Manager Patricia Frayre,

More information

ITEM NN17 - DRILLED SHAFTS ITEM NN17 - DRILLED SHAFTS (LOW OVERHEAD CLEARANCE) ITEM TRIAL SHAFTS

ITEM NN17 - DRILLED SHAFTS ITEM NN17 - DRILLED SHAFTS (LOW OVERHEAD CLEARANCE) ITEM TRIAL SHAFTS DESCRIPTION A. General. This work shall consist of furnishing the materials and installing drilled shafts at the locations, dimensions, and batters shown on the contract plans or where ordered by the Engineer

More information

4.5 GEOTECHNICAL, SUBSURFACE, AND SEISMIC HAZARDS

4.5 GEOTECHNICAL, SUBSURFACE, AND SEISMIC HAZARDS 4.5 GEOTECHNICAL, SUBSURFACE, AND SEISMIC HAZARDS This section discusses the geology, soils, seismicity, hazardous materials, and subsurface obstructions along Flower Street, and evaluates their potential

More information

Trenchless Technology

Trenchless Technology TRENCHLESS TECHNOLOGY Gene Woodbridge Earth Boring Co. Limited www.earthboring.ca Earth Boring Co. Limited 1576 Ifield Road Mississauga, ON L5H 3W1 (905) 277-9632 fax (905) 274-9040 Trenchless Technology

More information

Installation Manual. Bigfoot Systems Inc. EM

Installation Manual. Bigfoot Systems Inc.  EM Installation Manual Bigfoot Systems Inc. www.bigfootsystems.com EM info@bigfootsystems.com 6750 Highway 3, Martin s Point RR #2, Mahone Bay, Nova Scotia Canada B0J 2E0 TF 1-800-934-0393 PH (902) 627-1600

More information

Presented By: Brenden Tippets, Project Executive

Presented By: Brenden Tippets, Project Executive Presented By: Brenden Tippets, Project Executive Owner City of Aurora Engineer MWH Global, Inc., HDR Engineering, CH2M Hill Engineering Contractor BTrenchless / Reynolds Tierdael (GC) SUBS Kelley Dewatering,

More information

Ching Guan Kee ABSTRACT

Ching Guan Kee ABSTRACT Japanese Geotechnical Society Special Publication The 15th Asian Regional Conference on Soil Mechanics and Geotechnical Engineering Effects of base grouting and deep cement mixing on deep foundation bored

More information

Service Automation. Making the way

Service Automation. Making the way Industrial Hydraulics Electric Drives and Controls Linear Motion and Assembly Technologies Pneumatics Service Automation Mobile Hydraulics profile Drive & Control Niles-Simmons Engineering on the cutting

More information

MUD ROTARY TECHNIQUES. MUD Rotary Drilling Method 12/11/2017. Roger E. Renner, MGWC MUD ROTARY DRILLING. Rotary Well Rig

MUD ROTARY TECHNIQUES. MUD Rotary Drilling Method 12/11/2017. Roger E. Renner, MGWC MUD ROTARY DRILLING. Rotary Well Rig Roger E. Renner, MGWC MUD ROTARY TECHNIQUES Presenter: Roger E. Renner Master Groundwater Contractor President of E.H. RENNER & SONS, INC. Past President of NGWA 2001 Past President of Minnesota Water

More information

TBM Selection and Specification

TBM Selection and Specification By Bradford F. Townsend and Paul E. Jenkins Date: 13 June 2009 TBM Selection - Challenges to be met TBM Technology Auxiliary Measures and Backup New Developments Summary of Selection Process Procurements

More information

ITEM 416 DRILLED SHAFT FOUNDATIONS Materials. All materials shall conform to the requirements of the pertinent items as follows:

ITEM 416 DRILLED SHAFT FOUNDATIONS Materials. All materials shall conform to the requirements of the pertinent items as follows: ITEM 416 DRILLED SHAFT FOUNDATIONS 416.1. Description. This Item shall govern for the construction of foundations consisting of reinforced concrete drilled shafts and/or nonreinforced concrete drilled

More information

Advanced Construction Techniques. Underpinning. Underpinning

Advanced Construction Techniques. Underpinning. Underpinning is the installation of temporary or permanent support to an existing foundation to provide either additional depth or an increase in bearing capacity. There are several existing conditions which may lead

More information

Pump Station Excavation

Pump Station Excavation Pump Station Excavation SPONSORED BY THE KIEWIT CORPORATION A capstone project for the The Department of Civil & Environmental Engineering in The Ira A. Fulton College of Engineering and Technology Brigham

More information

KIEWIT FOUNDATIONS CO.

KIEWIT FOUNDATIONS CO. KIEWIT FOUNDATIONS CO. KIEWIT ADVANTAGE LOCAL CONTRACTOR, EXPANSIVE REACH With a strong local presence, access to a vast network of resources throughout North America and a focus on self-performing work,

More information

Steven Dapp, Ph.D., P.E. Steven Dapp, Ph.D., P.E. Dan Brown and Associates

Steven Dapp, Ph.D., P.E. Steven Dapp, Ph.D., P.E. Dan Brown and Associates LA Transportation Conference: 10 Jan 2011 Drilled Shaft Foundations For Two Mississippi River Bridges in Louisiana Dan Brown and Associates Projects John James Audubon Bridge, St. Francisville New Construction

More information

Soldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning Slope Stabilization

Soldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning Slope Stabilization Soldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning Slope Stabilization www.malcolmdrilling.com Soldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning

More information

Construction Technology B (CON4313)

Construction Technology B (CON4313) Topic 5 Tunnelling 1. Introduction Tunnels can be defined as underground passages constructed for the purpose of transportation connection between two points. 2. Type of Tunnels There are many types of

More information

ISM 2007 Toronto, Canada Horst Aschenbroich Dipl. Ing. President & CEO of Con-Tech Systems LTD. Titan Hollow Bar

ISM 2007 Toronto, Canada Horst Aschenbroich Dipl. Ing. President & CEO of Con-Tech Systems LTD. Titan Hollow Bar Advances in Hollow Thread Bar Micro Pile Installation Techniques, Equipment, Materials, Testing and Monitoring ISM 2007 Toronto, Canada Horst Aschenbroich Dipl. Ing. President & CEO of Con-Tech Systems

More information

PORT OF MIAMI TUNNEL PROJECT Highlights & Where we are today!

PORT OF MIAMI TUNNEL PROJECT Highlights & Where we are today! PORT OF MIAMI TUNNEL PROJECT Highlights & Where we are today! FEBRUARY 12, 2014 FTBA CONSTRUCTION CONFERENCE PROJECT PARTNERS Public Sponsors 90% Equity Partner Contractor 10% Equity Partner Operator Federal

More information

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 2, 2015 1.0 GENERAL This work shall consist of furnishing all

More information

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (01/18) 1.0 GENERAL This work shall consist of furnishing all materials, equipment,

More information

1.0 Micro Tunnelling An overview

1.0 Micro Tunnelling An overview 1.0 Micro Tunnelling An overview Micro tunnelling (also known as slurry pipejacking) is not a new method. It is preformed extensively across the world with rapid expansion every year. Herrenknecht, manufactured

More information

Forensics by Freezing

Forensics by Freezing Forensics by Freezing Joseph A. Sopko, Ph.D., P.E., M.ASCE Moretrench American Corporation, 100 Stickle Avenue, Rockaway, NJ 07866, e-mail: jasopko@moretrench.com ABSTRACT Subsurface conditions in water

More information

Tunnel Boring Machines

Tunnel Boring Machines Tunnel Boring Machines IMIA WGP 60 Michael Spencer, Zurich London (Chairman) Alessandro Stolfa Generali Heiko Wannick Munich Re Ronan Gallagher Allianz John Forder Willis Beat Guggisberg Allianz Eric Bentz

More information

Developed countries require a modern infrastructure Roads Railways Power Communications Water Wastewater

Developed countries require a modern infrastructure Roads Railways Power Communications Water Wastewater Introduction to Soft Ground Tunnelling in Urban Environment Dr. Noppadol Phienwej Geotechnical and Geo-environmental environmental Engineering School of Engineering and Technology Asian Institute of Technology

More information

Installation Manual For Conical Tanks. INSTALLATION and MAINTENANCE INSTRUCTIONS FOR CONICAL TANKS

Installation Manual For Conical Tanks. INSTALLATION and MAINTENANCE INSTRUCTIONS FOR CONICAL TANKS INSTALLATION and MAINTENANCE INSTRUCTIONS FOR CONICAL TANKS Page 1 of 10 INDEX 1. Health & Safety 3 2. Introduction 3 3. Requirements 3 4. Working Area 3 5. Equipment 3 6. 2 and 3 metre tank above ground

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2015

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2013 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

BEBO CONCRETE ARCHES TECHNICAL GUIDE

BEBO CONCRETE ARCHES TECHNICAL GUIDE PROVIDING SOLUTIONS SINCE 1908 BEBO CONCRETE ARCHES TECHNICAL GUIDE PRECAST COMPONENT BRIDGE SYSTEM PROVIDING SUPERIOR STRENGTH AND STABILITY VERSATILE LOW MAINTENANCE RAPID INSTALLATION ARMTEC.COM _ BEBO

More information

Shoring of Long Beach Main Pump Station utilizing Ground Improvement Methods, Long Beach, CA

Shoring of Long Beach Main Pump Station utilizing Ground Improvement Methods, Long Beach, CA Shoring of Long Beach Main Pump Station utilizing Ground Improvement Methods, Long Beach, CA Gabriel Carvajal, Project Manager, Condon-Johnson & Associates, Inc., 9685 Via Excelencia, Suite 106, San Diego,

More information

ARMTEC.COM. Bridge Materials / Versatile Low Maintenance Rapid Installation

ARMTEC.COM. Bridge Materials / Versatile Low Maintenance Rapid Installation _ ARMTEC.COM Bridge Materials / BEBO CONCRETE ARCHES TECHNICAL GUIDE PRECAST COMPONENT BRIDGe SYSTEM PROVIDING SUPERIOR STRENGTH AND STABILITY Versatile Low Maintenance Rapid Installation _ BEBO arches

More information

Goulds Multistage Process Pumps

Goulds Multistage Process Pumps Goulds 3355 Multistage Process Pumps Multiple nozzle orientations to fit your piping configurations. Radial Suction Configuration. Radial nozzles are rotatable at 90 increments. Goulds Model 3355 Multistage

More information

Stevens & Associates, Inc. Tunnel Construction Projects. Fact Sheets

Stevens & Associates, Inc. Tunnel Construction Projects. Fact Sheets Stevens & Associates, Inc. Tunnel Construction Projects Fact Sheets Stevens & Associates, Inc. 4 Knights Court Newbury, MA 01951 978-764-9886 glen@stevensai.com Massachusetts Water Resources Authority

More information

Pipejacking Tunnel Boring Machines TBMs. Michael Frenke, LOVAT Inc.

Pipejacking Tunnel Boring Machines TBMs. Michael Frenke, LOVAT Inc. Pipejacking Tunnel Boring Machines TBMs Michael Frenke, LOVAT Inc. Pipejacking Tunnel Boring Machines (TBMs( TBMs) Introduction Pipejacking Sequence TBM Design Features Types of Jacking Pipe Pipejacking

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update January 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

VTA s BART Silicon Valley Phase II Extension

VTA s BART Silicon Valley Phase II Extension VTA s BART Silicon Valley Phase II Extension Santa Clara Community Working Group December 3, 2015 1 Agenda Follow-up Items and Work Plan New Starts Project Development & Schedule Update Construction Methods

More information

Dulles Corridor Metrorail Project

Dulles Corridor Metrorail Project Dulles Corridor Metrorail Project PHASE 2 MONTHLY COST AND SCHEDULE UPDATE AS OF DECEMBER 31, 2015 FEBRUARY 2016 Phase 2 Cost Summary December Expenditures $ 62.9 Million Total Expenditures $ 655.6 Million

More information

FOR HIGHWAY TUNNEL GALLERIA SPARVO.

FOR HIGHWAY TUNNEL GALLERIA SPARVO. HERRENKNECHT EPB SHIELD S-574 FOR HIGHWAY TUNNEL GALLERIA SPARVO. PRODUCT PORTFOLIO OF HERRENKNECHT GROUP. MECHANIZED TUNNELLING TECHNOLOGY. STEEP TUNNELLING. St. Petersburg 30 downhill EPB Shield Access

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update January 1, 2016 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

4th International Engineering and Construction Conference - July 28, 2006

4th International Engineering and Construction Conference - July 28, 2006 4th International Engineering and Construction Conference - July 28, 2006 BOX-JACKING - A USEFUL CONSTRUCTION TOOL By Anthony Lynn, Berkeley Engineering Company, Inc. Box jacking is jacking a large precast

More information

UNIT V RETAINING WALLS RETAINING WALL 2.5. Retaining walls are structures used to retain earth or water or other materials such as coal, ore, etc; where conditions do not permit the mass to assume its

More information

Lecture 13 CONCRETE WORKS

Lecture 13 CONCRETE WORKS Lecture 13 TSP-308 MPK Ferdinand Fassa CONCRETE WORKS Concrete works Concrete is a man-made (rock) construction material, which is a mixture of portland cement, water, aggregates, and in some cases, admixtures.

More information

Dahlia Ponds Tunnel Project. Presented By: Nathan Soule, PE, PG Brierley Associates & Brenden Tippets, Project Executive, BTrenchless

Dahlia Ponds Tunnel Project. Presented By: Nathan Soule, PE, PG Brierley Associates & Brenden Tippets, Project Executive, BTrenchless DAHLIA PONDS TUNNEL PROJECT CASE HISTORY Presented By: Nathan Soule, PE, PG Brierley Associates & Brenden Tippets, Project Executive, BTrenchless Outline Owner s Approach Design & Engineering Construction

More information

STANDARDIZED STRUCTURES

STANDARDIZED STRUCTURES Q, QH & QL TOWERS 16.1 Q, QH, and QL Towers General Description The series includes three and four leg angle towers, which are suited for a variety of antenna mounting positions and load conditions. The

More information

LARGE DIAMETER PIPE ROOF BOX EXCAVATION FOR PASSENGER LINKWAY TUNNEL

LARGE DIAMETER PIPE ROOF BOX EXCAVATION FOR PASSENGER LINKWAY TUNNEL Submission for Hulme Prize 2017 LARGE DIAMETER PIPE ROOF BOX EXCAVATION FOR PASSENGER LINKWAY TUNNEL F. Saffiyah BADURDEEN 1, G. T. SENTHILNATH 2, 1 Ed. Zublin AG Singapore 2 Geoconsult Asia Singapore

More information

Upon speaking with the representatives with Technical Foundations as well as Walder Foundations, it was determined that:

Upon speaking with the representatives with Technical Foundations as well as Walder Foundations, it was determined that: As part of our analyses, we have considered the design and construction of the cantilever retaining wall that will be located along the north side of Lucks Lane, between Falling Creek and Gladstone Glen

More information

CS-13 TRENCHLESS TECHNOLOGY TABLE OF CONTENTS

CS-13 TRENCHLESS TECHNOLOGY TABLE OF CONTENTS TABLE OF CONTENTS CS-13.0 Trenchless Technology... 1 CS-13.1 Location of Existing Services... 1 CS-13.2 Alignment... 1 CS-13.3 Directional Drilling... 1 CS-13.4 Pipe Thrusting... 2 CS-13.5 Guided Boring/Auger

More information

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS 1.0 DESCRIPTION This work shall consist of furnishing all materials and labor necessary for conducting an Osterberg Cell (O-cell)

More information

Case History: Value Engineering of Driven H-Piles for Slope Stability on the Missouri River

Case History: Value Engineering of Driven H-Piles for Slope Stability on the Missouri River DEEP FOUNDATIONS 207 Case History: Value Engineering of Driven H-Piles for Slope Stability on the Missouri River W. Robert Thompson, III, 1 M.ASCE, P.E., Jeffrey R. Hill, 2 M.ASCE, P.E., and J. Erik Loehr,

More information

Risk Management of the Restoration of Shanghai Metro Line 4

Risk Management of the Restoration of Shanghai Metro Line 4 ISGSR2007 First International Symposium on Geotechnical Safety & Risk Oct. 18~19, 2007 Shanghai Tongji University, China Risk Management of the Restoration of Shanghai Metro Line 4 X. P. Yu, W. J. Zhu

More information

Tel: Neil: Tony: Website:

Tel: Neil: Tony: Website: Australian Tunnelling Services are a consortium that has been formed to offer specialist underground services to both clients and contractors in the Civil Engineering, Mining & Building Industries. The

More information

KIEWIT FOUNDATIONS GROUP

KIEWIT FOUNDATIONS GROUP KIEWIT FOUNDATIONS GROUP KIEWIT AT-A-GLANCE With a strong local presence and access to a vast network Keeping safety at the forefront, the Kiewit Foundations Group self- OUR MARKETS of industry experts,

More information

CWRP WEEKLY CONSTRUCTION PROGRESS REPORT Week ending March 2, 2013

CWRP WEEKLY CONSTRUCTION PROGRESS REPORT Week ending March 2, 2013 CWRP WEEKLY CONSTRUCTION PROGRESS REPORT Week ending March 2, 2013 RIVER DIVERSION SEGMENT At the first of the week, Spindler stripped the wall forms off of the 100 cy pour that was placed toward at the

More information

Garage Beam System DAYTONSUPERIOR.COM FORMING. For Post-Tensioned Beam and Slab Parking Structures

Garage Beam System DAYTONSUPERIOR.COM FORMING. For Post-Tensioned Beam and Slab Parking Structures Garage Beam System For Post-Tensioned Beam and Slab Parking Structures FORMING The Garage Beam System is a complete forming system designed specifically for post-tensioned beam and slab multi-story parking

More information

Learning Legacy Document Duration of data recorded (approx.) 1

Learning Legacy Document Duration of data recorded (approx.) 1 Table 1: Crossrail Water Consumption Data Contract C300/C410 - Crossrail Running Tunnels - West; Bond Street & Tottenham Court Road s - Early Access Shafts & SCL Works (JV: BAM Nuttall Ltd / Ferrovial

More information

PROJECT UPDATE SOUTH NORFOLK JORDAN BRIDGE CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA. April 2012

PROJECT UPDATE SOUTH NORFOLK JORDAN BRIDGE CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA. April 2012 PROJECT UPDATE Rendering View from the City of Chesapeake Elizabeth River Boat Landing and Park looking across the Elizabeth River at Portsmouth CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA The new 5,375

More information

Design Data 4M. Jacking Concrete Pipe

Design Data 4M. Jacking Concrete Pipe Design Data 4M Jacking Concrete Pipe FOREWORD Jacking or tunneling concrete pipe is an increasingly important construction method for installing concrete pipelines without interrupting commerce, or disturbing

More information