1 NORTH SHORE CONNECTOR TUNNELS AND STATION SHELL LIGHT RAIL PROJECT PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV
2 North Shore Connector Alignment 7300 lf Extension to existing 25 mile system 18 Contracts $435 Million
3 Funding $ 435 Million 80% 17% 3%
4 Project Location Future- to Airport North Shore Connector Light Rail Expansion 004 New Gateway Station 003 EXISTING GATEWAY STATION Existing Light Rail System
5 Project Team Owner Port Authority of Allegheny County Construction Manager TriGold Jacobs Civil HDR Kwame
6 Project Team Design Engineer DMJM Contractor North Shore Constructors JV Obayashi Corp. Trumbull Corp.
7 What we are building Two Contracts Combined Contract Value - $156,500, Time NTP Oct 2, Tunnels 1243 days Feb 26, Station / C&C 870 days Feb 18, 2009
8 Four Major Structure Types Boat Section 340 lf SOE - Steel Soldier Piles and Wood Lagging g Cut and Cover 1200 lf SOE - Cement Deep Soil Mixing i Wall (CDSM) SOE Cement Bentonite Wall (CB) Top Down Construction - Station SOE - Slurry Wall Bored Tunnel 2240 lf SOE - Precast Concrete Segmental Lining i
9 Boat Section Soldier pile and lagging Excavation 0 to 35 feet Soldier Piles and Wood Lagging Above or at the water table Deep Wells Walls and Waterproofing EXISTING SOILS
10 Boat Section - SOE - Soldier Piles & Lagging Soldier Piles and Lagging
11 Cut & Cover SOE CDSM Walls 60 +/- BACKFILL CDSM Walls Cut off ground water ROCK
12 Cut & Cover / Launch Pit CDSM Walls
13 Cut & Cover / Launch Pit - CDSM WALLS In place soils mixed with Bentonite Slurry going down Insert Steel Soldier Piles Cement Slurry mixed going up
14 CDSM SOE Drill Rock Socket
15 CDSM WALLS Temporary Bridge
16 Excavation / Mud Slab / WP/ Base Slab ROCK
17 Structural Concrete Waterproofing ROCK
18 Structural Concrete Cut and Cover
19 Backfill BACKFILL ROCK
20 Bridge to hold the Bridge Support two Bents
21 Cut & Cover Instrumentation Instruments Stain gauges Weather Tilt Meters Motorized Total Station
22 Underpinning SR-65 Drilled Pier Drilled Pier
23 Underpinning SR-65 ROCK
24 Underpinning SR-65 Drilled Pier
25 Underpinning SR-65 ROCK
26 Underpinning SR-65 ROCK
27 North Side Station Shell
28 North Shore Station - Slurry Walls SEA PARKING GARAGE Concourse
29 North Shore Station - Slurry Walls
30 North Shore Station Slurry Walls DESANDING Pi Primary Excavate Slot Panel Secondary Panel Pi Primary Panel Pi Primary Panel
31 North Side Station Slurry walls Concrete Pi Primary Panel Secondary Tremie pipe Panel Rebar Pi Primary Panel Secondary Panel Pi Primary Panel
32 Slurry Walls - Rebar Cage
33 North Side Station Top Down ROCK
34 North Side Station Pour Roof Slab Roof Slab ROCK
35 Excavate to Concourse Backfill Roof Slab CONCOURSE ROCK
36 Excavate to Concourse CONCOURSE Soldier Backfill Piles installed by building Roof Slab contractor ROCK
37 Excavate to first row of struts Backfill Roof Slab CONCOURSE ROCK
38 Station Roof Slab Excavation 60 ft 40 ft
39 Excavate to Invert Pour Base Slab Backfill Roof Slab CONCOURSE SLAB ANCHORS ROCK
40 Station Ground Anchors Ground Anchors
41 Construct Platform & Deck Backfill Roof Slab CONCOURSE ROCK
42 TBM Launch Pit - SOE CDSM WALL
43 TBM Launch Pit - SOE Tie Backs
44 Launch Pit - SOE Tie Backs TIE BACKS TBM TIE BACKS ROCK
45 Ground Improvement - Jet Grouting
46 Launch Pit - Jet Grout Jet Grout column construction Drill Down Grout bottom up
47 Launch Pit Entrance Packing Soft Eye
48 TBM Move to Launch Pit
49 TBM Move to Launch Pit 150 feet fully assembled
50 Launch Pit TBM Launch JET JET GROUT GROUT 1 3 2
51 Launch Pit Structure Work JET GROUT
52 Stanwix St. Receiving Pit Location GATEWAY II HORNE BUILDING RECEIVING PIT
53 Ground Improvement - Jet Grout Receiving Pit 75% COVERAGE 100% 100% Coverage 6 Around Tunnel
54 Ground Improvement - Jet Grout 75% HORNE BLG. Minimize Angular Distortion due to ground loss
55 Jet Grouting Stanwix Street
56 Stanwix Street Receiving Pit CB Wall
57 Bored Tunnels Tunnel Boring Machine Launch Pit NORTH SHORE TBM Tunnels 2200 lf SOUTH SHORE Receiving Pit
58 Bored Tunnel Section PRECAST SEGMENT LINING Segment Lining 20 inside diameter CAST IN PLACE INVERT
59 TBM Tunnels Slurry Pressure Balance TBM (SPBTBM) Mixed Shield (Soft Ground and Rock) Working Pressure 3 bar
60 Mining Cycle Mine 4 & Grout Mine 4 GROUT MAINTAINED GROUT MAINTAINED BEHIND SHIELD
61 Mining Cycle Install 4 Segment Ring Build 4 Ring
62 Mining Cycle Ring Complete - Mine Mine 4 GROUT MAINTAINED GROUT MAINTAINED BEHIND SHIELD
63 Segment Grouting Segments Grout Nozzle Grout
64 TBM SLURRY MIX SHIELD 22-9
65 SPTBM Mixed Shield
66 Slurry TBM 22-9 dia (6.92 m) inch twin disk cutters 20 - Scrapers Bucket lips 3 - Wear detection devices rpm Left or Right
67 Cutting Tools After first tunnel Disk Cutters Scrappers Bucket Lips
68 Rock Crusher
69 TBM Assembly Man Locks 3 Bar (45 psi) Material Lock
70 Cutter Head Drive Motors hp Total hp Variable Frequency Drive (VFD) 480 v AC rpm (l or r) Main bearing 85ft 8.5
71 TBM Rear of Middle Shield 5 Cylinders 4 Steering Groups 6 Cylinders 7 Cylinders
72 TBM Rear of Middle Shield Propel Cylinders - 24 Piston Diameter mm Rod Diameter mm Max Stroke mm Advance force kn (4,296 tn)
73 TBM Operation Excavation Chamber Working Chamber Hydrostatic and Soil Pressure Slurry In Slurry Out
74 TBM Operation Plan SLURRY IN 455 hp PUMP SLURRY OUT 2 EA hp PUMPS
75 Slurry Separation Plant Plant Capacity 1000 m 3 /hr
76 Segment Erector Hydraulic telescopic arm type 6 ranges of movement Telescope Rotation ti Travel Independent Roll & Yaw Controlled by joy stick
77 Segment Erector Thrust rams retracted 4-6
78 Segment Installation BOLT Segment Erector
79 Key Segment Installation TBM Shield
80 Key Segment Installation MOVE OUT KEY SEGMENT MOVE FORWARD
81 TBM Mining Start North Side SOUTH SHORE NORTH SHORE Equitable Resources Building Soft Ground
82 Fluvioglacial Material Gravel 40% - 57% Sand 50% - 38% Fines 10% - 5% Cobbles - up to 2
83 TBM Mining - River Crossing SOUTH SHORE NORTH SHORE Equitable Resources Building Mixed Face
84 TBM North River Wall Alluvium Fluvioglacial Claystone Siltstone
85 TBM North River Wall - Grouting Alluvium Fluvioglacial Claystone Siltstone
86 River Crossing SOUTH SHORE NORTH SHORE Equitable Resources Building Rock
87 River Crossing 25 feet ALLEGHENY RIVER 22 feet RIVER SILTS (ALLUVIAL) ) Top of Rock FLUVIOGLACIAL 10 feet SILTY SHALE (5,400 11,800 psi) COAL CLAYSTONE (200-4, psi) SILTSTONE (3,400-11, psi)
88 River Crossing SOUTH SHORE NORTH SHORE Well Horne Blg. Equitable Resources Building Jet Grout Soft Ground Mixed Face
89 TBM Guidance System VMT Total Station Operator s Display 80 mm Target
90 Precast Segments Universal Ring Six pieces + Key 4 Long 20 ID Bolted Two tapers 2-3/8 & 1-5/8
91 Segment Rebar Cages
92 Seg Plant cycle 4 rings X 2/ day
93 Segment Finishing Line Rotate Segments curve up Repair Surfaces Add Gasket Add Joint Packing Stack in reverse order of installation
94 Secondary Steam Curing 5 day Secondary Cure 8000 psi
95 Multi Purpose Vehicle (MVP)
96 Multi Purpose Vehicle (MVP)
97 Heading Segment Unloading
98 Heading Segment Unloading
99 Segment Erection
100 Tunnel Infrastructure Temporary Lighting 50,000 CFM Ventilation 2-4 water 8 Discharge Walkway
101 First Tunnel to Receiving Pit - July 10, 2008 Soft eye Fiberglass piles
102 First Tunnel to Receiving Pit - July 10, 2008 Containment Wall
103 TBM U-Turn
104 TBM U-Turn- Rotate 180 deg
105 TBM U-Turn- Rotate 180 deg
106 TBM U-Turn- Rotate 180 deg
107 TBM U-Turn- Rotate 180 deg
108 Invert Clean Up
109 Invert Placement
110 Thank You Questions?
Bonner Bridge Replacement Update:
Bonner Bridge Replacement Update: Jerry D. Jennings, PE - NCDOT Division 1 Engineer Pablo A. Hernandez, - NCDOT Resident Engineer September 18, 2017 Bonner Bridge Replacement Timeline Refresher Bonner
More informationØ1.8m Double Shield TBM for Mixed Ground Sewer Tunnels in Cincinnati
Ø1.8m Double Shield TBM for Mixed Ground Sewer Tunnels in Cincinnati Steve Lamb The Robbins Company, Solon, Ohio, USA Steve Abernathy Midwest Mole, Inc., Indianapolis, Indiana, USA ABSTRACT: A Robbins
More informationPipe Jacking/Microtunnelling. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo.
Pipe Jacking/Microtunnelling Dr. Mark Knight Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo 1 New Installations New Installations Non-Steering Methods Steering Methods
More informationPushing the Envelope For 100 Years
Pushing the Envelope For 100 Years Tunneling under the Chesapeake Bay The Parallel Thimble Shoal Highway Tunnel Presented by: Kevin Abt, PE Chesepeake Bay Bridge and Tunnel District Mike Kling, PE, PTOE
More information2008 Underground Construction Technology International Conference & Exhibition, Cobb County Galleria Center, Atlanta, GA - January
Program: Title: Author: 2008 Underground Construction Technology International Conference & Exhibition, Cobb County Galleria Center, Atlanta, GA - January 29-31. Successful Technology for Utility Installations
More informationBREAKTHROUGH AND BURIAL OF TBMS ON THE BRISBANE AIRPORT LINK PROJECT
BREAKTHROUGH AND BURIAL OF TBMS ON THE BRISBANE AIRPORT LINK PROJECT Russell Connors 1 ABSTRACT The Airport Link Project (APL) was constructed in the Northern Suburbs of Brisbane and connects the Central
More informationKing County Uses Trenchless Methods to Construct a Large Siphon Under Seattle s Ship Canal
North American Society for Trenchless Technology (NASTT) NASTT s 2013 No-Dig Show Sacramento, California March 3-7, 2013 TA-T1-03 King County Uses Trenchless Methods to Construct a Large Siphon Under Seattle
More informationDIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS
DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS Implenia Spezialtiefbau GmbH Robert Bosch Straße 25 D-63225 Langen Phone: +49 6103 988 345 Fax: +49 6103 988 277 Email: info.spezialtiefbau@implenia.com
More information7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by
Construction Technology B (CON4313) Self Assessment Questions: Chapter 1 Prestressed Concrete 1. How does the prestressing of steel tendons in prestressed concrete offer a higher loading capacity than
More informationPresented by: Frank Guyamier
FTBA Orlando Tuesday, March 20, 2012 Presented by: Frank Guyamier Project Engineer P3 PROJECT PARTNERS Public Sponsors 90% Equity Partner Design/Build Contractor 10% Equity Partner VMS Operator Federal
More informationAlaska Way Viaduct Replacement Project
Alaska Way Viaduct Replacement Project Presented by Gregory Hauser, PE Former VP Underground Operations Retired Jan. 8, 2018 Currently Senior Technical Advisor for JCK Underground, Inc. The Existing Alaska
More informationConstruction Technology B (CON4313)
3 - Basement 1 Quick Revision 1.1 Problems arising from basement construction a. Excavation method. b. Surface and ground water control c. Lateral stability of basement excavation. d. Stability of adjoining
More informationCivil Engineering Construction I (CBE5031)
Civil Engineering Construction I (CBE5031) Basement 1 1 Quick Revision 1.1 Problems arising from basement construction a) Excavation method. b) Surface and ground water control c) Lateral stability of
More informationCOMMUNITY BOARD EIGHT
SECOND AVENUE SUBWAY PROJECT COMMUNITY BOARD EIGHT PROJECT UPDATE SEPTEMBER 26, 2011 Scope: SECOND AVENUE SUBWAY - PHASE 1 Tunnels from 92 nd St to 63 rd St Stations at 96 th St, 86 th St, 72 nd St and
More informationPrinciples for Tunnel Design
20th to 21st April 2017 Kuala Lumpur Tunnel Design Philosophy Bored Tunnel, Segmental Lining Design 20th to 21st April 2017 Kuala Lumpur Disclaimer a) The speakers are presenting their own personal views
More informationUnderpinning. Underpinning
is the installation of temporary or permanent support to an existing foundation to provide either additional depth or an increase in bearing capacity. There are several existing conditions which may lead
More informationDesign and Implementation of the South Hartford CSO Tunnel
Design and Implementation of the South Hartford CSO Tunnel Brian Canterbury, P.E., AECOM James Sullivan, P.E., AECOM Andrew Perham, The Metropolitan District The Metropolitan District NEWEA January 22,
More informationUNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION
UNDERGROUND UTILITY CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION Effective September 9, 2014 The General Trade Knowledge portion of the examination is administered daily in Computer
More informationBi-Directional Static Load Testing of Driven Piles
Bi-Directional Static Load Testing of Driven Piles Paul J. Bullock, PhD Fugro Consultants Inc. Loadtest Bi-Directional Osterberg Cell Testing Specialized jack in pile uses bearing to mobilize side shear
More informationHudson River Tunnels, Mega Projects, and Risk A Designer s Perspective
Purdue Geotechnical Society Workshop Digging Deep April 8, 2011 Hudson River Tunnels, Mega Projects, and Risk A Designer s Perspective David Chapman, P.E. Lachel & Associates, Inc. Morristown, NJ Hudson
More informationBRADSHAW CONSTRUCTION CORPORATION
BRADSHAW CONSTRUCTION CORPORATION TUNNELING SPECIALISTS From a Contractor s Perspective Bradshaw s Experience 54 years as a tunneling contractor 26 years as a microtunneling contractor 25 years using conventional
More informationDiaphragm wall Construction
Diaphragm wall Construction Diaphragm wall is a continuous wall constructed in ground in to facilitate certain construction activities, such as: a) As a retaining wall b) As a cut-off provision to support
More informationHIGH PERFORMANCE TUNNEL BORING MACHINE FOR QUEENS WATER TUNNEL, NO. 3: A DESIGN AND CASE HISTORY
Chapter 11 HIGH PERFORMANCE TUNNEL BORING MACHINE FOR QUEENS WATER TUNNEL, NO. 3: A DESIGN AND CASE HISTORY Brian B. Khalighi and Joseph J. Diehl Atlas Copco Robbins Inc. and Grow Tunneling Corp. ABSTRACT
More informationESTABLISHING A SOLID FOUNDATION FOR NEW BRIDGE CONSTRUCTION REPLACEMENT OF BRIDGE OVER THE SOUTH CANADIAN RIVER NEAR PURCELL, OKLAHOMA
ESTABLISHING A SOLID FOUNDATION FOR NEW BRIDGE CONSTRUCTION REPLACEMENT OF BRIDGE 412.1 OVER THE SOUTH CANADIAN RIVER NEAR PURCELL, OKLAHOMA BURLINGTON NORTHERN AND SANTA FE RAILWAY By: John W. Hronek
More informationPresentation Outline
St. John s Tunnel Rehabilitation A Demonstration of Successful Fast- Track Design and Construction Christopher P. Russell, P.E. Shannon & Wilson Inc., Staff Engineer Gregory R. Fischer, Ph.D., P.E. Shannon
More informationIronton Russell Bridge Project
Construction Update September 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: September
More information6 Preliminary Assessment of Construction Method and Constructability Issues
6 Preliminary Assessment of Construction Method and Constructability Issues 6.1 Construction Approach Appendix C includes conceptual designs of the alternatives discussed below. Generally, the conceptual
More informationDesign Data 4. Jacking Concrete Pipe
Design Data 4 Jacking Concrete Pipe FOREWORD Jacking or tunneling concrete pipe is an increasingly important construction method for installing concrete pipelines without interrupting commerce, or disturbing
More informationIronton Russell Bridge Project
Construction Update July 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The entails the construction of a cast in place
More informationSIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE
SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE Keith Donington, P.E. October 2012 1 Sibley Pond - Bridge Elevation 2 Bridge Open to Traffic November 2011 3 Bridge Highlights
More informationStabilization of Running Granular Soils in TBM Alignment with Sodium Silicate Grout
Stabilization of Running Granular Soils in TBM Alignment with Sodium Silicate Grout Brendan P. Harkins 1, E.I.T.; Dominic M. Parmantier 2, M. ASCE, P.E. 1 Project Engineer, Condon-Johnson & Associates,
More informationIronton Russell Bridge Project
Construction Update October 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2014
More informationIronton Russell Bridge Project
Construction Update March 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: March 1, 2014
More informationMICROTUNNELING SYSTEMS DRIVEN FOR CUSTOMER SUCCESS
MICROTUNNELING SYSTEMS DRIVEN FOR CUSTOMER SUCCESS OUR EQUIPMENT SYSTEMS Since inception, Akkerman has grown with the evolution of industry demands. We offer pipe jacking, microtunneling, guided boring
More informationPIPE JACKING & TUNNELING SYSTEMS DRIVEN FOR CUSTOMER SUCCESS
PIPE JACKING & TUNNELING SYSTEMS 6(721 6(*'( 35$+6 '1$ 6558% //$ (920(5 DRIVEN FOR CUSTOMER SUCCESS OUR EQUIPMENT SYSTEMS Since inception, Akkerman has grown with the evolution of industry demands. We
More informationExperts in tunneling with Tunnel Boring Machines
www.eurohinca.com www.terratest.es Experts in tunneling with Tunnel Boring Machines info@eurohinca.com EUROHINCA Europea de Hincas Teledirigidas, S.A., EUROHINCA, was incorporated in 1996 for the execution
More informationUSE OF MICROTUNNELING TO INSTALL PIPES IN AN ENVIRONMENTALLY SENSISTIVE AREA. Miranda Roman D. *, LaFaso Edward
USE OF MICROTUNNELING TO INSTALL PIPES IN AN ENVIRONMENTALLY SENSISTIVE AREA Miranda Roman D. *, LaFaso Edward Iseki, Inc. 7518 Carroll Road, San Diego, Calif. 92121-2402 USA This paper will discuss the
More informationConstruction of a Semi-Buried Building A Super-sized Shopping Mall : The Festival Walk
Construction of a Semi-Buried Building A Super-sized Shopping Mall : The Festival Walk Presented by Raymond Wong Wai Man, Division of Building Science & Technology, City University of Hong Kong Raymond
More informationD7: TUNNEL CONSTRUCTION AND METHODOLOGY
HIGH SPEED TWO INFORMATION PAPER D7: TUNNEL CONSTRUCTION AND METHODOLOGY This paper outlines the proposed tunnelling methodology. It will be of particular interest to those potentially affected by the
More informationSECTION PRECAST CONCRETE SEGMENTAL TUNNEL LINING
SECTION 31 74 16 PRECAST CONCRETE SEGMENTAL TUNNEL LINING PART 1 - GENERAL 1.1 DESCRIPTION A. The Work specified in this Section consists of the requirements for manufacturing, installing, erecting and
More informationMisan University - College of Engineering Civil Engineering Department
CHAPTER 2 Soil and Excavations Soil investigation including two phases: surface investigation and subsurface investigation Surface investigation involves making a preliminary judgment about the site s
More information2013 ASCE Agenda. Microtunneling in Difficult Ground Craig Camp. Microtunneling Characteristics (NASTT) Akkerman MTBM Introduced 1995
2013 ASCE Agenda Introduction Difficult Ground Microtunneling in Difficult Ground Craig Camp July 31, 2013 Microtunneling Characteristics (NASTT) Earth pressure balancing Hydrostatic pressure balancing
More informationFOUNDATIONS. Foundations Copyright G G Schierle, 2006 Press Esc to end, for next, for previous slide 1
FOUNDATIONS Foundations Copyright G G Schierle, 2006 Press Esc to end, for next, for previous slide 1 Liquefaction reduced the soil strength under these apartment buildings in Niigata (Japan) 1964. Liquefaction
More informationALMEDA TUNNEL PAST, PRESENT AND FUTURE
ALMEDA TUNNEL PAST, PRESENT AND FUTURE Ravi Kaleyatodi, P.E., CPM Senior Assistant Director, City of Houston Ravi.kaleyatodi@cityofhouston.net Paul C. Wallick, P.E., Senior Project Manager Patricia Frayre,
More informationITEM NN17 - DRILLED SHAFTS ITEM NN17 - DRILLED SHAFTS (LOW OVERHEAD CLEARANCE) ITEM TRIAL SHAFTS
DESCRIPTION A. General. This work shall consist of furnishing the materials and installing drilled shafts at the locations, dimensions, and batters shown on the contract plans or where ordered by the Engineer
More information4.5 GEOTECHNICAL, SUBSURFACE, AND SEISMIC HAZARDS
4.5 GEOTECHNICAL, SUBSURFACE, AND SEISMIC HAZARDS This section discusses the geology, soils, seismicity, hazardous materials, and subsurface obstructions along Flower Street, and evaluates their potential
More informationTrenchless Technology
TRENCHLESS TECHNOLOGY Gene Woodbridge Earth Boring Co. Limited www.earthboring.ca Earth Boring Co. Limited 1576 Ifield Road Mississauga, ON L5H 3W1 (905) 277-9632 fax (905) 274-9040 Trenchless Technology
More informationInstallation Manual. Bigfoot Systems Inc. EM
Installation Manual Bigfoot Systems Inc. www.bigfootsystems.com EM info@bigfootsystems.com 6750 Highway 3, Martin s Point RR #2, Mahone Bay, Nova Scotia Canada B0J 2E0 TF 1-800-934-0393 PH (902) 627-1600
More informationPresented By: Brenden Tippets, Project Executive
Presented By: Brenden Tippets, Project Executive Owner City of Aurora Engineer MWH Global, Inc., HDR Engineering, CH2M Hill Engineering Contractor BTrenchless / Reynolds Tierdael (GC) SUBS Kelley Dewatering,
More informationChing Guan Kee ABSTRACT
Japanese Geotechnical Society Special Publication The 15th Asian Regional Conference on Soil Mechanics and Geotechnical Engineering Effects of base grouting and deep cement mixing on deep foundation bored
More informationService Automation. Making the way
Industrial Hydraulics Electric Drives and Controls Linear Motion and Assembly Technologies Pneumatics Service Automation Mobile Hydraulics profile Drive & Control Niles-Simmons Engineering on the cutting
More informationMUD ROTARY TECHNIQUES. MUD Rotary Drilling Method 12/11/2017. Roger E. Renner, MGWC MUD ROTARY DRILLING. Rotary Well Rig
Roger E. Renner, MGWC MUD ROTARY TECHNIQUES Presenter: Roger E. Renner Master Groundwater Contractor President of E.H. RENNER & SONS, INC. Past President of NGWA 2001 Past President of Minnesota Water
More informationTBM Selection and Specification
By Bradford F. Townsend and Paul E. Jenkins Date: 13 June 2009 TBM Selection - Challenges to be met TBM Technology Auxiliary Measures and Backup New Developments Summary of Selection Process Procurements
More informationITEM 416 DRILLED SHAFT FOUNDATIONS Materials. All materials shall conform to the requirements of the pertinent items as follows:
ITEM 416 DRILLED SHAFT FOUNDATIONS 416.1. Description. This Item shall govern for the construction of foundations consisting of reinforced concrete drilled shafts and/or nonreinforced concrete drilled
More informationAdvanced Construction Techniques. Underpinning. Underpinning
is the installation of temporary or permanent support to an existing foundation to provide either additional depth or an increase in bearing capacity. There are several existing conditions which may lead
More informationPump Station Excavation
Pump Station Excavation SPONSORED BY THE KIEWIT CORPORATION A capstone project for the The Department of Civil & Environmental Engineering in The Ira A. Fulton College of Engineering and Technology Brigham
More informationKIEWIT FOUNDATIONS CO.
KIEWIT FOUNDATIONS CO. KIEWIT ADVANTAGE LOCAL CONTRACTOR, EXPANSIVE REACH With a strong local presence, access to a vast network of resources throughout North America and a focus on self-performing work,
More informationSteven Dapp, Ph.D., P.E. Steven Dapp, Ph.D., P.E. Dan Brown and Associates
LA Transportation Conference: 10 Jan 2011 Drilled Shaft Foundations For Two Mississippi River Bridges in Louisiana Dan Brown and Associates Projects John James Audubon Bridge, St. Francisville New Construction
More informationSoldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning Slope Stabilization
Soldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning Slope Stabilization www.malcolmdrilling.com Soldier Pile Walls Soil Nail Systems Secant Piling Soil Mix Walls Underpinning
More informationConstruction Technology B (CON4313)
Topic 5 Tunnelling 1. Introduction Tunnels can be defined as underground passages constructed for the purpose of transportation connection between two points. 2. Type of Tunnels There are many types of
More informationISM 2007 Toronto, Canada Horst Aschenbroich Dipl. Ing. President & CEO of Con-Tech Systems LTD. Titan Hollow Bar
Advances in Hollow Thread Bar Micro Pile Installation Techniques, Equipment, Materials, Testing and Monitoring ISM 2007 Toronto, Canada Horst Aschenbroich Dipl. Ing. President & CEO of Con-Tech Systems
More informationPORT OF MIAMI TUNNEL PROJECT Highlights & Where we are today!
PORT OF MIAMI TUNNEL PROJECT Highlights & Where we are today! FEBRUARY 12, 2014 FTBA CONSTRUCTION CONFERENCE PROJECT PARTNERS Public Sponsors 90% Equity Partner Contractor 10% Equity Partner Operator Federal
More informationBi-Directional Static Load Testing of Drilled Shafts
Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 2, 2015 1.0 GENERAL This work shall consist of furnishing all
More informationBi-Directional Static Load Testing of Drilled Shafts
Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (01/18) 1.0 GENERAL This work shall consist of furnishing all materials, equipment,
More information1.0 Micro Tunnelling An overview
1.0 Micro Tunnelling An overview Micro tunnelling (also known as slurry pipejacking) is not a new method. It is preformed extensively across the world with rapid expansion every year. Herrenknecht, manufactured
More informationForensics by Freezing
Forensics by Freezing Joseph A. Sopko, Ph.D., P.E., M.ASCE Moretrench American Corporation, 100 Stickle Avenue, Rockaway, NJ 07866, e-mail: jasopko@moretrench.com ABSTRACT Subsurface conditions in water
More informationTunnel Boring Machines
Tunnel Boring Machines IMIA WGP 60 Michael Spencer, Zurich London (Chairman) Alessandro Stolfa Generali Heiko Wannick Munich Re Ronan Gallagher Allianz John Forder Willis Beat Guggisberg Allianz Eric Bentz
More informationDeveloped countries require a modern infrastructure Roads Railways Power Communications Water Wastewater
Introduction to Soft Ground Tunnelling in Urban Environment Dr. Noppadol Phienwej Geotechnical and Geo-environmental environmental Engineering School of Engineering and Technology Asian Institute of Technology
More informationInstallation Manual For Conical Tanks. INSTALLATION and MAINTENANCE INSTRUCTIONS FOR CONICAL TANKS
INSTALLATION and MAINTENANCE INSTRUCTIONS FOR CONICAL TANKS Page 1 of 10 INDEX 1. Health & Safety 3 2. Introduction 3 3. Requirements 3 4. Working Area 3 5. Equipment 3 6. 2 and 3 metre tank above ground
More informationIronton Russell Bridge Project
Construction Update October 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2015
More informationIronton Russell Bridge Project
Construction Update October 1, 2013 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails
More informationBEBO CONCRETE ARCHES TECHNICAL GUIDE
PROVIDING SOLUTIONS SINCE 1908 BEBO CONCRETE ARCHES TECHNICAL GUIDE PRECAST COMPONENT BRIDGE SYSTEM PROVIDING SUPERIOR STRENGTH AND STABILITY VERSATILE LOW MAINTENANCE RAPID INSTALLATION ARMTEC.COM _ BEBO
More informationShoring of Long Beach Main Pump Station utilizing Ground Improvement Methods, Long Beach, CA
Shoring of Long Beach Main Pump Station utilizing Ground Improvement Methods, Long Beach, CA Gabriel Carvajal, Project Manager, Condon-Johnson & Associates, Inc., 9685 Via Excelencia, Suite 106, San Diego,
More informationARMTEC.COM. Bridge Materials / Versatile Low Maintenance Rapid Installation
_ ARMTEC.COM Bridge Materials / BEBO CONCRETE ARCHES TECHNICAL GUIDE PRECAST COMPONENT BRIDGe SYSTEM PROVIDING SUPERIOR STRENGTH AND STABILITY Versatile Low Maintenance Rapid Installation _ BEBO arches
More informationGoulds Multistage Process Pumps
Goulds 3355 Multistage Process Pumps Multiple nozzle orientations to fit your piping configurations. Radial Suction Configuration. Radial nozzles are rotatable at 90 increments. Goulds Model 3355 Multistage
More informationStevens & Associates, Inc. Tunnel Construction Projects. Fact Sheets
Stevens & Associates, Inc. Tunnel Construction Projects Fact Sheets Stevens & Associates, Inc. 4 Knights Court Newbury, MA 01951 978-764-9886 glen@stevensai.com Massachusetts Water Resources Authority
More informationPipejacking Tunnel Boring Machines TBMs. Michael Frenke, LOVAT Inc.
Pipejacking Tunnel Boring Machines TBMs Michael Frenke, LOVAT Inc. Pipejacking Tunnel Boring Machines (TBMs( TBMs) Introduction Pipejacking Sequence TBM Design Features Types of Jacking Pipe Pipejacking
More informationIronton Russell Bridge Project
Construction Update January 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails
More informationVTA s BART Silicon Valley Phase II Extension
VTA s BART Silicon Valley Phase II Extension Santa Clara Community Working Group December 3, 2015 1 Agenda Follow-up Items and Work Plan New Starts Project Development & Schedule Update Construction Methods
More informationDulles Corridor Metrorail Project
Dulles Corridor Metrorail Project PHASE 2 MONTHLY COST AND SCHEDULE UPDATE AS OF DECEMBER 31, 2015 FEBRUARY 2016 Phase 2 Cost Summary December Expenditures $ 62.9 Million Total Expenditures $ 655.6 Million
More informationFOR HIGHWAY TUNNEL GALLERIA SPARVO.
HERRENKNECHT EPB SHIELD S-574 FOR HIGHWAY TUNNEL GALLERIA SPARVO. PRODUCT PORTFOLIO OF HERRENKNECHT GROUP. MECHANIZED TUNNELLING TECHNOLOGY. STEEP TUNNELLING. St. Petersburg 30 downhill EPB Shield Access
More informationIronton Russell Bridge Project
Construction Update January 1, 2016 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails
More information4th International Engineering and Construction Conference - July 28, 2006
4th International Engineering and Construction Conference - July 28, 2006 BOX-JACKING - A USEFUL CONSTRUCTION TOOL By Anthony Lynn, Berkeley Engineering Company, Inc. Box jacking is jacking a large precast
More informationUNIT V RETAINING WALLS RETAINING WALL 2.5. Retaining walls are structures used to retain earth or water or other materials such as coal, ore, etc; where conditions do not permit the mass to assume its
More informationLecture 13 CONCRETE WORKS
Lecture 13 TSP-308 MPK Ferdinand Fassa CONCRETE WORKS Concrete works Concrete is a man-made (rock) construction material, which is a mixture of portland cement, water, aggregates, and in some cases, admixtures.
More informationDahlia Ponds Tunnel Project. Presented By: Nathan Soule, PE, PG Brierley Associates & Brenden Tippets, Project Executive, BTrenchless
DAHLIA PONDS TUNNEL PROJECT CASE HISTORY Presented By: Nathan Soule, PE, PG Brierley Associates & Brenden Tippets, Project Executive, BTrenchless Outline Owner s Approach Design & Engineering Construction
More informationSTANDARDIZED STRUCTURES
Q, QH & QL TOWERS 16.1 Q, QH, and QL Towers General Description The series includes three and four leg angle towers, which are suited for a variety of antenna mounting positions and load conditions. The
More informationLARGE DIAMETER PIPE ROOF BOX EXCAVATION FOR PASSENGER LINKWAY TUNNEL
Submission for Hulme Prize 2017 LARGE DIAMETER PIPE ROOF BOX EXCAVATION FOR PASSENGER LINKWAY TUNNEL F. Saffiyah BADURDEEN 1, G. T. SENTHILNATH 2, 1 Ed. Zublin AG Singapore 2 Geoconsult Asia Singapore
More informationUpon speaking with the representatives with Technical Foundations as well as Walder Foundations, it was determined that:
As part of our analyses, we have considered the design and construction of the cantilever retaining wall that will be located along the north side of Lucks Lane, between Falling Creek and Gladstone Glen
More informationCS-13 TRENCHLESS TECHNOLOGY TABLE OF CONTENTS
TABLE OF CONTENTS CS-13.0 Trenchless Technology... 1 CS-13.1 Location of Existing Services... 1 CS-13.2 Alignment... 1 CS-13.3 Directional Drilling... 1 CS-13.4 Pipe Thrusting... 2 CS-13.5 Guided Boring/Auger
More informationSAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS
SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS 1.0 DESCRIPTION This work shall consist of furnishing all materials and labor necessary for conducting an Osterberg Cell (O-cell)
More informationCase History: Value Engineering of Driven H-Piles for Slope Stability on the Missouri River
DEEP FOUNDATIONS 207 Case History: Value Engineering of Driven H-Piles for Slope Stability on the Missouri River W. Robert Thompson, III, 1 M.ASCE, P.E., Jeffrey R. Hill, 2 M.ASCE, P.E., and J. Erik Loehr,
More informationRisk Management of the Restoration of Shanghai Metro Line 4
ISGSR2007 First International Symposium on Geotechnical Safety & Risk Oct. 18~19, 2007 Shanghai Tongji University, China Risk Management of the Restoration of Shanghai Metro Line 4 X. P. Yu, W. J. Zhu
More informationTel: Neil: Tony: Website:
Australian Tunnelling Services are a consortium that has been formed to offer specialist underground services to both clients and contractors in the Civil Engineering, Mining & Building Industries. The
More informationKIEWIT FOUNDATIONS GROUP
KIEWIT FOUNDATIONS GROUP KIEWIT AT-A-GLANCE With a strong local presence and access to a vast network Keeping safety at the forefront, the Kiewit Foundations Group self- OUR MARKETS of industry experts,
More informationCWRP WEEKLY CONSTRUCTION PROGRESS REPORT Week ending March 2, 2013
CWRP WEEKLY CONSTRUCTION PROGRESS REPORT Week ending March 2, 2013 RIVER DIVERSION SEGMENT At the first of the week, Spindler stripped the wall forms off of the 100 cy pour that was placed toward at the
More informationGarage Beam System DAYTONSUPERIOR.COM FORMING. For Post-Tensioned Beam and Slab Parking Structures
Garage Beam System For Post-Tensioned Beam and Slab Parking Structures FORMING The Garage Beam System is a complete forming system designed specifically for post-tensioned beam and slab multi-story parking
More informationLearning Legacy Document Duration of data recorded (approx.) 1
Table 1: Crossrail Water Consumption Data Contract C300/C410 - Crossrail Running Tunnels - West; Bond Street & Tottenham Court Road s - Early Access Shafts & SCL Works (JV: BAM Nuttall Ltd / Ferrovial
More informationPROJECT UPDATE SOUTH NORFOLK JORDAN BRIDGE CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA. April 2012
PROJECT UPDATE Rendering View from the City of Chesapeake Elizabeth River Boat Landing and Park looking across the Elizabeth River at Portsmouth CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA The new 5,375
More informationDesign Data 4M. Jacking Concrete Pipe
Design Data 4M Jacking Concrete Pipe FOREWORD Jacking or tunneling concrete pipe is an increasingly important construction method for installing concrete pipelines without interrupting commerce, or disturbing
More information