Sidewalk Repair Program. Charter Township of Canton Engineering Services

Size: px
Start display at page:

Download "Sidewalk Repair Program. Charter Township of Canton Engineering Services"

Transcription

1 Sidewalk Repair Program Charter Township of Canton Engineering Services

2 Sidewalk Repair Program History Canton lost a landmark case at the Michigan Supreme Court level in The Supreme Court has determined that Townships are responsible for maintenance of sidewalks located within a public right-of-way (ROW). The sidewalk ordinance and repair program was implemented in 1999 to reduce our liability from injury claims and improve the appearance of the community.

3 Sidewalk Repair Program History The program began with inspection of the oldest subdivisions platted in the Township. In the later years we consolidated subdivisions by area. The first cycle of the program covered 16 years. We have inspected sidewalks in all 154 platted subdivisions, totaling 16,353 parcels. The second cycle of sidewalk repair is planned to cover 10 years. Consolidated subdivision areas are depicted on a map in targeted zones.

4 Sidewalk Program Target Zones See Map for Targeted Neighborhood Areas 2015 ZONE ZONE ZONE ZONE ZONE ZONE ZONE ZONE ZONE ZONE 10

5 Sidewalk Repair Program Facts Every year the Township works on three (3) different sidewalk repair programs consisting of the past (warranty work), present (construction repair) and future (marking & quantities). Concerns about the program are typically handled as a service request. Service requests are tracked by software, providing electronic information to staff, prior to addressing. Sidewalk inspection for the following year targeted zone is advertised in our local paper and shown on our website. The area includes all commercial and residential parcels that are located along a public road right-of-way.

6 Sidewalk Program Inspections As inspections are done, defective concrete is marked & photographed. Quantities are then measured and charted by parcel ID. The inspector marks defective concrete with dots: (Red) dots indicate areas of Township responsibility (Green) dots areas of Resident responsibility

7 Code of Ordinances The sidewalk section is in Chapter 62, Article 2, in Section 62-31/38 inclusive. The detailed criteria used to determine sidewalk repair may be viewed on our website:

8 Ordinance Criteria Sidewalk Dots? Here are some examples

9 Sidewalk Displacement Displacement of 3/4 inch or greater between any two slabs.

10 Spalling Sidewalk If, in any five-linear-foot of sidewalk, more than 50 percent of the surface has scaled off to a depth of one-quarter inch or greater.

11 Spider Cracking If spider cracking is visible and adjoining flag(s) need to be removed. Additives placed in the concrete (due to cold or hot weather changes), or used in the finishing process, may cause spider cracking. It is possible that when removing a defective flag, adjacent, unmarked flags with pre-existing spider cracks may crumble from the release in pressure that is currently holding the spider-cracked flag together.

12 Cracked Sidewalks If the sidewalk has more than two cracks of one-quarter inch in width (or more) in any two linear feet of sidewalk section.

13 Ponding of Water If the concrete has settled, allowing water to pond to a depth of three-quarters inch or more.

14 Back Pitch or Back Slope If any section of sidewalk is tilted from the outside edge toward the inside edge. The outside edge being the edge of the sidewalk nearest the street.

15 Utility Repair If a portion of the sidewalk is removed or damaged as a result of a utility repair.

16 Township Owned Utility Sanitary Manhole and Water System Gate Valves If the sidewalk is damaged as a result of a Township utility.

17 Storm Sewer Manholes Owned by Wayne County Sidewalk in the right-of-way that has a defect caused by a County Storm Water structure will be addressed by Canton Township for the safety of our residents. Only sidewalk flags that touch the storm manhole will be repaired by the Township. Any adjoining flags that need repair will be the responsibility of the homeowner.

18 Sidewalk Ramps Bringing into ADA compliance Ramps with concrete defects are brought into compliance per the American Disability Act. Sidewalk ramps will not be assessed to the adjacent property owner. Ramps are considered from the edge of the curb up to the key flag. Ramps that require adjustment in grade to meet the ADA Accessibility Guidelines (including the key flag) will not be assessed to the adjacent property owner. Ramps that lead across into a driveway or go nowhere, such as to a greenbelt area, will be removed and replaced with sod as required by Wayne County standards, only when defective concrete is present.

19 Medians & Common Park Areas Median sidewalk and common park areas with sidewalk fronting the road are considered home owner association responsibility. The cost for this repair will be billed to your association. The sidewalk flags marked within the median will be repaired and brought into compliance to meet the ADA Accessibility Guidelines. Ramps located along common park areas are considered home owner association responsibility.

20 Sidewalk Approach Apron It is the duty of every owner of property to maintain and keep sidewalks and driveway approaches in a condition reasonably safe for public travel.

21 Sidewalk Repair Program Incorporating a Master Gap Plan History In late 1999 to early 2000, a committee of sidewalk members came together prioritizing missing links of sidewalk. The exception on that list of missing sidewalk, were areas under active development. Between 2001 thru 2014 the Township completed approximately 6,000 flags/slabs of sidewalk gap. That equates to about 6 miles.

22 Sidewalk Repair Program Incorporating a Master Gap Plan Facts Locations of missing sidewalk links on worn paths are reported and placed on a list. Some of these locations have been shown on the sidewalk repair program map. The list, depicting missing sidewalk link locations, denote gaps that are to remain and those that are to be installed. A master gap plan from the list will be utilized to establish future installation for projects under review, approval or building permit application.

23 Sidewalk Repair Program Notification Public notification for the necessity of repairs is advertised. Estimate letters are mailed to the homeowner containing information about quantities and price in March. Estimate letters include notification of the public hearing date, homeowner responsibility, the contractor chosen, construction information including contact numbers and information that can be viewed on our website.

24 Sidewalk Repair Program What happens next? The Resident or Business Owner will have 60 days from the date of the Public Hearing to perform one of the following: Replace the sidewalk marked with green dots. All work must meet Canton Township Standards. Contractors must obtain a permit and inspection from the Canton Township Building & Inspection Services Division and obtain a Wayne County Permit for work within the rightof-way (ROW). This work must be done prior to Memorial Day. Do nothing and Canton will repair the sidewalk and invoice the resident for the work performed. Canton will have a contractor perform the work during the months of June and July. Invoices for that work will be mailed in the fall or winter.

25 Construction On June 1 st sidewalk construction repair will begin with an anticipated completion the end of July.

26 Sidewalk Program Conclusion The sidewalk repair program effectively corrects sidewalk defects. Defects occur due to age deterioration, cracking, disintegration, root lifting and construction work activities. Repairing these defects provides safe pedestrian travel for our residents, in a beautiful community that they and their children can enjoy for years!

Sidewalk Repair Program. Charter Township of Canton

Sidewalk Repair Program. Charter Township of Canton Sidewalk Repair Program Charter Township of Canton Engineering Services Sidewalk Repair Program The sidewalk ordinance and repair program was implemented in 1999 to reduce our liability from injury claims

More information

SIDEWALK CONSTRUCTION AND REPAIR

SIDEWALK CONSTRUCTION AND REPAIR SIDEWALK CONSTRUCTION AND REPAIR Q: Why all the concern over sidewalks? A: Sidewalks are the avenues and streets of pedestrian traffic. Residents should maintain the sidewalks as best as they can. The

More information

CITY OF DES PLAINES-CONCRETE PROGRAM SIDEWALK, CURB AND DRIVEWAY GUIDELINES

CITY OF DES PLAINES-CONCRETE PROGRAM SIDEWALK, CURB AND DRIVEWAY GUIDELINES CITY OF DES PLAINES-CONCRETE PROGRAM SIDEWALK, CURB AND DRIVEWAY GUIDELINES SUMMARY AND INTENT OF PROJECT The City of Des Plaines Curb and Sidewalk Program is intended to repair hazardous sidewalk and

More information

Maintaining a Walkable Sacramento: SIDEWALK MAINTENANCE PROGRAM HANDBOOK

Maintaining a Walkable Sacramento: SIDEWALK MAINTENANCE PROGRAM HANDBOOK Maintaining a Walkable Sacramento: SIDEWALK MAINTENANCE PROGRAM HANDBOOK Well-maintained sidewalks and curb ramps provide safe and desirable paths for pedestrians and others to enjoy neighborhoods, commercial

More information

Homeowner s Do-It Yourself Guide for Hazardous Sidewalks

Homeowner s Do-It Yourself Guide for Hazardous Sidewalks Homeowner s Do-It Yourself Guide for Hazardous Sidewalks The City and County of Denver s Neighborhood Sidewalk Repair Program is a multi-year program addressing damaged, sloping and uneven sidewalks, citywide,

More information

Driveways and Other Concrete Slabs

Driveways and Other Concrete Slabs Driveways and Other Concrete Slabs V I L L A G E O F H A N O V E R P A R K F I R E D E PA R T M E N T I certify that I have received a copy of these regulations and will comply with the regulations contained

More information

Curb and Gutter Replacement Project Phase I

Curb and Gutter Replacement Project Phase I Phase I Prepared for: Prepared by: Cheyenne Downtown Development Authority / Main Street 1601 Capitol Avenue Cheyenne, WY 82001 307 433 9730 BenchMark Engineers, PC 1920 Thomes Avenue, Suite 620 Cheyenne,

More information

Presented By SUCCESSFUL SIDEWALK STRATEGIES: Learning Objectives. Part I Problems Underfoot. Part I Complications. Part I Typical Approaches

Presented By SUCCESSFUL SIDEWALK STRATEGIES: Learning Objectives. Part I Problems Underfoot. Part I Complications. Part I Typical Approaches SUCCESSFUL SIDEWALK STRATEGIES: EFFECTIVE SIDEWALK MAINTENANCE MANAGEMENT Presented By Overland Park, Kansas, Public Works Dave Bergner, Superintendent Janet Luessenheide, Engineering Technician II Michael

More information

DRIVEWAYS & CURB CUTS (INCLUDING DRIVEWAY EXTENSIONS) BUILDING PERMIT APPLICATION

DRIVEWAYS & CURB CUTS (INCLUDING DRIVEWAY EXTENSIONS) BUILDING PERMIT APPLICATION Community Development 17 Montrose Drive Romeoville, IL 60446-1329 (815) 886-7203 (815) 372-4039 Email: buildinginspections@romeoville.org DRIVEWAYS & CURB CUTS (INCLUDING DRIVEWAY EXTENSIONS) BUILDING

More information

Sidewalk Regulations. Table of Contents

Sidewalk Regulations. Table of Contents Sidewalk Regulations Table of Contents Section 1. Purpose and Intent... 2 Section 2. Pedestrian Sidewalk, Driveway Apron and Curb and Guttering Requirements... 2 Section 3. Sidewalk Provision Criteria...

More information

CITY OF MADRAS RIGHT-OF-WAY CONSTRUCTION & USE PERMIT 125 SW E Street, Madras, OR Telephone (541) Fax (541)

CITY OF MADRAS RIGHT-OF-WAY CONSTRUCTION & USE PERMIT 125 SW E Street, Madras, OR Telephone (541) Fax (541) CITY OF MADRAS RIGHT-OF-WAY CONSTRUCTION & USE PERMIT 125 SW E Street, Madras, OR 97741 Telephone (541)475-2344 Fax (541)475-1038 Permit type (may include multiple types, please provide detail in the the

More information

CITY OF LOS ANGELES Sidewalk Repair Program. Amber Elton, PE

CITY OF LOS ANGELES Sidewalk Repair Program. Amber Elton, PE CITY OF LOS ANGELES Sidewalk Repair Program Amber Elton, PE Sidewalk Repair Program Civil Engineer APRIL 20, 2017 Century Plaza Towers 2029 Century Park East City s Goal BEFORE AFTER Improve Mobility in

More information

EFFECTIVE AND EFFICIENT SIDEWALK MAINTENANCE: Presented By. Learning Objectives AFFORDABLE AND ACHIEVABLE

EFFECTIVE AND EFFICIENT SIDEWALK MAINTENANCE: Presented By. Learning Objectives AFFORDABLE AND ACHIEVABLE EFFECTIVE AND EFFICIENT SIDEWALK MAINTENANCE: AFFORDABLE AND ACHIEVABLE LLC 2011 v.3 1 Presented By Janet Luessenheide, Sr. Engineering Technician Overland Park, KS Public Works Michael Hale, P.E., Supervisory

More information

Project Need and Evaluation

Project Need and Evaluation City of Brooklyn Center 2011 Palmer Lake East Street and Utility Reconstruction Project Public Hearings February 14, 2011 Public Improvement Hearing: Special Assessments Local public improvements to the

More information

Part 4. Sidewalk Construction and Repair

Part 4. Sidewalk Construction and Repair Part 4. Sidewalk Construction and Repair 604.01. Permit Required. No sidewalk or curb and gutter shall be constructed on any street, alley, avenue, or other public property in this city without first having

More information

SIDEWALK PROBLEMS AND REPAIR

SIDEWALK PROBLEMS AND REPAIR Borough of New Hope, Pennsylvania 41 North Main Street, New Hope, Pennsylvania, 18938 (215) 862-3347 SIDEWALK PROBLEMS AND REPAIR BACKGROUND New Hope Borough Code of Ordinance Article III, section 233-3

More information

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE GENERAL Final restoration of areas within the public right-of-way associated with Street Excavation Permits shall be completed as determined

More information

TOWN OF WINDSOR CONCRETE RATING GUIDE

TOWN OF WINDSOR CONCRETE RATING GUIDE TOWN OF WINDSOR CONCRETE RATING GUIDE December 2007 TOWN OF WINDSOR Engineering Department Concrete Rating Guide The Concrete Rating system is designed to prioritize concrete replacement and assist in

More information

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW Chapter 8 Building and Building Regulations, Article XIII Grading and Drainage and Article XV Soil Erosion and Sedimentation

More information

Sidewalk Replacement Criteria The following are the criteria used to determine if sidewalk needs to be replaced in the City of Watertown:

Sidewalk Replacement Criteria The following are the criteria used to determine if sidewalk needs to be replaced in the City of Watertown: Sidewalk Replacement Criteria The following are the criteria used to determine if sidewalk needs to be replaced in the City of Watertown: -Any slab raised one-half inch (1/2 ) or more, which is considered

More information

Sandstone Curb Replacement Standards

Sandstone Curb Replacement Standards Sandstone Curb Replacement Standards Division of Infrastructure Management SCOPE OF CURB REPLACEMENT (Funding Dependent) Sandstone Curb Section I - Purpose: Sandstone curb may be replaced only if existing

More information

I. STREET CONSTRUCTION AND RECONSTRUCTION

I. STREET CONSTRUCTION AND RECONSTRUCTION CITY OF OSHKOSH POLICY FOR SPECIAL ASSESSMENTS A. GENERAL I. STREET CONSTRUCTION AND RECONSTRUCTION 1. Assessments shall be levied according to the front foot dimensions of the abutting property to the

More information

Zoning Permits 11-1 ZONING PERMITS

Zoning Permits 11-1 ZONING PERMITS Zoning Permits 11-1 ZONING PERMITS (a) Building or structures shall be started, repaired, reconstructed, enlarged or altered only after a zoning permit has been obtained from the administrator and a building

More information

SITE SPECIFIC GRADING PLAN FOR CONTIGUOUS SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION WITH PREVIOUSLY APPROVED PRELIMINARY PLAT (FORM 2)

SITE SPECIFIC GRADING PLAN FOR CONTIGUOUS SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION WITH PREVIOUSLY APPROVED PRELIMINARY PLAT (FORM 2) WASHINGTON COUNTY DIVISION OF PLAN REVIEW AND PERMITTING 80 West Baltimore Street Hagerstown, Maryland 21740-6003 Telephone: (240) 313-2460 FAX: (240) 313-2461 Hearing Impaired call 7-1-1 for Maryland

More information

study for 2018 include:

study for 2018 include: MEMORANDUM TO: Mayor and City Council gk FROM: Shawn Sanders irector of Public Works DATE: March 15, 2018 RE: Feasibility Study for the 2018 Street Improvement Project Project No. 2018-02 INTRODUCTION

More information

ARTERIAL BLOCK WALL REPLACEMENT PERMIT APPLICATION Please Type or Print

ARTERIAL BLOCK WALL REPLACEMENT PERMIT APPLICATION Please Type or Print ARTERIAL BLOCK WALL REPLACEMENT PERMIT APPLICATION Please Type or Print An arterial block wall replacement permit is required for the repair and/or replacement of existing privately-owned block walls located

More information

CHURCHILL DOWNS SUBDIVISION, 2 ND UNIT, RESUBDIVISION OF LOTS

CHURCHILL DOWNS SUBDIVISION, 2 ND UNIT, RESUBDIVISION OF LOTS CHURCHILL DOWNS SUBDIVISION, 2 ND UNIT, RESUBDIVISION OF LOTS 105-107 Engineering Comments: Must comply with the Mobile County Flood Damage Prevention Ordinance. Mobile Area Water & Sewer System Comments:

More information

APPLICATION FOR A SITE CONSTRUCTION PERMIT

APPLICATION FOR A SITE CONSTRUCTION PERMIT CITY OF KLAMATH FALLS PUBLIC WORKS ENGINEERING 226 S. 5 th St., Klamath Falls, OR 97601 Phone (541) 883-5368 Fax (541) 883-5287 APPLICATION FOR A SITE CONSTRUCTION PERMIT For City Use Only: APPLICATION

More information

Pavement Surface Evaluation and Rating. Manual RATING RATING RATING PASER RATING. Concrete Roads

Pavement Surface Evaluation and Rating. Manual RATING RATING RATING PASER RATING. Concrete Roads PASER MANUAL FOR CONCRETE ROADS PAVEMENT ENGINEERING SERVICES PASER RATING SUNFLOWER VILLAGE HOMES ASSOCIATION 45800 HANFORD ROAD CANTON, MICHIGAN SME Project Number: 074170.00 July 1, 2016 Pavement Surface

More information

Municipality of Waterville Public Sidewalk Repair Policy

Municipality of Waterville Public Sidewalk Repair Policy Municipality of Waterville Public Sidewalk Repair Policy Purpose - The purpose of this policy is to protect the public health, safety and welfare of the citizens and inhabitants of the Municipality by

More information

It is the CONTRACTORS RESPONSIBILITY to use OSHA approved shoring

It is the CONTRACTORS RESPONSIBILITY to use OSHA approved shoring PERMIT# EXCAVATION/RIGHT OF WAY PERMIT ATE: NOTE: No permit shall be issued \vithout CURRENT Montana Contractors License, Insurance and Bonding on file with the Public Works epartment. It is the CONTRACTORS

More information

2008 Street and Utility Improvement Project West Golden Lake Road. Public Informational Meeting January 3, 2008

2008 Street and Utility Improvement Project West Golden Lake Road. Public Informational Meeting January 3, 2008 2008 Street and Utility Improvement Project West Golden Lake Road C P Public Informational Meeting January 3, 2008 Presentation Summary Project Location Existing Conditions Proposed Improvements Project

More information

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM

TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Americans with Disabilities Act Requirements of Maintenance and Operational

More information

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013 PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: July 11, 2013 SUBDIVISION NAME DEVELOPMENT NAME LOCATION Northside LTD/Joint Venture Subdivision, Resubdivision of and Addition to Lot 3A Northside

More information

20 North Main Alpine, UT (Phone) (Fax) SITE PLAN

20 North Main Alpine, UT (Phone) (Fax)   SITE PLAN Site Plan Instructions New Home Form #1 20 North Main Alpine, UT 84004 801-756-6347 (Phone) 801-756-1189 (Fax) www.alpinecity.org SITE PLAN A detailed site plan, drawn to scale, 1 = 20 min., shall be filed

More information

SIDEWALK REPAIR GUIDE

SIDEWALK REPAIR GUIDE SIDEWALK REPAIR GUIDE Below are examples of sidewalk deficiencies as defined by Chapter 136 of the Altoona Code of Ordinances. Included with each example is a repair suggestion. Some examples may have

More information

BUILDING & INSPECTIONS DIVISION 200 East Wood Street Palatine, IL Telephone (847)

BUILDING & INSPECTIONS DIVISION 200 East Wood Street Palatine, IL Telephone (847) 2018 EXPRESS PERMIT CONCRETE PATIO/ SIDEWALK/STOOP PRINT CLEARLY. ILLEGIBLE AND/OR INCOMPLETE S WILL BE RETURNED (this is a two sided application) Property/Owner Information check if applicant Project

More information

Dodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits.

Dodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits. Dodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits. All private construction and/or maintenance activities which take place within the City right-of-way are subject to oversight

More information

BUILDING & INSPECTIONS DIVISION 200 East Wood Street Palatine, IL Telephone (847)

BUILDING & INSPECTIONS DIVISION 200 East Wood Street Palatine, IL Telephone (847) 2018 EXPRESS PERMIT PRINT CLEARLY. ILLEGIBLE AND/OR INCOMPLETE S WILL BE RETURNED (this is a two sided application) Property/Owner Information check if applicant Project Address: Owner Name: Day Phone:

More information

KINGS MILL Builder Guidelines

KINGS MILL Builder Guidelines KINGS MILL Builder Guidelines 1. Proposed Square Footage Requirements: Section 1: 50 Lots: 1,500 square feet (minimum) 3,000 square feet (maximum) 60 Lots: 1,800 square feet (minimum) 3,500 square feet

More information

FENCES. This hand out is for REFERENCE ONLY. For more details see specific code sections.

FENCES. This hand out is for REFERENCE ONLY. For more details see specific code sections. Village of Vernon Hills Community Development Department 290 Evergreen Drive, Vernon Hills, IL 60061 Phone 847-367-3704 - Fax 847-367-2541 - http:// www.vernonhills.org FENCES This hand out is for REFERENCE

More information

LAGRANGE TOWNSHIP 353 South center street p.o. box 565 lagrange ohio 44050

LAGRANGE TOWNSHIP 353 South center street p.o. box 565 lagrange ohio 44050 LAGRANGE TOWNSHIP 353 South center street p.o. box 565 lagrange ohio 44050 Resolution 2004-5 Resolution of the Board of Trustees of LaGrange Township, Lorain County, Ohio, adopting general rules and regulations

More information

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES DIVISION OF ENGINEERING & CONSTRUCTION MANAGEMENT PLAN REVIEW DEPARTMENT WASHINGTON COUNTY SOIL CONSERVATION DISTRICT 1260 Maryland Avenue, Suite 101 Hagerstown, MD 21740 Telephone: (301) 797-6821, Ext.

More information

CHANCEFORD TOWNSHIP, YORK COUNTY, PENNSYLVANIA ORDINANCE NO

CHANCEFORD TOWNSHIP, YORK COUNTY, PENNSYLVANIA ORDINANCE NO CHANCEFORD TOWNSHIP, YORK COUNTY, PENNSYLVANIA ORDINANCE NO. 2005-2 AN ORDINANCE REGULATING THE CONSTRUCTION AND REPAIR OF ALL SIDEWALKS IN CHANCEFORD TOWNSHIP, YORK COUNTY, PENNSYLVANIA, BY PROVIDING

More information

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015

PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015 NAME SUBDIVISION NAME CC Williams Plant Subdivision CC Williams Plant Subdivision LOCATION CITY COUNCIL DISTRICT

More information

Demolition Permit Application

Demolition Permit Application Demolition Permit Application 2012 Michigan Building Code 2015 Michigan Residential Code City of Jackson 161 W. Michigan Avenue Jackson, MI 49201 (517) 788-4012 www.cityofjackson.org Project Information

More information

REQUIREMENTS FOR WIRELESS FACILITY PERMIT APPLICATIONS

REQUIREMENTS FOR WIRELESS FACILITY PERMIT APPLICATIONS REQUIREMENTS FOR WIRELESS FACILITY PERMIT APPLICATIONS (A copy of the full Wireless Telecommunication Facilities Ordinance is available upon request) TABLE OF CONTENTS Page I. GENERAL REQUIREMENTS...

More information

SECTION CURB RAMPS AND OTHER MINOR CONCRETE FACILITIES. Part 1 - General Work Included Related Requirements...

SECTION CURB RAMPS AND OTHER MINOR CONCRETE FACILITIES. Part 1 - General Work Included Related Requirements... SECTION 02530 CURB RAMPS AND OTHER MINOR CONCRETE FACILITIES CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Inspection And Tests... 1 1.04 Quality Assurance...

More information

CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA PHONE: 727/ FAX: 727/

CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA PHONE: 727/ FAX: 727/ CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA 34695 PHONE: 727/724-1555 FAX: 727/724-1566 RIGHT-OF-WAY / EASEMENT USE PERMIT DATE SUBMITTED: EXPIRATION DATE: Submit the following to the

More information

PennDOT Pub. 170 Highway Occupancy Permit (HOP) Manual Page 56

PennDOT Pub. 170 Highway Occupancy Permit (HOP) Manual Page 56 PennDOT Pub. 170 Highway Occupancy Permit (HOP) Manual Page 56 Additional Fees Additional fees may be charged by PennDOT consistent with Sections 411 and 420 of the State Highway Law and Regulations 441.4(d)

More information

Index. Composition and Order of Plan Set. Utility Plan... 5

Index. Composition and Order of Plan Set. Utility Plan... 5 City of Des Plaines Public Works and Engineering Department Revised-October 5, 2012 Index Composition and Order of Plan Set Title Page Number Cover Sheet... 1 Requirements for Site Development... 2 Grading

More information

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY Guidance on restoration of City Rights-of-Way Public Works Department Directors Office 747 Market Street Suite 408 Tacoma, WA 98402 253-591-5525 Right-of-Way

More information

January 15, The meeting was called to order at 7:00 p.m. by Mayor Docimo. The meeting was advertised in the following manner:

January 15, The meeting was called to order at 7:00 p.m. by Mayor Docimo. The meeting was advertised in the following manner: The meeting was called to order at 7:00 p.m. by Mayor Docimo. The meeting was advertised in the following manner: A. Posting written notice on the Official Bulletin Board in the Township Municipal Building

More information

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE BE IT ORDAINED by the Town Council of the Town of Plainville: SECTION 1. SUBDIVISIONS. All subdivisions hereinafter developed within

More information

DOWNTOWN OXNARD PARKLET PILOT PROGRAM PARKLET DESIGN GUIDELINES

DOWNTOWN OXNARD PARKLET PILOT PROGRAM PARKLET DESIGN GUIDELINES Development Services Planning Division 214 South C Street Oxnard, California 93030 (805) 385-7858 Fax (805) 385-7417 DOWNTOWN OXNARD PARKLET PILOT PROGRAM PARKLET DESIGN GUIDELINES I. INTRODUCTION As part

More information

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision Plat Name: Location Description/ Nearest Intersection: Acreage:

More information

CITY OF ANN ARBOR, MICHIGAN Public Services Area/Project Management Unit 301 E. Huron Street P.O. Box 8647, Ann Arbor, Michigan 48107

CITY OF ANN ARBOR, MICHIGAN Public Services Area/Project Management Unit 301 E. Huron Street P.O. Box 8647, Ann Arbor, Michigan 48107 CITY OF ANN ARBOR, MICHIGAN Public Services Area/Project Management Unit 301 E. Huron Street P.O. Box 8647, Ann Arbor, Michigan 48107 Web: www.a2gov.org Printed on recycled paper May 17, 2016 Subject:

More information

PUBLIC WORKS DEPARTMENT GENERAL NOTES

PUBLIC WORKS DEPARTMENT GENERAL NOTES PUBLIC WORKS DEPARTMENT GENERAL NOTES 1. All construction shall be in strict accordance with the standards of the City of Southlake and governed by the North Central Texas Council of Government's Standard

More information

SECTION 9000 MAINTENANCE SERVICES

SECTION 9000 MAINTENANCE SERVICES SECTION 9000 MAINTENANCE SERVICES 9000 MAINTENANCE SERVICES... 1 9001 LEGISLATIVE AUTHORITY... 1 9002 GENERAL MAINTENANCE... 1 9003 PEDESTRIAN OVERPASSES... 1 9003.1 GENERAL MAINTENANCE... 1 9003.2 WINTER

More information

Grovewood Homeowners Association, Inc. Architectural Review Committee Guidelines Adopted September 18, 2018

Grovewood Homeowners Association, Inc. Architectural Review Committee Guidelines Adopted September 18, 2018 Grovewood Homeowners Association, Inc. Architectural Review Committee Guidelines Adopted September 18, 2018 These Guidelines do not change or replace anything in the Grovewood Deed Restrictions or any

More information

THE ANTICIPATED SEQUENCE OF EVENTS ARE AS FOLLOWS, BUT THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS

THE ANTICIPATED SEQUENCE OF EVENTS ARE AS FOLLOWS, BUT THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS GENERAL PLAN NOTES PERMANENT SIGNS PROJECT SCOPE THIS PROJECT INCLUDES REMOVAL OF PORTIONS OF CONCRETE CURB & GUTTER AND HMA SURFACE; INSTALLATION OF SANITARY AND STORM SEWER AND UNDERDRAIN; EXCAVATION

More information

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS 12.1 The subdivider shall construct and install the improvements in accordance with the County's Standards for Construction Plans and Specifications

More information

Fences, Wall and Hedge Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Fences, Wall and Hedge Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations Section 16.40.040 Fence, Wall and Hedge Regulations 16.40.040.1 All fences, walls and hedges shall comply with the following requirements which relate to height, location and design. 16.40.040.2 Definitions

More information

Project Title: Major Site Review (SR16-06) for Ripon Gardens II Commercial

Project Title: Major Site Review (SR16-06) for Ripon Gardens II Commercial Planning Commission Staff Report Planning Commission Hearing November 14, 2016 Project Title: Major Site Review (SR16-06) for Ripon Gardens II Commercial Request: A request to develop a 15,996 square foot

More information

OPERATING POLICY MANUAL

OPERATING POLICY MANUAL Page 1 of 7 Section 1. PURPOSE This policy is to explain the review process that the Bedford Regional Water Authority ( Authority ) utilizes for water and sewer developer projects planned within the service

More information

STREET IMPROVEMENTS (Refer to Title 18, chapter entitled "STREETS" of the Layton Municipal Code.)

STREET IMPROVEMENTS (Refer to Title 18, chapter entitled STREETS of the Layton Municipal Code.) STREET IMPROVEMENTS (Refer to Title 18, chapter 18.24 entitled "STREETS" of the Layton Municipal Code.) I. Street widths STREET TYPE (ALL MEASUREMENTS IN FEET) ROW WIDTH LAYTON CITY STANDARD STREET SECTIONS

More information

6 STORMWATER IMPROVEMENTS

6 STORMWATER IMPROVEMENTS 6 STORMWATER IMPROVEMENTS 6.01 General Requirements a. In addition to the standards contained in this, the design of stormwater systems is also governed by several ordinances and regulations. (1) Projects

More information

HAROLD L. MOSELEY SUBDIVISION, RESUBDIVISION OF LOT 2

HAROLD L. MOSELEY SUBDIVISION, RESUBDIVISION OF LOT 2 HAROLD L. MOSELEY SUBDIVISION, RESUBDIVISION OF LOT 2 Engineering Comments: Must comply with the Mobile County Flood Damage Prevention Ordinance. Development shall be designed to comply with the storm

More information

PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: February 7, 2013

PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: February 7, 2013 PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: February 7, 2013 NAME LOCATION MAWSS Shelton Beach Road East side of Shelton Beach Road Extension, 2/10± mile North of Moffett Road CITY

More information

SECTION RIGHT-OF-WAY DAMAGE REPAIRS PART 1 - GENERAL PART 2 - MATERIALS AND METHODS

SECTION RIGHT-OF-WAY DAMAGE REPAIRS PART 1 - GENERAL PART 2 - MATERIALS AND METHODS SECTION 01200 RIGHT-OF-WAY DAMAGE REPAIRS PART 1 - GENERAL 1.01 SCOPE This specification covers the work within the street right-of-way (property line) for the repair of that area which is disturbed during

More information

T a b l e o f C o n t e n t s

T a b l e o f C o n t e n t s C i t y o f G l a d s t o n e P u b l i c W o r k s D e s i g n S t a n d a r d s T a b l e o f C o n t e n t s SECTION THREE SANITARY SEWER REQUIREMENTS... 1 3.0000 SANITARY SEWERS... 1 3.0010 General

More information

PLEASE READ AND SIGN RESIDENTIAL ENERGY CODE AND EROSION CONTROL!

PLEASE READ AND SIGN RESIDENTIAL ENERGY CODE AND EROSION CONTROL! CITY OF SOLON REQUIREMENTS FOR OBTAINING A SOLON BUILDING PERMIT City Office Telephone Number: 319/624-3755 Public Works Director 319/631-5071 Building Official Telephone Number 319/338-4939 office 319/321-6563

More information

CHAPTER 12 INSTALLATION OF UTILITIES AND OTHER SYSTEMS TABLE OF CONTENTS

CHAPTER 12 INSTALLATION OF UTILITIES AND OTHER SYSTEMS TABLE OF CONTENTS CHAPTER 12 INSTALLATION OF UTILITIES AND OTHER SYSTEMS TABLE OF CONTENTS Section Title Page 12.1 General... 12-1 12.2 Design Standards... 12-1 12.2.1 General Requirements...12-1 12.2.2 Minimum Depth...12-1

More information

Beaumont Lot Grading Guidelines

Beaumont Lot Grading Guidelines Beaumont Lot Grading Guidelines Updated: 2019-01-14 CONTENTS LOT GRADING OVERVIEW... 3 INTRODUCTION... 3 PURPOSE... 3 DEFINITIONS... 3 LOT GRADING REQUIREMENTS... 3 DESIGN GRADES AND EXISTING GRADES...

More information

CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2

CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2 CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2 7.1. GENERAL.... 2 7.1.1. Inspection Restriction Dates.... 2 7.1.2. Complete Improvements.... 2 7.1.3. Public Improvements.... 2 7.1.4. Warranty

More information

RESOLUTION NO A RESOLUTION ESTABLISHING POLICY ON SUMP PUMP CONNECTIONS TO THE CITY STORM SEWER SYSTEM.

RESOLUTION NO A RESOLUTION ESTABLISHING POLICY ON SUMP PUMP CONNECTIONS TO THE CITY STORM SEWER SYSTEM. RESOLUTION NO. 3690 A RESOLUTION ESTABLISHING POLICY ON SUMP PUMP CONNECTIONS TO THE CITY STORM SEWER SYSTEM. WHEREAS, the City of Overland Park recognizes that there are locations within the City where

More information

6 STORMWATER IMPROVEMENTS

6 STORMWATER IMPROVEMENTS 6 STORMWATER IMPROVEMENTS 6.01 General Requirements a. In addition to the standards contained in this, the design of stormwater systems is also governed by several ordinances and regulations. (1) Projects

More information

Appendix 3. POLICY & PROCEDURE No

Appendix 3. POLICY & PROCEDURE No DEPARTMENT OF PUBLIC WORKS DIVISION: ENGINEERING SERVICES SECTION: ADMINISTRATIVE PAGE NO: 1 OF 10 REVISION NO: 3 DATE: 1995 05 01 ESTABLISHED: 1986 03 03 Appendix 3 POLICY & PROCEDURE No. 2.3.1-020 TITLE:

More information

Providence Corner HOA Upper Providence Township, Pennsylvania

Providence Corner HOA Upper Providence Township, Pennsylvania DEFICIENCY REPORT FOR THE Providence Corner HOA Upper Providence Township, Pennsylvania Project Number: 15-1064 Date: July 8, 2016 W:\2015\15-1064\CORR\Deficiency\Providence Corner Deficiency Report 07

More information

Chapter 3: Permit Procedures and Requirements

Chapter 3: Permit Procedures and Requirements Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8

More information

Construction Application for Permit (CAP) Instructions

Construction Application for Permit (CAP) Instructions Construction Application for Permit (CAP) Instructions A CAP is required to be completed and submitted to the Wayne Soil & Water Conservation District (SWCD) office for non-farm, earth-disturbing activities

More information

Fence and Wall Requirements

Fence and Wall Requirements Fence and Wall Requirements Definitions Decorative wall - A wall constructed of stone or other material erected for the sole purpose of providing a decorative and/or landscaped feature, and not to include

More information

Franklin County Communique to the Planning Board

Franklin County Communique to the Planning Board Franklin County Communique to the Planning Board PETITIONER(S): Name of Petitioner: Carolina Solar Energy II, LLC Address: 400 W. Main St. Suite 503 City/State/Zip: Durham, NC 27701 LOCATION: REQUEST FOR

More information

Improvement Plan Cost Estimate

Improvement Plan Cost Estimate Building and Engineering Division Development Services Department 214 S. C Street, Oxnard CA 93030 ph: 805.385.7925 fax 805.385.7854 Improvement Plan Cost Estimate Land Development Permit No. (Tract or

More information

SURFACE WATER UTILITY FEE

SURFACE WATER UTILITY FEE The Surface Water Utility Fee section of the FY2014 Budget Message provides background, impacts and actions associated with the County s prior and new surface water level of service in the unincorporated

More information

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: September 7, 2017

PLANNED UNIT DEVELOPMENT STAFF REPORT Date: September 7, 2017 PLANNED UNIT DEVELOPMENT STAFF REPORT Date: September 7, 2017 DEVELOPMENT NAME LOCATION Custom Boat Storage 3975 Demetropolis Road (East side of Demetropolis Road, 0.2± miles South of Halls Mill Road.)

More information

EXCAVATION PERMIT CHECKLIST

EXCAVATION PERMIT CHECKLIST EXCAVATION PERMIT CHECKLIST Complete These Forms ST. LOUIS COUNTY/MUNICIPAL ZONING APPROVAL FOR PERMIT APPLICATION EXCAVATION PERMIT APPLICATION Present These Documents Drawing showing location of excavation

More information

City of Norwalk. Residential Development Permit Process

City of Norwalk. Residential Development Permit Process City of Norwalk Residential Development Permit Process City of Norwalk Zoning Department 38 Whittlesey Avenue, PO Box 30 Norwalk, OH 44857 (419) 663-6736 www.norwalkoh.com 1 TABLE OF CONTENTS OVERVIEW...

More information

York County Engineering Department Roadway Inspection Requirements

York County Engineering Department Roadway Inspection Requirements York County Engineering Department Roadway Inspection Requirements The following is a list, in order, of the roadway inspections that are required to be passed by York County before a subdivision can receive

More information

CITY OF THOUSAND OAKS APPROVAL CHECKLIST FOR REFUSE/RECYCLING ENCLOSURES

CITY OF THOUSAND OAKS APPROVAL CHECKLIST FOR REFUSE/RECYCLING ENCLOSURES CITY OF THOUSAND OAKS APPROVAL CHECKLIST FOR REFUSE/RECYCLING ENCLOSURES ADMINISTRATIVE ITEMS: Waste Management (a.k.a.: G.I. Industries ) must approve plans for a new refuse/recycling enclosure (enclosure)

More information

COMMERCIAL RE-ROOF BUILDING PERMIT GUIDE

COMMERCIAL RE-ROOF BUILDING PERMIT GUIDE Nampa Building Safety Department COMMERCIAL RE-ROOF BUILDING PERMIT GUIDE 411 3 rd Street S. Nampa, Idaho 83651 208-468-5435 Fax#: 208-468-5439 www.cityofnampa.us Patrick Sullivan C.B.O Building Safety

More information

June 5, Prepared By: Thompson Engineering, Inc Cottage Hill Road Ste. 190 Mobile, Al Office (251) Fax: (251)

June 5, Prepared By: Thompson Engineering, Inc Cottage Hill Road Ste. 190 Mobile, Al Office (251) Fax: (251) Addendum No. 3 to the Water Street Signal Planning And Striping Plan Concrete Sidewalk Phase Mobile, Alabama For the City of Mobile, Alabama Project No. 2017-2060-06 June 5, 2017 Prepared By: Thompson

More information

SIDEWALKS ASSESSMENT PROJECT TOWN OF MOUNTAIN VIEW, COLORADO

SIDEWALKS ASSESSMENT PROJECT TOWN OF MOUNTAIN VIEW, COLORADO SIDEWALKS ASSESSMENT PROJECT TOWN OF MOUNTAIN VIEW, COLORADO FEBRUARY 2017 REVISED MAY 2017 PREPARED BY: RGA JOB NO.: 1104.0002 R:\1104 - Town of Mountain View\Report\Sidewalks-Assessment.doc 1 CAPITAL

More information

Section 7: Monitoring and Status Reporting

Section 7: Monitoring and Status Reporting Section 7: Monitoring and Status Reporting Section 7.1: Introduction SacDOT currently is engaged in an on-going effort to construct curb ramps, sidewalks, and other pedestrian facilities at numerous locations

More information

York County Engineering Department Roadway Inspection Requirements

York County Engineering Department Roadway Inspection Requirements York County Engineering Department Roadway Inspection Requirements The following is a list, in order, of the roadway inspections that are required to be passed by York County before a subdivision can receive

More information

RESIDENTIAL BUILDING PERMIT APPLICATION ( MINIMUM Building Requirements-Page 6)

RESIDENTIAL BUILDING PERMIT APPLICATION ( MINIMUM Building Requirements-Page 6) www.shawneeok.org RESIDENTIAL BUILDING PERMIT APPLICATION ( MINIMUM Building Requirements-Page 6) Planning Office 405-878-1666 222 N Broadway Ave Shawnee OK 74801-6917 FAX: (405) 878-1587 cosinspections@shawneeok.org

More information

2018 Utility & Street Reconstruction

2018 Utility & Street Reconstruction 2018 Utility & Street Reconstruction Public Hearing On Proposed Special Assessments/Hookup Fees for Installation and Construction of Public Improvements Introduction of the Village technical staff Laura

More information

Marbella Isles Homeowners Association, Inc.

Marbella Isles Homeowners Association, Inc. REQUEST FOR ARCHITECTURAL REVIEW Please Note: There is a $25.00 non-refundable processing fee for all requests. The application will not be processed if it is not included with application. Make check

More information

ENGINEERING DEPARTMENT. Provide engineering and public improvements in the most economical manner.

ENGINEERING DEPARTMENT. Provide engineering and public improvements in the most economical manner. ENGINEERING DEPARTMENT MISSION STATEMENT: Provide engineering and public improvements in the most economical manner. The Engineering Department performs the following services to maintain and improve the

More information

BONDING REQUIREMENTS AND PROCEDURES

BONDING REQUIREMENTS AND PROCEDURES Town of Apex Development Services 73 Hunter Street, 3 rd Floor Apex, NC 27502 (919) 249-3394 BONDING REQUIREMENTS AND PROCEDURES ORDINANCE RATIFYING THE REQUIREMENT FOR BONDING: (From the Unified Development