Scope of Work Bid Package C-3 - West Precast Concrete
|
|
- Agnes Gilbert
- 6 years ago
- Views:
Transcription
1 Scope of Work Bid Package C-3 - West Precast Concrete CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools, equipment, plant, supplies, samples, shop drawings, layout, handling, storage, hoisting, distribution, protection, transportation, supervision, contributions, coordination, compliance with all agencies (University, City, County, State and Federal), taxes, insurance, overhead, profit and all other services and facilities necessary for the performance of the Work as shown, detailed, and/or implied by the following documents and as defined herein: 1. Contract Document List dated August 8, Standard Provisions dated February 4, Turner CCIP Manual July 13, Turner Project Safety Program dated February 22, Storm Water Pollution Prevention Plan 6. Soils Reports- Geotechnical Services Reports (see bid manual) 7. KU LEEP2 BP-C Code Footprint document. 8. KU Select Manufacturer/Vendor List dated August 5, The Subcontractor is also responsible for trade specifications not specifically listed above but required by reference in the listed specifications or as required to perform the scope of work described herein, as well as the Division 1 specifications and the use of the Construction Documents as a whole. GENERAL The following scope of work is intended to be general in nature. This Subcontractor shall perform all work shown on the Contract Documents unless specifically indicated below to be excluded. Attention is called to the Understandings and Stipulations for additional information. The Scope of Work takes precedence over the drawings and specifications in the event of a conflict in trade assignment or responsibility. The Subcontractor acknowledges that the Contract Documents are not necessarily fully coordinated at 100% complete and accepts the responsibility to thoroughly review and analyze the complete set of Contract Documents to provide a complete system at no additional costs. The word Provide when used in this document means to furnish and install completely, including all costs for labor, materials, equipment, hoisting, pumping, layout, scaffolding, tools, rigging, and any of the facilities necessary to complete the Work. The word Furnish when used in this document means to provide to jobsite, freight on board. SCOPE OF WORK Provide all equipment, labor, and materials necessary for the complete construction of the Concrete Package as indicated in the contract drawings and the specifications sections listed below: Precast Structural Concrete Joint Sealants -6 -
2 Special Bidding Instructions: 1. All subcontractors shall provide their lump-sum BASE BID utilizing the select equipment manufacturers and/or vendors as detailed on the KU Select Manufacturer/Vendor List for ALL applicable materials included as part of this specific scope of work. Each subcontractor may provide a DEDUCT ALTERNATE to provide the specified materials from a separate supplier/provider (if approved in the contract documents/specifications) and must indicate the specific value of the deduct and information on the alternate equipment, material or vendor on the Bid Form. Refer to the KU Select Manufacturer/Vendor List for additional information. This Work shall include, but not be limited to providing: 1. The Contract Sum shall not be altered for any work that could have been reasonably inferred from the Contract Documents. The following items are listed as examples of the intent of this statement, but is not limited to these items alone: a. Variations to avoid interference and obstructions. b. Providing all necessary components, equipment and appurtenances, whether shown or not, for a complete system in strict code compliance based on the Contract Documents. 2. Provide all insulated precast panels & textured precast panels, including all concrete embeds, clip angles, inserts, threaded rods, shim plates/packs, bearing pads, lifting lugs, plates, support angles and rebar as required for attachment of all precast concrete units. Include all attachment angles, embeds, etc that are required to be furnished to other contractors for installation in their work, complete with detailed installation drawings. Include curing sealants. 3. Provide any and all necessary shimming and/or steel plates to set the precast at the design elevations to tolerances as defined in the drawings and specifications. Coordinate final requirements. 4. If required, provide all shop drawings, and calculations (sealed by a professional engineer registered in the state of KS), mock-ups, certificates, product data, material lists, qualification data, maintenance data, test reports, procedures, warranties and material samples required by the Contract Documents. 5. Provide shop drawings showing the intended placement sequence or locations of installed work with respect to coordination of the structures approved sequence. Provide written erection and rigging plans sealed by a professional engineer registered in the state of KS. 6. Install all embeds if required for work by other contractors in precast during casting operations. Embeds will be furnished to the Contractor by others. 7. Structural Steel shops will be reviewed and into fabrication prior to this award, Turner will furnish this subcontractor a record copy of the documents for coordination. 8. Provide joint sealant and backer rod at locations of precast to precast connections. All caulking at locations of dissimilar materials will be by others. 9. Make all markings on precast units with white chalk. Felt pens, spray paint and other permanent markings will not be allowed. All chalk marks must be removed from precast when finished. 10. During welding of plate connections and shims, etc., take care to keep weld burns on precast to a minimum. Clean-up of all welding rods must be done a daily basis, so that there are NO rust spots on exposed surfaces of precast. All exposed clips, shims, and fasteners should be hot dipped galvanized to prevent rusting. 11. Provide touch up paint to all steel connections after welding. -7 -
3 12. Submit a final as-built survey of all conditions, elevations of the completed, set in place, and welded precast. Control all camber and design to assure that tolerances are consistent with the concrete contractor s ACI tolerances and additional requirements as listed in the Construction Documents. 13. Provide all precast concrete units cleaned of all fabrication stains and residue. Perform final cleaning at the completion of the Work of this Bid Package. 14. Provide grouting of precast after installation and patching at lifting hooks and holes. 15. Provide all necessary repair of chips, spalls and misfits in accordance with the specifications. 16. Provide necessary protection to keep all portions of the Work free of dirt and damage. Clean all furnished materials prior to installation. 17. Furnish, install, maintain and remove all scaffolding required per OSHA standards necessary to perform the Work of this Bid Package. Scaffolding shall not be modified or altered (i.e., cross bracing removed) for loading of materials or any other reason unless specifically designed for that purpose. 18. The Work of this Bid Package includes coordination with adjacent existing work and the work of others in order to ensure that other items of the work are properly coordinated with contiguous work. The coordination efforts may require that certain sections of the Work be Left Out and/or Opened Up in order to allow for Other Trades to access their respective work areas. 19. Perform all layout work. Turner will provide layout of corners only. 20. Accept condition of the new concrete and steel structure by others prior to the start of the Work. Report any discrepancies from the Contract Documents or unforeseen conditions to the Construction Manager. 21. Remove and reinstall, where applicable, all temporary barricades and fall protection, which interfere with the installation of the Work of this Bid Package. 22. Cooperate with the Owner s Testing and Inspection Agency. Review the specified testing requirements and provide applicable coordination work/activities. 23. Contact the Owner s Testing Agency and inspection authorities directly to schedule inspections required for this Work. The Construction Manager and Owner s Testing Agency must be notified 24 hours in advance of any tests arranged by this Contractor. Copies of all test reports and inspection reports are to be submitted to the Construction Manager immediately. Costs associated with scheduled testing found to be not ready for testing will be the responsibility of this Contractor. 24. Provide coordination with all other Bid Packages required. 25. Provide cranes, hoisting, and installation/erection equipment as needed to perform the work. 26. Include all erection costs including operators, set up of cranes and equipment and removal. Coordinate all picks with safety provisions and capabilities of crane. EXCLUDED FROM THE SCOPE OF WORK 1. Sales Tax 2. Temporary site perimeter fencing (will be provided by Turner) -8 -
4 3. Caulking at dissimilar materials. 4. Cast-in-place concrete 5. Footings and Foundations 6. Bonds UNDERSTANDINGS AND STIPULATIONS 1. This Subcontractor shall be responsible for providing all layout (including registered surveying) and field engineering required. This includes the transfer and continuation of control lines/elevations. Any layout required is to be by this Subcontractor. Any discrepancies, inconsistencies, etc., found are to be brought to Turner s attention for review prior to installation of the Work. Any work installed incorrectly from inconsistent control without being brought to Turner s attention will be the responsibility of this Subcontractor. 2. It is understood that this Subcontractor visited the project site prior to award. This Subcontractor reviewed and understands the scope of the existing conditions on site. In addition, there are several existing site features that are indicated to remain in the documents, and all new construction must take place without disturbing these features. All costs to perform the work of this package in and around the existing site features are included in the work. 3. Site access will primarily be limited to the Southwest Corner of the project area (LOT 302). Vehicle access will come from Crescent Drive off of 23 rd Street. A limited amount of material storage may be permitted on site, and only with prior approval of Turner s site manager. If required to meet the Master Project Schedule, this Subcontractor shall store material off-site until ready to be shipped to the site for installation. 4. No parking is available on campus, and it shall be the responsibility of each Subcontractor, and/or his employees, to obtain parking permits directly from the University (this includes ALL subcontractors on site). Turner will not provide permits, and does not control campus parking. Violators will be towed by the University at the vehicle owner s expense. Transport vehicles will be required to obtain a permit from the University, and park on campus next to the project site, or return to the off-site parking area if campus parking is not available. Only superintendent s/foremen s vehicles will be permitted on site as required for construction (i.e., trucks carrying tools and equipment), and only as approved by Turner s site manager. 5. Contract award is subject to the Owner s approval. 6. All Subcontractors will be required to attend a brief Turner safety orientation on site prior to beginning work. 7. Provide all sequencing/scheduling/overtime as necessary to meet the schedule. This Subcontractor shall provide Turner with a schedule for his activities that in turn can be used by Turner to develop a Master Project Schedule. This Subcontractor shall provide all necessary manpower and/or equipment to complete the Work without extending the project schedule and causing delays. 8. This project is tax exempt from Kansas Sales Tax. This Subcontractor is responsible to be in compliance with all appropriate laws, etc. in support of such a tax exemption. 9. Provide all safety and security items necessary for the completion of the Work, including Drug Screening costs. -9 -
5 10. Provide all unloading, hoisting, access, staging and miscellaneous handling for the Work. 11. Turner will be providing electronic files (PDF) of the documents only. It is the responsibility of this Subcontractor to obtain any required hard copies. 12. All vehicle tires/tracks must be cleaned on site prior to entering any city or campus roads. 13. This Subcontractor shall be responsible for removal and replacement of all existing or temporary facilities and perimeter fencing as required for the Work of this package. Existing site conditions that are removed or damaged by this Subcontractor must be replaced in a manner that is equal to, or better than, the original condition. 14. This Subcontractor shall hold weekly meetings to coordinate the work of his subcontractors, independent of Turner s weekly Subcontractor Coordination Meeting. Turner s site manager may attend at his discretion. 15. No City of Lawrence permits are required for the performance of this Work. However, there are certain requirements of the that must be met even in the absence of a permit process. Allow for all inspections and testing required for the performance of the Work, and notify the Turner site manager 48 hours in advance of the need for testing services. The Owner shall provide all construction (earthwork, concrete/rebar/mortar/grout and steel) testing on site using a specified inspection company. Examples of contractor testing are pipe pressure testing, water quality testing, fire alarm testing, as well as any additional testing required by the Construction Documents. 16. All equipment access ways or other facilities necessary to allow the performance of the Work will be the responsibility of this Subcontractor and shall be approved by Turner s site manager. 17. Include all drinking water/ice for employees and all water required for the performance of the work. 18. This Subcontractor shall provide all labor, material and equipment as specified or as shown on the drawings, and as required for a complete installation whether or not shown. The intent is to include components indicated in the contract documents and any miscellaneous accessories necessary to complete said assemblies. 19. The site will not have temporary power for the performance of this subcontract Work package. Include the use of electrical generators as required to complete the Work. Any additional utilities and/or hookups required for the Work will be the responsibility of this Subcontractor. 20. This Subcontractor is to place special emphasis on the coordination and smooth transition of its work with the work of adjacent trades. 21. One week prior to installation, review existing conditions and inform Turner of any corrections required to insure proper installation of the Work. Start of the Work of this Subcontract indicates acceptance of work previously completed. 22. This Subcontractor will clean up all of his debris due to daily work during construction, and at the completion of the project. Provide all general cleanup labor necessary to maintain orderly housekeeping associated with this Work package. 23. Protect all materials, both stored and installed, from damage throughout the project. 24. All work is to be performed in accordance with OSHA and governing regulatory agency requirements. This Subcontractor is responsible for all safety requirements relative to the performance of his work, and will also be responsible for reading and understanding Turner s Project Safety Program (available upon -10 -
6 request). The successful bidder must sign an agreement form accepting these safety policies prior to contract award. 25. This Subcontractor shall make a good faith effort to award a percentage of his contract value to a Minority Business Enterprise (MBE) and/or a Women Owned Business (WBE) that is certified or capable of being certified by the State of Kansas. 26. Provide the extension of warranties required so the specified warranties start at the Date of Substantial Completion of the entire project. This is irrespective of any use of the equipment for temporary services during construction. 27. All warranties shall be written directly to the Owner. 28. It is understood that at least one employee of this Subcontractor will take and pass OSHA 30 Hour training and notify Turner as to who the participant(s) is/are. In addition, all lower tiered subcontractors are required to have at least one (1) supervisor take and pass the OSHA 30 Hour training and notify Turner as to who the participant is. It is understood that all the participants must complete the training within two months of the execution of this contract. 29. Water may be available on site at a hydrant if Subcontractor makes arrangements with the University well in advance. Plan on providing a meter and backflow assembly for this temporary usage. 30. It is understood that this subcontractor will not contract with any subcontractor who has an experience modification rate (EMR) greater than 1.0, and that evidence of this will be provided to Turner. 31. It is understood that these Understandings and Stipulations are project specific, and shall take precedence over the Standard Provisions if in conflict. ALLOWANCES Turner will use any monetary allowance(s) for the direct costs of labor and material and all overhead and profit per the terms of the formula for changes, included in the contract for any work items directed beyond the scope of this bid package. All authorized work must be approved by Turner s site manager on dailysigned work order tickets authorized by a TCCo SIS. Unused allowances shall be deducted from the contract in a change order. 1. Provide a $5,000 allowance for additional precast embeds/finishing work that may be required but is not defined in the documents. ALTERNATES 1. None. UNIT PRICES & LABOR RATES Unit prices listed herein will be used to adjust the Subcontract Price for changes in quantities authorized by Change Orders, Subcontract Work Orders or Superintendent s Instructions to Subcontractors. Unit prices listed shall include all labor, fringe benefits, materials, tools, equipment, plant, supplies, samples, shop drawings, layout handling, storage, hoisting, distribution, protection, transportation, supervision, contributions, coordination, compliance with all agencies (University, City, County, State and Federal), and all other services and facilities necessary for a complete installation of the item noted. Unit prices will apply to the net difference in quantities in any given change
7 1. Unit Prices shall be priced on the Bid Form. 2. Labor Rates - Provide labor rates on the Bid Form and attach a completed bid rate calculation sheet for each applicable trade. SCHEDULE AND SEQUENCING OF WORK The schedule information below are anticipated dates of this Subcontractors Work and are to be considered as targets to assist this Subcontractor in anticipating manpower and equipment requirements. The Subcontractor is to submit a schedule showing its plan for accomplishing the work within the times described below. Submittals shall be completed as required to meet the installation dates noted below. Assume a minimum of one week for expedited submittal review. Critical dates of the work of this Contract are as follows: Start Complete Award Subcontract August 1, 2013 Mobilize Layout 1 or 2 nd qtr % Complete Bid Package-C August 2014 CONTRACT PRICING Base Bid TOTAL CONTRACT TBD TBD END SCOPE OF WORK -12 -
Scope of Work Bid Package C-4 - West Polished Concrete
Scope of Work Bid Package C-4 - West Polished Concrete CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools,
More informationScope of Work Bid Package C-8 - West Overhead Doors
Scope of Work Bid Package C-8 - West Overhead Doors CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools,
More informationScope of Work Bid Package C-6 West Metal Panels
Scope of Work Bid Package C-6 West Metal Panels CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools, equipment,
More informationScope of Work Bid Package C-1 West Site Utilities & Earthwork
Scope of Work Bid Package C-1 West Site Utilities & Earthwork CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials,
More informationUNIVERSITY OF KENTUCKY Memorial Hall/College of Law Expansion and Renovation UK Project No
PART 1 GENERAL 1.1 RELATED DOCUMENTS REQUIREMENTS COMMON TO ALL WORK CATEGORIES 1. Drawings and general provisions of the Contract, including General Special Conditions and other Division 1 Specification
More informationCherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE # 5A Metal and Structural Steel 09/01/11
SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: 05 1200 - STRUCTURAL STEEL FRAMING Complete; SECTION: 05 2100 - STEEL JOIST FRAMING Complete;
More information1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.
PAGE 051200-1 SECTION 051200 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,
More informationSECTION EMBEDDED CMU/SPLIT FACE ARCHITECTURAL PRECAST/SITECAST CONCRETE. A. Site Cast or Tilt-Up CMU/Split Face Concrete Panels.
SECTION 03460 EMBEDDED CMU/SPLIT FACE ARCHITECTURAL PRECAST/SITECAST CONCRETE PART 1 GENERAL 1.1 SECTION INCLUDES A. Site Cast or Tilt-Up CMU/Split Face Concrete Panels. B. Shop/Plant Cast CMU/Split Face
More informationBi-Directional Static Load Testing of Drilled Shafts
Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 2, 2015 1.0 GENERAL This work shall consist of furnishing all
More informationBi-Directional Static Load Testing of Drilled Shafts
Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (01/18) 1.0 GENERAL This work shall consist of furnishing all materials, equipment,
More informationDIVISION 5 - STRUCTURAL STEEL AND IRON WORK
DIVISION 5 - STRUCTURAL STEEL AND IRON WORK SECTION 05100 STRUCTURAL METAL FRAMING PART 1.00 GENERAL 1.01 SCOPE OF WORK A. Work Included: 1. 2. Structural steel complete in place. Steel joists complete
More informationSECTION BRICK FACED ARCHITECTURAL PRECAST CONCRETE. A. Section Cast-In-Place Concrete: Concrete, reinforcing, anchors, etc.
SECTION 03460 BRICK FACED ARCHITECTURAL PRECAST CONCRETE PART 1 GENERAL 1.1 SECTION INCLUDES A. Site Cast (Tilt-Up) Brick Faced Concrete Panels. B. Plant Cast (Precast) Brick Faced Concrete Panels. 1.2
More informationSECTION ARCHITECTURAL PRECAST CONCRETE. C. Section Joint Sealers: Perimeter joints with sealant and backing.
SECTION 03451 ARCHITECTURAL PRECAST CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. Architectural precast concrete wall panels; with integral insulation. B. Supports, anchors, and attachments. C. Intermediate
More informationCherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12
SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and
More informationSECTION STRUCTURAL PRECAST HOLLOW CORE SLABS
PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish all labor, materials, equipment and incidentals to provide a complete structural precast hollow core slab system as shown on the Contract
More informationSECTION INSTALLATION OF OWNER-FURNISHED PRODUCTS
SECTION 13 00 50 INSTALLATION OF PART 1 GENERAL 1.1 GENERAL A. Furnish and install all tools, supplies, materials, equipment, appurtenances, and labor necessary for the installation, testing, and placing
More informationSECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES
SECTION 07 4243 - PART 1 GENERAL 1.01 SECTION INCLUDES A. Composite wall panel system consisting of aluminum-faced composite panels in a rainscreen application as part of the assembly described below.
More informationSECTION STRUCTURAL METAL FRAMING
SECTION 05100 STRUCTURAL METAL FRAMING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Structural steel framing including lintels, shelf angles, bearing plates, anchor bolts and other items as shown on
More informationUPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04
UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 1. Description This work shall consist of the design, manufacture and construction of a T-WALL structure
More informationSECTION DRILLED CONCRETE PIERS AND SHAFTS
1 PART ONE - GENERAL 1.1 COORDINATION SECTION 02466 DRILLED CONCRETE PIERS AND SHAFTS A. The General, Supplementary, and Special Conditions of these specifications shall all be considered as a part of
More informationMcPherson Contractors, Inc.
McPherson Contractors, Inc. Construction Manager Manual Jardine K-8 Campus Bid Package #2 Building Package Invitation to Bid *****FROM***** McPherson Contractors, Inc. 3501 SW Fairlawn Rd., Suite 100 Topeka,
More informationSECTION STEEL H PILES. A. Section includes steel H piles embedded into drilled concrete piers.
SECTION 31 62 16 STEEL H PILES PART 1 - GENERAL 1.01 SCOPE OF WORK A. Section includes steel H piles embedded into drilled concrete piers. B. Furnish all labor, materials, equipment and incidentals required
More informationTexas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017
Texas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017 Plumbing - 220000 Without limiting the application of all of the Contract Documents to the Subcontract,
More informationSECTION PRECAST CONCRETE COVER SYSTEM
SECTION 13500 PRECAST CONCRETE COVER SYSTEM PART 1 GENERAL 1.1 SYSTEM DESCRIPTION A. Design Criteria: 1. Precast manufacturer shall be responsible for structural design of individual precast components,
More informationSECTION TILT-UP PRECAST CONCRETE. A. Work includes, but is not limited to, the following:
SECTION 03470 TILT-UP PRECAST CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Work includes, but is not limited to, the following: 1. Precast wall panels. 2. Forms and casting beds. 3. Concrete. 4. Reinforcing
More informationC. Miscellaneous Metal Fabricators are specified elsewhere in Division 5.
SECTION 05 1200 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.01 SUMMARY A. Extent of structural steel work is shown on drawings, including schedules, notes and details to show size and location of members,
More informationCherokee Nation W.W. Keeler Second Story Addition and Remodel Tahlequah, Oklahoma WORK PACKAGE # 7B EIFS 3/25/15
SCOPE SUMMARY: Cherokee Nation W.W. Keeler Second Story Addition and Remodel Tahlequah, Oklahoma WORK PACKAGE # 7B EIFS DIVISION: 0 - LEGAL DOCUMENTS As Applicable; DIVISION: 1 - GENERAL REQUIREMENTS As
More informationSECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate.
SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Welded stainless steel railing systems. 1.2 RELATED SECTIONS A. Section 03300 - Cast-In-Place Concrete; coordination with substrate.
More information1. High bay shelving units, fabrication and installation including leveling.
SECTION 10 56 13 - HIGH BAY SHELVING * ALL FIELDS IN [ ] MUST BE EDITED. PART 1 - GENERAL 1.1. RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary
More informationADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:
ADDENDUM NO. 1 TO THE DRAWINGS AND SPECIFICATIONS FOR THE New Dishman-McGinnis Elementary School Bowling Green Independent Schools Bowling Green, Kentucky BG 12-256 RTA 1209 March 11, 2013 To All Plan
More informationSECTION INTERIOR STONE INTERIOR STONE
SECTION 04401- INTERIOR STONE 04401-1 PART ONE: GENERAL 1.1 Description INTERIOR STONE 1.1.1 Work of this Section, as shown or specified, shall be provided by the Interior Contractor/Vendor and shall be
More informationJONES AIRWAY, LLC CLEVELAND REGIONAL JETPORT SECTION STRUCTURAL STEEL
CLEVELAND REGIONAL JETPORT 05 1200-1 PART 1 - GENERAL SECTION 05 1200 STRUCTURAL STEEL 1.1 RELATED SPECIFICATION SECTIONS: A. Bolting of wood to steel, steel anchors for work of other trades, concrete
More informationSECTION BRICK FACED ARCHITECTURAL PRECAST CONCRETE. Display hidden notes to specifier by using Tools / Options / View / Hidden Text.
SECTION 03460 BRICK FACED ARCHITECTURAL PRECAST CONCRETE Display hidden notes to specifier by using Tools / Options / View / Hidden Text. PART 1 GENERAL 1.1 SECTION INCLUDES A. Site Cast or Tilt-Up Brick
More informationGUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410
GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 Note to user: These guide specifications are provided by Mid- States Concrete Products as a service to you; they are NOT specific
More informationSECTION BID PROPOSAL FORM. Telephone NO: ( ) Facsimile NO: ( ) Oklahoma License NO:
ISSUE DATE: MARCH 21, 2012 (REVISION 2-08/31/12) PROJECT: CNB BUILDINGS 2 AND 3 CATOOSA, OKLAHOMA OWNER: BID TO: (Mail & Fax) CHEROKEE NATION BUSINESSES 777 WEST CHEROKEE STREET CATOOSA, OKLAHOMA 74015
More informationReCote Finish System over Concrete
Part 1 General 1.01 GENERAL A. The Master Wall ReCote Finish System for smooth precast and cast in place concrete consists of an acrylic primer and ReCote acrylic finish. When needed an acrylic modified
More informationSPECIFICATIONS FOR INSTALLATION OF PRECAST PRESTRESSED CONCRETE DECK PANELS
SPECIFICATIONS FOR INSTALLATION OF PRECAST PRESTRESSED CONCRETE DECK PANELS 1.0 DESCRIPTION The Work shall consist of:.1 Transportation, unloading, erection and grouting of precast prestressed concrete
More information2016 CDM Smith All Rights Reserved July 2016 SECTION COMPOSITE STEEL FLOOR DECK
PART 1 GENERAL 1.01 SCOPE OF WORK SECTION 05 36 00 COMPOSITE STEEL FLOOR DECK A. Furnish all labor, materials, equipment and incidentals required and install composite steel floor deck complete as shown
More informationSECTION 807 PUMP STATION REHABILITATION
SECTION 807 PUMP STATION REHABILITATION 807-1 DESCRIPTION: Rehabilitation of pump stations shall be defined as the cleaning, removal, repair and/or replacement of any and/or all components including but
More informationSECTION EXTERIOR GRILLS AND SCREENS
SECTION 10 82 13 PART 1 GENERAL PART 1 1 SUMMARY A. Section Includes: 1. Exterior perforated aluminum screen wall system with Ombrae TM Optical Tile imaging technology. 2. Accessories including attachments,
More informationUNISTRUT CORPORATION GENERAL NOTES 1. THIS UNISTRUT SUPPORT SYSTEM IS DESIGNED TO SUPPORT A MAXIMUM UNIFORM LOAD OF PSF.
1. THIS SUPPORT SYSTEM IS DESIGNED TO 4. ALL CHANNEL & FITTINGS TO HAVE STANDARD 1. THIS SUPPORT SYSTEM IS DESIGNED TO 4. ALL CHANNEL & FITTINGS TO HAVE STANDARD 1. THIS SUPPORT SYSTEM IS DESIGNED TO 4.
More informationJobsite Layout Considerations
1 Jobsite Layout Considerations The controlling contractor must consider many factors when laying out a site to support construction operations Site and building size and Equipment requirements configuration
More informationStrengthened Soil Wall Construction Manual
Strengthened Soil Wall Construction Manual This information has been prepared by Shaw Technologies, Inc. as an aid in constructing their Strengthened Soil Wall system. Final determination of the suitability
More informationInstallation Manual. ArchCast Bridge. 3-Sided Precast Concrete Bridge Structure
ArchCast Bridge 3-Sided Precast Concrete Bridge Structure Installation Manual Salem Location: 749 West Commercial Ave. Salem, IL 62881 (618) 548-1190 countymaterials.com Email: info@countymaterials.com
More informationNutrient Removing Filtration System
Nutrient Removing Filtration System Contractor Installation Manual Version 1.0 Suntree Technologies, Inc 798 Clearlake Road, Suite 2 Cocoa, Florida 32922 321.637.7552 www.suntreetech.com info@suntreetech.com
More informationSECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS
SECTION 01 00 00 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Summary of Work: 1. General 2. Contract. B. Contract Considerations: 1. Schedule of values. 2. Applications for payment. 3.
More informationSECTION BASIC ELECTRICAL MATERIALS AND METHODS
SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:
More informationSECTION STRUCTURE MOUNT RAILING SYSTEM
SECTION 05520 STRUCTURE MOUNT RAILING SYSTEM Peak Fall Protection specializes in the design, engineering, fabrication, installation, and certification of fall protection safety systems. Our team of safety
More informationSECTION ARCHITECTURAL PRECAST CONCRETE. A. American Society for Testing and Materials (ASTM):
SECTION 03450 ARCHITECTURAL PRECAST CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03100 - Concrete Formwork 2. 03200 - Concrete Reinforcement 3. 03300 - Cast-in-Place Concrete 4. 03600 -
More informationSTRUCTURAL STEEL FRAMING
SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Section includes 1. Structural steel framing 2. Structural steel framing required for support and framing of rooftop mechanical
More informationPRECAST CONCRETE GIRDER ERECTION
7.1 Precast Concrete Girder Erection - General Erection of precast concrete girders includes transporting the girders to the site, handling and temporary storage, installing anchor bolts, shear blocks
More information6494 Latcha Rd. Walbridge, Ohio v: f: Table of Contents
Document (00 21 13) Rudolph/Libbe Inc. www.rlcos.com 6494 Latcha Rd. Walbridge, Ohio 43465 v: 419.241-5000 f: 419.837.9373 Table of Contents 1.0 General Instructions 1.1 Document Hierarchy 1.2 Safety 1.3
More informationPROJECT MANUAL FOR: CP AGRICULTURAL ENGINEERING RAIN TOWER REPAIRS CP HULSTON HALL STAIR TOWER REPAIRS
ADDENDUM #01 DATE: MAY 6, 2016 Page 1 of 2 TO CONTRACT DOCUMENTS ENTITLED: PROJECT MANUAL FOR: CP151322 AGRICULTURAL ENGINEERING RAIN TOWER REPAIRS CP160372 HULSTON HALL STAIR TOWER REPAIRS AT UNIVERSITY
More informationSECTION A. Manufacturer's data sheets on each product to be used, including:
Page 1 of 7 SECTION 084239 PRESSURE-RESISTANT ENTRANCES **Note to Specifier** This specification contains component and configuration options. Where indicated choose the appropriate choice for your specific
More informationA. The work under this section consists of furnishing and installing gauge steel framing and bracing as indicated on the drawings and as specified.
SECTION 05450 LIGHT GAUGE STEEL FRAMING SYSTEM PART 1 GENERAL 1.1 SUMMARY A. The work under this section consists of furnishing and installing gauge steel framing and bracing as indicated on the drawings
More informationATTACHMENT A. Bid # 6793
ATTACHMENT A SCOPE OF WORK TECHNICAL SPECIFICATIONS AND CONTRACT DRAWINGS STORAGE SHED INSTALLATION AT THE SAN JOAQUIN COUNTY HOUSEHOLD HAZARDOUS WASTE FACILITY Bid # 6793 Department of Public Works Solid
More informationTEXAS TECH UNIVERSITY HEALTH SCIENCES CENTER MEDICAL SCIENCE BUILDING II EARLY GMP SUB SELECTION REQUEST FOR PROPOSAL
TEXAS TECH UNIVERSITY HEALTH SCIENCES CENTER MEDICAL SCIENCE BUILDING II El Paso, Texas EARLY GMP SUB SELECTION REQUEST FOR PROPOSAL for the BUILDING CONCRETE GLASS AND GLAZING FIRE SPRINKLER MECHANICAL
More informationExpansion Joint Covers
Expansion Joint Covers 07 95 00 (079513) PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Supplementary Conditions and Division-1
More informationCorium Brick Rainscreen System Specifications
CORIUM BRICK RAINSCREEN SYSTEM PART 1 - GENERAL 1.1 SUMMARY A. Work Included: The Work of this Section shall include but not be limited to the following: 1. Corium brick plates 2. Galvanized and coated
More informationMaster Specifications for Microcotta November 2017
SECTION 042130 - MICROCOTTA PART 1 - GENERAL 1.1 SUMMARY A. Provide Architectural Microcotta, cast architectural polymer resin units manufactured in accordance with the Contract Documents. 1.2 WORK INCLUDED
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II
SECTION 052100 - STEEL JOISTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections
More informationSECTION STAINLESS STEEL WALL PANELS
SECTION 07400 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Dry joint, Rainscreen stainless steel wall panel system. 2. Accessories including attachments, clips, sub girts, shims, and fasteners 3.
More informationSECTION IRRIGATION WATER WELL
PART 1 GENERAL 1.1 SECTION INCLUDES: SECTION 02670 IRRIGATION WATER WELL A. The work shall consist of furnishing all labor, material, equipment and services necessary for the drilling of irrigation water
More information***************************************************************************************************************
03365 POST-TENSIONED CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 38 00. ***************************************************************************************************************
More informationDIVISION 5 METALS SECTION STRUCTURAL STEEL
DIVISION 5 METALS SECTION 05 12 00 PART 1 GENERAL 1.01 SUMMARY A. Section Includes: All labor and materials required to furnish and install the structural steel shown on the Drawings and required by these
More informationSECTION IRRIGATION WATER WELL
PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 33 21 16 IRRIGATION WATER WELL A. The work shall consist of furnishing all labor, material, equipment, and services necessary for the drilling of irrigation
More informationDIVISION 2- EXISTING CONDITIONS
DIVISION 2- EXISTING CONDITIONS 024100- SELECTIVE DEMOLITION PART 1 - GENERAL: 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationPART 1 / GENERAL SECTION ALUMINUM PLATE PANEL SYSTEM. ALPLY Insulated Panels. Alply TECH WALL Aluminum Plate System 2002
SECTION 07 42 13 ALUMINUM PLATE PANEL SYSTEM ALPLY Insulated Panels Alply TECH WALL Aluminum Plate System 2002 PART 1 / GENERAL 1.1 SYSTEM DESCRIPTION A. Preformed Aluminum Plate System for Screen wall
More informationSECTIONAL OVERHEAD DOORS SECTION SECTIONAL OVERHEAD DOORS PART 1 GENERAL
13686.00 SECTIONAL OVERHEAD DOORS 083613-1 1.1 RELATED DOCUMENTS SECTION 083613 - SECTIONAL OVERHEAD DOORS PART 1 GENERAL A. Drawings and general provisions of Contract, including General and Supplementary
More informationSECTION UNCLASSIFIED EXCAVATION AND GRADING
SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on
More information1. Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.
SECTION 011000 - SUMMARY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections,
More informationExpansion Joint Covers (079513)
Expansion Joint Covers 07 95 00 (079513) PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Supplementary Conditions and Division-1
More informationGENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS USING THE THERMOFORM (PVC) PIPE LINING SYSTEM
1. GENERAL 1.01 DESCRIPTION GENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS USING THE THERMOFORM (PVC) PIPE LINING SYSTEM A. The Contractor shall furnish all labor, equipment and materials necessary
More informationEXHIBIT A - INSTRUCTIONS TO BIDDERS
1.01 GENERAL INFORMATION Neiman Marcus, Oak Brook, IL Oak Brook Center Remodel Project 2 EXHIBIT A - INSTRUCTIONS TO BIDDERS PROJECT: OWNER: CONSTRUCTION MANAGER: Neiman Marcus Oak Brook Remodel Project
More informationSECTION MISCELLANEOUS METAL FABRICATIONS
SECTION 05500 PART I - GENERAL 1.01 DESCRIPTION: A. Scope: Work under this Section shall include all material and installation necessary to provide Miscellaneous Metal Fabrications, as shown and detailed
More informationADDENDUM NUMBER 3 AUGUST 18, Jackson County Utility Authority Project No Pascagoula/Moss Point WWTP Escatawpa WWTP Repairs
ADDENDUM NUMBER 3 AUGUST 18, 2016 Jackson County Utility Authority Project No. 20150619124 Pascagoula/Moss Point WWTP Escatawpa WWTP Repairs FROM: BURK-KLEINPETER, INC. ENGINEERS, ARCHITECTS, PLANNERS,
More information***************************************************************************************************************
03450 ARCHITECTURAL PRECAST CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 45 13 ***************************************************************************************************************
More informationMezzanines By Design Page 1
SECTION 05120 STRUCTURAL STEEL PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions and Division 1 apply to this Section. 1.2 SUMMARY
More informationSECTION DECORATIVE METAL FENCES AND GATES
SECTION 32 31 19 SPEC WRITER NOTE: Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section
More informationMODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications
MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications Mar/2008 v1.0 SECTION 02255 HYDRAULICLY DRIVEN STEEL UNDERPINNING PILES PART 1 GENERAL 1.01 SCOPE OF WORK The work shall
More informationSECTION WELDED STEEL PICKET FENCE. 1. Fusion welded and rackable ornamental steel picket fence system.
PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Fusion welded and rackable ornamental steel picket fence system. B. Related sections: 1. Section 03310 Concrete Work for post support. 2. Section 09960
More informationSPECIFICATIONS FOR AluSystems Aluminum Composite Panels Series 20 Dry Joint 1.00 GENERAL 1.01 RANGE OF WORK Section includes: Laminated panels and attachment systems for use as exterior cladding. A. Provide
More informationEndicott Mbrick Thinbrick Color Red Blend Velour
Endicott Mbrick Thinbrick Color Red Blend Velour Innovative Brick Systems, LLC 11625 Reed Ct. Broomfield, CO 80020 Phone: (800) 413-4588 Phone: (720) 890-6032 Fax: (720) 890-6038 Info@mbrick.com www.mbrick.com
More informationSummitville Mbrick Thinbrick Color Old Salem
Summitville Mbrick Thinbrick Color Old Salem Innovative Brick Systems, LLC 11625 Reed Ct. Broomfield, CO 80020 Phone: (800) 413-4588 Phone: (720) 890-6032 Fax: (720) 890-6038 Info@mbrick.com www.mbrick.com
More informationEndicott Mbrick Thinbrick Color Burgundy Sands
Endicott Mbrick Thinbrick Color Burgundy Sands Innovative Brick Systems, LLC 11625 Reed Ct. Broomfield, CO 80020 Phone: (800) 413-4588 Phone: (720) 890-6032 Fax: (720) 890-6038 Info@mbrick.com www.mbrick.com
More informationSummitville Mbrick Thinbrick Color Yorktown
Summitville Mbrick Thinbrick Color Yorktown Innovative Brick Systems, LLC 11625 Reed Ct. Broomfield, CO 80020 Phone: (800) 413-4588 Phone: (720) 890-6032 Fax: (720) 890-6038 Info@mbrick.com www.mbrick.com
More informationEndicott Mbrick Thinbrick Color Coppertone
Endicott Mbrick Thinbrick Color Coppertone Innovative Brick Systems, LLC 11625 Reed Ct. Broomfield, CO 80020 Phone: (800) 413-4588 Phone: (720) 890-6032 Fax: (720) 890-6038 Info@mbrick.com www.mbrick.com
More informationSECTION STRUCTURAL STEEL
PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish and install all materials, labor, equipment and incidentals required to provide structural steel shown on the Contract Drawings and as
More informationCounty Materials Mbrick Thinbrick Color Tuscany Villa Blend
County Materials Mbrick Thinbrick Color Tuscany Villa Blend Innovative Brick Systems, LLC 11625 Reed Ct. Broomfield, CO 80020 Phone: (800) 413-4588 Phone: (720) 890-6032 Fax: (720) 890-6038 Info@mbrick.com
More informationSECTION ORNAMENTAL ALUMINUM RAILING
SECTION 05730 ORNAMENTAL ALUMINUM RAILING PART 1 GENERAL 1.1 SECTION INCLUDES A. Aluminum Pipe Railing 1.2 RELATED SECTIONS A. Section 03300 Cast-In-Place Concrete: Placement of sleeves cast in concrete.
More informationREQUEST FOR PROPOSAL (RFP) INSTRUCTIONS AND SUPPLEMENTAL CONDITIONS
REQUEST FOR PROPOSAL (RFP) INSTRUCTIONS AND SUPPLEMENTAL CONDITIONS Project Title: Parking Lot Sealcoating, Striping and Numbering RFP Number: EQ5P2SSAC-17-0008 RFP Issue Date: Monday, August 14, 2017
More informationREQUEST FOR PROPOSALS Garfield Charter Township Hall Sidewalk Snowmelt Heating System Repairs Garfield Township, Grand Traverse County
REQUEST FOR PROPOSALS Garfield Charter Township Hall Sidewalk Snowmelt Heating System Repairs Garfield Township, Grand Traverse County Proposals Due: 10:00 A.M., Thursday, March 28, 2019 Address Proposals
More informationSPECIFICATIONS FOR ERECTION OF PRECAST PRESTRESSED CONCRETE GIRDERS
SPECIFICATIONS FOR ERECTION OF PRECAST PRESTRESSED CONCRETE GIRDERS 1.0 DESCRIPTION The Work shall consist of:.1 Transportation, unloading, and erection of precast prestressed concrete girders;.2 Supply
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II
SECTION 015000 - TEMPORARY FACILITIES AND CONTROLS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationSECTION FIRE HYDRANTS
SECTION 02080 FIRE HYDRANTS PART 1 - GENERAL 1.01 DESCRIPTION A. Work Specified The work specified shall include all labor, material, equipment, tools, services and incidentals necessary to furnish and
More information2. Clarification: The building address is 801 Henderson Street.
East Energy Structural Steel Painting University of South Carolina Project Number H27-Z037 Addendum One October 19, 2015 NOTE: The following amendments, additions, and deletions shall be made to the Construction
More informationSECTION PORTLAND CEMENT CONCRETE
PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including the supplemental documents as indicated in the Site Work General Provisions, apply to work of this
More informationREQUEST FOR PROPOSAL
REQUEST FOR PROPOSAL DATE: February 24, 2015 Shimizu North America LLC 909 3rd Avenue, 28th Floor New York, NY 10022 RFP Queries (646) 205-4722 Fax (212) 223-1930 PROJECT: The Japan Foundation New York
More informationSECTION TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:
PART 1 GENERAL 1.01 SUMMARY SECTION 03460 TILT-UP PRECAST CONCRETE SANDWICH PANELS A. Work includes, but is not limited to, the following: 1. Architectural precast concrete sandwich wall panels. 2. Integral
More informationSTRUCTURAL STEEL FRAMING Section
PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Structural steel. 2. Grout. 1.2 DEFINITIONS A. Structural Steel: Elements of the structural frame indicated on Drawings and as described in AISC 303,
More information