1 SECTION WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. The Contractor shall provide all labor, materials, tools, and equipment required to remove existing residuals from the North Lagoon at the Williams Road Water Treatment Plant site, provide on-site dewatering to a minimum of 20% solids content if required, transport residuals, and dispose of all residuals in an approved, New York State Department of Environmental Conservation (NYSDEC) permitted, manner. 1.2 QUALITY ASSURANCE A. Requirements of Regulatory Agencies 1. Comply with the applicable requirements of the NYSDEC, Division of Solid Waste and other agencies or authorities having jurisdiction. Apply for, pay for and obtain necessary and/or required permits for hauling and disposing of residuals at a site approved by NYSDEC. 1.3 SUBMITTALS A. Shop Drawings: Submit for approval the following: 1. Detailed description of the proposed Lagoon cleaning procedures including materials and equipment used to remove residuals and clean Lagoon. 2. Detailed description of the residuals dewatering system including procedures for handling excess leachate from the residuals dewatering process. 3. NYSDEC permitted (or NYSDEC approved alternative) residual disposal location to be used. 4. Material to be used for clay cut off trench and clay liner. 1.4 DEFINITIONS A. Contract Documents may refer to water treatment residuals as sludge. These two (2) descriptions shall be used interchangeably. PART 2 - REQUIREMENTS 2.1 GENERAL A. The North Lagoon at the Williams Road Treatment Plant has been taken out of service as of the time of this Contract. The Contractor will be responsible to removed supernatant water, remove the sludge from the Lagoon, and provide on-site dewatering of the sludge to a minimum of 20% solids content if required. All sludge removed shall be taken to an approved disposal site and disposed of WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING
2 in an approved manner. All liquid obtained in dewatering process shall be removed from the site and disposed of in an approved manner. B. All sludge removed from the Lagoon shall be processed and treated on-site to twenty percent (20%) (min.) solids and no free moisture shall be evident in the sludge. C. All removal, treatment, transportation, and disposal of sludge and liquid obtained from dewatering process shall be in accordance with the New York State Department of Environmental Conservation, Division of Solid Waste, 6 NYCRR Part 360 Solid Waste Management Facilities and the rules and regulations of the Agency. D. The Contractor shall handle, transport, and dispose of sludge using methods consistent with all regulations of the NYSDEC or other agencies having jurisdiction of the work. E. Upon removal of the sludge from the Water Treatment Plant site, the Contractor shall assume and hold ownership of all removed materials. F. The Contractor shall dispose of all sludge obtained hereunder, at a NYSDEC approved disposal site as identified in the Bid Requirements Section. The Contractor shall not be limited to the use of one approved NYSDEC approved disposal site. The Contractor shall be required to remove from the site all sludge from the North Lagoon at the Water Treatment Plant throughout the terms of this Contract regardless of operating status of any disposal site owned or operated by the Contractor or others. G. The Contractor shall clear and grub the existing vegetation and trees growing in the sludge deposits at the bottom of the existing Lagoon prior to removal of the sludge. All vegetation and trees removed shall be disposed of off-site in an approved manner. Vegetation and grass removed from the side slopes of the Lagoon embankment shall be disposed of off-site in an approved manner. All costs associated with clearing and grubbing shall be included in the applicable lump sum item(s). H. All sludge must be properly disposed as outlined in Section 2.1 of this section. Alternative disposal or private disposal of the sludge is strictly prohibited unless NYSDEC permit documentation is provided showing alternative or private disposal is permitted by the NYSDEC. 2.2 OBLIGATION AND RESPONSIBILITY OF CONTRACTOR A. The Contractor shall, at his own cost and expense, provide any and all manner of superintendence, insurance, taxes, permits, permit fees, testing, labor, materials, apparatus, appliances, tools, machinery, power, transportation and whatever else may be required of every description necessary to do and complete the work as shown and as specified. B. The Contractor shall be capable of providing all aspects of work required for the handling, transportation, disposal, procurement of applicable permits and testing required for the treatment and disposal of the Water Treatment Plant sludge removed from the North Lagoon. 2.3 PERMITS AND TESTING A. Full TCLP, ph, and total solids tests were performed on the sludge and are included in this Specification under Appendix "C". The test results are for informational purposes only and are representative of the sludge on the day the tests were taken. Testing required in order to obtain or WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING
3 comply with permits, shall be performed by the Contractor and all costs associated with these tests will be the responsibility of the Contractor and included under the applicable lump sum prices. B. The Contractor shall obtain all permits required for the handling, transportation and disposal of all sludge from the Water Treatment Plant site. C. Permits may include transportation permits, disposal permits, NYSDEC permits, and any other permits required to complete the work as shown and as specified. D. All fees required for the procurement of the above mentioned permits and any tests required shall be paid by the Contractor. E. The Contractor shall obtain approved permits prior to the start of any work requiring permits and shall deliver a copy to the Engineer prior to starting any work under this Contract. F. All testing required for disposal of the sludge shall be obtained by the Contractor. G. Appendix "B" contains safety data sheets for chemicals used in the water treatment process from which the sludge originated. These sheets are supplied for information purposes only. PART 3 - EXECUTION 3.1 REMOVAL OF SLUDGE A. The existing sludge shall be removed by the Contractor. The Contractor is responsible for all methods used for the removal of the sludge from the Lagoon; however, any methods employed shall be approved by the Engineer. The Contractor's selection of equipment and methods used to remove the sludge from the Lagoon shall take into account the construction of the existing Lagoon to be cleaned, the sizes of the available work areas, existing Owner's operations in the area and any other factors which may affect the work under this project. B. The approximate quantity of sludge in the Lagoon is 4,980 CY+/-. This calculated volume is only representative of the volume of sludge on the day the field tests and survey was completed. The Lagoon bottom was surveyed in August 2009 after cleaning. The top of sludge was surveyed in March Actual volumes may vary. The Contractor is responsible to remove all sludge in the Lagoon from the existing top elevations to the top of the existing Lagoon bottom. If the amount of sludge to be removed to reach the clay layer exceeds 4,980 CY, no additional compensation to the Contractor shall result. C. The Contractor shall confine his operations to the limits of work areas as designated by the Owner. Any damage resulting from work outside the limits of work areas shall be restored by the Contractor and shall be subject to approval by the Engineer. Upon completion of all work required under this Contract, the Contractor shall restore the areas used for his work to the original condition and to a condition acceptable to the Engineer. Restoration shall include but is not limited to grading as required, furnishing and installing topsoils and seeding. D. An approximate cross section of the existing Lagoon have been included in Appendix D. Prior to excavation and sludge removal, the Contractor will be required to make test excavations to determine and verify the elevation of the top of the existing Lagoon bottom. The cost of the test excavations shall be included in the lump sum price bid by the Contractor for completion of this WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING
4 Contract. Location and quantity of these test excavations shall be approved by the Engineer. The Contractor shall remove sludge to the elevations and limits as shown on the Contract Drawings or to the top of the existing Lagoon bottom. For the Lagoon bottom, the Contractor shall use care when excavating and removing sludge from the lagoon so as not to over excavate below the proposed elevations as shown. Any over excavation caused by the Contractor's operations may result in removal of sections of the existing Lagoon bottom. These test excavations (to confirm the Lagoon bottom elevation) are not considered test pit excavations and shall not be paid for under the test pit excavation bid item. E. In the event that the Lagoon bottom is disturbed or damaged by the Contractor's operations, the bottom shall be repaired with additional compacted clay material by the Contractor. The Contractor shall not repair the bottom with the disturbed existing material unless directed by the Engineer. Repairs, if required, shall be approved by the Engineer. A shop drawing submittal is required to be submitted by the Contractor outlining materials, equipment and methods used by the Contractor to repair the Lagoon bottom. The Lagoon bottom shall be repaired or replaced to the thickness of the required for the proposed clay liner, as required and approved by the Engineer. Clay material shall have a permeability of 1 x 10-7 centimeters per second or less. Compaction shall meet 95%of maximum density at the approximate optimum moisture content determined by the procedure ASTM D-1557 modified proctor. Compaction shall be obtained by the use of mechanical tamping devices. 3.2 ON-SITE SLUDGE TREATMENT A. The Contractor will be required to ensure that the sludge taken to an approved landfill is a minimum of 20% solids with no free liquid evident in the sludge as per requirements of the NYSDEC Part 360. If the sludge removed meets these criteria, the sludge may be directly taken to an approved landfill. If the sludge does not meet the 20% solids criteria, the Contractor shall provide means to treat the sludge to meet the criteria. As the Contractor's option, the sludge can be mixed with sludge consisting of higher percent solids in order to obtain a uniform mixture of solids meeting the Specification requirements. As solids content requires, the Contractor shall provide a trailer mounted on-site dewatering unit to provide on-site sludge dewatering to meet the 20% solids criteria. The dewatering unit shall be trailer mounted and outfitted with all necessary equipment to make it a complete dewatering facility. Equipment shall include sludge pumps, sludge conditioning equipment, chemicals, and all other equipment necessary to treat and dewater the sludge. The Contractor will not be allowed to add water to the sludge to aid in the removal of the sludge from the Lagoon. B. Liquids produced from the dewatering operation shall be collected and sent to a tank or other approved collection system. No liquids will be allowed to escape from the process. The Contractor shall provide all means necessary to ensure complete collection of liquids resulting from dewatering operations. The liquids obtained from dewatering operations shall NOT be returned to any point of the Water Treatment Plant site. C. The Contractor shall provide all required tanks, trucks, or other methods necessary to contain the water and liquids produced from the sludge removal operations and shall dispose of the liquids offsite in an approved manner. The Contractor is responsible to make all arrangements and obtain all permits required in order to dispose of the liquids produced by his operations. WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING
5 D. The Contractor will be responsible to perform and pay the associated costs for all testing required by the permits in order to ensure the sludge meets all the criteria including percentage of solids, as well as any additional tests ordered by the Engineer, to ensure conformance with the permits and the Contract Documents. 3.3 SLUDGE HAULING AND DISPOSAL A. Methods employed by the Contractor to haul and dispose of sludge shall meet all permit requirements and local ordinances in effect at the time of this Contract. The Contractor shall use bed liners, covers, and all other equipment necessary to prevent sludge spillage or seepage during transportation. The Contractor shall be responsible for all costs for cleanup of all spilled sludge between the project and disposal sites. B. The Contractor shall coordinate his sludge hauling operations with the Owner's operations and with other Contractors performing work at the site. Any hauling operations by the Contractor shall be scheduled in order to avoid conflicts with Owner's operations and other work and shall be acceptable to the Owner. The Owner will designate routes or roadways at the Water Treatment Plant site for the Contractor's uses. The hauling operation shall be limited to these designated routes or roadways. 3.4 SITE MAINTENANCE A. The Contractor shall be responsible for daily clean-up of the site including the grass area, stone haul road, and asphalt pavement area. B. While cleaning the pavement area, at no time is the Contractor allowed to discharge water into the existing storm sewer system located on the site (within the pavement area). C. The Contractor shall be responsible for all necessary soil and erosion control measures to prevent the discharge of soil or contaminated water into the storm sewer system. D. The Contractor shall be responsible for final cleaning of the site at the completion of the project. This will include stone haul road restoration, site grading, topsoiling, and seeding, and pavement restoration (if necessary). END OF SECTION WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING
1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1
1.01 GENERAL A. The Contractor shall perform all excavation, backfilling, grubbing and grading required for construction and installation of pipelines, structures and appurtenances. Excavation shall include
More informationITEM 706 PIPE SLOPE DRAIN
AFTER NOVEMBER 1, 2008 ITEM 706 PIPE SLOPE DRAIN 706.1 Description. This work shall consist of the installation of temporary erosion protection and sediment control pipe slope drains, utilized during construction
More informationCW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS
CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS 1. GENERAL CONDITIONS...1 3. DESCRIPTION...1 5. MATERIALS...1 5.1 General...1 5.2 Handling and Storage of Materials...1 5.3 Testing and Approval...1 5.4
More informationUnion County Vocational - Technical Schools Scotch Plains, New Jersey
SECTION 02222 - EXCAVATION, BACKFILL, AND COMPACTION FOR UTILITIES PART 1 - GENERAL 1.01 SECTION INCLUDES A. Excavating trenches for the installation of utilities and stormwater detention facilities. B.
More informationSECTION MEASUREMENT AND PAYMENT
SECTION 012000 Applies only to Collier County Public Utilities Projects or Works and Utilities Portions of Collier County Transportation Projects, but not to Private Developments PART 1 GENERAL 1.1 SECTION
More informationADDENDUM No. 2. ITB No WTP LIME RESIDUAL REMOVAL CONTRACT No. 2 DREDGING AND HAULING
ADDENDUM No. 2 ITB No. 4561 WTP LIME RESIDUAL REMOVAL CONTRACT No. 2 DREDGING AND HAULING Bids Due: February 4, 2019 at 2:00 P.M. (Local Time) The following changes, additions, and/or deletions shall be
More informationSECTION UNCLASSIFIED EXCAVATION AND GRADING
SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on
More informationTECHNICAL SPECIFICATION
TECHNICAL SPECIFICATION ITEM 04821 TEMPORARY VEHICLE AND EQUIPMENT FUELING AREA PART 1 - GENERAL 1.01 Description Installation of erosion and sediment control for a temporary vehicle and equipment fueling
More informationDIVISION 4100 SITEWORK
DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES
More informationSECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.
SECTION 1100 GRADING 1101 SCOPE. This section covers the performance of all work required for grading the project in coordination with all previous work performed at the locations shown on the contract
More informationCITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP
INFRASTRUCTURE SERVICES Page 1 of 7 1.0 GRANULAR BASE AND SUB-BASE 1.1 DESCRIPTION.1 This section specifies requirements for supplying, producing, hauling placing and compacting processed gravel or quarried
More informationRFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered
RFB for Wastewater Force Main #3 October 2, 2015 Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered The proposed force main will be required to transmit up to 1000 gallons of wastewater
More informationEXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.
CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related
More informationB. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation.
SECTION 312333 TRENCHING AND BACKFILLING PART 1 - GENERAL 1.1 SUMMARY A. Excavate trenches for new electric and telephone conduits, gas lines, and their appurtenances from at least 5 feet outside the building
More informationTOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT
TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT 06045-0191 HILLIARD S POND DAM REMOVAL AND BIGELOW BROOK STREAM CHANNEL RESTORATION BID NO. 14/15-74
More informationEXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013
GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The Work of this Section shall be all labour, materials, equipment and supervision necessary
More informationB. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.
SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution
More informationSECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...
SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...
More informationSANBORN COUNTY
Sheet 1 of 12 SPECIFICATIONS ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 110E0500 Remove Pipe Culvert 134 Ft 110E1010 Remove Asphalt Concrete Pavement 178
More informationSECTION TRENCHING & BACKFILLING
SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications
More informationSECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.
SECTION 01220 UNIT PRICES PART 1 GENERAL 1.01 SUMMARY A. This Section specifies administrative and procedural requirements for the unit prices. B. The omission of any unit price description from this Section
More informationGRADING, EROSION AND SEDIMENTATION CONTROL
SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,
More informationSECTION MEASUREMENT AND PAYMENT
SECTION 01025 - MEASUREMENT AND PAYMENT PART 1 - GENERAL 1.01. BASIS FOR MEASUREMENT AND PAYMENT Measurement and Payment will be made for only those items included in the Schedule of Unit Prices or Contract
More informationSECTION TEMPORARY ENVIRONMENTAL CONTROLS
SECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall provide environmental controls consistent with regulatory requirements throughout the duration
More informationSPECIAL SPECIFICATION 3504 Septic Tank System
1993 Specifications CSJ s 3136-01-126, etc. & 0683-01-070, etc. SPECIAL SPECIFICATION 3504 Septic Tank System 1. Description. This Item shall govern for all materials, equipment and labor necessary for
More informationSECTION MEASUREMENT AND PAYMENT
SECTION 01026 PART 1 GENERAL 1.1 SECTION INCLUDES A. Explanation and Definitions B. Measurement C. Payment D. Schedule of Values E. Application for Payment 1.2 EXPLANATION AND DEFINITIONS A. The following
More informationADDENDUM NO. 1. DATE ISSUED: June 1, 2018
ADDENDUM NO. 1 DATE ISSUED: June 1, 2018 BID #018-041 BIDDING AND CONTRACT DOCUMENTS FOR THE CLASS THREE LANDFILL CELLS 8-12 & CLASS TWO LANDFILL CLOSURE PROJECT GEORGETOWN COUNTY, SOUTH CAROLINA ****************************************************************************************************
More informationSECTION 14 EMBANKMENT
SECTION 14 EMBANKMENT 14.1 DESCRIPTION A. General: This work consists of constructing roadway embankments, including preparation of the areas upon which embankments are to be placed; the construction of
More informationSpecial Provision Item P-152 Excavation and Embankment
Special Provision Item P-152 Excavation and Embankment DESCRIPTION This item shall be constructed in conformity with FAA Standard Specification "Item P-152 Excavation and Embankment, except as herein modified
More informationSECTION A1 EXCAVATION AND BACKFILL GENERAL
SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such
More informationa. Unless otherwise specified, all lengths shall be horizontal distances.
SECTION 01025 PART 1- GENERAL 1.01 DESCRIPTION A. This section describes the method used to determine quantities of Work performed or materials supplied for which a price is given in the Bid. It establishes
More informationSection 5 Specification 5.22 Supply and Install Smooth Wall Steel Pipes TABLE OF CONTENTS
TABLE OF CONTENTS 5.22 SUPPLY AND INSTALL SMOOTH WALL STEEL PIPES... 1 5.22.1 GENERAL... 1 5.22.2 MATERIALS... 1 5.22.2.1 Culvert Material... 1 5.22.2.2 Material for Bedding, Backfill and Sealing... 1
More informationITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES
AFTER MARCH 1, 2012 ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES 430.1 Description. This item shall govern for all excavation required for the construction of sewers, sewer structures, pipe culverts,
More informationSECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing.
SECTION 02221 TRENCHING, BACKFILLING AND COMPACTION PART 1 GENERAL 1.01 WORK INCLUDED A. Excavation for piped utility material. B. Provide necessary sheeting, shoring and bracing. C. Prepare trench bottom
More informationJob Order Sewer Repair Services
Job Order Sewer Repair Services Bid Addendum No. 1 October 10, 2018 All Contractual Requirements as defined within the Contract Documents shall remain in full force to the extent that they are not modified
More informationSECTION PAYMENT PROCEDURES
SECTION 01 29 00 PAYMENT PROCEDURES PART 1 GENERAL 1.01 SECTION INCLUDES A. For each BID item, the WORK will be measured and paid for on either a unit price basis or on a lump sum basis. The quantities
More informationSECTION EARTHWORK
SECTION 02200 EARTHWORK PART 1 - GENERAL 1.01 WORK INVOLVED A. Provide all labor, materials and equipment as required for all excavation, grading, providing borrow materials, hauling, placing and compacting
More informationConstruction Specification for General Excavation
Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03
More information1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods
SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include
More informationSECTION IV. PIPELINE EXCAVATION AND BACKFILL
SECTION IV. PIPELINE EXCAVATION AND BACKFILL A. Description of Work B. Surface Types C. Backfill D. Surface Restoration A. DESCRIPTION OF WORK 1. Extent: Excavation of trenches for pipelines shall include
More informationSECTION TRENCHING
SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.
More informationSECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING
PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels
More informationSTATE OF NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION DIVISION OF COASTAL ENGINEERING
INDEX OF DRAWINGS SHEET NO. DESCRIPTION 1 TITLE SHEET AND LOCATION PLAN 2 GENERAL NOTES AND SITE ACCESS AND STAGING AREA LAYOUT 3 EXISTING CONDITIONS AND DEMOLITION PLAN 4 CONSTRUCTION PLAN AND PROFILE
More informationSECTION 1 GENERAL NOTES
ISSUE DATE NOVEMBER 1st, 2011 SECTION 1 Page List Page Number Page Title COVER COVER GN-01 PAGE 1 GN-02 PAGE 2 GN-03 PAGE 3 GN-04 PAGE 4 GN-05 PAGE 5 GN-06 PAGE 6 GN-07 PAGE 7 : 1. (CCU) STANDARD SPECIFICATIONS
More informationSPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL. 2.1 General...2-1
SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL TABLE OF CONTENTS 2.1 General...2-1 2.2 Materials...2-1 2.2.1 Compacted Non-granular Material...2-1 2.2.2 Gravel Material and Crushed Aggregate
More informationDOCUMENT ADDENDA AND MODIFICATIONS
DOCUMENT ADDENDA AND MODIFICATIONS PART 1 1.1 PROCEDURE GENERAL A. For filing purposes, add Addenda and Modifications to the Contract Documents following this page. Modified June 20, 2017 Addenda and Modifications
More informationSTANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION TRENCHING AND BACKFILL
STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION 31 23 33 TRENCHING AND BACKFILL PART 1 GENERAL... 3 1.1 Description... 3 A. Excavation for Utilities Includes... 3 B. Suitable Fill Material...
More informationCITY OF LETHBRIDGE SECTION Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5
Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5 1.0 EXCAVATION AND FILL 1.1 GENERAL.1 The excavation or fill shall be made to provide proper grade, lines and crosssection for the laying of
More informationAddendum No. 1 Page 1 of 2
Addendum No. 1 Page 1 of 2 DATE: March 14, 2016 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Bidders SUBJECT: Addendum No. 1 PROJECT NAME: Parking Lot S7 Improvements JJC PROJECT
More informationSECTION EMBANKMENT
02260-1 of 8 SECTION 02260 EMBANKMENT 02260.01 GENERAL A. Description 1. Embankment shall be formed of suitable material obtained from General, Structure, Borrow, Trench, and other excavations included
More informationCity of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING
January 2007(Revision 1) Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 CLASSIFICATION OF THE WORK 1.05 QUALITY ASSURANCE PART 2 PRODUCTS 2.01
More informationSECTION 603 SEEDING I. GENERAL 1.1 DESCRIPTION OF WORK
SECTION 603 SEEDING I. GENERAL 1.1 DESCRIPTION OF WORK The Contractor shall furnish all labor, supervision, material (except as herein provided), tools, equipment, supplies, and services; and, shall perform
More informationSECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section
02540-1 of 10 SECTION 02540 STORM DRAIN REHABILITATION 02540.01 GENERAL A. Description Storm drain rehabilitation shall include, but not necessarily be limited to, pipe joint sealing, inlet and manhole
More informationSECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.
PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and
More informationSECTION EARTHWORK. B. Removal of subsoil and excavating all classes of material encountered.
SECTION 02200 PART 1 GENERAL 1.1 SECTION INCLUDES A. Subsoil and aggregate materials. B. Removal of subsoil and excavating all classes of material encountered. C. Handling, storage, transportation and
More informationSPECIAL SPECIFICATION 4653 Polypropylene Pipe
2004 Specifications CSJ 2158-01-013, Etc. SPECIAL SPECIFICATION 4653 Polypropylene Pipe 1. Description. Furnish and install polypropylene pipe for constructing polypropylene pipe culverts or polypropylene
More informationCITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL
CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL 13.01 GENERAL The work included in this section shall consist of furnishing all materials and equipment and performing all labor
More informationExcavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.
Item Excavation and Backfill for Structures 1. DESCRIPTION 2. MATERIALS Excavate for placement and construction of structures and backfill structures. Cut and restore pavement. Use materials that meet
More informationSECTION GENERAL EXCAVATION
02210-1 of 11 SECTION 02210 GENERAL EXCAVATION 02210.01 GENERAL A. Description 1. General excavation shall include but not necessarily be limited to, excavation and grading for general site work, roadways,
More informationSTATE OF SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION PLANS FOR PROPOSED
STATE OF SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION PLANS FOR PROPOSED PROJECT 000P-151 US HWY 12 DAY COUNTY Construction of New Field Approach PCN i4g8 Sheet 1 of 11 ENVIRONMENTAL COMMITMENTS An Environmental
More informationEROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY
31 25 00 EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY A. Erosion and sedimentation control shall be provided by the Contractor for all areas of the site denuded or otherwise disturbed
More informationADDENDUM #1 Village of Hawthorn Woods Darlington Drive Culvert Replacement Date: January 29, 2018
CBBEL PROJECT NO. 02-0065.H0226 ADDENDUM #1 Village of Hawthorn Woods Darlington Drive Culvert Replacement Date: January 29, 2018 Modification No. 1 In regards to the COBBLESTONE PAVERS specification,
More informationSurface Infrastructure Restoration for Utility Cuts DIVISION 14 Shallow Buried Utilities Section _Mar29_2016.pdf Page 1 of 20 INDEX
14001_Mar29_2016.pdf Page 1 of 20 INDEX 14001-0 REQUEST TO CUT CITY SURFACE INFRASTRUCTURE 2 14001-1 COST SCHEDULE FOR WORK PERFORMED BY CITY FORCES 2 14001-2 SPECIFICATIONS FOR WORK PERFORMED BY EXTERNAL
More informationC. Foundation stabilization for pipe and utility structures.
PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization
More informationADDENDUM 1. Request for Proposals City of Minot, North Dakota Structure Demolition and Site Restoration Project, # Round 3.
ADDENDUM 1 Request for Proposals City of Minot, North Dakota Structure Demolition and Site Restoration Project, #3755.2 Round 3 April 14, 2016 Proposals Due: 11:00 A.M., Tuesday, April 19, 2016, Minot
More informationTable of Contents for Guide Specifications
Table of Contents for Guide Specifications 01270A Measurement and Payment 01355A Environmental Protection 01356A Storm Water Pollution Prevention Measures 01421 Basic Storm Water Pollution Prevention Plan
More informationSTANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL Section Number Title 801 GENERAL 802 STANDARD METHODS OF EROSION AND SEDIMENT
More information2. Insert Pre-Bid Meeting Minutes, and Sign-in Sheet before Technical Specifications.
June 7, 207 Addendum No. To Plans, Contract Documents and Specifications CNW TSTC Waco Airport Airfield Improvements - Stage III TxDOT CSJ No. 609TSTCW This addendum shall be a part of the Plans, Contract
More informationB. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.
SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating and filling for rough grading the Site. 2. Preparing subgrades for walks, curbs, pavements, and turf and grasses.
More informationTown of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL
CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with
More information2.1 Backfill - General
2.1 Backfill - General Excavations are made for the purpose of constructing bridge substructure elements, and consequently requiring competent backfill material. The backfill material must be adequately
More informationSPECIAL SPECIFICATION 6666 Charter Communications System
2004 Specifications CSJ 1200-05-014 SPECIAL SPECIFICATION 6666 Charter Communications System 1. Description. A. This Item will govern the installation of all facilities belonging to Charter Communications,
More informationITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS
AFTER FEBRUARY 1, 2011 ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS 481.1 Description. This specification shall govern for the construction of monolithic, reinforced concrete box sewers of the size,
More informationItem Name Description Unit of Measure Mobilization Per WSDOT Lump Sum
Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of
More informationSECTION 10 - TRENCHING AND BACKFILLING
SECTION 10 - TRENCHING AND BACKFILLING 10.1 General A. Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 10.1.1 Related requirements
More informationSECTION 18 - EARTHWORK TABLE OF CONTENTS
SECTION 18 - EARTHWORK TABLE OF CONTENTS Section Page 18-1 GENERAL... 18.1 18-2 ROADWAY EXCAVATION... 18.1 18-2.01 General... 18.1 18-2.02 Unsuitable Roadway Excavation and Backfill... 18.1 18-2.03 Surplus
More informationSPECIAL SPECIFICATION 4425 Thermoplastic Pipe
2004 Specifications CSJ 0264-07-028 SPECIAL SPECIFICATION 4425 Thermoplastic Pipe 1. Description. Furnish and install thermoplastic pipe for constructing thermoplastic pipe culverts or thermoplastic storm
More informationSECTION 18 - EARTHWORK TABLE OF CONTENTS
SECTION 18 - EARTHWORK TABLE OF CONTENTS Section Page 18-1 GENERAL... 18-2 18-2 ROADWAY EXCAVATION... 18-2 18-2.01 General... 18-2 18-2.02 Unsuitable Roadway Excavation and Backfill... 18-2 18-2.03 Surplus
More informationSPECIFICATIONS FOR STRUCTURAL EXCAVATION
SPECIFICATIONS FOR STRUCTURAL EXCAVATION 1.0 DESCRIPTION The Work shall consist of:.1 Excavation and removal of material for the placement of foundations, substructure units, approach slabs, transition
More informationIII. TECHNICAL SPECIFICATIONS DIVISION 56 BORED PIPE
III. TECHNICAL SPECIFICATIONS DIVISION 56 BORED PIPE PART I - GENERAL 56.01 SCOPE: The Contractor shall furnish all labor, material, equipment and supplies and shall perform all work necessary for the
More informationSECTION 32 EXCAVATION, BACKFILL, COMPACTION AND GRADING
32.1 GENERAL SECTION 32 EXCAVATION, BACKFILL, COMPACTION AND GRADING This Section covers excavation, backfill, fill and grading associated with utility trench and structural construction. All such WORK
More information1993 Specifications CSJ SPECIAL SPECIFICATION ITEM 4417 DEWATERING IN CONTAMINATED GROUNDWATER
1993 Specifications CSJ 8015-24-003 SPECIAL SPECIFICATION TO ITEM 4417 DEWATERING IN CONTAMINATED GROUNDWATER 1. DESCRIPTION. This item shall govern all work required to remove groundwater encountered
More informationCCU Engineering Specifications. Section PIPE REMOVAL, DISPOSAL, ALTERATION, MODIFICATION OR PIPE ABANDONMENT
CCU Engineering Specifications Section 002310 PIPE REMOVAL, DISPOSAL, ALTERATION, MODIFICATION OR PIPE ABANDONMENT Effective Date: Nov. 1st, 2011 Page 1 of 5 PART 1 - GENERAL The following specification
More informationBid Item 2 Prevention Control and Abatement of Erosion and Water Pollution Bid Item 3 Soil Tracking Prevention Device
Bid Item- Basic Description & Associated Specifications Bid Item 1 Mobilization/Demobilization and Permits The work specified under this Section shall consist of the preparatory work and operations necessary
More informationThe Regional Municipality of Peel Basis of Payment
Page PS-1 THE REGIONAL MUNICIPALITY OF PEEL BASIS OF PAYMENT FOR SANITARY SEWER CONSTRUCTION Page PS-2 INDEX Page No. PS.1. EXCAVATION...4 1.1. Trench Excavation...4 1.2. Asphalt/Concrete Removal...5 PS.2.
More information2. SECTION MEASUREMENT AND PAYMENT:
IN THE SPECIFICATIONS: 1. SECTION 00301 BID FORM: REPLACE Pages BF-1 through BF-6 (BF-1 follows page 00301-3) with the attached BF-1 through BF-6. This change adds a bid item for payment of CIPP testing.
More informationTERMS OF REFERENCE PROJECT EDINBURGH ROAD FROM SPEEDVALE AVENUE TO LONDON ROAD
TERMS OF REFERENCE PROJECT EDINBURGH ROAD FROM SPEEDVALE AVENUE TO LONDON ROAD OBJECTIVES/PURPOSE The City of Guelph intends to upgrade the underground services to current standards and carry out complete
More informationRFB # ADDENDUM NO. 1 ISSUED APRIL 23, 2018 PRE-BID MEETING MINUTES NEW HANOVER COUNTY LANDFILL GAS COLLECTION AND CONTROL SYSTEM CONSTRUCTION
RFB # 18-0197 ADDENDUM NO. 1 ISSUED APRIL 23, 2018 PRE-BID MEETING MINUTES NEW HANOVER COUNTY LANDFILL GAS COLLECTION AND CONTROL SYSTEM CONSTRUCTION The following information was conveyed and discussed
More informationCITY OF FARGO SPECIFICATIONS REMOVALS
REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation
More informationCONSTRUCTION SPECIFICATION FOR BORROW
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 212 APRIL 1999 CONSTRUCTION SPECIFICATION FOR BORROW TABLE OF CONTENTS 212.01 SCOPE 212.02 REFERENCES 212.03 DEFINITIONS 212.04 SUBMISSION AND DESIGN
More informationCITY OF FARGO SPECIFICATIONS REMOVALS
REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation
More informationB. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.
SECTION 312000- EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Special Conditions, apply to this Section. 1.2 SUMMARY This Section
More informationSECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.
SECTION 31 20 00 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating soil and other material for surface improvements. B. Excavating soil and other material for drainage basins. C. Placing fill. D. Compaction
More informationSECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION
820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing
More informationSECTION TRENCHING, BACKFILL AND COMPACTION
SECTION 312333 TRENCHING, BACKFILL AND COMPACTION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes 1. Native Backfill Material 2. Crushed Stone Bedding 3. Select Backfill Material 4. Shoring and Bracing
More informationSECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES
SECTION 02221 EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02660 - Water Systems. 3. 02720 - Storm Drainage System. 4.
More informationCETCO-VOLCLAY CG-50 SPECIFICATION GUIDELINES MIX IN PLACE
CETCO-VOLCLAY CG-50 SPECIFICATION GUIDELINES MIX IN PLACE 1.0 GENERAL 1.1 Scope A. This specification guideline covers the technical requirements for furnishing all labor, materials, equipment, and incidentals
More informationSECTION STORM DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-place Concrete.
SECTION 02720 STORM DRAINAGE SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02221 - Excavating, Backfilling, and Compaction for Utilities. 2. 03300 - Cast-in-place Concrete. 1.02 REFERENCES
More informationSPECIAL SPECIFICATION. Water and Sewer System and Appurtenances
2004 Specifications CSJ 2250-01-021, etc SPECIAL SPECIFICATION 5243 Water and Sewer System and Appurtenances 1. Description. This Item governs for the furnishing of all equipment, labor and materials to
More informationErosion & Sedimentation Control Policy
Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of