1 NWIT Page 1 1 GENERAL 1.1 REQUIREMENTS INCLUDED.1 Furnish all labour, material, services and equipment necessary to carry out and complete excavation work and shoring, as indicated on the drawings and as hereinafter specified..2 The Work shall include, but shall not necessarily be limited to:.1 Bulk excavation of Site to elevations indicated..2 Removal of any existing site services, foundations, footings, paving, curbs and any other appurtenances as indicated and as discovered..3 Removal of non-contaminated excavated materials and all debris, rubbish and vegetation from the Site and transportation to permitted disposal area(s) or dump sites..4 Removal, stockpiling on site, and loading into trucks of any contaminated soil discovered during excavations..5 Providing, maintaining, and removing temporary roads and access ramp within the excavation..6 Dewatering collection, including site grading, trenching and berming..7 Dewatering of excavations including temporary sediment control ponds including all pumping equipment and piping and maintenance of such sediment control pumping as required by the City and LEED sedimentation control..3 The work under this section also includes supply and installation of bulk excavation shoring and underpinning an temporary sediment control facility, as indicated on the Excavation Shoring Drawings and as specified herein..4 Bulk excavation shall be carried out to comply with Excavation Shoring Drawings and shall be coordinated with the required excavation shoring installations..5 Bulk Excavation shoring and underpinning details and Shoring Notes and Specifications and temporary sediment control details and General Notes on the Excavation Shoring Drawings form an integral part of this specification section and shall be read in conjunction therewith.

2 NWIT Page RELATED REQUIREMENTS.1 Section : Green Building Information Submittal Form..2 Section : LEED Requirements and Procedures..3 Section : Waste Management and Disposal..4 Section : Geotechnical Investigation Report..5 Section : Backfill (Future Contract). 1.3 EROSION & SEDIMENTATION CONTROL - LEED PREREQUISITE SUSTAINABLE SITES.1 The Contractor is reminded that requirements for erosion and sedimentations control as defined by LEED and summarized in Section , form a Prerequisite for this project. Failure to comply will risk appropriate legal action by the City..2 Prior to commencing work the Excavation and Shoring Subcontractor shall prepare and submit for review and approval by the Consultant and Geotechnical Engineer, a site plan and written procedures approach, outlining methods to minimize dust, controlling water run-off from the site, avoiding dirty water or silt entering the City storm waster system, and preventing all vehicles from tracking materials off site. 1.4 SUBMISSION PROPOSED PROCEDURES.1 Submit to the Geotechnical Engineer and the Consultant, a proposed bulk excavation and shoring schedule and procedures for review, prior to commencing work on the Site..2 Do not proceed with any stage of the bulk excavation or shoring until written confirmation is provided by the Geotechnical Engineer that the proposed methods and sequencing for bulk excavation and shoring are in general agreement with the intent of the Geotechnical Engineer's design for excavation and shoring. 1.5 CODES AND STANDARDS.1 Perform excavating to B.C. Building Code 2006, City Regulations and WorkSafe BC regulations, as applicable..2 During excavation and final clean up, observe all anti-dust, air pollution and noise regulations of the City of Vancouver and stage operations in accordance with these regulations..3 Comply with City Noise/Construction By-Law regulations..4 Comply with City regulations for cleaning of vehicle tires exiting the site and keeping City streets and sidewalks clean at all times..5 Comply with Section LEED Requirements and Procedures and Section.

3 NWIT Page EXAMINATION OF SITE.1 Visit and examine the site and note all visible characteristics and features affecting the work of this section..2 Check all existing visible conditions. Report any unsatisfactory conditions to the Consultant prior to commencing excavation..3 Before commencing bulk excavation check status of existing services still in operation with utilities hot-line. 1.7 GEOTECHNICAL INVESTIGATION REPORT.1 A geotechnical investigation report of the site accompanies the Bid Documents, for information only. 1.8 VERIFY DIMENSIONS.1 Existing elevations, dimensions and existing features shall be verified before laying out work. Starting work shall be held to imply that the Contractor has verified them and found them to be correct. Any additional costs arising out of any rectifications due to the Contractor's failure to verify existing conditions shall be borne by the Contractor. 1.9 PERMITS AND DEPOSITS.1 The Contractor shall obtain and pay for Excavation and Shoring Permits and all Damage and Crossing deposits as required by the City, and shall also obtain and pay for a Temporary Encroachment Permit, if required, and other permits or licenses required for Excavation and Shoring..2 The Contractor shall make a record and take digital photographs of any damage to adjoining streets, sidewalks, boulevards, etc. existing prior to commencement of the Work..3 Damage deposits made to the City by the Contractor shall not relieve the Contractor of his responsibility to provide adequate protection to prevent damage to City property. Charges against the damage deposits as a result of the Contractor's activities will be deducted by the City from monies due to the Contractor ENVIRONMENTAL SITE ASSESSMENT REPORT.1 An environmental assessment of the site has been done. Copy of the report accompanies the Bid Documents. The report is for information only..2 If any contaminated or hazardous materials present on the site are encountered (any soil containing any contaminated or hazardous materials is referred to collectively herein as Hazardous Substances ), excavate, remove and dispose of such Hazardous Substances at such location and in such manner required by the applicable Provincial regulations. After prior approval of the Consultant, the Contractor will be entitled to a Change Order to adjust the schedule and the contract price in an amount as agreed between the Contractor and the City.

4 NWIT Page REVIEWS.1 GeoPacific Consultants Ltd. has been retained by the Owner as the Geotechnical Engineer to review the bulk excavation and to design and review the shoring of the bulk excavation..2 As such, the Geotechnical Engineer shall periodically observe the performance of the Work and the stability of the excavation faces as the work progresses, and shall confirm bearing capacity of the soils at footing locations, and review seepage conditions..3 The Geotechnical Engineer has the authority in an emergency to stop the progress of the Work whenever, in his opinion, such stoppage may be necessary to ensure the safety of life, the Work or adjoining property. This includes authority to make changes in the Work..4 Where actual soils conditions warrant addition, or deletion of excavation to that indicated, as determined by the Geotechnical Engineer, then such excavation shall be considered as an addition, or deletion as applicable to the contract, and the contract price shall be adjusted, utilizing unit prices stated in the tender..5 The Geotechnical Engineer or his authorized representative shall be the sole judge to decide on questions arising on actual soils conditions encountered, on excavation procedures, on shoring, or protection to be provided and on any other matter concerning the excavation, or shoring, his decision shall be final..6 Cooperate with the Geotechnical Engineer and allow free and unobstructed access to the site at all times..7 The Geotechnical Engineer will sign a letter of assurance and hand the letter to the City for forwarding to the City Engineering Department together with two (2) sealed copies of a drawing showing a plan of the maximum extent of the excavation, (on the Site and on the City property) as well as complete details of proposed shoring and anchors STREET REPAIRS.1 Repair all streets, sidewalks, and curbs damaged during the Work by excavation equipment or activities to City standards STREET MAINTENANCE.1 Be responsible for the cleaning of vehicle tires exiting from the site and/or cost of street and sidewalk cleaning, for the duration of this contract in accordance with City regulations..2 Refer also to Clause 3.12 Erosion and Sedimentation Control DUST CONTROL.1 Be responsible for the adequate control of dust for the duration of the Work. Such control shall be to the approval of the City and shall be adequate to avoid inconvenience and complaints from the City, or from adjoining property holders.

5 NWIT Page SITE ACCESS AND TRAFFIC.1 If required obtain and pay for any permits and/or approvals from the City and other authorities having jurisdiction for proposed haul routes to the disposal or landfill sites. Comply with all requirements of the City and other authorities for such routing..2 Be responsible for traffic control at the site to the satisfaction of the City and other regulatory authorities at the area of the Site and provide all necessary barricades and flagpersons..3 Provide and maintain adequate warning signs, flashing lights, barricades, etc., at the Site, as required by the City..4 Access to the site and egress for trucks and equipment shall be controlled by the Contractor EXISTING UNDERGROUND SERVICES.1 Prior to commencing the Work, establish in coordination with the Geotechnical Engineer, the Consultant, the City and other applicable authorities and/or utility companies the location and state of use of existing buried utility or service lines shown on the Contract Documents within the area of the Site, including service entry points. Mark these locations clearly on Site and prevent accidental disturbance during the work..2 Costs and damages incurred by the Contractor causing disturbance of existing utilities and service lines required to remain in operation shall be borne by the Excavation and Shoring Subcontractor..3 Any utility or service discovered during excavation and not indicated on the Contract Documents, which is presently in use, or not definitely established as abandoned but which must be moved or otherwise disturbed, shall be referred to the City and the applicable utility owner so that they can carry out necessary removal..4 Any damage done, settlement or collapse to services caused by inadequate measures being taken by the Contractor to prevent same, shall be made good immediately, at no additional cost to the Owner. 2 PRODUCTS 2.1 MATERIALS.1 Materials for the temporary roads within excavation and temporary ramp access shall be as required to adequately carry intended equipment and truck loads and minimize ramp maintenance and street cleaning..2 Provide suitable road mulch or other granular material for ramp(s) and road surface within the excavation..3 Lean Mix Concrete 5 MPa at 28 days..5 Shot crete, soil anchors and grout Refer to Excavation Shoring Drawings.

6 NWIT Page 6 3 EXECUTION 3.1 SEQUENCE OF BULK.1 Carry out bulk excavation progressively to allow for installation of excavation shoring and underpinning. Provide stable excavation faces during all excavation work..2 Phase bulk excavation to allow for progressive construction of shoring and underpinning. 3.2 SITE CLEARING.1 Clear site of all remaining surface debris..2 Remove existing foundation walls, retaining walls and footings..3 Break-up and remove any existing asphalt paving, concrete slabs on grade, concrete paving, concrete sidewalks and curbs within the site..4 Remove any abandoned power poles, concrete bases and other concrete appurtenances within the site..5 Recycle existing bricks left on site and all asphalt surfacing and concrete materials in accordance with Section Waste Management and Disposal. 3.3 BULK EXCAVATION.1 Refer to Excavation Shoring Drawings and carry out bulk excavation progressively as required by such drawings to allow for installation of shoring..2 Prior to commencing excavation: - Ensure all existing services to the site have been disconnected. - Verify documented permission has been obtained by the City from adjacent property Owners prior to conducting any work on such properties. - Notify the Geotechnical Engineer and the Consultant two (2) working days before commencing bulk excavation..3 Coordinate bulk excavation with the excavation shoring installations..4 Excavate to elevations, cross-sections and dimensions indicated on the drawings..5 Unless noted otherwise final elevations of bottom of bulk excavations shall be to underside of new building concrete slabs on grade as indicated. Final elevations shall be to within plus 1 or minus 1 of required elevations for bulk excavation..6 Remove any existing abandoned underground service lines encountered on site during excavation, as indicated and/or as discovered. Preserve and protect any water, sewer or electrical services encountered at the perimeter of the site.

7 NWIT Page BULK EXCAVATION (Continued).7 Remove existing concrete, footings, foundation walls, bases, slabs, and other obstructions below grade encountered during excavation..8 At the cut face, phase operations so that a stable slope is maintained as the bulk excavation progresses. The Geotechnical Engineer will examine the excavation as it progresses and will design any additional support work that may be required to maintain a stable excavation..9 Where excavation to final grade is to be carried out during wet weather conditions or left open for a period of several days or more place a lean mix concrete of unconfined compressive strength of at least 5 MPa at 28 days and at least 2 thick over exposed subgrade area for footings. Remove any loosened, softened, or otherwise disturbed portion of the subgrade and replace with lean mix concrete..10 Where over excavation of post glacial soils is required fill with 5 MPa lean mix concrete..11 Remove all boulders encountered during excavation. Boulders one (1) cubic yard and under in size shall be included as part of this contract. Removal of boulders over one (1) cubic yard in size shall be defined as rock excavation and will be paid for at unit price stated in the Bid. (Refer to clause and 3.6.).12 Be totally responsible for safety during excavation work and meet the requirements of all regulatory bodies..13 No additional compensation will be paid by the City for any changes due to deterioration or overexcavation of excavations caused by activities or neglect of the Contractor..14 Level and clean excavation bottoms free from loose material and debris on completion of the Work..15 Protect excavations against freezing. If frozen material occurs, it shall be removed and backfilled by the Contractor with mass concrete of strength approved by the Structural Engineer at no additional cost to the Owner. 3.4 BULK EXCAVATION SHORING AND UNDERPINNING.1 Install excavation shoring systems and underpinning in accordance with Excavation Shoring Drawings..2 Carry out installation of shoring and underpinning progressively as required by Excavation Shoring Drawings and to accommodate bulk excavation..3 Unless noted otherwise shoring faces shall be to within plus 1 or minus 1 of the vertical.

8 NWIT Page ROCK EXCAVATION.1 Excavate all rock to produce clean undisturbed surfaces..2 Rock excavation shall be defined as material exceeding one (1) cubic yard in volume including sandstone, shale or conglomerate that cannot be ripped by a D-9 tractor with a single shank ripper in open excavation or that cannot be removed by a Cat 345 B/C hydraulic backhoe with ripper in detailed excavation. Glacial till, hardpan, frozen material and any material that can be loosened with a jack hammer and/or the above equipment shall not be defined as rock. This classification does not include materials that can be removed by means other than drilling and blasting or drilling and wedging, but which for reasons of economy, the Excavation and Shoring Subcontractor chooses to remove by drilling and blasting..3 Rock excavation as defined in will be paid for at unit prices stated in the bid..4 Rock will be stripped for measurement before excavating and no rock excavated or loosened before measurement will be allowed or paid for as rock. Measurement, and payment therefore, will be the number of cubic yards required to bring the excavations to the required elevations..5 Mass excavation in rock shall be bank measure, i.e. the volume as it exists in the ground, not the truck volume. The face of the excavation shall be measured vertically, with no slope allowance..6 A land surveyor licensed to practice in B.C. will be employed by the City to measure volume of rock as defined before excavation in rock is started. 3.6 MEASUREMENT AND PAYMENT FOR ROCK.1 State in the tender a unit cost per cubic yard for excavating in and removing rock as defined above under clause 3.5.2, inclusive of all profit, overhead, taxes, supervision, loading, transportation costs and dumping. Rock as defined above and encountered in the excavation will be paid for at the unit rate stated in the tender. Unit prices stated shall exclude HST..2 Rock excavation shall be measured in accordance with Canadian Institute of Quantity Surveyors Method of Measurement. 3.7 BLASTING.1 Blasting shall only be permitted where approved in writing by the Geotechnical Engineer..2 Provide a blasting plan to the Consultant and Geotechnical Engineer for review prior to commencing any blasting..3 Prior to blasting, submit to the Consultant and Geotechnical Engineer a written proposal of operations for rock removal indicating types and quantities of explosives to be used; loading charts and drill hole patterns; type of blasting caps / method of detonation;

9 NWIT Page BLASTING (Continued) blasting techniques; blast protection measures for items such as fly rock; vibration and dust and noise control; schedule time for blasting; and other pertinent details..4 Notify the Consultant, and Geotechnical Engineer 24 hours prior to commencement of any blasting. Drilling, blasting and the use, hauling and storage of explosives and accessory equipment shall be done strictly by bonded operators..5 Conform with blasting requirements of Canadian Construction Safety Code, City and WorkSafe BC applicable regulations..6 Be totally responsible for safety on the Site and meet the requirements of all regulatory bodies, with respect to blasting..7 Retain qualified, licensed explosives expert to supervise and program Work, to determine precautions, preparation and blasting techniques, and to supervise and report on drilling of blast holes and line drilling operations. Pay all costs for such services..8 Assume full responsibility and pay all costs for claims arising from the handling and use of explosives related to this project, notwithstanding approval to proceed..9 Ensure the safety of the public and property at all times during blasting operation..10 When blasting operations are required, it will be necessary to perform these operations under controlled techniques so as to limit the intensity of the ground vibrations at the nearby buildings to prevent any possibility of damage to the buildings and to minimize adverse affects upon people and equipment within the buildings..11 Post guards, sound warnings and display signs when blasting is scheduled to take place in accordance with applicable regulations..12 Any floaters or layers of rock extending across the property line shall be cut by drilling and wedging or by carefully controlled blasting procedures..13 Be responsible for and take all necessary precautions, and pay all costs to prevent blasting activities from causing damage to adjoining buildings, sidewalks, streets, lanes, surroundings, and services; including temporary removal and replacement of utilities..14 Where pockets are formed by blasting below the required bottom elevations, and where such pockets will not drain, provide ditching to a free outlet, and at fill pockets to required elevation with concrete of strength approved by the Structural Consultant..15 It will be necessary to perform blasting operations under controlled techniques so as to limit the intensity of the ground vibrations at nearby buildings to prevent any possibility of damage to the buildings and to minimize adverse affects upon people and equipment within the adjacent buildings.

10 NWIT Page BLASTING (Continued).16 Blasting procedures shall be followed which will protect personnel and property from any possible damage. Extreme care shall be exercised with the use of mats and other safeguards as required so as not to scatter loose rock that would cause damage to adjacent property. Take every precaution to protect the public and workers from any injury or harm which might arise from the use of explosives. Only workers thoroughly experienced in handling explosives shall be permitted to supervise, handle, haul, load and shoot explosives..17 In addition to the general requirements set out above, appropriate blasting procedures shall be followed when blasting rock within the excavation to limit the peak ground motion velocities at adjacent structures to 1 per second..18 All blasts shall be monitored by the Contractor. During the initial stages of blasting and in conjunction with the Geotechnical Engineer, a monitoring relationship formula shall be developed between peak particle velocity, distance and maximum explosive charge per delay. The work shall be so organized that blasts more distant from the adjacent structures of concern are to be initially monitored..19 All vibration / seismographic monitoring records obtained during the course of blasting shall be provided to the Geotechnical Engineer in a timely fashion. 3.8 RAMP(S) AND ROAD SURFACES.1 Provide and maintain temporary ramp(s) and road surfaces within the excavations. Use suitable gravel road base material for ramp travel surfaces. Maintain ramp surface until completion of the bulk excavation..2 Leave temporary ramp in place on completion of excavation..3 State in the Bid the amount of monies to be added to the tender price for the removal of the temporary ramp at the direction of the Contractor. 3.9 EROSION AND SEDIMENTATION CONTROL.1 The Contractor is reminded that the requirements for erosion and sedimentation control as defined by LEED and summarized in Section , form a Prerequisite for this project. Failure to comply will risk appropriate legal action by the City..2 An Erosion and Sedimentation Control Plan shall be prepared by the Contractor to meet LEED Prerequisite requirement and the requirements of the City of Vancouver. Submit the Plan to the Geotechnical Engineer, and the Consultant for review prior to proceeding..3 Provide the temporary sediment control facility on site as required by City guidelines and in strict accordance with plans, details and general notes for such facility as indicated on the Excavation Shoring drawings.

11 NWIT Page EROSION AND SEDIMENTATION CONTROL (Continued).4 Provide all necessary pumping equipment and piping and pump out or otherwise remove continuously all water that may accumulate in excavations during the progress of the work into the sediment control pond. Do not divert water onto adjacent property or directly into existing storm drains..5 Maintain existing storm drains and water from any source which hinders the satisfactory prosecution of the work or which otherwise adversely affects the quality of the Work shall be diverted or removed by temporary drains and pumping into the control pond..6 Comply also with the guidelines of the City for erosion control as specified on Excavation Shoring Drawing No. G-SP DISPOSAL OF EXCAVATED MATERIALS.1 Refer to Section Waste Management and Disposal and comply with requirements for waste management and disposal..2 Remove all non-contaminated excavated materials from the site and the property. Remove all debris and all rubbish from the site. Transport all such excavated materials and debris to permitted dump or disposal areas. Excavated materials or debris shall not be left on the site or adjoining property..3 Remove any contaminated soil discovered during excavations in accordance with B.C. Environmental Management Act and BC Hazardous Waste Regulations CLEAN UP.1 Promptly, as the work proceeds and on completion, clean up and remove from the Site any debris or rubbish resulting from the Work in accordance with Section On completion of the excavation work subgrade level(s) shall be left clean for later operations UNIT PRICES.1 Submit unit prices as listed in the Bid Form for excavation and shoring..2 Each unit price will be used for payment of work additional to the contract and work deleted from the contract. Unit prices quoted shall remain in force until date of Substantial Performance of the Work.

12 NWIT Page UNIT PRICES (Continued).3 Unit prices shall include supply, conveyance and delivery to the project site, unloading, installation and all overhead, profit and taxes, excluding HST..4 Work will be measured by the City appointed land surveyor, whose decision shall be final..5 Excavation and fill quantities will be measured as bank measure and unit prices shall include loading, removal from site, transportation and dumping at permitted landfill or disposal area as required. END OF SECTION

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards... SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...

More information

Construction Specification for General Excavation

Construction Specification for General Excavation Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03

More information

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 02210 - Site Grading C O N T E N T S PART 1 - GENERAL... 1 1.01 REQUIREMENT... 1 1.02 STRUCTURE PROTECTION... 2 1.03 JOB CONDITIONS... 3 PART 2 - PRODUCTS...

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION UNCLASSIFIED EXCAVATION AND GRADING SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on

More information

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1 1.01 GENERAL A. The Contractor shall perform all excavation, backfilling, grubbing and grading required for construction and installation of pipelines, structures and appurtenances. Excavation shall include

More information

SECTION GENERAL EXCAVATION

SECTION GENERAL EXCAVATION 02210-1 of 11 SECTION 02210 GENERAL EXCAVATION 02210.01 GENERAL A. Description 1. General excavation shall include but not necessarily be limited to, excavation and grading for general site work, roadways,

More information

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill. SECTION 312000- EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Special Conditions, apply to this Section. 1.2 SUMMARY This Section

More information

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving. SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating and filling for rough grading the Site. 2. Preparing subgrades for walks, curbs, pavements, and turf and grasses.

More information

This specification supplements the requirements of the Occupational Health and Safety Act, and its Regulations.

This specification supplements the requirements of the Occupational Health and Safety Act, and its Regulations. SPEC-1100 1/9 1.0 PURPOSE This specification describes the minimum requirements for general grading, excavation of earth, rock and solid slag, embankment construction, ditching, use of explosives, and

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The Work of this Section shall be all labour, materials, equipment and supervision necessary

More information

SECTION EXCAVATION AND FILL

SECTION EXCAVATION AND FILL SECTION 02315 EXCAVATION AND FILL PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, equipment, and incidentals necessary to perform excavation, backfill, grading, and slope protection required to

More information

SECTION 10 - TRENCHING AND BACKFILLING

SECTION 10 - TRENCHING AND BACKFILLING SECTION 10 - TRENCHING AND BACKFILLING 10.1 General A. Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 10.1.1 Related requirements

More information

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES SECTION 02221 EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02660 - Water Systems. 3. 02720 - Storm Drainage System. 4.

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL

CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL 13.01 GENERAL The work included in this section shall consist of furnishing all materials and equipment and performing all labor

More information

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION EXCAVATION AND BACKFILL, GENERAL

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION EXCAVATION AND BACKFILL, GENERAL SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION 31 23 00 EXCAVATION AND BACKFILL, GENERAL PART 1 GENERAL... 2 1.1 Description... 2 1.2 Submittals... 2 1.3 Reference

More information

SECTION EXCAVATION AND FILL

SECTION EXCAVATION AND FILL SECTION 312300 EXCAVATION AND FILL PART 1 - GENERAL 1.1 SUMMARY A. Excavate, backfill, compact, and grade the site to the elevations shown on the Drawings, as specified herein, and as needed to meet the

More information

SECTION STRUCTURE EXCAVATION AND EARTHWORK

SECTION STRUCTURE EXCAVATION AND EARTHWORK SECTION 02200 STRUCTURE EXCAVATION AND EARTHWORK PART 1 GENERAL 1.1 SECTION INCLUDES A. Pavement Removal B. Stripping Topsoil C. Rock Excavation D. Excavation E. Subgrade Preparation F. Filling 1.2 REFERENCES

More information

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations. Item Excavation and Backfill for Structures 1. DESCRIPTION 2. MATERIALS Excavate for placement and construction of structures and backfill structures. Cut and restore pavement. Use materials that meet

More information

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels

More information

SECTION DRILLED CONCRETE PIERS AND SHAFTS

SECTION DRILLED CONCRETE PIERS AND SHAFTS SECTION 31 63 29 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

GENERAL NOTES REQUIRED NOTES ON ALL PLANS

GENERAL NOTES REQUIRED NOTES ON ALL PLANS GENERAL NOTES REQUIRED NOTES ON ALL PLANS ALL MATERIALS, WORKMANSHIP AND CONSTRUCTION SHALL CONFORM TO THE CURRENT CITY OF SANTA ROSA DESIGN AND CONSTRICTIOIN STANDARDS AND CONSTRUCTION SPECIFICATIONS

More information

SPECIFICATIONS FOR STRUCTURAL EXCAVATION

SPECIFICATIONS FOR STRUCTURAL EXCAVATION SPECIFICATIONS FOR STRUCTURAL EXCAVATION 1.0 DESCRIPTION The Work shall consist of:.1 Excavation and removal of material for the placement of foundations, substructure units, approach slabs, transition

More information

CONSTRUCTION SPECIFICATION FOR EXCAVATING AND BACKFILLING - STRUCTURES

CONSTRUCTION SPECIFICATION FOR EXCAVATING AND BACKFILLING - STRUCTURES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 902 DECEMBER 1983 CONSTRUCTION SPECIFICATION FOR EXCAVATING AND BACKFILLING - STRUCTURES 902.01 SCOPE 902.02 REFERENCES 902.03 DEFINITIONS TABLE OF

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

Section SITE CLEARING. B. Description of Work: 1. The extent of site clearing is shown on the drawings.

Section SITE CLEARING. B. Description of Work: 1. The extent of site clearing is shown on the drawings. Section 02110 SITE CLEARING 1.00 General: A. Related Documents: The general provisions of the Contract including General and Supplementary Conditions and General Requirements, apply to the work specified

More information

SECTION PROTECTION AND RESTORATION OF EXISTING FACILITIES

SECTION PROTECTION AND RESTORATION OF EXISTING FACILITIES PART 1 - GENERAL 1.1 GENERAL A. The CONTRACTOR shall protect all existing utilities and improvements not designated for removal and shall restore damaged or temporarily relocated utilities and improvements

More information

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION 820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing

More information

A. Backfill: Soil material or controlled low-strength material used to fill an excavation.

A. Backfill: Soil material or controlled low-strength material used to fill an excavation. GSA Project No.: GS-P-03-14-AZ-5044 SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Preparing subgrades for walks. 2. Excavating and backfilling for structures. 3. Subbase

More information

GENERAL SPECIFICATION FOR THE USE OF EXPLOSIVES

GENERAL SPECIFICATION FOR THE USE OF EXPLOSIVES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 120 NOVEMBER 2014 GENERAL SPECIFICATION FOR THE USE OF EXPLOSIVES TABLE OF CONTENTS 120.01 SCOPE 120.02 REFERENCES 120.03 DEFINITIONS 120.04 DESIGN

More information

SPECIAL SPECIFICATION 6666 Charter Communications System

SPECIAL SPECIFICATION 6666 Charter Communications System 2004 Specifications CSJ 1200-05-014 SPECIAL SPECIFICATION 6666 Charter Communications System 1. Description. A. This Item will govern the installation of all facilities belonging to Charter Communications,

More information

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING

More information

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS 1. GENERAL CONDITIONS...1 3. DESCRIPTION...1 5. MATERIALS...1 5.1 General...1 5.2 Handling and Storage of Materials...1 5.3 Testing and Approval...1 5.4

More information

C. Foundation stabilization for pipe and utility structures.

C. Foundation stabilization for pipe and utility structures. PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization

More information

SECTION MAINTENANCE OF EXISTING CONDITIONS

SECTION MAINTENANCE OF EXISTING CONDITIONS SECTION 02 01 00 MAINTENANCE OF EXISTING CONDITIONS PART 1 GENERAL 1.1 GENERAL A. The CONTRACTOR shall protect all existing utilities and improvements not designated for removal and shall restore damaged

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING January 2007(Revision 1) Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 CLASSIFICATION OF THE WORK 1.05 QUALITY ASSURANCE PART 2 PRODUCTS 2.01

More information

SECTION TRENCH EXCAVATION AND BACKFILL

SECTION TRENCH EXCAVATION AND BACKFILL SECTION 02221 - TRENCH EXCAVATION AND BACKFILL CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Sections... 2 1.03 Reference Standards... 2 1.04 Quality Assurance... 2 1.05 Measurement

More information

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL Section Number Title 801 GENERAL 802 STANDARD METHODS OF EROSION AND SEDIMENT

More information

SECTION ROCK REMOVAL

SECTION ROCK REMOVAL SECTION 31 23 16.26 ROCK REMOVAL PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required to perform rock

More information

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES Construction Best Management Practices Handbook www.montereysea.org BEST MANAGEMENT PRACTICES 26 www.montereysea.org Construction Best Management Practices Handbook VEHICLE TRACKING AND DUST CONTROL IN

More information

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements. SECTION 31 20 00 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating soil and other material for surface improvements. B. Excavating soil and other material for drainage basins. C. Placing fill. D. Compaction

More information

SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS

SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS CS-2-01. GENERAL: Trench excavation shall conform with the City Standard Specifications. In general a trench is defined as an excavation in which

More information

SECTION DRILLED CONCRETE PIERS AND SHAFTS

SECTION DRILLED CONCRETE PIERS AND SHAFTS 1 PART ONE - GENERAL 1.1 COORDINATION SECTION 02466 DRILLED CONCRETE PIERS AND SHAFTS A. The General, Supplementary, and Special Conditions of these specifications shall all be considered as a part of

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

ASPHALT CONCRETE COLD PLANING THROUGH DECEMBER 2017

ASPHALT CONCRETE COLD PLANING THROUGH DECEMBER 2017 FOR ASPHALT CONCRETE COLD PLANING THROUGH DECEMBER 2017 Date Prepared: March 2017 TABLE OF CONTENTS SECTION 1 GENERAL... SP-1 1-1.01 Terms and Definitions... SP-1 SECTION 2 BIDDING... SP-1 2-1.01 General...

More information

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The work covered by this Section includes all labour, materials, equipment, and supervision necessary to complete the site services as shown

More information

SECTION EARTHWORK

SECTION EARTHWORK SECTION 310000 PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and perform all excavation, backfill, fill and grading required to complete the work

More information

SECTION SOILS REPORT

SECTION SOILS REPORT SECTION 02300 SOILS REPORT 1. GENERAL: 1.1 All work included under this heading shall be subject to the General Conditions of the entire operation. This Contractor is required to refer especially thereto.

More information

CONSTRUCTION SPECIFICATION FOR EXCAVATING, BACKFILLING AND COMPACTING FOR MAINTENANCE HOLES, CATCH BASINS, DITCH INLETS AND VALVE CHAMBERS

CONSTRUCTION SPECIFICATION FOR EXCAVATING, BACKFILLING AND COMPACTING FOR MAINTENANCE HOLES, CATCH BASINS, DITCH INLETS AND VALVE CHAMBERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 516 APRIL 1999 CONSTRUCTION SPECIFICATION FOR EXCAVATING, BACKFILLING AND COMPACTING FOR MAINTENANCE HOLES, CATCH BASINS, DITCH INLETS AND VALVE CHAMBERS

More information

CITY OF ELIZABETHTON Building Department Excavations and Cuts Permit Application

CITY OF ELIZABETHTON Building Department Excavations and Cuts Permit Application CITY OF ELIZABETHTON Building Department Excavations and Cuts Permit Application WORK SITE INFORMATION: Address: City: State: Zip Code: Foreman: Phone: ( ) Email Address: Purpose: CONTRACTOR INFORMATION:

More information

Subsection or plan to be revised: 7-1, 7-8, , On page(s): 27-31(2006), 48-49(2003)

Subsection or plan to be revised: 7-1, 7-8, , On page(s): 27-31(2006), 48-49(2003) Proposed Revision To: Standard Specifications For Public Works Construction Standard Plans For Public Works Construction Public Works Standards, Inc. AGC Southern California Regional Office 1906 West Garvey

More information

CONSTRUCTION SPECIFICATION FOR TUNNELLING

CONSTRUCTION SPECIFICATION FOR TUNNELLING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 415 FEBRUARY 1990 CONSTRUCTION SPECIFICATION FOR TUNNELLING 415.01 SCOPE 415.02 REFERENCES 415.03 DEFINITIONS TABLE OF CONTENTS 415.04 SUBMISSION AND

More information

CITY OF LETHBRIDGE SECTION Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5

CITY OF LETHBRIDGE SECTION Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5 Construction Specifications SIDEWALK CONSTRUCTION PAGE 1 of 5 1.0 EXCAVATION AND FILL 1.1 GENERAL.1 The excavation or fill shall be made to provide proper grade, lines and crosssection for the laying of

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 024116 - STRUCTURE DEMOLITION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION EARTHWORK. B. Removal of subsoil and excavating all classes of material encountered.

SECTION EARTHWORK. B. Removal of subsoil and excavating all classes of material encountered. SECTION 02200 PART 1 GENERAL 1.1 SECTION INCLUDES A. Subsoil and aggregate materials. B. Removal of subsoil and excavating all classes of material encountered. C. Handling, storage, transportation and

More information

CHAPTER 3 EXCAVATIONS

CHAPTER 3 EXCAVATIONS 7-3-1 7-3-1 CHAPTER 3 EXCAVATIONS SECTION: 7-3-1: Permit Requirements 7-3-2: Bond Required 7-3-3: Subject and Excluded Excavations 7-3-4: Standards 7-3-5: Protection of Public 7-3-6: Relocation and Protection

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF CONTENTS 422.01 SCOPE 422.02

More information

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 401 NOVEMBER 2015 (Formerly OPSS 401, November 2013) CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 401.01

More information

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014 MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341 Adopted April 24, 2014 Effective June 6, 2014 EROSION CONTROL RULE 1. POLICY. It is the policy of

More information

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK

1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK 1993 SPECIFICATIONS CSJ 581-1-95 SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK 1. DESCRIPTION. This Item shall govern for the furnishing and installation of all materials and equipment for

More information

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis. PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and

More information

Chapter 3: Permit Procedures and Requirements

Chapter 3: Permit Procedures and Requirements Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8

More information

SAN DIEGO STATE UNIVERSITY PACIFIC CORNERSTONE ARCHITECTS TENOCHCA HALL PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION

SAN DIEGO STATE UNIVERSITY PACIFIC CORNERSTONE ARCHITECTS TENOCHCA HALL PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION SECTION 02 41 14 SELECTIVE BUILDING DEMOLITION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Procedures for systematic removal of site improvements or portions of exterior and interior of buildings

More information

SPECIAL SPECIFICATION 6664 Level (3) Communications System

SPECIAL SPECIFICATION 6664 Level (3) Communications System 2004 Specifications CSJ 1200-05-014 SPECIAL SPECIFICATION 6664 Level (3) Communications System 1. Description. A. This Item will govern the installation of all facilities belonging to Level (3) Communications,

More information

Water Pollution Control for Work in Sensitive Areas

Water Pollution Control for Work in Sensitive Areas Water Pollution Control for Work in Sensitive Areas 10-1. WATER POLLUTION CONTROL The Contractor is advised that failure to fully comply with the provisions of this Section, and all requirements listed

More information

SECTION 503 TEMPORARY PAVEMENT RESTORATION

SECTION 503 TEMPORARY PAVEMENT RESTORATION SECTION 503 TEMPORARY PAVEMENT RESTORATION 503-1 DESCRIPTION: This work consists of furnishing, placing, compacting, and maintaining a temporary pavement surface suitable for driving in accordance with

More information

Special Provision No. 799F01 March 2012 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS

Special Provision No. 799F01 March 2012 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS ... m NOISE BARRIER - Item No.... m NOISE BARRIER INCLUDING PRECAST NOISE/TRAFFIC BARRIER - Item No.... m NOISE BARRIER ON STRUCTURES - Item No.... m SALVAGEABLE NOISE BARRIER - Item No.... m SALVAGEABLE

More information

SPECIAL SPECIFICATION 6658 Time Warner Communications System

SPECIAL SPECIFICATION 6658 Time Warner Communications System 2004 Specifications CSJ 1200-05-014 1. Description. SPECIAL SPECIFICATION 6658 Time Warner Communications System A. This Item will govern the installation of all facilities belonging to Time Warner Cable

More information

SECTION EXCAVATION, BACKFILLING AND COMPACTING

SECTION EXCAVATION, BACKFILLING AND COMPACTING PART 1 GENERAL 1.01 SCOPE Work of this Section shall include all labor, materials, equipment, plant and incidentals required to complete all excavation, backfilling and compacting as indicated on the Drawings

More information

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation.

B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation. SECTION 312333 TRENCHING AND BACKFILLING PART 1 - GENERAL 1.1 SUMMARY A. Excavate trenches for new electric and telephone conduits, gas lines, and their appurtenances from at least 5 feet outside the building

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain

More information

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM 4417 DEWATERING IN CONTAMINATED GROUNDWATER

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM 4417 DEWATERING IN CONTAMINATED GROUNDWATER 1993 Specifications CSJ 8015-24-003 SPECIAL SPECIFICATION TO ITEM 4417 DEWATERING IN CONTAMINATED GROUNDWATER 1. DESCRIPTION. This item shall govern all work required to remove groundwater encountered

More information

Excavation Safety Program

Excavation Safety Program Excavation Safety Program Excavation, Trenching & Shoring Safety I. Purpose The purpose of this policy is to establish safe operating procedures for any earthwork or underground work that is done on a

More information

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM)

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) PART 1 GENERAL 1.01 WORK INCLUDED SECTION 02360 / 31 34 30.13 ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) A. Provide all equipment, material, labor and supervision to design and

More information

Special Provision No. 599F01 May 2004 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS

Special Provision No. 599F01 May 2004 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS ... m NOISE BARRIER - Item No.... m NOISE BARRIER INCLUDING PRECAST NOISE/TRAFFIC BARRIER - Item No.... m NOISE BARRIER ON STRUCTURES - Item No.... m SALVAGEABLE NOISE BARRIER - Item No.... m SALVAGEABLE

More information

Property and Public Protection Plan

Property and Public Protection Plan Property and Public Protection Plan OTTO CONSTRUCTION PROPERTY AND PUBLIC PROTECTION PLAN Otto Construction s pre-planning of construction activities includes procedures to protect the general public and

More information

CITY OF FARGO SPECIFICATIONS REMOVALS

CITY OF FARGO SPECIFICATIONS REMOVALS REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 02222 - EXCAVATION, BACKFILL, AND COMPACTION FOR UTILITIES PART 1 - GENERAL 1.01 SECTION INCLUDES A. Excavating trenches for the installation of utilities and stormwater detention facilities. B.

More information

CITY OF FARGO SPECIFICATIONS REMOVALS

CITY OF FARGO SPECIFICATIONS REMOVALS REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation

More information

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices. SECTION 01220 UNIT PRICES PART 1 GENERAL 1.01 SUMMARY A. This Section specifies administrative and procedural requirements for the unit prices. B. The omission of any unit price description from this Section

More information

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS 8.1 INTRODUCTION To minimize the detrimental effects of erosion and sedimentation, Henrico County requires that those individuals responsible for

More information

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS. SECTION 1100 GRADING 1101 SCOPE. This section covers the performance of all work required for grading the project in coordination with all previous work performed at the locations shown on the contract

More information

BID FORMS AND SPECIFICATIONS FOR THE DEMOLITION OF COMMERCIAL STRUCTURES IN THE 1700 BLOCK OF M STREET. CITY OF BELLEVILLE

BID FORMS AND SPECIFICATIONS FOR THE DEMOLITION OF COMMERCIAL STRUCTURES IN THE 1700 BLOCK OF M STREET. CITY OF BELLEVILLE BID FORMS AND SPECIFICATIONS FOR THE DEMOLITION OF COMMERCIAL STRUCTURES IN THE 1700 BLOCK OF M STREET. CITY OF BELLEVILLE BIDS DUE: December 22 nd 2016 @ 2:00 P.M. Belleville City Hall City Hall 1819

More information

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing.

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing. SECTION 02221 TRENCHING, BACKFILLING AND COMPACTION PART 1 GENERAL 1.01 WORK INCLUDED A. Excavation for piped utility material. B. Provide necessary sheeting, shoring and bracing. C. Prepare trench bottom

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price) SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

CONSTRUCTION SPECIFICATION FOR GRADING

CONSTRUCTION SPECIFICATION FOR GRADING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 206 NOVEMBER 2000 CONSTRUCTION SPECIFICATION FOR GRADING TABLE OF CONTENTS 206.01 SCOPE 206.02 REFERENCES 206.03 DEFINITIONS 206.04 SUBMISSION AND

More information

The work required for this project includes, but is not limited to, the following items, not listed in order of execution.

The work required for this project includes, but is not limited to, the following items, not listed in order of execution. ESTIMATE OF QUANTITIES SPECIFICATIONS Construction Specifications: South Dakota Standard Specifications for Roads and Bridges, 2004 Edition and Required Provisions, Supplemental Specifications and/or Special

More information

C. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of:

C. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of: 02070 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.1 STIPULATIONS A. The specifications sections " General Conditions of the Construction Contract ", "Special Conditions", and "Division 1 - General Requirements"

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 (Reissued November 2010) CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF

More information

DIVISION 2- EXISTING CONDITIONS

DIVISION 2- EXISTING CONDITIONS DIVISION 2- EXISTING CONDITIONS 024100- SELECTIVE DEMOLITION PART 1 - GENERAL: 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

GRADING, EROSION AND SEDIMENTATION CONTROL

GRADING, EROSION AND SEDIMENTATION CONTROL SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) United Nation Development Programme Rehabilitation of Tunis & Omer Bin Abdel Aziz Sidewalks PAL 10-71488 : UXOs and Rubble Removal From Gaza Strip Bill of Quantity (BOQ) PREAMBLE TO BILL OF QUANTITY (BOQ)

More information

CCU Engineering Specifications. Section PIPE REMOVAL, DISPOSAL, ALTERATION, MODIFICATION OR PIPE ABANDONMENT

CCU Engineering Specifications. Section PIPE REMOVAL, DISPOSAL, ALTERATION, MODIFICATION OR PIPE ABANDONMENT CCU Engineering Specifications Section 002310 PIPE REMOVAL, DISPOSAL, ALTERATION, MODIFICATION OR PIPE ABANDONMENT Effective Date: Nov. 1st, 2011 Page 1 of 5 PART 1 - GENERAL The following specification

More information

Construction Specification for Utility Adjustments

Construction Specification for Utility Adjustments Engineering & Construction Services Division Standard Specifications for Road Works TS 4.50 September 2017 for Utility Adjustments Table of Contents TS 4.50.01 SCOPE... 2 TS 4.50.02 REFERENCES... 2 TS

More information

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES 1 1 1 0 1 0 1 0 1 SECTION 1. STRUCTURAL EXCAVATION FOR STRUCTURES BASED ON DFD MASTER SPECIFICATION DATED /1/1 P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all

More information