1 Town Administrator GEORGE T. GOODWIN III Town Clerk AMY E. MOYER TOWN OF SCOTTSVILLE VICTORY HALL 401 VALLEY STREET SCOTTSVILLE, VIRGINIA TELEPHONE: (434) FACSIMILE: (434) March 5, 2013 Mayor JESSE B. GROVE III Town Council SHANNON W. ADCOCK NANCY E. GILL R. DANIEL GRITSKO ELIZABETH M. KNOTTS ROBERT E. O HALLORAN RONALD L. SMITH Town Attorney JAMES M. BOWLING IV INVITATION TO BID Contract for Mowing and Maintenance of the A. Raymon Thacker Flood Control System, Scottsville, Virginia This is an invitation to bid on a contract with the Town of Scottsville for maintenance of the A. Raymon Thacker Flood Control System, Scottsville, Virginia, for the spring, summer, and fall growing season of year Sealed bids must be received in the Town Office by 5:00 p.m., Friday, March 15, This Bid Packet has three sections: 1) Overview and Specifications 2) Qualifications, and 3) Bid Form. OVERVIEW and SPECIFICATIONS The A. Raymon Thacker Flood Control Project is a multi-faceted system made up of five sections: 1) Earthen Levee, 2) Pump Station, 3) Mink Creek, 4) Mink Creek Dam, and 5) Route 20 Bridge Entrance. SECTION 1, Earthen Levee: The earthen levee extends from the Hyosung access road (Bird Street) on the west end to a point just east of Ferry Street. The Levee is 3,500 feet long and has a height that varies from 0 to 21 feet. The Levee side slopes are 2 horizontal to 1 vertical and the crest is 10 feet wide. The slopes are covered with either grass or armor stone (rip-rap). To the east of Ferry Street, the earthen levee turns into a concrete wall which continues to the eastern terminus of the levee at East Main Street. In this section, the Contractor will: a) Mow or weed-eat the grass on the Levee, which includes the entire Scottsville side of the Levee and approximately 1000 feet of the James River side of the Levee (facing the Hyosung Plant to the creek at the toe of the levee) to a height of approximately three inches. b) Apply herbicide to the river side of the levee covered by armor stone (rip-rap), so this is kept free of all vegetative growth. c) Apply herbicide to the base of the cinderblock structures at Ferry Street and East Main Street, as well as the concrete wall portion of the levee which terminates at East Main Street, so that no weedy growth disturbs the foundations of these structures. d) Apply herbicide to any grass on Levee Walk pathways. e) Certify that herbicide use will be carried out in conformance with state and federal laws. SECTION 2, Pump Station: The Pump Station is located at 205 Lumber Street. The access road to the station from Main Street is via South Street, just before the Chevron Station. In this section, the Contractor will: a) Mow the fenced-in area of the pump-house area. b) Weed-eat the chain link fence on both sides of the entire fence to keep it clear of growth. c) Weed-eat around the foundation of the building and all stairways and concrete works associated with the Pump House. SECTION 3, Mink Creek: a distance of creek bank approximately 500 feet in length between the East Main Street Bridge and the Pump Station. Portions of this creek bank are covered in rip-rap, and other portions are earthen
2 bank. The banks vary in height from 10 to 30 feet high along the course of this section. The creek enters an underground tunnel which takes it under the levee at a large grate near the pump house. In this section, the contractor will: a) Maintain growth on the banks of Mink Creek through a combination of spraying where there is rip-rap armor stone, and weed-eating. b) Clear growth and debris from the grate marking the entrance of Mink Creek to the under-levee tunnel. c) Weed-eat the slopes of the Route 20 Bridge rampart above Mink Creek, and above the chain link fence on the west side of the Pump House. d) Mow and weed eat the area south of the municipal parking between Route 20 rampart and Mink Creek. e) Certify that all herbicide will be applied in conformance with state and federal law. SECTION 4, Mink Creek Dam: The Dam is located on Mink Creek immediately upstream of Scottsville. Vehicular access is gained on Jefferson Street. The Mink Creek Dam consists of an earthen embankment approximately 35 feet high and 320 feet across. The dam side slopes are 2.5 horizontal to 1 vertical and the crest width is 15 feet. There is a spill way that curves around on the west side of the Dam, which is approximately 50 wide at the mouth, and narrows as it moves down hill. There is a rip-rap section about 15 feet wide by 300 feet long on the water side of the dam. In this Section, the Contractor will: a) Mow the grass on both the pond side and down stream side of the dam, including the stand of trees that is on the west side of the dam. b) Mow the grass on the emergency spillway. c) Mow the grass in the triangular area at the base of the dam, which begins at the small concrete bridge over Mink Creek, and goes to the base of the dam. d) Weed-eat the banks of Mink Creek from concrete bridge to the concrete impact basin at the base of the dam. e) Weed-eat around the base of the impact basin. f) Keep the rip-rap portion of the dam, on the pond side, free of all growth through the use of an herbicide. SECTION 5, Bridge Entrance: Mow and/or weed-eat and use approved herbicide, if necessary, on each side of Route 20 bridge approach on Scottsville side of James River Bridge. GENERAL SPECIFICATIONS: Mowing The grass in all five sections shall be mowed four (4) times over the summer months, on a 45-day cycle, with the first cutting in the first week of May. Additional cuttings may be necessary at the same rate per cutting. Spraying The rip-rap slope protection along the levee (section 1), the rip-rap slope protection on Mink Creek between the Pump Station and Main Street (section 3), and the rip-rap section on the Mink Creek Dam (section 4) will be sprayed with a commercial weed killer on the same schedule as the grass mowing. Herbicide must be used only in accordance with all state and federal laws. The entire rip-rapped area shall be kept free of brush and woody growth in order to prevent stone displacement. Other All gullies, holes, and washes shall be reported to the Levee Superintendent within 24 hours of discovery. The Levee Maintenance Contractor shall report directly to the Town Administrator.
3 QUALIFICATIONS The contractor must provide a copy of and maintain for the duration of the contract a Liability Insurance Policy, valued at least $500,000. The contractor must provide three references. The contractor must submit a bid on the attached Bid Form, with his or her signature.
4 BIDS Bids must be in to the Town Office before 5:00 p.m., Friday, March 15, The Town Council will review the bids at the regular session on March 18, 2013, beginning at 7:00 p.m. Please provide your costs on the Bid Form provided. Bids submitted in a different format may be excluded from consideration. A contract will be awarded only for the entire project. Bids for only a portion of the project will not be considered. The lowest bidding contractor will be offered a contract with the Town of Scottsville per the specifications of this bid packet. The contract will be paid out in four installments after an inspection of each mowing. Bids may be mailed or hand delivered to: Mayor of Scottsville Town of Scottsville 401 Valley Street Scottsville, VA Attn: SEALED BID ENCLOSED Bid proposals shall include: 1) A completed and signed Bid Form 2) Copy of Insurance Policy 3) Three References 4) Copy of Business License Failure to meet any specifications in this packet will result in forfeiture of bid. The Town reserves the right to refuse all bids. This invitation is open to any and all persons. The Town does not discriminate based on race, creed, gender, national origin, age, disability, marital or veteran status, sexual preference or any other legally protected status.
5 Bid Form A. Raymon Thacker Flood Control System Mowing and Maintenance Contract Section 1: Earthen Levee Mow/Weed-eat Section 2: Pump Station Mow/Weed-eat Section 3: Mink Creek Mow/Weed-eat Section 4: Mink Creek Dam Mow/Weed-eat Section 5: Bridge Entrance Mow/Weed-eat Spray per-cut cost X 4 Total Bid Price: I submit that the bid prices above are based on the specifications described in the 2013 Bid Packet: Attest: Print Name: Title: Company Name: Address: Phone:
Grass Cutting & Trimming Services
Charter Township of Van Buren Grass Cutting & Trimming Services 2019 Bid Instructions and Specifications CHARTER TOWNSHIP OF VAN BUREN SPECIFICATIONS GRASS CUTTING AND RELATED SERVICES 2019 SCOPE OF WORK
More informationLyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual
Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This
More informationSAN GABRIEL RIVER 1 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #
LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010031 PERIODIC INSPECTION REPORT NO. 2 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: APRIL 19, 2017 PERIODIC
More informationPOLICE DEPARTMENT. Bid Package SITE MAINTENANCE
Town of Middlebury, Vermont POLICE DEPARTMENT Bid Package SITE MAINTENANCE July 1, 2018- June 30, 2019 Town of Middlebury, Vermont Police Department Site Maintenance Bid July 1, 2018- June 30, 2019 Invitation
More informationVillage Of Carthage. Guyots Island Bank Stabilization Project
Village Of Carthage 120 South Mechanic Street G. Wayne McIlroy Carthage, New York 13619 Telephone: (315) 493-1060 TDD: 1-800-662-1220 Facsimile: (315) 493-7201 Email: carthagect@westelcom.com.com Guyots
More information378 - POND NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE SPECIFICATION I. SCOPE
378-1 NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE SPECIFICATION 378 - POND I. SCOPE The work shall consist of constructing an earthfill embankment and appurtenances to the lines, grades,
More informationINVITATION TO BID GIFFORD WOODS STATE PARK KENT BROOK PEDESTRIAN BRIDGE PROJECT
INVITATION TO BID VERMONT AGENCY OF NATURAL RESOURCES DEPARTMENT OF FORESTS, PARKS & RECREATION GIFFORD WOODS STATE PARK KENT BROOK PEDESTRIAN BRIDGE PROJECT ISSUE DATE: JUNE 14, 2012 MANDATORY SITE MEETING:
More informationMcElroy s Run Impoundment Structural Stability Assessment Report
Allegheny Energy Supply Company, LLC A FirstEnergy Company Pleasants Power Station Pleasants County, West Virginia October 2016 Prepared for: Allegheny Energy Supply Company, LLC A FirstEnergy Company
More informationPrince George s County, MD Levee Response and Remediation Plan
Prince George s County, MD Levee Response and Remediation Plan Presented By: Hilary Stephens-Kendro Prepared for: Prince George s County Department of Public Works and Transportation Project Background
More informationAMERICAN ELECTRIC POWER (SWEPCO)
2016 DAM & DIKE INSPECTION REPORT ASH PONDS GERS-16-163 WELSH POWER PLANT AMERICAN ELECTRIC POWER (SWEPCO) CASON, TEXAS NATIONAL INVENTORY NO. TX4357 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION
More informationDAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety
DAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety NAME OF DAM: Milltown Dam DEPDAMNO.: 15-146 LOCATION: Municipality: East Goshen Township
More informationCONSTRUCTION PLAN CHECKLIST
CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted
More informationLAND DISTURBANCE PERMIT
SPRINGVILLE CITY Application Date: 110 South Main Springville, UT 84663 Permit Number: (801) 491-2780 Caselle #2208 Project Name: Project Address: LAND DISTURBANCE PERMIT Priority Site Owner s Name Phone
More information2016 WEED CONTROL SPRAYING. City of Rock Island, Illinois
2016 WEED CONTROL SPRAYING City of Rock Island, Illinois Issued By: Public Works Department Municipal Services Division INSTRUCTIONS TO BIDDERS Plans and Proposal Documents Prepared by: City of Rock Island
More informationNew Administration Building
New Administration Building Stormwater Pollution Prevention Plan Hudson Valley Community College Troy, New York Prepared for: Hudson Valley Community College 80 Vandenburgh Avenue Troy, New York 12180
More informationCoal Combustion Residuals Inflow Design Flood Control System Plan
gaiconsultants.com I transforming ideas into reality., Coal Combustion Residuals Inflow Design Flood Control System Plan Virginia Electric and Power Company Possum Point Power Station Surface Impoundment
More informationSECTION NEW MARTINSVILLE FIREMAN S DOCK BIDS DUE: 4:30 PM LOCAL TIME ON FRIDAY JANUARY 30 TH, 2015
SECTION 00 91 13.01 NEW MARTINSVILLE FIREMAN S DOCK ADDENDUM #2 ADDENDUM #2 ISSUE DATE: JANUARY 21, 2015 PROJECT NAME: NEW MARTINSVILLE FIREMAN S DOCK BIDS DUE: 4:30 PM LOCAL TIME ON FRIDAY JANUARY 30
More informationApplication for a Residential Building Permit
Town of Chevy Chase 301-654-7144 (phone) 4301 Willow Lane 301-718-9631 (fax) Chevy Chase, MD 20815 townoffice@townofchevychase.org Town Permit No.: Application for a Residential Building Permit Please
More informationCoal Combustion Residuals Unit Structural Stability Assessment
Coal Combustion Residuals Unit Structural Stability Assessment Virginia Electric and Power Company Chesterfield Power Station Upper (East) Pond Chesterfield County, Virginia GAI Project Number: C1500035.00
More informationTown of Aurora Stream Management Master Plan PUBLIC INFORMATION CENTRE May 1 st, 2018
Town of Aurora Stream Management Master Plan PUBLIC INFORMATION CENTRE May 1 st, 2018 Your comments are encouraged and appreciated, as this will provide us an opportunity to address project issues and
More informationINVITATION TO BID CITY OF HOPKINSVILLE
INVITATION TO BID CITY OF HOPKINSVILLE Office of the Procurement Specialist 715 South Virginia Street P. O. Box 707 Hopkinsville, Kentucky 42241-0707 TITLE: DESIGN BUILD BUIDLING FOR THE CITY OF HOPKINSVILLE,
More informationSTANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL Section Number Title 801 GENERAL 802 STANDARD METHODS OF EROSION AND SEDIMENT
More informationCONTRACT AGREEMENT. This CONTRACT AGREEMENT is entered into by and between the CITY OF WINDER (the
CONTRACT AGREEMENT This CONTRACT AGREEMENT is entered into by and between the CITY OF WINDER (the "City") and Contractor as of the date the last party to this Contract Agreement signed below. W I T N E
More informationVisual Inspection Checklist
APPENDIX Q. Visual Inspection Checklist Thispageintentionallyleftblank. VISUAL INSPECTION CHECKLIST CITY OF AUBURN PUBLIC WORKS DEPARTMENT INSPECTION YEAR: TYPE OF INSPECTION: (Informal, Regular, Formal):
More informationGainesville Technical Center 5399 Wellington Branch Drive Gainesville VA Phone (703)
Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA 20155 Phone (703) 754-6750 Work Request # UNDERGROUND DISTRIBUTION FACILITIES AGREEMENT (FOR COMMERCIAL CUSTOMER) Developer/Builder/Owner
More informationNEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL
NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by
More informationCITY OF THREE RIVERS, MICHIGAN Specifications for Bids. Tree and/or Stump Removal Performance Bids
CITY OF THREE RIVERS, MICHIGAN Specifications for Bids Tree and/or Stump Removal Performance Bids The City of Three Rivers is committed to the concept of performance bids. All vendors are encouraged to
More informationPennsylvania Department of Transportation District 8-0 Rest Area Site G Specifications for Landscaping and Lawn Maintenance
Revised 2/15 Pennsylvania Department of Transportation District 8-0 Rest Area Site G Specifications for Landscaping and Lawn Maintenance 1. DESCRIPTION The contractor shall furnish all equipment, personnel
More informationAnnual Inspection Report CCR Surface Impoundment. MidAmerican Energy Company, Louisa Generating Station
Annual Inspection Report CCR Surface Impoundment MidAmerican Energy Company, Louisa Generating Station Final January 15, 2016 Annual Inspection Report CCR Surface Impoundment Prepared for MidAmerican Energy
More informationINVITATION TO BID. Roof Repair Multiple Elastomeric Coating Roofs. Invitation to Bid No. 2013/14-09
INVITATION TO BID Invitation to Submittal Deadline: Wednesday, April 30, 2014 at 2:00 p.m. Mail bids to the following address: Curry County Administration 700 N. Main Street, Suite 10 Clovis, NM 88101
More informationInspection and Maintenance of Stormwater Control Measures: Helping Protect Greensboro s s Water Quality and Water-Supply
Inspection and Maintenance of Stormwater Control Measures: Helping Protect Greensboro s s Water Quality and Water-Supply NC APWA Stormwater Management Conference-September 16, 2013 Program Background Privately
More informationAMERICAN ELECTRIC POWER (SWEPCO)
2015 DAM & DIKE INSPECTION REPORT ASH PONDS GERS-15-034 WELSH POWER PLANT AMERICAN ELECTRIC POWER (SWEPCO) CASON, TEXAS NATIONAL INVENTORY NO. TX4357 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION
More informationExtended Detention Basin Maintenance Plan for [[== Insert Project Name ==]]
Extended Detention Basin Plan for [[== Insert Project Name ==]] [[== Insert Date =]] Project Address and Cross Streets Assessor s Parcel No.: Property Owner: Phone No.: Designated Contact: Phone No.: Extended
More informationPOST CLOSURE PLAN. CFR (d) Pond 1. Clinch Power Plant Russell County, West Virginia. November Prepared for: Appalachian Power Company
POST CLOSURE PLAN CFR 257.104(d) Pond 1 Clinch Power Plant Russell County, West Virginia November 2016 Prepared for: Appalachian Power Company Prepared by: Amec Foster Wheeler Environment & Infrastructure,
More informationEROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY
31 25 00 EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY A. Erosion and sedimentation control shall be provided by the Contractor for all areas of the site denuded or otherwise disturbed
More informationJEFFERSON COUNTY STORM WATER MANAGEMENT
JEFFERSON COUNTY STORM WATER MANAGEMENT B-210 Courthouse, Birmingham, Alabama 35203 Telephone: (205) 325-8741 Erosion and Sedimentation Control Measures for Commercial Projects (Plans Requirements) -All
More informationKENDALL COUNTY HIGHWAY DEPARTMENT
KENDALL COUNTY HIGHWAY DEPARTMENT JOB DESCRIPTION Job Title: Highway Maintenance Crew Member Immediate : Highway Maintenance Foreman FLSA Status: Non-Exempt Bargaining Unit: International Union of Operating
More informationINVITATION FOR BID FOR GENERAL CONTRACTORS
INVITATION FOR BID FOR GENERAL CONTRACTORS Arlington Public Schools Purchasing Department BID TITLE: BID #: ARLINGTON PUBLIC SCHOOLS REMOVAL AND REPLACEMENT OF THE STADIUM BLEACHERS AND PRESS BOX AT WAKEFIELD
More informationEnvironmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE
Environmental Management Chapter 335-6-9 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE CHAPTER 335-6-9 SURFACE MINING RULES TABLE OF CONTENTS
More informationREQUEST FOR BIDS FOR REPAIRS SOUTH FEATHER WATER AND POWER AGENCY S MINERS RANCH CONDUIT
REQUEST FOR BIDS FOR REPAIRS OF SOUTH FEATHER WATER AND POWER AGENCY S MINERS RANCH CONDUIT Issue date: July 2, Bid Due Date: August 8, 2012 Prepared by: Shawn Hayse, Special Projects Manager Shayse@southfeather.com
More informationIf you have any questions, feel free to contact the office of the Planning Commission at
Attention: Enclosed, is an application for a zoning permit for the Townships of Amboy, Franklin, Fulton & York. You may return your application and check made payable to: ZONING FEES Fulton County Regional
More informationKalkaska County Road Commission 1049 Island Lake Road Kalkaska, MI Telephone: Facsimile:
Kalkaska County Road Commission 1049 Island Lake Road Kalkaska, MI 49646 Telephone: 231.258.2242 Facsimile: 231.258.8205 The Kalkaska County Road Commission is an Equal Opportunity Provider and Employer
More informationINVITATION TO BID BY SEALED BID ON STANDING TIMBER MILL POND INC. TRACT HENRY COUNTY, VA. Timber Species Est. Volume Bd.Ft./Tree
WILLIAM H. LOCK & ASSOCIATES, INC. Consulting Forester * Certified Arborist * Real Estate Broker P. O. Box 49571 * Greensboro, NC 27419 (336) 632-9088 1-888-899-9088 * www.whlock.com INVITATION TO BID
More informationAGENDA. PRE-BID / SITE VISIT MEETING Tuesday, August 7, 2018, 9:00 am
AGENDA PRE-BID / SITE VISIT MEETING Tuesday, August 7, 2018, 9:00 am Project #217090 & 218041 Britt Place Washout / Precinct Road Washout CBJTC, Starke, FL 1. SIGN-IN OF ALL ATTENDEES: 2. INTRODUCTIONS:
More informationSuggested Stormwater Management Practices For Individual House Lots
Suggested Stormwater Management Practices For Individual House Lots These practices are necessary to satisfy the water quantity and water quality criteria of the Rappahannock Stormwater Ordinance. These
More informationAEC Premier Straw Double Net Quick Mow EROSION CONTROL BLANKET SPECIFICATION
AEC Premier Straw Double Net Quick Mow EROSION CONTROL BLANKET SPECIFICATION PART I - GENERAL 1.01 Summary A. The erosion control blanket contains agricultural straw fibers for the purpose of erosion control
More informationThis Addendum Number One forms part of the Contract Documents and modifies the original Bidding Documents dated June 8, 2016.
ADDENDUM NUMBER ONE - June 15, 2016 CITY OF CLARKSVILLE TO: All Bidders of Record This Addendum Number One forms part of the Contract Documents and modifies the original Bidding Documents dated June 8,
More informationDTE Energy St. Clair Power Plant
DTE Energy St. Clair Power Plant Unit 6 Scrubber Basins CCR Rule Compliance Project Annual Inspection Report - 2017 Project Number: 60546402 June 30, 2017 Prepared by: 27777 Franklin Road, Suite 2000 Southfield,
More informationMetropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems
Metropolitan St. Louis Sewer District Statement of Policy for Maintenance of Stormwater Sewer Systems 1.0 Introduction Adequate drainage in the Metropolitan St. Louis area is necessary to preserve and
More information2-14 LOWELL CREEK, ALASKA (CWIS NOS , 10140, & 12838) Condition of Improvement 30 September 2011
LOWELL CREEK 2-14 LOWELL CREEK, ALASKA (CWIS NOS. 72856, 10140, & 12838) Condition of Improvement 30 September 2011 AUTHORIZATIONS: (1) Public Resolution No. 52, 9 February 1927 (69th Congress) as adopted,
More informationCCR Annual Inspection (b) for the Ash Pond at the San Miguel Plant. Revision 0
Submitted to San Miguel Electric Cooperative, Inc. 6200 FM 3387 Christine, Texas 78012 Submitted by AECOM 9400 Amberglen Boulevard Austin, Texas 78729 257.83 (b) for the Ash Pond at the San Miguel Plant
More informationADDENDUM NO. 1. Please acknowledge receipt of this addendum on page 10 of the Invitation for Pre-Qualification of Bidders
ADDENDUM NO. 1 Date: May 22, 2017 To: Re: Prospective Bidders Peachtree City Lake Spillway Replacement Please acknowledge receipt of this addendum on page 10 of the Invitation for Pre-Qualification of
More informationSANTA MARIA RIVER 3A LEVEE SEGMENT SANTA BARBARA COUNTY, CALIFORNIA NLD SYSTEM ID #
SANTA MARIA RIVER 3A LEVEE SEGMENT SANTA BARBARA COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010095 PERIODIC INSPECTION REPORT NO. 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL
More informationREQUEST FOR PROPOSAL DEMOLITION & REMOVAL OF THE OLD TOWN HALL 2278 US ROUTE 4 EAST
REQUEST FOR PROPOSAL DEMOLITION & REMOVAL OF THE OLD TOWN HALL 2278 US ROUTE 4 EAST MENDON, VT 05701 TOWN OF MENDON, VERMONT August, 2018 1 1. SUMMARY AND BACKGROUND The Town of Mendon s original Town
More informationCommercial Submittal Packet
Commercial Submittal Packet City of Pepper Pike Building Department 28000 Shaker Boulevard Pepper Pike, Ohio 44124 Phone: (216) 896-6134 Fax: (216) 831-6525 www.pepperpike.org Submitting for the Architectural
More information2018 Annual Dam and Dike Inspection Report
218 Annual Dam and Dike Inspection Report Bottom Ash Pond Northeastern 3&4 Plant Public Service Company of Oklahoma Oologah, Oklahoma September 218 Prepared for: Public Service Company of Oklahoma Northeastern
More informationFormal Annual Inspection It is recommended that you customize this form to fit your dam. Pre-Inspection Information
Formal Annual Inspection It is recommended that you customize this form to fit your dam. Pre-Inspection Information Name of Dam: Inspection Date: Current Weather: Weather During Last Week: Name of Creek,
More informationGrading & Excavation Information Application & Checklist
Grading & Excavation Information Application & Checklist Yakima County Public Services ~ Building & Fire Safety Division 128 North 2 nd Street, Yakima, WA 98901 ~ Office (509) 574-2300 Building & Fire
More informationTulalip Tribes Request for Proposals: DEER CREEK ENHANCEMENT PROJECT
Tulalip Tribes Request for Proposals: DEER CREEK ENHANCEMENT PROJECT 1. Notice to Qualified Parties: 1.1. Invitation: The Tulalip Tribes is advertising a Request for Proposals (RFP) from qualified contractors
More informationLimited Visual Dam Safety Inspections OA Wahiawa Dam. Oahu, Hawaii
Limited Visual Dam Safety Inspections OA00017 Wahiawa Dam Oahu, Hawaii Prepared by: U.S. ARMY CORPS OF ENGINEERS HONOLULU DISTRICT STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES May 2006 Dam
More informationNorth Umpqua Hydroelectric Project (FERC 1927) Erosion Control Plan Site Remediation/ Assessment Form
(FERC 1927) Erosion Control Plan Site Remediation/ Assessment Form Site # CW2-3 Priority Ranking Med Locator Information/GPS Lat: Long: Impact Rating 3 Start Project Development: Clearwater 2 Risk Rating
More informationREQUEST FOR CONSTRUCTION BIDS May 23, 2017
REQUEST FOR CONSTRUCTION BIDS May 23, 2017 Cambridge Greenway Trail / Railroad Bridge Replacement Flood Mitigation Project 1.0 Project Background A former railroad bridge that currently carries the Cambridge
More informationGRASS CUTTING CONTRACT/S TYTHERINGTON PARISH COUNCIL Clerk to Parish Council, Gill Brooks c/o 8 Solent Way, Thornbury,Bristol BS 35
GRASS CUTTING CONTRACT/S 2015 2016-2017 Clerk to Parish Council, Gill Brooks c/o 8 Solent Way, Thornbury,Bristol BS 35 2XD (01454) 416637 tytheringtonpc@uwclub.net. CONTENTS 1. Invitation to Tender 2.
More informationTown of Berkley Office of BOARD OF HEALTH 1 North Main Street, Berkley, MA
Town of Berkley Office of BOARD OF HEALTH 1 North Main Street, Berkley, MA 02779 508-822-7828 Subsurface Disposal, Well and Land Development Regulation Revised July 25, 2016 Procedure to Obtain Perc Test
More informationAugust 19, Addendum No. 2 Roosevelt Hall Interior Renovation Brooklyn College Project No.: BY
The City University Of New York August 19, 2010 Addendum No. 2 Roosevelt Hall Interior Renovation Brooklyn College Project No.: BY600-006 This Addendum is for the purpose of conveying the below Documents
More informationFINAL PLANS JULY 08, 2015
GOVERNING STANDARDS AND SPECIFICATIONS: FLORIDA DEPARTMENT OF TRANSPORTATION DESIGN STANDARDS FOR CONSTRUCTION, MAINTENANCE, AND UTILITY OPERATIONS ON THE STATE HIGHWAY SYSTEM; CURRENT VERSION W S E INDEX
More informationZONING CLEARANCE PLAN REVIEW CHECKLIST. Based on the Revised Town of Carefree Zoning Ordinance
ZONING CLEARANCE PLAN REVIEW CHECKLIST Based on the Revised Town of Carefree Zoning Ordinance Date: Applicant: Permit Number: Reviewer: Address: Lot & Subdivision: Zoning District: New SRF: Addn/Remodel:
More informationTown of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL
CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with
More informationCONSTRUCTION PROPOSAL Vision General Contracting LLC
CONSTRUCTION PROPOSAL Vision General Contracting LLC August 25, 2015 My Site Name 1234 Address Street My City, GA 000000 Horizontal Infrastructure completion! Vision General Contracting LLC 1681 Fernleaf
More informationTOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT
TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT 06045-0191 HILLIARD S POND DAM REMOVAL AND BIGELOW BROOK STREAM CHANNEL RESTORATION BID NO. 14/15-74
More informationVANDERBURGH COUNTY, INDIANA GENERAL SPECIFICATIONS FOR REGULAR MAINTENANCE OF REGULATED DRAINS 2008
VANDERBURGH COUNTY, INDIANA GENERAL SPECIFICATIONS FOR REGULAR MAINTENANCE OF REGULATED DRAINS 2008 The following regulated drains in Vanderburgh County, Indiana will be maintained per requirements found
More informationRequest for Quote. For. Invitation # Issue Date: 08/08/2011
Ohio Department of Transportation Office of Contracts 1980 West Broad St. Columbus, OH, 43223 Request for Quote For Installation of Rest Stop WWTP Post Aeration Invitation #501 12 Issue Date: 08/08/2011
More informationGRADING, EROSION AND SEDIMENTATION CONTROL
SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,
More informationDam Safety Inspection Checklist
Dam Safety Inspection Checklist Complete All Portions of This Section (Pre-inspection) Date of Inspection: Name of Dam: EAP: (yes, no) OM&I: (yes, no) File Number: Review Inventory - Highlight missing
More informationEastern Oregon Miners and Prospectors, Inc.
Eastern Oregon Miners and Prospectors, Inc. 2017 MEMBERSHIP APPLICATION Annual Dues, $100.OO PER INDIVIDUAL EOMP Membership entitles you to become member in the Eastern Oregon Miners & Prospectors Corporation,(a.k.a.:
More informationSTORM DRAINAGE DESIGN MANUAL
Appendix I STORM DRAINAGE DESIGN MANUAL by: SUNGATE DESIGN GROUP, P.A. GEN ERAL DESIGN STAN DARDS AN D POLICIES 1. STREET AND LOCAL DRAINAGE Discharge estimates for specified design storms shall be calculated
More informationSECTION EROSION CONTROLS
SECTION 31 25 13 EROSION CONTROLS PART 1 GENERAL 1.1 SUMMARY A. Section Includes installing, maintaining and removing: 1. Silt Fence. 2. Temporary Construction Entrances. 3. Diversion Channels. 4. Sediment
More informationCORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN
CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN SITUATED IN THE SW ¼ OF SECTION 18, T.2S., R.67W., OF THE 6 TH P.M. COUNTY OF ADAMS, STATE OF COLORADO PREPARED FOR: Thornton Cornerstone
More informationWhatcom County Invitation to Bid Bid 17-45
Invitation to Bid Bid 17-45 NOTICE IS HEREBY GIVEN that sealed bids will be received by Purchasing at their office in the Administrative Services Finance Department on the fifth floor of the Whatcom County
More informationCONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR STORMWATER
CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR STORMWATER Tavares, Florida Jones Edmunds & Associates, Inc. Project No. 06806-012-01 CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR
More informationADDENDUM #1 Dated: August 14, Lubna Drive Water Booster Station Effective Water Storage Improvements Project Town of Christiansburg
Town of Christiansburg Lubna Drive Booster Station 8/14/2015 ADDENDUM #1 Dated: August 14, 2015 Lubna Drive Water Booster Station Effective Water Storage Improvements Project Town of Christiansburg 1.
More informationVolume II: Hazard Annex Dam Failure
Volume II: Hazard Annex Dam Failure Causes and Characteristics of Dam Failure Dam Characteristics Dams are impervious structures that block the flow of water in a river or stream, capturing water behind
More informationTender Number: MR 141/2016
Tender Number: MR 141/2016 Tender Name: PROVISION OF DEPOT UPKEEP/GRASS CUTTING SERVICES FOR FEA S HEAD OFFICE, KINOYA HFO, KOROVOU PS, ROKOBILI PS, NADI PS, QALELOA PS, CAWAIRA PS, LABASA DEPOT & SAVUSAVU
More informationSchedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw
Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw 6410 2006 The Erosion and Sediment Control plan should seek (i) to protect the soil surface from erosion where possible and (ii) capture
More informationA. Road Maintenance Activities, Temporary Haul Roads and Borrow Sites.
A. Road Maintenance Activities, Temporary Haul Roads and Borrow Sites. Within the boundaries of the HCP area, incidental take of SKR during the course of otherwise lawful activities may occur in connection
More informationProperly constructing and maintaining a road drainage system is the most effective ways to reduce flood damage
Mitigating Flood Damage to Vermont Local Roads Properly constructing and maintaining a road drainage system is the most effective ways to reduce flood damage Vermont Emergency Management Vermont Local
More informationEXHIBIT "B" LAND USE REGULATIONS MARK TWAIN LAKE
EXHIBIT "B" LAND USE REGULATIONS MARK TWAIN LAKE The Lessee agrees to conduct all farming operations in accordance with the land use practices set forth and in accordance with an approved annual land use
More informationPenn State Forestland Management Office Multi-Strand High-Tensile Wire Fence Specifications
Penn State Forestland Management Office Multi-Strand High-Tensile Wire Fence Specifications 1. FENCE REQUIREMENTS Hazard Trees All hazard trees, which are within tree length of the fence, must be felled
More informationFACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES
FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES 1. COVERAGE UNDER THIS GENERAL PERMIT Area of Coverage: This permit covers all areas of the Commonwealth
More informationDRAFT FINDING OF NO SIGNIFICANT IMPACT (FONSI) LEVEE VEGETATION MAINTENANCE MILL CREEK FLOOD CONTROL PROJECT WALLA WALLA, WASHINGTON JULY 2015
DRAFT FINDING OF NO SIGNIFICANT IMPACT (FONSI) LEVEE VEGETATION MAINTENANCE MILL CREEK FLOOD CONTROL PROJECT WALLA WALLA, WASHINGTON JULY 2015 I. Introduction/Proposed Action The U.S. Army Corps of Engineers,
More informationStormwater Management Permit Application LESS Than One Acre. Public Works Department st Ave East Kalispell, Montana (406)
Public Works Department 201 1 st Ave East Kalispell, Montana 59901 (406) 758-7720 Note: This permit is separate from any permits required by the Montana Department of Environmental Quality. A State Stormwater
More informationTAYLORS FALLS CITY COUNCIL MEETING COUNCIL CHAMBERS MONDAY, SEPTEMBER 26, :00 A.M. MINUTES
City Council Meeting September 26, 2012 Page 1 of 3 TAYLORS FALLS CITY COUNCIL MEETING COUNCIL CHAMBERS MONDAY, SEPTEMBER 26, 2012 8:00 A.M. MINUTES The Agenda for this Meeting was posted Thursday, September
More informationRequest for Qualifications
Request for Qualifications The Borough of Lansdowne has been awarded a Transportation Enhancements Grant to construct a onequarter (.25) mile pedestrian trail, a 21 space parking area and related amenities
More informationROAD CUT PERMIT APPLICATION & INSTRUCTIONS
Jeremy Robinson Commissioner Ann Fordock Martin E. Davis, L.S. DEPARTMENT OF PUBLIC WORKS Ben Walsh, Mayor ROAD CUT PERMIT APPLICATION & INSTRUCTIONS REQUIRED FOR: Construction in (cutting into) a city
More informationBUILDING PERMIT CHECKLIST FOR THE TOWN OF GRAND LAKE
BUILDING PERMIT CHECKLIST FOR THE TOWN OF GRAND LAKE Please Note: No construction, including site preparation (grading, excavating, vegetation removal, etc.), will be allowed until a building permit or
More informationENGINEERING MANAGER Salary Range: $9,021 - $12,088
ENGINEERING MANAGER Salary Range: $9,021 - $12,088 San Lorenzo Valley Water District is looking for applicants for the position of Engineering Manager. Please read the details of the position and how to
More informationEROSION CONTROL GENERAL NOTES EC JAN 2017 C.B.
EROSION CONTROL GENERAL NOTES EC - 000 EROSION CONTROL GENERAL NOTES EC - 001 INSTALL TEMPORARY DRIVEWAY CULVERT IF THERE IS A ROADSIDE DITCH PRESENT EXISTING PAVEMENT OR APPROVED ACCESS POINT OR AS PRACTICABLE
More informationMINUTES. Motion made by Mr. Vollmer and second by Mr. Sivick to approve the minutes of August 22, 2017 as presented. Unanimous.
Wednesday, 7:00 p.m. MINUTES Chairman Robert H. Rohner, Jr. called the meeting to order at 7:00 p.m. Also present were Richard C. Vollmer, Vice Chairman, John P. Sivick, Supervisor, Robert F. Bernathy,
More informationTown of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /
Town of Friday Harbor PO Box 219 / Friday Harbor / WA / 98250 (360) 378-2810 / fax (360) 378-5339 / www.fridayharbor.org LAND CLEARING, GRADING, OR FILLING PERMIT APPLICATION APPLICATION DATE GRD No. APPLICANT/FRANCHISE
More informationHarmony Family Center, Inc. Employment Application Form. Harmony Family Center Employment Application Form
Harmony Family Center Employment Application Form Harmony Family Center, Inc. is an equal opportunity employer and does not discriminate on the basis of race, religion, color, national origin, age, sex,
More information