1 SECTION TRENCHING AND BACKFILLING PART 1 - GENERAL 1.1 SUMMARY A. Excavate trenches for new electric and telephone conduits, gas lines, and their appurtenances from at least 5 feet outside the building to the point of connection with the existing utility, or a point of discharge in the case of the storm sewers. B. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation. 1.2 REFERENCES A. Final Construction Drawings. B. Erosion and Sedimentation Control Plan (narrative and drawings). C. Commonwealth of Pennsylvania Department of Transportation (PennDOT) Specifications (Publication 408), latest revision. D. ASTM C33 - Standard Specification for Concrete Aggregates. E. ASTM D422 - Standard Test Method for Particle-Size Analysis of Soils. F. ASTM D Standard Test Methods for Moisture-Density Relations of Soils and Soil-Aggregate Mixtures, using 10 pound (4.54 kg) Rammer and 18-inch (457 mm) Drop. G. ASTM D Laboratory Determination of Water (Moisture) Content of Soil, Rock, and Soil- Aggregate Mixture. H. ASTM D Test Methods for Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth). I. ASTM D Test Methods for Moisture Content of Soil and Soil-Aggregate Mixtures. J. ASTM D Test Methods for Maximum Index Density of Soils Using a Vibratory Table. K. ASTM D Test Methods for Minimum Index Density of Soils and Calculation of Relative Density. L. ASTM D Liquid Limit, Plastic Limit, and Plasticity Index of Soils, Grain Size (ASTM D422), and Plasticity (Atterberg Limits, ASTM D ). 1.3 INFORMATIONAL SUBMITTALS A. The Contractor is responsible for providing copies of all test results and material certifications to the Owner or his representative prior to installation to demonstrate conformance with these specifications Trenching & Backfilling

2 B. The Owner s representative will be responsible for collecting samples of onsite soils for testing. The Contractor shall notify the Owner s representative where he plans to excavate onsite soil for use as backfill prior to soil sampling. The Owner s representative shall have the soil samples tested by a qualified soils testing laboratory for maximum dry density and optimum moisture content in accordance with ASTM D1557. C. The Contractor is responsible for selecting the supplier(s) of the imported soil materials (if required) and sand, and providing the name(s) of the supplier(s) to the Owner or his representative prior to the commencement of construction. The Contractor shall provide Modified Proctor (performed in accordance with ASTM D1557), grain size distribution (performed in accordance with ASTM D422), plasticity (Atterberg Limits ASTM D4318), test results from samples of the soil materials and sand to be imported. The Owner or his representative may request information about the supplier(s), and the Owner holds the right to direct the Contractor to use a supplier of the Owner s choice. If the Contractor chooses to change the supplier, he must first receive approval from the Owner or his representative. D. The Contractor shall submit Relative Density (performed in accordance with ASTM D4253 and ASTM D4254) and grain size distribution (performed in accordance with ASTM D422) test results from samples of sand and the AASHTO #57 stone to be imported, and certifications that indicate the imported sand and AASHTO #57 stone satisfies the material requirements as specified herein. 1.4 PROJECT RECORD DOCUMENTS A. The Owner or his representative shall receive copies of all test results and material certifications, and may request additional testing. B. Accurately record actual locations of utilities remaining by horizontal dimensions, elevations or inverts, and slope gradients. 1.5 DEFINITIONS A. Bedding: Fill placed under, beside, and directly over pipe prior to subsequent backfill operations. In the case of storm sewer inlets and manholes, bedding shall be defined as fill placed under the inlet/manhole prior to subsequent backfill operations. B. Utility: Any buried pipe, appurtenance, conduit, or cable. 1.6 REGULATORY REQUIREMENTS A. Obtain required approvals/permits from the appropriate authorities for materials to be disposed offsite. B. The Contractor shall contact the Pennsylvania One Call System ( ) prior to earth disturbance. C. Do not close or obstruct roadways, fire lanes, sidewalks, or hydrants without approval from the City of Pittsburgh and/or PennDOT. D. Conform to applicable regulatory requirements when discovering hazardous or contaminated materials. E. All excavations shall be made in accordance with federal, state, and local codes and ordinances, and the latest requirements for construction standards for excavations (29 CFR Part Subpart P) as promulgated by OSHA Trenching & Backfilling

3 F. Coordinate work with the utility companies where existing utilities may be affected by utility trenching. 1.7 COORDINATION A. Verify work associated with lower elevation utilities has been completed before placing higher elevation utilities. B. Verify that site clearing activities have been completed and all erosion and sedimentation control measures have been installed prior to commencing with utility trenching. C. Coordinate the work with other utility installations and relocations. D. Route vehicular and pedestrian traffic away from work at all times during construction activities. E. Immediately notify the Owner or his representative after identifying existing utilities that are not shown on the drawings. F. Perform work in accordance with the construction sequence included in the Erosion and Sedimentation Control Plan. PART 2 - PRODUCTS 2.1 MATERIALS A. Subsoil Type S1: Excavated and re-usable material, graded, free of lumps larger than 3 inches, rocks larger than 2 inches and debris. The excavated subsoil material shall be approved by the Owner or his representative prior to its reuse. B. Subsoil Type S2: Imported material, graded, free of lumps larger than 3 inches, rocks larger than 2 inches, and debris. The imported subsoil material shall be approved by the Owner or his representative prior to its use. C. AASHTO #57 Stone: See Section 02100, Part 2.1, Item E (Rock for Inlet Protection). D. Sand: Well-graded coarse sand that satisfies the requirements for fine aggregate in PennDOT Publication 408, Section E. Products: Subject to compliance with requirements, provide one of the following or approved equal: 1. Three Rivers Aggregate, Inc.; AASHTO #57 Stone 2. M & M Lime Co., Inc; AASHTO #57 Stone 3. Ohio Earth Food; Soils Type S1 and S2 4. Lincoln Way Supply; Soils Type S1 and S2 5. Lincoln Way Supply; Sand 2.2 SOURCE QUALITY CONTROL A. Perform laboratory tests of soil samples to determine the moisture-density relationship of each sample in accordance with ASTM D1557. B. Perform laboratory tests of soil samples to determine the grain size distribution of each sample in accordance with ASTM D Trenching & Backfilling

4 C. Perform laboratory tests of soil samples to evaluate plasticity in accordance with ASTM D4318. D. Visually observe soil materials to verify they meet the project description. E. Perform laboratory tests of AASHTO #57 stone samples to determine the relative density and grain- size distribution of each sample in accordance with ASTM D4253 and ASTM D4254, and ASTM D422, respectively. F. Visually observe the AASHTO #57 stone to verify it meets the project description. G. Perform laboratory tests of sand samples to determine the relative density and grain size distribution of each sample in accordance with ASTM D4253 and 4254 and ASTM D422, respectively. H. Visually observe the sand to verify it meets the project description. I. If tests indicate materials do not meet specified requirements, change materials and retest at no cost to the Owner, and/or change placement and compaction methods. PART 3 - EXECUTION 3.1 EXAMINATION A. Verify that survey benchmarks and intended elevations for the work are as shown on the drawings. B. Verify that the erosion and sedimentation control measures have been properly installed in their proper locations prior to commencing with utility trenching. 3.2 PREPARATION A. Identify required lines, levels, contours, and datum. B. Locate, identify, and protect any and all above and below grade utilities and appurtenances, which are to remain, from damage. C. Stake and flag locations of known utilities. D. Protect trees, plant life, lawns, and other site features which will remain as part of the final landscaping. E. Protect bench marks, existing structures, sidewalks, pavement, curbs, and other site features from excavation and construction equipment, and vehicular traffic. 3.3 TRENCH EXCAVATION A. The storm sewer, sanitary sewer, electric and telephone conduit, and water line trenches shall be excavated as shown on the drawings. Excavate subsoil required for the pipe, inlets, manholes, endwalls, and other utility installations to the established lines and grades as shown on the drawings. Provide a firm and uniform bearing for the entire length of pipe and for the bottom of foundations/footings for subsurface structures and appurtenances. B. If the material found at the bottom of the excavation might cause unequal settlement or provide unequal bearing for the pipe, structure, etc., or is otherwise unsuitable for a foundation or for pipe Trenching & Backfilling

5 bedding, it shall be removed by the Contractor to a depth and width specified by the Owner or his representative and replaced with suitable onsite material. The subgrade foundation materials shall be compacted to a density consistent with the undisturbed soils and to the satisfaction of the Owner or his representative. Overexcavation and replacement of unsuitable materials shall be at no additional cost to the Owner. C. Cut trenches sufficiently wide to enable installation and allow for inspection. D. If rock is encountered at the bottom of the trench excavation, the rock shall be removed by the Contractor to such depth and width as required by the Owner or his representative, and replaced with subgrade foundation material. Subgrade foundation material shall be ASTM Size No. 4 gravel. If conditions warrant, a layer of concrete sand and layers of ASTM Size No. 67 and ASTM Size No. 4 gravel shall be substituted for the ASTM Size No. 4 gravel. Proportions of each shall be determined by the Owner or his representative based on field conditions. The ASTM Size No. 4 and No. 67 gravel shall meet the requirements of the current ASTM Designation C33 for "Concrete Aggregate" and all amendments thereto. E. Do not interfere with 45 degree bearing splay of existing and/or new foundations. F. All excavations shall be kept free of water, snow, and ice during construction. G. The bottom portion of all trenches shall, conform to the external shape and dimensions of the pipe or structure (inlet, manhole, endwall, etc.) and provide an even bearing pressure. Hand trim if necessary. The character of the ground encountered may be such that the external shape and dimensions of the pipe/structure cannot be preserved, or the method of making the excavation may leave a trench which varies from the base of the pipe/structure. In such instances, the space between the external shape and the bottom and sides of the excavation as made shall be filled with pipe bedding material. H. Remove lumped subsoil, boulders and rock. I. Any excavation below the required level without authorization shall be backfilled with approved subsoil materials by the Contractor, at no expense to the Owner. Placement and compaction of such backfill shall be to the satisfaction of the Owner or his representative. J. The trench excavations shall not advance more than 200 feet ahead of the pipe laying and masonry work, except where it is absolutely necessary because of site conditions. The Contractor shall extend the trench or dig test pits to locate utilities when approaching existing utilities to be crossed or connected to. Any necessary changes in line or grade of the work, or any excavation and removal of pipe, caused by failure to take such precautions, will be at no expense to the Owner. K. When approaching sections where existing underground construction appears to be in proximity to pipe or conduit grades as set, or approaching existing utilities for connections, the trench shall be opened a sufficient distance ahead of the work, test pits made, or other approved exploration methods employed to allow for changes in line or grade. Any necessary changes in line or grade of the work, or any excavation and removal of pipe, caused by failure to take such precautions, will be at no cost to the Owner. Lines of new work may be adjacent to, and/or cross sewers, gas lines, water mains, and other underground utilities. Utility excavations in public roadways or pavement areas shall be performed in accordance with the procedures and guidelines set forth by the Owner, or appropriate local, state, and federal agencies having jurisdiction over the work. L. The Contractor shall furnish, install, and maintain such sheeting, shoring, bracing, and coffer damming, etc., as may be needed to support the sides and roofs of excavations and to prevent any earth or rock movements which might in any way diminish or affect the necessary width of the excavation, endanger the safety of persons, injure or delay the work, or jeopardize the safety or adjacent pavements, property, buildings, or other structures. The work of sheeting, shoring, and bracing shall, at all times, be in conformance with the latest requirements for construction standard Trenching & Backfilling

6 for excavations (29 CFR Part Subpart P) promulgated by OSHA, and any other local, state, and federal laws and ordinances. Where sheeting and bracing are required, the trench excavation width shall be increased accordingly. M. Trench sheeting shall remain in place until the pipe has been properly laid and backfill placed and compacted to a minimum depth of two feet over the top of pipe, or until depths required by OSHA regulations. Sheeting, shoring, and bracing shall be removed progressively up from the bottom of the trench as the compacted backfill is placed, or until the depths required by OSHA regulations. During backfill operations, sheeting which is to be removed shall at no time extend into the backfill which is being compacted. The sheeting shall be withdrawn so as to always be above the backfill. Upon removal, all voids shall be carefully backfilled and compacted. N. Sheeting and shoring at concrete structure excavations shall remain in place until the concrete has cured to 75 percent of its specified 28-day compressive strength. O. The decision as to whether or not sheeting and shoring are necessary, and the design of such sheeting and shoring, will be made by the Contractor in accordance with OSHA regulations. The Contractor shall assume sole responsibility for the safety of the work and adjacent structures and properties during and following the excavation operation. P. The Contractor shall remove, by pumping or other means, any surface or groundwater which may accumulate in trench excavations and shall at all times keep trench excavations free from water while work is being performed in them. The water shall be disposed of in a manner that will not cause injury or damage to the public health, public property, nearby streams or rivers, the work contemplated or in progress, surfaces of the streets, or cause any interference with the use of same. The disposal of this water shall be performed in a manner satisfactory to the Owner or his representative, and authorities having jurisdiction. Drainage of water by way of the section of pipe under construction will not be permitted. Q. Water pumped from the utility trench shall pass through a filter bag before discharging to the storm sewer system. The maximum pumping rate shall not exceed the capacity of the filter bag. The silt socks shall be routinely observed by the Contractor for sediment deposits. Sediment removed by the dewatering process shall be placed upgradient of the silt fence, sediment basin or sediment traps and allowed to dry. Once dry, the sediments may be incorporated in the fill. R. All suitable materials resulting from excavations may be used as backfill, and shall not be removed from the site without consent of the Owner or his representative. The Contractor may deposit suitable excavated materials directly into permanent position when it is consistent with the proper prosecution of the work. Materials suitable for reuse as backfill, which cannot be placed at once in permanent position, shall be stockpiled in an orderly manner a sufficient distance from all trenches to prevent slides or cave-ins. All stones over 2 inches in diameter shall be removed from pipe backfill that will be placed within 12 inches from the top of the pipe. Re-excavating material from the stockpiles and any other rehandling shall be included as part of the bid price. Materials unsuitable for reuse in the permanent work shall be disposed of offsite or disposed of onsite (if approved by the Owner) by placing and compacting at locations designated by the Owner. S. The Contractor shall assume all responsibility for conclusions as to the nature of the materials to be excavated and the difficulties of making and maintaining the required excavations. No additional allowances above the bid price will be made on account of any of the material being wet or frozen. No extra payment will be made for hand excavations. 3.4 STOCKPILING A. Stockpile reusable materials onsite at locations designated by the Owner or his representative. The materials shall be stockpiled a sufficient distance away from the utility trenches or excavations to prevent slides or cave-ins Trenching & Backfilling

7 B. The stockpile side slopes shall not be steeper than 2 horizontal to 1 vertical (2:1). C. Stockpile in sufficient quantities to meet project schedules and requirements. D. Separate differing materials with dividers or stockpile apart to prevent mixing. E. Direct surface water away from stockpiles to prevent erosion or deterioration of materials. F. Cover stockpiles with a polyethylene liner to prevent sediment pollution. Anchor liners in-place with heavy stones. 3.5 PIPE BACKFILLING A. Backfill trenches between the top of the bedding material and the subgrade elevation with suitable materials, as shown on the drawings. B. Systematically backfill to allow maximum time for natural settlement. Do not backfill over porous, wet, frozen or yielding subgrade surfaces. C. Place approved subsoil materials, Types S1 or S2, in maximum 8-inch thick, loose lifts. Refuse, broken paving materials, organic matter, frozen, saturated, or other unsuitable materials shall not be used in the backfill. Compact the backfill to at least 95% of its maximum dry density and within +3% of its optimum moisture content, as determined by the Modified Proctor compaction test (ASTM D1557). Any water used to increase the moisture content of the backfill shall be potable. The thickness of the fill layers shall be kept within the compacting ability of the equipment used. Continue backfilling over the pipe as specified herein, to the pavement subgrade or final ground surface elevation less 6 inches for topsoil. D. D. Employ placement and compaction methods that do not disturb or damage foundation perimeter drainage and other subsurface structures or utilities. Any damage to utilities/structures caused by placement and compaction methods shall be repaired by the Contractor at no expense to the Owner to the satisfaction of the Owner or his representative. 3.6 BACKFILLING FOR STRUCTURES A. Backfill between the sides of the storm sewer inlets and the excavation with suitable unfrozen materials. All backfill placed around the storm sewer inlet from the subgrade elevation down to the top of the lowest pipe shall be AASHTO #57 stone. Place AASHTO #57 stone in maximum 8-inch thick loose layers and carefully compact each layer to at least 75% of its relative density as determined by ASTM D4253 and ASTM D4254 using mechanical tampers. All soil backfill placed between the top of lowest pipe elevation and top of bedding shall be placed in maximum 8-inch thick loose lifts and compacted to at least 95% of its maximum dry density and within ±3% of its optimum moisture content as determined by ASTM D1557. The thickness of the fill layers shall be kept within the compacting ability of the equipment used. Any water used to increase the moisture content of the backfill shall be potable. Continue backfilling around the inlet as specified herein, to the pavement subgrade or final ground surface elevation (less 6 inches for topsoil). B. Backfill between the sides of the manholes and the excavation with suitable unfrozen soil materials. All soil backfill shall be placed in maximum 8-inch thick loose lifts and compacted to at least 95% of its maximum dry density and within ±3% of its optimum moisture content as determined by ASTM D1557. The thickness of the fill layers shall be kept within the compacting ability of the equipment used. Any water used to increase the moisture content of the backfill shall be potable. Continue backfilling around the manhole as specified herein, to the pavement subgrade or final ground surface elevation (less 6 inches for topsoil). C. Do not backfill over porous, wet, frozen, or yielding surfaces Trenching & Backfilling

8 D. Employ placement and compaction methods that do not disturb or damage foundation perimeter drainage and other subsurface structures or utilities. Any damage to utilities/structures caused by improper placement and compaction methods shall be repaired by the Contractor at no expense to the Owner to the satisfaction of the Owner or his representative. 3.7 RESTORATION A. As the trenching work, or portions of the work, is completed, the Contractor shall complete the final grading and restoration. This final restoration shall include the raking of the surface to remove all debris and stones. The Contractor will be required to replace, at his own expense, any pavement, curb, sidewalk, or other structure outside the trench area which has been damaged, has settled or moved out of alignment, either during the progress of the work or due to subsequent settlement by reason of trenching, or improper backfilling. The area disturbed by construction shall be left in as good condition as it was before the commencement of the work. Any repairs required because of unsatisfactory trench backfilling shall be at the expense of the Contractor. The costs for restoration shall be included with the costs for trenching and backfilling on the bid form. 3.8 CONTRACTOR REQUIREMENTS A. Conduct construction activities in a manner which minimizes interference with existing utilities to remain. B. Immediately cease construction activities if adjacent structures appear to be in danger. Notify authority having jurisdiction. Do not resume construction activities until directed by the Owner. C. Conduct construction activities with minimum interference to public or private accesses. D. Maintain safe pedestrian travel ways around the construction site at all times. 3.9 DISPOSAL A. Removed excess material not being reused shall be disposed of offsite at an approved landfill STOCKPILE CLEANUP A. Remove all stockpiled materials that will not be used for construction, and leave area in a clean and neat condition. Grade ground surface to provide positive drainage TOLERANCES A. Top Surface of Subgrade: Plus or minus 1/10 foot FIELD QUALITY CONTROL A. The Owner or his representative shall visually observe to verify that lift thicknesses are not greater than 8 inches. B. The Owner or his representative shall perform field density testing in accordance with ASTM D2216, ASTM D2922, and/or ASTM D Trenching & Backfilling

9 C. The Owner or his representative shall visually observe the utility trenches to verify that a firm, unyielding foundation with no sudden, sharp, or abrupt changes or break in grades shall exist after compaction. No standing water or excess moisture shall be allowed. All soft or yielding areas will be excavated to a depth at which, when replaced with approved subsoil materials and recompacted at a moisture content not exceeding optimum, the subgrade will display minimal elasticity. D. If tests indicate work does not meet specified requirements, remove work, replace, compact, and retest at no cost to the Owner. E. Frequency of Tests: Perform field density testing at a rate of one test per lift per 50 linear feet of trench, or portion thereof. F. The Contractor shall give at least 24-hour notice to the Owner or his representative to allow sufficient time to coordinate testing. Any work performed by the Contractor prior to completion of the required testing will be performed at the Contractor s own risk. Any deficient work completed by the Contractor will be repaired and paid for by the Contractor PROTECTION OF FINISHED WORK. A. The Contractor shall be responsible for protecting and maintaining the trench bottom in a suitable condition. Should the Contractor fail to maintain this material in a condition suitable for trench foundation, he shall, at his own expense, excavate and dispose of this material and replace and compact the new subgrade foundation material to the required grade. If the trench bottoms become wet, all soft materials shall be removed and replaced with a suitable material and compacted to a density equal to that of the undisturbed soil. Trench bottoms shall be protected from frost or freezing. B. The Contractor shall be entirely and solely responsible for the adequacy and sufficiency of all supports and of all sheeting, bracing, shoring, coffer damming, etc. The Contractor shall assume entire and sole liability for damages on account of injury to persons, adjacent pavements, and public and private property including, but not limited to, the work under construction, buildings and other structures, which injury shall result directly or indirectly from the Contractor's failure to install or to leave in place adequate and sufficient supports, sheeting, bracing, shoring, coffer damming, etc. C. Reshape and recompact fills subjected to vehicular traffic during construction. END OF SECTION Trenching & Backfilling

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1 1.01 GENERAL A. The Contractor shall perform all excavation, backfilling, grubbing and grading required for construction and installation of pipelines, structures and appurtenances. Excavation shall include

More information

C. Foundation stabilization for pipe and utility structures.

C. Foundation stabilization for pipe and utility structures. PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 02222 - EXCAVATION, BACKFILL, AND COMPACTION FOR UTILITIES PART 1 - GENERAL 1.01 SECTION INCLUDES A. Excavating trenches for the installation of utilities and stormwater detention facilities. B.

More information

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels

More information

SECTION EARTHWORK. B. Removal of subsoil and excavating all classes of material encountered.

SECTION EARTHWORK. B. Removal of subsoil and excavating all classes of material encountered. SECTION 02200 PART 1 GENERAL 1.1 SECTION INCLUDES A. Subsoil and aggregate materials. B. Removal of subsoil and excavating all classes of material encountered. C. Handling, storage, transportation and

More information

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards... SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving. SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating and filling for rough grading the Site. 2. Preparing subgrades for walks, curbs, pavements, and turf and grasses.

More information

SECTION TRENCI-JING PART 1 GENERAL

SECTION TRENCI-JING PART 1 GENERAL S SECTION 3123 17 TRENCI-JING PART 1 GENERAL 1.1 STIPULATIONS A. The Specification Sections "General Conditions of Contract", "Special Conditions" and "Division 01 - General Requirements" form a part of

More information

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements. SECTION 31 20 00 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating soil and other material for surface improvements. B. Excavating soil and other material for drainage basins. C. Placing fill. D. Compaction

More information

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

EXCAVATION & BACKFILLING GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The Work of this Section shall be all labour, materials, equipment and supervision necessary

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

SECTION EXCAVATION AND FILL

SECTION EXCAVATION AND FILL SECTION 02315 EXCAVATION AND FILL PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, equipment, and incidentals necessary to perform excavation, backfill, grading, and slope protection required to

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES SECTION 02221 EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02660 - Water Systems. 3. 02720 - Storm Drainage System. 4.

More information

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill. SECTION 312000- EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Special Conditions, apply to this Section. 1.2 SUMMARY This Section

More information

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related

More information

SECTION FILL AND BACKFILL

SECTION FILL AND BACKFILL PART 1 GENERAL 1.1 SECTION INCLUDES A. Filling, backfilling, and compacting for building volume below grade, footings, slabs-on-grade, paving, site structures, and utilities within the building. B. Backfilling

More information

Construction Specification for General Excavation

Construction Specification for General Excavation Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03

More information

SECTION EARTHWORK

SECTION EARTHWORK SECTION 02200 EARTHWORK PART 1 - GENERAL 1.01 WORK INVOLVED A. Provide all labor, materials and equipment as required for all excavation, grading, providing borrow materials, hauling, placing and compacting

More information

CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL

CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL 13.01 GENERAL The work included in this section shall consist of furnishing all materials and equipment and performing all labor

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING January 2007(Revision 1) Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 CLASSIFICATION OF THE WORK 1.05 QUALITY ASSURANCE PART 2 PRODUCTS 2.01

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES 1 1 1 0 1 0 1 0 1 SECTION 1. STRUCTURAL EXCAVATION FOR STRUCTURES BASED ON DFD MASTER SPECIFICATION DATED /1/1 P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all

More information

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES AFTER MARCH 1, 2012 ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES 430.1 Description. This item shall govern for all excavation required for the construction of sewers, sewer structures, pipe culverts,

More information

SECTION EARTHWORK

SECTION EARTHWORK SECTION 310000 PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and perform all excavation, backfill, fill and grading required to complete the work

More information

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS. SECTION 1100 GRADING 1101 SCOPE. This section covers the performance of all work required for grading the project in coordination with all previous work performed at the locations shown on the contract

More information

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing.

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing. SECTION 02221 TRENCHING, BACKFILLING AND COMPACTION PART 1 GENERAL 1.01 WORK INCLUDED A. Excavation for piped utility material. B. Provide necessary sheeting, shoring and bracing. C. Prepare trench bottom

More information

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations. Item Excavation and Backfill for Structures 1. DESCRIPTION 2. MATERIALS Excavate for placement and construction of structures and backfill structures. Cut and restore pavement. Use materials that meet

More information

STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION TRENCHING AND BACKFILL

STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION TRENCHING AND BACKFILL STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION 31 23 33 TRENCHING AND BACKFILL PART 1 GENERAL... 3 1.1 Description... 3 A. Excavation for Utilities Includes... 3 B. Suitable Fill Material...

More information

SECTION 10 - TRENCHING AND BACKFILLING

SECTION 10 - TRENCHING AND BACKFILLING SECTION 10 - TRENCHING AND BACKFILLING 10.1 General A. Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 10.1.1 Related requirements

More information

SECTION STRUCTURE EXCAVATION AND EARTHWORK

SECTION STRUCTURE EXCAVATION AND EARTHWORK SECTION 02200 STRUCTURE EXCAVATION AND EARTHWORK PART 1 GENERAL 1.1 SECTION INCLUDES A. Pavement Removal B. Stripping Topsoil C. Rock Excavation D. Excavation E. Subgrade Preparation F. Filling 1.2 REFERENCES

More information

SECTION TRENCHING AND BACKFILLING. A. Earth excavation and backfilling for construction of pipe and appurtenances, and for required removals.

SECTION TRENCHING AND BACKFILLING. A. Earth excavation and backfilling for construction of pipe and appurtenances, and for required removals. SECTION 312333 - TRENCHING AND BACKFILLING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES SECTION 02215 EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES PART 1 - GENERAL 1.1 DESCRIPTION: This section includes materials, testing, and installation of earthwork for excavations, fills, and

More information

SECTION TRENCH EXCAVATION AND BACKFILL

SECTION TRENCH EXCAVATION AND BACKFILL SECTION 02221 - TRENCH EXCAVATION AND BACKFILL CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Sections... 2 1.03 Reference Standards... 2 1.04 Quality Assurance... 2 1.05 Measurement

More information

SECTION 32 EXCAVATION, BACKFILL, COMPACTION AND GRADING

SECTION 32 EXCAVATION, BACKFILL, COMPACTION AND GRADING 32.1 GENERAL SECTION 32 EXCAVATION, BACKFILL, COMPACTION AND GRADING This Section covers excavation, backfill, fill and grading associated with utility trench and structural construction. All such WORK

More information

TRENCH EXCAVATION AND BACKFILL

TRENCH EXCAVATION AND BACKFILL TRENCH EXCAVATION AND BACKFILL PART 1 - GENERAL 1.01 SECTION INCLUDES A. Trench Excavation for Pipe Systems B. Trench Foundation Stabilization C. Pipe Bedding and Backfill 1.02 DESCRIPTION OF WORK A. Excavate

More information

SECTION GENERAL EXCAVATION

SECTION GENERAL EXCAVATION 02210-1 of 11 SECTION 02210 GENERAL EXCAVATION 02210.01 GENERAL A. Description 1. General excavation shall include but not necessarily be limited to, excavation and grading for general site work, roadways,

More information

SECTION 02215BP TRENCHING AND BACKFILLING

SECTION 02215BP TRENCHING AND BACKFILLING SECTION 02215BP TRENCHING AND BACKFILLING This page is intentionally left blank. Fluor-B&W Portsmouth, LLC (FBP) SITE PREPARATION INFRASTRUCTURE PHASE 1 SPECIFICATION COVER SHEET Client: U.S. Department

More information

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING Section Number Title 301 GENERAL 302 MATERIALS SPECIFICATIONS 303 CLEARING

More information

SECTION EXCAVATION AND FILL

SECTION EXCAVATION AND FILL SECTION 312300 EXCAVATION AND FILL PART 1 - GENERAL 1.1 SUMMARY A. Excavate, backfill, compact, and grade the site to the elevations shown on the Drawings, as specified herein, and as needed to meet the

More information

DIVISION 31 SITE WORK SECTION TRENCHING AND BACKFILLING FOR UTILITIES

DIVISION 31 SITE WORK SECTION TRENCHING AND BACKFILLING FOR UTILITIES DIVISION 31 SITE WORK PART 1 GENERAL 1.01 SECTION INCLUDES A. Excavating trenches for utilities. B. Backfilling and compaction of utility trenches. C. Excavation, backfill and compaction for manholes and

More information

A. Backfill: Soil material or controlled low-strength material used to fill an excavation.

A. Backfill: Soil material or controlled low-strength material used to fill an excavation. GSA Project No.: GS-P-03-14-AZ-5044 SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Preparing subgrades for walks. 2. Excavating and backfilling for structures. 3. Subbase

More information

SECTION TRENCHING, BACKFILL AND COMPACTION

SECTION TRENCHING, BACKFILL AND COMPACTION SECTION 312333 TRENCHING, BACKFILL AND COMPACTION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes 1. Native Backfill Material 2. Crushed Stone Bedding 3. Select Backfill Material 4. Shoring and Bracing

More information

SECTION EXCAVATION, TRENCHING AND BACKFILL

SECTION EXCAVATION, TRENCHING AND BACKFILL SECTION 02315 EXCAVATION, TRENCHING AND BACKFILL PART 1 - GENERAL 1.01 SUMMARY A. Section includes: 1. Excavation, trenching, and backfill necessary for the construction of the facilities as indicated

More information

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION UNCLASSIFIED EXCAVATION AND GRADING SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on

More information

SECTION BUILDING EARTHWORK

SECTION BUILDING EARTHWORK Conditions of Use/ Responsibility of Data Montgomery County Public Schools Facilities Guide DIVISION 2 - SITE WORK These guideline specifications are to be used by the A/E as a base document in the development

More information

REGIONAL CONSTRUCTION STANDARDS

REGIONAL CONSTRUCTION STANDARDS REGIONAL CONSTRUCTION STANDARDS SIXTH EDITION Publication Update 6.5 (Full Committee Approved Proposed Revision 6.5 Storm Sewer Joint Wrap - Section 302 As Publication Update 6.5) March 27, 2018 Copyright

More information

SECTION 14 EMBANKMENT

SECTION 14 EMBANKMENT SECTION 14 EMBANKMENT 14.1 DESCRIPTION A. General: This work consists of constructing roadway embankments, including preparation of the areas upon which embankments are to be placed; the construction of

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain

More information

SECTION EXCAVATION, BACKFILLING AND COMPACTING

SECTION EXCAVATION, BACKFILLING AND COMPACTING PART 1 GENERAL 1.01 SCOPE Work of this Section shall include all labor, materials, equipment, plant and incidentals required to complete all excavation, backfilling and compacting as indicated on the Drawings

More information

SECTION 1 GENERAL NOTES

SECTION 1 GENERAL NOTES ISSUE DATE NOVEMBER 1st, 2011 SECTION 1 Page List Page Number Page Title COVER COVER GN-01 PAGE 1 GN-02 PAGE 2 GN-03 PAGE 3 GN-04 PAGE 4 GN-05 PAGE 5 GN-06 PAGE 6 GN-07 PAGE 7 : 1. (CCU) STANDARD SPECIFICATIONS

More information

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis. PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and

More information

The Six-Inch Layer Compaction Method

The Six-Inch Layer Compaction Method 1/7 1.0 PURPOSE This specification describes the minimum requirements for the backfilling of trenches or the construction of berms primarily for the installation of buried pipelines, cables, ducts and

More information

This specification supplements the requirements of the Occupational Health and Safety Act, and its Regulations and the Ontario Building code.

This specification supplements the requirements of the Occupational Health and Safety Act, and its Regulations and the Ontario Building code. 1/6 1.0 PURPOSE This specification describes the minimum requirements for filling depressions and for backfilling excavations for structural footings, slabs, floors, buildings, trestles, and the like..

More information

SECTION EROSION CONTROLS

SECTION EROSION CONTROLS SECTION 31 25 13 EROSION CONTROLS PART 1 GENERAL 1.1 SUMMARY A. Section Includes installing, maintaining and removing: 1. Silt Fence. 2. Temporary Construction Entrances. 3. Diversion Channels. 4. Sediment

More information

SECTION EMBANKMENT

SECTION EMBANKMENT 02260-1 of 8 SECTION 02260 EMBANKMENT 02260.01 GENERAL A. Description 1. Embankment shall be formed of suitable material obtained from General, Structure, Borrow, Trench, and other excavations included

More information

ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS

ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS AFTER FEBRUARY 1, 2011 ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS 481.1 Description. This specification shall govern for the construction of monolithic, reinforced concrete box sewers of the size,

More information

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION EXCAVATION AND BACKFILL, GENERAL

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION EXCAVATION AND BACKFILL, GENERAL SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION 31 23 00 EXCAVATION AND BACKFILL, GENERAL PART 1 GENERAL... 2 1.1 Description... 2 1.2 Submittals... 2 1.3 Reference

More information

Chapter 7 GENERAL CONSTRUCTION SPECIFICATIONS FOR CONVEYANCE SYSTEMS

Chapter 7 GENERAL CONSTRUCTION SPECIFICATIONS FOR CONVEYANCE SYSTEMS Chapter 7 GENERAL CONSTRUCTION SPECIFICATIONS FOR CONVEYANCE SYSTEMS 7.01 General Provisions 7.01.1 Scheduling 7.01.2 Preservation, Restoration, and Cleanup 7.01.3 Interferences and Obstructions 7.01.4

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain

More information

SECTION STORM DRAIN

SECTION STORM DRAIN PART 1 - GENERAL 1-01 SECTION INCLUDED A. Furnishing and installing storm drainage facilities, including pipe, cleanout, manhole structures and inlet structures. 1-02 RELATED SECTIONS A. Division 00 Contract

More information

PUBLIC WORKS DEPARTMENT GENERAL NOTES

PUBLIC WORKS DEPARTMENT GENERAL NOTES PUBLIC WORKS DEPARTMENT GENERAL NOTES 1. All construction shall be in strict accordance with the standards of the City of Southlake and governed by the North Central Texas Council of Government's Standard

More information

Chapter 3: Permit Procedures and Requirements

Chapter 3: Permit Procedures and Requirements Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8

More information

APPLICANT any person who makes application for a permit. BOROUGH Borough of Elizabethtown, Lancaster County, Pennsylvania.

APPLICANT any person who makes application for a permit. BOROUGH Borough of Elizabethtown, Lancaster County, Pennsylvania. CHAPTER 21 PART 2 TUNNELING AND EXCAVATIONS 201. Definitions. The following words and phrases, when used in this Part, shall have the meanings ascribed to them in this 201, except in those instances where

More information

REGIONAL CONSTRUCTION STANDARDS Proposed Revision Form

REGIONAL CONSTRUCTION STANDARDS Proposed Revision Form Proposed Revision To: REGIONAL CONSTRUCTION STANDARDS Proposed Revision Form General Provisions (Division 1) Technical Specifications (Divisions 2-8) Standard Details Change No. Hampton Roads Planning

More information

SECTION EROSION CONTROL DEVICES

SECTION EROSION CONTROL DEVICES SECTION 02374 PART 1 GENERAL EROSION CONTROL DEVICES 1.1 SUMMARY A. Section Includes: 1. Diversion Channels. 2. Rock Energy Dissipator. 3. Paved Energy Dissipator. 4. Rock Basin. 5. Rock Barriers. 6. Sediment

More information

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain

More information

SPECIFICATIONS FOR STRUCTURAL EXCAVATION

SPECIFICATIONS FOR STRUCTURAL EXCAVATION SPECIFICATIONS FOR STRUCTURAL EXCAVATION 1.0 DESCRIPTION The Work shall consist of:.1 Excavation and removal of material for the placement of foundations, substructure units, approach slabs, transition

More information

Section SITE CLEARING. B. Description of Work: 1. The extent of site clearing is shown on the drawings.

Section SITE CLEARING. B. Description of Work: 1. The extent of site clearing is shown on the drawings. Section 02110 SITE CLEARING 1.00 General: A. Related Documents: The general provisions of the Contract including General and Supplementary Conditions and General Requirements, apply to the work specified

More information

EXCAVATION & BACKFILL SPECIFICATION

EXCAVATION & BACKFILL SPECIFICATION REVISION DATE DESCRIPTION BY REVIEWER 0 12/14/2009 ISSUED FOR CONSTRUCTION MJS TDJ SECTION 1 EARTHWORK 1.1 GENERAL. This section covers general earthwork and includes preparation of the construction areas;

More information

TRENCH EXCAVATION AND BACKFILL

TRENCH EXCAVATION AND BACKFILL SUDAS Standard Specifications Division 3 - Trench and Trenchless Construction Section 300 - Trench Excavation and Backfill TRENCH EXCAVATION AND BACKFILL PART - GENERAL.0 SECTION INCLUDES A. Trench Excavation

More information

TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma

TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma 10-2-2017 October 2, 2017 ADDENDUM NO. 1, Project: Owner: Architect: TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma Moore

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 804 EXCAVATION, TRENCHING AND BACKFILL

San Antonio Water System Standard Specifications for Construction ITEM NO. 804 EXCAVATION, TRENCHING AND BACKFILL ITEM NO. 804 EXCAVATION, TRENCHING AND BACKFILL 804.1 DESCRIPTION: This section shall govern the excavation, trenching, and backfilling for water, sanitary sewer, and recycled water construction, unless

More information

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS 1. GENERAL CONDITIONS...1 3. DESCRIPTION...1 5. MATERIALS...1 5.1 General...1 5.2 Handling and Storage of Materials...1 5.3 Testing and Approval...1 5.4

More information

SECTION SOILS REPORT

SECTION SOILS REPORT SECTION 02300 SOILS REPORT 1. GENERAL: 1.1 All work included under this heading shall be subject to the General Conditions of the entire operation. This Contractor is required to refer especially thereto.

More information

A. Work of this Section is affected by unit prices for earth moving specified in Section "Unit Prices."

A. Work of this Section is affected by unit prices for earth moving specified in Section Unit Prices. SECTION 312000 EARTH MOVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION EARTH MOVING

SECTION EARTH MOVING SECTION 312000 -EARTH MOVING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Section,

More information

A. Excavation consists of the removal of material encountered to subgrade elevations and the reuse or disposal of materials removed.

A. Excavation consists of the removal of material encountered to subgrade elevations and the reuse or disposal of materials removed. SECTION 02200 EARTHWORK PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer

More information

GRADING, EROSION AND SEDIMENTATION CONTROL

GRADING, EROSION AND SEDIMENTATION CONTROL SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,

More information

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014 1 0 1 0 1 0 1 SECTION 1. TRENCHING BASED ON DFD MASTER SPECIFICATION DATED // P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all work, materials, labor, equipment,

More information

CITY OF KANSAS CITY, MISSOURI

CITY OF KANSAS CITY, MISSOURI KCMO Supplement April 2000 Document No. 000079 CITY OF KANSAS CITY, MISSOURI SUPPLEMENT TO APWA STANDARD SPECIFICATIONS AND DESIGN CRITERIA SECTION 2600 This is the Kansas City, Missouri Supplement to

More information

SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS

SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS CS-2-01. GENERAL: Trench excavation shall conform with the City Standard Specifications. In general a trench is defined as an excavation in which

More information

Special Provision No. 421F01 April 2006

Special Provision No. 421F01 April 2006 RIGID PIPE CULVERTS Item No. FLEXIBLE PIPE CULVERTS Item No. CSP ARCH CULVERTS Item No. STRUCTURAL PLATE CSP Item No. CORRUGATED STEEL PIPE EXTENSIONS Item No. ROCK EXCAVATION FOR CULVERTS Item No. CLAY

More information

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1 March 2002 No. 400 INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS 400. 1 SCOPE... 1 400. 2 REMOVING CULVERTS AND TIMBER STRUCTURES 2.1 Concrete and Metal Pipe Culverts... 1 2.2 Structural

More information

SECTION ASPHALT CONCRETE

SECTION ASPHALT CONCRETE SECTION 02740 ASPHALT CONCRETE PART 1. GENERAL 1.01 SECTION INCLUDES A. Work includes but is not limited to the following: 1.02 RELATED SECTIONS 1. Provide all material, labor, and equipment to prepare

More information

SECTION TRENCH EXCAVATION, BACKFILL, AND COMPACTION. 1. Maintenance of traffic; Sections O1410 through

SECTION TRENCH EXCAVATION, BACKFILL, AND COMPACTION. 1. Maintenance of traffic; Sections O1410 through 02250-1 of 18 SECTION 02250 TRENCH EXCAVATION, BACKFILL, AND COMPACTION 02250.01 GENERAL A. Description Trench excavation, backfill, and compaction shall include, but not necessarily be limited to, the

More information

CITY OF LETHBRIDGE SECTION Construction Specifications Page 1 of 7 BACKFILL REGULATIONS FOR PUBLIC RIGHT-OF-WAYS

CITY OF LETHBRIDGE SECTION Construction Specifications Page 1 of 7 BACKFILL REGULATIONS FOR PUBLIC RIGHT-OF-WAYS Construction Specifications Page 1 of 7 1. GENERAL 1.1 The following specifications apply to compaction of all water, sewer and shallow utility service cuts, repairs, replacements, mainbreaks, extensions,

More information

CITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP

CITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP INFRASTRUCTURE SERVICES Page 1 of 7 1.0 GRANULAR BASE AND SUB-BASE 1.1 DESCRIPTION.1 This section specifies requirements for supplying, producing, hauling placing and compacting processed gravel or quarried

More information

BID NO VOLUME II. Date Due: May 7, 2018 at 10:30am

BID NO VOLUME II. Date Due: May 7, 2018 at 10:30am BID NO. 1804 Hardscape Repair At Multiple Sites Summer 2018 VOLUME II Date Due: May 7, 2018 at 10:30am BID NO. 1804 Hardscape Repair At Multiple Sites Summer 2018 - Page 1 TABLE OF CONTENTS - VOL-2 VOLUME

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 02210 - Site Grading C O N T E N T S PART 1 - GENERAL... 1 1.01 REQUIREMENT... 1 1.02 STRUCTURE PROTECTION... 2 1.03 JOB CONDITIONS... 3 PART 2 - PRODUCTS...

More information

.1 Furnish all labor, material and equipment necessary to complete all Site Work as shown on the Drawings and Specifications.

.1 Furnish all labor, material and equipment necessary to complete all Site Work as shown on the Drawings and Specifications. SECTION 31 22 00- GRADING 1.0 GENERAL.1 Furnish all labor, material and equipment necessary to complete all Site Work as shown on the Drawings and Specifications.. 2 Excavate to exact line and grade as

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF CONTENTS 422.01 SCOPE 422.02

More information

DUKE UNIVERSITY CONSTRUCTION STANDARDS

DUKE UNIVERSITY CONSTRUCTION STANDARDS DUKE UNIVERSITY CONSTRUCTION STANDARDS 1 31 23 00 Trenching, Backfilling, and Compaction of Utilities 1. General A. The Contractor shall furnish all labor, materials, tools, equipment, and perform all

More information

Installation Guidelines

Installation Guidelines 815 NE 172 nd Avenue Vancouver, WA 98684 877-694-0141 Installation Guidelines Installation steps include job planning, layout, excavating and preparing the soil subgrade, applying geotextiles (optional),

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 804 EXCAVATION, TRENCHING AND BACKFILL

San Antonio Water System Standard Specifications for Construction ITEM NO. 804 EXCAVATION, TRENCHING AND BACKFILL ITEM NO. 804 EXCAVATION, TRENCHING AND BACKFILL 804.1 DESCRIPTION: This section shall govern the excavation, trenching, and backfilling for water, sanitary sewer, and recycle mains construction, unless

More information