1 BILL Nr1 - PRELIMINARIES 1.0 PRELIMINARY PARTICULARS 1.1 Funding The funding shall be provided by the Guyana Power & light Inc., of 40 Main street, North Cummingsburg, Georgetown. 1.2 Engineer The Engineer shall be the Civil Engineer - Administrative Department, Guyana Power & Light Inc. 1.3 Contract The Bills of Quantities have been prepared in accordance with the General Conditions of contract, Form of Tender and Agreement. The Conditions of contract should be carefully read as such conditions may have a considerable bearing on the tender. 1.4 Quantities The quantities shown in Bill Nr. 3 have been measured net, as fixed in position, and the bidder shall allow in his prices for waste, laps, etc. The quantities given are thus generally not suitable for the ordering of materials. 1.5 Provisional Sum The term 'Provisional Sum' shall mean a sum provided for works or for costs which cannot be entirely foreseen, defined or detailed at the time the tender documents are prepared. Such sums shall be used in whole or in part as directed by the Engineer & shall be deemed to be inclusive of any profit required by the contractor, unless otherwise indicated. 1.6 Description of Site The site of the proposed works is located at Versailles, Region No Description of Works Construction of concrete, chain link mesh and razor wire fence measuring approximately 175in ft. Works also include rehabilitation of a section of the fence that is broken and rehabilitation of a security hut. 1.8 Visiting the Site The Contractor is advised to visit the site of the proposed Works in order to ascertain the prevailing site conditions and to obtain all information necessary for costing and executing the Works. 1

2 BILL Nr1 - PRELIMINARIES 2.0 GENERAL MATTERS Allow for the following General Matters in the Unit Rates of Measured Work. A. Plant and Tools. B. Setting out the works. C. Holiday with pay. D. Transportation of materials and plant. E. Site organization with regards to employment of Foreman-in-Charge, Storekeeper, Cleaner, and Security Guard. F. Lighting and Power. G. Programmed and progress Chart. H. Collection & payment of NIS contributions. 3.0 TEMPORARY WORKS Allow for the following Temporary Works, constructed to the Engineer's satisfaction, and for dismantling and removing from site on completion. A. Toilet & Washing facilities for GPL supervisor and Contractors staff. Sum Not Applicable B. Mass area for workers and barrier to prevent persons from coming into contact with the works. Sum C. Provide storage and workshop facilities Sum D. Provide a suitable furnished site office of size 10' x 10'. Sum Not Applicable E. Provide water for the works Sum F. Provide all scaffolding necessary for the works Sum G. Provide for the protection of all sections of the Works from inclement weather Sum H. Allow a Provisional Sum for the testing of concrete to be incorporated in the Works Prov.Sum 40,000 TEMPORARY WORKS TO SUMMARY - PG 4 2

3 BILL Nr1 - PRELIMINARIES 4.0 OTHER MATTERS A. Allow for the following Insurance's: (1) Contractor's All Risk Insurance The Insurance must be for the entire contract period. (Construction Period + Defects Liability Period) Prov.Sum 50,000 (2) Public Liability Insurance The Insurance must be for the entire contract period. (Construction Period + Defects Liability Period) Prov.Sum 50,000 (3) Employer's Liability Insurance The Insurance must be for the entire contract period. (Construction Period + Defects Liability Period) Prov.Sum 60,000 B. Allow for surety for providing Mobilization Advance. Prov.Sum 50,000 C. Allow for surety for providing Performance Bond. Bond to be valid until the issue of the Final Certificate. Prov.Sum 60,000 D. Allow for progress photographs, 12 exposures per week. Sum Not Applicable E. Allow for clearing the site of all vegetation, and maintaining same during the execution of the project. Sum F. Allow for the removal of construction debris. Sum G. Allow for the safety and health of workers and keep on site an adequate First Aid Kit. Sum OTHER MATTERS TO SUMMARY - PG 4 3

4 SUMMARY Bill NR 1 - PRELIMINARIES 1.0 Preliminary Particulars 2.0 General Matters 3.0 Temporary Works 4.0 Other matters PRELIMINARIES TO MAIN SUMMARY - PG 10 4

5 BILL Nr. 2 - Day Work A. GENERALLY In accordance with the day work clause in the conditions of Contract, where the Engineer orders work to be executed on a day work basis, the Contractor shall be paid for such work under the conditions of the day work schedule. Such payment shall be the sum of the prime cost, 1.2 calculated in accordance with the following "Definition of Prime Cost of Day Work" and the percentage additions to each section of the prime cost at the rates set out hereunder by the contractor, and recorded in the Appendix to the Conditions of Contract. B. DEFINITION OF PRIME COST OF DAY WORK LABOUR I II III IV The amount of wages paid at the rates applicable to work men on day work. The amount of wages paid at the rates applicable to work men engaged on day work and operating mechanical plant and transport and erecting and dismantling other plant. The time of principals, foreman, gangers, and leading hands at the time rates for the trades practiced, when actually working with there hands, unless when previously otherwise authorized. The cost of overtime where specifically ordered or subsequently sanctioned in writing by the Engineer as day work. MATERIALS I II The cost of materials including delivery to site. Materials supplied from the Contractor's stock at current prices plus justifiable charges for handling and delivery to site. PLANT I Use of mechanically operated plant for the time engaged in the work. No allowance mace for idle time. 5

6 BILL Nr. 2 - Day Work Use of scaffolding, staging, trestles, tarpaulins and other nonmechanical plant excluding tools, specifically provided on site for day work operation, for such time as the Engineer considers reasonable. A. OVERHEADS I Overheads for the purpose of the Contractor shall mean the following: Head office charges Site supervision and site charges Time loss due to inclement weather Bonus or other incentive payments All other liabilities and obligations whatsoever II Overheads as define above and profit shall be dealt with by means of a percentage addition to the totals of prime cost in each of the after mentioned sections at the rate stated herein after. B. PRIME COST Including the following sums for works which may be executed as day work. I Materials Prov Sum 100,000 II Add percentage for overheads and profit. % III Labour Prov Sum 100,000 IV Add percentage for overheads and profit. % V Plant Prov Sum 80,000 VI Add percentage for overheads and profit. % DAY WORK TO MAIN SUMMARY - PG 10 6

7 BILL 3 - MEASURED WORKS - FENCE 1.0 DEMOLITION WORKS 1.1 Remove chain link mesh from existing fence and store as directed by the Engineer. Ly Remove existing metal angle post and store as directed by the Engineer. Nr Remove existing mild steel runners and store as directed by the Engineer. Ly Demolish and remove existing curb wall (16" - 24" high) and foundation and dispose of as directed by engineer Ly 60 DEMOLITION WORKS TO SUMMARY - PG EARTH WORKS 2.1 Excavate trench for strip foundation not exceeding 18 inches deep and dispose of materials as directed by engineer Cy Level, ram and compact bottom of excavated trench sy Keeping excavation clear of water generally sum 2.4 Provide, place and compact 6 inch thick white to strip foundation sy Return, fill and ram excavated material around foundation cy 15 EARTH WORKS TO SUMMARY - PG CONCRETE WORKS. Reinforced concrete mix 1:2;4 3/4" max agg., 3000 psi in 28 days 3.1 In foundation 14" wide x 8" deep. Cy In 6" x 6 " x 3' high RC columns. Cy In 10" x 10" x 10' high RC gate columns. Cy 0.75 CONCRETE WORKS CARRIED FORWARD 7

8 CONCRETE WORKS BOUGHT FORWARD REINFORCEMENT: MILD STEEL BARS PROPERLY SECURED WITH 18 GAUGE BINDING WIRE /2" dia. main bars to foundation. Lbs /8" dia. stirrups at 8" centre's to foundation. Lbs /2" dia. main bars to 8" x 8" x 3' high columns. Lbs /4" dia. stirrups at 8" x 8" x 3' high columns Lbs /2" dia main bars to 8" x 8" x 10' high columns as gate post. Lbs /8" dia. stirrups at 8" x 8" x 10' high columns Lbs 30 FORMWORK TO INSITU CONCRETE 3.10 To foundation. Sy To 8" x 8 " columns (fair face finish). Sy To 10" x 10 " columns (fair face finish). Sy 7.5 CONCRETE WORKS TO SUMMARY - PG 10 BILL Nr. 3 MEASURED WORKS 4.0 BLOCK WORKS Hollow Concrete Block, bedded in 1:3 cement & sand mortar 4.1 4" x 8" x 16" H.C.B bedded in 1:3 cement / sand mortar to walls of fence. S.y 60 BLOCK WORKS TO SUMMARY - PG PLASTER WORKS STEEL TROWEL FINISH: 1:3 CEMENT/SAND MIX 5.1 1/2" thick plaster to top of fence not exceeding 5" girth. Ly /2" thick plaster to walls. Sy 120 PLASTER WORKS TO SUMMARY - PG 10 8

9 6.0 METAL WORK Metal work ; etch and two coats zinc chromate primer after fabrication Supply and install 2" dia galvanized pipe with crab welded to base and cast into the columns as shown on drawings. Ly 55 Supply and weld into position 11/2" dia. galvanized pipe as runners to 2" dia. galvanized pipe. Ly 120 Supply and weld into position 2" dia galvanized pipe welded at an angle of 45 degrees to 2" dia. Galvanized pipe to take razor wire. Ly 10 Supply and weld into position 1/2" dia. Steel rods as runners (2 No.) to 2" dia. Galvanized arms and as an intermediate support arm to take razor wire. Ly 120 Supply and install 5' wide x 10 gauge chain link mesh to 2" dia. & 1 1/2" dia. galvanized pipe. Ly Supply and install razor wire to arms Rolls 7 METAL WORK TO SUMMARY - PG PAINTING AND DECORATING 7.1 Prime and apply two additional coats of emulsion paint to block surfaces. Sy Prime and apply two additional coats of emulsion paint to top of fence not exceeding 5" girth LY Prime and apply two coats of metal paint to runners, columns and arm. Ly Prime and apply two coats of metal paint to 1/2" steel rods. Ly 120 PAINTING & DECORATING TO SUMMARY - PG 10 8 REHABILITATION WORKS Provide all materials, labour, plant and equipment required for the rehabilitation of guard hut measuring 4'- 6" x 4' - 6". Provide all materials, labour and plant required for the rehabiliation of the chainlink fence on the norhern side of fence approximately 50ft long. Allow for replacing broken mild steel angle runners and poles REHABILITATION WORKS TO SUMMARY - PG 10 sum Sum 9

10 SUMMARY BILL NR 3 - MEASURED WORKS - FENCE 1.0 DEMOLITION WORKS 2.0 EARTH WORKS 3.0 CONCRETE WORKS 4.0 BLOCK WORKS 5.0 PLASTER WORKS 6.0 METAL WORK 7.0 PAINTING AND DECORATING REHABILITATION WORKS 8.0 TOTAL MEASURED WORKS - FENCE TO MAIN SUMMARY - PG 10 MAIN SUMMARY Bill No Description Total 1 BILL NR 1 - PRELIMINARIES 2 BILL NR 2 - DAY WORKS 3 BILL NR 3 - MEASURED WORKS - FENCE CONTINGENCY 150,000 TOTAL 10

REHABILITATION OF DRIVEWAY AND GROUND FLOOR OF THE SECOND BUILDING AT MIDDLE STREET OFFICE

REHABILITATION OF DRIVEWAY AND GROUND FLOOR OF THE SECOND BUILDING AT MIDDLE STREET OFFICE BILL Nr1 - PRELIMINARIES 1.0 PRELIMINARY PARTICULARS 1.1 Funding The funding shall be provided by the Guyana Power & light Inc., of 40 Main street, North Cummingsburg, Georgetown. 1.2 Engineer The Engineer

More information

BILL SUMMARY. BILL No. DESCRIPTION AMOUNT 1 PRELIMINARIES $0 2 DAY WORKS $0 3 DISMANTLING AND REMOVAL OF BUILDINGS $0

BILL SUMMARY. BILL No. DESCRIPTION AMOUNT 1 PRELIMINARIES $0 2 DAY WORKS $0 3 DISMANTLING AND REMOVAL OF BUILDINGS $0 CLENT: GUYANA POWER AND LGHT NC BLL SUMMARY BLL No. DESCRPTON AMOUNT 1 PRELMNARES $0 2 DAY WORKS $0 3 DSMANTLNG AND REMOVAL OF BULDNGS $0 TOTAL $0 CLENT: GUYANA POWER AND LGHT NC BLL No.1: PRELMNARES BLL

More information

BILL SUMMARY. March 15, 2018 BILL No. DESCRIPTION AMOUNT

BILL SUMMARY. March 15, 2018 BILL No. DESCRIPTION AMOUNT PROJECT: CONSTRUCTION OF NEW TIMBER WHARF, SOUTHERN BILL No. DESCRIPTION AMOUNT 1 PRELIMINARIES 2 DEMOLISHION WORKS 3 TIMBER WHARF CONSTRUCTION 4 CATWALK CONSTRUCTION BILL SUMMARY 5 CONCRETE WALKWAY CONSTRUCTION

More information

BILL SUMMARY. BILL No. DESCRIPTION AMOUNT

BILL SUMMARY. BILL No. DESCRIPTION AMOUNT CLIENT: GUYANA POWER AND LIGHT INC PROJECT CONSTRUCTION OF LEGUAN COMMERCIAL BUILDING : BILL SUMMARY BILL No. DESCRIPTION AMOUNT 1 PRELIMINARIES 2 DAY WORKS 3 EXCAVATION AND EARTHWORKS 4 CONCRETE WORKS

More information

B Insurance against injury to persons, property and works item 1. C Performance Bond 5% of Contract amount item 1. D Security and transport item 1

B Insurance against injury to persons, property and works item 1. C Performance Bond 5% of Contract amount item 1. D Security and transport item 1 PRELIMINARIES 1 All rates to be inclusive of all taxes including V.A.T General Matters A Water for the works item 1 B Insurance against injury to persons, property and works item 1 C Performance Bond 5%

More information

CONTRACT NO. : MTK11/2017 REHABILITATION OF MSAULI ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

CONTRACT NO. : MTK11/2017 REHABILITATION OF MSAULI ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL SECTION 1: PRELIMINARY AND GENERAL SECTION 1: PRELIMINARY & GENERAL 1.1 1200A FIXED CHARGE AND VALUE RELATED ITEMS 8.3.1 CONTRACTUAL REQUIREMENTS 1.1.1 Surety or bank guarantee Sum 1 1.1.2 Common Law Liability

More information

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. Beit Hanoun Emergency Water Supply Project "Beit Hanoun Emergency Water Supply Project" " Rehabilitation and Construction of Beit Hanoun Water Network " BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE Bill of Quantities PREAMBLE TO

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) PAL 10-92895 - Emergency Removal and Crushing of Rubble and Debris Management Lot # 10: Site Preparation and Crushing of Concrete Rubble Bill of Quantity (BOQ) Bill of Quantity (BOQ) ITB 2015-039 PREAMBLE

More information

CONTRACT NO. : MTK 11/2018 REHABILITATION OF UITKYK ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

CONTRACT NO. : MTK 11/2018 REHABILITATION OF UITKYK ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL SECTION 1: PRELIMINARY AND GENERAL SECTION 1: PRELIMINARY & GENERAL SANS 1.1 1200A FIXED CHARGE AND VALUE RELATED ITEMS 8.3.1 CONTRACTUAL REQUIREMENTS 1.1.1 Surety or bank guarantee 1.1.2 Common Law Liability

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) United Nation Development Programme Programme of Assistance to the Palestinian People UXOs and Rubble Removal from Gaza Strip Removal of Residential and public Debris from North Governorate (Package 7)

More information

CONTRACT NO. : MTK 5/2018 REHABILITATION OF STEELPOORT ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

CONTRACT NO. : MTK 5/2018 REHABILITATION OF STEELPOORT ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL SECTION 1: PRELIMINARY AND GENERAL SECTION 1: PRELIMINARY & GENERAL SANS 1.1 1200A FIXED CHARGE AND VALUE RELATED ITEMS 8.3.1 CONTRACTUAL REQUIREMENTS 1.1.1 Surety or bank guarantee 1.1.2 Common Law Liability

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) United Nation Development Programme Rehabilitation of Tunis & Omer Bin Abdel Aziz Sidewalks PAL 10-71488 : UXOs and Rubble Removal From Gaza Strip Bill of Quantity (BOQ) PREAMBLE TO BILL OF QUANTITY (BOQ)

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) United Nation Development Programme Construction Salah El Deen Road Median From Al Zawaida entrance to Al Maghazi Northern entrance PAL 10-00071488 Bill of Quantity (BOQ) PREAMBLE TO BILL OF QUANTITY (BOQ)

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) Emergency Removal and Crushing of Rubble and Debris Management PAL 10-92895 Lot # 13: Rubble Removal from Different Locations of Gaza Governorates Bill of Quantity (BOQ) Bill of Quantity (BOQ) PREAMBLE

More information

PROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI. Item Description Unit Quantity Rate Amount

PROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI. Item Description Unit Quantity Rate Amount EXTERNAL WORKS DEMOLITION AND ALTERATIONS EXTERNALLY Pulling down to ground level; removing debris from Site a 200 mm thick masonry wall finished both sides with plaster and paint; net total area 158 square

More information

CONTRACT NO ITEM NO PAYMENT DESCRIPTION UNIT QUANTITY REFERS BROUGHT FORWARD : PREVIEW COPY ONLY

CONTRACT NO ITEM NO PAYMENT DESCRIPTION UNIT QUANTITY REFERS BROUGHT FORWARD : PREVIEW COPY ONLY CONTRACT NO ITEM NO PAYMENT DESCRIPTION UNIT QUANTITY PRELIMINARY & GENERAL FOR ALL SITES A1.1 Safety requirements (According to Act 85 of 1983 and E4E and E7/1) and Value related (Project, public liability,

More information

Description Unit Quantity Rate Kshs. Amount Kshs.

Description Unit Quantity Rate Kshs. Amount Kshs. BILL No.1 40m3 MASONRY STORAGE TANK No. Description Unit Quantity Rate Kshs. Amount Kshs. 1 SETTING OUT AND EARTH WORKS 1.1 General site clearance and setting out 1.2 Excavate over site 200mm to remove

More information

United Nations Development Programme-South Sudan

United Nations Development Programme-South Sudan United Nations Development ProgrammeSouth Sudan PRICED BILLS OF QUANTITIES FOR CONSTRUCTION OF TORIT PRISON PERIMETER SECURITY FENCING Main Summary Currency Item No. 1 Preliminaries Item No. 2 Excavations

More information

ITEM 555 CHAIN LINK FENCING

ITEM 555 CHAIN LINK FENCING ITEM 555 AFTER MARCH 1, 2012 CHAIN LINK FENCING 555.1 Description. This item shall govern for furnishing the quantities of chain link fencing and gates as shown on the plans, including all posts, bracing

More information

COUNTY GOVERNMENT OF SIAYA: PROPOSED ECD BLOCK

COUNTY GOVERNMENT OF SIAYA: PROPOSED ECD BLOCK PROPOSED ECD BLOCK ELEMENT NO. 1 SUBSTRUCTURES (ALL PROVISIONAL) A B C D Site clearance Clear the site off grass, shrubs and all vegetation; cart away as directed Excavate vegetable soil average 200mm

More information

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00 Description Page No Summary Amount Summary 1/7 230,694.60 22,019.25 22,642.65 2/6 96,801.30 80,150.60 114,056.00 Total Per Unit (MYR) 327,495.90 102,169.85 136,698.65 Total Unit(s) X 1 2 2 Total Per Type

More information

SECTION 2831 ITEM F-162 CHAIN-LINK FENCES

SECTION 2831 ITEM F-162 CHAIN-LINK FENCES SECTION 2831 ITEM F-162 CHAIN-LINK FENCES PART 1 - GENERAL 1.1 DESCRIPTION. This item shall consist of furnishing and erecting a chain-link fence in accordance with these specifications and the details

More information

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil United Nations Development Programme Programme of Assistance to the Palestinian People-PAPP Construction and Rehabilitation of wadi Gaza Bridges PAL10-00054031 Funded by Government of Brazil BILL OF QUANTITIES

More information

CITY OF LONGWOOD. Fostering citizen trust and cultivating a prosperous community ADDENDUM II. June 6, 2016

CITY OF LONGWOOD. Fostering citizen trust and cultivating a prosperous community ADDENDUM II. June 6, 2016 CITY OF LONGWOOD Fostering citizen trust and cultivating a prosperous community ADDENDUM II June 6, 2016 To: Prospective Bidders & All Others Concerned From: Greg Kirby, Purchasing Manager Subject: IFB

More information

CATCHMENT STRUCTURE 13M X 15M

CATCHMENT STRUCTURE 13M X 15M BILL OF QUANTITIES AND SPECIFICATIONS CONSTRUCTION OF 100M3 DJABIA ITEM No. DESCRIPTION UNIT QUANTITY RATE AMOUNT KSHS CATCHMENT STRUCTURE 13M X 15M 1.1 Clear catchment site of all bushes, scrubs, undergrowth,

More information

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES RFP/GRC/LSV/2017-003: RENOVATION (CIVIL WORKS) AT SKALA SYKAMNIAS CHILDRENS PLAYGROUND BILL OF QUANTITIES 1/7 The Contractor shall consider in his price all costs or expenses of all requirements stipulated

More information

Bear Exhibit Fence Upgrades. The following modifications are hereby made part of the contract documents:

Bear Exhibit Fence Upgrades. The following modifications are hereby made part of the contract documents: ADDENDUM TO BID T2017-04 Metropolitan Park District Department of Planning, Design and Development 4702 South 19 th Street Tacoma WA 98405 Date Prepared: November 17, 2017 Bid Number: T2017-04 Addendum

More information

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil

BILL OF QUANTITIES. Construction and Rehabilitation of wadi Gaza Bridges PAL Funded by Government of Brazil United Nations Development Programme Programme of Assistance to the Palestinian People-PAPP Construction and Rehabilitation of wadi Gaza Bridges PAL10-00054031 Funded by Government of Brazil BILL OF QUANTITIES

More information

Contract Identification No. and Package 1. SUHEP-067/68-Lot No.1-AR: Package B 2. SUHEP-067/68-Lot No.1-AR: Package C

Contract Identification No. and Package 1. SUHEP-067/68-Lot No.1-AR: Package B 2. SUHEP-067/68-Lot No.1-AR: Package C Notice of Amendment No.1 Addendum No.1 to the following Contract Packages has been made in the Bids, for which the first date notice was published in the Gorkhapatra daily on December 14, 2010 by Sanjen

More information

TOWN OF LABRADOR CITY FORM OF TENDER TLC SUPPLY & INSTALLATION OF CONCRETE FLOOR

TOWN OF LABRADOR CITY FORM OF TENDER TLC SUPPLY & INSTALLATION OF CONCRETE FLOOR TOWN OF LABRADOR CITY FORM OF TENDER TLC-04-18 SUPPLY & INSTALLATION OF CONCRETE FLOOR Tenderer Address Telephone # The undersigned bidder has carefully examined the Form of Tender, Instructions to Bidders,

More information

ITEM No. D E S C R I P T I O N UNIT QTY. 5-E343.2 In class III material m³ 1,260 - Max. Depth: m For disposal

ITEM No. D E S C R I P T I O N UNIT QTY. 5-E343.2 In class III material m³ 1,260 - Max. Depth: m For disposal EARTHWORKS Excavation for foundations 5E343.2 In class III material m³ 1,260 Max. Depth: 0.50 1 m For disposal 5E334.2 In class III material m³ 720 Max. Depth: 1 2 m For disposal Filling Ancillaries 5E723.0

More information

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL.

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL. Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities for SIX CHAMBER VIP LATRINE FACILITY LOCATED AT PRIMARY & SECONDARY SCHOOL YEI RIVER COUNTY South Sudan JUN,

More information

KANPUR SMART CITY LIMITED

KANPUR SMART CITY LIMITED Nagar Nigam Mukhyalay, 3 rd Floor, Moti Jheel, Kanpur - 208002 Tel.: +91 512 2541258, 2546194 Email:ksclkanpur@gmail.com KANPUR SMART CTY LMTED No.: KSCL/PMC/Open Gym/01/2 Date: 17/02/2018 Reply to queries

More information

Item Quantity Amount No BILL NO 1

Item Quantity Amount No BILL NO 1 Item Quantity Amount BILL NO 1 PRELIMINARIES MEANING OF TERMS "TENDER / TENDERER" (i) (ii) Any reference to the words "Tender" or "Tenderer" herein and/or in any other documentation shall be construed

More information

2-DAY NATIONAL WORKSHOP ON RELEVANCE OF BESMM4 IN TOTAL COST MANAGEMENT OF CONSTRUCTION/ENGINEERING WORKS ORGANIZED BY:

2-DAY NATIONAL WORKSHOP ON RELEVANCE OF BESMM4 IN TOTAL COST MANAGEMENT OF CONSTRUCTION/ENGINEERING WORKS ORGANIZED BY: 2-DAY NATIONAL WORKSHOP ON RELEVANCE OF BESMM4 IN TOTAL COST MANAGEMENT OF CONSTRUCTION/ENGINEERING WORKS ORGANIZED BY: THE NIGERIAN INSTITUTE OF QUANTITY SURVEYORS HELD AT: BARCELONA HOTELS, NO. 23 BLANTYRE

More information

Drainage, Road Drainage and Collection Pit A - EXCAVATION:

Drainage, Road Drainage and Collection Pit A - EXCAVATION: 57 Drainage, Road Drainage and Collection Pit SCHEDULE OF QUANTITY Sl.N o. 1 Particulars Qty Unit Rate Amount A - EXCAVATION: Earth work in EXCAVATION IN FOUNDATION TRENCHES IN ALL KIND OF SOIL including

More information

Tender No: DAFFPL/MOD/FF/ /06 15 th July, 2015

Tender No: DAFFPL/MOD/FF/ /06 15 th July, 2015 Tender No: DAFFPL/MOD/FF/2015-16/06 15 th July, 2015 Dear Sirs, Sealed offer is invited by Delhi Aviation Fuel Facility Private Limited for the work as detailed below: 1. Name of the work : Construction

More information

ADDENDUM #3 NWIT Front Street Parkade Demolition and Rehabilitation New Westminster, BC

ADDENDUM #3 NWIT Front Street Parkade Demolition and Rehabilitation New Westminster, BC March 26, 2015 ADDENDUM #3 NWIT-15-01 Front Street Parkade Demolition and Rehabilitation New Westminster, BC This addendum modifies the Invitation to Tender only as noted: ADDITIONAL INFORMATION Please

More information

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4 City of Columbia Engineering Regulations PART 25: SPECIFICATIONS FOR ALTITUDE VALVE VAULT Table of Contents Paragraph Description Page No. 25.1 General 25-1 25.2 Materials 25-1 25.3 Concrete Masonry Work

More information

Item No. Description Unit Quantity Rate (EUR) Amount (EUR) No 2

Item No. Description Unit Quantity Rate (EUR) Amount (EUR) No 2 BILL NO.1 : PRELIMINARY AND SUPERVISORY SERVICES 1.01 Allow a prime cost sum for material testing to be spent in whole or part as directed by the Resident Engineer. PC Sum 1 1,351.35 1,351.35 1.02 Contractor's

More information

TOWN OF OSOYOOS PERIMETER FENCING OSOYOOS LANDFILL

TOWN OF OSOYOOS PERIMETER FENCING OSOYOOS LANDFILL TOWN OF OSOYOOS PERIMETER FENCING OSOYOOS LANDFILL CONTRACT DOCUMENTS AND SPECIFICATIONS TRUE Consulting August 2011 Job No. 302-706 PLANHOLDER REGISTRATION FORM Request for Tender No. 302-706 PERIMETER

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) United Nation Development Program UXOs and Solid Waste Management PAL 10-71646 Lot # 2 Removal of Solid Waste from Random sites in North Governorate Bill of Quantity (BOQ) Page 1 of 8 PREAMBLE TO BILL

More information

Unit Rate. Subtotal in SDG. Site Clearing Preliminary Works. 1.0 Job. Excavation & Earth Works. Stone Masonry Works in foundation 100 M.

Unit Rate. Subtotal in SDG. Site Clearing Preliminary Works. 1.0 Job. Excavation & Earth Works. Stone Masonry Works in foundation 100 M. Bill of Quantities Nature of work : Construction of Health Center with 8 rooms (Clinics, Pharmacy, Labs, Fence & Latrines) Location: Shakreen- El Fasher Town- North Darfur State No. Description Qty Unit

More information

BILL OF QUANTITIES FOR KIPUNGANI SEA WALL

BILL OF QUANTITIES FOR KIPUNGANI SEA WALL BILL NO 17 CONCRETE WORK (All Provisional) 17/1 Clear site of all obstacles and dispose as directed by the Engineer on site. SM 500 200 100,000.00 17/2 Set out works over land and water ITEM 1 50000 50,000.00

More information

EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS

EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS BILLS OF QUANTITIES - Name of Project CONSULTANT: Name of Office DATE:APR. 2008 External Works EXTERNAL WORKS EXCAVATION,BACKFILLING & SITE WORKS page 1 BILLS OF QUANTITIES - Name of Project CONSULTANT:

More information

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) OF THR 8th PRIMARY SCHOOL TOILETS IN MYTILENE. Annex A - BILL OF QUANTITIES 1/9

RFP/GRC/LSV/ : RENOVATION (CIVIL WORKS) OF THR 8th PRIMARY SCHOOL TOILETS IN MYTILENE. Annex A - BILL OF QUANTITIES 1/9 RFP/GRC/LSV/2017-005: RENOVATION (CIVIL WORKS) OF THR 8th PRIMARY SCHOOL TOILETS IN MYTILENE Annex A - BILL OF QUANTITIES 1/9 The Contractor shall consider in his price all costs or expenses of all requirements

More information

COUNTY GOVERNMENT OF BUSIA DEPARTMENT OF WATER, ENVIRONMENT AND NATURAL RESOURCES P.O BOX BUSIA (K)

COUNTY GOVERNMENT OF BUSIA DEPARTMENT OF WATER, ENVIRONMENT AND NATURAL RESOURCES P.O BOX BUSIA (K) COUNTY GOVERNMENT OF BUSIA DEPARTMENT OF WATER, ENVIRONMENT AND NATURAL RESOURCES P.O BOX 392-50400 BUSIA (K) DRILLING, DEVELOPMENT, TEST PUMPING, AND WATER QUALITY ANALYSIS FOR: BOREHOLE NAME: KAMUNA

More information

ITEM 461 STRUCTURAL PLATE STRUCTURES. Galvanized steel plates shall conform to AASHTO M167 and aluminum plates shall conform to AASHTO M219.

ITEM 461 STRUCTURAL PLATE STRUCTURES. Galvanized steel plates shall conform to AASHTO M167 and aluminum plates shall conform to AASHTO M219. ITEM 461 STRUCTURAL PLATE STRUCTURES 461.1. Description. This Item shall govern for the furnishing and installing of structural plate pipes, pipe arches, arches, underpasses, box culverts and special shapes

More information

Standard Method of Measurement for Concrete Repair

Standard Method of Measurement for Concrete Repair Standard Method of Measurement for Concrete Repair Third Edition 2015 INDEX INTRODUCTION 3 Section 1: PRELIMINARIES 5 Section 2 : PREAMBLES 8 Section 3 : NOTES ON REPAIR MEASUREMENT 10 including illustrations

More information

ITEM 442 METALS FOR STRUCTURES

ITEM 442 METALS FOR STRUCTURES AFTER NOVEMBER 1, 2008 ITEM 442 METALS FOR STRUCTURES 442.1 Description. These specifications shall govern for materials such as structural steel, wrought iron, bronze, and other metals used in structures,

More information

OPEN AIR MARKET(RUKANGA KASIGHAU MARKET SHED) Item Description Qty Unit Rate Total

OPEN AIR MARKET(RUKANGA KASIGHAU MARKET SHED) Item Description Qty Unit Rate Total BILL OF QUANTITY Proposed Market Shed OPEN AIR MARKET(RUKANGA KASIGHAU MARKET SHED) ELEMENT NO. 1: - SUBSTRUCTURE (ALL PROVISIONAL): - Excavations and Earthworks: - A Clear site of all bush and grass and

More information

Calculation of requirement of Labour. for construction of IAY/CMRHM

Calculation of requirement of Labour. for construction of IAY/CMRHM Calculation of requirement of Labour for construction of IAY/CMRHM Total cost as per 2012 SOR = Rs 7,01,746.00 Deduct 7.5% Contractor s profit = Rs (-) 52,631.00 = Rs 6,49,115.00 Taking 1/3 as the Labour

More information

BID FORM (LUMP SUM CONTRACT)

BID FORM (LUMP SUM CONTRACT) BID FORM (LUMP SUM CONTRACT) Place County of El Paso Purchasing Department Date Project No. 11-016 Proposal of (hereinafter called Bidder), a corporation organized under the laws of the State of /a partnership/an

More information

Special Provision No. 799F01 March 2012 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS

Special Provision No. 799F01 March 2012 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS ... m NOISE BARRIER - Item No.... m NOISE BARRIER INCLUDING PRECAST NOISE/TRAFFIC BARRIER - Item No.... m NOISE BARRIER ON STRUCTURES - Item No.... m SALVAGEABLE NOISE BARRIER - Item No.... m SALVAGEABLE

More information

GENERAL(Smallworks) & ENGINEER'S OFFICE. Ablution and toilet facilities on site and elsewhere Sum 1

GENERAL(Smallworks) & ENGINEER'S OFFICE. Ablution and toilet facilities on site and elsewhere Sum 1 NHBRC- Construction of a new parking and rehabilitation of existing shaderports SECTION A - PRELIMINARY AND GENERAL ITEM NO PAYMENT REF SANS 1200 AA,AB GENERAL(Smallworks) & ENGINEER'S OFFICE A.1 8,3 FIXED-CHARGE

More information

Annex II- Lot 2. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 6 Admin Units in localities of Sinar State

Annex II- Lot 2. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 6 Admin Units in localities of Sinar State Annex II- Lot 2 Bills of Quantities for Civil Works of septic tanks and soak-away wells in 6 Admin Units in localities of Sinar State Lot: 2 Site 2-1: Allakandie All Prices of items shall include Supplying,

More information

Bill of Quantities. Bill 1: Site Preparatory Works. Page No. 1/7. Bill 1 Page 1/1. Contract No.

Bill of Quantities. Bill 1: Site Preparatory Works. Page No. 1/7. Bill 1 Page 1/1. Contract No. Bill 1: Site Preparatory Works Page No. 1/7 Bill 1 Page 1/1 1.1 Construction of access roads to quarry sites LS 1 including their maintenance throughout the working period 1.2 Construction of deviations

More information

SECTION 410 FENCES All materials shall be new and without flaws or defects of any type GENERAL

SECTION 410 FENCES All materials shall be new and without flaws or defects of any type GENERAL SECTION 410 FENCES 410.1 GENERAL This work shall consist of the construction of fences and gates in substantial compliance with the specifications, lines, and grades shown on the plans or established by

More information

Annex III- Lot 3. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 8 Admin Units in localities of Sinar State

Annex III- Lot 3. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 8 Admin Units in localities of Sinar State Annex III- Lot 3 Bills of Quantities for Civil Works of septic tanks and soak-away wells in 8 Admin Units in localities of Sinar State Lot: 3 Site 3-1: Sinja city All Prices of items shall include Supplying,

More information

Special Provision No. 599F01 May 2004 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS

Special Provision No. 599F01 May 2004 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF NOISE BARRIER TABLE OF CONTENTS ... m NOISE BARRIER - Item No.... m NOISE BARRIER INCLUDING PRECAST NOISE/TRAFFIC BARRIER - Item No.... m NOISE BARRIER ON STRUCTURES - Item No.... m SALVAGEABLE NOISE BARRIER - Item No.... m SALVAGEABLE

More information

ITEM 432 RIPRAP. Dry Riprap is defined as Stone Riprap of the required type with voids filled only with spalls or small stones.

ITEM 432 RIPRAP. Dry Riprap is defined as Stone Riprap of the required type with voids filled only with spalls or small stones. ITEM 432 RIPRAP 432.1. Description. This Item shall govern for the furnishing and placing of riprap of the type and details shown on the plans and in accordance with this Item. 432.2. General. Riprap furnished

More information

QUANTITY SURVEYING DIVISION ASSESSMENT OF PROFESSIONAL COMPETENCE PART I ASSESSMENT SEPTEMBER 2013 WRITTEN TEST

QUANTITY SURVEYING DIVISION ASSESSMENT OF PROFESSIONAL COMPETENCE PART I ASSESSMENT SEPTEMBER 2013 WRITTEN TEST PART I ASSESSMENT SEPTEMBER 2013 TIME ALLOWED: 3 hours 30 minutes Page 1 of 27 NOTES TO CANDIDATES A. Headings to questions are for ease of identification only and do not form part of the questions. B.

More information

Tender ref no: SBIIMS/BHU/AO2/ / 57 Date: PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING. Cum 15.

Tender ref no: SBIIMS/BHU/AO2/ / 57 Date: PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING. Cum 15. Tender ref no: SBIIMS/BHU/AO/08-9/ Date: 0.0.09 Sl. No. ITEM SPECIFICATION UNIT QTY RATES AMOUNT PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING Earth work in excavation of recharge

More information

Bill No.1: Preliminaries

Bill No.1: Preliminaries Bill No.1: Preliminaries Item No. Description of Works Qty. 1 Mobilization 1.1 This item should include site office for the use of the Engineer's and Employer's staffs with the necessary facilities, furniture,

More information

Name of work Estimated cost Time allowed for completion of work 1. Construction of PVC coated Chain Link fencing at Megapode Resort. Sl. No.

Name of work Estimated cost Time allowed for completion of work 1. Construction of PVC coated Chain Link fencing at Megapode Resort. Sl. No. The Andaman & Nicobar Islands Integrated Development Corporation Ltd, Vikas Bhawan, Post Box. No.180, Port Blair 744 101 Phone: 232098 Fax 03192-240615 F.No. 7-37/ANIIDCO/95/1231/2018 Dated the 16 th April

More information

SCHEDULE OF QUANTITIES CPUT BELLVILLE JOB NO: SECTION 1 : PRELIMINARY AND GENERAL ITEM PAYMENT DESCRIPTION UNIT QTY RATE AMOUNT

SCHEDULE OF QUANTITIES CPUT BELLVILLE JOB NO: SECTION 1 : PRELIMINARY AND GENERAL ITEM PAYMENT DESCRIPTION UNIT QTY RATE AMOUNT SECTION 1 : PRELIMINARY AND GENERAL ITEM PAYMENT DESCRIPTION UNIT QTY RATE A SECTION 1 : PRELIMINARY AND GENERAL A.1 8.3 FIXED-CHARGE ITEMS A.1.1 8.3.1 Contractual Requirements A.1.2 8.3.2.1 Facilities

More information

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building... Contents 11. Construction processes and materials... 11-2 11.1 Power House... 11-2 11.2 Maintenance Building... 11-2 11.3 Fuel Treatment Building... 11-3 11.4 Roads & Paths... 11-3 11.5 Fencing... 11-3

More information

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI.

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI. SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST RAIGARH, MUMBAI. Tender Reference No. BL/LI/CC/TCWMUM/BOUNDARY WALL/1617/04

More information

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK DIVISION 5 - STRUCTURAL STEEL AND IRON WORK SECTION 05100 STRUCTURAL METAL FRAMING PART 1.00 GENERAL 1.01 SCOPE OF WORK A. Work Included: 1. 2. Structural steel complete in place. Steel joists complete

More information

Scanned by CamScanner

Scanned by CamScanner JODHPUR MUNICIPAL CORPORATION G-SCHDULE NIT No. Date Sr No. Last Date of Sale :- Earnest Money : Rs... Date of Receipt :- CR No. Dated.. Copy issued to M/s STORM WATER DRAINAGE MASTER PLAN FOR THE CITY

More information

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications Mar/2008 v1.0 SECTION 02255 HYDRAULICLY DRIVEN STEEL UNDERPINNING PILES PART 1 GENERAL 1.01 SCOPE OF WORK The work shall

More information

BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR 2014 WATER MAIN AND SEWER MAIN REPLACEMENT IN EASEMENTS

BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR 2014 WATER MAIN AND SEWER MAIN REPLACEMENT IN EASEMENTS BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR 2014 WATER MAIN AND SEWER MAIN REPLACEMENT IN EASEMENTS (Easement 6 & 11, 4200 block of Versailles Avenue and Belclaire Avenue and the 4300 block of Westway

More information

SECTION DRILLED CONCRETE PIERS AND SHAFTS

SECTION DRILLED CONCRETE PIERS AND SHAFTS 1 PART ONE - GENERAL 1.1 COORDINATION SECTION 02466 DRILLED CONCRETE PIERS AND SHAFTS A. The General, Supplementary, and Special Conditions of these specifications shall all be considered as a part of

More information

SECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section

SECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section 02670-1 of 6 SECTION 02670 CURB, COMBINATION CURB AND GUTTER, AND 02670.01 GENERAL A. Description This work shall include, but not necessarily be limited to, the construction of concrete curb, concrete

More information

Annex I- Lot 1. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 7 Admin Units in localities of Sinar State

Annex I- Lot 1. Bills of Quantities for Civil Works of septic tanks and soak-away wells in 7 Admin Units in localities of Sinar State Annex I- Lot 1 Bills of Quantities for Civil Works of septic tanks and soak-away wells in 7 Admin Units in localities of Sinar State Lot: 1 Site 1-1: Sinnar city All Prices of items shall include Supplying,

More information

Heavy Rib. Page 1 of 6. Expanded Mesh & Metal Products. Key Product Features:

Heavy Rib. Page 1 of 6. Expanded Mesh & Metal Products. Key Product Features: TMI- is used widely in construction work for joints, stop-end, retaining walls and columns. It creates a strong bond base for successive pours. is fixed as permanent formwork. Key Product Features: Unique

More information

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL

SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL SECTION B1 BITUMINOUS CONCRETE PAVING GENERAL This section covers the restoration of roadways and sidewalks, in whole or in part, with bituminous concrete paving. WITHIN 4 DAYS OF BACKFILLING IN AREAS

More information

ELECTRIC SUPPLY CIRCLE, BHAGALPUR

ELECTRIC SUPPLY CIRCLE, BHAGALPUR ELECTRIC SUPPLY CIRCLE, BHAGALPUR BILL OF QUANTITY NIT NO. : 67/PR/SBPDCL/2014 Due on : 25/06/2014 Name of work : Repair and maintenance work of existing Boundary wall (East, West & South) side with provision

More information

NZQA Expiring unit standard version 2 Page 1 of 5. Prepare a schedule of quantities, cost estimate and tender documentation for landscape work

NZQA Expiring unit standard version 2 Page 1 of 5. Prepare a schedule of quantities, cost estimate and tender documentation for landscape work Page 1 of 5 Title Prepare a schedule of quantities, cost estimate and tender documentation for landscape work Level 5 Credits 15 Purpose This unit standard is for people working, or intending to work,

More information

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General DESIGN STANDARDS Division 02 Existing Conditions- Site Work General I. This Division includes: A. Demolition B. Clearing and Grubbing C. Excavation, Backfill and Compaction D. Pavement Base E. Paving and

More information

SECTION MINOR CONCRETE

SECTION MINOR CONCRETE SECTION 03300 - MINOR CONCRETE CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And Payment...

More information

KGN-BDD TENDER FOR SUPPLY OF LABORATORY EQUIPMENT AND PROVISION OF CIVIL WORKS FOR THE OLKARIA CIVIL ENGINEERING LABORATORY.

KGN-BDD TENDER FOR SUPPLY OF LABORATORY EQUIPMENT AND PROVISION OF CIVIL WORKS FOR THE OLKARIA CIVIL ENGINEERING LABORATORY. KENYA ELECTRICITY GENERATING COMPANY LIMITED KGN-BDD-07-2017 TENDER FOR SUPPLY OF LABORATORY EQUIPMENT AND PROVISION OF CIVIL WORKS FOR THE OLKARIA CIVIL ENGINEERING LABORATORY. 11 th May 2017 In accordance

More information

SECTION STORM DRAINAGE

SECTION STORM DRAINAGE SECTION 02720 STORM DRAINAGE PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of storm drains and appurtenances. E. Installation

More information

SECTION CHAIN LINK FENCING

SECTION CHAIN LINK FENCING Section 02444 1 SECTION 02444 CHAIN LINK FENCING PART 1 - GENERAL 1.01 DESCRIPTION A. Requirement. Under these specifications, the Contractor shall furnish all materials, labor, tools, and equipment required

More information

SECTION DECORATIVE METAL FENCES AND GATES

SECTION DECORATIVE METAL FENCES AND GATES SECTION 32 31 19 SPEC WRITER NOTE: Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section

More information

SECTION STRUCTURAL STEEL

SECTION STRUCTURAL STEEL SECTION 051200 STRUCTURAL STEEL PART 1 GENERAL 1.01 SECTION INCLUDES A. Structural steel framing members and support members. B. Base plates, shear stud connectors. C. Grouting under base plates. 1.02

More information

CONSTRUCTION SPECIFICATION FOR ERECTION OF POLES

CONSTRUCTION SPECIFICATION FOR ERECTION OF POLES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 615 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR ERECTION OF POLES TABLE OF CONTENTS 615.01 SCOPE 615.02 REFERENCES 615.03 DEFINITIONS - Not Used 615.04

More information

ICAR-NRRI-CENTRAL RAINFED UPLAND RICE RESEARCH STATION (ICAR-NATIONAL RICE RESEARCH INSTITUTE) HAZARIBAG , (JHARKHAND), INDIA

ICAR-NRRI-CENTRAL RAINFED UPLAND RICE RESEARCH STATION (ICAR-NATIONAL RICE RESEARCH INSTITUTE) HAZARIBAG , (JHARKHAND), INDIA ICAR-NRRI-CENTRAL RAINFED UPLAND RICE RESEARCH STATION (ICAR-NATIONAL RICE RESEARCH INSTITUTE) HAZARIBAG 825 301, (JHARKHAND), INDIA Tel: 06546-222263, FAX: 06546-223697, e-mail: crurrs.hzb@gmail.com F.No.1/3-4/Const.Work/BL/15-16/

More information

NZS 4202:1995. New Zealand Standard. Standard method of measurement of building works. Superseding NZS 4202:1986 NZS 4202:1995

NZS 4202:1995. New Zealand Standard. Standard method of measurement of building works. Superseding NZS 4202:1986 NZS 4202:1995 New Zealand Standard Standard method of measurement of building works Superseding NZS 4202:1986 NZS 4202:1995 COMMITTEE REPRESENTATION This Standard was prepared under the direction of the Standards Council,

More information

Advisory Circular PAGECONTROLCHART. Remove Pages Dated II Inscr t Pages Dated l/2/ thru 258-l 7/6/ l/2/90

Advisory Circular PAGECONTROLCHART. Remove Pages Dated II Inscr t Pages Dated l/2/ thru 258-l 7/6/ l/2/90 U.S. Department of Transportation Federal Aviation Administration Advisory Circular Subject: Change 8 to STANDARDS FOR SPECIFYING CONSTRUCTION OF AIRPORTS Date: 7/6/94 AC No: 150/53701OA Initiated by:

More information

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2 INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...

More information

CONSTRUCTION SPECIFICATION FOR ERECTION OF POLES

CONSTRUCTION SPECIFICATION FOR ERECTION OF POLES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 615 NOVEMBER 2008 (Reissued November 2010) CONSTRUCTION SPECIFICATION FOR ERECTION OF POLES TABLE OF CONTENTS 615.01 SCOPE 615.02 REFERENCES 615.03

More information

1 1. 2. 3. 4. 5. 6. 7. 8. 9. 2 3 4 5 6 A1 A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A16 A17 o o o o o o o o o o o o o A18 o o o o o o o o o o o o o o o o o A19 A20 A21 A22 A23 A24 A25 B1 B2 B3

More information

PROPOSED ERECTION AND COMPLETION OF CEREAL STORE.

PROPOSED ERECTION AND COMPLETION OF CEREAL STORE. PROPOSED ERECTION AND COMPLETION OF. AB/1 STORE ELEMENT NO. 1 A B SUBSTRUCTURES (ALL PROVISIONAL) Excavations Clear site of small bushes and grub roots of small trees and cart away Excavate average 150mm

More information

CIVIL WORKS Mahesh G. Nair

CIVIL WORKS Mahesh G. Nair MEASUREMENT BOOK SUNIL Date Work Order Contractor : : EARTH WORKS CIVIL WORKS Mahesh G. Nair GROUND FLOOR 1 EARTH WORKS EXCAVATION : Earth work excavation for foundation trenches in all classes of soil

More information

Maps are enclosed of the larger areas to be included in the projects. The area in yellow are the proposed areas.

Maps are enclosed of the larger areas to be included in the projects. The area in yellow are the proposed areas. January 20, 2015 Contractor: The Park Hill School District is soliciting bids for asphalt and concrete repairs and additions for parking lots, curbs and sidewalks at various schools. A Mandatory Pre-Bid

More information

1 BILL NO.1 PRELIMINARIES AND GENERAL MANIFESTATION.

1 BILL NO.1 PRELIMINARIES AND GENERAL MANIFESTATION. ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT 1 BILL NO.1 PRELIMINARIES AND GENERAL MANIFESTATION. Clearing of site, site office/work shed, Toilet, etc. A provisional cost to be allocated in South African

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE FOOTINGS AND MAINTENANCE PLATFORMS FOR HIGH MAST LIGHTING POLES

CONSTRUCTION SPECIFICATION FOR CONCRETE FOOTINGS AND MAINTENANCE PLATFORMS FOR HIGH MAST LIGHTING POLES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 631 NOVEMBER 2011 CONSTRUCTION SPECIFICATION FOR CONCRETE FOOTINGS AND MAINTENANCE PLATFORMS FOR HIGH MAST LIGHTING POLES TABLE OF CONTENTS 631.01

More information

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 616 APRIL 2018 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03 DEFINITIONS

More information