1 Page 1 PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions Specification Sections, apply to this section. 1.2 SUMMARY A. The shade structure contractor shall be responsible for the design, engineering, fabrication, supply and installation of the work specified herein. The intent of this specification is to have only one contractor be responsible for the above functions as a design build project SUBMITTALS With Bid Submittals: A. Provide proof of installed reference sites with structures for similar scope of project and installation that are engineered to IBC 2006 specifications. Include in reference list of structure dimension with install dates and project locations. B. Provide fabric samples to demonstrate fabric color range and paint color selections Award of Contract Submittals: A. Provide wet sealed structural engineering drawings and calculations as deferred submittal for approval by Construction Manager. B. This is a deferred submittal. All submittals shall be in accordance to the General and Special Conditions. C. Provide fabric samples and powder coat colors for final order selection. 1.4 QUALITY ASSURANCE Fabrication and erection are limited to firms with proven experience in design and construction of fabric shade structures; such firms shall meet the following minimum requirements: A. A single contractor must design engineer, manufacture the steel and fabric and erect the fabric shade structures including foundations. B. All bidders must have at least ten (10) years experience in the design, engineering, manufacture, and installation of structures, engineered to currently adopted International Building Code requirements with similar scope and a successful construction record of inservice performance and erection of permanent fabric structures under the same name. C. The Contractor shall demonstrate that it has a staff of experienced fabric structure installation personnel who will undertake the installation of each project. D. The Contractor shall submit a Corporate Quality Control Manual describing their complete quality assurance program.

2 Page 2 E. All bidders shall be able to provide proof with bid submittal of a minimum of $2,000,000 general/public liability insurance. F. All bidders must have an in-house warranty & service department and local office to assist in repairs and service calls. 1.5 PROJECT CONDITIONS A. Field Measurements: Verify layout information for shade structures shown on the Drawings in relation to the property survey and existing structures, and verify locations by field measurements prior to construction. 1.6 WARRANTY 1. The successful bidder shall provide a 12 month warranty on all labor and materials. 2. A supplemental warranty from the manufacturer shall be provided for a period of 10 years on fabric and 10 years on the structural integrity of the steel from date of substantial completion. 3. The warranty shall not deprive the Owner of other rights the Owner may have under the provisions of the Contract Documents and will be in addition to and run concurrent with other warranties made by the Contractor under requirements of the Contract Documents. 4. Because of surety requirements, any performance and payment bond that may be required will cover only the first year of the warranty. The manufacturer s warranty will be a separate document between Total Shade LLC dba Killer Shade and the Owner, and will be executed at the time of completion of work. PART 2 PRODUCTS 2.1 GENERAL Pre-Engineered Package: the proposed structure(s) manufactured or approved equal shall be modular and pre-fabricated, and include the structural steel frame, fabric roof, steel cables, all fasteners, and installation of structure(s) including foundations. A. The structures shall be manufactured by Total Shade LLC dba Killer Shade or approved equal and include engineering drawings and calculations, patterning and fabrication of architectural membrane, structural steel frame, architectural hdpe membrane roof, steel cables, all fasteners, and installation of structure(s) including foundations. B. Contact: Killer Shade 3416 West Flower Street Phoenix, AZ Zac Carino x101 C. The shade structure shall conform to the current adopted version of the International Building Code 2006 including local agency amendments and additions to the code. D. All shade structures shall be engineered and designed to meet a minimum 90 mph wind load Exposure C

3 Page 3 All shade structures shall be engineered with a zero wind pass through on the fabric. 5 psf snow load 5 psf live load E. Welding: 1. All shop welded connections of the shade structure shall be designed and performed in strict accordance with the requirements of the American Welding Society (AWS) Specifications. Structural welds shall be made in compliance with the requirements of the Prequalified welded joints where applicable and by certified welders. No onsite or field welding shall be permitted. F. Tension Cable: Steel cable is determined based on calculated engineering load. G. Fabric Roof Systems: 1. UV Shade Fabric: a. UV Shade fabric is made of a UV stabilized high-density polyethylene. Mesh shall be Rachel knitted with monofilament and tape yarn filler to ensure that material will not unravel if cut. Panels to be 10ft wide. b. Fabric shall meet the following fire resistance tests: 1) ASTM E84 2) NFPA (Weathered of unweathered) 2. Size/Form: See site plan and construction details for size requirements for each structure. See site plan for layout. 3. Stitching & Thread: a. All sewing threads are to be double stitched. b. Thread shall be GORE Tenara Sewing Thread manufactured from 100% expanded PTFE; mildew resistant exterior approved thread. Thread shall meet or exceed the following: 1) Flexible temperature range 2) Very low shrinkage factor 3) Extremely high strength, durable in outdoor climates 4) Resists flex and abrasion of fabric 5) Unaffected by cleaning agents; acid rain, mildew, salt water and rot resistant, unaffected by most industrial pollutants 6) Treated for prolonged exposure to the sun 4. Fabric colors shall be determined from the standard colors available from the manufacturer by the Construction Manager. PART 3 EXECUTION 3.1 INSTALLATION A. Installations of shade structures and demolition of the existing structure shall be performed by a State of AZ licensed and bonded contractor. B. Concrete:

4 Page 4 1. Concrete work shall be executed in accordance with the latest edition of American Concrete Building Code ACI 318.

5 Page 5 2. Concrete specifications shall comply in accordance with the section , and detailed as per plans, shall be as follows: a. 28 Days Strength F c = 2500 psi b. Aggregate: HR c. Slump: 3-5 d. Portland Cement shall conform to C-150 e. Aggregate shall conform to ASTM C Reinforcing steel shall be detailed, fabricated, and placed in accordance with the latest ACI Detailing Manual and Manual of Standard Practice. 4. Whenever daily ambient temperatures are below 80 degrees Fahrenheit, the contractor may have mix accelerators and hot water added at the batch plant (See Table 1). 5. The contractor shall not pour any concrete when daily ambient temperature is below 55 degrees Fahrenheit. TABLE 1 Temperature Range % Accelerator Type Accelerator degrees 1% High Early (non calcium) degrees 2% High Early (non calcium) Below 70 degrees 3% High Early (non calcium) C. Foundations: 1. All Anchor Bolts set in new concrete shall be ASTM A All Anchor Bolts shall be Hot Dipped Galvanized. 3. Footings shall be placed in accordance with and conform to manufacturers engineered specifications and drawings. - END -

SECTION DSA PRE-ENGINEERED FABRIC SHADE STRUCTURES

SECTION DSA PRE-ENGINEERED FABRIC SHADE STRUCTURES PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 133123 DSA PRE-ENGINEERED FABRIC SHADE STRUCTURES A. Drawings and general provisions of the Contract, including General Conditions and Division 1 Specification

More information

Request for Bids BID #1058

Request for Bids BID #1058 Request for Bids BID #1058 Case Community Park Shade Structures February 27, 2018 NOTICE TO BIDDERS Case Community Park Shade Structures BID #1058 The City of Sand Springs will accept sealed bids from

More information

TECHNICAL SPECIFICATIONS 2019

TECHNICAL SPECIFICATIONS 2019 4487 A ASHTON ROAD SARASOTA, FL 34233 TECHNICAL SPECIFICATIONS 2019 PRE ENGINEERED SHADE STRUCTURES 1. DESIGN/PERFORMANCE REQUIREMENTS A. Design members to withstand wind loads in accordance with current

More information

02800 SHADE STRUCTURES

02800 SHADE STRUCTURES 02800 SHADE STRUCTURES for PLAY AREAS ****************************************** SPECIFIER: The shade structure shall utilize a four point hypar system with four columns located a minimum of 10 feet from

More information

Custom Canopies Intl. Inc.

Custom Canopies Intl. Inc. POWDERCOAT COLORS WHITE GREY ALMOND GREEN TEAL POWDER BLUE YELLOW RED ORANGE BLACK BROWN BLUE STANDARD SHADE SAIL & SHADE STRUCTURE SPECIFICATIONS Quality Assurance All shade structures & shade sails shall

More information

CITY OF JOPLIN, MISSOURI

CITY OF JOPLIN, MISSOURI CITY OF JOPLIN, MISSOURI BID PACKAGE #2015-11 for Installation of 2 Commer cial Prefabricated Shade structures JOPLIN ATHLETIC COMPLEX 3301 W. 1st STREET JOPLIN, MO 64801 NOTICE TO BIDDERS The City of

More information

DUGOUT MODEL (4 POST) 10 x 24 SPECIFICATIONS

DUGOUT MODEL (4 POST) 10 x 24 SPECIFICATIONS DUGOUT MODEL (4 POST) 10 x 24 SPECIFICATIONS Dimensions: Roof Dimensions 10-0 x 24 Column Dimensions (center to center) 6-7 x 22-9 Minimum Clearance 7-6 Minimum Clearance @ Front ±9-2 Roof Pitch 2:12 pitch

More information

SIERRA MODEL 12 X 24 SPECIFICATIONS

SIERRA MODEL 12 X 24 SPECIFICATIONS SIERRA MODEL 12 X 24 SPECIFICATIONS Dimensions: Roof Dimensions 12-0 x 24-0 Column Dimensions (center to center) 9-0 x 21-0 Minimum Clearance 8-0 Shed Roof 1:12 pitch Square Feet Under Roof 288 Columns

More information

FUM10-4-DB_8EV-E1 Y638 PROJECT NAME: HARRIS PARK Y638 PROJECT LOCATION: LEAWOOD, KS DRAWING NOTES DESIGN CRITERIA: SEE CALCS DRAWING LIST

FUM10-4-DB_8EV-E1 Y638 PROJECT NAME: HARRIS PARK Y638 PROJECT LOCATION: LEAWOOD, KS DRAWING NOTES DESIGN CRITERIA: SEE CALCS DRAWING LIST BUILDING TYPE: PROJECT NUMBER: FUM10-4-DB_8EV-E1 Y638 Y638 A Division of PORTERCORP 4240 N. 136th AVE HOLL, MI 49424 (616) 399-1963 Designs and calculations of PARASOL buildings are protected under copyright

More information

603 Summit Avenue, Suite 102 Greensboro, N.C Voice/FAX (336)

603 Summit Avenue, Suite 102 Greensboro, N.C Voice/FAX (336) Ricky L. Loman, AIA Architect 603 Summit Avenue, Suite 102 Greensboro, N.C. 27405-7700 Voice/FAX (336) 273-7999 ADDENDUM: Number 1 ISSUED: March 14, 2017 SUBJECT: New Agriculture & Equipment Storage Barn

More information

REINFORCED CONCRETE MASONRY SECTION

REINFORCED CONCRETE MASONRY SECTION SECTION 04 22 02 - REINFORCED CONCRETE MASONRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Providing high quality designed & customized tension, frame and tensile membrane solutions to new clients and existing building owners

Providing high quality designed & customized tension, frame and tensile membrane solutions to new clients and existing building owners Design Material Service Construction Management Providing high quality designed & customized tension, frame and tensile membrane solutions to new clients and existing building owners www.signaturestructureshome.com

More information

SECTION STRUCTURE MOUNT RAILING SYSTEM

SECTION STRUCTURE MOUNT RAILING SYSTEM SECTION 05520 STRUCTURE MOUNT RAILING SYSTEM Peak Fall Protection specializes in the design, engineering, fabrication, installation, and certification of fall protection safety systems. Our team of safety

More information

Product Guide Specification DIVISION SPECIALTIES MANUFACTURERS OF PROTECTIVE COVERS

Product Guide Specification DIVISION SPECIALTIES MANUFACTURERS OF PROTECTIVE COVERS Product Guide Specification DIVISION 107300 SPECIALTIES MANUFACTURERS OF PROTECTIVE COVERS PART 1 - GENERAL [reference CSI 2004 MasterFormat Division 10 (Specialties Manufacturers) category 7300 (Protective

More information

SECTION STRUCTURAL STEEL

SECTION STRUCTURAL STEEL SECTION 051200 STRUCTURAL STEEL PART 1 GENERAL 1.01 SECTION INCLUDES A. Structural steel framing members and support members. B. Base plates, shear stud connectors. C. Grouting under base plates. 1.02

More information

SECTION METAL WALL PANEL SYSTEM

SECTION METAL WALL PANEL SYSTEM CSI Format for Metal Wall Panel System Specification SECTION 07410 METAL WALL PANEL SYSTEM PART 1 GENERAL 1.1 SECTION INCLUDES A. Exterior Metal Plate Wall Panels B. Substructure and Framing C. Structural

More information

Bear Exhibit Fence Upgrades. The following modifications are hereby made part of the contract documents:

Bear Exhibit Fence Upgrades. The following modifications are hereby made part of the contract documents: ADDENDUM TO BID T2017-04 Metropolitan Park District Department of Planning, Design and Development 4702 South 19 th Street Tacoma WA 98405 Date Prepared: November 17, 2017 Bid Number: T2017-04 Addendum

More information

SECTION PRECAST CONCRETE COVER SYSTEM

SECTION PRECAST CONCRETE COVER SYSTEM SECTION 13500 PRECAST CONCRETE COVER SYSTEM PART 1 GENERAL 1.1 SYSTEM DESCRIPTION A. Design Criteria: 1. Precast manufacturer shall be responsible for structural design of individual precast components,

More information

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK DIVISION 5 - STRUCTURAL STEEL AND IRON WORK SECTION 05100 STRUCTURAL METAL FRAMING PART 1.00 GENERAL 1.01 SCOPE OF WORK A. Work Included: 1. 2. Structural steel complete in place. Steel joists complete

More information

Frequently Asked Questions. Frequently Asked Questions

Frequently Asked Questions. Frequently Asked Questions Frequently Asked Questions Frequently Asked Questions We love talking about shade and will always make time to answer any/all questions you might have for us. In this forum due to limited space, we have

More information

SECTION FABRICATED ENGINEERED STRUCTURES. A. Pre-engineered, shop-fabricated structural steel building with formed purlin framing.

SECTION FABRICATED ENGINEERED STRUCTURES. A. Pre-engineered, shop-fabricated structural steel building with formed purlin framing. PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 13 34 00 FABRICATED ENGINEERED STRUCTURES A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1

More information

SECTION GROUND STORAGE TANK

SECTION GROUND STORAGE TANK SECTION 13210 GROUND STORAGE TANK PART 1 GENERAL 1.01 Summary A. Section Includes: Provision for welded steel storage tank design, fabrication, construction and erection, including tank accessories. B.

More information

Insulating Cellular Concrete Steel Joists Painting. A. America Society for Testing and Materials (ASTM):

Insulating Cellular Concrete Steel Joists Painting. A. America Society for Testing and Materials (ASTM): SECTION 05120 STRUCTURAL STEEL PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03342 - Insulating Cellular Concrete. 2. 05210 - Steel Joists. 3. 09900 - Painting. 1.02 REFERENCES A. America Society

More information

A. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein.

A. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein. SECTION 10530 - EXTRUDED ALUMINUM WALKWAY COVERS PART I - GENERAL.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General, Supplementary, and Special Conditions and Division

More information

SECTION PRE-ENGINEERED MEMBRANE STRUCTURE

SECTION PRE-ENGINEERED MEMBRANE STRUCTURE SECTION 13125 PART 1 - GENERAL 1.1 SUMMARY A. Section includes the design, engineering, fabrication and erection of a frame-supported, tensilemembrane structure complete with entrance and exit doors and

More information

'\\\\ PURCHASING DIRECTOR ~ \...,;\ "---XJ 'I\J~ ADDENDUM #I-O'BRIEN PARK SUN SHADE STRUCTURES

'\\\\ PURCHASING DIRECTOR ~ \...,;\ ---XJ 'I\J~ ADDENDUM #I-O'BRIEN PARK SUN SHADE STRUCTURES TULSA COUNTY PURCHASING DEPARTMENT MEMO DATE: NOVEMBER I, 2012 FROM: LINDA R. DORRELL ~. t"- ~ ~ - l\. '" ~ '\\\\ PURCHASING DIRECTOR ~ \...,;\ "---XJ 'I\J~ BOARD OF COUNTY COMMISSIONERS SUBJECT: ADDENDUM

More information

SPECIAL INSPECTION AGREEMENT

SPECIAL INSPECTION AGREEMENT PART 1 STATEMENT OF SPECIAL INSPECTIONS When special inspection is required to be performed in accordance with International Building Code Chapter 17, a building permit cannot be issued until a statement

More information

Carver County Government Center. Facilities Department. 600 East Fourth Street. Chaska, MN 55318

Carver County Government Center. Facilities Department. 600 East Fourth Street. Chaska, MN 55318 Project: SALT SHED STORAGE BUILDING, Hollywood Public Works Facility Electronic Published Date: August 1, 2016 Date Due: August 26th, 2016 ADDRESS PROPOSALS/DELIVERY: Attn: Jim Kuchelmeister, Facilities

More information

A. The work consists of furnishing a Chiller Noise Reduction System as listed in the specifications.

A. The work consists of furnishing a Chiller Noise Reduction System as listed in the specifications. SECTION 32 31 14 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply

More information

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) SECTION 13125 ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

GUIDE SPECIFICATION EXETER VERSA SHIELD SECURITY SCREEN SYSTEM

GUIDE SPECIFICATION EXETER VERSA SHIELD SECURITY SCREEN SYSTEM 1 GUIDE SPECIFICATION EXETER VERSA SHIELD SECURITY SCREEN SYSTEM 1.01 WORK INCLUDED PART 1: GENERAL A. Provide for all labor, equipment, materials, and services to furnish and install VERSA SHIELD Window

More information

SECTION COLD-FORMED METAL TRUSSES

SECTION COLD-FORMED METAL TRUSSES SECTION 054400 COLD-FORMED METAL TRUSSES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION ARCHITECTURAL PRECAST CONCRETE. C. Section Joint Sealers: Perimeter joints with sealant and backing.

SECTION ARCHITECTURAL PRECAST CONCRETE. C. Section Joint Sealers: Perimeter joints with sealant and backing. SECTION 03451 ARCHITECTURAL PRECAST CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. Architectural precast concrete wall panels; with integral insulation. B. Supports, anchors, and attachments. C. Intermediate

More information

SECTION METAL FRAMED SKYLIGHT. A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system.

SECTION METAL FRAMED SKYLIGHT. A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system. SECTION 08625 METAL FRAMED SKYLIGHT PART 1 GENERAL 1.01 SECTION INCLUDES: A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system. B. Fabrication

More information

SECTION PRE-ENGINEERED EXTRUDED ALUMINUM DECKING WALKWAY COVERS SPECIFICATION

SECTION PRE-ENGINEERED EXTRUDED ALUMINUM DECKING WALKWAY COVERS SPECIFICATION Awning Works Inc Aluminum Decking Walkway Cover Specification CSI- Division 10 SECTION 10530 PRE-ENGINEERED EXTRUDED ALUMINUM DECKING WALKWAY COVERS SPECIFICATION PART 1 GENERAL 1.01 DESCRIPTION OF WORK

More information

FRP Specifications. Section Fiberglass Reinforced Polymer (FRP) Hollow Core Building Panels Products and Fabrications REVISED 11.

FRP Specifications. Section Fiberglass Reinforced Polymer (FRP) Hollow Core Building Panels Products and Fabrications REVISED 11. FRP Specifications Section 06 70 00 Fiberglass Reinforced Polymer (FRP) Hollow Core Building Panels Products and Fabrications REVISED 11.2016 BRISTOL FACILITY 400 Commonwealth Ave., P. O. Box 580, Bristol,

More information

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM PART 1- GENERAL 1.1 SUMMARY A. Section Includes: SECTION 084523 - SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM 1. Flat factory prefabricated structural insulated translucent sandwich panels; with glazed endwalls.

More information

STRUCTURAL STEEL FRAMING

STRUCTURAL STEEL FRAMING SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Section includes 1. Structural steel framing 2. Structural steel framing required for support and framing of rooftop mechanical

More information

SECTION METAL FABRICATIONS FOR STEAM UTILITY DISTRIBUTION

SECTION METAL FABRICATIONS FOR STEAM UTILITY DISTRIBUTION PAGE 055015-1 SECTION 055015 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

SECTION (10705) EXTERIOR SUN CONTROL DEVICES

SECTION (10705) EXTERIOR SUN CONTROL DEVICES 10 71 13 SECTION (10705) EXTERIOR SUN CONTROL DEVICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION ALUMINUM WINDOWS

SECTION ALUMINUM WINDOWS SECTION 08520 ALUMINUM WINDOWS PART 1 - GENERAL 1.01 SUMMARY A. Section includes: 1. Storefront systems and aluminum framed glass doors. 2. Hardware, fasteners, accessories, filler pieces, etc., required

More information

SECTION STRUCTURAL STEEL

SECTION STRUCTURAL STEEL PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish and install all materials, labor, equipment and incidentals required to provide structural steel shown on the Contract Drawings and as

More information

SECTION TENSIONED FABRIC STRUCTURES

SECTION TENSIONED FABRIC STRUCTURES SECTION 13 31 23 TENSIONED FABRIC STRUCTURES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Section includes a tensioned fabric canopy system as shown on Drawings and specified in this Section. 2.

More information

WARDLAW AHU-2 REPLACEMENT

WARDLAW AHU-2 REPLACEMENT DRAWING INDEX GENERAL T1 TITLE SHEET MECHANICAL M1 M2 M3 MECHANICAL DEMOLITION PLAN MECHANICAL RENOVATION PLAN DETAILS, NOTES, SCHEDULES, AND LEGEND ELECTRICAL E1 E2 ELECTRICAL DEMOLITION PLAN ELECTRICAL

More information

2. Clarification: The notice to proceed construction period of 60 days will begin after the Contractor receives all materials and equipment.

2. Clarification: The notice to proceed construction period of 60 days will begin after the Contractor receives all materials and equipment. East Energy Chiller 1 Cooling Tower Addition State Project Number H27-1969 Addendum One June 28, 2012 NOTE: The following amendments, additions, and deletions shall be made to the Construction Documents

More information

DESIGN STANDARDS WASHINGTON UNIVERSITY SCHOOL OF MEDICINE

DESIGN STANDARDS WASHINGTON UNIVERSITY SCHOOL OF MEDICINE SECTION 01 43 29 (00041) SPECIAL INSPECTIONS PART 1 GUIDELINES As defined by the IBC 2003, Section 1704, Special Inspections of materials, installation, fabrication, erection of components and connections

More information

DBI-SALA Uni 8 Horizontal Lifeline Cable System

DBI-SALA Uni 8 Horizontal Lifeline Cable System SECTION 112429.17 - HORIZONTAL FALL PROTECTION - CABLE PART 1 - GENERAL 1.1 SECTION INCLUDES A. Provide horizontal cable fall protection system, including end anchors, energy absorbers, intermediate cable

More information

DIVISION 5 METALS SECTION STRUCTURAL STEEL

DIVISION 5 METALS SECTION STRUCTURAL STEEL DIVISION 5 METALS SECTION 05 12 00 PART 1 GENERAL 1.01 SUMMARY A. Section Includes: All labor and materials required to furnish and install the structural steel shown on the Drawings and required by these

More information

METAL FABRICATION..1 General Conditions and Division 1 shall govern Work of this section.

METAL FABRICATION..1 General Conditions and Division 1 shall govern Work of this section. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 05500-1 PART 1 GENERAL 1.1 Description of Work.1 General Conditions and Division 1 shall govern Work of this section. 1.2 Quality Assurance.1 Personnel:.1

More information

SECTION ROOF MOUNTED ATTIC EXHAUST VENT

SECTION ROOF MOUNTED ATTIC EXHAUST VENT SECTION 07 72 00 ROOF MOUNTED ATTIC EXHAUST VENT **This is a CSI Three-Part Specification using CSI MasterFormat 2004-2010 Section Numbers and Titles. This specification must be edited to suit your particular

More information

SECTION PRE-ENGINEERED COLD-FORMED METAL ROOF AND FLOOR TRUSSES

SECTION PRE-ENGINEERED COLD-FORMED METAL ROOF AND FLOOR TRUSSES SECTION 05440- PRE-ENGINEERED COLD-FORMED METAL ROOF AND FLOOR TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section includes pre-engineered, pre-fabricated cold formed steel framing elements. Work includes:

More information

CITY OF OVERLAND PARK, KANSAS RECREATION SERVICES DEPARTMENT GOLF DIVISION SYKES/LADY OVERLAND PARK GOLF CLUB INSTRUCTIONS TO BIDDERS

CITY OF OVERLAND PARK, KANSAS RECREATION SERVICES DEPARTMENT GOLF DIVISION SYKES/LADY OVERLAND PARK GOLF CLUB INSTRUCTIONS TO BIDDERS CITY OF OVERLAND PARK, KANSAS RECREATION SERVICES DEPARTMENT GOLF DIVISION SYKES/LADY OVERLAND PARK GOLF CLUB INSTRUCTIONS TO BIDDERS Bidders shall submit specifications and certification information of

More information

GUIDELINES FOR DESIGN, FABRICATION AND INSTALLATION OF TENSION MEMBRANE AND SHADE STRUCTURES

GUIDELINES FOR DESIGN, FABRICATION AND INSTALLATION OF TENSION MEMBRANE AND SHADE STRUCTURES GUIDELINES FOR DESIGN, FABRICATION AND INSTALLATION OF TENSION MEMBRANE AND SHADE STRUCTURES First Edition Aug.1986 Revised March 2009, 2010, October 2011 with minor editorial changes in May 2012. This

More information

GUIDE SPECIFICATION EXETER SECURITY SHIELD SECURITY WINDOW BARRIER SYSTEM

GUIDE SPECIFICATION EXETER SECURITY SHIELD SECURITY WINDOW BARRIER SYSTEM 1 GUIDE SPECIFICATION EXETER SECURITY SHIELD SECURITY WINDOW BARRIER SYSTEM 1.01 WORK INCLUDED PART 1: GENERAL A. Provide for all labor, equipment, materials and services to furnish and install SECURITY

More information

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014 STATE STRUCTION FUND DIRECTIVE 5-1 Issue date: October 2014 STRUCTURAL STEEL 1. General: It is the Fund's policy that the design of the structural steel is the prime responsibility of the project's Structural

More information

Addendum #4 NEW LOW HEAD OXYGEN SYSTEM Contractor EXHIBIT T SPECIAL PROVISIONS SECTION METAL SHADE STRUCTURE

Addendum #4 NEW LOW HEAD OXYGEN SYSTEM Contractor EXHIBIT T SPECIAL PROVISIONS SECTION METAL SHADE STRUCTURE SECTION 13 34 00 METAL SHADE STRUCTURE PART 1 - GENERAL 1.01 STRUCTURE TYPE A. Structure shall be free standing rigid frame and gable roof with slopes as indicated. Structure shall also include foundation,

More information

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns. PAGE 051200-1 SECTION 051200 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

Adam Sweet 2KGAL DW AST DUAL FUEL STORAGE TANK FOR A GENERATOR - NO DRAWINGS 5/9/2017 False

Adam Sweet 2KGAL DW AST DUAL FUEL STORAGE TANK FOR A GENERATOR - NO DRAWINGS 5/9/2017 False Above Ground Concrete Encased Fuel Storage Tank System Category: Tanks Project ID #: 1004373561 Street Address: To Be Announced Woodstock CT Staff Estimate Value $60,000.00 06281 County: Windham Stage:

More information

SECTION STAINLESS STEEL WALL PANELS

SECTION STAINLESS STEEL WALL PANELS SECTION 07400 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Dry joint, Rainscreen stainless steel wall panel system. 2. Accessories including attachments, clips, sub girts, shims, and fasteners 3.

More information

SECTION ELECTRICAL POWER ATTIC EXHAUST VENTILATOR

SECTION ELECTRICAL POWER ATTIC EXHAUST VENTILATOR SECTION 07 72 00 ELECTRICAL POWER ATTIC EXHAUST VENTILATOR **This is a CSI Three-Part Specification using CSI MasterFormat 2004-2010 Section Numbers and Titles. This specification must be edited to delete

More information

TERMS OF REFERENCE FOR SERVICE CONTRACTING

TERMS OF REFERENCE FOR SERVICE CONTRACTING TERMS OF REFERENCE FOR SERVICE CONTRACTING Assignment Location Construction of Steel Portal Frame Shades Zaatari, Azraq Refugee Camps and Ruwayshid 1. JUSTIFICATION/BACKGROUND To safeguard children from

More information

CUSTOM BRICK. Custom Brick Finish Polymer System Specifications For Use On Vertical Walls DS151. Architectural Finish for Use on Vertical Walls

CUSTOM BRICK. Custom Brick Finish Polymer System Specifications For Use On Vertical Walls DS151. Architectural Finish for Use on Vertical Walls CUSTOM BRICK Architectural Finish for Use on Vertical Walls Custom Brick Finish Polymer System Specifications For Use On Vertical Walls PART I- GENERAL DRYVIT SYSTEMS, INC. MANUFACTURER S SPECIFICATION

More information

SECTION STRUCTURAL STEEL FRAMING

SECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 05 12 00 SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // ---// if not applicable to project. Also delete any other item or paragraph

More information

A. Section includes cast-in-place concrete, including reinforcement, concrete materials, mixture design, placement procedures, and finishes.

A. Section includes cast-in-place concrete, including reinforcement, concrete materials, mixture design, placement procedures, and finishes. SECTION 033053 - CONCRETE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION GROUND WATER STORAGE TANKS

SECTION GROUND WATER STORAGE TANKS SECTION 33 16 13 GROUND WATER STORAGE TANKS PART 1: GENERAL 1.01 SCOPE A. Section includes requirements for designing, fabricating, and erecting a welded steel ground storage tank. 1.02 SYSTEM DESCRIPTION

More information

SECTION STRUCTURAL METAL FRAMING

SECTION STRUCTURAL METAL FRAMING SECTION 05100 STRUCTURAL METAL FRAMING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Structural steel framing including lintels, shelf angles, bearing plates, anchor bolts and other items as shown on

More information

SECTION ANCHOR SYSTEMS

SECTION ANCHOR SYSTEMS SECTION 05 05 00 ANCHOR SYSTEMS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Anchor bolts. B. Requirement: 1. Furnish all materials, labor and equipment required to provide anchor systems not specifically

More information

GUIDELINES FOR DESIGN, FABRICATION AND INSTALLATION OF TENSION MEMBRANE AND SHADE STRUCTURES

GUIDELINES FOR DESIGN, FABRICATION AND INSTALLATION OF TENSION MEMBRANE AND SHADE STRUCTURES GUIDELINES FOR DESIGN, FABRICATION AND INSTALLATION OF TENSION MEMBRANE AND SHADE STRUCTURES First Edition Aug.1986 Revised March 2009, 2010, October 2011 with minor editorial changes in May 2012. This

More information

DBI-SALA Uni 8 Overhead Horizontal Lifeline Cable System SECTION HORIZONTAL FALL PROTECTION - OVERHEAD CABLE

DBI-SALA Uni 8 Overhead Horizontal Lifeline Cable System SECTION HORIZONTAL FALL PROTECTION - OVERHEAD CABLE SECTION 112429.18 - HORIZONTAL FALL PROTECTION - OVERHEAD CABLE PART 1 - GENERAL 1.1 SECTION INCLUDES A. Provide overhead horizontal cable fall protection system, including end anchors, energy absorbers,

More information

FRP Specifications. Section Fiberglass Reinforced Polymer (FRP) Architectural Decking panels and Fabrications REVISED 11.

FRP Specifications. Section Fiberglass Reinforced Polymer (FRP) Architectural Decking panels and Fabrications REVISED 11. FRP Specifications Section 06 73 13 Fiberglass Reinforced Polymer (FRP) Architectural Decking panels and Fabrications REVISED 11.2016 BRISTOL FACILITY 400 Commonwealth Ave., P. O. Box 580, Bristol, VA

More information

Flood Mitigation Solutions

Flood Mitigation Solutions Brought to you by: Side Deployed Flex-Wall (w) (p) 877-441-8368 (e) flexwall@smartvent.com Storage Container with Hinged Door open End Post Flex-Wall Guide Wire Cable (op on) Standard and custom configured

More information

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. SECTION 260529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. 1.2

More information

SECTION DETAILS (MECHANICALLY ASSEMBLY)

SECTION DETAILS (MECHANICALLY ASSEMBLY) COVER SHEET ELEVATION SHEET SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY) SECTION DETAILS (DOOR ASSEMBLY)

More information

SECTION CHAIN LINK FENCING

SECTION CHAIN LINK FENCING SECTION 02835 - CHAIN LINK FENCING 1.0 GENERAL 1.1 Furnish and install chain link fencing complete in place with gates and accessories as specified herein and as shown on the Contract Drawings. 1.2 Reference

More information

SECTION STEEL JOIST FRAMING

SECTION STEEL JOIST FRAMING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 05 21 00 1. Use this section only for NCA projects. 2. Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable

More information

Expansion Joint Covers (079513)

Expansion Joint Covers (079513) Expansion Joint Covers 07 95 00 (079513) PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Supplementary Conditions and Division-1

More information

Quality Control and Quality Assurance for Installation of Steel Deck

Quality Control and Quality Assurance for Installation of Steel Deck s American National standards institute/ steel deck institute QA/QC - 2011 Standard for Quality Control and Quality Assurance for Installation of Steel Deck copyright 2012 steel deck institute 1. General

More information

SECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM

SECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM ARCHITECTURAL SPECIFICATIONS MANUFACTURER: InterBlock LLC PO Box 1123, Sheboygan, WI 53082 Phone Number 920-207-7234 SECTION 03100 STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM PART 1 GENERAL 1.01 Summary

More information

COVER SHEET ELEVATION SHEET SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY)

COVER SHEET ELEVATION SHEET SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY) COVER SHEET ELEVATION SHEET SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY) SECTION DETAILS (DOOR ASSEMBLY)

More information

ADDENDUM NUMBER 3 AUGUST 18, Jackson County Utility Authority Project No Pascagoula/Moss Point WWTP Escatawpa WWTP Repairs

ADDENDUM NUMBER 3 AUGUST 18, Jackson County Utility Authority Project No Pascagoula/Moss Point WWTP Escatawpa WWTP Repairs ADDENDUM NUMBER 3 AUGUST 18, 2016 Jackson County Utility Authority Project No. 20150619124 Pascagoula/Moss Point WWTP Escatawpa WWTP Repairs FROM: BURK-KLEINPETER, INC. ENGINEERS, ARCHITECTS, PLANNERS,

More information

SECTION METAL STAIRS

SECTION METAL STAIRS SECTION 05 51 00 METAL STAIRS PART 1 GENERAL 1.1 SUMMARY A. Section includes steel stair frame of structural sections, with closed risers; pan to receive concrete fill stair treads and landings; integral

More information

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications Mar/2008 v1.0 SECTION 02255 HYDRAULICLY DRIVEN STEEL UNDERPINNING PILES PART 1 GENERAL 1.01 SCOPE OF WORK The work shall

More information

URS 101 Research Drive Columbia, SC Phone: (803) Fax: (803) Posted to USC Website May 30, 2013

URS 101 Research Drive Columbia, SC Phone: (803) Fax: (803) Posted to USC Website May 30, 2013 URS 101 Research Drive Columbia, SC 29203 Phone: (803) 254-4400 Fax: (803) 771-6676 Posted to USC Website May 30, 2013 RE: Athletic Village Sand Volleyball Court Construction For the University of South

More information

ThermalShell Modular Insulated Pre-Cast Panels

ThermalShell Modular Insulated Pre-Cast Panels 412 N. California St. Building #2 Sycamore IL, 60178 Phone: 815.899.0224 Fax: 815.899.0226 E-mail: info@thermalshell.com Web: www.thermalshell.com ThermalShell Modular Insulated Pre-Cast Panels Construction

More information

SECTION ALTERNATING TREAD STEEL STAIRS

SECTION ALTERNATING TREAD STEEL STAIRS SECTION 05 51 33.23 - ALTERNATING TREAD STEEL STAIRS PART 1 - GENERAL 1.1 SCOPE OF WORK Fabricate and Install metal alternating tread stair assemblies in accordance with the requirements set forth in this

More information

2012 VIRGINIA TECH SCHEDULE OF SPECIAL INSPECTIONS

2012 VIRGINIA TECH SCHEDULE OF SPECIAL INSPECTIONS 2012 VIRGINIA TECH SCHEDULE OF SPECIAL INSPECTIONS HECO-6 GENERAL Pre-construction conference Preconstruction meeting Scheduled by SI with the Contractor, UBO, A/E, and relevant subs prior to commencement

More information

SECTION METAL DECKING. A. Extent of metal decking is indicated on Plans, including basic layout for the following type of deck required:

SECTION METAL DECKING. A. Extent of metal decking is indicated on Plans, including basic layout for the following type of deck required: PART 1 GENERAL 1.1 WORK INCLUDED A. Extent of metal decking is indicated on Plans, including basic layout for the following type of deck required: 1.2 RELATED WORK 1. Metal Roof Deck. A. Structural Steel:

More information

SPECIFICATIONS FOR AluSystems Aluminum Composite Panels Series 20 Dry Joint 1.00 GENERAL 1.01 RANGE OF WORK Section includes: Laminated panels and attachment systems for use as exterior cladding. A. Provide

More information

SPECIAL SPECIFICATION. Transparent Noise Barrier Panels

SPECIAL SPECIFICATION. Transparent Noise Barrier Panels 2004 Specifications CSJ 0047-06-139 SPECIAL SPECIFICATION 4659 Transparent Noise Barrier Panels 1. Description. Furnish the materials and construct a transparent panel noise barrier as shown on the plans

More information

REVISED NEW HANOVER COUNTY OGDEN SKATEPARK SPECIALTY PRE-QUALIFICATION PACKET

REVISED NEW HANOVER COUNTY OGDEN SKATEPARK SPECIALTY PRE-QUALIFICATION PACKET REVISED NEW HANOVER COUNTY OGDEN SKATEPARK SPECIALTY PRE-QUALIFICATION PACKET This project is being readvertised due to the small number of prequalification packages received in response to the county's

More information

COLQUITT COUNTY BOARD OF COMMISSIONERS 101 East Central Avenue

COLQUITT COUNTY BOARD OF COMMISSIONERS 101 East Central Avenue COLQUITT COUNTY BOARD OF COMMISSIONERS 101 East Central Avenue TERRY R. CLARK Chairman LUKE STRONG, JR District 1 Commissioner CHRIS HUNNICUTT District 2 Commissioner MARC DEMOTT District 3 Commissioner

More information

SECTION RIGID PAVEMENT

SECTION RIGID PAVEMENT SECTION 02750 PART 1 GENERAL RIGID PAVEMENT 1.1 SUMMARY A. Section Includes: 1. Concrete sidewalks. 2. Concrete stair steps. 3. Concrete integral curbs gutters. 4. Concrete parking areas and roads. B.

More information

Facility Repairs - MCAS Cherry Point - Tank Farm A SECTION STRUCTURAL STEEL 05/14

Facility Repairs - MCAS Cherry Point - Tank Farm A SECTION STRUCTURAL STEEL 05/14 SECTION 05 12 00 STRUCTURAL STEEL 05/14 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the

More information

SECTION ORNAMENTAL WELDED STEEL FENCING

SECTION ORNAMENTAL WELDED STEEL FENCING SECTION 032300 ORNAMENTAL WELDED STEEL FENCING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

CUSTOM BRICK. Custom Brick Finish Polymer System Specifications For Use On Vertical Walls DS151. Architectural Finish for Use on Vertical Walls

CUSTOM BRICK. Custom Brick Finish Polymer System Specifications For Use On Vertical Walls DS151. Architectural Finish for Use on Vertical Walls CUSTOM BRICK Architectural Finish for Use on Vertical Walls Custom Brick Finish Polymer System Specifications For Use On Vertical Walls PART I- GENERAL DRYVIT SYSTEMS, INC. MANUFACTURER S SPECIFICATION

More information

SECTION DECORATIVE METAL FENCES AND GATES

SECTION DECORATIVE METAL FENCES AND GATES SECTION 32 31 19 SPEC WRITER NOTE: Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section

More information

SECTION LATCHWAYS CONSTANT FORCE POSTS

SECTION LATCHWAYS CONSTANT FORCE POSTS PART 1 GENERAL 1.1 SYSTEM DESCRIPTION SECTION 112429 LATCHWAYS CONSTANT FORCE POSTS A. Type of system required: Constant Force Posts (CFP(s)) Use with Latchways Lifeline or single point anchors B. System

More information

SECTION TENSIONED FABRIC STRUCTURES

SECTION TENSIONED FABRIC STRUCTURES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

More information

SPECIFICATIONS FOR. CEI Composite Materials, LLC Featuring R4000 Rear Back Ventilated Rainscreen System. Section Aluminum Composite Panels

SPECIFICATIONS FOR. CEI Composite Materials, LLC Featuring R4000 Rear Back Ventilated Rainscreen System. Section Aluminum Composite Panels SPECIFICATIONS FOR (1/13 Edition) CEI Composite Materials, LLC Featuring R4000 Rear Back Ventilated Rainscreen System Section 074243 Aluminum Composite Panels (Based upon CEI Composite Materials R4000

More information

FRP Specifications. Section Fiberglass Reinforced Polymer (FRP) Baffle Wall Panel Products and Fabrications REVISED 11.

FRP Specifications. Section Fiberglass Reinforced Polymer (FRP) Baffle Wall Panel Products and Fabrications REVISED 11. FRP Specifications Section 06 70 00 Fiberglass Reinforced Polymer (FRP) Baffle Wall Panel Products and Fabrications REVISED 11.2016 BRISTOL FACILITY 400 Commonwealth Ave., P. O. Box 580, Bristol, VA 24203-0580

More information