1 Page 1 of 16 BARRATT DEVELOPMENTS PLC SAFETY, HEALTH & ENVIRONMENTAL CODE FOR SUBCONTRACTORS SECTION 1 - MANAGEMENT FOR SAFETY Introduction Acknowledgement of Safety, Health & Environmental code (a) Safety Policy (b) Subcontractors (c) Supervision (d) Pre-start Meetings (e) Monitoring of Subcontractors (f) Safety, Health and Environmental Plan (g) Consultation (h) Induction / Safety Health and Environmental Briefings (i) (j) Personal Protective Equipment (PPE) Accident Reporting (k) Random Alcohol/ Drug Testing (l) Non English Speaking Personnel (m) Welfare Facilities SECTION 2 - SITE OPERATIONS (a) Asbestos (b) Confined Spaces (c) Control of Substances Hazardous to Health (COSHH) (d) Demolition (e) Electricity (f) Excavations (g) Fire (h) Housekeeping

2 Page 2 of 16 (i) (j) (k) (l) Ladders/Stepladders/Trestles Lifting Operations Manual Handling Mobile Phones (m) Noise (n) Overhead and Underground Services (o) Permits to Work (p) Plant and Equipment (q) Road Works (r) (s) (t) Work at Heights Scaffolding Steel Erection (u) Transport (v) Vibration (w) Young Persons SECTION 3 - ENVIRONMENTAL ASPECTS (a) Chemical Storage, Discharge and Spillage (b) Noise, Dust and Visual Impact (c) Plants and Animals (d) Waste Management The Barratt Developments PLC Group of Companies comprise: Barratt Homes Barratt North Scotland David Wilson Homes Ward Homes Wilson Bowden Developments This will apply to all UK operating Divisions within the Group.

3 Page 3 of 16 BARRATT DEVELOPMENTS PLC SAFETY, HEALTH & ENVIRONMENTAL CODE FOR SUBCONTRACTORS We acknowledge receipt of this Safety Health & Environmental Code for Subcontractors and will adhere to the standards. Signed: Date:.. Title:.. on behalf of Company:.. Address:.... Further copies of this Code can be obtained from the local Divisional Office within the Group. This acknowledgement slip must be completed and returned to the Divisional Office, by the Subcontractor, before commencement of work.

4 Page 4 of 16 BARRATT DEVELOPMENTS PLC SAFETY, HEALTH & ENVIRONMENTAL CODE FOR SUBCONTRACTORS SECTION 1 MANAGEMENT FOR SAFETY INTRODUCTION This Code had been prepared by Barratt Developments PLC (the Group) to assist in the achievement of safe working methods and practice on site. Whilst the Code is believed to be comprehensive, the Subcontractor should recognise that Safety, Health & Environmental regulations and publications are regularly updated and the Subcontractor is responsible for ensuring that they remain up to date with any changes that may occur and with best practice. Where the Group appoints a contractor to undertake the role of Principal Contractor under the Construction, Design and Management (CDM) Regulations this will be stated within the contractual arrangements and they must comply with the duties of a Principal Contractor as defined within these Regulations. ACKNOWLEDGEMENT OF SAFETY CODE The Subcontractor is required to sign and return the Acknowledgement in the front of this Code to the Divisional Office with which the contract was agreed. Subcontractors are required and will be deemed to have included copies of the Safety, Health & Environmental Code for Subcontractors in any subcontract let by them and shall make compliance with this Code a condition of any such subcontract. Any subcontracting of works must be notified in writing to the local Divisional Office for approval. (a) Safety Policy A written safety policy remains a statutory requirement under the Health and Safety at Work Act for any employer with five or more persons. Prior to commencement of work on site all Subcontractors will be required to provide a copy of their safety policy document. A copy of the Group Health and Safety Policy will be made available to the Subcontractor on request and it will also be available at each site. (b) Subcontractors Subcontractors must comply at all times with the requirements laid down in the Construction Phase Safety, Health and Environmental Plan. All Subcontractors will be expected to complete a questionnaire setting out details of their safety, health and environmental policy, training, health records, accident history, accident prevention, enforcement action and control measures. Subcontractor s personnel must be over 16 years of age (unless other restrictions apply), should be competent, fit and able for the work they are expected to undertake and have previously been given adequate information, instruction and training. Trained and experienced people shall supervise the work. Where the Division s apprentices are under the control of a Subcontractor they must be supervised by the Subcontractor s nominated foreman or manager to ensure their training requirements and general health and safety is in line with the Group s standards. Subcontractors shall not sublet work without written permission.

5 Page 5 of 16 (c) Supervision The Subcontractor shall ensure that sufficient supervision is available at all times when work is being undertaken on site. Supervisors shall be competent, experienced and trained as necessary. Certification will be required, minimum requirement will be the Construction Industry Training Board approved safety course. Subcontractors must submit the name of the individual responsible, on their behalf for health and safety on site, to the site management. This must also be stated in the Method Statement/Risk Assessment. (d) Pre-Start Meetings Subcontractors will be required to attend a pre-start meeting to discuss the necessary measures, which need to be implemented to reduce and control risks to workers and others. Regular meetings on site during the construction works will also be held to review the Subcontractors performance. Subcontractors may be required to hold their own meetings to discuss and review health and safety matters relevant to their operations. (e) Monitoring of Subcontractors The safety, health and environmental performance of Subcontractors will be monitored by various members of the Division s management team, and by their safety advisers. Subcontractors have a legal duty to ensure they have the services of a competent person to provide specialist health and safety assistance appropriate to their operations, this must be identified in their SMS. Subcontractors must be aware of the disciplinary arrangements, which apply in the event of a breach of Policy, Legislation or Site Rules, even if the breach does not result in an accident/injury. Such breaches may result in verbal and/or written warnings, work being stopped or Subcontractors being removed from site. On a regular basis the Division will complete an appraisal form relating to the Subcontractor s operations and the details will be kept on record and considered before awarding further work. (f) The Construction Phase Safety, Health and Environmental Plan Subcontractors have a duty to provide information to the Division about the following safety, health and environmental matters:- The risks to safety, health and environment arising from their activities and how they are controlled, including details of any proposed changes to work practices, which might affect approved Method Statements and the Safety, Health and Environmental Plan. Construction/installation activities, which may affect others carrying out future maintenance or alteration/demolition of the building/structure.

6 Page 6 of 16 (g) Consultation The Group recognises the importance of ensuring that site personnel are able to express their views on health and safety matters and Subcontractors are required to co-operate with the Division to ensure effective lines of communication remain open. Where appropriate, the Division will recognise appointed Safety Representatives and any arrangements for monitoring and discussing health and safety matters at a local level. The Division recognises its duty to ensure that only authorised and suitably qualified persons are allowed on site. The co-operation of Subcontractors is essential to ensure that appropriate checks are made to identify and authorise workers for specific tasks having regard to their skills and experience. Any local arrangements for first aid will be notified at the pre-start meeting and information will be on display about facilities and first aiders. (h) Induction/Safety, Health & Environmental Briefings All operatives/visitors prior to commencing work /visit a site must receive the Barratt Group induction. The Subcontractor must carry out Safety, Health and Environmental Briefings at least one per month. Records of these briefings must be kept. (i) Personal Protective Equipment (PPE) The Subcontractor shall comply with the policy for the wearing of safety helmets, high visibility vests and protective footwear (including mid-sole protection on the footwear) to the current standards. Other PPE appropriate to the work upon which employees are engaged, e.g. eye protection, respirators, gloves and full body harness, shall be provided by the Subcontractor to the appropriate British Standard and training given for use and maintenance. (j) Accident Reporting Subcontractors must report any injury caused by an accident to their employees or Subcontractors to the site management immediately, this is to enable an entry to be made in the Accident Book held on site. In the event of any Injury or Dangerous Occurrence as specified by the Reporting of Injuries, Diseases and Dangerous Occurrences Regulations, the Subcontractor shall report the occurrence to the Incident Contact Centre, or the local office of the Health & Safety Executive (or enforcing authority) using Forms F2508 or F2508A with copies submitted to the site management at the same time. (k) Random Alcohol/Drug Testing The Division reserves the right to randomly test any operative on a site. The acknowledgement slip at the front of this code is required to be signed, so therefore this is notice that the Division is eligible to carry out random tests for alcohol and drugs as the Division may require on any of the operatives. It is the subcontractor s responsibility to inform their employees of this requirement.

7 Page 7 of 16 (l) Non English Speaking Personnel Contractors must be able to demonstrate how they will discharge their statutory duty to provide understandable information on the risks to health & safety and relevant precautions. Any Contractor who wishes to employ non English speaking nationals must also provide a competent trained person who can communicate / translate the site induction, Safety, Health & Environmental briefings and health & safety information effectively amongst the workforce. All employees expect to be treated fairly and considerately. It is illegal to discriminate against people at work on the grounds of Gender, Race, Disability, Sexual orientation, Religion or belief. The ratio for a bi-lingual supervisor supervising non English speaking operatives is a maximum of 1 to 4 persons, however site management reserve the right to reduce this number for high risk based activities. The supervisor must remain with the operatives at all times in order to communicate/manage their work activities. The following high risk activities may not be undertaken by non English speaking workers:- - Demolition. - Lifting Operations. - Plant Operations. - Any Permit to Work activities. - Lone Working. (m) Welfare Facilities All subcontractors must ensure that the facilities provided are kept in good working order and not misused. Any person found wilfully damaging such facilities would be liable to be removed from site.

8 Page 8 of 16 SECTION 2 SITE OPERATIONS (a) Asbestos If a Subcontractor encounters asbestos, it must not be disturbed, and reported to the site management immediately. Prior to any refurbishment or demolition works, a survey of the structure/s must be undertaken to establish the asbestos content of any materials. Any contractors employed to work with asbestos will need to produce a detailed plan of work and assessment of exposure prior to commencing work. All asbestos operatives must have received an approved medical examination within the last two years. Licensed contractors will be employed to remove asbestos insulation, asbestos sprayed coatings and asbestos insulating boards. Formal notification of the intention to remove asbestos must be provided to the appropriate Enforcement Authority as required prior to commencing removal of work. (b) Confined Spaces Entry into confined spaces must be strictly monitored. A detailed risk assessment and safety method statement must be written prior to any work being undertaken in a confined space, with the following also being complied with: - A permit to work must be implemented. Adequate supervision and training must be demonstrated prior to entry. The correct procedures in the event of an emergency must be in place. All personnel involved must be fully conversant with the Safety Method Statement. The correct type of rescue equipment must be provided and maintained. The appropriate air monitoring must be carried out by competent personnel. (c) Control of Substances Hazardous to Health (COSHH) Prior to the commencement of work involving hazardous substances or processes, Subcontractors are required to provide to the division copies of all assessments made and the measures they will undertake for the control of any substance hazardous to health, which is intended for use on/in, any of the divisions sites or premises. All Subcontractors must ensure that their workforce is trained and informed on all aspects of the use and control of hazardous substances and all appropriate records must be maintained. When required the Subcontractor must supply all necessary Personal Protective Equipment to comply with the control measures for hazardous substances.

9 Page 9 of 16 (d) Demolition All demolition work must be planned ahead in consultation with the Division. A detailed safe system of work must be prepared and submitted to the Division for vetting. All work must be carried out by competent Subcontractors and be supervised by a competent person or persons. Where the demolition Subcontractor is appointed as Principal Contractor they must comply with the duties placed on the Principal Contractor under the Construction, Design and Management Regulations. No demolition work may proceed until services have been adequately protected or rendered harmless in which written confirmation is required from the relevant authority. Demolition areas must be clearly defined and suitable safety barriers must be erected and maintained in good order, together with prominent warning notices wherever appropriate. When work is taking place inside or near to existing buildings every reasonable precaution must be taken by the use of suitable covers or other means to prevent damage by dust. The training standards of the demolition operatives must be made known to the Division prior to commencement of operations. Demolition contractors should be members of the recognised trade association or able to demonstrate their competency through the Group s pre-qualification requirements. Refer also to Section 2 (a) - Asbestos. (e) Electricity Any work associated with an electrical system must be undertaken in strict accordance with The Electricity at Work Regulations. It is the Group s policy to operate site electrical services for portable tools and lighting at 110 volts. Where special equipment requires a voltage greater than 110 volts then written agreement must be obtained from the Division s site management and additional protective measures put in place. All temporary distribution cables, plugs, sockets and equipment installed to serve small tools, hand lamps, etc. must conform to the requirements of the current IEE Regulations. All electricity cables and equipment being used must be regularly inspected on a 3 monthly basis and results recorded as appropriate to ensure that any defective equipment is taken out of service until repaired or replaced. (f) Excavations Prior to any excavation work being undertaken no matter how small, a survey must be carried out using cable avoidance tools (personnel using cable avoidance tools must be trained and certificated) and a record of where services are, if any, must be clearly marked on site, and recorded on site drawings. A permit to Dig/Excavate/Drive piles must have been issued by the site management prior to any work commencing. Subcontractors must ensure that no excavation is left exposed at any time without suitable and proper means of support and in addition, that site traffic and personnel are advised by prominent visual warning signs and barriers to restrict them to authorised routes.

10 Page 10 of 16 An assessment of the protection required for the prevention of collapse of an excavation must be provided by the Subcontractor. In all cases steps shall be taken to prevent collapse at depths exceeding 1 metre. Statutory Inspections/Examinations must be made by competent personnel and a record maintained by the Subcontractor, which must be available on site. Control measures must be in place during excavation work and all other operations to ensure that adjacent properties are not damaged. Any damage to a service must be reported to the site management and to the statutory undertaker immediately. No pneumatic tools should be used in the vicinity of electric or communication cables. No road pins or metal stakes should be driven into the ground in the vicinity of any cable routes. No mechanical excavators or power tools must not be used within 0.5 metres of the indicated line of the service. (g) Fire All hot work is covered by a permit, which will be issued by the Division s site management prior to any hot work commencing. The storage and use of flammable substances must be in compliance with current legislation. Such substances must be stored in suitable places as designated by the division. (h) Housekeeping Subcontractors must deposit rubbish created by their own activities in designated areas or skips and must take an active role in maintaining a tidy site. Failure to maintain the required standard of tidiness may result in the Division carrying out the work and charging the cost of the cleaning to the Subcontractor. Storage areas must be kept tidy and stacked materials suitably arranged to maintain stability within a secure area. Materials must not be stacked against the boundary fence. If work is being carried out in existing premises particular attention is required to observe the client s/occupier s rules for tidiness, restricting access to authorised working areas only and to assist fire prevention by avoiding the build up of combustible materials. Where materials are stacked within or upon a completed or partially completed structure, then appropriate calculations and necessary temporary works must be undertaken by the Subcontractor to avoid overloading the structure. (i) Ladders/Stepladders/Trestles All ladders & stepladders must be Class 1 industrial type where practicable. Ladders must only be used after a risk assessment has been carried out and the work is of short duration, low risk and no other means of access is available for that specific task. Stepladders must only be used after a risk assessment has been carried out and no other means of access is available for that task i.e. tower scaffold. Trestles must only be used internally on firm level ground. The use of trestles is PROHIBITED EXTERNALLY. The trestles, which are to be used, must conform to the Working at Height Regulations and shall include handrails and toe boards.

11 Page 11 of 16 (j) Lifting Operations All lifting operations must be undertaken under the specific control of a competent person who has received appropriate training. Crane operations must be properly planned and carried out in accordance with BS For Contract Lifts, where crane operations are under the direct control of the Subcontractor, the lifting operations Safe System of Work must be vetted by the Division. Individual site rules/method Statements must be prepared and followed. An Appointed Person (a person who has received the 3 day Appointed Person training) is the only person that can complete a lifting plan. A lift supervisor (a person who has received the two day Lift Supervisor training) as a minimum must be on site to supervise lifting activities. The Crane Operator must have the relevant certification for operating the crane and also the relevant certification for the crane and accessories on site prior to any lifting taking place. A Slinger/Signaller must have received formal training and be certificated. Where persons are hoisted emergency procedures and warning signals for individual situations must be assessed. Lorry loaders (HIAB type equipment) must only be used for self-loading/unloading. All lifting equipment and accessories must have received statutory tests/examinations within the following periods: 1) Equipment used for lifting people every 6 months 2) All lifting accessories, chains, slings etc. every 6 months 3) All other lifting equipment every 12 months (k) Manual Handling Wherever possible, the need for the repetitive manual handling of loads above 20kgs should be avoided by operatives. Where this is not reasonably practicable the Subcontractor must provide the appropriate mechanical handling devices to eliminate/reduce the need for manual handling. Where manual handling is required, the Subcontractor must make an assessment of the task to be carried out, this must be recorded. The following points must be considered in the assessment: The work task The load to be lifted. The local environment. The capabilities of the individuals. The Subcontractor must ensure that they have given their employees the appropriate training, instruction and supervision to enable them to perform all manual handling operations in a safe manner. The planning of stacking and storage should take into account the reduction or elimination where possible of manual handling operations.

12 Page 12 of 16 (l) Mobile Phones Mobile phones are prohibited where high-risk activities are being carried out, the high-risk activities are listed below. This list is not exhaustive Erecting/Dismantling Scaffold Operating Plant/Machinery Working in a Confined Space Steel Erection Lifting Operations Banking vehicles (m) Noise Subcontractors are required to make noise assessments where appropriate and submit the results to the Division. Where possible noise levels should be reduced at source by the selection of plant, etc. and where this is not practicable, acoustic screens and suitable hearing protection must be provided, worn correctly and training given. Where the Division designates noise protection zones, Subcontractors must comply with the requirements for hearing protection. (n) Overhead and Underground Services Where work has to be carried out in the vicinity of overhead electricity cables approval is required from the Division following the review of the Subcontractor s proposed Safe System of Work, in consultation with the local Electricity Company. (o) Permits to Work Subcontractors must use the permit system for the following areas of work: - Dig/excavate/pile. Hot work Confined spaces (work in sewers, tanks, vessels & manholes etc.) Work on mains electricity or adjacent to switchgear, substations. Work in lift motor rooms Loading/Dismantling Formwork/Falsework Use of Lifting appliances Plant Arrival (p) Plant and Equipment All plant operators must be over the age of 18 and hold a full UK driving licence. Operators must hold a Construction Plant Competence Scheme (CPCS) card for the particular plant being operated. Forklift drivers must hold one of the following for the particular type of plant they are operating CPCS Road Transport Training Board (RTITB) Association of Industrial Truck Trainers (AITT)

13 Page 13 of 16 All forklift operators must have completed a minimum medical screening to the DVLA Group 1 Standard prior to operating a forklift for the first time. All operators over the age of 40 must be medically screened every five years and any operator absent from work for one month or more must be medically screened prior to returning to forklift operation. Operators of mobile elevating working platforms must hold either a CPCS card or a card issued by the International Powered Access Federation (IPAF). Operators of cherry pickers must wear a harness, which is secured to a suitable point within the operating platform. Note: familiarisation training provided by the suppliers is not sufficient. (q) Road Works The Subcontractor shall be competent, trained and certificated to execute all works in accordance with The New Roads and Street works Act. The Subcontractor shall provide all necessary signage and traffic and pedestrian management to Chapter Eight requirements. (r) Work at Heights All work at height must be carried out in such a manner that operatives are protected from falling by some form of physical restraint. Protection must be provided where a person can fall in excess of 1 metre but this may need to be at a lower height for instances work close to water or protruding rebar. The hierarchy of control for prevention of falls whilst undertaking high risk operations are: Evaluate the work to establish if working at height is necessary or if the work can be undertaken from an existing safe structure. Safe working platforms incorporating handrails and toeboards. Use of proprietary fall arrest systems such as Swaledeck and Oxford system for stairwells. Use of mobile elevating working platforms. Passive or collective systems such as safety nets, bean bags or air bags, which require no action by the user to work effectively. Work restraint systems, which include a harness and lanyard, which is adjusted or set to a fixed length that physically prevents the person getting to the place where they could fall. Personal fall arrest system that uses a harness connected to a reliable anchor to arrest and restrict a fall and prevent the user hitting the ground. The anchor point must be above head height where practicable and never below the waist of the operative. The above hierarchy must be applied to all situations and the initial element considered first i.e. safe working platforms should be the first method considered to prevent falls and not beanbags. Each control should be evaluated and only dismissed if it is deemed not reasonably practicable. (s) Scaffolding Where a Subcontractor provides or arranges for the provision of their own scaffolding for the sole use of their employees, the responsibility for ensuring that it is erected in accordance with the requirements identified below, rests with the Subcontractor. Any Subcontractor who utilises a scaffold erected for common use must, prior to use by their employees, inspect the scaffold to ensure that it is safe and suitable for use and immediately report any defects. Co-ordination arrangements for the use of scaffolding will usually be under the direction of the Division. Subcontractors shall comply with the site rules as they affect scaffolding and access including the requirements for the closing of loading bay gates.

14 Page 14 of 16 Responsibility for the provision of scaffolding will be as stated in the sub-contract and all scaffolding must comply with the Work at Height Regulations and BS EN and TG 20 Codes of Practice, including the use of appropriate signage when the scaffold is not in use. Where scaffolders are working above 4 metres they must comply with the requirements of NASC Guide SG 4 Preventing Falls in Scaffolding and Falsework. (t) Aluminium Scaffold Towers Must be erected and dismantled by competent trained, certificated operatives and used in accordance with the Prefabricated Access Suppliers and Manufacturers Association (PASMA) guidelines. The training received from the hire companies or suppliers when delivered to site is not deemed adequate. The training should be provided by a PASMA recognised provider. (u) Steel Erection The Safe System of Work shall specify a working sequence and method of access, which reduces the possibility of falls of persons to an absolute minimum. Tools must be secured in frogs, and fixings, bolts and cleats, etc. must be kept in bags to avoid being dislodged and falling to the ground. The use of MEWP s is preferred. Walking/climbing/shinning steelwork is prohibited on all sites. (v) Transport Drivers must always report to the site office before travelling around the site and must abide by the Divisions Traffic Management Plan s defined access routes and storage areas for the site. Vehicles with high loads must not travel under pipe bridges, overhead mains, etc. unless adequate arrangements have been made to prevent a collision. Vehicles must not travel around site with the body raised. Drivers must have a safety helmet available for use when outside the cab and must wear safety footwear, high visibility vests and any other appropriate protective clothing. Vehicles must be loaded within any appropriate loading restriction and loads must be suitably secured. In all cases where a lorry or similar vehicle needs to reverse on, or around site, a Banksman must be provided, and used by the Subcontractor. Vehicles must never be left unattended with the engine running, or with ignition keys in place, unless the local emergency arrangements require otherwise. Vehicles must be parked in a safe place, on level ground, away from excavations, evacuation routes, assembly points, hoists, fixed cranes and storage areas. (x) Vibration The Subcontractor will inform Division site management through the Method Statement/Risk Assessment submitted of how they will control the vibration exposure to their employees. The subcontractor must introduce a programme of controls to eliminate or reduce their exposure so far as reasonably practicable.

15 Page 15 of 16 This will be achieved by: (a) Informing employees of the vibration levels of the equipment being used and instructing them formally of how long they are to use the equipment for. (b) Monitoring operatives on the use of the equipment. (c) Regular maintenance schedule for equipment. (d) Where operatives are regularly exposed above the Exposure Action Levels health surveillance must be provided. (This is only appropriate for Hand Arm Vibration - HAV and not Whole Body Vibration - WBV) (y) Young Persons A specific risk assessment must be carried out on a young person under the age of 18 prior to the commencement of work. The details of this assessment must be provided to the division prior to the young person commencing work. They must also have a restricted activity agreement in writing stating exactly what tasks they are allowed/not allowed to carry out whilst on site. The Young Persons risk assessment register must also be completed on site prior to starting work. Tasks, which young persons are excluded from are:- Painting with lead based paint or other materials with harmful properties such as toxic, carcinogenic or similar high-risk attributes. Driving a mechanically propelled vehicle. Giving instruction signals for the operating of a lifting appliance. Operating a lifting appliance. The operating of any mechanically driven wood cutting machine. The operating of any mechanically driven machine with the exception of simple hand tools, unless under direct supervision. Working on any electrical equipment that would give rise to danger. Working in excavations unless under direct supervision. Demolition works unless low risk and directly supervised. Currently no working day is to exceed 8 hours at any one time.

16 Page 16 of 16 SECTION 3 ENVIRONMENTAL ASPECTS (a) CHEMICAL STORAGE, DISCHARGE AND SPILLAGE Only the designated areas marked on the site plan shall be used for the storage of chemicals and oils. These must be clearly labelled and bunded where necessary. Tanks for storage of oil or diesel on site shall conform to the following; Tanks must be of sufficient strength and integrity as to ensure that they are unlikely to burst or leak. Where the container has a storage capacity in excess of 200 litres or more a secondary containment system is used to ensure that leaking or spilt oil does not enter the watercourse. They must be positioned so that they are not vulnerable to impact from vehicles. The secondary containment system i.e. bund must be provided which has the capacity to contain at least 110% of the maximum contents of the tank. The bund walls and floor must be impermeable to water and oil and checked regularly for leaks. A Tank placed upon a skip will not be suitable as a means of containment. Valves and other ancillary equipments must be kept within the bund when not in use. Tanks must not be positioned within 10 metres of any watercourse. Flexible pipes and fittings for filling vehicles etc. must have an automatic valve or tap which closes automatically when not in use. This must not be able to be fixed in the open position. The valve must be locked when not in use and remain inside the bund area. All rainwater accumulating in the bund must be removed. This waste may need to be treated as hazardous particular if contaminated with oil or alternatively filtered first. (b) NOISE, DUST AND VISUAL IMPACT The subcontractors must adhere to noise/dust control zones, where applicable, according to the site-specific rules. The site hours of work and the hours that specific items of equipment are allowed to operate must be adhered to, according to the site-specific rules. (c) PLANTS AND ANIMALS All control measures implemented for the protection of trees and animal species on site must be strictly adhered to. When excavating under/around the canopy of trees or hedges hand digging is only permitted unless under the direct instruction of site management to utilise mechanical means. If a subcontractor suspects they are working in a protected area or near endangered species and this area has not been clearly identified on the site plan or visually signed on site they should report this immediately to the site manager and avoid taking any action that may damage the area. (d) WASTE MANAGEMENT All waste must be deposited in the correct skips, which are clearly marked/labelled. No waste is to be burnt on site. If the contractor is providing their own skip(s) they are responsible for ensuring they comply with the legal requirements for the disposal of that waste. All waste removed from site should be disposed of at a registered waste management facility.

This document sets out the rules applicable to all contract companies and their personnel when working on a CF Fertilisers UK Limited (CF) site.

This document sets out the rules applicable to all contract companies and their personnel when working on a CF Fertilisers UK Limited (CF) site. CONTRACTOR EHS REQUIREMENTS FOR ON-SITE WORK Issued by:: EHS Page No: Issue No: Issue Date: Authorised By: Review date: 1 of 8 3 July 2016 N Cook July 2020 1. INTRODUCTION This document sets out the rules

More information

Health Safety, & Environment

Health Safety, & Environment GROUP SAFETY HEALTH AND ENVIRONMENT MANUAL R.G. Carter Construction Ltd Integrated Management System Section 7 Health Safety, & Environment Issue Manual No. Holders Name: Issue Date: GROUP HEALTH AND SAFETY

More information

HEALTH AND SAFETY POLICY

HEALTH AND SAFETY POLICY SECTION 1. GENERAL POLICY STATEMENT: Director Responsible for Safety: A.C. Appleton The Director responsible for safety will ensure the adoption and maintenance of proper standards of safety, health and

More information

Risk Assessment & Safe Working Practice

Risk Assessment & Safe Working Practice RA Ref Number: 01f Revision: 2 Project/Job Number Reference Insert Job Number Approval Date: 30/03/2018 RA Description: Working at Heights Fixed Tubular Scaffolds Next Review Date: 01/04/2019 Notes: Please

More information

PGR Innovations Limited. Company Policy For Health & Safety

PGR Innovations Limited. Company Policy For Health & Safety PGR Innovations Limited Company Policy For Health & Safety January 2012 CONTENTS Company Policy Statement 1.0 Organisation Duties And Responsibilities 2.0 Managing Director 2.1 Projects Managers and Site

More information

M.B. Power Services (Essex) Ltd

M.B. Power Services (Essex) Ltd M.B. Power Services (Essex) Ltd HEALTH & SAFETY POLICY 1 POLICY STATEMENT The company recognises that under the Health & Safety at Work Act 1974 the Company has a legal duty to ensure so far as is reasonably

More information

HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd

HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd HEALTH & SAFETY POLICY Of JMC Mechanical Electrical & Air Conditioning Ltd Company Trading Address 242 Fort Austin Avenue Crownhill Plymouth PL6 5NZ Tel: 01752 657227 Fax: 01752 657227 Email: enquiries@jmc-sw.com

More information

SITE SAFETY RULES - SILVERSTONE CLASSIC 2018

SITE SAFETY RULES - SILVERSTONE CLASSIC 2018 SITE SAFETY RULES - SILVERSTONE CLASSIC 2018 The following is an outline of the Safe Working Requirements for all Companies, staff and any other persons for this event. Please note that the terms Company

More information

EMPLOYEE SAFETY HANDBOOK

EMPLOYEE SAFETY HANDBOOK EMPLOYEE SAFETY HANDBOOK This Employee Safety Handbook has been produced to provide you with Health and Safety information. It also includes information about your duties as an employee and will help you

More information

Health and Safety Policy Statement. LONDONGUILD Ltd ELECTRICAL CONTRACTORS. The Palmerston Centre Oxford Road Wealdstone Harrow Middlesex HA3 7RG

Health and Safety Policy Statement. LONDONGUILD Ltd ELECTRICAL CONTRACTORS. The Palmerston Centre Oxford Road Wealdstone Harrow Middlesex HA3 7RG Statement LONDONGUILD Ltd ELECTRICAL CONTRACTORS The Palmerston Centre Oxford Road Wealdstone Harrow Middlesex HA3 7RG Contents 1 General Statement of Policy 2 Organisation and Roles and Responsibilities

More information

Safe planning and operation for Mobile Elevated Working Platforms (MEWPs)

Safe planning and operation for Mobile Elevated Working Platforms (MEWPs) Safe planning and operation for Mobile Elevated Working Platforms (MEWPs) This document sets out the Morgan Sindall standards for the control of Mobile Elevated Work Platforms (MEWP) on its projects. It

More information

Example Only. Outline Health and Safety Plan. Introduction. Project Brief. Appointments. Introduction. Description of Project. Location.

Example Only. Outline Health and Safety Plan. Introduction. Project Brief. Appointments. Introduction. Description of Project. Location. Outline Health and Safety Plan Introduction Introduction This Health & Safety Plan is prepared in accordance with the Construction (Design & Management) Regulations 2007, Approved Code of Practice to the

More information

HEALTH & SAFETY POLICY

HEALTH & SAFETY POLICY 1. Policy Statement CONTENTS 1. Policy Statement 2. Responsibilities 3. In Practice 3.1 Risk Assessments 3.2 COSHH 3.3 PPE 3.4 Safety Training 3.5 Accident Procedure 3.6 Emergency Procedure 3.7 Site Audits

More information

TECHNICAL SUPPORT ASSOCIATES HEALTH AND SAFETY POLICY STATEMENT

TECHNICAL SUPPORT ASSOCIATES HEALTH AND SAFETY POLICY STATEMENT TECHNICAL SUPPORT ASSOCIATES HEALTH AND SAFETY POLICY STATEMENT Technical Support Associates 57-59 High Street Bagshot Surrey GU19 5AH Tel: 01276 476237 Email: enquiries@tsaservices.co.uk Website: www.tsaservices.co.uk

More information

The Health & Safety Policy

The Health & Safety Policy The Health & Safety Policy April 2014 Issue: 3 Page 1 of 16 Review Date: April 2015 Introduction This document sets out the Health & Safety arrangements for Astra Signs Ltd and represents our commitment

More information

A-one+ Supply Chain Standards

A-one+ Supply Chain Standards A-one+ Supply Chain Standards A-one+ Page 1 of 12 Introduction We at A-one+ are committed to achieving an incident and accident free environment through our health and safety strategy. We demand Supply

More information

Health and Safety Policy

Health and Safety Policy Health and Safety Policy T. C. Garrett Ltd. Roofing and Scaffolding Contractor 1 January 2017 SECTION 1: HEALTH AND SAFETY POLICY STATEMENT It is the policy of T C Garrett Ltd. to provide so far as is

More information

REFURBISHMENT DEMOLITION

REFURBISHMENT DEMOLITION CONTRACTOR WHS HAZARD STANDARD REFURBISHMENT DEMOLITION EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition

More information

CHAS Assessment Standards

CHAS Assessment Standards CHAS Assessment Standards Section 1 - All Prosecutions or Enforcement Notices The Supplier has provided details of any enforcement notices or prosecutions served on them in the last three years by the

More information

The Hong Kong Polytechnic University Facilities Management Office

The Hong Kong Polytechnic University Facilities Management Office The Hong Kong Polytechnic University Facilities Management Office Safety Precautions and Requirements The Contractor shall ensure as a priority in all activities connected with the Works, the safety and

More information

Level 1 Award in Health and Safety in a Construction Environment

Level 1 Award in Health and Safety in a Construction Environment Level 1 Award in Health and Safety in a Construction Environment Student notes (sample) Version 2.0 www.britsafe.org Membership Training Qualifications Audit and Consultancy Audit and Policy Consultancy

More information

Risk Assessment Site name:

Risk Assessment Site name: Risk Assessment Site name: Task: Installation of signage externally fixed at height Ref: INS/Site/RA194 Persons Affected: Insign installation operatives, Visitors to the site, Clients employees, Members

More information

Employee Summary of Company Safety Arrangements SAFETY ARRANGEMENTS

Employee Summary of Company Safety Arrangements SAFETY ARRANGEMENTS 1. Introduction 2. The Company Health & Safety Management System 3. Accidents & Incidents 4. Consultation & Communication with Employees 5. Control of Substances Hazardous to Health (COSHH) 6. Contractors

More information

FARNCOMBE CONSTRUCTION. Health & Safety Policy, Organisation and Arrangements

FARNCOMBE CONSTRUCTION. Health & Safety Policy, Organisation and Arrangements Health & Safety Policy, Organisation and Arrangements July 2017 1 Contents 2 Table of Revisions... 3 3 Health and Safety Policy Statement... 4 4 Organisational Chart for Health and Safety... 5 5 Organisation

More information

Contractor and Supplier Expectations

Contractor and Supplier Expectations Contractor and Supplier Expectations GUI/1548 Issue 15 Page 1 of 10 16 September 2016 Contents 1. INTRODUCTION AND SCOPE 3 2. RICARDO ENERGY & ENVIRONMENT POLICIES 3 3. SUSTAINABILITY 4 4. MANAGEMENT OF

More information

Health Safety and Welfare Policy

Health Safety and Welfare Policy Health Safety and Welfare Policy For IDG Tool Repair and Electrical Testing Ltd 19 Bourne Way Swanley Kent BR8 7HX David Griffiths CONSULTANT HSWS LTD 01322 662363 Section 1 Statement of General Policy

More information

Health & Safety Policy, Organisation and Arrangements

Health & Safety Policy, Organisation and Arrangements FARNCOMBE CONSTRUCTION Health & Safety Policy, Organisation and Arrangements July 2018 1 1 Contents 2 Table of Revisions...3 3 Health and Safety Policy Statement...4 4 Organisational Chart for Health and

More information

GUIDANCE NOTES - CONSTRUCTION DESIGN AND MANAGEMENT (CDM) 3

GUIDANCE NOTES - CONSTRUCTION DESIGN AND MANAGEMENT (CDM) 3 GUIDANCE NOTES - CONSTRUCTION DESIGN AND MANAGEMENT (CDM) 3 Page 1 Page 2 GUIDANCE NOTES - CONSTRUCTION DESIGN AND MANAGEMENT (CDM) ROLES AND RESPONSIBILITIES The CLIENT must: 1. Be satisfied that all

More information

Delivery, Unloading and Loading of Materials and Plant

Delivery, Unloading and Loading of Materials and Plant Delivery, Unloading and Loading of TAKE THE STEPS TO SHE Form 67 - July 06 - Pg of 6.0 Scope This policy applies to all delivery drivers attending Barratt Developments PLC ( the Group ) developments and

More information

HEALTH AND SAFETY POLICY

HEALTH AND SAFETY POLICY HEALTH AND SAFETY POLICY Prepared for: Limited Unit A9 Bell Lane Office Village Little Chalfont Bucks HP6 6GL Date of Issue: 3 Feb 2014 Current Issue 9 June 2017 Issue 5 Tel: 01494 765671 Fax: 01494 549852

More information

Work Health & Safety Procedure

Work Health & Safety Procedure 1 PURPOSE This procedure explains the process for qualification of Contractors at Port of Newcastle (PON). It outlines the responsibilities for PON Representatives and Contractors. It also provides a system

More information

HEALTH AND SAFETY AT WORK ACT 1974 HEALTH AND SAFETY POLICY OF:

HEALTH AND SAFETY AT WORK ACT 1974 HEALTH AND SAFETY POLICY OF: HEALTH AND SAFETY AT WORK ACT 1974 HEALTH AND SAFETY POLICY OF: D J MACAULAY (CONSTRUCTION) LTD. The Health and Safety at Work Act 1974 places an obligation on all Employers to make every reasonable effort

More information

BHC-P-03.1 Training, Competence and Induction

BHC-P-03.1 Training, Competence and Induction BHC-P-03.1 Training, Competence and Induction Contents 1.0 Purpose 2.0 Scope 3.0 Definitions 4.0 Main requirements 5.0 Guidance documents and references 6.0 Appendices Revision register Date Version Description

More information

ACT Scaffolding Services LTD METHOD STATEMENT Scaffold erection

ACT Scaffolding Services LTD METHOD STATEMENT Scaffold erection Address: 20 Bole Close, Wombwell, Barnsley, South Yorkshire. S73 8AZ Tel: 07883 780704 Email: enquiries@actscaffold.co.uk Web: www.actscaffold.co.uk Project/Contract Boiler Scaffolding Client Example Comp

More information

HEALTH & SAFETY MANUAL Legislated Duties and Responsibilities

HEALTH & SAFETY MANUAL Legislated Duties and Responsibilities CONTRACTOR SAFETY PROGRAM PURPOSE: The Contractor Safety Program (CSP) establishes that contractors are required to work in compliance with legislation, regulations and the Town of Caledon health and safety

More information

WORKING AT HEIGHT. The company will comply with the Work at Height Regulations 2005, its schedules and Codes of Practice.

WORKING AT HEIGHT. The company will comply with the Work at Height Regulations 2005, its schedules and Codes of Practice. WORKING AT HEIGHT The company will comply with the Work at Height Regulations 2005, its schedules and Codes of Practice. Principally this means that we comply with the hierarchy of risk in that we shall:

More information

BHC-P-03.1 Training, Competence and Induction

BHC-P-03.1 Training, Competence and Induction BHC-P-03.1 Training, Competence and Induction Contents 1.0 Purpose 2.0 Scope 3.0 Definitions 4.0 Main requirements 5.0 Guidance documents and references 6.0 Appendices Revision Register Date Version Description

More information

Health & Safety Policy

Health & Safety Policy Health & Safety Policy Bracknell Glazing Unit 5, Long Shot Lane Bracknell Berkshire RG12 1RL Policy Date: 22 September 2010 1/14 Contents Page 1.0 General Statement of Intent 1.1 Principle Legislation

More information

RISK ASSESSMENT As exhibitions and events are deemed as hazardous environments, it is a legal requirement that all exhibitors and contractors

RISK ASSESSMENT As exhibitions and events are deemed as hazardous environments, it is a legal requirement that all exhibitors and contractors RISK ASSESSMENT As exhibitions and events are deemed as hazardous environments, it is a legal requirement that all exhibitors and contractors undertake a suitable and sufficient Risk Assessment prior to

More information

Construction, Demolition & Excavation Works Doc Reference: DoMN-WHSMS 3.14 Version Number: 2.2

Construction, Demolition & Excavation Works Doc Reference: DoMN-WHSMS 3.14 Version Number: 2.2 Purpose This procedure provides guidance to the Diocese of Maitland Newcastle (DoMN), principal contractors and other persons conducting a business or undertaking (PCBU) who commission or carry out construction,

More information

Contractors Code of Practice

Contractors Code of Practice Estates and Facilities Department of the University of Bradford In partnership with ICT Services Contractors Code of Practice Issue Date Comments 1 st Draft 2 nd Draft Issued 19/5/2010 Distributed as per

More information

GENERAL OCCUPATIONAL SAFETY AND HEALTH REQUIREMENTS AT YIT WORK SITES. 1 Purpose of the occupational safety and health requirements

GENERAL OCCUPATIONAL SAFETY AND HEALTH REQUIREMENTS AT YIT WORK SITES. 1 Purpose of the occupational safety and health requirements 1 (6) GENERAL OCCUPATIONAL SAFETY AND HEALTH REQUIREMENTS AT YIT WORK SITES 1 Purpose of the occupational safety and health requirements The purpose of this document is to lay the groundwork for accident-free,

More information

Safe Work Procedure for installation of

Safe Work Procedure for installation of Safe Work Procedure for installation of external cladding This procedure has been formulated to cover safe systems of work for the installation of external cladding. This instruction will be used to reduce

More information

All Employees Temporary Workers (including Resource Solutions Staff)

All Employees Temporary Workers (including Resource Solutions Staff) 1. POLICY STATEMENT 2. RESPONSIBILITIES a. The Board Directors b. Director Responsible for Safety (CFO) c. The Chief Information Officer d. The Group HR Director e. Group General Counsel f. The Appointed

More information

North West Facilities Ltd

North West Facilities Ltd Project/Contract North West Facilities Ltd 17-18 Gaerwen Industrial Estate Gaerwen Isle of Anglesey LL60-6HR Tel: 01248-422555 Fax: 01248-422556 Mobile: 07891 557 581 Full bathroom refit Principle Contractor

More information

PICS Health and Safety Policy and Arrangements

PICS Health and Safety Policy and Arrangements PICS Health and Safety Policy and Arrangements H&S Manual 2016 page 1 of 16 Date issued: November 2016 Contents Policy Statement & Organisation Details... 3 Health and Safety Policy Statement... 4 Health

More information

HEALTH & SAFETY ASSESSMENT SCHEME CONTRACTOR & PRINCIPAL CONTRACTOR APPRAISAL QUESTIONNAIRE

HEALTH & SAFETY ASSESSMENT SCHEME CONTRACTOR & PRINCIPAL CONTRACTOR APPRAISAL QUESTIONNAIRE HEALTH & SAFETY ASSESSMENT SCHEME CONTRACTOR & PRINCIPAL CONTRACTOR APPRAISAL QUESTIONNAIRE The purpose of the health and safety questionnaire is to provide Clients with assurances that all companies on

More information

A2B. Construction (Design and Management) Regulations 2015 PRE CONSTRUCTION INFORMATION PACK (V ) PROJECT:

A2B. Construction (Design and Management) Regulations 2015 PRE CONSTRUCTION INFORMATION PACK (V ) PROJECT: A2B. Construction (Design and Management) Regulations 2015 PRE CONSTRUCTION INFORMATION PACK (V.2 10.5.17) PROJECT: Oakdale Primary School, Peterborough Extension, Refurbishments and Associated Works.

More information

Construction Method Statement

Construction Method Statement Construction Method Statement Introduction. The project involves the construction of the new Apartment Extra Car Home for Grwp Cynefin in Pothmadog, Gwynedd, Wales. The programme and construction methodology

More information

Health & Safety Policy & Management Systems. Guidance Note 13

Health & Safety Policy & Management Systems. Guidance Note 13 Health & Safety Policy & Management Systems Guidance Note 13 1 Health & Safety Policy & Management Systems Introduction This Guidance Note gives practical information regarding basic health and safety

More information

HEALTH AND SAFETY POLICY AND PROCEDURES

HEALTH AND SAFETY POLICY AND PROCEDURES HEALTH AND SAFETY POLICY AND PROCEDURES Relevant Legislation The Health and Safety At Work Act 1974 The Management of Health and Safety At Work Regulations 1999(as amended) All associated Health and Safety

More information

HS00: CONSTRUCTION PHASE HEALTH & SAFETY PLAN JOB THE PADDOCKS - SAMPLE PROJECT FOR TRIAL USERS: THE PADDOCKS 2015

HS00: CONSTRUCTION PHASE HEALTH & SAFETY PLAN JOB THE PADDOCKS - SAMPLE PROJECT FOR TRIAL USERS: THE PADDOCKS 2015 HS00: CONSTRUCTION PHASE HEALTH & SAFETY PLAN JOB THE PADDOCKS - SAMPLE PROJECT FOR TRIAL USERS: THE PADDOCKS 2015 Client: John Smith TEST Site Address: Principal Designer: [Principal Designer] Principal

More information

The following is a description of the type of work that our Company undertakes:

The following is a description of the type of work that our Company undertakes: Health & Safety Introduction K9 Patrol is committed to providing a workplace that is healthy and safe for our employees and anyone who interacts with us e.g. customers and members of the public. Conformance

More information

WILTSHIRE POLICE FORCE PROCEDURE

WILTSHIRE POLICE FORCE PROCEDURE Form 535 Template v3 WILTSHIRE POLICE FORCE PROCEDURE MANAGEMENT OF CONTRACTORS PROCEDURE Date of Publication: September 2017 Version: 6.0 Next Review Date: September 2018 TABLE OF CONTENTS PROCEDURE OVERVIEW...

More information

Safety, Health and Environmental Essentials for Contractors Working at the Rutherford Appleton Laboratory

Safety, Health and Environmental Essentials for Contractors Working at the Rutherford Appleton Laboratory Safety, Health and Environmental Essentials for Contractors Working at the Rutherford Appleton Laboratory SHE Booklet for Contractors at RAL July 2016 Page 1 of 28 1 1 ROAD 18 ROAD 7 ROAD 8 ROAD 6 ROAD

More information

Level 2 NVQ Diploma in Removal of Hazardous Waste (Construction) Licensed Asbestos

Level 2 NVQ Diploma in Removal of Hazardous Waste (Construction) Licensed Asbestos Level 2 NVQ Diploma in Removal of Hazardous Waste (Construction) Licensed Asbestos November 2016 This qualification has a Total Qualification time (TQT) of 420 Hours Guided Learning Hours: 191 Ofqual Qualification

More information

Health & Safety Plan DEMOLITION WORKS: No 2 Substation

Health & Safety Plan DEMOLITION WORKS: No 2 Substation DEMOLITION WORKS: No 2 Substation Revision History Revision Date Section Detail of Amendment By r3a 09/10/14 First Issue JH 17 October 2014 Page 2 Revision 4 Contents 1. Description of Project 1.1. Introduction

More information

Management Plan: Hazardous Materials Removal & Demolition

Management Plan: Hazardous Materials Removal & Demolition Management Plan: Hazardous Materials Removal & Demolition Kingswood School (Upper Site), Corby 1.0 Introduction 1.1 Background Lambert Smith Hampton has been instructed by Northamptonshire County Council

More information

Contractors Safety Code of Practice

Contractors Safety Code of Practice Document Control Revision No. Date Document Reviewed 8 October 2017 Publication on Web Site November 2017 Date of next Review October 2019 or following any changes Summary of main changes Change in format

More information

Corporate Health and Safety Policy July 2012

Corporate Health and Safety Policy July 2012 Corporate Health and Safety Policy July 2012 Contents Page General Statement of Health and Safety Policy and Intent 2 1. ORGANISATION 3 1.1 Elected Members 3 1.2 Cabinet Members 3 1.3 Governing Bodies

More information

NORTHERN EDUCATION TRUST HEALTH AND SAFETY DOCUMENT OF POLICIES

NORTHERN EDUCATION TRUST HEALTH AND SAFETY DOCUMENT OF POLICIES NORTHERN EDUCATION TRUST HEALTH AND SAFETY DOCUMENT OF POLICIES Contents Policy on Health and Safety COSHH Policy Working with VDU's Policy Management of Health and Safety at Work Policy The Workplace

More information

Adelaide Airport Limited

Adelaide Airport Limited Induction Pack for Contractors Site Rules and Conditions for Contractors Revision: 7 November 2015 Site Rules and Conditions-Adelaide:Legal 42723757_1 1. GENERAL 1 2. BUILDING CONSENT AND APPROVAL 1 3.

More information

Safety, Health and Environmental Essentials for Contractors Working at Daresbury Laboratory

Safety, Health and Environmental Essentials for Contractors Working at Daresbury Laboratory Safety, Health and Environmental Essentials for Contractors Working at Daresbury Laboratory DL Contractors SHE Booklet v1 (Nov 2016) Page 1 of 28 Contents Page Introduction 3 Before Work Starts 4 Fire

More information

Training Standard Draft Only

Training Standard Draft Only Title Duration Purpose/ Scope Occupational Relevance Health and Safety in Construction (Site Manager) Minimum 5 days of 6 learning hours per day Purpose: The purpose of training delivered against this

More information

Health & Safety Policy

Health & Safety Policy Health & Safety Policy Zircon Air Conditioning 19 Tall Trees Close Kingswood Maidstone Kent ME17 3PT Registered Company Number: 7127523 Policy Date: 10 February 2017 1/18 Contents Page 1.0 General Statement

More information

Level 2 NVQ Diploma in Building Maintenance Multi-trade Repair and Refurbishment Operations (Construction)

Level 2 NVQ Diploma in Building Maintenance Multi-trade Repair and Refurbishment Operations (Construction) Level 2 NVQ Diploma in Building Maintenance Multi-trade Repair and Refurbishment Operations (Construction) Qualification Specification ProQual 2018 Contents Page Introduction 3 Qualification profile 3

More information

Management of Contractors Procedure

Management of Contractors Procedure Management of Contractors Procedure Version Control Sheet Version Date Reviewed By Revision Details 1.0 28/08/2015 Louise Newsham Changes to job titles and roles. Reviewed to include recent legislative

More information

Safe Work Method Statement Perimeter and Balcony Fallguard (0003)

Safe Work Method Statement Perimeter and Balcony Fallguard (0003) Safe Work Method Statement Perimeter and Balcony Fallguard (0003) To be used in conjunction with SWMS 0001 General Site Activities and Fallguard Installation Manual. JOB DETAILS Principal Contractor Project

More information

Safe Management of Contractors Policy

Safe Management of Contractors Policy Safe Management of Contractors Policy Stour Federation Stour Federation Safe Management of Contractors, Page 1 1.! INTRODUCTION 1.1! Shipston-on-Stour Primary School and Acorns Primary School accept the

More information

K.Construction Scotland LTD

K.Construction Scotland LTD K.Construction Scotland LTD Leith, Edinburgh, EH6 5NA, Scotland, U.K Tel: 0131-554-0514 Email: contact@kconstructionltd.com Company Number: SC288209 VAT number: GB870618611, Method Statement For the Refurbishment

More information

OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY

OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY 1. Introduction 1.1 SCOPE & PURPOSE This policy (which includes this document and the work health and safety standards, policies, procedures and safety control

More information

HEALTH & SAFETY POLICY AND ORGANISATIONAL ARRANGEMENTS

HEALTH & SAFETY POLICY AND ORGANISATIONAL ARRANGEMENTS HEALTH & SAFETY POLICY AND ORGANISATIONAL ARRANGEMENTS Enquin Environmental Limited 1 Ringside Business Centre Heol Y Rhosog Wentloog Cardiff CF3 2EW Enquin Environmental Ltd Page 1 of 10 March 2016 Introduction

More information

1. PURPOSE 2. SCOPE 3. APPLICATIONS AND INTERPRETATION. This document is to be read and understood in conjunction with the following, inter alia:

1. PURPOSE 2. SCOPE 3. APPLICATIONS AND INTERPRETATION. This document is to be read and understood in conjunction with the following, inter alia: HEALTH & SAFETY SPECIFICATIONS FOR RENOVATION OF EXISTING BUILDINGS AND CONSTRUCTION OF NEW INFRASTRUCTURE IN THE NZG (PRETORIA AND MOKOPANE) AND THOHOYANDOU BOTANICAL GARDEN 1. PURPOSE The objective of

More information

SAFETY STATEMENT. ABC Company. Address Line 1 Address Line 2. Approved by number. owner. number 01 xx/xx/xx Manager 1 Manager 1 1

SAFETY STATEMENT. ABC Company. Address Line 1 Address Line 2. Approved by number. owner. number 01 xx/xx/xx Manager 1 Manager 1 1 SAFETY STATEMENT ABC Company Address Line 1 Address Line 2 Revision Date Document Approved by Page owner 01 xx/xx/xx Manager 1 Manager 1 1 Contents PART 1 PART 2 PART 3 PART 4 Company Statement 1.1 Application

More information

Level 2 NVQ Certificate in Erection of Precast Concrete (Construction)

Level 2 NVQ Certificate in Erection of Precast Concrete (Construction) Level 2 NVQ Certificate in Erection of Precast Concrete (Construction) Qualification Specification ProQual 2016 Contents Introduction 3 Qualification profile 3 Qualification Structure 4 Pathway 1 Flooring

More information

IDENTIFICATION AND MANAGEMENT OF HAZARDS

IDENTIFICATION AND MANAGEMENT OF HAZARDS ) ERECTION OF INSULATED HOARDING SCREENS HOARDING MATERIAL The insulated hoarding consists of a 10mm thick layer of Foamex PVC bolted with M12 nylon bolts to a fibreglass scaffold frame. The panels will

More information

HS41 Guidance Note - Contractor Guidelines

HS41 Guidance Note - Contractor Guidelines HS41 Guidance Note - Contractor Guidelines Ladders and Step Ladders Ladders and step ladders should only be used for straightforward, short duration work. They should be in good condition, be fit for purpose

More information

Health, Safety and Environmental Policy

Health, Safety and Environmental Policy Health, Safety and Environmental Policy SyxthSense Ltd. 3 Topsham Units. Dart Business Park. Topsham. Exeter EX3 0QH. United Kingdom Copyright Notice This document has been prepared by SyxthSense Limited

More information

SAFETY METHOD STATEMENT

SAFETY METHOD STATEMENT SAFETY METHOD STATEMENT OUR POLICY The safety of our employees and those of our clients is our main priority when carrying out any work on site. This method statement is designed to let you, the client

More information

SHE Rules for Contractors BOW109.11

SHE Rules for Contractors BOW109.11 SHE Rules for Contractors BOW109.11 1.0 Introduction This document details the safety, health and environment rules that contractors employed by Arqiva must follow. This document should be read in conjunction

More information

Health and Safety Policy

Health and Safety Policy Health and Safety Policy Organisation June 2014 Organisation Management Structure Aaron Klatt Managing Director Director Responsible for Health & Safety Site Supervisors Sub-Contractors Specialist Contractors

More information

WORK HEALTH AND SAFETY AUDIT STANDARD

WORK HEALTH AND SAFETY AUDIT STANDARD WORK HEALTH AND SAFETY AUDIT STANDARD FORESTRY INDUSTRY South Australia, Victoria and Tasmania Safety Standards 2017 2017 Content I. Introduction... 2 II. Audit Criteria and Indicators... 3 1 PLANNING...

More information

Constraints on how the Contractor Provides the Works

Constraints on how the Contractor Provides the Works Constraints on how the Contractor Provides the Works [DELETE AS APPROPRIATE: WHERE NOTIFIABLE CDM APPLIES:] CONSTRUCTION (DESIGN AND MANAGEMENT) REGULATIONS 2007 In line with the requirements of the above

More information

MVDC F041 Safety Inspection Checklist

MVDC F041 Safety Inspection Checklist MVDC F041 Safety Inspection Checklist JOB TITLE: DEPARTMENT: JOB NO.: DATE: LEGEND 1 Satisfactory 2 Requires Improvement 3 Non Existent 4 Not Applicable EMERGENCY PREPAREDNESS Emergency procedure is posted

More information

Health & Safety Policy Statement Organisation & Responsibilities

Health & Safety Policy Statement Organisation & Responsibilities Health & Safety Policy Statement Organisation & Responsibilities Prepared by: Barry Harden Joint Managing Director Temple Lifts Limited Regency House, 33-49 Farwig Lane, Bromley, Kent, BR1 3RE. Tel: 020

More information

Health and Safety Toolkit

Health and Safety Toolkit Health and Safety Toolkit H&S Conception, Design & Planning Checklist This checklist is for use at the outset of a project and should be regularly reviewed as the concept and design phases progress. The

More information

OSH LEGISLATION LAW AND REGULATION TO CONSTRUCTION SAFETY LAW AND REGULATION TO CONSTRUCTION SAFETY 20/2/2013

OSH LEGISLATION LAW AND REGULATION TO CONSTRUCTION SAFETY LAW AND REGULATION TO CONSTRUCTION SAFETY 20/2/2013 LAW AND REGULATION TO CONSTRUCTION SAFETY Sr Dr. Mohd Saidin Misnan UNIVERSITI TEKNOLOGI MALAYSIA 81310 UTM Skudai, Johor, Malaysia LAW AND REGULATION TO CONSTRUCTION SAFETY OSH LEGISLATION 1 To enable

More information

LOADING UNLOADING OPERATIONS

LOADING UNLOADING OPERATIONS CONTRACTOR WHS HAZARD STANDARD LOADING UNLOADING OPERATIONS EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION

More information

Level 2 NVQ Diploma in Accessing Operations And Rigging (Construction) Qualification Specification

Level 2 NVQ Diploma in Accessing Operations And Rigging (Construction) Qualification Specification Level 2 NVQ Diploma in Accessing Operations And Rigging (Construction) Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 3 Qualification structure 4 Centre requirements

More information

HEALTH AND SAFETY (MANAGEMENT IN CONSTRUCTION) (JERSEY) REGULATIONS 2016

HEALTH AND SAFETY (MANAGEMENT IN CONSTRUCTION) (JERSEY) REGULATIONS 2016 Arrangement HEALTH AND SAFETY (MANAGEMENT IN CONSTRUCTION) (JERSEY) REGULATIONS 2016 Arrangement Regulation PART 1 5 INTRODUCTORY 5 1 Interpretation... 5 2 Construction site... 8 3 Construction work...

More information

Critical Elements from the Arrium Codes of Practice (Including Arrium Mining Codes of Practice)

Critical Elements from the Arrium Codes of Practice (Including Arrium Mining Codes of Practice) Critical Elements from the Arrium Codes of Practice (Including Arrium Mining Codes of Practice) Version 3 June 2014 Authorised by Arrium Safety Council TOOL75.WHS.COP.001 Critical Elements from the Code

More information

DEMOLITION TRADE SPECIFICATION

DEMOLITION TRADE SPECIFICATION DEMOLITION TRADE SPECIFICATION GENERAL a) BDW Trading Limited Barratt Homes and David Wilson Homes are all trading names of BDW Trading Limited the Company. b) Site Condition The Contractor is to examine

More information

HFM Asset Management Contractor Induction Queens Riverside Apartments

HFM Asset Management Contractor Induction Queens Riverside Apartments HFM Asset Management Contractor Induction Queens Riverside Apartments Contents Purpose About HFM Asset Management HFM Asset Management s Responsibilities Contractors Responsibilities Commencing Work Working

More information

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW PROCEDURE Contractor Safety Issued with the authority of the Chief Commissioner and General Manager of Chief Commissioner signature Chief Executive Officer signature Sponsor Head of Risk Document type

More information

HEALTH AND SAFETY (MANAGEMENT IN CONSTRUCTION) (JERSEY) REGULATIONS 2016

HEALTH AND SAFETY (MANAGEMENT IN CONSTRUCTION) (JERSEY) REGULATIONS 2016 HEALTH AND SAFETY (MANAGEMENT IN CONSTRUCTION) (JERSEY) REGULATIONS 2016 Revised Edition Showing the law as at 1 January 2017 This is a revised edition of the law Health and Safety (Management in Construction)

More information

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) EHS Regulatory Instrument Code of Practice EHS RI - CoP 41.0 Steel Erection Version 2.0 February 2012 ACKNOWLEDGEMENTS With gratitude Abu Dhabi EHS Center

More information

DRAKS INTERIOR DOOR SYSTEMS LTD STATEMENT OF INTENT

DRAKS INTERIOR DOOR SYSTEMS LTD STATEMENT OF INTENT DRAKS INTERIOR DOOR SYSTEMS LTD STATEMENT OF INTENT The management of Draks Interior Door Systems Ltd looks upon the promotion of Health and Safety measures as a mutual objective for themselves and their

More information

HEALTH AND SAFETY POLICY

HEALTH AND SAFETY POLICY HEALTH AND SAFETY POLICY Introduction It is the policy of the Company to take all reasonable steps to ensure the health, safety and welfare of its employees, and it will, so far as is reasonably practicable,

More information

North West Facilities Ltd

North West Facilities Ltd North West Facilities Ltd 17-18 Gaerwen Industrial Tel: 01248-422555 Fax: 01248-422556 Mobile: 07891-557581 Project/Contract Re-decorating of kitchens, bathrooms and other rooms in residential properties

More information

University of Birmingham

University of Birmingham University of Birmingham Health and Safety Policy Manager responsible for review: Facilities Manager Date of last review and update: April 2015 Approved by: H&S committee 2015 Next scheduled review date:

More information