1 1.0 General 1.1. The specifications in this section include all components of the Diffused Aeration System with the exception of the individual diffuser units. Refer to additional specification sections for diffuser unit specification The complete aeration system shall be supplied by the Aeration Diffuser Manufacturer to maintain single source responsibility for the system. The complete system shall be defined as beginning at the top flange of the air supply drop pipes through all submerged piping, wall brackets, lateral supports, expansion joints, diffusers and any other equipment specified within this section of the specifications. The approved manufacturer for this system to be included within the Base Bid shall be manufactured by Tideflex Technologies, Inc. Pittsburgh, PA Any other submittals intended as equivalent or alternate must be submitted prior to the Bid Date and be pre-approved by the Engineer prior to Bid opening. 2.0 Referenced Standards ASTM A240 Chromium-Nickel Stainless Steel Plate ASTM A380 Corrosion Protection, Acid Pickling ASTM A480 Stainless Steel Finish ASTM A530 Specialized Carbon and Alloy Steel Pipe ASTM A554 Welded Stainless Steel Mechanical Tubing ASTM A774 Stainless Steel Welded Fittings ASTM A778 Stainless Steel Welded, Unannealed Austenitic Pipe ASTM D1171 Elastomer Deterioration ASTM D1784 PVC/CPVC Pipe Compounds ASTM D1785 PVC Pipe, Schedules 40, 80 & 120 ASTM D2466 PVC Solvent Cement ASTM D2855 PVC Solvent Joints ASTM D3915 PVC Pipe Fitting Compounds AISI Stainless Steel Plate AISI 304L 304L Stainless Steel Plate AISI Stainless Steel Plate AISI 316L 316L Stainless Steel Plate ANSI B-16.1 Pipe Flanges ANSI B-16.5 Pipe Flanges 3.0 Stainless Steel Pipe Materials 3.1. All stainless steel pipe supplied shall conform with the associated referenced standards as listed in the section Referenced Standards All stainless steel pipe components shall be passivated by complete immersion in nitric-hydrofluric acid as specified in the associated referenced standard as listed in the section Referenced Standards. Print Date: 06/27/

2 3.3. If the stainless steel stock pipe has been previously passivated prior to welding, as defined in the previous section, an acceptable alternative to re-immersion of the complete welded assembly shall consist of the following procedures: Wire brush all welded joints to remove burrs and excess residual debris Liberally apply a coat of OAKITE 33 (phosphoric acid based passivating solution) at 50% concentration or immerse in the same at a concentration of 25% volume to all welds for a minimum period of 30 minutes Rinse the OAKITE 33 solution completely from the manifold or fabricated part with warm water after the curing period. Immediately towel dry the surface and inspect Repeat the procedure until all free residuals and discoloration is eliminated OAKITE 33 conforms to the following Federal Government Specifications: TT-C-490, Method VI, and MIL-C10578, Type 1. Mfg. By Oakite Products, Inc. P.O Box 602, 50 Valley Rd., Berkley Heights, NJ Vertical Piping Support Brackets 4.1. All components of the bracket assembly shall be 304 stainless steel The components of the bracket assembly shall be 304 stainless steel The assembly support bracing shall be anchored to the concrete wall with drill and tap expansion anchors, the pull-out rating of the combined anchors shall be a minimum of 10 times greater than the static weight of the vertical pipe section All welded structural components of the assembly shall be passivated in accordance with the section Stainless Steel Pipe Materials. 5.0 Lateral Piping Support Brackets 5.1. All components of the bracket assembly shall be 304 stainless steel Support brackets shall allow for a minimum of 2 adjustment in elevation of the lateral pipe Assembly components shall consist of two riser type clamps minimum width of 2.00 and minimum thickness of 0.190, two all-thread rods minimum diameter of 0.625, one neoprene strip minimum thick with a length equivalent to the lateral pipe circumference, and stainless steel lock nuts with integral nylon ring. Riser clamps shall provide a Print Date: 06/27/

3 minimum of of compression of the neoprene strip when assembled around the lateral piping Threaded rods shall be anchored to the concrete floor using Epoxy type anchors. 6.0 Stainless Steel Welding 6.1. All welding of pipe and structural support members shall be conducted at the factory using TIG, MIG, inert gas or plasma-arc welding methods Field welding will not be permitted without the approval of the Engineer All welded components shall be passivated in accordance with the specifications defined in this section Weld cross-sections shall have a thickness equal to or greater than the welded material All butt welds shall be fully penetrated with gas shielding to the interior and exterior of the joint All face rings and flanges shall be continuously welded on both sides unless lap joint flanges are specified All welding practices shall be in accordance with the referenced standards listed in the section Referenced Standards. 7.0 Polyvinyl Chloride (PVC) Pipe 7.1. All PVC pipe and PVC pipe fittings shall be a minimum schedule SDR 33.5, sewer drainage pipe or plastic pipe with a sidewall thickness less than schedule 40 will not be accepted for any portions of the piping material PVC pipe compounds shall be in accordance with the standards listed in the section Referenced Standards PVC solvent and solvent joints shall be in accordance with the standards listed in section Referenced Standards. Field solvent welding will not be allowed unless approved by the Engineer or if field pressure testing is required within these specifications. 8.0 Vertical, Air Supply Piping 8.1. Vertical air supply piping shall be a minimum of Schedule stainless steel. Print Date: 06/27/

4 8.2. Lap Joint type (follower flange) plate flanges shall be provided at the top end of the pipe section, flanges shall be in accordance with ANSI bolt hole diameters and spacing Each drop pipe shall be equipped with a stainless steel lifting lug capable of sustaining twice the static weight of the drop pipe assembly Stainless steel bolts, nuts and neoprene gasket shall be provided for field connection of each vertical pipe to the non-wetted field routed air supply piping at the top of the tank. 9.0 Lateral, Air Distribution Piping 9.1. Lateral air distribution piping shall be a minimum of schedule 40 PVC in accordance with the specifications for PVC pipe as listed in the section Polyvinyl Chloride (PVC) Pipe All PVC lateral pipe components shall be completely submerged during normal system operation. Any portions that would be exposed to atmosphere during normal operation must be a minimum of Schedule stainless steel Pipe Joints All pipe joints that are to be field connected shall be either flanged or threaded union type. No ball and socket, slip-on or compression fit joints will be accepted when joining PVC to PVC Flanged connections shall be in accordance with ANSI bolt diameter and hole spacing standards. Flange material shall be either stainless steel or PVC to match the associated pipe material. Bolts and nuts shall be a minimum of 304 stainless steel. Gasket material shall be neoprene or EPDM elastomer Threaded union connections shall be a minimum schedule 40 PVC with EPDM internal o-ring. Threaded connections will only be allowed for pipe diameters of 4 and less. 6 pipe diameter and greater shall be a flanged connection Pipe Clean-Outs Pipe clean-outs shall be provided at the end of each lateral distribution pipe For PVC pipes a transition coupling, socket x FIPT, with a threaded plug with square nut shall be provided. The diameter of the transition piece and plug shall be equal to the lateral pipe diameter. All fittings shall be a Print Date: 06/27/

5 minimum schedule 40 PVC For stainless steel lateral piping, a flange and blind flange plate shall be provided at the end of each lateral pipe. Stainless steel bolts, nuts and neoprene gasket shall be provided Expansion Joints Expansion joints shall be provided at the end of each vertical air supply piping at the transition point to the lateral distribution piping The joint shall be a stainless steel compression type with a minimum length of 6 and fully gasketed at 6 long by ½ thick neoprene or PGR and have a pressure capacity of 50 psi The expansion joint shall be capable rated for a minimum operating pressure of 50 psi and a maximum temperature of 250 F Diffuser Connection Assemblies Diffusers shall be connected to the lateral distribution piping or saddle assembly by an NPT threaded connection PVC distribution piping shall have a removable type saddle fitted with an FIPT thread. Saddle assemblies not providing a threaded connection for the diffusers will not be accepted The diffuser saddle assembly shall be constructed of PVC schedule 40, with an independent top section and bottom section which are to be connected together around the manifold piping by means of (4) 304SS bolts. The bottom section must be equipped with a stem extension which extends into the port hole on the manifold to prevent against rotation of the saddle on the manifold pipe. The stem extension must include a recessed ring and equipped with an EPDM elastomer ring gasket for sealing the outlet port. The saddle must be rated to 150 psi pressure capacity. Saddles with eccentric compression wedge closure mechanisms and fabricated of PVC Type II material will not be accepted (due to the effects of expansion and contraction by thermal differentials upon this grade of PVC) unless the Contractor provides one additional replacement saddle assembly for every individual saddle provided Airflow Monitoring Equipment The Aeration System manufacturer shall provide pressure differential assemblies consisting of 316 stainless steel pitot tubes, magnehelic gauge, pressure tubing, conversion chart, and Nema-4X enclosure with handrail mounting hardware as specified within the specifications section titled Airflow Indication Equipment. Print Date: 06/27/

6 15.0 Delivery, Storage, and Material Handling Individual diffuser units shall be packaged separately and wrapped in protective plastic or packaging paper separate from the piping equipment All flanges shall be protected by using plastic inserts or plank wood, pipe sections are to be fully supported to prevent pipe deflection or damage to fittings or connections All equipment shall be shipped on pallets capable of fully supporting the pipe sections across their entire length. Pallets should be accessible for fork lift transport or strap and hoist means without causing any load to the pipe equipment All stainless steel components shall be stored separately away from any carbon steel components or other materials which could stain or deface the stainless steel finish from run-off of oxidized ferrous materials All pipe equipment should be covered and stored in areas free from contact with construction site sediment erosion to prevent accumulation of materials within pipe threaded connections Diffuser membranes should be protected from contact with rigid objects during handling and storage. The contractor shall be responsible for replacing any diffuser membranes or elastomer components which are damaged after arrival on the site through installation and start-up of the system Submittals System Installation Drawings The aeration equipment manufacturer shall be responsible for providing engineering installation drawings of the complete aeration system supplied by the manufacturer. These drawings shall include plan view piping arrangement, sections and elevations as required, support bracket installation details, diffuser orientation details, and all dimensions required for locating the system within the specified dimensions of the tank Drawings shall be a minimum of 11 x 17 inches Six (6) sets of plans shall be provided to the Engineer for review and approval. Print Date: 06/27/

7 Two (2) sets of final fabrication and installation drawings shall be included with the shipment of aeration equipment Installation, Operation and Maintenance Manuals 17.0 Installation Within 30 days of final approval of the installation drawings, by the Engineer, the aeration manufacturer shall provide four (4) sets of the installation portion of the Installation, Operation and Maintenance (IOM) Manuals for the applicable aeration system. Within 30 days of final approval, by the Engineer, of the installed aeration system the aeration manufacturer shall provide six (6) copies of the complete Installation, Operation and Maintenance (IOM) Manual for final review and approval The manuals shall be in the following format and include the listed required information as a minimum: Enclosed in separate binders with project title and system designation shown on the front cover. Table of contents. Copy of Process calculations for aeration system (as developed by aeration manufacturer). Copy of complete set of installation plans. Parts and equipment list with specification numbers for ordering of replacement parts. Product specification sheets for diffusers, expansion joints, expansion anchors, flow metering equipment and any other specialized items supplied with the system. Installation guidelines for the aeration system and individual diffuser units. Operational procedures for the aeration system. Guidelines for repair of system components. Schedule for suggested periodic maintenance of the aeration system Installation of the aeration system shall be in accordance with the guidelines provided by the aeration manufacturer as specified in the installation section of the IOM manual. Refer to section on Submittals for quantities and delivery schedules of the documents Start-Up and Testing Procedures Start-up and testing procedures of the aeration system shall be in accordance with the guidelines provided by the aeration manufacturer as Print Date: 06/27/

8 19.0 Warranty Diffused Aeration Piping Equipment specified in the installation section of the IOM manual. Refer to section on Submittals for quantities and delivery schedules of the documents All piping, support brackets, saddle assemblies, joint connections, expansion joints, and anchors shall be warranted by the aeration manufacturer against failure under design conditions for a period on one (1) year from the date of final installation and field testing certification. End of Section Contact Valve and Equipment for Microsoft Word Versions of this document Valve & Equipment Consultants, Inc Yoakum St Huffman, TX Phone: Fax sales@valveandequipment.com Web Site: Print Date: 06/27/

Stainless Steel Aeration Equipment Specification

Stainless Steel Aeration Equipment Specification Section 15 Stainless Steel Aeration Equipment Specification Part 1 - General 1.01 Description A. Scope of Work 1. Furnish, install and test aeration system including air mains, drop pipes, valves, expansion

More information

SECTION 1137X FINE BUBBLE DIFFUSER SYSTEM PTFE MEMBRANE

SECTION 1137X FINE BUBBLE DIFFUSER SYSTEM PTFE MEMBRANE SECTION 1137X FINE BUBBLE DIFFUSER SYSTEM PTFE MEMBRANE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish and install, complete and ready to operate, a flexible membrane fine bubble

More information

SSI Tube 1000 Complete Aeration System Specification

SSI Tube 1000 Complete Aeration System Specification Stamford Scientific International, Inc. 4 Tucker Drive Poughkeepsie, N.Y. 12601 U.S.A. Tel: 845-454-8171 Fax: 845-454-8094 Email: info@stamfordscientific.com www.stamfordscientific.com 1.01 Scope: SSI

More information

Water & Industrial Products Catalog

Water & Industrial Products Catalog Water & Industrial Products Catalog www.smith-blair.com info@smith-blair.com Phone: 800..9705 or 870.77.527 After Hours Number: 90.277.998 Fax: 800.8.792 or 870.77.52 EMERGENCY PHONE 90.277.998 In the

More information

SECTION TAPPING SLEEVES AND VALVES

SECTION TAPPING SLEEVES AND VALVES SECTION 33 12 16.17 TAPPING SLEEVES AND VALVES PART 1: GENERAL 1.01 SCOPE Furnish, install and test all tapping sleeves, tapping valves, and tapping saddles as shown on the Drawings. 1.02 RELATED WORK

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING

SECTION HANGERS AND SUPPORTS FOR PLUMBING SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

DIVISION 15-MECHANICAL SECTION SUPPORTS AND ANCHORS PN PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Pipe and equipment support systems.

DIVISION 15-MECHANICAL SECTION SUPPORTS AND ANCHORS PN PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Pipe and equipment support systems. PART 1 - GENERAL 1.01 SECTION INCLUDES A. Pipe and equipment support systems. B. Inserts. 1.02 RELATED SECTIONS A. Section 15890 - Ductwork Supports. 1.03 DEFINITIONS A. Supports: Attachments, hangers,

More information

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 13686.00 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 230529-1 SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 1.1 SUMMARY A. Section Includes: 1. Metal pipe hangers and supports.

More information

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION SECTION 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 - GENERAL 1.1 SUMMARY A. This section supplements all sections in this division, including pipe, fittings, valves, and connections for sprinkler

More information

SECTION of GENERAL. A. Description

SECTION of GENERAL. A. Description SECTION 15210-1 of 10 15210.01 GENERAL A. Description This section includes requirements for interior piping and fittings, buried and interior valves and specialty items used in conjunction with piping

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes pipe and equipment supports, hangers, anchors, bases sleeves and the sealing of

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS PART 1 GENERAL 1.01 SUMMARY Section 15140 PIPE HANGERS, This Section includes the furnishing and subsequent installation of: A. Pipe and equipment hangers, supports, and associated anchors B. Equipment

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

East Central College HANSEN HALL LEVEL 300/400 RENOVATIONS CONSTRUCTION PACKAGE

East Central College HANSEN HALL LEVEL 300/400 RENOVATIONS CONSTRUCTION PACKAGE SECTION 220529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Stainless Steel Sluice Gates C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Stainless Steel Sluice Gates C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 11294 - Stainless Steel Sluice Gates C O N T E N T S PART 1 - GENERAL... 1 1.01 SUMMARY... 1 1.02 REFERENCES... 1 1.03 DEFINITIONS... 1 1.04 DESIGN REQUIREMENTS...

More information

1.02 RELATED SECTIONS: Water supply piping, water use piping, electrical, irrigation, foundations, site plans.

1.02 RELATED SECTIONS: Water supply piping, water use piping, electrical, irrigation, foundations, site plans. INC. ENGINEERING/CONSTRUCTION/MANUFACTURING /WWW.CONTAINWATER.COM SPRINGS, TEXAS. 78620 MODEL SPECIFICATION FOR CONTAIN WATER INC. 30 DEGREE ROOF CORRUGATED STEEL WATER STORAGE Part 1 GENERAL 1.01 SECTION

More information

1.02 RELATED SECTIONS: Water supply piping, water use piping, electrical, irrigation, foundations, site plans.

1.02 RELATED SECTIONS: Water supply piping, water use piping, electrical, irrigation, foundations, site plans. INC. ENGINEERING/CONSTRUCTION/MANUFACTURING /WWW.CONTAINWATER.COM SPRINGS, TEXAS. 78620 MODEL SPECIFICATION FOR CONTAIN WATER INC. DOME ROOF CORRUGATED STEEL WATER STORAGE TANKS. Part 1 GENERAL 1.01 SECTION

More information

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes pipe and equipment supports, hangers, anchors, bases sleeves and the sealing of work

More information

SECTION ALUMINUM GATES

SECTION ALUMINUM GATES P.O. Box 1058 370 South Athol Rd. Athol, Massachusetts 01331 Phone: (978) 249-7924 Fax: (978) 249-3072 SECTION ALUMINUM GATES PART 1 GENERAL 1.01 SCOPE OF WORK A. The CONTRACTOR shall furnish all labor,

More information

SECTION PLUMBING PIPING

SECTION PLUMBING PIPING SECTION 22 1000 PLUMBING PIPING PART 1 GENERAL 1.1 QUALITY ASSURANCE A. Perform Work in accordance with authority having jurisdiction standards. Utilize products as indicated in drawings and as allowed

More information

SECTION ALUMINUM HANDRAIL SYSTEMS

SECTION ALUMINUM HANDRAIL SYSTEMS SECTION 05520 ALUMINUM HANDRAIL SYSTEMS PART 1 - GENERAL 1.01 SUMMARY A. Section includes aluminum handrails and railings. B. Related Work: 1. Section 03300 - Cast-in-Place Concrete C. References: 1. American

More information

SECTION HANGERS AND SUPPORTS PART 1 - GENERAL. A. Drawings and Division 1 Specification Sections, apply to this Section.

SECTION HANGERS AND SUPPORTS PART 1 - GENERAL. A. Drawings and Division 1 Specification Sections, apply to this Section. 1.01 RELATED DOCUMENTS SECTION 15060 HANGERS AND SUPPORTS PART 1 - GENERAL A. Drawings and Division 1 Specification Sections, apply to this Section. 1.02 SUMMARY A. This Section includes hangers and supports

More information

Daytona Beach Pier Building Renovation Jun 2010

Daytona Beach Pier Building Renovation Jun 2010 SECTION 15060 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

. SECTION HANGERS AND SUPPORTS

. SECTION HANGERS AND SUPPORTS . SECTION 230529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division I Specification

More information

All definitions are defined according to ANSI/AWWA C

All definitions are defined according to ANSI/AWWA C SAN ANTONIO WATER SYSTEM SPECIFICATIONS FOR REDUCED-WALL, RESILIENT-SEATED GATE AND TAPPING VALVES FOR WATER SUPPLY SERVICE 4 IN. THROUGH 48 IN. ANSI/AWWA C515-01 July 2017 1. SCOPE This product specification

More information

SECTION 13. A. Extent of Work: The requirements of this section apply to the piping systems specified elsewhere in these specifications.

SECTION 13. A. Extent of Work: The requirements of this section apply to the piping systems specified elsewhere in these specifications. SECTION 13 PIPE, TUBE AND PART 1 - GENERAL 1.01 DESCRIPTION A. Extent of Work: The requirements of this section apply to the piping systems specified elsewhere in these specifications. 1.02 QUALITY ASSURANCE

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 22 0529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

SECTION ALTERNATING TREAD STEEL STAIRS

SECTION ALTERNATING TREAD STEEL STAIRS SECTION 05 51 33.23 - ALTERNATING TREAD STEEL STAIRS PART 1 - GENERAL 1.1 SCOPE OF WORK Fabricate and Install metal alternating tread stair assemblies in accordance with the requirements set forth in this

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density

More information

East Central College

East Central College SECTION 230529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 WORK INCLUDES A. Base Bid and Alternate Bids: 1. Contractor provide the following hangers and supports for HVAC system

More information

Fabricate and Install metal alternating tread stair assemblies in accordance with the requirements set forth in this section.

Fabricate and Install metal alternating tread stair assemblies in accordance with the requirements set forth in this section. SECTION - ALTERNATING TREAD STEEL STAIRS PART 1 - GENERAL 1.1 SCOPE OF WORK Fabricate and Install metal alternating tread stair assemblies in accordance with the requirements set forth in this section.

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Steel pipe hangers and supports. 2. Metal framing systems. 3. Thermal-hanger shield inserts. 4. Fastener systems.

More information

SUPPORT AND ANCHORS SECTION 15090

SUPPORT AND ANCHORS SECTION 15090 SUPPORT AND ANCHORS SECTION 15090 PART 1 GENERAL 1.1 DESCRIPTION OF WORK A. Work included in this Section: Materials, equipment, fabrication, installation and tests in conformity with applicable codes

More information

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

Copper-Type K soft Drawn 40, 50 HDPE 100 and larger

Copper-Type K soft Drawn 40, 50 HDPE 100 and larger 1.0 GENERAL 1.1 Scope 1.1.1 The work covered by this section involves the installation of water and sewer service connections and all other associated work. 1.2 Authorization 1.2.1 Do not install service

More information

SECTION FLAT WALK-ON TYPE ALGAE CONTROL/LAUNDER COVERS

SECTION FLAT WALK-ON TYPE ALGAE CONTROL/LAUNDER COVERS PART 1 GENERAL 1.01 THE REQUIREMENT SECTION 11301 FLAT WALK-ON TYPE ALGAE CONTROL/LAUNDER COVERS A. The contractor shall furnish and install complete Flat Walk-On Algae Control/Launder Covers as shown

More information

SECTION ALTERNATING TREAD STEEL STAIRS

SECTION ALTERNATING TREAD STEEL STAIRS SECTION 05 51 33.23 - ALTERNATING TREAD STEEL STAIRS PART 1 - GENERAL 1.1 SCOPE OF WORK Fabricate and install carbon steel or stainless steel alternating tread stair assemblies in accordance with the requirements

More information

Addendum #4 NEW LOW HEAD OXYGEN SYSTEM Contractor EXHIBIT T SPECIAL PROVISIONS SECTION METAL SHADE STRUCTURE

Addendum #4 NEW LOW HEAD OXYGEN SYSTEM Contractor EXHIBIT T SPECIAL PROVISIONS SECTION METAL SHADE STRUCTURE SECTION 13 34 00 METAL SHADE STRUCTURE PART 1 - GENERAL 1.01 STRUCTURE TYPE A. Structure shall be free standing rigid frame and gable roof with slopes as indicated. Structure shall also include foundation,

More information

SECTION SANITARY SEWERAGE PART 1 GENERAL 1.01 RELATED DOCUMENTS

SECTION SANITARY SEWERAGE PART 1 GENERAL 1.01 RELATED DOCUMENTS SECTION 02530 - SANITARY SEWERAGE PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

MATERIAL/MANUFACTURER SPECIFICATIONS FOR DISTRIBUTION WATER MAINS AND APPURTENANCES

MATERIAL/MANUFACTURER SPECIFICATIONS FOR DISTRIBUTION WATER MAINS AND APPURTENANCES MATERIAL/MANUFACTURER SPECIFICATIONS FOR DISTRIBUTION WATER MAINS AND APPURTENANCES REVISION April 2008 1 MATERIAL SPECIFICATIONS T.S. 1 GENERAL Materials incorporated in the finished work and used during

More information

Service Saddles/ Brass Alloy/ Stainless Steel Straps for Cast, Ductile & PVC Pipe

Service Saddles/ Brass Alloy/ Stainless Steel Straps for Cast, Ductile & PVC Pipe F 1 F 1.1 F 1.2 F 2 F 2.1 F 3 Service Saddles/ Hinged Type for 2 PVC Service Saddles/ Brass Alloy/ Stainless Steel Straps for Cast, Ductile & PVC Pipe Service Saddles/ Ductile Iron/ Stainless Steel Straps

More information

City of Winnipeg BASES, HANGERS AND SUPPORTS Section NEWPCC - Pump Well Isolation Page 1 of 6 Tender No June 2003

City of Winnipeg BASES, HANGERS AND SUPPORTS Section NEWPCC - Pump Well Isolation Page 1 of 6 Tender No June 2003 NEWPCC - Pump Well Isolation Page 1 of 6 PART 1 General 1.1 RELATED SECTIONS.1 Section 01001 General Requirements..2 Section 03300 - Cast-in-Place Concrete..3 Section 05121 - Structural Steel for Buildings..4

More information

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems.

This section includes materials and installation of ductile-iron pipe and fittings for potable and recycled water systems. NORTH MARIN WATER DISTRICT STANDARD SPECIFICATIONS SECTION 15056 DUCTILE-IRON PIPE AND FITTINGS PART 1 GENERAL 1.01 DESCRIPTION This section includes materials and installation of ductile-iron pipe and

More information

1. Hangers and supports for electrical equipment and systems.

1. Hangers and supports for electrical equipment and systems. PART 1 - GENERAL... 1 1.1 RELATED DOCUMENTS... 1 1.2 SUMMARY... 1 1.3 DEFINITIONS... 1 1.4 PERFORMANCE REQUIREMENTS... 1 1.5 SUBMITTALS... 2 1.6 QUALITY ASSURANCE... 2 1.7 COORDINATION... 2 PART 2 - PRODUCTS...

More information

PLASTIC FITTINGS Avenue Edmonton, AB Canada T6E 5Z7. Toll Free: Phone: (780) Fax: (780)

PLASTIC FITTINGS Avenue Edmonton, AB Canada T6E 5Z7. Toll Free: Phone: (780) Fax: (780) 9333 45 Avenue Edmonton, AB Toll Free: 1-800-272-9693 Phone: (780) 436-1930 Fax: (780) 435-4849 info@can-con.com TABLE OF CONTENTS PLASTIC FITTINGS POLYETHYLENE PIPE...- 1 - SERVICE RISERS... - 3 - TRANSITION

More information

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION 230529 - HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and other Division 1 Specification Sections,

More information

SECTION TURBINE VENTILATORS

SECTION TURBINE VENTILATORS SECTION 07 72 00 TURBINE VENTILATORS **This is a CSI Three-Part Specification using CSI MasterFormat 2004-2010 Section Numbers and Titles. This specification must be edited to suit your particular project.

More information

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING

More information

SECTION (15150) - SANITARY WASTE AND VENT PIPING

SECTION (15150) - SANITARY WASTE AND VENT PIPING SECTION 22 13 16 (15150) - SANITARY WASTE AND VENT PIPING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Pipe Materials. 2. Fittings. 3. Joining Materials. B. Related Sections: 1.02 REFERENCES 1.

More information

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1 SECTION SUPPORTING DEVICES

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1 SECTION SUPPORTING DEVICES KNOXVILLE, TENNESSEE SECTION 26 05 29 PAGE 1 PART 1 - GENERAL: 1.01 DESCRIPTION OF WORK: SECTION 26 05 29 A. Extent of supports, anchors, sleeves and seals is indicated by drawings and schedules and/or

More information

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications Mar/2008 v1.0 SECTION 02255 HYDRAULICLY DRIVEN STEEL UNDERPINNING PILES PART 1 GENERAL 1.01 SCOPE OF WORK The work shall

More information

SECTION SLUICE GATES

SECTION SLUICE GATES SECTION 11100 SLUICE GATES PART 1--GENERAL Fill in the blank with a short description of sluice gate usage, i.e., for isolation of wastewater, or for tank drainage, or for control of water surface. 1.01

More information

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY Section Includes: 1. Pipe and fittings. 2. Drain Basin. 3. De-chlorination tablet feeder. 4. Non-pressure transition couplings.

More information

SECTION ORNAMENTAL ALUMINUM RAILING

SECTION ORNAMENTAL ALUMINUM RAILING SECTION 05730 ORNAMENTAL ALUMINUM RAILING PART 1 GENERAL 1.1 SECTION INCLUDES A. Aluminum Pipe Railing 1.2 RELATED SECTIONS A. Section 03300 Cast-In-Place Concrete: Placement of sleeves cast in concrete.

More information

REGIONAL CONSTRUCTION STANDARDS

REGIONAL CONSTRUCTION STANDARDS REGIONAL CONSTRUCTION STANDARDS SIXTH EDITION Publication Update 6.1 (Full Committee Approved Proposed Revision 6.1 Ductile Iron Pipe Protections - Section 200 As Publication Update 6.1) March 27, 2018

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The General Conditions, Special Conditions and Division 1 through Division 22 as set forth in

More information

SECTION ALUMINUM STORM WINDOWS

SECTION ALUMINUM STORM WINDOWS PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 08 51 69.11 ALUMINUM STORM WINDOWS SPEC WRITER NOTES: 1. Delete between // // if not applicable to project. 2. Also delete any other item or paragraph not applicable

More information

SECTION VERTICAL MEZZANINE GATE U.S. Patent No:

SECTION VERTICAL MEZZANINE GATE U.S. Patent No: Page 1 of 6 Part 1. GENERAL SECTION 05522 VERTICAL MEZZANINE GATE U.S. Patent No: 5806245 1.1 SECTION INCLUDES A. Specialty custom designed, manual, fully electric, electric/pneumatic or fully pneumatic

More information

SECTION WALL AND DOOR PROTECTION

SECTION WALL AND DOOR PROTECTION PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 10 26 00 WALL AND DOOR PROTECTION SPEC WRITER NOTE: Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable to

More information

Effective Date: Revision #: 1. Section K: Miscellaneous. Casing Insulators/ Stainless Steel. Polyethylene Encasement.

Effective Date: Revision #: 1. Section K: Miscellaneous. Casing Insulators/ Stainless Steel. Polyethylene Encasement. K 1 K 2 K 3 K 4 K 5 K 6 K 7 K 8 K 9 Casing Insulators/ Stainless Steel Polyethylene Encasement Manhole Inserts Pipe Saddle Support/ Valve Vaults/ Adjustable Cylindrical Wall Seals & Line Sleeves Metal

More information

SECTION STEAM AND CONDENSATE HEATING PIPING

SECTION STEAM AND CONDENSATE HEATING PIPING PART 1 GENERAL 1.01 SECTION INCLUDES A. Pipe and pipe fittings. B. Pipe hangers and supports. C. Valves. D. Steam piping system. E. Steam condensate piping system. 1.02 RELATED REQUIREMENTS A. Section

More information

DOUBLE CONTAINMENT DESIGN & INSTALLATION GUIDE

DOUBLE CONTAINMENT DESIGN & INSTALLATION GUIDE DC-3-0604 Spears Double Containment Systems are engineered for ease of installation and lower associated installation costs. Complete systems include all necessary components - carrier pipe, containment

More information

Preassembled steel stairs with concrete-filled treads.

Preassembled steel stairs with concrete-filled treads. SECTION 055113 - PART 1 - GENERAL 1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending

More information

SECTION STORM DRAINAGE. A. This Section includes gravity-flow, nonpressure storm drainage (REMOVED), with the following components:

SECTION STORM DRAINAGE. A. This Section includes gravity-flow, nonpressure storm drainage (REMOVED), with the following components: SECTION 02630 STORM DRAINAGE PART - GENERAL. SUMMARY A. This Section includes gravity-flow, nonpressure storm drainage (REMOVED), with the following components:. Cleanouts. 2. Precast concrete manholes.

More information

SECTION MISCELLANEOUS METALS

SECTION MISCELLANEOUS METALS PART 1 GENERAL 1.1 WORK OF THIS SECTION A. Contractor shall provide all labor, materials, equipment and incidentals as shown, specified and required to furnish and install all miscellaneous metal fabrications

More information

Style 206 Product Specification

Style 206 Product Specification Style 206 Product Specification 1.0 Application The Style 206 is used in rigid piping systems to compensate for axial, lateral, torsional and angular movement and misalignment due to thermal expansion

More information

SPECIFICATIONS FOR THE INSTALLATION OF REDUCED PRESSURE BACKFLOW PREVENTERS AND CONCRETE VAULTS FOR METERS 4 AND LARGER

SPECIFICATIONS FOR THE INSTALLATION OF REDUCED PRESSURE BACKFLOW PREVENTERS AND CONCRETE VAULTS FOR METERS 4 AND LARGER SPECIFICATIONS FOR THE INSTALLATION OF REDUCED PRESSURE BACKFLOW PREVENTERS AND CONCRETE VAULTS FOR METERS 4 AND LARGER Updated January 2018 RP-2 Installation Specifications 1. In W.H.U.D s service area

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 848 SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 848 SANITARY SEWERS ITEM NO. 848 SANITARY SEWERS 848.1 DESCRIPTION: This item shall govern the furnishing, installation and jointing of sanitary sewer pipe of the size and type specified by the project's plans and specifications.

More information

SECTION RACEWAYS

SECTION RACEWAYS SECTION 16110 RACEWAYS PART 1 GENERAL 1.1 SYSTEM DESCRIPTION A. Provide a complete raceway system suitable for receiving wire and cable and continuous from outlet to outlet. System shall be complete with

More information

B. Fiberglass for construction in back lot easements placed on cast-in-place base.

B. Fiberglass for construction in back lot easements placed on cast-in-place base. Section 02083 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Fiberglass manholes for unpaved areas placed on top of a precast base to form a manhole. B. Fiberglass for construction in back lot easements

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 PRECAST CONCRETE PIPE 10.1.1 General This section covers material requirements,

More information

DARTMOUTH COLLEGE DESIGN September 15, 2004 &CONSTRUCTION GUIDELINES

DARTMOUTH COLLEGE DESIGN September 15, 2004 &CONSTRUCTION GUIDELINES PART 1 DESIGN DIRECTIVE 1.1 RELATED DOCUMENTS SECTION 15240 SEISMIC RESTRAINT AND VIBRATION CONTROL A. This section shall be considered as a part of each DC Standards, Part 15. 1.2 QUALITY ASSURANCE A.

More information

SECTION INDUSTRIAL ACCESS / INSPECTION HATCH. A. Industrial Access / Inspection Hatch: Model AH-710

SECTION INDUSTRIAL ACCESS / INSPECTION HATCH. A. Industrial Access / Inspection Hatch: Model AH-710 Page 1 of 6 PART 1 - GENERAL SECTION 08370 INDUSTRIAL ACCESS / INSPECTION HATCH 1.1 SECTION INCLUDES A. Industrial Access / Inspection Hatch: Model AH-710 1.2 RELATED SECTIONS A. Section 04810 - Unit Masonry

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING SECTION 221316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following soil and waste, sanitary drainage and vent piping inside the building: 1. Pipe, tube,

More information

SECTION CHAIN LINK FENCES AND GATES (PARK)

SECTION CHAIN LINK FENCES AND GATES (PARK) SECTION 02821 CHAIN LINK FENCES AND GATES (PARK) PART I GENERAL 1.1 SECTION INCLUDES A. Installation of chain link fences, and gate units provided by single source including erection accessories, fittings,

More information

SEWER FORCE MAIN HDPE PIPE

SEWER FORCE MAIN HDPE PIPE SECTION 15150 SEWER FORCE MAIN HDPE PIPE PART 1: GENERAL 1-1 DESCRIPTION: This specification governs the material, pipe, fittings, joining methods and general construction practice for High Density Polyethylene

More information

UNIVERSITY OF MISSOURI Hydronic Energy Distribution 2016 Q1

UNIVERSITY OF MISSOURI Hydronic Energy Distribution 2016 Q1 GENERAL: The scope of this document is to provide instruction for the installation and testing of chilled water piping installed for the University of Missouri. DESIGN GUIDELINES: 1. Materials 1.1. Pipe

More information

A. ASTM F Standard Specification for Pressure-rated Polypropylene (PP) Piping Systems.

A. ASTM F Standard Specification for Pressure-rated Polypropylene (PP) Piping Systems. SECTION 221114 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the water distribution piping system, including potable cold, hot and hot water piping including associated fittings, and specialities

More information

100% Speed One Pump Operating Range 90% Speed 65.6% Efficiency 76.6% Efficiency

100% Speed One Pump Operating Range 90% Speed 65.6% Efficiency 76.6% Efficiency 350 300 100% Speed One Pump Operating Range 90% Speed 250 65.6% Efficiency 76.6% Efficiency Total Head (ft) 200 150 80% Speed 70% Speed 60% Speed 83.6% Efficiency 80 PSI Pressure 85.9% Efficiency 83.6%

More information

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. SECTION 33 05 13 MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. B. Related Sections: 1. Section 03 20 00 - Concrete

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB #

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # SECTION 26 0529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS SECTION 02670 UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of containment

More information

SECTION HYDRONIC PIPING

SECTION HYDRONIC PIPING PART 1 GENERAL 1.1 REFERENCES SECTION 23 21 13 HYDRONIC PIPING A. ANSI/ASME SEC 9: Welding and Brazing Qualifications B. ANSI/ASME B16.3: Malleable Iron Threaded Fittings Class 150 and 300 C. ANSI/ASME

More information

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces.

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces. SECTION 05500- METAL FABRICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

All definitions are defined according to ANSI/AWWA C b. Flanged Joint: The flanged and bolted joint as described in ANSI/AWWA C110/A21.10.

All definitions are defined according to ANSI/AWWA C b. Flanged Joint: The flanged and bolted joint as described in ANSI/AWWA C110/A21.10. 21-02 SAN ANTONIO WATER SYSTEM SPECIFICATIONS FOR RESILIENT-SEATED GATE AND TAPPING VALVES FOR WATER SUPPLY SERVICE ANSI/AWWA C509-01 3 IN., 4 IN., 6 IN., 8 IN., 10 IN., 12 IN., 16 IN., & 20 IN. Revised

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

SECTION DECORATIVE METAL RAILINGS

SECTION DECORATIVE METAL RAILINGS SECTION 05 73 00 DECORATIVE METAL RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Vertical Stainless Steel Cable Railing System. B. Horizontal Stainless Steel Cable Railing System. 1.2 RELATED SECTIONS

More information

DIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS

DIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS PART 1 - GENERAL 01.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work of this Section.

More information

Changes for the. TOHOPEKALIGA WATER AUTHORITY Standards, Specifications and Details

Changes for the. TOHOPEKALIGA WATER AUTHORITY Standards, Specifications and Details Changes for the 2017 TOHOPEKALIGA WATER AUTHORITY Standards, Specifications and Details The following changes are made to the existing standards and details to clarify or improve existing information.

More information

Design and Construction Standards SECTION HYDRONIC PIPING

Design and Construction Standards SECTION HYDRONIC PIPING SECTION 15510 HYDRONIC PIPING PART 1 GENERAL 1.1 REFERENCES A. ANSI/ASME SEC 9: Welding and Brazing Qualifications. B. ANSI/ASME B16.3: Malleable Iron Threaded Fittings Class 150 and 300. C. ANSI/ASME

More information

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. SECTION 260529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. 1.2

More information

TM Series Induced Draft Cooling Tower Specifications

TM Series Induced Draft Cooling Tower Specifications Delta Cooling Towers, Inc. 41 Pine Street P.O. Box 315 Rockaway, New Jersey 07866-0315 Telephone 973.586.2201 Fax 973.586.2243 www.deltacooling.com sales@deltacooling.com TM Series Induced Draft Cooling

More information

Double Containment DESIGN & INSTALLATION GUIDE TECHNICAL INFORMATION. Visit our web site

Double Containment DESIGN & INSTALLATION GUIDE TECHNICAL INFORMATION. Visit our web site Double DESIGN & INSTALLATION GUIDE TECHNICAL INFORMATION Visit our web site www.spearsmfg.com 1326 The information contained in this publication is based on current information and Product design at the

More information

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections. SANITARY SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Sanitary Sewer Gravity Mains B. Sanitary Sewer Force Mains C. Sanitary Sewer Services 1.02 DESCRIPTION OF WORK A. Construct sanitary sewer gravity

More information

PREMIER Low Profile Induced Draft Cooling Tower Specifications

PREMIER Low Profile Induced Draft Cooling Tower Specifications Fa Delta Cooling Towers, Inc. 185 US Highway 206 Roxbury Township, NJ 07836 973.586.2201 973.586.2243 fax www.deltacooling.com sales@deltacooling.com PREMIER Low Profile Induced Draft Cooling Tower Specifications

More information

CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS

CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS PART 1 - GENERAL 1.01 SUMMARY A. Section Includes furnishing and installing chain-link fabric fence, gate, and appurtenances. 1.02

More information

SANITARY WASTE AND VENT PIPING

SANITARY WASTE AND VENT PIPING SECTION 15420 - SANITARY WASTE AND VENT PIPING PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION BASIC FIRE SUPPRESSION MATERIALS AND METHODS. A. Section includes pipe, fittings, valves, and connections for sprinkler systems.

SECTION BASIC FIRE SUPPRESSION MATERIALS AND METHODS. A. Section includes pipe, fittings, valves, and connections for sprinkler systems. SECTION 210500 - BASIC FIRE SUPPRESSION MATERIALS AND METHODS PART 1 GENERAL 1.1 SUMMARY A. Section includes pipe, fittings, valves, and connections for sprinkler systems. B. Related Sections: 1. Section

More information