1 SECTION ROOF INSULATION PART 1 - GENERAL 1.01 DESCRIPTION A. Work included: The Roofing Contractor will provide all polyisocyanurate insulation and high density wood fiber roof insulation (tapered edge strip) required for this work RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Special Conditions and Technical Specification Sections, apply to this Section SUBMITTALS A. Product Samples: Provide a roof insulation sample - size 6" x 6" PRODUCT DELIVERY A. All products delivered to the site shall be in the original unopened containers or wrappings. B. Handle all materials to prevent damage. Store materials elevated off the ground and fully protected from moisture. Material shall be covered with opaque tarps, secured to prevent displacement by wind forces. C. Store temperature susceptible materials in a dry and heated area between 60 degrees F and 80 degrees F. If exposed to lower temperatures, restore to proper temperature prior to use. If required, provide certification from the manufacturer indicating that freezing temperatures will not adversely affect the materials use and performance. D. Materials determined by the Owner s Representative to be damaged or to have been subjected to adverse conditions shall be removed and replaced at the Contractor s expense. E. Average live loads on the roof during the work shall not exceed twenty (20) pounds per square foot at any time JOB CONDITIONS A. All methods employed in performing the work, and all equipment, tools, and machinery used for handling materials and executing any part of the work, shall be subject to the approval of the Owner s Representative before the work is started, and whenever found unsatisfactory, shall be changed and improved as required. B. Insulation shall not be applied during precipitation or started in the event there is a probability of precipitation during the application. C. Do not expose roof insulation to open flame or excessive heat. The material may smolder if ignited. If this occurs, extinguish completely, remove from the project site, and replace with new material PROTECTION A. Protect insulation against concentrated loads, and standing loads exerting a force in excess of 50% of the materials compressive strength. ROOF INSULATION SECTION
2 B. Any traffic shall be limited to the workmen installing the material. The contractor shall plan installation progress to prevent or minimize traffic across completed or partially completed sections. Where traffic across completed or partially completed sections is necessary, Contractor shall provide protection adequate in nature and duration, consistent with requirements of the material manufacturer QUALITY CONTROL A. References: Some products and execution are specified in this section by reference to published specifications or standards of the following: The American Society for Testing & Material (ASTM) Federal Specification (FS) Factory Mutual Research (FM) B. Qualifications: Contractor must be trained by the manufacturer in application of insulation system specified, and must be approved for this work by manufacturer. PART 2 - PRODUCTS 2.01 INSULATION MATERIALS A. General: All insulation material shall be the product of the roof membrane manufacturer or a product approved by the roof membrane manufacturer. B. Where existing roofing system is to be replaced as shown on the drawings, provide insulation as specified. 1. Roof Areas A, B, E & F: a. First layer: 2 polyisocyanurate roof insulation as specified below. b. Second layer: 2 polyisocyanurate roof insulation as specified below. c. Third Layer: 1.5 polyisocyanurate roof insulation as specified below. 2. Roof Areas C & D: a. First layer: 3 polyisocyanurate roof insulation as specified below. b. Second layer: 1.5 polyisocyanurate roof insulation as specified below. 3. Roof Area G: a. First layer: 2 polyisocyanurate roof insulation as specified below. b. Second layer: 0.5 high density polyisocyanurate roof insulation as specified below. 4. Roof Areas H and I: a. First layer: 3 polyisocyanurate roof insulation as specified below. b. Second layer: Tapered polyisocyanurate insulation as specified below, manufactured by an authorized tapered systems fabricator and approved by the membrane system manufacturer. i. Tapered slope shall be as designated in the drawings. ii. Minimum thickness for the tapered insulation boards shall be 1-1/2 Inch. iii. Tapered cricket slope shall be twice the slope of the finished roof surface. 5. Tapered edge strip shall be 18" as manufactured from an authorized tapered systems fabricator. Cut tapered edge as required to match insulation and blocking thicknesses. C. Polyisocyanurate Insulation: Membrane manufacturers approved closed cell polyisocyanurate foam core insulation skinned on both sides with factory applied fiberglass facers suitable for ROOF INSULATION SECTION
3 installation with cold adhesive and mechanical attachment. 1. ASTM C , Type II, Class 1, Grade 3 (25 psi). 2. UL Classified and Factory Mutual Approved. 3. Minimum LTTR: 6.0 per inch thickness. D. Condition of Acceptability: By the Owner for the above subject to the following manufacturer's data: 1. Warpage potential. 2. Compatibility to proposed system, Fully Adhered Single Ply Roof System. 3. Fire rating of insulation in relation to substrate conditions. 4. Factory mutual approval 2.02 INSULATION SECUREMENT A. All insulation Securement shall provide a wind uplift rating which meets current code requirements. Provide perimeter and corner enhancements as recommended by the roof system manufacturer. B. Mechanical Fasteners: 2.03 METAL DECKING 1. Mechanical fasteners and plates as recommended and approved by the insulation and primary roofing materials manufacturer to meet the required pull strengths and wind loading. 2. Factory Mutual approved, hardened, self-tapping, Phillips pan head screws with 3 inch round, square or hexagonal steel stress plates. 3. Minimum penetration 3/4 inch, maximum penetration 1-1/2, minimum pull out resistance from deck 400 pounds unless specified otherwise by the membrane manufacturer. A. Galvanized corrugated steel deck, 22 gauge (minimum), of the same configuration and profile to match the existing. B. All new metal deck materials for replacement and overlay shall be compliant with FM Global requirements for the project and the tested FM assembly OTHER MATERIALS A. All other materials not specifically described but required for a complete and proper installation of the work of this Section, shall be as selected by the Contractor subject to the approval of the Owner's Representative. PART 3 - EXECUTION 3.01 CONDITION OF DECK C. Prior to installing insulation on the deck areas, the existing deck must be inspected and all deficiencies corrected. D. The roofing contractor shall perform all other work of preparing the existing deck. When insulation is applied, the existing deck shall be dry and free of dew, frost, ice, and snow. E. The roofing contractor shall notify the Consultant of any unacceptable conditions or improper installations METAL DECK PREPARATION AND CORRECTION ROOF INSULATION SECTION
4 A. After removal of the existing wet or damaged roof system and equipment, examine the metal roof deck surface for condition and suitability to receive the new roof assembly. B. If the existing metal deck has been structurally impaired due to deterioration or is open due to the removal of obsolete equipment; the following steps shall be taken: 1. Examine the underside of the metal deck for any conduit located directly below the deck surface, anything suspended or fastened to the deck, etc. If necessary, detach all objects from the bottom side of the deck to be removed. 2. Remove the structurally impaired metal deck using a Sawzall to prevent sparks. Care must be taken to prevent metal deck sections from falling into the building. 3. Fasten new 22 gauge (minimum) galvanized corrugated metal deck of the same configuration and profile to the existing steel bar joists. New metal deck should span over a minimum of three steel bar joists (structural supports) and will lap over the outside supporting steel bar joists a minimum of 6". In the field and perimeter zones, fasten every deck flute at each steel bar joists using one (1) - TEK/ x 1 1/4" hex head washer screws. Fasten metal deck side laps with a minimum of four (4) - TEK/ x 3/4" hex head washer screws (maximum every 36" o.c.) between supporting bar joists. In the roof corners, fasten every deck flute at each steel bar joists using two (2) - TEK/ x 1 1/4" hex head washer screws. Perimeter is defined as a 10'-0" strip around the entire roof perimeter. Corners are defined as the common areas shared by two or more intersecting roof perimeter areas (10'-0" x 10'-0"). Welding of the replacement metal deck will not be allowed. E. Deck Cleaning and Painting: At areas of moderate corrosion development, the existing metal decking may require wire brushing, cleaning and painting. Wire brush, properly clean and paint areas of corroded roof decking with Sherwin Williams B66W1 DTM. F. Deck Overlay: At isolated areas, after proper cleaning and painting as described above, additional deck overlay may be required. At areas determined during the course of the project to need overlay deck installation, install minimum 20 gauge galvanized sheet metal mechanically fastened to the existing metal deck. Note: The Owner s on site representative and the contractor's on site project superintendent shall make the determination of areas of deck replacement, deck cleaning and painting and deck overlay installation. The Owner s on site representative shall keep a daily log and running total of the above items with daily signatures being obtained from the contractors on site project superintendent. G. Contractor shall document deck remediation both before and after corrections. Documentation of remediated areas shall be provided to the Owner prior to payment. The Contractor shall not be paid for deck remediation if proper documentation cannot be provided. H. Verify that the metal deck is now suitable to receive the specified roof insulation and membrane system INSTALLATION OF INSULATION: A. Installation of insulation over metal roof deck. 1. Mechanically attach all layers of new flat stock insulation and/or new tapered insulation into the existing deck. 2. Fastener frequency: One every two (2) square feet or in strict accordance with the selected manufacturer s requirements to provide a wind uplift rating which meets current code requirements. Provide perimeter and corner enhancements as recommended by the roof system manufacturer. ROOF INSULATION SECTION
5 3. Install additional fasteners as required to ensure insulation is firm under foot. 4. Drive mechanical fasteners flush to top surface. 5. Install tapered insulation around drains creating a 4'x4' drain sump. B. Other insulation installation requirements: 3.04 VERIFICATION 1. Stagger joints within layers at least 6 inches. 2. Install insulation boards in courses parallel to roof edges. 3. Firmly butt each insulation board to surrounding boards. Do not jam or deform boards. 4. Maximum insulation gap: 1/8 inch. Fill insulation board joint gaps larger than 1/4 inch with roof insulation. 5. Maximum elevation variation between boards at joints: 1/8 inch. 6. Cut and fit insulation boards where roof deck intersects vertical surfaces. Cut board 1/4 inch from vertical surface. 7. Filler size: 18 inches in length or width, minimum. All filler insulation shall be adhered in insulation adhesive. 8. Lay insulation in 48 inch wide courses. A. Upon completion of the installation in each area, visually inspect and verify that all insulation is complete and properly installed. END OF SECTION ROOF INSULATION SECTION
2007 FLORIDA BUILDING CODE TEST PROTOCOLS HVHZ (RAS)
ROOFING APPLICATION STANDARD (RAS) No. 117 STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES 1.. 3. Scope
More informationRECOMMENDED DESIGN SPECIFICATION
RECOMMENDED DESIGN SPECIFICATION SILICONE COATED SPF ROOFING 1 General 1.1 Section Includes A. Silicone coated SPF roofing system, including substrate board, roof insulation boards, foam insulation materials,
More informationThe Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.
SECTION 05 31 23 - STEEL ROOF DECKING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 - Specification
More informationA. National Roofing Contractors Association (NRCA) Roofing and Waterproofing Manual
SECTION 07 22 16 - ROOF AND DECK INSULATION Specifier Note: There are numerous types of roof insulation, some which are installed in multiple-layer roof assemblies. Specifier to verify Project requirements
More informationSECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 075423 - THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including Division 00 Bidding Requirements and other Division
More informationSECTION STEEL DECKING
SECTION 05 31 00 STEEL DECKING SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Refer to Section 05 36 00, COMPOSITE METAL DECKING for floor
More informationRecommended Fastening Patterns for Rmax Insulation in Low Slope Roofing Applications
Recommended Fastening Patterns for Rmax Insulation in Low Slope Roofing Applications INTRODUCTION Rmax recommends that any insulation which is laid over a steel or wood roof deck be attached with mechanical
More informationBridgeton Research Center Roof Replacement and Related Work December 4, 2000 DSR # C/D
SECTION 07220 ROOF INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Special Conditions and Division 1 Specification Sections,
More informationROOFING EPDM ELASTOMERIC SHEET ROOFING FULLY ADHERED- CONVENTIONAL
ROOFING EPDM ELASTOMERIC SHEET ROOFING FULLY ADHERED- CONVENTIONAL PART 1 GENERAL 1.1 SECTION INCLUDES A. Insulation, membrane roofing, base flashings roofing membrane accessories joints, and counter flashings.
More informationSECTION 07530CP EPDM MEMBRANE ROOFING
PART 1 GENERAL 1.1 SUMMARY SECTION 07530CP EPDM MEMBRANE ROOFING A. Section includes: 1. Adhered membrane roofing and flashing 2. Mechanically fastened roof insulation 3. Walkway pads 1.2 ARCHITECTURAL
More informationThe Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.
SECTION 05 31 33 - STEEL FORM DECKING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 - Specification
More informationThe Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.
SECTION 05 31 33 - STEEL FORM DECKING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 - Specification
More informationC. Applicable building codes should always be checked prior to proposing the application to Mule-Hide or the building owner.
1.0 Insulation Guidelines A. The following is a list of generic insulations acceptable for use with Mule-Hide Single Ply Roofing Systems. Requests to use other types of insulation boards are to be made
More informationSECTION THERMOPLASTIC MEMBRANE ROOFING PART 1 GENERAL 1.01 SECTION INCLUDES
SECTION 07540 - THERMOPLASTIC MEMBRANE ROOFING PART 1 GENERAL 1.01 SECTION INCLUDES A. Mechanically attached system with thermoplastic roofing membrane. B. Insulation, flat and tapered. C. Flashings. D.
More informationSECTION THERMOPLASTIC MEMBRANE ROOFING. C. Flashings. D. Roofing cant strips, stack boots, roofing expansion joints, and walkway pads.
McClellan Blakemore Architects New Warehouse Facility for SECTION 07540 THERMOPLASTIC MEMBRANE ROOFING PART 1 GENERAL 1.01 SECTION INCLUDES A. Adhered system with thermoplastic roofing membrane. B. Insulation,
More informationRe-Cover Board-3. Insulation for Above the Deck ROOF WALL SPECIALTY
Insulation for Above the Deck WALL SPECIALTY PRODUCT DESCRIPTION Rmax Re-Cover Board-3 is an energy-efficient thermal insulation board composed of a closed-cell polyisocyanurate (polyiso) foam core bonded
More informationOREGON CONVENTION CENTER CHILLER PLANT RE-DESIGN CD SET
SECTION 07 54 19 - POLYVINYL-CHLORIDE (PVC) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division
More informationSECTION 1 - ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING
Project Name: Jefferson City Jaycees Fairgrounds Main Building Roof Replacement Project Site Address: 1445 Fairgrounds Road, Jefferson City, MO 65109 Project Contact: Randy Weaver Project Contact phone
More informationSECTION CEMENTITIOUS WOOD FIBER DECKS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 03 51 13 CEMENTITIOUS WOOD FIBER DECKS SPEC WRITE NOTES: 1. Delete between // // if not applicable to project. 2. Also delete any other item or paragraph not applicable
More informationDL-200. Specifications
DL-200 Specifications Everlast Metals 10 Enterprise Court Lebanon, PA 17042 Phone: (717) 270-6554 Fax: (717) 270-6569 www.everlastmetals.com 7410 Structural Preformed Metal Roofing PART 1: GENERAL 1.01
More informationPASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017
SECTION 053100 STEEL DECKING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationSECTION ADHERED SINGLE PLY MEMBRANE ROOFING
SECTION 07535 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Adhered EPDM elastic sheet single ply membrane roofing. B. Related Sections: 1. Section 06100 - Carpentry: Wood deck and curbs. 2. Section
More informationTuscaloosa Police Station
Tuscaloosa Police Station 3801 Trevor S Phillips Ave Tuscaloosa, AL 35401 Core Cut: Spray Foam Roof- ½ thick +- Single Ply Membrane Tapered EPS Insulation 2-6 Metal Deck PART 1 GENERAL 1.1 SCOPE OF WORK
More informationSSL-175. Specifications
SSL-175 Specifications Everlast Metals 10 Enterprise Court Lebanon, PA 17042 Phone: (717) 270-6554 Fax: (717) 270-6569 www.everlastmetals.com 7410 Preformed Metal Roofing PART 1: GENERAL 1.01 SECTION INCLUDES
More informationSECTION (05300) - STEEL DECKING
SECTION 05 31 00 (05300) - STEEL DECKING PART 1 GENERAL 1.01 SUMMARY A. Section includes: 1. Roof Deck 2. Composite Floor Deck 3. Noncomposite Form Deck B. Related Sections: 1.02 SUBMITTALS 1. Section
More informationMechanical Attachment of Separation Panels Hot Asphalt Attachment of Separation Panels
Table of Contents Title Number General.01.1 Types and Mandatory Compliances.02.1 Installation.03.1 Attachment.04.1 Mechanical Attachment of.04.1.1 Hot Asphalt Attachment of.04.1.2 Cold Adhesive Attachment
More informationA. Thermal Conductivity: Thicknesses indicated are for thermal conductivity (k-value at 75 degrees F) specified for each material.
SECTION 07 20 00 - PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply
More informationFirestone Polyiso Boards
Firestone Polyiso Boards Superior energy efficiency. Superior protection. Firestone Polyiso Boards POLISOBROUK10.indd 1 1/04/10 14:26 Firestone Polyiso Boards Firestone total roofing systems Since Firestone
More informationSILICONE ROOF COATING RESTORATION (RCR) SYSTEM OVER METAL ROOF PANEL
SILICONE ROOF COATING RESTORATION (RCR) SYSTEM OVER METAL ROOF PANEL Part 1. 1.1 Description General Conditions A. Scope of Work Provide all materials, labor and equipment required for the installation
More informationSECTION ELASTOMERIC MEMBRANE ROOFING
SECTION 07 5300 - PART 1 GENERAL 1.01 SECTION INCLUDES A. Elastomeric roofing membrane, mechanically fastened conventional application. B. Insulation, flat and tapered. C. Flashings. D. Roofing cant strips,
More informationSECTION LIGHTWEIGHT INSULATING CONCRETE
SECTION 03342 LIGHTWEIGHT INSULATING CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03300 - Cast-In-Place Concrete. 2. 05310 - Steel Deck. 3. 07511 - Multi-Ply Mineral Surfaced Built-Up Roofing
More informationBid Opportunity Wilkes Reservoir North Cell Rehabilitation
Water and Waste MONOMER (EPDM) ROOFING Page 1 of 11 Part 1 General 1.1 REFERENCES.1 ASTM International Inc..1 ASTM D4637-14E1, Standard Specification for EPDM Sheet Used In Single-Ply Roof Membrane..2
More informationArchitectural Roof and Wall Products Guide Specifications
Architectural Roof and Wall Products Guide Specifications 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 FORMED METAL ROOF AND WALL PANELS This Guide Specification is to be used
More informationArchitectural Wall Products Guide Specifications
Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 Architectural Wall Products Guide Specifications FORMED METAL WALL PANELS This Guide Specification is
More informationPre-Fabricated Roof Curbs
TC-1, TC-2, TC-3, TC-5 Table of Contents General Information 4-5 Specifications 6-9 Assembly Instructions 10-16 Pitch Information 17 Submittal 18-21 54 years of excellence... www.thybar.com 3 Insulated
More informationArchitectural Roof and Wall Products Guide Specifications
Architectural Roof and Wall Products Guide Specifications Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 FORMED METAL WALL PANELS This Guide Specification
More informationML200 Panel Technical Data Guide
Description ML200 is a mechanical seamed standing seam roofing panel used on low to steep sloped commercial applications. The panel is factory formed in continuous lengths up to 60-0 long. Attachment to
More informationSECTION GYPSUM BOARD PART 1 - GENERAL
SECTION 09250 - GYPSUM BOARD PART 1 - GENERAL 1.01 DESCRIPTION: A. Work under this section is subject to requirements of the Contract Documents including the General Conditions and Supplementary Conditions
More informationDIVISION 5 METALS SECTION METAL DECKING
DIVISION 5 METALS SECTION 05 30 00 PART 1 GENERAL 1.01 SUMMARY A. Section Includes: All labor and materials required to furnish and install metal decking and accessories including shear connectors, closures,
More informationSECTION PRE-ENGINEERED COLD-FORMED METAL ROOF AND FLOOR TRUSSES
SECTION 05440- PRE-ENGINEERED COLD-FORMED METAL ROOF AND FLOOR TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section includes pre-engineered, pre-fabricated cold formed steel framing elements. Work includes:
More information2016 CDM Smith All Rights Reserved July 2016 SECTION STEEL ROOF DECK
PART 1 GENERAL 1.01 SCOPE OF WORK SECTION 05 31 23 STEEL ROOF DECK A. Furnish all labor, materials, equipment and incidentals required and install steel roof deck complete as shown on the Drawings and
More informationSECTION ROOF SPECIALTIES
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 07 71 00 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable
More informationSTEEL DECK INSTITUTE Industry Standard Terms & Definitions
s Industry Standard Terms & Definitions November 2016 Industry Standard Terms & Definitions A specialized set of jargon to describe common terms used by manufacturers and other professionals associated
More informationIndustry Standard Terms & Definitions Of The Steel Deck Institute
Industry Standard Terms & Definitions Of The Steel Deck Institute A specialized set of jargon to describe common terms used by manufacturers and other professionals associated with the usage of Steel Deck
More informationSECTION GYPSUM BOARD ASSEMBLIES
SECTION 09 21 16 GYPSUM BOARD ASSEMBLIES PART 1 GENERAL 1.1 SECTION INCLUDES A. Metal stud wall and ceiling framing, 20 gauge. B. Metal channel suspended ceiling framing. C. Gypsum board. D. Gypsum sheathing.
More informationA. Product Data: For each type of deck, accessory, and product indicated.
SECTION 053100 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Roof deck. 2. Composite floor deck. 3. Noncomposite form deck. 1.2 SUBMITTALS A. Product Data: For each type of deck, accessory, and
More informationROXUL Roof and Deck Insulation Section Master Guide Specification (MONOBOARD ) Page 1 April 2016
Master Guide Specification (MONOBOARD ) Page 1 Click on the pilcrow in the MS Word Toolbar to toggle ROXUL GUIDE NOTES on and off. Delete this text before incorporating the section into a Project Manual.
More informationSECTION COLD-FORMED METAL TRUSSES
SECTION 054400 COLD-FORMED METAL TRUSSES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSECTION NON-STRUCTURAL METAL FRAMING
SECTION 09 22 16 PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories
More informationTHE SITUATION WITH STEEL DECKS
THE SITUATION WITH STEEL DECKS Steel roof deck design can affect roof system selection and design by Mark S. Graham 32 www.professionalroofing.net MARCH 2017 teel roof decks commonly are encountered in
More informationEverGuard Plaza Deck Roofing For Above-Grade Plaza Deck Applications
EverGuard Plaza Deck Roofing For Above-Grade Plaza Deck Applications Specifications Updated: 12/07 Quality You Can Trust Since 1886... From North America s Largest Roofing Manufacturer PLAZA DECK ROOFING
More informationEverGuard TPO/PVC Mechanically Attached Retrofit Roofing Systems Over Metal Roof Panels on Metal Buildings
EverGuard TPO/PVC Mechanically Attached Retrofit Roofing Systems Over Metal Roof Panels on Metal Buildings A Guide to Metal Roof Retrofit in Commercial Low-slope Roof Assemblies Prepared by GAF Technical
More informationShort Form Guide Specification. Specifying Extruded Polystyrene Roof Insulation- STYROFOAM DECKMATE Plus Tapered
07 22 16.13 Short Form Guide Specification Specifying Extruded Polystyrene Roof Insulation- STYROFOAM DECKMATE Plus Tapered June 2006 SPEC NOTE: This guide specification is intended for use when specifying
More information2016 CDM Smith All Rights Reserved July 2016 SECTION COMPOSITE STEEL FLOOR DECK
PART 1 GENERAL 1.01 SCOPE OF WORK SECTION 05 36 00 COMPOSITE STEEL FLOOR DECK A. Furnish all labor, materials, equipment and incidentals required and install composite steel floor deck complete as shown
More informationUniversity of New Hampshire Scholars' Repository
University of New Hampshire University of New Hampshire Scholars' Repository Division 07 Thermal and Moisture Protection Chapter 5 Technical Construction and Renovation Standards 1-25-2013 075423 - TPO
More informationROOFING APPLICATION STANDARD (RAS) No. 109
ROOFING APPLICATION STANDARD (RAS) No. 109 1. 2. Scope 1.1 This Roofing Application Standard sets the requirements to determine whether a substrate and surrounding environmental conditions are appropriate
More informationDated 3/28/14 SECTION SINGLE PLY ROOFING
SECTION 0 0-0 0 PART - GENERAL CONTRACT CONDITIONS Work of this Section is bound by the Contract Conditions and Division, bound herewith, in addition to this Specification and accompanying Drawings. EXTENT
More informationLEGACY REPORT DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: FLUID APPLIED ROOFING REPORT HOLDER: CONKLIN COMPANY INC.
0 Most Widely Accepted and Trusted ICC ES Legacy Report ICC ES 000 (800) 42 6587 (562) 699 054 www.icc es.org ER 520 Reissued 09/2017 This report is subject to renewal 09/2018. DIVISION: 07 00 00 THERMAL
More informationA. Product Data: Identify thermal conductivity, thickness, and jackets (both factory and field applied, if any), for each type of product indicated.
SECTION 23 07 13 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationMulti-Institutional Academic Health Science & Research Center Evansville, IN
SECTION 061600 - SHEATHING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationRoof Replacement. Notes: T-1 (Title Sheet) Roof Key Plan Russell House Student Union 1400 Greene Street Columbia, South Carolina 29208
Notes: Drawing Index T-1 Title R-1 Roof Plan - Existing Conditions R-2 Roof Plan - New D-1 Roof Details D-2 Roof Details D-3 Roof Details M-1 Mechanical - Roof Plan M-2 Mechanical - Details Roof Key Plan
More informationSECTION PRE-ENGINEERED BUILDING INSULATION
PART 1 GENERAL SECTION 07213 PRE-ENGINEERED BUILDING INSULATION Microsoft Word Instructions: Display hidden notes to specifier by using "Tools"/"Options"/"View"/"Hidden Text". 1.1 SECTION INCLUDES A. Pre-Engineered
More informationROXUL Roof and Deck Insulation Section Master Guide Specification Page 1 April 2016
Master Guide Specification Page 1 Click on the pilcrow in the MS Word Toolbar to toggle ROXUL GUIDE NOTES on and off. Delete this text before incorporating the section into a Project Manual. 1 GENERAL
More informationConstruction Standards PAGE
Construction Standards PAGE 095113-1 SECTION 095113 - PART 1 - GENERAL 1.1 M.S.U. ISSUES 1. It the intent of MSU that all joint sealants used on its projects will comply with LEED NC 3 Credit Requirements
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II
SECTION 052100 - STEEL JOISTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections
More informationSOLAR COATING SYSTEMS SYSTEM EMULSION /ACRYLIC. Specification for Built-Up Roofing MULSION/A 1.01 SUMMARY
SOLAR COATING SYSTEMS 2-PLY EMULSION MULSION/A /ACRYLIC SYSTEM Specification for Built-Up Roofing 07590 PART 1. GENERAL 1.01 SUMMARY Name Address City, State, zip A. Furnish and install a seamless, reinforced
More informationArchitectural Roof and Wall Products Guide Specifications
Architectural Roof and Wall Products Guide Specifications 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 FORMED METAL ROOF AND WALL PANELS This Guide Specification is to be used
More information.2 Flashings at grade to extents shown on the Drawings. .3 Membrane and polyethylene slip sheets at perimeter of walls.
RWPS Foundations and Concrete Structures Page 1 of 8 1. GENERAL 1.1 Work Included.1 Supply and installation of ethylene propylene diene monomer (EPDM) membrane and insulation to extents shown on the Drawings
More informationThe Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.
SECTION 05 31 13 STEEL FLOOR DECKING PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 - Specification
More informationUpdate In Progress. Division 7 Thermal and Moisture Protection Page Section ROOFING AND WATERPROOFING
Section 07 10 00 ROOFING AND WATERPROOFING Page 07 10 00-1 1. GENERAL REQUIREMENTS A. Indicate applicable American Society for Testing and Materials (ASTM) specification in this section. 01. Fire resistance
More informationFascia Systems. oofing 7.1
Systems oofing 7.1 TremLock TM A Pre-engineered, Non-Penetrating Metal Edge System oofing TremLock TM Pre-engineered, Non-penetrating Metal Edge System The TremLock is a pre-engineered, non-penetrating
More informationROOFING APPLICATION STANDARD (RAS) No. 109
ROOFING APPLICATION STANDARD (RAS) No. 109 Scope 1.1 This Roofing Application Standard sets the requirements to determine whether a substrate and surrounding environmental conditions are appropriate for
More informationSECTION METAL DECKING. A. Extent of metal decking is indicated on Plans, including basic layout for the following type of deck required:
PART 1 GENERAL 1.1 WORK INCLUDED A. Extent of metal decking is indicated on Plans, including basic layout for the following type of deck required: 1.2 RELATED WORK 1. Metal Roof Deck. A. Structural Steel:
More informationSECTION ELASTOMERIC MEMBRANE ROOFING ADDENDUM 10 APRIL 20, 2011
SECTION 07553 ELASTOMERIC MEMBRANE ROOFING ADDENDUM 10 APRIL 20, 2011 PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Elastomeric roofing membrane (EPDM), conventional application at low slope roof
More information1. Decks, balconies, and sun porches 2. Walkways, ramps, and stairways 3. Patios and courtyards
SECTION 07185 TRAFFIC MEMBRANE PART 1 GENERAL 1.1 SECTION INCLUDES A. Traffic membrane, consisting of welded seam PVC waterproofing, over f following surfaces: 1. Decks, balconies, and sun porches 2. Walkways,
More information1.2 DEFINITIONS, REFERENCES, AND OVERALL STANDARDS Follow 07500
07503 ROOF ASSEMBLY LIGHTWEIGHT INSULATING CONCRETE (LWIC) ************************************************************************************************************* SPECIFIER: All roof-related items
More informationStandard Specification For Installation of ARMOROC PANEL For Roofs 1. GENERAL 1.01 SUMMARY OF WORK 1.02 DESCRIPTION OF ARMOROC PANEL
Standard Specification For Installation of ARMOROC PANEL For Roofs 9/28/15 SECTION 06100 1. GENERAL 1.01 SUMMARY OF WORK A. Materials shall be ARMOROC PANEL Cement Bonded Particle Board (CBPB) as distributed
More informationArchitectural Roof Products Guide Specifications
Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 Architectural Roof Products Guide Specifications FORMED METAL ROOF AND WALL PANELS This Guide Specification
More informationNRCC Guarded Hot Box Testing (ASTM C ) for Energy Efficiency of a Total Roof Assembly
Introduction 2001 Company, contracted NRCC/IRC to evaluate and determine both the thermal resistance and air leakage characteristics of five roofing specimens under controlled laboratory conditions. The
More informationArchitectural Roof Products Guide Specifications
Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 Architectural Roof Products Guide Specifications FORMED METAL ROOF AND WALL PANELS This Guide Specification
More informationNortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1
16 May 2014 Page 1 PART 1 GENERAL 1.1 DESCRIPTION This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories
More informationSECTION A. ACSE 7 Minimum Loads for Buildings and other Structures.
SECTION 06 12 00 STRUCTURAL INSULATED PANELS ------------------------------------------------------------------------------------------------------------ PART 1- GENERAL ----------------------------- 1.1
More informationWVU DESIGN GUIDELINES & CONSTRUCTION STANDARDS DIVISION 07 THERMAL AND MOISTURE PROTECTION
075000 ROOFING SYSTEMS PART 1 - GENERAL 1.1. Any deviation from the following instructions must be approved during design by WVU Facilities Management Personnel. 1.2. DEFINITIONS A. ASTM American Society
More informationSection Property Standard Year Wind FM Physical Properties ASTM D
ROOFING SYSTEMS EVALUATION: 1. SCOPE: Product Category: Roofing Sub-Category: Single Ply Roof Systems Compliance Statement: Carlisle Single Ply Roof Systems, as produced by Carlisle SynTec Incorporated,
More informationSECTION (formerly 05425) PRE-ENGINEERED, PRE-FABRICATED COLD-FORMED STEEL ROOF & FLOOR TRUSSES
SECTION 05 44 00 (formerly 05425) PRE-ENGINEERED, PRE-FABRICATED COLD-FORMED STEEL ROOF & FLOOR TRUSSES PART 1 GENERAL 1.1 SUMMARY A. Section includes pre-engineered, pre-fabricated cold-formed steel framing
More informationSECTION A. ACSE 7 Minimum Loads for Buildings and other Structures.
SECTION 06 12 00 STRUCTURAL INSULATED PANELS ------------------------------------------------------------------------------------------------------------ PART 1- GENERAL ----------------------------- 1.1
More informationUnion County Vocational - Technical Schools Scotch Plains, New Jersey
SECTION 092216 - NON-STRUCTURAL METAL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationPROJ. NO SECTION HVAC DUCT INSULATION
SECTION 23 07 13 HVAC DUCT INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationCONTRACT NUMBER: W912DQ-08-C % CORRECTED DESIGN 28 JULY 2008
SECTION 092900 - GYPSUM BOARD 1.1 SUMMARY A. This Section includes the following: 1. Interior gypsum board. 2. Tile backing panels. B. Related Sections include the following: 1. Division 06 Section "Rough
More informationRAMAPO COLLEGE OF NEW JERSEY PHASE II HOUSING REHABILITATION C 2012
SECTION 09260 - GYPSUM BOARD ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationHALIFAX HUMANE SOCIETY BOARDING AND GROOMING FACILITY SECTION STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS
SECTION 075216 - PART 1 - GENERAL 1.1 SUMMARY A. Section includes styrene-butadiene-styrene (SBS) modified bituminous membrane roofing. 1.2 DEFINITIONS A. Hot Roofing Asphalt: Roofing asphalt heated to
More informationPrepared for: Thompson Architectural Metals Company, Inc E. Hillsborough Avenue Tampa, FL 33605
Evaluation Report of 5V Panel Metal Roof Assembly for Florida Product Approval # FL 3539.3 Florida Building Code 2001 Method: 1 - D Category: Roofing Sub - Category: Non-Structural Metal Roofing Product:
More informationSection Roof/Ceiling Thermal Insulation
Section 07200 Roof/Ceiling Thermal Insulation Part 1 General 1.01 Summary A. Provide glass fiber thermal insulation for (roof) (ceiling) assembly as indicated in building plans. 1.02 Materials Provided
More informationDIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ROOFING AND SIDING PANELS REPORT HOLDER: KINGSPAN INSULATED PANELS, INC.
0 Most Widely Accepted and Trusted ICC-ES Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-1143 Reissued 04/2017 This report is subject to renewal 04/2018. DIVISION: 07 00 00 THERMAL
More informationLightweight Insulating Concrete Roof Decks
MeARlCrEte Tm Lightweight Insulating Concrete Roof Decks WWW.AErIXINDUsTrIEs.COm M EARLCRETETM lightweight insulating concrete is produced on the job site by mixing Portland cement -water slurry with the
More informationA. Provide and install a factory made, wood framed, storage building. B. Building Construction Type: IBC Type V-B Wood Frame.
Farmington, Missouri Project Number M1801-0l PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide and install a factory made, wood framed, storage building. B. Building Construction Type: IBC Type V-B Wood
More informationEXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD
SECTION 09 29 00 GYPSUM BOARD PART 1 - GENERAL 1.1 DESCRIPTION This section specifies installation and finishing of gypsum board. 1.2 RELATED WORK A. Installation of steel framing members for walls, partitions,
More informationSECTION (07530) - ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING
SECTION 07 53 23 (07530) - ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Extent of flexible sheet roofing (FSR) is indicated on Drawings and is hereby
More informationSECTION SOUND ISOLATION
SECTION 13085 SOUND ISOLATION PART 1 GENERAL 1.1 SECTION INCLUDES A. Resilient sound isolation clips installed with drywall furring channels for support of gypsum board for noise control (de-coupling)
More informationSECTION ROOF AND DECK INSULATION
SECTION 07 22 00 ROOF AND DECK INSULATION SPEC WRITER NOTES: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Follow recommendations of National Roofing Contractors