A Perspective 1. Perspective 2. Perspectives. Kincaid Park Anchorage Alaska. Schematic rendering to represent intent 100% CD.

Size: px
Start display at page:

Download "A Perspective 1. Perspective 2. Perspectives. Kincaid Park Anchorage Alaska. Schematic rendering to represent intent 100% CD."

Transcription

1 Perspective 1 Schematic rendering to represent intent Perspectives Perspective 2 A.01.1

2 Over-Under Net Timber! Cave Charlotte's Web Stepping Forms (10) Vertical Net Tree Vine Moose Hollow Log Vine 2 Vine 1 Schematic rendering to represent intent Perspective Layout A.01.2

3 Moose: 6" reinforced concrete slab Approximate Sculpture weights: 5' 16.5" AeccDbFeatureLine (AeccLand100) 20.5" AeccDbFeatureLine (AeccLand100) Vine 1: 1' reinforced concrete slab Stepping Forms (10): 12"x30" fiber reinforced concrete pier Desired height above given AeccDbFeatureLine (AeccLand100) 24.5" 4'-6" 7' 4' '-8" 5'- 4" 9'- 8" " 76 " 6' Moose - 1,350 lbs Vine 1-5,000 lbs Vine 2 (a) - 3,800 lbs Vine 2 (b) - 2,200 lbs Tree Vine - 1,000 lbs Charlotte's Web - 2,500 lbs Timber! Cave - 8,000 lbs Hollow log - 2,600 lbs Stepping Forms lbs 8' Tree Vine: 24" reinforced concrete slab 9'- 8" " 11 39" 24.5" 20.5" 16.5" 12.5" Hollow Log: 4" reinforced concrete slab Low point of sculpture Charlotte's Web: 6" reinforced concrete slab " 4'-10 61" 5'- 20.5" 24.5" 22" 10 " '-7 8'-2" 1" 5'- Note: Typical concrete slab Reinforced concrete slab #5 rebar 12" O.C. each way 3" clear all sides, 2500 psi By Others AeccDbFace (AeccLand100) AeccDbFeatureLine (AeccLand100) Vine 2: 9 1/2" reinforced concrete slab approx 3 cubic yards Timber!Cave: 4" integral footing 16"x36" Fiber reinforced concrete pier (3) Typical concrete pier Fiber reinforced concrete pier 2500 psi, By Others EXISTING PICNIC SHELTER All rope colors are Green Plan Layout W-09 Plan Layout SCALE: 3/32" = 1'-0" 0 8' 16' 24' A.01.3

4 4'-3" GFRC Sculpture 4"x4"x3/8" AL Angle 5/8" hole 4'-3" 7' 5'-6" 5'-4" 2500 psi, #3 rebar, 12" OC/EW 4" 9" 5 1/2" -5 1/2" 5-1/2" artificial turf surfacing 4"x4"x3/8" AL Angle 1/2"x4-1/2" SS wedge anchor 3-1/2" embed 2500 psi, #3 rebar, 12" OC/EW Compacted subgrade W-02 Hollow Log Plan SCALE: 3/8" = 1'-0" 0 4' 6' W-02 Hollow Log Section SCALE: 3/8" = 1'-0" 0 4' 6' Hollow Log A.01.4

5 Installation Note: Finished height of stepping forms may be varied by lowering concrete footing. Installation is wet set. Installation Note: Max Fall Height above : 2-5 year olds: 20" 5-12 year olds: 30" 5 1/2" 1'-1/2" -6" -6" 5-1/2" artificial turf surfacing 1/2" threaded insert 1/2" threaded rod anchor, 8" embed 1/2" nut (2), 1/2" washer 5 1/2" -1/2" -6" -6" 5-1/2" artificial turf surfacing 1/2" threaded insert 1/2" threaded rod anchor, 8" embed 1/2" nut (2), 1/2" washer W-05 Stepping Forms Sections SCALE: 3/8" = 1'-0" 1' 12" x 30" fiber reinforced concrete pier by others 1' 12" x 30" fiber reinforced concrete pier by others 0 4' 6' Small SF-10" Med SF-18" 12 x30 pier Lrg SF- 28" +6'-0"-unlinked play-all ages +1'-6"-maximum years old +1'-0"-maximum- 2-5 years old +9"-minimum Rock equivelent Rock equivelent W-05 Stepping Forms Plans Rock equivelent Stepping Forms A.01.5

6 20' 0'-2" 9'-8" 7'-11" 0'-2" sculpture extents 1'-4" 1'-4" 8' 9'-8" 3/4" hole (16) PL 1/2" (4) 6" 5 1/2" 4'-4" PL 1/2" (4) 5-1/2" artificial turf surfacing 5/8" x 5" SS expansion anchor 4" embed (16) W-03 Charlottes Web Plan 6" reinforced concrete footing #5 rebar, 12" OC each way GFRC composite structure minimum use zone W-03 Charlottes Web Section 6" reinforced concrete footing #5 rebar, 12" OC each way compacted sub-grade Charlottes Web A.01.6

7 6' min. use zone (to be verified by installer), #3 rebar, 8" OC each way, centered in slab integral to sculpture 5'-3" Ramp net 16"x36" Fiber reinforced concrete pier, 2500 psi (3) 20'-7" 1'-5" 0'-10" 4'-10" 4'-10" GFRC sculpture plan outline Plan outline at 33' W-04 Timber!Cave Plan 3' 5 1/2" 5'-7 1/2" 4" 4" Integral Footing Reinforced concrete slab #3 rebar, 8" OC each way Compacted Sub-Grade 16"x36" Fiber reinforced concrete pier (3), 2500 psi 5-1/2" artificial turf surfacing W-04 Timber!Cave Section Timber! Cave A.01.7

8 1-8" 11'-4" 5'-11" 4'-6" 6' 5'-9" 61" 74.5" 76" 4'-8" 10'-7" 9'-3" 59" 1'-8" 110 9'-1" 8'-11" Vine 1 GFRC Sculpture 5" Integral Footer 1' reinforced concrete slab #5 rebar 8" OC each way 4"x4"x3/8" AL angle 11/16" hole (4) Vine 2 (a) GFRC Sculpture 4'-6" 5'-1 1/2" 4 1/2" 1'-10" 7'-7 1/2" 8'-2" 1'-2" Vine 2 (b) GFRC Sculpture 5" Integral Footer (2) " 9-1/2" reinforced concrete slab #5 rebar 8" OC each way 4"x4"x3/8" AL Angle 11/16" hole (8) 22" 1'-10" 39" 39" 3'-6" 4'-10" 3 Tree Vine Final Design Intent 2500 psi, double mat #5 rebar 12" OC/EW, 3" clear all sides 54" 1 5" 1' 5 1/2" 6'-2 1/2" 2 4'-11" Vines 1 and 2 Plan Similar section. Refer to plans for layout and footing dimensions Vines 1 and 2 Similar Section Composite assembly: 2-3" thick GFRC Acrylic Concrete Shell,Structural foam armature #3 rebar, 12" OC longitudily 10 GA galvanized tie wire, 12"OC transverse throughout sculpture shell. 1'-10" 3'-3" 5 1/2" artificial turf surfacing 5" Integral Footing 4"x4"x3/8" AL angle 5/8" x 8-1/2" ss wedge anchor 7-1/2" embed 2500 psi, #5 rebar 8" OC/EW Compacted Sub Grade rope connections Tree Vine GFRC Sculpture 3/4" PL 7/8" hole (6) Solid concrete #5 rebar, 8" OC longitudily 10 GA galvanized tie wire 8" OC transverse throughout sculpture shell Tree Vine GFRC Sculpture 3/4" PL 3/4" x 8-1/2" Wedge Anchor 7-1/2" Embed (6) 5 1/2" artificial turf surfacing 5 4 Tree Vine Plan SCALE: 1/4" = 2500 psi, double mat #5 rebar 12" OC/EW, 3" clear all sides Compacted subgrade Tree Vine Section 94" 55 11/16" 18 9/16" 48" 1'-0" 5 1/2" 24" 94" A.01.8 Vines

9 6' use zone (to be verified by installer) 8' 5' 6" 2500 psi, #5 rebar 12" OC/EW 15'-8" 5' 1'-2" Plan outline Integral footing 4"x4"3/8" AL Angle 5/8" hole (4) 19'-6 1/2" 1 Moose Plan SCALE: 1/4" = 1'-0" 3 Moose Final Design Intent 2 Moose Section SCALE: 1/4" = Compacted subgrade 1'-0" 3'-9 1/2" 6" 5" 5 1/2" Composite steel-epoxy antlers GFRC Sculpture 5-1/2" artificial turf surfacing 2500 psi, #3 rebar 12" OC/EW 3" clear all sides, integral to sculpture 2500 psi, #5 rebar 12" OC/EW 1/2"x5-1/2" wedge anchor 4-1/2" embed (4) A.01.9 Moose

10 E.W.F. Optimal Placement of Chain Swage (above P.I.P. or below E.W.F. ) Cut off chain links to remove excess slack Do not install Playground ropes taut Trim Wedge Anchor so less than 1/4" protrudes from top nut Nut Washer Chain Link Washer Nut Washer Footing P.I.P. 1/2 x 8-1/2 SS Wedge Anchor 7" Embed 1 Rope to Footing Detail SCALE: 3" = 1'-0" 0 3'' 6'' 9'' Rope Connections 2 Female Threaded Connection 3 Installed Connector A.01.10

Specialty Applications. for Keystone Walls

Specialty Applications. for Keystone Walls for Walls SHEET INDEX Title Sheet Sheet 1 Soil Nail Facing Sheet 2 Rock/Shotcrete Facing Sheet 3 Manta Ray Anchor Wall Sheet 4 H-Pile Wall Facing Sheet 5 Sheet Pile Wall Facing Sheet 6 Railing per Site

More information

Interior Hangers. Application

Interior Hangers. Application Application Interior bridge deck hangers are typically fabricated using two heavy duty sheet metal end clips that have been electrically resistance welded to an appropriate sized wire or formed metal connecting

More information

GENERAL ISOMETRIC LAYOUT

GENERAL ISOMETRIC LAYOUT STRUCTURAL SPECIFICATIONS: 1. FLOODGATE MATERIAL TO BE ALUMINUM AS FOLLOWS: LID - ALUMINUM CONNECTED EXTRUSION - GRADE 6061 MIN. Fᵧ=35 KSI PAN STIFFENERS - 1 2" ALUM FLAT BAR - GRADE 6061 MIN. Fᵧ=35 KSI

More information

DOOR AND WINDOW OPENINGS PREPARE IN ADVANCE VBUCK CONSTRUCTION

DOOR AND WINDOW OPENINGS PREPARE IN ADVANCE VBUCK CONSTRUCTION DOOR AND WINDOW OPENINGS Openings for doors and windows are formed with bucks, or frames, which are constructed to the rough opening dimensions required for the doors and windows to be installed. These

More information

Foundation Specifications for 3.6-/3.7-Meter Earth Station Antennas

Foundation Specifications for 3.6-/3.7-Meter Earth Station Antennas Installation Instructions Foundation Specifications for 3.6-/3.7-Meter Earth Station Antennas Bulletin 37835A Revision E Introduction This document specifies typical foundation characteristics, designs,

More information

INSTALLATION INSTRUCTIONS FOR THE BOULDERS LISTED BELOW:

INSTALLATION INSTRUCTIONS FOR THE BOULDERS LISTED BELOW: INSTALLATION INSTRUCTIONS FOR THE BOULDERS LISTED BELOW: SND - SM SND - MD SND - LG GRN - SM GRN - MD GRN - LG WARNING: The surfacing under and around playground equipment is one of the most important

More information

FitTech UP171F ELLIPTICAL (FOOTING) UP171I ELLIPTICAL (IN GROUND) UP171S ELLIPTICAL (SURFACE) Parts List

FitTech UP171F ELLIPTICAL (FOOTING) UP171I ELLIPTICAL (IN GROUND) UP171S ELLIPTICAL (SURFACE) Parts List ELLIPTICAL BASE COVER DESCRIPTION FOOTBUCK WELD ASS'Y HARDWARE COMPLETE HARDWARE COMPLETE HARDWARE COMPLETE /" ANCHOR ROD 3/" x " HEX HEAD CAP SCREW 3/" WEDGE ANCHOR 3/" ANCHOR BOLT 3/" FLATWASHER (" O.D.)

More information

Entellus 75 NORTH STREET MERRILL SHERIFF CONSTRUCTION. 181 North 200 West, Suite #4. Bountiful, UT Phone

Entellus 75 NORTH STREET MERRILL SHERIFF CONSTRUCTION. 181 North 200 West, Suite #4. Bountiful, UT Phone Entllus DUMPSTER PAD AND REPLACE WITH NEW BETWEEN THESE TWO POINTS SAWCUT ALONG DEMO LINE REMOVE PARKING SPOTS CURB, GUTTER, ASPHALT AND LANDSCAPING, WITHIN HATCHED AREA FOR NEW ADDITION CURB & GUTTER

More information

Foundation Specifications

Foundation Specifications Installation Instructions Foundation Specifications for 3.6-/3.7-Meter Earth Station Antennas ulletin 37835A Revision L Introduction This document specifies typical foundation characteristics, designs,

More information

STANDARDIZED STRUCTURES

STANDARDIZED STRUCTURES Q, QH & QL TOWERS 16.1 Q, QH, and QL Towers General Description The series includes three and four leg angle towers, which are suited for a variety of antenna mounting positions and load conditions. The

More information

Construction Details 5-37

Construction Details 5-37 5-37 5-38 Construction Details 5-39 5-40 Construction Details 5-41 5-42 Construction Details 5-43 5-44 Construction Details 5-45 5-46 Construction Details 5-47 5-48 Construction Details 5-49 RING ANCHOR

More information

Heartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785)

Heartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785) Perma-Column Installation Instructions Unlike any other concrete post-frame foundation system, Perma-Column Precast Concrete Piers use 10,000 psi concrete and our unique Sturdi-Wall Plus wet-set bracket

More information

STANDARD DESIGN NOTES 1 / 2

STANDARD DESIGN NOTES 1 / 2 ISIONS STANDARD DESIGN NOTES / 2 N/A ISIONS STANDARD DESIGN NOTES 2 / 2 N/A 2 FENCE AS REQUIRED BY OWNER. SEE DETAIL 8 / DWG. 9 CAP BLOCK LEVEL WEDGE FOR CAP AS REQUIRED FINAL SITE GRADING MATERIAL BY

More information

FitTech UP166F CHEST PRESS (FOOTING) UP166I CHEST PREES (IN GROUND) UP166S CHEST PRESS (SURFACE)

FitTech UP166F CHEST PRESS (FOOTING) UP166I CHEST PREES (IN GROUND) UP166S CHEST PRESS (SURFACE) CHEST PRESS BASE COVER DESCRIPTION FOOTBUCK WELD ASSEMBLY HARDWARE COMPLETE HARDWARE COMPLETE HARDWARE COMPLETE /" ANCHOR ROD 3/" x " HEX HEAD CAP SCREW 3/" WEDGE ANCHOR 3/" ANCHOR BOLT 3/" FLATWASHER

More information

Midwest Roadside Safety Facility

Midwest Roadside Safety Facility Bridge Pit 1504 1/2" 38214 244" 6198 1" 25 16 15 14 13 12 11 10 9 8 7 25 6 5 51 3/16" 1300 4 3 2 1 Impact 2270P 2455 5/16" 62365 1379 1/2" 35039 - Barrier nos. 5-13 Anchored Ground Line Note: (1) Test

More information

CHEMICAL /4" 3/8" to 5/8" /8" 3/4" to 1-1/4" 1 10

CHEMICAL /4 3/8 to 5/8 /8 3/4 to 1-1/4 1 10 194 ASTM A193 GRADE B7 HIGH-STRENGTH CARBON, ZINC PLATED (ASTM B 633 YELLOW DICHROMATE) B7 (AISI 414) anchor rod is supplied with nuts meeting the requirements of ASTM Specification A 194, Grade 2H (ASTM

More information

Retrofit Measures for Superstructures, Bearings, and Seats

Retrofit Measures for Superstructures, Bearings, and Seats Retrofit Measures for Superstructures, Bearings, and Seats Presented by Richard V Nutt Elements to be Retrofitted Bridge Decks and Girders Bearings, Anchorages and Pedestals Expansion Joints 1 Elements

More information

INSTALLATION INSTRUCTION

INSTALLATION INSTRUCTION INSTALLATION INSTRUCTION UNPACKING INSTRUCTIONS Carefully open the packaging, remove contents and lay out parts on a protective surface to avoid damage. Check package contents against the Supplied Parts

More information

Site Preparation... 2

Site Preparation... 2 TRUFIREWALLS INSTALLATION MANUAL This Installation Manual is intended to assist in the preparation and installation of TruFireWalls products manufactured by Oldcastle Enclosure Solutions. The TruFireWalls

More information

03 CONCRETE TAKEOFF SUMMARY REPORT Takeoff and Items Cost Summary. Ryan Manocchio

03 CONCRETE TAKEOFF SUMMARY REPORT Takeoff and Items Cost Summary. Ryan Manocchio 03 CONCRETE TAKEOFF SUMMARY REPORT Takeoff and Items Cost Summary Ryan Manocchio rmanocchio@stackct.com Concrete Takeoff Summary Report The STACK To Go Team is capable of performing takeoff for concrete

More information

POST FRAME BUILDING STANDARDS

POST FRAME BUILDING STANDARDS CASS COUNTY, MISSOURI BUILDING CODES, ENVIRONMENTAL HEALTH AND ZONING DEPARTMENT 30508 S. West Outer Road, Harrisonville, MO 64701 P- (816) 380-8134 F- (816) 380-8130 POST FRAME BUILDING STANDARDS 201.3

More information

City of Mesquite General Design Standards Revision Date:

City of Mesquite General Design Standards Revision Date: SCREENING WALLS (Public and Private) Page 1 of 6 Section 1 General Design & Notes 1.1 Standards 1.1.1 All screening walls in the City of Mesquite and within its Extraterritorial Jurisdiction (ETJ), both

More information

Perma-Column Deck Post Design Manual DP4430, DP4440, DP4640, DP6630, DP6640, DP6430, and DP6440 models

Perma-Column Deck Post Design Manual DP4430, DP4440, DP4640, DP6630, DP6640, DP6430, and DP6440 models Perma-Column Deck Post Design Manual DP4430, DP4440, DP4640, DP6630, DP6640, DP6430, and DP6440 models Project Number S007-12 by Brent Leatherman, P.E. Timber Tech Engineering, Inc E-Mail: bl@timbertecheng.com

More information

tournesolsiteworks.com

tournesolsiteworks.com Force Protection Who says security has to be ugly? Institutions need to be protected, but few have considered how to do it thoughtfully, efficiently and attractively. Tournesol Siteworks has a range of

More information

Materials Carbon Steel and Malleable Iron are used in the manufacture of concrete inserts. Stainless Steel and other materials are available.

Materials Carbon Steel and Malleable Iron are used in the manufacture of concrete inserts. Stainless Steel and other materials are available. Concrete inserts offered in this section are designed to provide a pre-set support point in concrete ceilings, walls, and floors. A range of inserts with varying design loads are available. Materials Carbon

More information

TFX - Toggle Lock Installation Guide

TFX - Toggle Lock Installation Guide Trench Former Pre-Engineered Cast In Place Trench Drain Forming System TFX - Toggle Lock Installation Guide P.O. Box 837-259 Murdock Road - Troutman, NC 28166 Tel (704) 528-9806 - Fax (704) 528-5478 -

More information

SECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section.

SECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section. SECTION 10 5300 ALUMINUM WALKWAY COVERS Part 1 General 1.01 Related Documents A. The requirements of Division 1 specifications shall apply to work specified in the section. 1.02 References A. International

More information

Civil and Structural Engineering CONSTRUCTION OF BRIDGE STRUCTURES SHALL BE IN ACCORDANCE WITH THE FOLLOWING SPECIFICATIONS, LISTED IN ORDER OF PRECEDENCE: 1. CDOT STANDARD SPECIFICATIONS FOR ROAD AND

More information

Figure 1. Horst Aschenbroich, President/CEO, Con-Tech Systems Ltd.

Figure 1. Horst Aschenbroich, President/CEO, Con-Tech Systems Ltd. Root Pile Support of Vancouver s Hollow Tree Parallels to Wind Turbine Foundations Horst Aschenbroich Dipl. Ing, President Con-Tech Systems Ltd, Delta, BC, Canada Abstract One of Vancouver s famous landmarks,

More information

Seismic Installation Manual

Seismic Installation Manual Seismic Installation Manual This manual provides the design strength capacities and installation guidelines for the Restraint systems brace components for use in the design of an overall bracing/restraint

More information

CTP STITCH-TIE AGAIN! Quick and easy way to re-anchor existing veneers to back-up structures.

CTP STITCH-TIE AGAIN! Quick and easy way to re-anchor existing veneers to back-up structures. Helical Wall Tie System for Stabilizing Veneers and Structural Repair AGAIN! ANOTHER CTP SOLUTION! CTP STITCH-TIE Quick and easy way to re-anchor existing veneers to back-up structures. Brick to Concrete

More information

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications Mar/2008 v1.0 SECTION 02255 HYDRAULICLY DRIVEN STEEL UNDERPINNING PILES PART 1 GENERAL 1.01 SCOPE OF WORK The work shall

More information

SECTION CONCRETE REINFORCEMENT

SECTION CONCRETE REINFORCEMENT PART 1 GENERAL 1.01 DESCRIPTION SECTION 03200 CONCRETE REINFORCEMENT A. The work specified in this Section consists of furnishing and installing reinforcement for concrete structures. All reinforcement

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB #

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # SECTION 26 0529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Concrete Inserts. B Adjustable Metal Deck Ceiling Bolt

Concrete Inserts. B Adjustable Metal Deck Ceiling Bolt B3019 - Adjustable Metal Deck Ceiling Bolt Size Range: 3 /8"-16 thru 3 /4"-10 rod Function: For use in metal deck formed concrete to attach hanger rods. Allows for pre-positioning of hanger rods in poured

More information

1. Cast-in-place concrete is specified in Section

1. Cast-in-place concrete is specified in Section SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record

More information

Openings in Walls I: Reinforcement

Openings in Walls I: Reinforcement Openings in Walls I: Reinforcement INTRODUCTION These general construction techniques are chosen to introduce low-tech and low-cost construction. Combined with good quality control, they can create buildings

More information

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT SPECIFICATION EO-1124 REVISION 3 November 2013 EFFECTIVE DATE November 11,

More information

Perma-Column Deck Post Design Manual

Perma-Column Deck Post Design Manual Perma-Column Deck Post Design Manual DP4430, DP4440, DP4640, DP6630, DP6640, DP6430, and DP6440 models Project Number S007-12 by Brent Leatherman, P.E. Timber Tech Engineering, Inc E-Mail: bl@timbertecheng.com

More information

PS 3000 Installation Manual Step-By-Step Procedures C.9. DOOR AND WINDOW OPENINGS C.9.1 PREPARE IN ADVANCE. C.9.2 VBUCK CONSTRUCTION.

PS 3000 Installation Manual Step-By-Step Procedures C.9. DOOR AND WINDOW OPENINGS C.9.1 PREPARE IN ADVANCE. C.9.2 VBUCK CONSTRUCTION. C.9. DOOR AND WINDOW OPENINGS Openings for doors and windows are formed with bucks, or frames, which are constructed to the rough opening dimensions required for the doors and windows to be installed.

More information

HOLDOWN & STRAP SCHEDULE

HOLDOWN & STRAP SCHEDULE SHEAR WALL SCHEDULE STRUCTURAL DESIGN CRITERIA GOVERNING CODE SOIL BEARING PRESSURE HOLDOWN & STRAP SCHEDULE MARK SHEATHING SHEATH BOTH SIDES NAILS EDGE SPACING NOTES MARK SW 7/" OSB NO 8d " OC - A SW

More information

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013 SPECIAL PROVISIONS - SP2014 BOOK Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2014-119 (PLANT MIXED ASPHALT PAVEMENT) or SP2014-121 (PLANT MIXED ASPHALT PAVEMENT FOR

More information

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway.

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway. Last Revision by CO Special Provisions: 09/14/18 Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2018-143 ((2360) PLANT MIXED ASPHALT PAVEMENT (MSCR)) when using this writeup.

More information

SECTION MECHANICALLY STABILIZED EARTHEN SLOPES. Display hidden notes to specifier by using Tools / Options / View / Hidden Text.

SECTION MECHANICALLY STABILIZED EARTHEN SLOPES. Display hidden notes to specifier by using Tools / Options / View / Hidden Text. PART 1 GENERAL SECTION 02260 MECHANICALLY STABILIZED EARTHEN SLOPES Display hidden notes to specifier by using Tools / Options / View / Hidden Text. 1.1 SECTION INCLUDES A. ** NOTE TO SPECIFIER ** Delete

More information

The work required for this project includes, but is not limited to, the following items, not listed in order of execution.

The work required for this project includes, but is not limited to, the following items, not listed in order of execution. ESTIMATE OF QUANTITIES SPECIFICATIONS Construction Specifications: South Dakota Standard Specifications for Roads and Bridges, 2004 Edition and Required Provisions, Supplemental Specifications and/or Special

More information

Technical Report 1. Hakuna Resort Swift Water, Pennsylvania. Image Courtesy of LMN Development LLC

Technical Report 1. Hakuna Resort Swift Water, Pennsylvania. Image Courtesy of LMN Development LLC Technical Report 1 Hakuna Resort Swift Water, Pennsylvania Image Courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic 13 September 2014 1 Table of Contents Technical

More information

SECTION (16071) - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION (16071) - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS SECTION 26 05 48 (16071) - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.01 SUMMARY A. This Section includes seismic restraints and other earthquake-damage-reduction measures for

More information

Lesson 7 REINFORCING CAGE. Version 1-1/

Lesson 7 REINFORCING CAGE. Version 1-1/ Lesson 7 REINFORCING CAGE 7-1 Version 1-1/15 7-1 Learning Outcomes Describe cage construction Determine the circumference of a shaft and rebar cage and calculate the required number of side spacers. Explain

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

PRODUCT SPECIFICATION

PRODUCT SPECIFICATION PRODUCT SPECIFICATION Part Name: PLASTICADE Modular Glare Screen System Description The Modular Glare Screen System is intended to be mounted to a barrier or median in order to delineate the barrier and

More information

See the IRC for additional information. See CPD-DS Information Bulletin 100 for Requirements for 1 & 2 Family Dwelling plan submittals.

See the IRC for additional information. See CPD-DS Information Bulletin 100 for Requirements for 1 & 2 Family Dwelling plan submittals. As a customer service initiative, the Kansas City, Missouri, City Planning and Development Department/Development Services, in cooperation with the Greater Kansas City Home Builders Association, has developed

More information

SECTION UNIT MASONRY

SECTION UNIT MASONRY SECTION 04200 UNIT MASONRY PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, and equipment and perform functions required in the installation and maintenance of the work covered by this Section.

More information

This drawing. is preliminary. and not for. construction or. implementation. purposes. project number 170 END VIEW DESIGN STRENGTHS: PLAN

This drawing. is preliminary. and not for. construction or. implementation. purposes. project number 170 END VIEW DESIGN STRENGTHS: PLAN project number 70 Reference Line 2-0" Reference 3 -" 6-0" 6-0" 3 -" Line Box Culvert Roadway Finished Channel -0" -0" E VIEW 20-0" Riprap 0-0" Riprap Outlet Invert El 87.0 Sta 233+00.00 Inlet Invert El

More information

Chem-Stud CHEMICAL SPIN TYPE CAPSULE ADHESIVE PRODUCT DESCRIPTION CHEM-STUD ADHESIVE PROPERTIES

Chem-Stud CHEMICAL SPIN TYPE CAPSULE ADHESIVE PRODUCT DESCRIPTION CHEM-STUD ADHESIVE PROPERTIES 192 Chem-Stud SPIN TYPE CAPSULE ADHESIVE BASE MATERIAL Solid Concrete SIZE RANGE 3" to 1-1" Anchor Rod, No. 3 to No.10 Reinforcing Bar ANCHOR MATERIAL Ester Based Resin PRODUCT DESCRIPTION The Chem-Stud

More information

I.C.E. BLOCK (U.S. Patent No. 4,223,501) Detail Manual

I.C.E. BLOCK (U.S. Patent No. 4,223,501) Detail Manual I.C.E. BLOCK (U.S. Patent No. 4,223,501) Detail Manual An energy efficient - cost effective building system, designed for contractors and property owners alike. 1 TYPICAL WOOD FRAME TO CONCRETE FLOOR 1"

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER. OPR:CT 1 of 5 APPR:JAR:DBP: FHWA:APPR:

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER. OPR:CT 1 of 5 APPR:JAR:DBP: FHWA:APPR: MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER OPR:CT 1 of 5 APPR:JAR:DBP:09-07-11 FHWA:APPR:09-07-11 a. Description. This work consists of furnishing and installing

More information

CONSTRUCTION SPECIFICATION FOR GUIDE RAIL ENERGY ABSORBING TERMINALS

CONSTRUCTION SPECIFICATION FOR GUIDE RAIL ENERGY ABSORBING TERMINALS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 554 NOVEMBER 1989 CONSTRUCTION SPECIFICATION FOR GUIDE RAIL ENERGY ABSORBING TERMINALS 554.01 SCOPE 554.02 REFERENCES 554.05 MATERIALS 554.05.01 Concrete.02

More information

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES PART 1 DESIGN DIRECTIVES 1.1 GENERAL SECTION 02801 MISCELLANEOUS SITE DETAILS A. This section consists of AutoCAD drawings depicting typical landscape details governing the installation of miscellaneous

More information

Modular Simplicity Dero

Modular Simplicity Dero B I K E H AV E N Modular Simplicity The Bike Haven bridges the gap between short and long term bike parking. The simple, modular canopy design makes it easy to create the bike shelter that fits your needs.

More information

Technical Data Sheet: The Corrugated HC-Omega

Technical Data Sheet: The Corrugated HC-Omega Performance Structural Concrete Solutions, LLC P.O. Box 2377, Davidson, NC 28036-2377 P: 980-333-6414 info@pscs-llc.com www.pscs-llc.com Technical Data Sheet: The Omega Figure 1. Omega armor joint on grade.

More information

GARAGES/ONE-STORY City of Grand Rapids Building Safety Division

GARAGES/ONE-STORY City of Grand Rapids Building Safety Division GARAGES/ONE-STORY City of Grand Rapids Building Safety Division 218-326-7601 www.cityofgrandrapidsmn.com This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS PART 1 GENERAL 1.01 SUMMARY Section 15140 PIPE HANGERS, This Section includes the furnishing and subsequent installation of: A. Pipe and equipment hangers, supports, and associated anchors B. Equipment

More information

MANUFACTURER S SPECIFICATIONS Section LIME CONCRETE. A. This section describes the requirements for floors and slabs on grade.

MANUFACTURER S SPECIFICATIONS Section LIME CONCRETE. A. This section describes the requirements for floors and slabs on grade. MANUFACTURER S SPECIFICATIONS Section 03330 LIME CONCRETE ST. ASTIER NATURAL HYDRAULIC LIME CONCRETE PART 1 GENERAL 1.01 General A. This section describes the requirements for floors and slabs on grade.

More information

580-1 Wells Road, Orange Park, Florida 32073

580-1 Wells Road, Orange Park, Florida 32073 M:\CAD Files\Crescent City\9318561\Design\SHT1.dwg, 3/19/2018 11:12:19 AM 580-1 Wells Road, Orange Park, Florida 32073 Tel. (904) 278-0030 Fax. (904) 278-0840 Florida License EB-6569 M:\CAD Files\Crescent

More information

SENTINEL BARRIER - GENERAL INSTALLATION GUIDELINES

SENTINEL BARRIER - GENERAL INSTALLATION GUIDELINES SENTINEL BARRIER - GENERAL INSTALLATION GUIDELINES Safety Precautions in the Excavation of a Sentinel Wedge take all necessary steps to make sure the pit is secured. Follow all OSHA requirements for digging

More information

SPECIFICATION & DESIGN MANUAL " AISI 1060 to 1065 Rockwell Hardness 51 to 55 Perma-Seal coated Stick-E Pin 3/4" (Step Shank) 1"

SPECIFICATION & DESIGN MANUAL  AISI 1060 to 1065 Rockwell Hardness 51 to 55 Perma-Seal coated Stick-E Pin 3/4 (Step Shank) 1 Trak-It /Stick-E TM SPECIFICATION & DESIGN MANUAL TM Stick-E Electrical and Mechanical Fastening System PRODUCT DESCRIPTION The Stick-E fastening system uses Trak-It gas technology with specially designed

More information

SECTION RIGID PAVEMENT

SECTION RIGID PAVEMENT SECTION 02750 PART 1 GENERAL RIGID PAVEMENT 1.1 SUMMARY A. Section Includes: 1. Concrete sidewalks. 2. Concrete stair steps. 3. Concrete integral curbs gutters. 4. Concrete parking areas and roads. B.

More information

Technical Notes. Mandatory Barrier Cable Inspection Requirements

Technical Notes. Mandatory Barrier Cable Inspection Requirements Technical Notes From M-10: Unbonded Tendon Committee Issue 20 December 2015 Mandary Barrier Cable Inspection Requirements Inspection of barrier cable installation in accordance with the PTI M10.4-07, Specification

More information

STANFORD UNIVERSITY UNIVERSITY ARCHITECT / CAMPUS PLANNING AND DESIGN

STANFORD UNIVERSITY UNIVERSITY ARCHITECT / CAMPUS PLANNING AND DESIGN STANFORD UNIVERSITY UNIVERSITY ARCHITECT / CAMPUS PLANNING AND DESIGN CONSTRUCTION FENCING SPECIFICATIONS PERIMETER AND PROJECT INFORMATION FENCING University Architect / Campus Planning and Design Office

More information

Hilti, Inc South 122 nd East Avenue Tulsa, OK

Hilti, Inc South 122 nd East Avenue Tulsa, OK ttached are page(s) from the 2011 Hilti North merican Product Tech Guide. For complete details on this product, including data development, product specifications, general suitability, installation, corrosion,

More information

SECTION NONPRESTRESSED ROCK ANCHORS. 1. Placing drawings. 2. Bar details. 3. Manufacturer s data, and recommendations for grout.

SECTION NONPRESTRESSED ROCK ANCHORS. 1. Placing drawings. 2. Bar details. 3. Manufacturer s data, and recommendations for grout. SECTION 02261 NONPRESTRESSED ROCK ANCHORS PART 1 GENERAL 1.1 THE REQUIREMENT A. The Work in this Section consists of all construction operations relating to designing, furnishing, and installing, complete

More information

INSTALLATION MANUAL. All Types F Series Rev G

INSTALLATION MANUAL. All Types F Series Rev G INSTALLATION MANUAL All Types - 1570 F Series Page 1 of 16 TABLE OF CONTENTS DESCRIPTION PAGE GENERAL INFORMATION & ADVISORIES 2 PRODUCT INFORMATION 3 GET TO KNOW YOUR CBU 4 HARDWARE AND COMPONENTS 5 CONCRETE

More information

UNIFORM STANDARD DRAWINGS CLARK COUNTY AREA, NEVADA YEAR 2015 REVISIONS

UNIFORM STANDARD DRAWINGS CLARK COUNTY AREA, NEVADA YEAR 2015 REVISIONS , NEVADA YEAR 2015 REVISIONS SECTION TITLE AND REVISIONS SUMMARY EFFECTIVE DATE 217.S2 "Residential Curb and Gutter, R-Type" - New drawing to accommodate ADA requirements. 223 "Residential Driveway" -

More information

CHAIN LINK FENCES AND GATES

CHAIN LINK FENCES AND GATES SECTION 02831 CHAIN LINK FENCES AND GATES PART 1 GENERAL 1.01 SUMMARY A. Alternate Material for Fence Post and Framing Material: Where schedule 40 galvanized steel is specified, the following will be accepted:

More information

Typical Deck Details Based on the 2009 International Residential Code (Designed and Printed August 2010)

Typical Deck Details Based on the 2009 International Residential Code (Designed and Printed August 2010) 1307 West Lehigh Street Bethlehem, PA 18018 610-866-9663 Office info@keycodes.net www.keycodes.net Typical Deck Details Based on the 2009 International Residential Code (Designed and Printed August 2010)

More information

CHAIN LINK FENCES AND GATES

CHAIN LINK FENCES AND GATES SECTION 02831 CHAIN LINK FENCES AND GATES PART 1 GENERAL 1.01 REFERENCES AND CODES A. Florida Department of Education, Office of Educational Facilities - State Requirements for Educational Facilities -

More information

Installation Instructions

Installation Instructions EconoDrain Trench Forming System Installation Instructions MultiDrain We Drain Your Site, Not Your Budget MultiDrain Systems, Inc. P.O. Box 88, Barium Springs, NC 28010 (704) 508-1010 or Toll Free 800-433-1119

More information

SECTION CHAIN LINK FENCES AND GATES

SECTION CHAIN LINK FENCES AND GATES SECTION 02831 CHAIN LINK FENCES AND GATES PART 1 GENERAL 1.01 REFERENCES AND CODES A. Florida Department of Education, Office of Educational Facilities - State Requirements for Educational Facilities -

More information

0331 Brick and block construction

0331 Brick and block construction 0331 BRICK AND BLOCK CONSTRUCTION 1 GENERAL 1.1 STANDARDS Materials and construction: To AS 4773.1 and AS 4773.2. 2 PRODUCTS 2.1 DURABILITY Exposure environment: [complete/delete] Exposure locations: To

More information

HANDSET WALL FORM. Handset Wall Form. Quick Assembly - can be built using only a hammer. Reduced weight increases productivity

HANDSET WALL FORM. Handset Wall Form. Quick Assembly - can be built using only a hammer. Reduced weight increases productivity HANDSET WALL FORM Quick Assembly - can be built using only a hammer Reduced weight increases productivity Unsurpassed flexibility in design and availability of panels for a wide variety of applications

More information

modular scaffolding R+

modular scaffolding R+ modular scaffolding R+ 1. Stand 6. Transverse U-transom Stand is the main element of modular scaffolding. Made of 48.2x3.2 mm steel pipe. Every 0,5m on the whole stand length are installed steel plates

More information

General: Exterior walks and paved areas constructed in conjunction with new building projects shall conform to the requirements of these guidelines.

General: Exterior walks and paved areas constructed in conjunction with new building projects shall conform to the requirements of these guidelines. General: Exterior walks and paved areas constructed in conjunction with new building projects shall conform to the requirements of these guidelines. Snow Removal Considerations: The requirement for snow

More information

APPENDIX A MEASUREMENT AND PAYMENT

APPENDIX A MEASUREMENT AND PAYMENT P-150 DEMOLITION 4.01 Removal of pavement shall be measured per square yard based on the area shown on the plans. Any pavement removed outside the designed limits of removal because the pavement was damaged

More information

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual Series 200 UL Introduction Series 200 UL Introduction SnapNrack Series

More information

HIGH RISE CONDO SOHO, NEW YORK, NY

HIGH RISE CONDO SOHO, NEW YORK, NY HIGH RISE CONDO SOHO, NEW YORK, NY TECHNICAL ASSIGNMENT 1 October 5, 2006 Joseph The Pennsylvania State University Structural Option Faculty Advisor: Andres Lepage TABLE OF CONTENTS TABLE OF CONTENTS 2

More information

Table of Contents 2. Structural Systems.4 Foundations.4 Floor System...4 Columns..5 Lateral System...5

Table of Contents 2. Structural Systems.4 Foundations.4 Floor System...4 Columns..5 Lateral System...5 WISCONSIN PLACE RESIDENTIAL TECHNICAL ASSIGNMENT 1 OCTOBER 5, 2007 KURT KRASAVAGE THE PENNSYLVANIA STATE UNIVERSITY STRUCTURAL OPTION FACULTY ADVISOR: DR. ALI MEMARI Table of Contents Table of Contents

More information

Retaining Wall Systems

Retaining Wall Systems Retaining Wall Systems Construction & Quality Control Tensar Earth Technologies, Inc. Manual CONSTRUCTION & QUALITY CONTROL This manual provides general guidelines for construction and quality control

More information

STANDARD CONSTRUCTION DETAILS SANITARY SEWER REVISED MARCH 2018 DEPARTMENT OF ENGINEERING

STANDARD CONSTRUCTION DETAILS SANITARY SEWER REVISED MARCH 2018 DEPARTMENT OF ENGINEERING STANDARD CONSTRUCTION DETAILS REVISED MARCH 2018 GENERAL NOTES EMBEDMENT DETAILS EMBEDMENT DETAILS TWO-WAY CLEANOUT - EXISTING LATERAL TWO-WAY CLEANOUT - NEW CONSTRUCTION TYPICAL SEWER HOUSE SERVICE CONNECTION

More information

Large cable sizes stronger than pipe/strut

Large cable sizes stronger than pipe/strut Legrand Seismic Wire Rope/Cable Bracing is the recommended seismic bracing for Legrand wire mesh and ladder tray systems. It is UL Listed, complies with all building codes and standards, and offers significant

More information

REPORT HOLDER: MITEK USA, INC. (FORMERLY USP STRUCTURAL CONNECTORS) SOUTHCROSS DRIVE, SUITE 200 BURNSVILLE, MINNESOTA EVALUATION SUBJECT:

REPORT HOLDER: MITEK USA, INC. (FORMERLY USP STRUCTURAL CONNECTORS) SOUTHCROSS DRIVE, SUITE 200 BURNSVILLE, MINNESOTA EVALUATION SUBJECT: 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 43 6587 (56) 699 0543 www.icc es.org ESR 3754 Reissued 09/07 This report is subject to renewal 09/09. DIVISION: 03 00 00 CONCRETE

More information

Z Z X X. Installation Instructions Bulletin Revision E Foundation Specifications. For 4.0 Meter Earth Station Antenna

Z Z X X. Installation Instructions Bulletin Revision E Foundation Specifications. For 4.0 Meter Earth Station Antenna Installation Instructions Bulletin 7547321 Revision E Foundation Specifications For 4.0 Meter Earth Station Antenna Y Y Z Z X X ASC Signal Corporation Earth Station Antennas www.ascsignal.com 1 of 18 Copyright

More information

HFX Adhesive Anchor Adhesive Anchoring Systems

HFX Adhesive Anchor Adhesive Anchoring Systems HFX Adhesive Adhesive ing Systems MD300 Dispenser HFX-M Mixer HFX Cartridge Standard Silicon Dispenser Product Description Hilti HFX is a new hybrid adhesive mortar combining resin, hardener, cement and

More information

05510: TAPERED STEEL TROLLEY POLES AND ACCESSORIES

05510: TAPERED STEEL TROLLEY POLES AND ACCESSORIES PART 1 GENERAL 1.01 DESCRIPTION A. The Vendor shall fabricate, furnish, test and deliver tapered steel trolley poles, including base plates, reinforced hand holes, anchor bolts, nuts and washers, and accessories

More information

2.7 LOGIX WALL CONSTRUCTION

2.7 LOGIX WALL CONSTRUCTION 2.7 LOGIX WALL CONSTRUCTION INTERLOCK The mechanism that holds successive courses of forms together. BARS The spaces between the lines. LINES The lines between the bars allow cuts to be easily made that

More information

EDGE7 Integrated Edge Protection System

EDGE7 Integrated Edge Protection System EDGE7 Integrated Edge Protection System Installation and Inspection Manual H I G H L A N D safety systems this page intentionally left blank table of contents SECTION ONE: INSTALLATION 4 6 8 10 13 16 18

More information

TRENCH SYSTEM Pedestrian channels are rated for 200 lbs./ft 2 Pedestrian channels are rated for 200 lbs./ft 2 8012 (10X10) 12" 10" 10" 10" 8022 (20X20) 12" 20" 20" 20" 8026 (24X24) 12" 24" 24" 24"

More information

STRUCTURAL STEEL FRAMING

STRUCTURAL STEEL FRAMING SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Section includes 1. Structural steel framing 2. Structural steel framing required for support and framing of rooftop mechanical

More information

TABLE OF CONTENTS. 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers

TABLE OF CONTENTS. 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers version 2.5 updated as of 08.04.2017 2 TABLE OF CONTENTS 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers 2.0 ASSEMBLY 2.1 Sequence of Assembly 2.2 Preparation

More information

Foundation Manual. Part Number: Version: Updated: July 5, S. Meadows Pkwy. A-9, #329 Reno, NV

Foundation Manual. Part Number: Version: Updated: July 5, S. Meadows Pkwy. A-9, #329 Reno, NV Foundation Manual Part Number: 150002 Version: 1.22 Updated: July 5, 2009 748 S. Meadows Pkwy. A-9, #329 Reno, NV 89521 775-831-9463 www.mariahpower.com July 2009, Mariah Power, All Rights Reserved Dear

More information

SECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories.

SECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories. SECTION 02830 CHAIN LINK FENCES AND GATES (GALVANIZED) 1.0 GENERAL 1.1 Section Includes A. Fence framework, fabric, gates, and accessories. B. Excavation for post bases; concrete footing for posts. C.

More information