1 Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010
2 Section I General Information This Operation and Maintenance Manual (O & M Manual) provides the information and guidance needed to thorough and complete operation and maintenance of the Lyon Creek Cedar Way Stormwater Detention Dam. It will provide information necessary for City of Mountlake Terrace Public Works employees to perform inspections and maintenance activities necessary to assure safe operation of the facility. General Description of the Facility The Lyon Creek Cedar Way Stormwater Detention Dam is located in the block of Cedar Way just downstream of the confluence of the east and west forks of Lyon Creek in the southeast corner of the City of Mountlake Terrace. The facility is owned and operated by the City of Mountlake Terrace. The facility was constructed in 1985 in accordance with recommendations contained in the 1981 Lyons Creek Watershed Comprehensive Drainage Plan. The dam was funded and constructed privately as part of the Creekside Apartment complex in lieu of on-site detention facilities and was also designed to meet the regional detention requirements outlined in the 1981 Comprehensive Drainage Plan. Construction type is homogeneous earthfill embankment with downstream drainage blanket. Structural fill height is 30 feet with a hydraulic height of 23 feet and total length of 175 feet. An additional one-foot of fill was added to the facility in 1991 following the recommendations of a 1990 Department of Ecology inspection report. Total active storage volume at the dam crest is 40 acre-feet. The facility also includes a fish ladder located at the outfall of the discharge pipe that is terraced to a location in the lower creek bed of Lyon Creek at the base of the downstream slope. Entranco Engineers provided full-time engineering inspection of the construction. Engineers from the Dam Safety Section (DSS) of the Department of Ecology also inspected the project periodically during construction. Entranco and Ecology DSS subsequently certified that the dam was built in accordance with the approved original plans. Several modifications have been made to the original structure since 1985 all at the suggestion of Ecology DSS. In January 1986, a flood surge eroded the embankment area adjacent to the fish ladder. The City repaired the damage later that year. In 1990, a low berm approximately six inches high was installed along Cedar Way to the west of the right abutment to prevent overflow down the right-of-way from entering the impoundment area. Also in 1990, a concrete erosion cut-off wall was installed in the emergency spillway. In 1991, additional fill was added to the top of the dam to raise the crest elevation by one foot. All changes were recommended in 1990 periodic inspection by DSS. Additional facility information is included in the Project Data Sheet information beginning on page 3 of this section. Page 2
3 Operating Personnel Responsibilities Overall responsibility for the project Overall responsibility for Public Works Maintenance Annual Inspections Weekly and Monthly Inspections Scheduling and Performing Routine Maintenance City of Mountlake Terrace Public Works Director Curt Brees Stormwater Program Manager Mike Shaw Stormwater Division Employees Public Work Supervisor Shawn Hjert Stormwater Division Employees Lyon Creek Cedar Way Stormwater Detention Dam Project Data Information General State I.D. Number SN Owner and Operator City of Mountlake Terrace Location Cedar Way, Mountlake Terrace Year Constructed 1985 Purpose Flood Control, Stormwater Detention Downstream Hazard Potential High, Hazard Class 1B Reservoir Watershed Drainage Area Spillway Overflow Elevation Surface Area at Spillway Crest Active Storage at Spillway Crest Surface Area at Dam Crest Active Storage at Dam Crest Lyon Creek 1040 Acres MSL 3 acres 25 acre-feet 6 acres 40 acre-feet Dam Embankment Type Structural Height Hydraulic Height Dam Crest Elevation (typical) Crest Length Earthfill with downstream drainage blanket 30 feet (includes core trench) 23 feet feet MSL 175 feet Page 3
4 Crest Width Upstream Slope Downstream Slope 12 feet 3 H : 1 V 3 H : 1 V Principal Spillway Type Concrete Drop Inlet Location Center of Dam Discharge Capacity 140 cfs (at water level 295.5) Overflow Elevation feet MSL Diameter of Riser 54 inches Diameter of Discharge Conduit 36 inches Length of Discharge Conduit 85 feet RCP, feeds into fish ladder 37 feet long Emergency Spillway Type Location Discharge Capacity Control Section Overflow Elevation Fuse Plug Base Elevation Gabion-lined Open Channel with Fuse Plug Center of Dam 590 cfs (at water level ft.) Base width 32 feet, side slopes 2.7 H : 1 V MSL (0.3 feet higher than design elevation) Erodible to feet MSL, base width 25 feet Outlet Works Type Location Discharge Capacity Controls 36-inch diameter concrete pipe with 13-inch diameter orifice plate at pipe entrance Center of Dam; feeds into Principal Spillway drop inlet riser and discharge pipe 20 cfs (at water level ft.) None, orifice has fixed diameter Top of Detention Facility Looking East Page 4
5 Section II Reservoir Operation Plan The Lyon Creek Cedar Way Stormwater Detention Facility is a passive, fixed orifice detention structure and requires no day-to-day operational attention. Periodic storms will raise the water level in the reservoir to varying levels depending on the intensity and duration of the storm. The fish ladder structure is also fixed and non-moving, requiring no periodic adjustment. Flow through the discharge conduit will reach capacity during storm events resulting in ponding in the reservoir to an elevation of feet MSL at which time flow will begin to enter the overflow riser and fall directly into the 36-inch discharge conduit. Internal drainage is provided by a blanket drain under the west half of the downstream side of the embankment. PVC pipes were installed in the lower end of the blanket to collect the seepage. The pipes drain to a single outlet pipe which discharges next to the lower end of the fish ladder. Detention Facility Nearing Overflow Page 5
6 Section III Maintenance Plan Maintenance Schedule for Lyon Creek Cedar Way Stormwater Detention Dam Element Frequency Description Dam Embankment Vegetation Control Control of Burrowing Animals Quarterly Cut grass at least three times during the summer growing months to allow for visual surveillance of the embankment surface. Maximum grass height should not exceed six inches. Remove trees or brush. Do not remove trees larger than six inches in diameter without advice from the Dam Safety Section, Department of Ecology. Repair animal burrowing damage by compacting fill into the excavated areas. If the burrowing is extensive, seek the advice of the Dam Safety Section, Department of Ecology. Maintain vegetation at a low level to eliminate cover for animals. Maintain Crest Design Elevation Erosion Control on Upstream and Downstream Slopes Principal Spillway and Fish Ladder Spillway Channel Maintain the design elevation of earthen and compacted gravel surfaces by leveling and grading the crest to design specifications. Fill any ruts or minor depressions. Repair erosion gullies by removing loose materials and replacing with compacted fill. Add gravel or grass as appropriate. Remove any obstructions or debris from outlet and fish ladder. Visually examine visible portions of outlet pipe. Perform confined space entry to inspect pipe at overflow riser connection point. Page 6
7 Element Frequency Description Fish Ladder Channel Outfall and Stilling Area Emergency Spillway Spillway Channel Outlet Works Trash Rack Inlet and Orifice Plate Low Level Outlet Blanket Drain PVC Drain Pipe or as needed Remove accumulated sediment from resting pools. Replace plywood weirs as needed. Remove accumulated debris, check for settlement or erosion. Replace gabion baskets and interties. Replace gabion baskets and interties. Repair erosion damage and remove accumulated sediment and debris. Remove debris, check for damage or problems. Remove accumulated sediment from around the trash rack and culvert intake. Visually inspect visible portions of 36 outlet pipe from inlet to overflow structure. Monitor for drainage. Report any change in drainage from this pipe to DSS. Page 7
8 Section IV Inspection Plan Inspection Plan for Lyon Creek Cedar Way Stormwater Detention Dam Weekly and After Every Flood Event Where Water Ponds Above the Inlet 1. Visually examine the condition of: a. Dam crest b. Upstream and downstream faces c. Spillway, fish ladder and stilling basin d. Inlet structure and overflow riser 2. Check inlet structure, overflow riser, spillway and fish ladder for debris 3. Visually examine upstream and downstream faces for erosion or animal burrows. 4. Check seepage area at left abutment 1. Inspect dam crest, upstream face and downstream face for settling or erosion 2. a. Inspect visible portions of outlet works and principal spillway b. Perform confined space entry into the overflow riser to inspect principal spillway 3. Inspect inlet structure and fish ladder for accumulated sediments 4. Inspect wire gabions and interties 5. Review and update Emergency Action Plan Page 8
9 Section V Instrumentation and Monitoring The Lyon Creek Cedar Way Stormwater Detention Dam has no monitoring instrumentation or any measuring devices that need to be monitored on an ongoing basis. Lyon Creek Cedar Way Stormwater Detention Dam Updating This O & M Manual should be reviewed and updated annually by the City of Mountlake Terrace Public Works Department. Elements to be updated include: Names and phone numbers of operating personnel Alterations to project data due to changes at the dam Changes in operation and/or maintenance procedures Increase or decrease in the frequency of maintenance routines based on recent performance Distribute updated O & M Manual information to: Permanent record file at Mountlake Terrace City Hall Washington State Department of Ecology, Dam Safety Section Page 9
10 Lyon Creek Cedar Way Detention Dam Weekly Report Dam Tender Date Time A.M / P.M. Weather Clear Overcast Cloudy Cold Cool Hot Warm Raining Dry Has Rained Freezing Amount of Water Behind Dam Feet Inspection of Crest Cracking Slumps Instability Erosion Needs Mowing Other Good Inspection of East and West Abutments East Water from spring? Vegetation Needs Mowing? West Good Condition Vegetation Needs Mowing? Check Drainpipe at Lower End of Fish Ladder Draining Plugged Needs Work No Seepage Inspect Spillway Trash Clear Needs Repair Water at Overflow Stage Settlement Emergency Spillway Inspect Gabions Settlement Alignment Washing of Fuse Plug Rock Missing Bottom Erosion or Scour Inspection of Outlet Works Low Water Headwall O.K. Fish Ladder Needs Repair Deck Over Fish Ladder O.K. Inspect Downstream Gabions Along West Bank O.K. Downstream Outfall Area Clear Needs Cleaning Loose or Missing Tie Wire Spillway in Good Condition High Water Fish Ladder O.K. Fish Ladder Needs Repair Deck Needs Repair Needs Repair Type Washed Out Other Page 10
Extended Detention Basin Maintenance Plan for [[== Insert Project Name ==]]
Extended Detention Basin Plan for [[== Insert Project Name ==]] [[== Insert Date =]] Project Address and Cross Streets Assessor s Parcel No.: Property Owner: Phone No.: Designated Contact: Phone No.: Extended
More informationSuggested Stormwater Management Practices For Individual House Lots
Suggested Stormwater Management Practices For Individual House Lots These practices are necessary to satisfy the water quantity and water quality criteria of the Rappahannock Stormwater Ordinance. These
More informationSTORM DRAINAGE DESIGN MANUAL
Appendix I STORM DRAINAGE DESIGN MANUAL by: SUNGATE DESIGN GROUP, P.A. GEN ERAL DESIGN STAN DARDS AN D POLICIES 1. STREET AND LOCAL DRAINAGE Discharge estimates for specified design storms shall be calculated
More informationVisual Inspection Checklist
APPENDIX Q. Visual Inspection Checklist Thispageintentionallyleftblank. VISUAL INSPECTION CHECKLIST CITY OF AUBURN PUBLIC WORKS DEPARTMENT INSPECTION YEAR: TYPE OF INSPECTION: (Informal, Regular, Formal):
More informationHISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY. Carrollton, Georgia 30116
(i) Site Name and Ownership Information: HISTORY OF CONSTRUCTION 40 CFR 257.73(c)(1)(i)-(xii) PLANT WANSLEY ASH POND (AP-1) GEORGIA POWER COMPANY Site Name: Site Location: Site Address: Owner: Owner Address:
More information4.4.6 Underground Detention
4.4.6 Underground Detention Limited Application Water Quality BMP Description: Detention storage located in underground pipe systems or vaults designed to provide water quantity control through detention
More informationAMERICAN ELECTRIC POWER (SWEPCO)
2016 DAM & DIKE INSPECTION REPORT ASH PONDS GERS-16-163 WELSH POWER PLANT AMERICAN ELECTRIC POWER (SWEPCO) CASON, TEXAS NATIONAL INVENTORY NO. TX4357 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION
More informationCONSTRUCTION PLAN CHECKLIST
CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted
More informationSC-01 Surface Outlet and Baffle Sediment Basin
Greenville County Technical Specification for: SC-01 Surface Outlet and Baffle Sediment Basin 1.0 Surface Outlet and Baffle Sediment Basin This Specification contains requirements for the design and construction
More informationFormal Annual Inspection It is recommended that you customize this form to fit your dam. Pre-Inspection Information
Formal Annual Inspection It is recommended that you customize this form to fit your dam. Pre-Inspection Information Name of Dam: Inspection Date: Current Weather: Weather During Last Week: Name of Creek,
More informationConstruction Inspection Checklists
III. Construction Inspection Checklists 33 Bioretention - Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: Construction Sequence Satisfactory / Unsatisfactory Comments
More informationHISTORY OF CONSTRUCTION 40 CFR (c)(1)(i) (xii) PLANT HAMMOND ASH POND (AP 2) GEEORGIA POWER COMPANY
HISTORY OF CONSTRUCTION 40 CFR 257.73(c)(1)(i) (xii) PLANT HAMMOND ASH POND (AP 2) GEEORGIA POWER COMPANY (i) Site Name and Ownership Information: Site Name: Plant Hammond Site Location: Site Address:
More informationVICINITY MAP AND SITE MAP. Page 1 of 9
INTRODUCTION... 2 1. Background Information of West Bottom Ash Pond (BAP)... 2 1.1 Facility Location Description...2 1.2 Description of West BAP CCR Unit...2 1.2.1 Embankment Configuration...2 1.2.2 Construction
More information2017 Annual Dam and Dike Inspection Report
2017 Annual Dam and Dike Inspection Report Bottom Ash Pond Complex Mitchell Plant Wheeling Power Company & Kentucky Power Company Marshall County, West Virginia October 20, 2017 Prepared by: American Electric
More information2015 INSPECTION REPORT FLY ASH DAM and BOTTOM ASH POND COMPLEX JOHN AMOS PLANT ST. ALBANS, WEST VIRGINIA. June 2015
2015 INSPECTION REPORT FLY ASH DAM and BOTTOM ASH POND COMPLEX JOHN AMOS PLANT ST. ALBANS, WEST VIRGINIA June 2015 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS,
More informationDTE Energy St. Clair Power Plant
DTE Energy St. Clair Power Plant Unit 6 Scrubber Basins CCR Rule Compliance Project Annual Inspection Report - 2017 Project Number: 60546402 June 30, 2017 Prepared by: 27777 Franklin Road, Suite 2000 Southfield,
More informationDTE Energy Monroe Power Plant
DTE Energy Monroe Power Plant Inactive Bottom Ash Impoundment CCR Rule Compliance Project Annual Inspection Report - 2018 Project Number: 60516675 September 7, 2018 Prepared by: 27777 Franklin Road, Suite
More informationChapter 5.5 Inlets, Outlets, and Flow Control
Chapter 5.5 Inlets, Outlets, and Flow Control There are common structural elements of SCMs that are designed to safely route water. Engineered flow control devices are used to effectively route water at
More informationManual for Erosion and Sediment Control Updates
Manual for Erosion and Sediment Control Updates Chapter 1 - The Erosion and Sedimentation Act of 1975 Minor revisions were made to content Existing pictures were replaced with new ones Chapter 2 Sediment
More informationRETENTION BASIN EXAMPLE
-7 Given: Total Tributary Area = 7.5 ac o Tributary Area within Existing R/W = 5.8 ac o Tributary Area, Impervious, Outside of R/W = 0.0 ac o Tributary Area, Pervious, Outside of R/W = 1.7 ac o Tributary
More informationCoal Combustion Residuals Inflow Design Flood Control System Plan
gaiconsultants.com I transforming ideas into reality., Coal Combustion Residuals Inflow Design Flood Control System Plan Virginia Electric and Power Company Possum Point Power Station Surface Impoundment
More informationBowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP)
Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP) SMP-11 PLANNING CONSIDERATIONS: Design Life: 1 yr Acreage
More informationSuitable Applications Where concentrated flow of surface runoff must be conveyed down a slope in order to prevent erosion.
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective
More informationAMERICAN ELECTRIC POWER (SWEPCO)
2015 DAM & DIKE INSPECTION REPORT ASH PONDS GERS-15-034 WELSH POWER PLANT AMERICAN ELECTRIC POWER (SWEPCO) CASON, TEXAS NATIONAL INVENTORY NO. TX4357 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION
More informationInspection and Maintenance of Stormwater Control Measures: Helping Protect Greensboro s s Water Quality and Water-Supply
Inspection and Maintenance of Stormwater Control Measures: Helping Protect Greensboro s s Water Quality and Water-Supply NC APWA Stormwater Management Conference-September 16, 2013 Program Background Privately
More informationDam Safety Inspection Checklist
Dam Safety Inspection Checklist Complete All Portions of This Section (Pre-inspection) Date of Inspection: Name of Dam: EAP: (yes, no) OM&I: (yes, no) File Number: Review Inventory - Highlight missing
More informationWQ-06 SAND FILTER. 1.0 Sand Filter. Greenville County Technical Specification for: 1.1 Description
Greenville County Technical Specification for: WQ-06 SAND FILTER 1.0 Sand Filter 1.1 Description Sand Filters remove pollutants through sedimentation and filtration within the sand. The primary components
More informationGreen CCR Landfill. Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2016 Annual Inspection Report
Green CCR Landfill Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2016 Annual Inspection Report January 10, 2017 Prepared By: Project ID: 160122B Big Rivers
More informationJim Bridger Power Plant
2015 Coal Combustion Residuals Annual Inspection Jim Bridger Power Plant Industrial Landfill Prepared for PacifiCorp Energy North Temple Office 1407 West North Temple Salt Lake City, Utah 84116 Final December
More informationDry Swale Wet Swale Grass Channel Dry Well Permeable Pavement Bioretention DESIGN ELEMENTS
FACILITY ID: DATE: / / ASSESSED BY: NAME: ADDRESS: PHOTO IDS: SECTION 1- BACKGROUND INFORMATION (GIS) BMP TYPE : Dry Detention Pond Extended Detention Pond Wet Pond Filter (specify: ) Infiltration (specify:
More informationCCR Rule Annual Inspection Report 2
Inspection Description An ARCADIS team performed the Trimble County Gypsum Storage Pond (GSP) 2015 annual inspection by a qualified professional engineer. The overall goal of the inspection was to ensure
More informationSediment Basin. Fe= (Depends on soil type)
3.9 Sediment Control Description: A sediment basin is an embankment with a controlled outlet that detains stormwater runoff, resulting in the settling of suspended sediment. The basin provides treatment
More information2018 Annual Dam and Dike Inspection Report
218 Annual Dam and Dike Inspection Report Bottom Ash Pond Northeastern 3&4 Plant Public Service Company of Oklahoma Oologah, Oklahoma September 218 Prepared for: Public Service Company of Oklahoma Northeastern
More informationSupplemental Watershed Plan Agreement No. 10 for Neshaminy Creek Watershed Core Creek Dam (PA-620) Bucks County, Pennsylvania
Supplemental Watershed Plan Agreement No. 10 for Neshaminy Creek Watershed Core Creek Dam (PA-620) Bucks County, Pennsylvania Project Authorization USDA's Small Watershed Program is carried out under the
More informationSubmittal Requirements. Post Construction Verification Document Plan Requirements
Submittal Requirements Post Construction Verification Document survey plan in accordance with the items of this Checklist Supporting calculations in accordance with the items of this Checklist A copy of
More informationOPERATIONS AND MAINTENANCE MANUAL. Project: STORMWATER CONTROL STRUCTURE Wet Detention Pond. Cary, NC. Owners: Prepared By: Date:
OPERATIONS AND MAINTENANCE MANUAL Project: STORMWATER CONTROL STRUCTURE Wet Detention Pond Cary, NC Owners: Prepared By: Date: Site/Subdivision Project # Project: Date Constructed: Location: Receiving
More information2016 ANNUAL INSPECTION REPORT W.H. Sammis Coal Plant South Pond Stratton, Ohio
Prepared for: FirstEnergy Generation, LLC 76 South Main St Akron, Ohio 44308 2016 ANNUAL INSPECTION REPORT W.H. Sammis Coal Plant South Pond Stratton, Ohio Prepared by: 10211 Wincopin Circle, Floor 4 Columbia,
More informationStandard for Wet Ponds
New Jersey Stormwater Best Management Practices Manual February 2004 Definition Purpose C H A P T E R 9. 1 1 Standard for Wet Ponds A wet pond is a stormwater facility constructed through filling and/or
More informationFinal Drainage Report
Thornton Electric Substation Project Final Drainage Report December 14, 2016 DRAFT Prepared for: Xcel Energy, 1800 Larimer Street, Suite 400, Denver, Colorado 80202 Prepared by: 350 Indiana Street, Suite
More information4.12. Detention Basins
4.12. Detention Basins Detention Basins can be a cost effective method to provide temporary storage, conveyance, and treatment of runoff when used within the context of Low Impact Development (LID) strategies.
More informationBlock and gravel filters can be used where velocities are higher. Reduces the amount of sediment leaving the site.
INLET PROTECTION From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.state.ma.us/dep/brp/stormwtr/files/esfull.pdf Definition: A sediment filter or an excavated
More informationTEMPORARY SEDIMENT TRAP CODE
ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY SEDIMENT TRAP CODE 960 Source: DEFINITION A small temporary stormwater storage structure designed to trap sediment. PURPOSE The purpose of this practice
More informationLimited Visual Dam Safety Inspections OA Wahiawa Dam. Oahu, Hawaii
Limited Visual Dam Safety Inspections OA00017 Wahiawa Dam Oahu, Hawaii Prepared by: U.S. ARMY CORPS OF ENGINEERS HONOLULU DISTRICT STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES May 2006 Dam
More informationMr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No
Environmental Resources Management January 13, 2017 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0352436 CityCentre Four 840 West Sam Houston Parkway North, Suite 600 Houston,
More informationINITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257
INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 HUFFAKER ROAD (PLANT HAMMOND) PRIVATE INDUSTRIAL LANDFILL (HUFFAKER ROAD LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion
More informationLow Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent
Slope Drains DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [1] Slope drains can act as outlet
More informationLow Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent
Slope Drains DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [1] Slope drains can act as outlet
More informationEarth Dikes and Drainage Swales
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective
More informationAppendix D Index. SWM/BMP Facility Site Photographs. Subshed 440 Facility Photo #
Index Subshed 440 Facility Photo # 19 1-3 489 4-7 Subshed 444 Facility Photo # 63 8-9 207 No photo 208 No photo 632 10-12 Subshed 448 Facility Photo # 28 13-16 481 17-20 5147 21-23 5255 24-25 5355 No photo
More informationMcElroy s Run Impoundment Structural Stability Assessment Report
Allegheny Energy Supply Company, LLC A FirstEnergy Company Pleasants Power Station Pleasants County, West Virginia October 2016 Prepared for: Allegheny Energy Supply Company, LLC A FirstEnergy Company
More informationPonds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.
POND SITE SELECTION AND CONSTRUCTION Uses, Planning, & Design David Krietemeyer Area Engineer USDA-NRCS June 20, 2008 Uses Considerations for Location of Commonly Used Terms Pond A water impoundment made
More informationFlood Hazard Assessment Report Falls Gulch, Larimer County, Colorado January 16, 2013
United States Department of Agriculture Natural Resources Conservation Service Denver Federal Center Building 56, Room 2604 P.O. Box 25426 Denver, CO 80225 720-544-2818-OFFICE alton.albin@co.usda.gov Flood
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationSediment Basins and Skimmers. Jay Dorsey/John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources
Sediment Basins and Skimmers Jay Dorsey/John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Dewatering Risers in Basins: Single orifice Perforated and wrapped riser And now
More informationNovember 2011 Updated August 2014
November 2011 Updated August 2014 INDEX BMP SUMMARY FOR CONSTRUCTION SITES GENERAL DESIGN GUIDELINES ESC 1.0...Permanent Seeding ESC 2.0...Temporary Seeding ESC 3.0...Temporary Construction Entrance ESC
More informationAPPENDIX A EARTHEN EMBANKMENT. VERSION 1.0 March 1, 2011
APPENDIX A EARTHEN EMBANKMENT VERSION 1.0 March 1, 2011 SECTION A-1: DESCRIPTION OF PRACTICE An earthen embankment is a raised impounding structure made from compacted soil. The embankment is the feature
More informationProperly constructing and maintaining a road drainage system is the most effective ways to reduce flood damage
Mitigating Flood Damage to Vermont Local Roads Properly constructing and maintaining a road drainage system is the most effective ways to reduce flood damage Vermont Emergency Management Vermont Local
More informationIndex. outlet protection Rev. 12/93
6 Index outlet protection level spreader outlet stabilization structure 6.40.1 6.41.1 Rev. 12/93 Practice Standards and Specifications 6.40 level spreader Definition Purpose Conditions Where Practice Applies
More information3.11 Sand Filter Basin
3.11 Sand Filter Basin Type of BMP Priority Level Treatment Mechanisms Maximum Drainage Area Flow-Through Treatment Priority 3 Treatment Control BMP Filtration 25 acres Description The Sand Filter Basin
More informationYork County STORMWATER LUNCH & LEARN
York County STORMWATER LUNCH & LEARN TOPICS Points of Exposure SWPPP's NOT's Construction Sequence Permanent BMP's Basin Details Major and Minor Modifications Construction Buffers Stabilization Questions
More informationMcElroy s Run Impoundment Coal Combustion Residual Annual Report
Allegheny Energy Supply Company, LLC A FirstEnergy Company Pleasants Power Station Pleasants County, West Virginia GAI Project Number: C150917.01 January 2016 Prepared for: Allegheny Energy Supply Company,
More informationTips with Creation of your Erosion and Sediment Control Plan
Tips with Creation of your Erosion and Sediment Control Plan By Chris Droste, CESCO Senior Erosion Control Specialist Westmoreland Conservation District Forming Your Narrative Use the DEP checklist. Page
More informationINITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR
INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR 257.82 EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part 257 and Part
More informationDAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety
DAM INSPECTION CHECKLIST Department of Environmental Protection Bureau of Waterways Engineering Division of Dam Safety NAME OF DAM: Milltown Dam DEPDAMNO.: 15-146 LOCATION: Municipality: East Goshen Township
More informationInstallation and Maintenance of Erosion Control BMPs
Installation and Maintenance of Erosion Control BMPs Or Common BMPs Applications Specifications Installation Problems Maintenance Utility Design Professionals Clarifications, proactive problem solving
More information2016 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO
2016 LANDFILL INSPECTION REPORT GERS-16-004 CARDINAL PLANT BRILLIANT, OHIO PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS, OHIO Cardinal Plant Landfill Inspection
More informationJacobi, Toombs, and Lanz, Inc.
Area 5: Blackiston Mill Road at Dead Man's Hollow Flooding Assessment Jacobi, Toombs, and Lanz, Inc. This document summarizes an assessment of drainage and flooding concerns and provides recommendations
More informationChapter 11 Culverts and Bridges
Chapter 11 Table of Contents 11-1 Introduction... 1 11-2 General Design... 1 11-2-1 Design Criteria... 1 11-2-2 Design Flows... 1 11-2-3 Permitting and Regulations... 2 11-2-4 Aesthetics and Safety...
More informationChapter 11 Culverts and Bridges
Chapter 11 Table of Contents 11-1 Introduction... 1 11-2 General Design... 1 11-2-1 Design Criteria... 1 11-2-2 Design Flows... 1 11-2-3 Permitting and Regulations... 2 11-2-4 Aesthetics and Safety...
More informationDESIGN GRADING AND EROSION CONTROL A. Slope Criteria
Section 5. DESIGN GRADING AND EROSION CONTROL A. Slope Criteria Earthen slopes shall conform to the following: Maximum slope should not be steeper than 6:1 (horizontal to vertical) unless protected from
More information378 - POND NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE SPECIFICATION I. SCOPE
378-1 NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE SPECIFICATION 378 - POND I. SCOPE The work shall consist of constructing an earthfill embankment and appurtenances to the lines, grades,
More informationMD Exhibit MD1 SMALL POND DESIGN CHECKLIST. ProjectName. Engineering Firm Date Submitted. Vicinity Map Pond Summary Sheet (MD-ENG-14) Pond Class
MD501.06 Exhibit MD1 SMALL POND DESIGN CHECKLIST ProjectName Engineering Firm Date Submitted Vicinity Map Pond Summary Sheet (MD-ENG-14) Pond Class REVIEW INDEX R (required, not submitted) NA (not applicable)
More informationWater Control Structures Selected Design Guidelines Alberta Environment Page 13-1
Alberta Environment Page 13-1 13.0 DROP INLET SPILLWAYS 13.1 General The drop inlet spillway is commonly used for providing flood protection for earth dams which have smaller reservoirs and/or smaller
More informationAnnual Inspection Report CCR Surface Impoundment. MidAmerican Energy Company, Louisa Generating Station
Annual Inspection Report CCR Surface Impoundment MidAmerican Energy Company, Louisa Generating Station Final January 15, 2016 Annual Inspection Report CCR Surface Impoundment Prepared for MidAmerican Energy
More information2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1
2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 There are three ways to accomplish urban soil erosion and sedimentation control: Allow erosion to take place and then control sediment
More informationEROSION CONTROL GENERAL NOTES EC JAN 2017 C.B.
EROSION CONTROL GENERAL NOTES EC - 000 EROSION CONTROL GENERAL NOTES EC - 001 INSTALL TEMPORARY DRIVEWAY CULVERT IF THERE IS A ROADSIDE DITCH PRESENT EXISTING PAVEMENT OR APPROVED ACCESS POINT OR AS PRACTICABLE
More informationAPPENDIX G Stormwater Control Operations and Maintenance Requirements
APPENDIX G Stormwater Control Operations and Maintenance Requirements This appendix contains the maintenance requirements for the following typical stormwater facilities and components: No. 1 Detention
More informationDescription. Installation and Implementation Requirements
Earth Dike SC-6 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description Structure that prevents erosion by intercepting, diverting, and conveying surface run-on (storm water
More informationGreen CCR Landfill. Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2017 Annual Inspection Report
Green CCR Landfill Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2017 Annual Inspection Report January 11, 2018 Prepared By: Project ID: 170138B Big Rivers
More informationExtended Detention Basin Design
Extended Detention Basin Design 1 Extended Detention 2 Ohio Department of Transportation 1 Extended Detention Basin L&D Vol. 2 Section 1117.3 Provides quality and quantity treatment 3 Extended Detention
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or any
More informationTable of Contents. Attachments Attachment A Photos Attachment B Inspection Map. Pages 3 of 10
Table of Contents 1.0 Introduction...4 2.0 Description of Landfill...4 3.0 Review of Available Information...5 4.0 Inspection...5 4.1 Changes in Geometry since Last Inspection...5 4.2 Volume...5 4.3 Definitions
More informationSECTION EROSION CONTROLS
SECTION 31 25 13 EROSION CONTROLS PART 1 GENERAL 1.1 SUMMARY A. Section Includes installing, maintaining and removing: 1. Silt Fence. 2. Temporary Construction Entrances. 3. Diversion Channels. 4. Sediment
More informationV. DRAINAGE IMPROVEMENTS
V. DRAINAGE IMPROVEMENTS 5.1 Formulation of Drainage Improvements As indicated in Chapter 4, following the completion of the hydrologic analysis associated with future land use conditions, drainage improvements
More informationTable of Contents. Attachments Attachment A Photos Attachment B Site Map. Pages 3 of 9
Table of Contents 1.0 Introduction...4 2.0 Description of Landfill...4 3.0 Review of Available Information...5 4.0 Inspection...5 4.1 Changes in Geometry since Last Inspection...5 4.2 Volume...5 4.3 Definitions
More information2016 ANNUAL DAM AND DIKE INSPECTION REPORT. Bottom Ash Ponds. Rockport Plant Spencer County, Indiana. December 6 th, 2016
2016 ANNUAL DAM AND DIKE INSPECTION REPORT Bottom Ash Ponds Rockport Plant Spencer County, Indiana December 6 th, 2016 Prepared for: Indiana Michigan Power Company Rockport Plant 2791 North US 231 Rockport,
More informationBEST MANAGEMENT PRACTICES OPERATION AND MAINTENANCE PLAN FOR STORMWATER-MANAGEMENT STRUCTURES FORT CARSON, COLORADO
BEST MANAGEMENT PRACTICES OPERATION AND MAINTENANCE PLAN FOR STORMWATER-MANAGEMENT STRUCTURES FORT CARSON, COLORADO Fort Carson Directorate of Public Works Environmental Division, Stormwater Program December
More informationChapter 11 Culverts and Bridges
Chapter 11 Culverts and Bridges Contents 1.0 Introduction... 1 2.0 General Design... 1 2.1 Design Criteria... 1 2.2 Design Flows... 1 2.3 Permitting and Regulations... 1 2.4 Aesthetics and Safety... 2
More informationRefinement Task 19 Minne Lusa Basin Search for Hybrid Alternatives
Refinement Task 19 Minne Lusa Basin Search for Hybrid Alternatives TO: Roger Coffey, PMT Document Control Center, CH2M Hill COPY: Jim Theiler, City of Omaha Scott Aurit, PMT Tom Heinemann, PMT FROM: Jim
More informationReport. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI
Report Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,
More informationLAKE CHEMUNG DAM LOCATION MAP
LAKE CHEMUNG DAM LOCATION MAP LAKE CHEMUNG DAM OUTLET LAKE CHEMUNG DAM From: deq-wrd-qreq To: Steve Nagy Subject: RE: flood or low flow discharge request (ContentID - 168812) Date: Friday, June 26, 2015
More informationSediment Control Practices
Sediment Control Practices SMP-05 Temporary Diversions, Berms or Ditches Symbol TD Description These temporary drains offer features such as conveyance for runoff down cut or fill slopes, subsurface drains
More informationChapter 6 Sand Filtration Treatment Facilities
Sand Filtration Treatment Facilities 6.1 Purpose This chapter presents criteria for the design, construction and maintenance of runoff treatment sand filters. Treatment sand filters are used to collect,
More informationDAM SAFETY INSPECTION REPORT GLENWOOD LAKE DAM CLASS B, INTERMEDIATE HAZARD DAM
May 1, 2013 DAM SAFETY INSPECTION REPORT GLENWOOD LAKE DAM CLASS B, INTERMEDIATE HAZARD DAM Name of Dam: Glenwood Lake Dam Westchester County, NY, NYSDEC ID No. 215-0184 NATDAM ID No. NY13618 Hazard Potential:
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part 257.82 PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part
More informationENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION
NEW CASTLE COUNTY DEPARTMENT OF LAND USE ENGINEERING CHECKLIST SEDIMENT & STORMWATER MANAGEMENT BASIN CONSTRUCTION For Permanent Structures, pursuant to Delaware Pond Code 378 and Delaware Sediment and
More informationWQ-08 ENHANCED DRY SWALE
Greenville County Technical Specification for: WQ-08 ENHANCED DRY SWALE 1.0 Enhanced Dry Swale 1.1 Description An Enhanced Dry Swale is a shallow open-channel drainage way stabilized with turf grass or
More informationWater Control Structures Selected Design Guidelines Alberta Environment Page 14-1
Alberta Environment Page 14-1 14.0 LOW LEVEL OUTLET WORKS 14.1 General In general, a low level outlet structure can be used to provide one or more of the following functions: Supply adequate water to meet
More informationNorth Umpqua Hydroelectric Project (FERC 1927) Erosion Control Plan Site Remediation/ Assessment Form
(FERC 1927) Erosion Control Plan Site Remediation/ Assessment Form Site # CW2-3 Priority Ranking Med Locator Information/GPS Lat: Long: Impact Rating 3 Start Project Development: Clearwater 2 Risk Rating
More informationINITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257
INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 PLANT BOWEN PRIVATE INDUSTRY SOLID WASTE DISPOSAL FACILITY (ASH LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals
More information