1 PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish all labor, materials, equipment and incidentals to provide a complete structural precast hollow core slab system as shown on the Contract Drawings and as herein specified. B. Coordinate with other trades for hanger requirements. Install hanger tabs in grout joints where requested RELATED WORK A. Section 03210, Concrete Reinforcement B. Section 03300, Cast-In-Place concrete 1.03 REFERENCED STANDARDS A. ACI Structural Concrete for Buildings. B. ACI Building Code Requirements for Reinforced Concrete. C. ACI 350 Code Requirements for Environmental Engineering Concrete Structures D. ANSI/AWS D1.1 - Structural Welding Code - Steel. E. ANSI/AWS D1.4 - Structural Welding Code - Reinforcing Steel. F. ASTM A36 - Structural Steel. G. ASTM A416 - Undercoat Seven-Wire Stress-Relieved Strand for Prestressed Concrete. H. ASTM A615 - Deformed and Plain Billet-Steel Bars for Concrete Reinforcement. I. ASTM C150 - Portland Cement. J. PCI MNL Manual for Quality Control for Plants and Production of Precast and Prestressed Concrete Products. K. PCI MNL Design Handbook - Precast and Prestressed Concrete. L. PCI MNL Manual on Design of Connections for Precast Prestressed Concrete. M. PCI MNL PCI Design for Fire Resistance of Precast Prestressed Concrete. TALL OAKS STP

2 N. PCI Manual for the Design of Hollow Core Slabs. O. UL - Underwriters' Laboratories. P. New York State Building Code 1.04 SUBMITTALS A. The Contractor shall submit Shop Drawings of proposed materials in accordance with Section and as herein specified. B. Product Data: 1. Submit manufacturer s specifications and instructions for manufactured materials and products. Include manufacturers certifications and PCI Quality Control Program test reports as required. C. Samples: 1. Submit samples representative of finished exposed face showing typical range of color and texture prior to commencement of production. 2. Sample Size shall be approximately 12 in x 12 in. and of appropriate thickness, representative of the proposed finished product. D. Shop Drawings 1. Submit shop drawings showing complete information for fabrication and installation of precast concrete units. Indicate member dimensions and crosssection, location size and any type of reinforcement, including special reinforcement and lifting devices necessary for handling and erection. 2. Submit erection drawings meet the requirements as outlined below a. Member piece marks and completely dimensioned size and shape of each member. b. Plans and/or elevations locating and defining all products furnished by the manufacturer. c. Section and details showing connections, cast-in items and their relation to the structure. d. Relation to adjacent materials. e. Joints and openings between members and between members and the structure. f. Description of all loose, cast-in and field hardware. TALL OAKS STP

3 g. Location, dimensional tolerances and details of anchorage devices that are embedded in or attached to the structure or other construction. h. Erection sequences i. All dead, live and other applicable loads used in the design. E. Submit structural design calculations performed by a registered engineer licensed in the State of New York experienced in the design of structural precast hollow core slabs. F. Design Modifications: 1. Submit design modifications necessary to meet performance requirement and field coordination. G. Test Reports: 1. Submit test reports on materials, compressive strength tests on concrete and water absorption tests on units. Two copies of the results shall be sent to the engineer prior to shipping materials to the jobsite. H. The precast concrete unit manufacturer and the erector shall submit the names and contact person of at least ten (10) past jobs performed supplying/installing units similar to the type required for this project QUALITY ASSURANCE A. The precast concrete manufacturing plant shall be certified by the Precast Concrete Institute (PCI), Plant Certification Program prior to the start of production. B. Perform work in accordance with the requirements of PCI MNL-116, PCI MNL-120 and PCI MNL-123. C. Fabrications Qualifications: 1. Firms which have ten (10) years of successful experience in fabrication of precast concrete units similar to the units required for this project will be acceptable. Fabricator must have sufficient in-door production capacity to produce the required units without causing a delay in work. 2. Slabs shall be prestressed, hollow core, machine cast in an enclosed factory with closely controlled mixing, casting and curing conditions. D. Erection Qualifications: 1. Regularly engaged for at least five (5) years in the erection of precast structural concrete similar to the requirements of this project. TALL OAKS STP

4 E. Welder qualifications shall be in accordance with AWS D1.1. F. Testing: 1. Compliance with the applicable provisions in MNL-116, Manual for Quality Control for Plants and Production of Precast and Prestressed Concrete Panels. G. Requirements of the regulatory agencies: 1. All codes, plus the following specifications, standards and codes are a part of these specifications. a. ACI 318 Building Code Requirements for Reinforced Concrete. b. AWS d1.1 Structural Welding Code Steel c. AWS D1.4 Structural Welding Code Reinforcing Steel d. All applicable ASTM specifications. e. Precast Concrete Institute, MNL-116, Manual for Quality Control for Plans and Production of Precast and Prestressed Concrete Products. f. New York State Building Code PRODUCT DELIVER, STORAGE AND HANDLING A. Product delivery, storage and handling shall be in accordance with Section and as herein specified. B. Delivery and Handling: 1. Deliver all precast concrete units to the project site in such quantities and at such times to ensure continuity of erection. 2. Handle and transport the units in a position consistent with their shape and design in order to avoid stresses which would cause cracking or damage. 3. Lift or support units only at the points shown on the shop drawings. 4. Place non-staining resilient spacers of even thickness between each unit. 5. Support units during shipment on non-staining shock-absorbing materials. 6. Don t not place units directly on the ground TALL OAKS STP

5 C. Storage at the jobsite: 1. Store and protect units to prevent contact with soil, staining and physical damage. 2. Store units, unless otherwise specified, with non-staining resilient supports located in the same position as when transported. 3. Store units on firm, level and smooth surfaces. 4. Place stored units so that identification marks are discernible, and so that production can be inspected. PART 2 - PRODUCTS 2.01 FABRICATORS A. The following suppliers shall be used to supply Hollow Core Plank for the project: 1. Oldcastle Building Systems Division, South Bethlehem, NY (518) Or approved equal. B. Substitutions: For suppliers who are not listed above must be approved by the Engineer. Supplier shall meet the following requirements: 1. Company specializing in the manufacturing the work of this Section with ten years documented experience and certified by the Prestressed Concrete Institute Plank Certification Program. 2. Products must meet or exceed all the requirements of this Section MATERIALS A. All materials used in the fabrication of the Hollow Core Plank shall meet the requirements of ACI 318, where applicable. B. Portland Cement meeting the requirements of ASTM C150, type I or II. Manufacturer to specify type of Portland cement to be used at time of shop drawing submittal. C. Admixtures: 1. Air-entraining admixtures shall meet the requirements of ASTM C Water reducing, retarding, accelerating, high range water reducing admixtures shall meet the requirements of ASTM C494. TALL OAKS STP

6 D. Water shall be potable or free from foreign material in amounts harmful to concrete and embedded steel. E. Tensioning Steel Tendons: ASTM A4169, Grade 270K, of sufficient strength commensurate with member design. F. Reinforcing Steel: ASTM A615, deformed steel bars. G. Wire: ASTM A82, Cold-drawn steel. H. Welding Studs: AWS D1.1 I. Grout: Non-shrink, non-metallic, minimum yield strength of 10,000 psi at 28 days. J. Bearing Strips: 1. Tempered hardboard. 2. Plastic: Mulit-monomer plastic strips shall be non-leaching and support construction loads with no visible overall expansion. K. Ceiling caulk: Latex type equivalent to Pecora AC20 or equal 2.03 CONCRETE MIXES A. Twenty-eight (28) day compressive strength shall be a minimum of 5,000 psi. B. Release strength shall be a minimum of 3,000 psi ACCESSORIES A. Connecting and Supporting Devices: ASTM A36 carbon steel plates, angles, items cast into concrete, or items connected to steel framing members, inserts, conforming to PCI MNL-123 unfinished. Do not paint surfaces in contact with concrete or surfaces requiring field welding. B. Core Hole End Plugs: Cardboard insert and concrete fill. C. Bearing Pads: High density plastic, 1/8 inch thick, smooth on both sides FABRICATION A. Manufacturing procedures shall be in general compliance with PCI MNL-116. B. Embed anchors, inserts, plates, angles, and other items at locations indicated on shop drawings of other trades. TALL OAKS STP

7 C. Provide required openings and embed accessories provided by other Sections, where indicated. Manufacturer shall plant cast rough openings with a minimum dimension of ten (10 ) inches manufacturing tolerances in any direction. Openings to be rectangular or square only. Certain headered opening sizes may require concrete fill by General Contractor, properly reinforced, to obtain required size. D. Patching: Will be acceptable providing the structural adequacy of the hollow core unit is not impaired. E. Clean reinforcement of loose rust and mill scale, earth and other materials which reduce or destroy bond with concrete. F. Accurately position, support and secure reinforcement against displacement by form work, construction or concrete placement operation. Locate and support reinforcing by metal chairs, runners, bolsters, spacers and hangers as required. G. Place reinforcement to obtain at least the minimum coverage for concrete protection. Arrange, space and securely tie bars and bar supports to hold reinforcement in position during concrete placement operations. Set wire ties so ends are directed into concrete, not towards exposed concrete surfaces. H. Pretensioning of tendons for prestressed concrete may be accomplished either by single stand tensioning method or multiple-strand tensioning method. Comply with PCI MNL-116 requirements. I. Cut exposed ends of stressing tendons. J. Weight of slabs shall not exceed 45 psf for 6, 57 psf for 8 or 82 psf for COMPONENTS A. Nominal thickness and plank widths to be as shown on Drawings FINISHING A. Plant Finish: Finish members to PCI MNL Standard - Finish A grade. B. Surface may contain small surface holes caused by air bubbles, minor chipping or spalling at edges or ends, without major discoloration FABRICATION TOLERANCES A. Conform to PCI MNL-116. as follows: 1. Maximum Variation from Nominal Dimensions: TALL OAKS STP

8 a. Length of precast units shall be + 1/2 inch of the length indicated on the approved shop drawing. b. Width of precast concrete units: + 1/4 inch. c. Thickness of precast concrete units: + 1/4 inch. d. Location of inserts within units: + 1 inch. e. Differential camber between adjacent units of the same design: + 1/4 inch per 10 ft., but not greater than 1/2 inch. f. Squareness of ends (vertical and horizontal alignment): + 1/4 inch TESTS A. Provide analysis and testing of stressing tendons under provisions of Section B. Cylinder test of concrete quality shall be made by manufacturer in accordance with ASTM C 192, for each mix design, for each day of production, or for each 50 cubic yards of concrete. PART 3 - EXECUTION 3.01 INSPECTION A. All bearing surfaces including lintels to be installed by others prior to slab erection. Where masonry walls are used as bearing surfaces, the top course shall be (filled) solid. B. Weld angles, anchor inserts in bearing surfaces, and supporting structures shall be installed plumb to line and grade by others prior to erection of slabs. Precast concrete slab contractor will verify that structure and anchorage inserts are within allowable tolerances C. No broken, cracked, spalled, warped, or otherwise defective units shall be erected, unless they are judged structurally adequate, and are capable of cosmetic repair with proper patching. D. Where masonry walls are used as bearing surfaces, the top course shall be solid filled U-block or other solid, smooth, level surface PREPARATION A. General contractor shall coordinate delivery and erection of precast concrete units, provide clear site, provide and maintain firm and level access roads to allow crane and trucks to reach work area under their own power. TALL OAKS STP

9 B. Care shall be taken to protect the work and material of other trades during installation of slabs INSTALLATION A. Precast concrete slabs shall be installed according to approved shop drawings and details by mechanics experienced in precast concrete slab erection. B. Units shall be erected tight and at right angles to bearing surfaces unless shown otherwise. Minimum bearing shall be 2-1/2 inches on steel, 3 inches on concrete and 3-1/2 inches on masonry. Align and level precast concrete slabs using shims, bolts, or jacks. C. Where weld inserts are shown, precast concrete slab contractor shall weld inserts in slabs to bearing surfaces. All field welding shall be done by certified welders using equipment and material compatible to the base material. D. Install hanger tabs in joints as required by other trades. E. Grouting Joints: 1. Clean joints before grouting. 2. Grout for joints shall be 1 part Portland cement, 3 parts sand, and water. 3. Fill longitudinal keyways between units with grout, this does not include grouting butt joints or joints between plank and other materials. 4. Remove grout that seeped through to ceiling below before grout hardens. 5. Grout plank joints; trowel smooth. 6. Transition dissimilar elevations of adjoining planks with grout to a maximum slope of 1:12. F. Openings greater than 10 inches square to be saw cut in field. Openings 10 inches or less will be done by trades requiring same. However, if more than two openings occur in any individual slab, approval of the precaster must be obtained prior to making any cuts. (A number of closely spaced small openings could effectively cut all prestressing strands and destroy the structural strength of the slab.) G. All openings required in the precast slabs shall be indicated on the structural plans TOLERANCES A. Erect members level and plumb, within allowable tolerances. B. Conform to PCI MNL-116 as follows: TALL OAKS STP

10 1. Erect to the following tolerances: a. Maximum Variation from Plane or Locations Indicated on Drawings: 1/4 inch/10 feet and 3/8 inch in 100 feet, noncumulative. b. Maximum Offset from True Alignment Between Members: 1/4 inch. c. Maximum Variation from Dimensions Indicated on Reviewed Shop Drawings: Plus or minus 1/8 inch. 2. Exposed Joint Dimension: 3/8 inch plus or minus 1/4 inch. 3. When members cannot be adjusted to conform to design or tolerance criteria, cease work and advise Architect/Engineer. Execute modifications as directed ADJUST AND CLEAN A. Planks that are broken, cracked, or chipped shall be repaired or replaced. B. After erection and grouting is completed the general contractor will be responsible for the protection of the slabs. C. Remove rubbish and debris resulting from precast concrete slab work from premises upon completion. Protect work of this section from fabrication to installation ERECTION A. Erect members without damage to structural capacity, shape, or finish. Replace or repair damaged members. B. Align and maintain uniform horizontal, end joints, as erection progresses. C. Maintain temporary bracing in place until final connection is made. Protect members from staining. D. Install bearing pads and sill seal at bearing ends of planks as indicated. E. Adjust differential camber between precast members to tolerance before final attachment. F. Secure units in place. Perform welding in accordance with ANSI/AWS D PROTECTION A. Protect members from damage caused by field welding or erection operations. TALL OAKS STP

11 B. Provide non-combustible shields during welding operations. C. The erector shall be responsible for any chipping, spalling, cracking or other damage to the units after delivery to the jobsite unless damage is caused in site storage by others. After installation is completed, an further damage shall be the responsibility of the general contractor CLEANING A. Clean weld marks, dirt, or blemishes from surface of exposed members. END OF SECTION TALL OAKS STP

12 THIS PAGE INTENTIONALLY LEFT BLANK TALL OAKS STP

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 Note to user: These guide specifications are provided by Mid- States Concrete Products as a service to you; they are NOT specific

More information

SECTION ARCHITECTURAL PRECAST CONCRETE. A. American Society for Testing and Materials (ASTM):

SECTION ARCHITECTURAL PRECAST CONCRETE. A. American Society for Testing and Materials (ASTM): SECTION 03450 ARCHITECTURAL PRECAST CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03100 - Concrete Formwork 2. 03200 - Concrete Reinforcement 3. 03300 - Cast-in-Place Concrete 4. 03600 -

More information

SECTION PRECAST CONCRETE COVER SYSTEM

SECTION PRECAST CONCRETE COVER SYSTEM SECTION 13500 PRECAST CONCRETE COVER SYSTEM PART 1 GENERAL 1.1 SYSTEM DESCRIPTION A. Design Criteria: 1. Precast manufacturer shall be responsible for structural design of individual precast components,

More information

***************************************************************************************************************

*************************************************************************************************************** 03450 ARCHITECTURAL PRECAST CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 45 13 ***************************************************************************************************************

More information

STRUCTURAL PRECAST CONCRETE

STRUCTURAL PRECAST CONCRETE SECTION 03410 STRUCTURAL PRECAST CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Provide labor, materials, necessary equipment, services and included, but not limited to, related work to complete the structural

More information

SECTION ARCHITECTURAL PRECAST CONCRETE. C. Section Joint Sealers: Perimeter joints with sealant and backing.

SECTION ARCHITECTURAL PRECAST CONCRETE. C. Section Joint Sealers: Perimeter joints with sealant and backing. SECTION 03451 ARCHITECTURAL PRECAST CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. Architectural precast concrete wall panels; with integral insulation. B. Supports, anchors, and attachments. C. Intermediate

More information

***************************************************************************************************************

*************************************************************************************************************** 03410 STRUCTURAL PRECAST CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 41 00 ***************************************************************************************************************

More information

SECTION PRECAST STRUCTURAL PRETENSIONED CONCRETE

SECTION PRECAST STRUCTURAL PRETENSIONED CONCRETE PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 03 41 33 PRECAST STRUCTURAL PRETENSIONED CONCRETE SPEC WRITER NOTE: Delete between //--// if not applicable to project. Also delete any other item or paragraph

More information

SECTION STRUCTURAL PRECAST CONCRETE

SECTION STRUCTURAL PRECAST CONCRETE SECTION 03500 STRUCTURAL PRECAST CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Section Includes. This section covers Prestressed or Precast concrete member construction, including product design not shown on

More information

SPECIFICATIONS PRECAST PRESTRESSED CONCRETE PART 1 GENERAL 1.6.2.5 Openings, inserts and related reinforcement 1.6.3 Each drawing submitted to bear stamp of 1.1 Related Work qualified Professional Engineer

More information

1. Cast-in-place concrete is specified in Section

1. Cast-in-place concrete is specified in Section SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record

More information

HARVEY MUDD COLLEGE TEACHING AND LEARNING CENTER SECTION Page 1 of 6 VOIDED CONCRETE SLAB

HARVEY MUDD COLLEGE TEACHING AND LEARNING CENTER SECTION Page 1 of 6 VOIDED CONCRETE SLAB 030111 Page 1 of 6 PART 1 - GENERAL 1.1 SUMMARY A. This Section specifies: 1. Voided concrete floor and roof slab system consisting of structural reinforced concrete containing hollow (bubbles) spherical

More information

ADDENDUM NUMBER 3 AUGUST 18, Jackson County Utility Authority Project No Pascagoula/Moss Point WWTP Escatawpa WWTP Repairs

ADDENDUM NUMBER 3 AUGUST 18, Jackson County Utility Authority Project No Pascagoula/Moss Point WWTP Escatawpa WWTP Repairs ADDENDUM NUMBER 3 AUGUST 18, 2016 Jackson County Utility Authority Project No. 20150619124 Pascagoula/Moss Point WWTP Escatawpa WWTP Repairs FROM: BURK-KLEINPETER, INC. ENGINEERS, ARCHITECTS, PLANNERS,

More information

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4

Paragraph Description Page No General Materials Concrete Masonry Work Altitude Valve Vault Cover 25-4 City of Columbia Engineering Regulations PART 25: SPECIFICATIONS FOR ALTITUDE VALVE VAULT Table of Contents Paragraph Description Page No. 25.1 General 25-1 25.2 Materials 25-1 25.3 Concrete Masonry Work

More information

SECTION UNIT MASONRY

SECTION UNIT MASONRY SECTION 04200 UNIT MASONRY PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, and equipment and perform functions required in the installation and maintenance of the work covered by this Section.

More information

***************************************************************************************************************

*************************************************************************************************************** 03365 POST-TENSIONED CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 38 00. ***************************************************************************************************************

More information

SECTION TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:

SECTION TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following: PART 1 GENERAL 1.01 SUMMARY SECTION 03460 TILT-UP PRECAST CONCRETE SANDWICH PANELS A. Work includes, but is not limited to, the following: 1. Architectural precast concrete sandwich wall panels. 2. Integral

More information

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns. PAGE 051200-1 SECTION 051200 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:

TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following: PART 1 GENERAL 1.01 SUMMARY SECTION 03460 TILT-UP PRECAST CONCRETE SANDWICH PANELS A. Work includes, but is not limited to, the following: 1. Architectural precast concrete sandwich wall panels. 2. Integral

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing

More information

SECTION TILT-UP PRECAST CONCRETE. A. Work includes, but is not limited to, the following:

SECTION TILT-UP PRECAST CONCRETE. A. Work includes, but is not limited to, the following: SECTION 03470 TILT-UP PRECAST CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Work includes, but is not limited to, the following: 1. Precast wall panels. 2. Forms and casting beds. 3. Concrete. 4. Reinforcing

More information

SECTION EMBEDDED CMU/SPLIT FACE ARCHITECTURAL PRECAST/SITECAST CONCRETE. A. Site Cast or Tilt-Up CMU/Split Face Concrete Panels.

SECTION EMBEDDED CMU/SPLIT FACE ARCHITECTURAL PRECAST/SITECAST CONCRETE. A. Site Cast or Tilt-Up CMU/Split Face Concrete Panels. SECTION 03460 EMBEDDED CMU/SPLIT FACE ARCHITECTURAL PRECAST/SITECAST CONCRETE PART 1 GENERAL 1.1 SECTION INCLUDES A. Site Cast or Tilt-Up CMU/Split Face Concrete Panels. B. Shop/Plant Cast CMU/Split Face

More information

Division 03 Concrete Section includes various guidelines for general concrete use, curing, forming, reinforcing, finishing and concrete accessories.

Division 03 Concrete Section includes various guidelines for general concrete use, curing, forming, reinforcing, finishing and concrete accessories. Section includes various guidelines for general concrete use, curing, forming, reinforcing, finishing and concrete accessories. This design guideline is written to the designer of record (DOR). This guideline

More information

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 1. Description This work shall consist of the design, manufacture and construction of a T-WALL structure

More information

1. Cast-in place structural concrete including footers, foundations, and other non-slab applications. 2. Formwork 3. Reinforcement

1. Cast-in place structural concrete including footers, foundations, and other non-slab applications. 2. Formwork 3. Reinforcement SECTION 03 31 00 - CAST-IN-PLACE STRUCTURAL CONCRETE PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Cast-in place structural concrete including footers, foundations, and other non-slab applications.

More information

Section REINFORCING STEEL

Section REINFORCING STEEL Section 03210 PART 1 GENERAL 1.01 SUMMARY This Section includes the furnishing and subsequent placing of reinforcing steel, deformed and smooth, chairs, ties, splicing devices, and other reinforcing accessory

More information

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK DIVISION 03 CONCRETE SPECIFICATION 031000: FORMS AND FORMWORK PART 1.0 GENERAL 1.1 DESCRIPTION The work of this specification includes furnishing of all labor, materials, equipment and incidentals to install,

More information

A. Section includes cast-in-place concrete, including reinforcement, concrete materials, mixture design, placement procedures, and finishes.

A. Section includes cast-in-place concrete, including reinforcement, concrete materials, mixture design, placement procedures, and finishes. SECTION 033053 - CONCRETE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

REINFORCED CONCRETE MASONRY SECTION

REINFORCED CONCRETE MASONRY SECTION SECTION 04 22 02 - REINFORCED CONCRETE MASONRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification

More information

C. Miscellaneous Metal Fabricators are specified elsewhere in Division 5.

C. Miscellaneous Metal Fabricators are specified elsewhere in Division 5. SECTION 05 1200 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.01 SUMMARY A. Extent of structural steel work is shown on drawings, including schedules, notes and details to show size and location of members,

More information

WHAT IS PRECAST/PRESTRESSED CONCRETE?

WHAT IS PRECAST/PRESTRESSED CONCRETE? PRODUCT LOAD TABLES 1 WHAT IS PRECAST/PRESTRESSED CONCRETE? PRECAST/PRESTRESSED CONCRETE is an architectural and structural material possessing great strength. Specifically, PRESTRESSED CONCRETE has unique

More information

Design Reference Sample: Sample of approved precast structural concrete color, finish, and texture, preapproved by Architect.

Design Reference Sample: Sample of approved precast structural concrete color, finish, and texture, preapproved by Architect. SECTION 034100 - PART 1 - GENERAL 1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this

More information

CONCRETE WALKS AND CURBS SECTION CONCRETE WALKS AND CURBS PART 1 - GENERAL

CONCRETE WALKS AND CURBS SECTION CONCRETE WALKS AND CURBS PART 1 - GENERAL 13686.00 CONCRETE WALKS AND CURBS 033015-1 1.1 RELATED DOCUMENTS: SECTION 033015 CONCRETE WALKS AND CURBS PART 1 - GENERAL A. Drawings and general provisions of Contract, including General and Supplementary

More information

SECTION CONCRETE FORMWORK

SECTION CONCRETE FORMWORK SECTION 03100 CONCRETE FORMWORK PART 1 GENERAL 1.1 REFERENCES A. The following is a list of standards which may be referenced in this section: 1. American Concrete Institute (ACI): a. 117, Standard Specifications

More information

JONES AIRWAY, LLC CLEVELAND REGIONAL JETPORT SECTION STRUCTURAL STEEL

JONES AIRWAY, LLC CLEVELAND REGIONAL JETPORT SECTION STRUCTURAL STEEL CLEVELAND REGIONAL JETPORT 05 1200-1 PART 1 - GENERAL SECTION 05 1200 STRUCTURAL STEEL 1.1 RELATED SPECIFICATION SECTIONS: A. Bolting of wood to steel, steel anchors for work of other trades, concrete

More information

SPECIAL SPECIFICATION 2043 Brick Veneer on MSE Wall

SPECIAL SPECIFICATION 2043 Brick Veneer on MSE Wall 2004 Specifications CSJ 0196-02-120 SPECIAL SPECIFICATION 2043 Brick Veneer on MSE Wall 1. Description. This Item shall govern for the furnishing of the materials and construction of brick veneers on abutment

More information

Master Specifications for Microcotta November 2017

Master Specifications for Microcotta November 2017 SECTION 042130 - MICROCOTTA PART 1 - GENERAL 1.1 SUMMARY A. Provide Architectural Microcotta, cast architectural polymer resin units manufactured in accordance with the Contract Documents. 1.2 WORK INCLUDED

More information

SECTION UNIT MASONRY SYSTEM

SECTION UNIT MASONRY SYSTEM SECTION 04320 UNIT MASONRY SYSTEM PART 1 GENERAL 1.01 SECTION INCLUDES A. Concrete masonry and face brick units. B. Reinforcement, anchorage, and accessories. 1.03 SUBMITTALS A. Submit product data under

More information

SECTION INTERIOR STONE INTERIOR STONE

SECTION INTERIOR STONE INTERIOR STONE SECTION 04401- INTERIOR STONE 04401-1 PART ONE: GENERAL 1.1 Description INTERIOR STONE 1.1.1 Work of this Section, as shown or specified, shall be provided by the Interior Contractor/Vendor and shall be

More information

Commission No Section

Commission No Section Commission No. 1511 Section 05120-1 PART ONE - GENERAL 1.1 DESCRIPTION A. Work Included: Structural steel and grout. Furnish, fabricate, mark for erection identification, pack, crate, or otherwise properly

More information

SECTION PRECAST STRUCTURAL PRETENSIONED CONCRETE

SECTION PRECAST STRUCTURAL PRETENSIONED CONCRETE PART 1 - GENERAL 1.1 DESCRIPTION SECTION 03 41 33 SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // -- // if not applicable to project. Also delete any other item or paragraph

More information

SECTION (03410) - PRECAST STRUCTURAL CONCRETE

SECTION (03410) - PRECAST STRUCTURAL CONCRETE SECTION 03 45 00 (03410) - PRECAST STRUCTURAL CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Plant-Precast Structural Concrete Units, Including the Following: a. Hollow-Core Slab Units b.

More information

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011. DIVISION 05 METALS 05 12 00 STRUCTURAL STEEL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Structural steel framing members, support members. 1.2 RELATED REQUIREMENTS A. Section 05 50 00 - Metal Fabrications:

More information

SECTION RIGID PAVEMENT

SECTION RIGID PAVEMENT SECTION 02750 PART 1 GENERAL RIGID PAVEMENT 1.1 SUMMARY A. Section Includes: 1. Concrete sidewalks. 2. Concrete stair steps. 3. Concrete integral curbs gutters. 4. Concrete parking areas and roads. B.

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE McClellan Blakemore Architects New Warehouse Facility for SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. Concrete formwork. B. Floors and slabs on grade. C. Concrete floor

More information

SECTION FIBERGLASS REINFORCED POLYMER (FRP) PANELS

SECTION FIBERGLASS REINFORCED POLYMER (FRP) PANELS SECTION 07 44 50 FIBERGLASS REINFORCED POLYMER (FRP) PANELS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Design, Engineering, manufacturing and erection of fiberglass reinforced panels. Delegated Design of

More information

SECTION BRICK FACED ARCHITECTURAL PRECAST CONCRETE. A. Section Cast-In-Place Concrete: Concrete, reinforcing, anchors, etc.

SECTION BRICK FACED ARCHITECTURAL PRECAST CONCRETE. A. Section Cast-In-Place Concrete: Concrete, reinforcing, anchors, etc. SECTION 03460 BRICK FACED ARCHITECTURAL PRECAST CONCRETE PART 1 GENERAL 1.1 SECTION INCLUDES A. Site Cast (Tilt-Up) Brick Faced Concrete Panels. B. Plant Cast (Precast) Brick Faced Concrete Panels. 1.2

More information

SPECIAL SPECIFICATION 4491 Type CAC Concrete

SPECIAL SPECIFICATION 4491 Type CAC Concrete 2004 Specifications SPECIAL SPECIFICATION 4491 Type CAC Concrete 1. Description. Remove unsound concrete and replace with Type CAC, calcium aluminate concrete for ultra high early strength concrete repairs.

More information

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK DIVISION 5 - STRUCTURAL STEEL AND IRON WORK SECTION 05100 STRUCTURAL METAL FRAMING PART 1.00 GENERAL 1.01 SCOPE OF WORK A. Work Included: 1. 2. Structural steel complete in place. Steel joists complete

More information

SECTION STRUCTURAL METAL FRAMING

SECTION STRUCTURAL METAL FRAMING SECTION 05100 STRUCTURAL METAL FRAMING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Structural steel framing including lintels, shelf angles, bearing plates, anchor bolts and other items as shown on

More information

STRUCTURAL STEEL FRAMING Section

STRUCTURAL STEEL FRAMING Section PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Structural steel. 2. Grout. 1.2 DEFINITIONS A. Structural Steel: Elements of the structural frame indicated on Drawings and as described in AISC 303,

More information

Concrete Prestressed Concrete Pretensioned Concrete Posttensioned Concrete Typical Tendon Layout

Concrete Prestressed Concrete Pretensioned Concrete Posttensioned Concrete Typical Tendon Layout Concrete 45 1.13.0 Prestressed Concrete Concrete in which internal stresses (forces) are induced by means of prestressing steel tendons such that tensile stresses resulting from loads are counteracted

More information

Columbia Public Schools Shepard Elementary School Classroom Building Addition PWA I 1 CONCRETE REINFORCEMENT ~4 ASSURANCE

Columbia Public Schools Shepard Elementary School Classroom Building Addition PWA I 1 CONCRETE REINFORCEMENT ~4 ASSURANCE B. Supports and accessories for steel reinforcement. 1.02 SECTIONS A. Section 03300- Cast-in-Place Concrete. 1.03 SUBMITTALS A. See Section 01300- Administrative Requirements, for submittal procedures.

More information

CONCRETE FORMWORK. .2 CSA , Supplement No.1 to CAN/CSA , Engineering Design in Wood. .4 CSA O151, Canadian Softwood Plywood.

CONCRETE FORMWORK. .2 CSA , Supplement No.1 to CAN/CSA , Engineering Design in Wood. .4 CSA O151, Canadian Softwood Plywood. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 03100-1 PART 1 GENERAL 1.1 Related Work.1 All Division 1 Specification Sections.2 Section 02233 Granular Base.3 Section 02311 Site Grading.4 Section 03200

More information

SPECIAL SPECIFICATION 4584 Segmental Concrete Bridge Unit

SPECIAL SPECIFICATION 4584 Segmental Concrete Bridge Unit 2004 Specifications CSJ: 0028-09-111 SPECIAL SPECIFICATION 4584 Segmental Concrete Bridge Unit 1. Description. Construct cast-in-place segmental concrete box girder superstructure according to the plans,

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 052100 - STEEL JOISTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections

More information

SECTION METAL STAIRS

SECTION METAL STAIRS SECTION 05 51 00 METAL STAIRS PART 1 GENERAL 1.1 SUMMARY A. Section includes steel stair frame of structural sections, with closed risers; pan to receive concrete fill stair treads and landings; integral

More information

CONCRETE TECHNOLOGY CORPORATION

CONCRETE TECHNOLOGY CORPORATION PRECAST, PRESTRESSED HOLLOW CORE SLABS DESIGN CRITERIA & SPAN-LOAD CHARTS Introduction 2 Design Criteria for Development of the Span-Load Charts 2 Related Publications 3 Manufacturing Tolerances 4 8" Bare

More information

STRUCTURAL STEEL FRAMING

STRUCTURAL STEEL FRAMING SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Section includes 1. Structural steel framing 2. Structural steel framing required for support and framing of rooftop mechanical

More information

SECTION PORTLAND CEMENT CONCRETE

SECTION PORTLAND CEMENT CONCRETE PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including the supplemental documents as indicated in the Site Work General Provisions, apply to work of this

More information

SECTION MISCELLANEOUS CAST-IN-PLACE CONCRETE

SECTION MISCELLANEOUS CAST-IN-PLACE CONCRETE SECTION 033053- MISCELLANEOUS CAST-IN-PLACE CONCRETE PART 1- GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

SECTION MISCELLANEOUS METALS

SECTION MISCELLANEOUS METALS PART 1 GENERAL 1.1 WORK OF THIS SECTION A. Contractor shall provide all labor, materials, equipment and incidentals as shown, specified and required to furnish and install all miscellaneous metal fabrications

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 321610 - CURBING PART 1 - GENERAL 1.1 DESCRIPTION A. This Section specifies requirements for furnishing and installing all types of curbing including the following: granite curb, concrete and bituminous

More information

SECTION STRUCTURAL STEEL

SECTION STRUCTURAL STEEL SECTION 05120 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this

More information

SECTION STEEL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION STEEL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 08110 - STEEL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General, Supplementary, and Special Conditions and Division 1 Specification

More information

- PRECAST CONCRETE POTABLE WATER STORAGE TANKS

- PRECAST CONCRETE POTABLE WATER STORAGE TANKS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2

More information

5 Concrete Placement

5 Concrete Placement 5 Concrete Placement Testing Entrained Air Slump Strength Water/Cementitious Ratio Mixing Placing Concrete Compressive Test Specimens Curing De-Tensioning Multiple Strand Release Single Strand Release

More information

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS SECTION 32 16 13 CONCRETE CURBS, GUTTERS AND SIDEWALKS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required

More information

SECTION GLASS UNIT MASONRY ASSEMBLIES

SECTION GLASS UNIT MASONRY ASSEMBLIES PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish and install all materials, labor, equipment and incidentals required to install glass unit masonry as shown on the contract drawings and

More information

SAMPLE SPECIFICATION ONLY FOR INFORMATIONAL PURPOSES NOT INTENDED FOR DUPLICATION OR USE SECTION XX.XX WELDED WIRE REINFORCEMENT

SAMPLE SPECIFICATION ONLY FOR INFORMATIONAL PURPOSES NOT INTENDED FOR DUPLICATION OR USE SECTION XX.XX WELDED WIRE REINFORCEMENT MEMO To: Design and Construction professionals From: Roy H. Reiterman, Technical Consultant, WRI Date: March 2006 Subject: A Sample Specification for Welded Wire Reinforcement (WWR) We have had many requests

More information

May 2017 Alterations to Buildings 1, 2, 3 & 9 Hudson County Prosecutor's Office Meadowview Campus Secaucus, New Jersey

May 2017 Alterations to Buildings 1, 2, 3 & 9 Hudson County Prosecutor's Office Meadowview Campus Secaucus, New Jersey SECTION 034100 - PRECAST STRUCTURAL CONCRETE PART 1 - GENERAL 1.1 SUMMARY A. Section is for precast structural concrete plank. 1.2 PERFORMANCE REQUIREMENTS A. Delegated Design: Design precast structural

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION ITEM 03100 CONCRETE FORMWORK 1.0 GENERAL 1.1 DESCRIPTION This section defines requirements and limitations for design, construction, erection, and removal of concrete formwork for

More information

***************************************************************************************************************

*************************************************************************************************************** 03100 CONCRETE FORMWORK *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 11 00 ***************************************************************************************************************

More information

SECTION COLD-FORMED METAL TRUSSES

SECTION COLD-FORMED METAL TRUSSES SECTION 054400 COLD-FORMED METAL TRUSSES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate.

SECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate. SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Welded stainless steel railing systems. 1.2 RELATED SECTIONS A. Section 03300 - Cast-In-Place Concrete; coordination with substrate.

More information

SECTION BRICK MASONRY ASSEMBLIES

SECTION BRICK MASONRY ASSEMBLIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following: 1. Face brick. 2. Mortar and grout. 3. Ties and anchors. 4. Miscellaneous masonry accessories. 1.2 SUBMITTALS A. Product Data: For each type

More information

HOLLOW METAL DOORS AND FRAMES SECTION HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL

HOLLOW METAL DOORS AND FRAMES SECTION HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 13686.00 HOLLOW METAL DOORS AND FRAMES 081113-1 SECTION 081113 - HOLLOW METAL DOORS AND FRAMES 1.1 RELATED DOCUMENTS: PART 1 - GENERAL A. Drawings and general provisions of Contract, including General

More information

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2) Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction

More information

SECTION 1 TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1-3 ABBREVIATIONS Common Usage.

SECTION 1 TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1-3 ABBREVIATIONS Common Usage. SECTION 1 TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1-3 ABBREVIATIONS. 1-3.2 Common Usage. Abbreviations Word or Words PAV.Pressure Aging Vessel PCC..Portland Cement Concrete PE.Polyethylene

More information

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS SECTION 13100 MECHANICALLY STABILIZED EARTH RETAINING WALLS PART 1 -- GENERAL 1.01 THE REQUIREMENT A. Includes all labor, material, equipment, testing and submittals required to design and complete construction

More information

1.02 STANDARD REFERENCES: The following standard specifications shall apply to the Work of this Section as indicated:

1.02 STANDARD REFERENCES: The following standard specifications shall apply to the Work of this Section as indicated: SECTION 04220 CONCRETE UNIT MASONRY PART 1 - GENERAL 1.01 SCOPE: A. The CONTRACTOR shall furnish all labor, materials and equipment necessary for the masonry construction as shown on the drawings or as

More information

SECTION STRUCTURAL REINFORCED POLYMER COMPOSITE PEDESTRIAN BRIDGE DECK

SECTION STRUCTURAL REINFORCED POLYMER COMPOSITE PEDESTRIAN BRIDGE DECK SECTION 06610 STRUCTURAL REINFORCED POLYMER COMPOSITE PEDESTRIAN BRIDGE DECK PART 1 GENERAL 1.1 SUMMARY A. A. This Section includes the requirements for furnishing and installing all Structural Reinforced

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

WELLS HOLLOWCORE DESIGN DATA

WELLS HOLLOWCORE DESIGN DATA WELLS HOLLOWCORE DESIGN DATA INTRODUCTION 1 PRODUCT OVERVIEW 2 A. The Manufacturing Process 3 B. Plank Design Considerations 3 C. Bottom Finishes 3 D. Fire Ratings 3 E. Production and Erection Tolerances

More information

SECTION METAL STAIRS

SECTION METAL STAIRS SECTION 05510 METAL STAIRS PART 1 GENERAL 1.01 SECTION INCLUDES A. Stairs with concrete treads. B. Stairs with metal treads. C. Structural steel stair framing and supports. D. Handrails and guards. 1.02

More information

A. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein.

A. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein. SECTION 10530 - EXTRUDED ALUMINUM WALKWAY COVERS PART I - GENERAL.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General, Supplementary, and Special Conditions and Division

More information

SECTION UNIT MASONRY

SECTION UNIT MASONRY SECTION 04200 UNIT MASONRY A. ACCEPTABLE MANUFACTURERS 1. Sound Absorptive Masonry Units: 12 inch wide Soundblox type RSC/RF as manufactured by the Proudfoot Company, Monroe, CT. 2. Concrete Masonry Units:

More information

SELECT APPROPRIATE SECTIONS FOR BELOW; DELETE OTHERS

SELECT APPROPRIATE SECTIONS FOR BELOW; DELETE OTHERS Master Specifications 03440-1 SECTION 03440 REINFORCED AUTOCLAVED AERATED CONCRETE PANELS Date: 04-19-07 SECTION REQUIRES EDITOR TO MAKE SELECTIONS - GENERALLY SELECTIONS ARE PRECEDED BY **. SPEC EDITOR

More information

GUIDE SPECIFICATION FOR CARBONCAST WALL PANELS SECTION 03450

GUIDE SPECIFICATION FOR CARBONCAST WALL PANELS SECTION 03450 GUIDE SPECIFICATION FOR CARBONCAST WALL PANELS SECTION 03450 PART 1 - GENERAL 1.1 RELATED DOCUMENTS 1.2 SUMMARY A. This Section includes CarbonCast precast concrete wall panel units, including manufacture,

More information

SECTION COMPOSITE METAL DECKING

SECTION COMPOSITE METAL DECKING PART 1 GENERAL 1.1 DESCRIPTION SECTION 05 36 00 1. Use this section only for NCA projects. 2. Delete between // ---- // if not applicable to project. Also delete any other item or paragraph not applicable

More information

SECTION METAL FRAMED SKYLIGHT. A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system.

SECTION METAL FRAMED SKYLIGHT. A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system. SECTION 08625 METAL FRAMED SKYLIGHT PART 1 GENERAL 1.01 SECTION INCLUDES: A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system. B. Fabrication

More information

Facility Repairs - MCAS Cherry Point - Tank Farm A SECTION STRUCTURAL STEEL 05/14

Facility Repairs - MCAS Cherry Point - Tank Farm A SECTION STRUCTURAL STEEL 05/14 SECTION 05 12 00 STRUCTURAL STEEL 05/14 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the

More information

SECTION MORTAR

SECTION MORTAR PART l - SCOPE SECTION 04100 - MORTAR A. This Section includes all labor, materials, equipment, and related items required for the work of mortar as shown on the Drawings and specified herein. The work

More information

G. Shop drawing of wall with all dimensions, details, and finishes. Drawings must include post foundations.

G. Shop drawing of wall with all dimensions, details, and finishes. Drawings must include post foundations. DURA-CRETE S-SERIES PRECAST CONCRETE WALL SPECIFICATIONS PART 1 GENERAL 1.01 SECTION INCLUDES A. Concrete Screen Wall Description: Work under this item shall consist of furnishing and erecting a wall in

More information

Section 708. PRESTRESSED CONCRETE BEAMS Description. Manufacture and erect prestressed concrete beams.

Section 708. PRESTRESSED CONCRETE BEAMS Description. Manufacture and erect prestressed concrete beams. 708.0 Section 708. PRESTRESSED CONCRETE BEAMS 708.0 Description. Manufacture and erect prestressed concrete beams. 708.02 Materials. Use materials meeting the following. Mortar and Grout... 702 Cement...

More information

CONCRETE WORK CONCRETE WORK. Underground Electric Distribution Standards I. SCOPE APPLICABLE STANDARDS

CONCRETE WORK CONCRETE WORK. Underground Electric Distribution Standards I. SCOPE APPLICABLE STANDARDS Underground Electric Distribution Standards I. SCOPE This section includes the standards for concrete, reinforcing steel, formwork, concrete placement, curing, and construction joints. Concrete work for

More information

The following specification refers to the Stepstone, Inc. product known as: Steptreads

The following specification refers to the Stepstone, Inc. product known as: Steptreads The following specification refers to the Stepstone, Inc. product known as: Steptreads If you need any additional information please call Stepstone, Inc. at 800-572-9029 or visit our website www.stepstoneinc.com

More information

Project Address: Name of Person Completing Form:

Project Address: Name of Person Completing Form: Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties

More information

Mezzanines By Design Page 1

Mezzanines By Design Page 1 SECTION 05120 STRUCTURAL STEEL PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions and Division 1 apply to this Section. 1.2 SUMMARY

More information

LITHOCRETE ARCHITECTURAL CONCRETE PAVING

LITHOCRETE ARCHITECTURAL CONCRETE PAVING LITHOCRETE ARCHITECTURAL CONCRETE PAVING PART 1 GENERAL 1.1 GENERAL CONDITIONS A. Requirements of "General Conditions of the Contract" and of Division 1, "General Requirements," apply to work in this Section