CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587
|
|
- Walter Singleton
- 6 years ago
- Views:
Transcription
1 CITY OF TROY DESIGN STANDARDS AND CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587 JANUARY 2010
2 TABLE OF CONTENTS SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 APPENDIX ROADWAY DESIGN DRAINAGE DESIGN DESIGN CRITERIA FOR WATER PROJECTS DESIGN CRITERIA FOR WASTEWATER PROJECTS CONSTRUCTION SPECIFICATIONS STANDARD DETAILS City of Troy Sewer Details City of Troy Water Details City of Troy Roadway Details City of Troy Erosion Control Details BIBLIOGRAPHY CONSTRUCTION PLAN CHECKLIST
3 Section 5 Construction Specifications 5.1 GENERAL The City of Troy has adopted the Standard Specifications for Public Works Construction, current edition, as published by the North Central Texas Council of Governments (NCTCOG). The following portions of this Section address amendments to those specifications that the City of Troy has chosen to make PART I GENERAL PROVISIONS TRENCH SAFETY Add the following: 'The CONTRACTOR shall comply with the US Department of Labor Occupational Safety and Health Administration (OSHA) regulations pertaining to excavations, trenching, and shoring and shall provide and familiarize its employees involved with excavation and trenching with the provisions in OSHA Pamphlet No. 2226, Excavating and Trenching Operations.
4 GENERAL CONSTRUCTION NOTES (Sheet 1) 1. CONTRACTOR SHALL MAKE AN EXAMINATION OF THE PROJECT SITE AND COMPLETELY FAMILIARIZE HIMSELF WITH THE NATURE AND EXTENT OF THE WORK TO BE ACCOMPLISHED. NO EXTRA COMPENSATION WILL BE ALLOWED FOR ANY WORK MADE NECESSARY BY UNUSUAL CONDITIONS OR OBSTACLES ENCOUNTERED DURING THE PROGRESS OF THE WORK, WHICH CONDITIONS OR OBSTACLES ARE READILY APPARENT UPON A VISIT TO THE SITE. IF THERE ARE ANY QUESTIONS IN THIS REGARD OR IF THERE ARE ANY DISCREPANCIES BETWEEN THE PLANS AND ACTUAL SITE CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER PRIOR TO SUBMISSION OF BIDS. 2. THE CONTRACTOR SHALL CONTACT ALL LOCAL UTILITIES COMPANIES AND ANY OTHER UTILITY COMPANY THAT SERVES THE AREA AT LEAST 72 HOURS PRIOR TO CONSTRUCTION TO VERIFY LOCATIONS OF EXISTING UTILITY LINES. THE FOLLOWING ARE THE TELEPHONE NUMBERS OF THE ENTITIES MOST LIKELY TO BE AFFECTED. TEXAS ONE CALL TEXAS EXCAVATION SAFETY SYSTEM ONCOR (DENNIS LANTRIP) CITY OF TROY, TEXAS CABLEVISON CENTROVISION SOUTH WESTERN BELL AT&T (CHARLIE KOHL) or PRIOR TO THE BEGINNING OF ANY CONSTRUCTION, THE CONTRACTOR SHALL VERIFY HORIZONTAL AND VERTICAL LOCATIONS OF ALL EXISTING UTILITIES LOCATED WITHIN THE VICINITY OF ANY WORK. IF THE EXISTING UTILITIES ARE IN ANY WAY DIFFERENT FROM WHAT IS SHOWN ON THE DRAWINGS, THEN IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO NOTIFY THE OWNER AND THE PROJECT ENGINEER BEFORE PROCEEDING WITH ANY CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REPAIRS TO FIX DAMAGES INCURRED TO EXISTING UTILITIES DURING CONSTRUCTION. 4. CONTRACTOR SHALL MAKE ALL DUE PRECAUTIONS TO PROTECT EXISTING UTILITIES. IF ANY DAMAGE OCCURS, TO EXISTING UTILITIES, DAMAGE IS TO BE REPAIRED IMMEDIATELY TO AT LEAST PREEXISTING CONDITION AT NO ADDITIONAL COST TO THE OWNER. 5. THE CONTRACTOR SHALL NOTIFY THE APPLICABLE UTILITY COMPANY IMMEDIATELY TO OBTAIN PROCEDURE DIRECTIONS. WHEN UNALLOCATED OR INCORRECTLY LOCATED UNDERGROUND PIPING OR A BREAK IN THE LINE OR OTHER UTILITIES AND SERVICES ARE ENCOUNTERED. CONTRACTOR TO COOPERATE WITH THE APPLICABLE UTILITY COMPANY IN MAINTAINING ACTIVE SERVICE IN OPERATION. 6. ALL BARRICADES AND SIGNS SHALL CONFORM TO THE LATEST EDITION OF THE TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FOR STREETS AND HIGHWAYS. 7. WHERE NEW CONSTRUCTION TIES TO EXISTING FACILITIES, THE PROPER SAW CUT AND CONNECTION SHALL BE MADE USING GOOD WORKMANSHIP AND PROPER TRANSITION TECHNIQUES TO BE APPROVED BY THE ENGINEER. 8. THIS PROJECT SHALL CONFORM TO THE REQUIREMENTS OF THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION NORTH CENTRAL TEXAS LATEST EDITION. THE TECHNICAL SPECIFICATIONS INCLUDED WITHIN THE PROJECT MANUAL SHALL SUPERSEDE ABOVE REFERENCED SPECIFICATIONS. 9. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO SUPPLY AND INSTALL ALL MATERIALS SO AS TO MEET OR EXCEED PROJECTS SPECIFICATIONS, STATE AND CITY OF TROY, TEXAS CODES AND ORDINANCES. 10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PAYING AND OBTAINING PERMITS FROM THE CITY, STATE, OR OTHER REGULATORY AGENCIES TO PERFORM WORK.
5 GENERAL CONSTRUCTION NOTES (Sheet 2) 11. ALL DEMOLITION AND EXCAVATED MATERIALS SHALL BE LEGALLY DISPOSED OF OFF THE SITE, UNLESS OTHERWISE INSTRUCTED BY THE OWNER, OR BY THE OWNERS REPRESENTATIVE. 12. THE CONTRACTOR SHALL CONTACT THE ENGINEER AND THE CITY OF TROY PROJECT REPRESENTATIVE 48 HOURS BEFORE COMMENCING CONSTRUCTION COMMENCES. 13. ALL CONSTRUCTION OPERATIONS TO BE ACCOMPLISHED IN ACCORDANCE WITH APPLICABLE REGULATIONS OF THE U.S. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA). COPIES OF THE OSHA STANDARDS MAY BE PURCHASED FROM THE U.S. GOVERNMENT PRINTING OFFICE; INFORMATION AND RELATED REFERENCE MATERIALS MAY BE OBTAINED FROM OSHA, 903 SAN JACINTO, AUSTIN, TEXAS. 14. THE CONTRACTOR SHALL BE RESPONSIBLE AND LIABLE FOR ALL JOB SITE SAFETY, MANAGEMENT OF JOB SITE PERSONNEL, SUPERVISION OF THE USE OF JOB SITE EQUIPMENT AND DIRECTION OF ALL CONSTRUCTION PROCEDURES, METHODS AND ELEMENTS REQUIRED TO COMPLETE THE CONSTRUCTION OF THE PROPOSED IMPROVEMENTS. 15. CONTRACTOR TO MAINTAIN ACCESS TO PUBLIC AND PRIVATE FACILITIES DURING CONSTRUCTION. ALL CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE CITY OF TROY. 16. BLASTING IS NOT PERMITTED ON THIS PROJECT. 17. CONTRACTOR SHALL TRANSITION NEW UTILITY CONSTRUCTION, SO AS TO MINIMIZE DAMAGE TO EXISTING VEGETATION, PLANTER BEDS, UTILITIES, SIDEWALKS, AND ROADWAYS. TRANSITIONS SHALL BE APPROVED BY OWNER OR ENGINEER. 18. THE CONTRACTOR SHALL PROTECT ALL SANITARY SERVICES AND MAINTAIN SERVICE THROUGHOUT THE DURATION OF CONSTRUCTION. IN THE EVENT THAT A SERVICE IS DAMAGED DURING CONSTRUCTION THE CONTRACTOR SHALL REPAIR THE SERVICE AT NO ADDITIONAL COST TO THE OWNER. 19. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL AREAS DISTURBED BY CONSTRUCTION FOR A PERIOD EQUAL TO, BUT NOT EXCEEDING, 12 MONTHS. 20. ALL ADDITIONAL PIPING NEEDED TO PROVIDE/ENSURE TEMPORARY POTABLE WATER SERVICES SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER. 21. IT IS THE CONTRACTORS RESPONSIBILITY TO REESTABLISH AND RESTORE EXISTING VEGETATION AND LANDSCAPING DISTURBED BY CONSTRUCTION. 22. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REMOVE EXCESS SPOILS AND MATERIAL DISTURBED BY CONSTRUCTION. 23. ANY EXISTING PAVEMENT, CURBS, AND/OR SIDEWALKS DAMAGED OR REMOVED BY THE CONTRACTOR THAT ARE NOT A PART OF THIS CONTRACT ARE TO BE REPAIRED BY THE CONTRACTOR TO AT LEAST THE PREEXISTING CONDITION, AT HIS EXPENSE, BEFORE ACCEPTANCE OF THE WORK. 24. CONSTRUCTION SPOILS OR MATERIALS TO BE USED FOR PROPOSED CONSTRUCTION, SHALL NOT BE STOCKPILED OR STORED WITHIN 100 YEAR FLOOD PLAIN. 25. NEW SANITARY SEWER MAIN AND SERVICES SHALL BE CONSTRUCTED PER THE LATEST TEXAS COMMISSION ON ENVIRONMENTAL QUALITY STANDARDS AND SPECIFICATIONS.
6 STANDARD 24" CURB & GUTTER 6" ADAPT GUTTER TO ALLOW DRAINAGE TO FLOW IN ACCORDANCE TO GRADING CONTOURS REINFORCED CONCRETE PAVEMENT (THICKNESS PER GEOTECH) #4 BAR 16" O.C.E.W. OR PER GEOTECHNICAL REPORT, WHICHEVER IS MORE STRINGENT WIDTH VARIES SEE SITE PLAN PREPARED SUBGRADE (PER GEOTECH SPECIFICATIONS) NOTE: 1. METHODS, THICKNESSES, AND MATERIALS USED TO CONSTRUCT PAVEMENT SECTION SHALL CONFORM TO GEOTECHINICAL REPORT TYPICAL REINFORCED CONCRETE PAVEMENT SECTION SCALE: NTS
7 3" 6 " 3 " 3"=R 4 " =R #3 BAR (TYP.) END AREA 1.56 SQ. FT. ADAPT GUTTER TO ALLOW DRAINAGE TO FLOW IN ACCORDANCE TO GRADING CONTOURS 12" 3 " 6" 6-5/8" 6 " 12" 6 " 2 4" STANDARD 24" CURB AND GUTTER SCALE: nts
8 PROVIDE EXPANSION JOINTS & DOWELS PROPERTY LINE 18'-0"MIN PROPERTY LINE SIDEWALK SIDEWALK #4 DIA. BARS AT 12" O.C.B.W. 6x6 #6 WIRE MESH ALLOWED CONTRACTION JOINT 1/2" PREMOLDED EXPANSION 1/2" DIA. DOWELS 1.5 R (TYP.) JOINT MATERIAL IN ALL EXPANSION JOINTS EXPANSION JOINTS 21'-0" MIN. 22'-0" MIN. 1/2" DIA. DOWELS DRIVE APPROACH DETAIL SCALE: nts
9 NEW PAVEMENT EXTENTS Existing Edge of Asphalt SAW CUT, REMOVE AND REPLACE HMAC TO MATCH EXISTING Existing Edge of Asphalt 2 ' TRANSITION NEW CURB TO MATCH EXISTING/NEW PAVEMENT SECTION 2 ' NEW REINFORCED CONCRETE DRIVEWAY APPROACH 2 ' TRANSITION NEW CURB TO MATCH EXISTING/NEW PAVEMENT SECTION SEE PLANS FOR SEE PLANS FOR SEE PLANS FOR RADIUS LENGTH DRIVE WIDTH RADIUS LENGTH New Curb & Gutter New Curb & Gutter CONNECTION TO EXISTING ROADWAY SCALE: NTS
10 A- SEE PLAN WIDTH 40' MAX EXPANSION JOINT SPACING 1/2" 0 DOWELL BARS 2'-0" LONG WITH APPROPRIATE DOWEL CUP ON THE END 1/2" A 3/8" DIA. 12" O.C. CONTRACTION JOINT 5'-0" 5'-0" 1/2" PREMOLDED EXPANSION JOINT MATERIAL SIDEWALK PLAN SCALE: NTS
11 NATURAL GROUND 12" O.C.E.W. 1 1/2" 1/4" R 4 " VARIES 6" TYP. 4" SAND CUSHION SEE PLANS 3" TYP. 4" MIN. 12" O.C.E.W NOTES: 1. #10 WELDED WIRE MESH WITH 6" x 6" OPENING MAY BE USED IN LEIU OF REBAR SHOWN. 2. CONTRACTOR SHALL MAINTAIN A 6 " PER 12" CROSS SLOPE ON SIDEWALK SECTION. SLOPE SHALL PROVIDE DRAINAGE AWAY FROM EXISTING AND/OR PROPOSED STRUCTURES. SIDEWALK SECTION SCALE: NTS
12 TREE PROTECTION NOTES: 1. THE CONTRACTOR SHALL PROVIDE STRAPPED ON PLANKING TO A HEIGHT OF EIGHT FEET (8'-0"), OR TO THE LIMITS OF THE LOWER BRANCHING, UPON ALL TREES THAT ARE LOCATED WITHIN THE VICINITY OF ANY PROPOSED CONSTUCTION. 2. ANY ROOTS EXPOSED BY CONSTRUCTION ACTIVITY SHALL BE PRUNED FLUSH WITH THE SOIL. BACK FILL ROOT AREAS WITH GOOD QUALITY TOP SOIL AS SOON AS POSSIBLE. IF EXPOSED AND ROOT AREA IS NOT BACK FILLED WITHIN TWO (2) DAYS, COVER WITH ORGANIC MATERIAL IN A MANNER WHICH REDUCES SOIL TEMPERATURE, AND MINIMIZES WATER LOSS DUE TO EVAPORATION. 3. PRIOR TO EXCAVATION OR GRADE CUTTING WITHIN TREE DRIPLINE. MAKE A CLEAN CUT BETWEEN DISTURBED AND UNDISTURBED ROOT ZONES WITH A ROCK SAW OR SIMILAR EQUIPMENT TO MINIMIZE DAMAGE TO REMAINING ROOTS. 4. TREES MOST HEAVILY IMPACTED BY CONSTRUCTION ACTIVITIES SHOULD BE WATERED DEEPLY ONCE A WEEK DURING PERIODS OF HOT, DRY WEATHER. TREE CROWNS SHOULD BE SPRAYED WITH WATER PERIODICALLY TO REDUCE DUST ACCUMULATION. 5. ANY TRENCHING REQUIRED FOR THE INSTALLATION OF LANDSCAPE IRRIGATION SHALL BE PLACED AS FAR FROM EXISTING TREE TRUNK AS POSSIBLE. 6. NO LANDSCAPE TOPSOIL GREATER THAN FOUR INCHES (4") SHALL BE PERMITTED WITHIN THE DRIPLINE OF A TREE. NO SOIL IS PERMITTED ON THE ROOT FLARE OF ANY TREE. 7. PRUNING TO PROVIDE CLEARANCE FOR STRUCTURES, VEHICULAR TRAFFIC, AND EQUIPMENT SHALL TAKE PLACE BEFORE CONSTRUCTION BEGINS. TREE PROTECTION DETAIL 8'MINIMUM 2"x4" WOOD SLATS BOTTOM AS NEAR TO GROUND AS POSSIBLE SCALE: NTS
13 NOTES: 1. STONE SIZE: 3-5" CRUSHED ROCK. 2. LENGTH: AS EFFECTIVE BUT NOT LESS THAN 50'. 3. THICKNESS: NOT LESS THAN 8". 4. WIDTH: AT LEAST 20'. 5. WASHING: WHEN NECESSARY, VEHICLE WHEELS SHALL BE CLEANED TO REMOVE SEDIMENT PRIOR TO ENTRANCE ON TO PUBLIC ROADWAY. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE AND DRAINS INTO AN APPROVED TRAP OR SEDIMENT BASIN. ALL SEDIMENT SHALL BE PREVENTED FROM ENTERING ANY STORM DRAIN, DITCH OR WATERCOURSE USING APPROVED METHODS. 6. MAINTENANCE: THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC ROADWAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE AS CONDITIONS DEMAND, AS WELL AS REPAIR AND CLEAN OUT OF ANY MEASURE DEVICES USED TO TRAP SEDIMENT. ALL SEDIMENTS THAT IS SPILLED, DROPPED, WASHED, OR TRACKED ON TO PUBLIC ROADWAY MUST BE REMOVED IMMEDIATELY. 7. DRAINAGE: ENTRANCE MUST BE PROPERLY GRADED OR INCORPORATE A DRAINAGE SWALE TO PREVENT RUNOFF FROM LEAVING THE CONSTRUCTION SITE. 50' MIN. EXISTING GRADE GRADE TO PREVENT RUNOFF FROM LEAVING SITE 8" MIN. ROADWAY PROFILE PROVIDE APPROPRIATE TRANSITION BETWEEN STABILIZED CONSTRUCTION ENTRANCE AND PUBLIC RIGHT-OF-WAY 50MIN. 20'MIN. R.O.W. PLAN VIEW STABILIZED CONSTRUCTION EXIT SCALE: N.T.S.
14 City of Troy Erosion Control Details NOTES 1. STEEL POSTS WHICH SUPPORT THE SILT FENCE SHALL BE INSTALLED ON A SLIGHT ANGLE TOWARD THE ANTICIPATED RUNOFF SOURCE. POST MUST BE EMBEDDED A MINIMUM OF 1". 2. THE TOE OF THE SILT FENCE SHALL BE TRENCHED IN WITH A SPADE OR MECHANICAL TRENCHER, SO THAT THE DOWNSLOPE FACE OF THE TRENCH IS FLAT AND PERPENDICULAR TO THE LINE OF FLOW. WHERE FENCE CAN NOT BE TRENCHED INTO THE SURFACE (E.G. PAVEMENT), THE FABRIC FLAP SHALL BE WEIGHTED DOWN WITH WASHED GRAVEL ON UPHILL SIDE TO PREVENT FLOW UNDER FENCE. SILT FENCE GEOTEXTILE FABRIC (TYPICAL) 3. THE TRENCH MUST BE A MINIMUM OF 6" DEEP AND 6" WIDE TO ALLOW FOR THE SILT FENCE FABRIC TO BE LAID IN THE GROUND AND BACKFILLED WITH COMPACTED MATERIAL. 4. INSPECTION SHALL BE MADE WEEKLY OR AFTER EACH RAINFALL EVENT AND REPAIR OR REPLACEMENT SHALL BE MADE PROMPTLY AS NEEDED. 5. SILT FENCE SHALL BE REMOVED WHEN THE SITE IS COMPLETED STABILIZED SO AS NOT TO BLOCK OR IMPEDE STORM FLOW OR DRAINAGE. 6" MIN. 6. ACCUMULATED SILT SHALL BE REMOVED WHEN IT REACHES A DEPTH OF 6". THE SILT SHALL BE DISPOSED OF ON AN APPROVED SITE AND IN SUCH A MANNER THAT WILL NOT CONTRIBUTE TO ADDITIONAL SILTATION. SILT FENCE 6" MIN. TRENCH (BACKFILLED) FABRIC TOE-IN SCALE: nts
15
STANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018
STANDARD CONSTRUCTION DETAILS REVISED - JANUARY 2018 TABLE OF CONTENTS STORM WATER POLLUTION PLAN NOTES - - - - - - - - - - - - - - - - - - - - - - - - - SD-EC01 SILT FENCE NOTES - - - - - - - - - - -
More informationCITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS
TEXAS STANDARD CONSTRUCTION NOTES DRWN. BY: DSGN. BY: KJW 1 of 2 *Place geotextile fabric as a permeable seperator to prevent mixing of coarse aggregate and underlying soil. (as needed). 1. GEOTEXTILE
More informationEROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY
31 25 00 EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY A. Erosion and sedimentation control shall be provided by the Contractor for all areas of the site denuded or otherwise disturbed
More informationSECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More information2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1
2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 There are three ways to accomplish urban soil erosion and sedimentation control: Allow erosion to take place and then control sediment
More informationSECTION EROSION AND SEDIMENTATION CONTROLS
SECTION 312500 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 01 - GENERAL REQUIREMENTS which are hereby made
More informationCity of Doral 8401 NW 53 rd Ter. Doral, FL 33166
City of Doral 8401 NW 53 rd Ter. Doral, FL 33166 Project Address: (305) 593-6700 Permit Number: National Pollution Discharge Elimination System (NPDES) Construction Site Erosion and Sedimentation Control
More informationSECTION TRENCHING & BACKFILLING
SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications
More informationM&M CARGO PARKING LOT REHABILITATION 5103 MAHER AVENUE LAREDO, TEXAS MAYOR PRO-TEMPORE, DISTRICT II DISTRICT VIII COUNCIL MEMBER
LAREDO INTERNATIONAL AIRPORT M&M CARGO PARKING LOT REHABILITATION 5103 MAHER AVENUE LAREDO, TEXAS 78041 CITY OF LAREDO, TEXAS HONORABLE RAUL G. SALINAS, MAYOR ESTEBAN RANGEL MAYOR PRO-TEMPORE, DISTRICT
More information1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1
1.01 GENERAL A. The Contractor shall perform all excavation, backfilling, grubbing and grading required for construction and installation of pipelines, structures and appurtenances. Excavation shall include
More informationSECTION MAINTENANCE OF EXISTING CONDITIONS
SECTION 02 01 00 MAINTENANCE OF EXISTING CONDITIONS PART 1 GENERAL 1.1 GENERAL A. The CONTRACTOR shall protect all existing utilities and improvements not designated for removal and shall restore damaged
More informationEROSION CONTROL GENERAL NOTES EC JAN 2017 C.B.
EROSION CONTROL GENERAL NOTES EC - 000 EROSION CONTROL GENERAL NOTES EC - 001 INSTALL TEMPORARY DRIVEWAY CULVERT IF THERE IS A ROADSIDE DITCH PRESENT EXISTING PAVEMENT OR APPROVED ACCESS POINT OR AS PRACTICABLE
More informationEXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.
CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related
More informationSECTION TRENCHING, BACKFILL AND COMPACTION
SECTION 312333 TRENCHING, BACKFILL AND COMPACTION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes 1. Native Backfill Material 2. Crushed Stone Bedding 3. Select Backfill Material 4. Shoring and Bracing
More informationSTANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL Section Number Title 801 GENERAL 802 STANDARD METHODS OF EROSION AND SEDIMENT
More informationSECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.
SECTION 31 20 00 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating soil and other material for surface improvements. B. Excavating soil and other material for drainage basins. C. Placing fill. D. Compaction
More information1993 Specifications CSJ'S & SPECIAL SPECIFICATION ITEM Tree Preservation and Treatment
1993 Specifications CSJ'S 0912-71-554 & 0912-71-555 SPECIAL SPECIFICATION ITEM 1016 Tree Preservation and Treatment 1. Description. This section specifies the requirements for protecting trees and related
More informationChapter 3: Permit Procedures and Requirements
Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8
More informationPUBLIC WORKS DEPARTMENT GENERAL NOTES
PUBLIC WORKS DEPARTMENT GENERAL NOTES 1. All construction shall be in strict accordance with the standards of the City of Southlake and governed by the North Central Texas Council of Government's Standard
More informationSECTION 10 - TRENCHING AND BACKFILLING
SECTION 10 - TRENCHING AND BACKFILLING 10.1 General A. Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 10.1.1 Related requirements
More informationIN T R A / M IN T R A M
SPRING MESA SUBDIVISION CONSTRUCTION PLANS A PART OF SECTION 35, TOWNSHIP 2 SOUTH, RANGELINE 70 WEST, 6th. PRINCIPAL MERIDIAN. CITY OF ARVADA, COUNTY OF JEFFERSON, STATE OF COLORADO COVER SHEET MARTIN
More informationSECTION EARTHWORK
SECTION 02200 EARTHWORK PART 1 - GENERAL 1.01 WORK INVOLVED A. Provide all labor, materials and equipment as required for all excavation, grading, providing borrow materials, hauling, placing and compacting
More informationCHAPTER 7: TREE PROTECTION DURING CONSTRUCTION 7.1 TREE PROTECTION AREAS
CHAPTER 7: TREE PROTECTION DURING CONSTRUCTION Urban trees need to be protected from damage to maximize their health, safety, benefits and functionality. Mature, young and newly transplanted trees need
More informationB. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.
SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating and filling for rough grading the Site. 2. Preparing subgrades for walks, curbs, pavements, and turf and grasses.
More informationCONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 507 JULY 1991 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES 507.01 SCOPE 507.02 REFERENCES 507.03 Not Used 507.04 Not Used
More informationSECTION PROTECTION AND RESTORATION OF EXISTING FACILITIES
PART 1 - GENERAL 1.1 GENERAL A. The CONTRACTOR shall protect all existing utilities and improvements not designated for removal and shall restore damaged or temporarily relocated utilities and improvements
More informationITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES
AFTER MARCH 1, 2012 ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES 430.1 Description. This item shall govern for all excavation required for the construction of sewers, sewer structures, pipe culverts,
More informationSECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS
SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING
More informationDodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits.
Dodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits. All private construction and/or maintenance activities which take place within the City right-of-way are subject to oversight
More informationThe developer/contractor shall be responsible for replacing all fences which must be disturbed for the installation of sanitary sewer or water lines.
SECTION 15.0 PIPE TRENCHES 15.01 Clearing and Grubbing The developer/contractor shall be responsible for the clearing and grubbing of the entire right-of-way. See Sections 13.01 and 14.01. Clearing and
More informationSECTION B. Prevention of sedimentation of waterways, open drainage ways, and storm and sanitary sewers due to construction activities.
SECTION 01 5713 TEMPORARY EROSION AND SEDIMENT CONTROL PART 1 GENERAL 1.01 SECTION INCLUDES A. Prevention of erosion due to construction activities. B. Prevention of sedimentation of waterways, open drainage
More informationConstruction Specification for General Excavation
Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03
More informationDIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012
2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include
More informationPART 1 GENERAL REQUIREMENTS
PART 1 GENERAL REQUIREMENTS Contract Closeout Plan 110 Arrow diagram for project close-out...3 Erosion Control 121 Straw bale barrier... 5 122 Silt fence... 7 123 Diversion dike... 9 124 Inlet protection...
More informationConstruction Best Management Practices Handbook BEST MANAGEMENT PRACTICES
Construction Best Management Practices Handbook www.montereysea.org BEST MANAGEMENT PRACTICES 26 www.montereysea.org Construction Best Management Practices Handbook VEHICLE TRACKING AND DUST CONTROL IN
More informationRock Sock (RS) Rock Sock height.
Rock Sock (RS) SC-5 Description A rock sock is constructed of gravel that has been wrapped by wire mesh or a geotextile to form an elongated cylindrical filter. Rock socks are typically used either as
More informationB. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.
SECTION 312000- EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Special Conditions, apply to this Section. 1.2 SUMMARY This Section
More informationAustin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000
Austin Technical Manuals - Standard Specifications Preservation of Trees and Other Vegetation (610S) 03/27/2000 610S.1 This item shall govern the proper care and treatment of all trees and other vegetation
More informationB. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.
SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution
More informationSECTION A1 EXCAVATION AND BACKFILL GENERAL
SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such
More informationCITY OF FARGO SPECIFICATIONS REMOVALS
REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation
More informationCITY OF FARGO SPECIFICATIONS REMOVALS
REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation
More informationPLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL
o PUBLIC WORKS DEPARTMENT PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL CIVIL ENGINEERING AND ARCHITECTURE 1. Offsite Improvements - Civil Engineering drawings may be required to show the following: Replacement
More informationSECTION EROSION AND SEDIMENTATION CONTROLS
SECTION 312500 EROSION AND SEDIMENTATION CONTROLS PART 1 - GENERAL 1.01 GENERAL PROVISIONS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 01 - GENERAL
More informationSE-6 GRAVEL BAG BERM. Objectives. Potential Alternatives
Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Materials and Waste Management - WM DESCRIPTION AND PURPOSE A gravel
More informationDOCUMENT ADDENDA AND MODIFICATIONS
DOCUMENT ADDENDA AND MODIFICATIONS PART 1 1.1 PROCEDURE GENERAL A. For filing purposes, add Addenda and Modifications to the Contract Documents following this page. Modified June 20, 2017 Addenda and Modifications
More informationAPPLICATION FOR RIGHT OF WAY PERMIT
City of Danville Department of Engineering & Urban Services APPLICATION FOR RIGHT OF WAY PERMIT PROJECT LOCATION: CONTRACTOR S BUSINESS NAME: CONTRACTOR'S ADDRESS: CONTRACTOR'S PHONE: OWNER S NAME: OWNER
More informationCITY OF SOUTH LAKE TAHOE APPLICATION FOR ENCROACHMENT, EXCAVATION and GRADING WITHIN THE CITY RIGHT OF WAY
CITY OF SOUTH LAKE TAHOE APPLICATION FOR ENCROACHMENT, EXCAVATION and GRADING WITHIN THE CITY RIGHT OF WAY The Right-of-Way Encroachment, Excavation & Grading Permit issued by the Public Works Department
More informationCHECK THE LOWER RIGHT CORNER OF EACH DETAIL FOR THE LATEST REVISION.
Standard Drawings Index NOTE: The specifications for materials and workmanship shall conform to the latest edition or the "Standard Specifications for Public Works Construction" published by the North
More informationSECTION EXCAVATION AND FILL
SECTION 02315 EXCAVATION AND FILL PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, equipment, and incidentals necessary to perform excavation, backfill, grading, and slope protection required to
More informationTree Protection Policy
Appendix F Tree Protection Policy The following is according to the City of Hamilton s special provision SP-97. General Tree Protection shall be in accordance with OPSS 801 as amended by this special provision.
More informationFigure Inlet protection (Source: Minnesota DOT)
3.9 INLET PROTECTION Figure 3.14. Inlet protection (Source: Minnesota DOT) Overview Description: A manufactured protective device or barrier used to trap sediment at a storm drain surface or curb inlet.
More informationAPPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER SHEET FOR SPECIAL CONDITIONS AND PERMIT NUMBERING
APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER FOR SPECIAL CONDITIONS AND PERMIT NUMBERING GENERAL NOTES: HOUSE GREEN HOUSE 1900 S. NORFOLK ST. SUITE 350 GARAGE GRADING
More informationCITY OF MILTON CONSTRUCTION NOTES
CITY OF MILTON CONSTRUCTION NOTES 1. Driveways shall be constructed of concrete and sloped per Georgia Highway standard 9031-J. Curb shall not be broken from gutter. Curb and gutter to be removed to existing
More informationSPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S
SPECIFICATIONS - DETAILED PROVISIONS Section 02210 - Site Grading C O N T E N T S PART 1 - GENERAL... 1 1.01 REQUIREMENT... 1 1.02 STRUCTURE PROTECTION... 2 1.03 JOB CONDITIONS... 3 PART 2 - PRODUCTS...
More informationBowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP)
Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP) SMP-11 PLANNING CONSIDERATIONS: Design Life: 1 yr Acreage
More informationSECTION IV. PIPELINE EXCAVATION AND BACKFILL
SECTION IV. PIPELINE EXCAVATION AND BACKFILL A. Description of Work B. Surface Types C. Backfill D. Surface Restoration A. DESCRIPTION OF WORK 1. Extent: Excavation of trenches for pipelines shall include
More informationPERMEABLE PATH PAVING
SAWCUT CONTROL JOINT: 1 WIDE x 1" DEEP SIGN B: R5-1 24" (1 REQ'D) SIGN C: R5-11 24"x 1 (1 REQ'D) PADOT STANDARD SIGNAGE INSTALL PER PADOT SPECIFICATIONS. HIGH INTENSITY PRISMATIC SIGN ON 0.080" THICK ALUMINUM
More informationTHE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION
THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION Standard Specifications for Restoration INDEX PAGE R.1 GENERAL...1 R.2 SCOPE...1 R.3 MATERIALS...1 R.4 CONSTRUCTION...2 R.4.1 General...2
More informationSECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.
SECTION 01220 UNIT PRICES PART 1 GENERAL 1.01 SUMMARY A. This Section specifies administrative and procedural requirements for the unit prices. B. The omission of any unit price description from this Section
More informationCONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 492 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES TABLE OF
More informationUnion County Vocational - Technical Schools Scotch Plains, New Jersey
SECTION 02222 - EXCAVATION, BACKFILL, AND COMPACTION FOR UTILITIES PART 1 - GENERAL 1.01 SECTION INCLUDES A. Excavating trenches for the installation of utilities and stormwater detention facilities. B.
More informationTOWN OF HOLLIS, NEW HAMPSHIRE
TOWN OF HOLLIS, NEW HAMPSHIRE ROAD and DRIVEWAY SPECIFICATIONS APPENDIX (Adopted 10/7/08) APPENDIX A A. Road Design Standards 1. Pavement and drainage facilities, curbs and sidewalks, when required, shall
More informationSECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS
SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01
More informationDIVISION 4100 SITEWORK
DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES
More informationSECTION 1 GENERAL NOTES
ISSUE DATE NOVEMBER 1st, 2011 SECTION 1 Page List Page Number Page Title COVER COVER GN-01 PAGE 1 GN-02 PAGE 2 GN-03 PAGE 3 GN-04 PAGE 4 GN-05 PAGE 5 GN-06 PAGE 6 GN-07 PAGE 7 : 1. (CCU) STANDARD SPECIFICATIONS
More informationSchedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw
Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw 6410 2006 The Erosion and Sediment Control plan should seek (i) to protect the soil surface from erosion where possible and (ii) capture
More informationITEM 706 PIPE SLOPE DRAIN
AFTER NOVEMBER 1, 2008 ITEM 706 PIPE SLOPE DRAIN 706.1 Description. This work shall consist of the installation of temporary erosion protection and sediment control pipe slope drains, utilized during construction
More informationSECTION 10.0 PIPE TRENCHES Excavation and Preparation of Trench
SECTION 10.0 PIPE TRENCHES 10.01 Excavation and Preparation of Trench The trench shall be excavated to the proper depth to permit installation of the pipe along the lines and grades shown on the Plans.
More informationSECTION UNCLASSIFIED EXCAVATION AND GRADING
SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on
More informationSECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS
SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS 12.1 The subdivider shall construct and install the improvements in accordance with the County's Standards for Construction Plans and Specifications
More informationTOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. June 1984
1 TOWN OF LAFAYETTE SPECIFICATIONS FOR HIGHWAY CONSTRUCTION June 1984 1. DEFINITIONS APPROVAL, APPROVED, ACCEPTED OR WORDS OR TERMS OF SIMILAR MEANING: Written approval of the Highway Superintendent. BASE
More informationWater Pollution Control for Work in Sensitive Areas
Water Pollution Control for Work in Sensitive Areas 10-1. WATER POLLUTION CONTROL The Contractor is advised that failure to fully comply with the provisions of this Section, and all requirements listed
More informationMINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014
MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341 Adopted April 24, 2014 Effective June 6, 2014 EROSION CONTROL RULE 1. POLICY. It is the policy of
More informationSECTION GENERAL EXCAVATION
02210-1 of 11 SECTION 02210 GENERAL EXCAVATION 02210.01 GENERAL A. Description 1. General excavation shall include but not necessarily be limited to, excavation and grading for general site work, roadways,
More informationSECTION EROSION CONTROLS
SECTION 31 25 13 EROSION CONTROLS PART 1 GENERAL 1.1 SUMMARY A. Section Includes installing, maintaining and removing: 1. Silt Fence. 2. Temporary Construction Entrances. 3. Diversion Channels. 4. Sediment
More informationCommon Construction-Site BMPs Quick Reference Guide
Common Construction-Site BMPs Quick Reference Guide Installation and Inspection Requirements For more information visit the Town of Truckee Clean Water Program Website: http://www.townoftruckee.com/engineering/clean-water-program
More informationInlet Protection. Fe= (Depends on soil type)
3.4 DESIGN CRITERIA: KEY CONSIDERATIONS Evaluate drainage patterns to ensure inlet protection will not cause flooding of roadway, property or structures Never block entire inlet opening Size according
More informationSECTION 18 - EARTHWORK TABLE OF CONTENTS
SECTION 18 - EARTHWORK TABLE OF CONTENTS Section Page 18-1 GENERAL... 18.1 18-2 ROADWAY EXCAVATION... 18.1 18-2.01 General... 18.1 18-2.02 Unsuitable Roadway Excavation and Backfill... 18.1 18-2.03 Surplus
More information1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods
SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include
More informationCITY OF URBANA CLASS 2 EROSION CONTROL PERMIT STANDARD DETAILS
CITY OF URBANA CLASS 2 EROSION CONTROL PERMIT STANDARD DETAILS CLASS 2 EROSION CONTROL PERMIT STANDARDS TABLE OF CONTENTS EROSION CONTROL PRACTICES FLOW CHART 1 EROSION CONTROL PERMIT FORM 2 EXAMPLE EROSION
More informationCity of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING
January 2007(Revision 1) Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 CLASSIFICATION OF THE WORK 1.05 QUALITY ASSURANCE PART 2 PRODUCTS 2.01
More informationCITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT
CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards
More informationSTORM DRAINAGE - 1 DETAILED SPECIFICATIONS - STORM DRAINAGE
STORM DRAINAGE - 1 DETAILED SPECIFICATIONS - STORM DRAINAGE 2-7-1 Scope 2-7-2 General 2-7-3 Location and Grade of Sewers 2-7-4 Order of Work 2-7-5 Existing Water, Sanitary Sewer, Gas, and Other Utility
More informationB. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.
The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language
More informationSECTION TRENCHING
SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.
More informationSECTION 10 - ENVIRONMENTAL CONTROLS AT WORK SITE TABLE OF CONTENTS
SECTION 10 - ENVIRONMENTAL CONTROLS AT WORK SITE TABLE OF CONTENTS Section Page 10-1 DUST CONTROL...10.1 10-2 AIR POLLUTION CONTROL...10.1 10-3 BURNING...10.1 10-4 EROSION, SEDIMENT, AND WATER POLLUTION
More informationOrder of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.
SEDIMENT CONTROL NOTES 1.0 GENERAL 1.1 The Developer and Contractor shall comply with the requirements of all regulatory authorities, federal, provincial and municipal government departments including
More informationThe Regional Municipality of Peel Basis of Payment
Page PS-1 THE REGIONAL MUNICIPALITY OF PEEL BASIS OF PAYMENT FOR SANITARY SEWER CONSTRUCTION Page PS-2 INDEX Page No. PS.1. EXCAVATION...4 1.1. Trench Excavation...4 1.2. Asphalt/Concrete Removal...5 PS.2.
More informationIt is the CONTRACTORS RESPONSIBILITY to use OSHA approved shoring
PERMIT# EXCAVATION/RIGHT OF WAY PERMIT ATE: NOTE: No permit shall be issued \vithout CURRENT Montana Contractors License, Insurance and Bonding on file with the Public Works epartment. It is the CONTRACTORS
More informationSECTION SOILS REPORT
SECTION 02300 SOILS REPORT 1. GENERAL: 1.1 All work included under this heading shall be subject to the General Conditions of the entire operation. This Contractor is required to refer especially thereto.
More informationC. Foundation stabilization for pipe and utility structures.
PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization
More informationPUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR
EASEMENT NOTES:. EASEMENT LIMIT SHOWN AS PROVIDED BY. TESC NOTES:. CONTRACTOR SHALL DEVELOP TEMPORARY EROSION AND SEDIMENT CONTROL PLAN AND PROVIDE ONSITE CERTIFIED EROSION AND SEDIMENT CONTROL LEAD (CESCL)
More informationSECTION EARTHWORK. B. Removal of subsoil and excavating all classes of material encountered.
SECTION 02200 PART 1 GENERAL 1.1 SECTION INCLUDES A. Subsoil and aggregate materials. B. Removal of subsoil and excavating all classes of material encountered. C. Handling, storage, transportation and
More informationSTANDARD SPECIFICATIONS SECTION PAVEMENT REQUIREMENTS
STANDARD SPECIFICATIONS SECTION 02950 PAVEMENT REQUIREMENTS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for removing, replacing and providing new paving for roads, driveways, parking
More informationAppendix C SPECIFICATIONS FOR DESIGN AND CONSTRUCTION (AMENDED 04/03/90)
Appendix C SPECIFICATIONS FOR DESIGN AND CONSTRUCTION (AMENDED 04/03/90) C-1. Design Speed, Sight Distance, Centerline Radius MINOR LOCAL SUBCOLLECTOR COLLECTOR ALLEY DESIGN SPEED 25 MPH 25 MPH 30 MPH
More informationSACHSE EROSION CONTROL GUIDELINES
SACHSE EROSION CONTROL GUIDELINES Section I. Definitions The following words, terms, and phrases, when used in this guideline, shall have the meanings ascribed to them in this Section, except where the
More informationSTANDARD SPECIFICATIONS SECTION 16 STORM SEWER SYSTEMS
STANDARD SPECIFICATIONS SECTION 16 STORM SEWER SYSTEMS 16.01 GENERAL Specifications in this section shall apply to the construction of storm sewer systems including excavation, trenching, backfilling,
More informationEXHIBIT F STUDIO GC DRAWINGS
STUDIO GC DRAWINGS GENERAL NOTES 4700 S Ravinia Ave, Orland Park, IL 6046 DRAWING INDEX. BEFORE BEGINNING WORK AT THE SITE AND THROUGHOUT THE COURSE OF THE WORK, INSPECT AND VERIFY THE LOCATION AND CONDITION
More informationSECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS
SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS CS-2-01. GENERAL: Trench excavation shall conform with the City Standard Specifications. In general a trench is defined as an excavation in which
More information