1 Stantec Architecture Inc. 20 East Greenway Plaza, Suite 200, Houston TX ADDENDUM Addendum Number One (01) TO PLANS AND SPECIFICATIONS FOR MERRILL GREEN STADIUM RENOVATIONS Project No: ARCHITECTURE INC. 20 E. GREEWAY PLAZA, SUITE 200 HOUSTON, TEXAS SEPTEMBER 4, 2015 NOTE: If you have questions about this Addendum, please contact Jose Garcia, Senior Project Manager. This Addendum is generally seperated into sections for convenience; however, all contractors, subcontractors, material suppliers and other involved parties shall be responsible for reading the entire Addendum. Failure to list an item(s) in all affected sections of this Addendum does not relieve any party affected from performing per instructions, provided the information is set forth one time anywhere in the Addendum. This document shall become attached to and part of the Construction Documents for the aforementioned project. APPROVED MATERIAL SUPPLIERS 1. Per specification section , add under Part 2 - Products, 2.5 Underslab Memberanes Viper Vaporcheck II 10-mil Class a Vapor Barrier Insulation Solutions 401 Truck Haven Rd., East Peoria, IL Contact: NickMehn Tel: Per specification section , add under Part 2 Products, 2.1 Composite Metal Building Panels, A. Manufacturers: Larson PE or FR by Alucoil North America, Contact: Camille Knezevich Tel: Project Name: Merrill Green Stadium Renovations Date: September 4, 2015 Addendum No. One (01) Page 1 of 2

2 3. Per specification section , add under Part 2 Product, 2.1 MANUFACTURES D. Armstrong Flooring - Natural Creations SPECIFICATIONS GENERAL & ARCHITECTURAL 1. REVISION: Specification Section SUMMERY OF WORK 1.4A Beginning date of work: October 19, REVISION: Specification Section GLAZING 3. REVISION: Specification Section ALUMINUM GLAZING SYSTEM 4. REVISION: Specification Section HAZARDOUS MATERIAL REMEDIATION MISCELLANEOUS ITEMS 1. A walk through for the site shall be conducted on September 10, 2015 from 2:00 3:00 PM. Meet at the front entrance gate off of Campus Drive. 2. A walk through for the site shall be conducted on September 15, 2015 from 2:00 3:00 PM. Meet at the front entrance gate off of Campus Drive. NUMBER OF ATTACHMENTS: Pre-Bid Conference Sign-in Sheet (1/7/15) 8 ½ x 11 2 pages Specifications 8 ½ x pages END OF ADDENDUM NUMBER ONE (01) Project Name: Merrill Green Stadium Renovations Date: September 4, 2015 Addendum No. One (01) Page 2 of 2

3

4

5 Merrill Green Stadium Renovations August 24, 2015 SECTION ALUMINUM-FRAMED GLAZING SYSTEMS: ADDENDUM #1 Sept. 4, 2015 PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Aluminum-framed storefronts, exterior and interior. 2. Aluminum entrance doors, exterior and interior. 3. Aluminum fixed windows, exterior and interior. 4. Aluminum frames for butt-glazed panels. B. Related Sections: 1. Section Joint Protection. 2. Section Door Hardware. 3. Section Glazing: For glazing panels and insulated aluminum infill panels. 1.2 REFERENCES A. American Architectural Manufacturers Association: 1. AAMA Methods of Test for Exterior Walls. 2. AAMA Voluntary Specification for Anodized Architectural Aluminum. 3. AAMA Voluntary Test Method for Thermal Transmittance and Condensation Resistance of Windows, Doors and Glazed Wall Sections. 4. AAMA CW-10 - Care and Handling of Architectural Aluminum from Shop to Site. 5. AAMA SFM-1 - Aluminum Store Front and Entrance Manual. B. ASTM International: 1. ASTM A36/A36M - Standard Specification for Carbon Structural Steel. 2. ASTM A123/A123M - Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products. 3. ASTM A653/A653M - Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process. 4. ASTM B209 - Standard Specification for Aluminum and Aluminum-Alloy Sheet and Plate. 5. ASTM B221 - Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes. 6. ASTM E330 - Standard Test Method for Structural Performance of Exterior Windows, Curtain Walls, and Doors By Uniform Static Air Pressure Difference. C. SSPC: The Society for Protective Coatings: 1. SSPC Paint 20 - Zinc-Rich Primers (Type I - Inorganic and Type II - Organic). 1.3 SYSTEM DESCRIPTION A. Aluminum-framed storefront system includes: tubular aluminum sections; aluminum and glass entrances; shop fabricated, factory finished, with glass and glazing specified in Section and installed by this Section; related flashings, anchorage and attachment devices. B. System Assembly: Site assembled. 1.4 PERFORMANCE REQUIREMENTS A. System Design: Design and size components to withstand dead and live loads caused by positive and negative wind pressure acting normal to plane of wall, including building corners. 1. To design pressure indicated on Drawings, as tested in accordance with ASTM ALUMINUM-FRAMED GLAZING SYSTEMS

6 Merrill Green Stadium Renovations August 24, 2015 E330. B. Deflection: Limit mullion deflection to 1/175 for spans under 13-6 and 1/240 plus 1/4 inch for spans over 13-6, with full recovery of glazing materials. C. System Assembly: Accommodate without damage to components or deterioration of seals, movement within system, movement between system and peripheral construction, dynamic loading and release of loads, deflection of structural support framing. D. Air Infiltration: Limit air leakage through assembly to 0.06 cfm/min/sq ft of wall area, measured at reference differential pressure across assembly of 1.57 psf as measured in accordance with AAMA 501. E. Air and Vapor Seal: Maintain continuous air barrier and vapor retarder throughout assembly, primarily in line with glass. F. Water Leakage: None, when measured in accordance with AAMA 501 with test pressure difference of 20 percent of design pressure, with minimum differential of 2.86 lbf/sq ft and maximum of lbf/sq ft. G. Thermal Transmittance of Assembly (Excluding Entrances): Maximum U Value of 0.69 Btu/sq ft per hour per deg F when measured in accordance with AAMA H. Expansion / Contraction: Provide for expansion and contraction within system components caused by cycling temperature range of 170 degrees F over 12 hour period without causing detrimental effect to system components and anchorage. I. System Internal Drainage: Drain water entering joints, condensation occurring in glazing channels, or migrating moisture occurring within system, to exterior by weep drainage network. 1.5 SUBMITTALS A. Section Submittal Procedures: Submittal procedures. B. Shop Drawings: Indicate system dimensions, framed opening requirements and tolerances, affected related Work and expansion and contraction joint location and details. C. Product Data: Submit component dimensions, describe components within assembly, anchorage and fasteners, glass and infill, door hardware, and internal drainage details. D. Samples: Submit two samples 12 x 12 inches in size illustrating finished aluminum surface. E. Design Data: Indicate framing member structural and physical characteristics and dimensional limitations. F. Manufacturer's Certificate: Certify products meet or exceed specified requirements. 1.6 QUALITY ASSURANCE A. Perform Work in accordance with AAMA SFM-1 and AAMA MCWM-1 - Metal Curtain Wall, Window, Store Front and Entrance - Guide Specifications Manual. 1.7 QUALIFICATIONS A. Manufacturer and Installer: Company specializing in manufacturing aluminum glazing systems with minimum three years experience. 1.8 PRE-INSTALLATION MEETINGS A. Section Administrative Requirements: Pre-installation meeting. ALUMINUM-FRAMED GLAZING SYSTEMS

7 Merrill Green Stadium Renovations August 24, 2015 B. Convene minimum one week prior to commencing work of this section. 1.9 DELIVERY, STORAGE, AND PROTECTION A. Section Product Requirements: Product storage and handling requirements. B. Handle Products of this section in accordance with AAMA MCWM-1 - Curtain Wall Manual #10. C. Protect finished aluminum surfaces with wrapping. Do not use adhesive papers or sprayed coatings which bond when exposed to sunlight or weather ENVIRONMENTAL REQUIREMENTS A. Section Product Requirements. B. Do not install sealants or glazing materials when ambient temperature is less than 40 degrees F during and 48 hours after installation WARRANTY A. Section Execution and Closeout Requirements: Product warranties and product bonds. B. Special Assembly Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of aluminum-framed systems that do not comply with requirements or that deteriorate as defined in this Section within specified warranty period. 1. Failures include, but are not limited to, the following: a. Structural failures including, but not limited to, excessive deflection. b. Noise or vibration caused by thermal movements. c. Deterioration of metals and other materials beyond normal weathering. d. Adhesive or cohesive sealant failures. e. Water leakage through fixed glazing and framing areas. f. Failure of operating components to function properly. 2. Warranty Period: Two years from date of Substantial Completion. C. Special Finish Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components on which finishes fail within specified warranty period. Warranty does not include normal weathering. 1. Warranty Period: 5 years from date of Substantial Completion. PART 2 - PRODUCTS 2.1 ALUMINUM-FRAMED GLAZING SYSTEMS A. Manufacturers: 1. Arch Aluminum & Glass Co., Inc Columbia Commercial Building Products, 3. EFCO Corporation 4. Kawneer 5. United States Aluminum Vistawall Architectural Products YKK AP America Inc., 8. Substitutions: Section Product Requirements. B. Product Description: 1. Exterior Aluminum Frames: Thermally broken; flush glazing stops; center glazed to accommodate 1 inch thick glazing. a. For exterior entry systems and exterior fixed windows. ALUMINUM-FRAMED GLAZING SYSTEMS

8 Merrill Green Stadium Renovations August 24, COMPONENTS b. Size: 4.5 deep with 2 profile. c. Basis of Design: Trifab VG 451T as manufactured by Kawneer. d. Furnish closed backs at heads and jambs of exterior frames 2. Interior Aluminum Frames: Non-thermally broken; flush glazing stops; center glazed to accommodate 1/4-inch thick glazing at interior. a. For interior entry systems and interior fixed windows. b. Size: 4 deep with 1-3/4 profile. c. Basis of Design: Trifab 450 as manufactured by Kawneer 3. Doors: Aluminum Framed Glass Doors; 2-inches thick, nominal 5 inch wide top rail and vertical stiles, nominal 6 3/4 inch wide bottom rail; 3/16 wall thickness; beveled glazing stops. a. Basis of Design: Series 500 Tuffline Wide Stile as manufactured by Kawneer. 4. ADD. #1: Head and Sill Frames at Press Box: Non-thermally broken impactresistant continuous frames; flush glazing stops; center glazed to accommodate 1-5/16 thick glazing. a. For Press Box windows. b. Size: 5 deep with 2-1/2 profile. c. Basis of Design: IR 501 as manufactured by Kawneer. d. Furnish closed backs at heads. A. Extruded Aluminum: ASTM B221; 6063 alloy, T5 temper typical, 6061 alloy, T6 temper for extruded structural members. B. Sheet Aluminum: ASTM B209, 5005 alloy, H15 or H34 temper. C. Sheet Steel: ASTM A653/A653M; galvanized to minimum G90. D. Steel Sections: ASTM A36/A36M; shaped to suit mullion sections, galvanized. E. Glass: Specified in Section F. Glazing Materials: Storefront manufacturer s standard types to suit application and to achieve weather, moisture, and air infiltration requirements. G. Flashings: Minimum inch thick aluminum to match mullion sections where exposed. H. Hardware: In accordance with Section and as follows: 1. Weather Stripping: Manufacturer's standard replaceable components. a. AAMA 701, made of wool, polypropylene, or nylon woven pile with nylonfabric or aluminum-strip backing. I. Flashings: Minimum inch thick aluminum to match mullion sections where exposed. J. Sealant and Backing Materials: 1. Sealant Used Within System (Not Used for Glazing): Manufacturer s standard materials to achieve weather, moisture, and air infiltration requirements. 2. Perimeter Sealant: Specified in Section K. Brackets and Reinforcements: Manufacturer's standard high-strength aluminum brackets and reinforcements. Provide non-staining, nonferrous shims for aligning system components. L. Fasteners: Manufacturer s standard stainless steel, compatible with adjacent materials. M. Bituminous Paint: Cold-applied asphalt-mastic paint complying with SSPC-Paint 12 requirements except containing no asbestos, formulated for 30-mil thickness per coat. ALUMINUM-FRAMED GLAZING SYSTEMS

9 Merrill Green Stadium Renovations August 24, FABRICATION A. Fabricate components with minimum clearances and shim spacing around perimeter of assembly, yet enabling installation and dynamic movement of perimeter seal. B. Fabricate sill pans with sealed end dams at jambs and changes in sill height. C. Fabricate frames for glazing from inside. D. Accurately fit and secure joints and corners. Make joints flush, hairline, and weatherproof. E. Prepare components to receive anchor devices. Fabricate anchors. F. Arrange fasteners and attachments to conceal from view. G. Prepare components with internal reinforcement for door hardware. 1. At exterior door frames, provide weatherstripping at fixed stops. 2. At interior door frames, provide weatherstripping or silencers at stops to prevent door-to-frame contact. H. Reinforce framing members for imposed loads. 2.4 SHOP FINISHING A. Clear Anodized Aluminum Surfaces: AAMA 611, AA-M12C22A41 non-specular as fabricated mechanical finish, medium matte chemical finish, and Architectural Class I 0.7 mils clear anodized coating. B. Concealed Steel Items: Galvanized to ASTM A123/A123M; minimum 1.2 oz/sq ft coating thickness; galvanize after fabrication. C. Apply bituminous paint to concealed aluminum surfaces in contact with cementitious materials or dissimilar metals. D. Touch-Up Primer for Galvanized Steel Surfaces: SSPC Paint 20 zinc rich. E. Extent of Finish: 1. Apply factory coating to surfaces exposed at completed assemblies. 2. Apply touch-up materials recommended by coating manufacturer for field application to cut ends and minor damage to factory applied finish. PART 3 - EXECUTION 3.1 EXAMINATION A. Section Administrative Requirements: Coordination and project conditions. B. Verify dimensions, tolerances, and method of attachment with other Work. C. Verify wall openings and adjoining air and vapor seal materials are ready to receive Work of this Section. 3.2 INSTALLATION A. Install wall system in accordance with AAMA MCWM-1 - Metal Curtain Wall, Window, Store Front and Entrance - Guide Specifications Manual. B. Attach to structure to permit sufficient adjustment to accommodate construction tolerances and other irregularities. C. Provide alignment attachments and shims to permanently fasten system to building structure. ALUMINUM-FRAMED GLAZING SYSTEMS

10 Merrill Green Stadium Renovations August 24, 2015 D. Align assembly plumb and level, free of warp or twist. Maintain assembly dimensional tolerances, aligning with adjacent Work. E. Install sill pans. Turn up ends and edges; seal to adjacent Work to form water tight dam. F. Coordinate attachment and seal of perimeter air and vapor retarder materials. G. Pack fibrous insulation in shim spaces at perimeter of assembly to maintain continuity of thermal barrier. H. Install integral flashings and integral joint sealers. I. Set thresholds in sealant and secure. J. Install hardware using templates provided. Refer to Section for installation requirements. K. Coordinate installation of glass and opaque panels with Section ; separate panels from metal surfaces. L. Coordinate installation of perimeter sealants with Section ERECTION TOLERANCES A. Section Quality Requirements: Tolerances. B. Maximum Variation from Plumb: 0.06 inches every 3 ft non-cumulative or 1/16 inches per 10 ft, whichever is less. C. Maximum Misalignment of Two Adjoining Members Abutting in Plane: 1/32 inch. 3.4 ADJUSTING A. Section Execution and Closeout Requirements: Testing, adjusting and balancing. B. Adjust operating hardware and sash for smooth operation. 3.5 CLEANING A. Section Execution and Closeout Requirements: Final cleaning. B. Remove protective material from pre-finished aluminum surfaces. C. Wash down surfaces with solution of mild detergent in warm water, applied with soft, clean wiping cloths. Take care to remove dirt from corners. Wipe surfaces clean. D. Remove excess sealant by method acceptable to sealant manufacturer. 3.6 PROTECTION OF INSTALLED CONSTRUCTION A. Section Execution and Closeout Requirements: Protecting installed construction. B. Protect finished Work from damage. END OF SECTION ALUMINUM-FRAMED GLAZING SYSTEMS

11 Merrill Green Stadium Renovations August 24, 2015 SECTION GLAZING: ADDENDUM #1 September 4, 2015 PART 1 - GENERAL 1.1 SUMMARY A. Section Includes glass and glazing for the following: 1. Doors. 2. Aluminum glazed framing. B. Related Sections: 1. Section Joint Protection: Requirements for sealant and back-up material other than glazing sealants. 2. Section Standard Steel Doors and Frames: Glazing in steel doors and windows. 3. Section Flush Wood Doors: Glazing in door-lite frames. 4. Section Aluminum-Framed Entrances and Storefronts. 1.2 REFERENCES A. American National Standards Institute: 1. ANSI Z Safety Glazing Materials Used in Buildings Safety. B. American Society of Civil Engineers: 1. ASCE 7 - Minimum Design Loads for Buildings and Other Structures. C. ASTM International: 1. ASTM C509 - Standard Specification for Elastomeric Cellular Preformed Gasket and Sealing Material. 2. ASTM C864 - Standard Specification for Dense Elastomeric Compression Seal Gaskets, Setting Blocks, and Spacers. 3. ASTM C Standard Specification for Flat Glass. 4. ASTM E1300 Standard Practice for Determining Load Resistance of Glass in Buildings. 5. ASTM E Standard Specification for Insulating Glass Unit Performance and Evaluation. D. Consumer Products Safety Commission: 1. CPSC 16 CFR Safety Standard for Architectural Glazing. E. Flat Glass Marketing Association: 1. FGMA Glazing Manual: Glazing compounds and preformed glazing sealants. F. Glass Association of North America: 1. GANA - Sealant Manual. 2. GANA - Glazing Manual. 3. GANA - Laminated Glass Design Guide. 1.3 PERFORMANCE REQUIREMENTS A. Glass Thickness: Glass thickness designations indicated are minimums and are for detailing only. Confirm glass thicknesses by analyzing Project loads and in-service conditions. Provide glass lites in the thickness designations indicated for various size openings, but not less than thicknesses conforming to ASTM E1300 and in strengths (annealed or heat treated) required to meet or exceed the following criteria: 1. Wind Loads: As indicated, but not less than wind loads required by ASCE 7 "Minimum Design Loads for Buildings and Other Structures": Section 6.0 "Wind Loads." 2. Probability of Breakage for Vertical Glazing: 8 lites per 1000 for lites set vertically GLAZING

12 Merrill Green Stadium Renovations August 24, 2015 or not more than 15 degrees off vertical and under wind action. a. Load Duration: 3 seconds. 3. Maximum Lateral Deflection: For exterior glass supported on all 4 edges, provide thickness required that limits center deflection at design wind pressure to 1/50 times the short side length or 1 inch, whichever is less. 4. Minimum Glass Thickness for Exterior Lites: Not less than 1/4 inch per each pane of 1 insulated glazing panel. B. Thermal Movements: Provide glazing that allows for noiseless thermal movements resulting from the following maximum change (range) in ambient and surface temperatures acting on glass framing members and glazing components. 1. Temperature Change (Range): 120 deg F, ambient; 180 deg F, material surfaces. C. Thermal and Solar Optical Performance: Measured or calculated in accordance with the following: 1. U-Values: NFRC Solar Heat Gain Coefficients: NFRC Solar Optical Properties: NFRC SUBMITTALS A. Section Submittal Procedures: Submittal procedures. B. Product Data: 1. Glass: Provide structural, physical, and thermal and solar optical performance characteristics, size limitations, and special handling or installation requirements. 2. Glazing Sealants, Compounds and Accessories: Provide chemical, functional, and environmental characteristics, limitations, special application requirements. Identify available colors where exposed. C. Samples: 1. Glass: Submit two samples 12x12 inch in size, of each type and color of glass specified, including spandrel glass. 2. Glazing Materials: Submit 12 inch long bead of glazing sealant for each color other than black. D. Manufacturer's Certificate: Certify sealed insulating glass and low-e coated glass meet or exceed specified requirements. E. Installer's Certificate: Certify glass furnished without identification label is installed in accordance with Construction Documents and applicable code. 1.5 QUALITY ASSURANCE A. Perform Work in accordance with GANA Glazing Manual for glazing installation methods. B. Safety Glazing Products: Comply with testing requirements in 16 CFR Obtain safety glazing products permanently marked with certification label of the Safety Glazing Certification Council or another certification agency or manufacturer acceptable to authorities having jurisdiction. 2. Where glazing units are specified for lites more than 9 sq. ft. in exposed surface area, and lites of any size in certain hazardous locations such as sliding glass doors, doors and enclosures for bathtubs, showers, hot tubs, whirlpools, saunas, and steam rooms, provide glazing products that comply with Category II materials; for lites 9 sq. ft. or less in exposed surface area, provide glazing products that comply with Category I or II materials. 1.6 QUALIFICATIONS A. Installer: Company specializing in performing Work of this section with minimum three GLAZING

13 Merrill Green Stadium Renovations August 24, 2015 years experience. 1.7 PRE-INSTALLATION MEETING A. Section Administrative Requirements: Pre-installation meeting. B. Convene minimum one week before starting Work of this section. 1.8 ENVIRONMENTAL REQUIREMENTS A. Section Product Requirements. B. Do not install liquid glazing sealants when ambient and substrate temperature conditions are outside limits permitted by glazing sealant manufacturer or below 40 deg F. C. Do not proceed with glazing operations when glazing channel substrates are wet from rain, frost, condensation, or other causes. 1.9 COORDINATION A. Section Administrative Requirements: Coordination and project conditions WARRANTY A. Section Execution and Closeout Requirements: Product warranties and product bonds. B. Extended Warranties: 1. Furnish 4-year warranty to include coverage for laminated glass units from deterioration or failure, and replacement of same. 2. Furnish 5-year warranty to include coverage for coated glass units from coating deterioration or failure, and replacement of same. 3. Furnish 10-year warranty to include coverage for sealed glass units from seal failure, interpane dusting or misting, and replacement of same. PART 2 - PRODUCTS 2.1 MATERIALS A. Manufacturers: 1. PPG Industries Model 2. No substitution. ADD. #1 B. Storefront Door and Window Glazing: 1. Insulating Glass Panels: ASTM E2190 certified by Insulating Glass Certification Council; with aluminum and silicone edge seal; 1-inch thick, black edge seal; purge interpane space with dry hermetic air. a. Outer Pane: 1/4 thick PPG Solar Gray tinted tempered glass with low-e coating applied to number 2 surface. b. Inner Pane: Clear tempered glass. c. U-Factor Winter: 0.29 d. U-Factor Summer: 0.27 e. Solar Heat Gain Coefficient: 0.24 f. Visible Light Transmittance: 35 g. Shading Coefficient: 0.28 GLAZING

14 Merrill Green Stadium Renovations August 24, 2015 C. Insulating Spandrel Glass Panels: 1. Meet requirements of ASTM C thick insulated panels, black edge seal; purge interpane space with dry hermetic air. 3. Inside and outside glazing faces of ¼ clear tempered glass. 4. Provide opaque ceramic coating on No. 2 surface. Color to match adjacent glazing tint. D. Press Box Glazing: 1. Low-E Impact-Resistant Insulating Glass: Insulating glass fabricated as follows: a. Outer Pane: 1/2 thick clear laminated glass, composed of (2) layers of 1/4 thick PPG Starphire non-tempered high-clarity glass laminated with SGP.03 safety glazing interlayer. b. Inner Pane: 1/4 thick pane of clear tempered glass, with Solarban 70XL Low-E coating on number 5 surface. c. Glazing Panel Construction: ASTM E2190 certified by Insulating Glass Certification Council; with aluminum and silicone edge seal; 1-5/16 thick, black edge seal; purge interpane space with dry hermetic air. 2. Joint Type: Frameless open-gapped sloped vertical joints filled with silicone sealant. Continuous head and sill frames provided under Section GLAZING ACCESSORIES A. Gaskets: Part of aluminum framing system. B. Setting Blocks: Elastomeric material recommended by glass manufacturer, 80 to 90 Shore A durometer hardness, length of 0.1 inch for each square foot of glazing or minimum 4 inch x width of glazing rabbet space minus 1/16 inch x height to suit glazing method and pane weight and area. C. Spacer Shims: Elastomeric material recommended by glass manufacturer, 50 to 60 Shore A durometer hardness, minimum 3 inch long x one half the height of glazing stop x thickness to suit application, self-adhesive on one face. PART 3 - EXECUTION 3.1 EXAMINATION A. Section Administrative Requirements: Coordination and project conditions. B. Verify openings for glazing are correctly sized and within acceptable tolerance. C. Verify surfaces of glazing channels or recesses are clean, free of obstructions impeding moisture movement, weeps are clear, and ready to receive glazing. 3.2 PREPARATION A. Clean contact surfaces with solvent and wipe dry. B. Seal porous glazing channels or recesses with substrate compatible primer or sealer. C. Prime surfaces scheduled to receive sealant. 3.3 INSTALLATION A. Perform installation in accordance with GANA Glazing Manual. GLAZING

15 Merrill Green Stadium Renovations August 24, Glazing Sealants: Comply with ASTM C Do not allow metal-to-glass contact. B. Exterior Dry Method (Gasket Glazing): 1. Cut glazing gasket to length; install on glazing pane. Seal corners by butting tape and sealing junctions with compatible butyl sealant. 2. Place setting blocks at 1/4 points with edge block no more than 6 inches from corners. 3. Rest glazing on setting blocks and push against fixed stop with sufficient pressure to attain full contact. 4. Install removable stops without displacing glazing spline. Exert pressure for full continuous contact. ADD.#1 C. Exterior Glazing at Press Box - Sloped vertical mullions with gapped exposed glazing joints: 3.4 CLEANING 1. Set top and bottom glazing panel edges in gaskets of horizontal framing as specified above. 2. Cut glazing gasket to length; install on glazing pane in continuous length. 3. Place setting blocks at 1/4 point spacing with an edge block no more than 6 inches from each corner. Provide additional edge blocking as may be required by the glazing panel manufacturer or aluminum system manufacturer for the specific installation. 4. Rest glazing on setting blocks and push against fixed stop with sufficient pressure to attain full contact. 5. Install removable stops without displacing glazing spline. Exert pressure for full continuous contact. 6. Provide temporary masking tape protection along exposed edges of glazing gaps and install specified black silicone joint filler at glazing gaps. Tool sealant with moderate pressure to eliminate air bubbles or gaps in sealant and to provide smooth finish face. 7. Trim any excess silicone sealer after removal of masking tape. A. Section Execution and Closeout Requirements: Final cleaning. B. Remove glazing materials from finish surfaces. C. Remove labels after Work is complete. D. Clean glass and adjacent surfaces. 3.5 PROTECTION OF INSTALLED CONSTRUCTION A. Section Execution and Closeout Requirements: Protecting installed construction. B. After installation, mark pane with a temporary 'X' using removable plastic tape or paste. Do not mark heat absorbing or reflective glass units. END OF SECTION GLAZING

16 Merrill Green Stadium Renovations September 4, 2015 Addendum #1 1. DESCRIPTION SUMMARY OF WORK 1.1 Except as otherwise expressly provided herein, Asbestos Abatement Contractor (Contractor) shall supply all labor, supervision, materials, equipment, tools, storage and any and all items necessary for the supply, fabrication, erection, construction, disposal (including handling, transportation, loading, unloading and receiving) of the abatement of asbestos-containing or asbestos-contaminated materials designated as the Work. Require that all phases of the Work be executed by skilled craftsmen trained and experienced in their respective trades. 1.2 Contractor may subcontract any phase or portion of the Work. However, such subcontract shall not relieve Contractor from enforcing the use of all required safety equipment and supplies by the subcontractor and his employees providing any phase of the Work in contaminated areas. Contractor shall require and verify that all materials and methods used by subcontractors are consistent with materials and methods for established and safe asbestos removal procedures and consistent with the Specification. 2. WORK INCLUDED IN THE SPECIFICATIONS 2.1 Remove and properly dispose of all asbestos containing materials present within the Press Box Building including, but not limited to the items listed below: Material Location Est. Quantity Residual Floor Tile Mastic Under Carpet and Floor Tile in Restroom 700 sq. ft. Floor Tile and Mastic Stairway Entry 15 sq. ft. Wallboard Joint Compound Central Press Box 2800 sq. ft. NOTE: These are quantity estimates only. For biddings purposes, it is the Contractor's responsibility to verify quantities of all material to be removed. All work shall be completed in accordance with all applicable Federal and state regulations regarding removal and disposal of asbestos containing materials. 2.2 Contractor to construct enclosures for all interior ACM removal. Removal enclosures must meet full containment requirements of Texas DSHS with negative pressure. 2.3 All work is to be performed within the schedule agreed upon by Owner, Construction Manager and Contractor. 2.4 Texas Department of State Health Services (DSHS) Notification. HAZARDOUS MATERIAL REMEDIATION

17 Merrill Green Stadium Renovations September 4, 2015 Addendum #1 3. WORK NOT INCLUDED IN THE SPECIFICATIONS 3.1 Consulting or air monitoring services for the Building Owner. 3.2 Payment of Texas DSHS Fee. 4. EXISTING CONDITIONS 5. STORAGE 4.1 Existing conditions are reflected correctly to the best of Consultant's knowledge. Should minor conditions be encountered which are not exactly as indicated, modification to new work shall be made as required at no additional expense to Building Owner. 4.2 Certain materials in the work area were tested at the Building Owner's request. Copies of these reports are available at the office of the Building Owner or Ownerʼs representative. These reports are specifically excluded from the Specifications. 5.1 Contractor shall supply any additional temporary storage (outdoor containers) required for storage of equipment and materials for duration of Project. Contractor is responsible for security of storage. 6. WORKING HOURS 6.1 Contractor shall submit his work schedule to the Construction Manager and Building Owner for approval. Asbestos removal operations may be performed 24 hours per day, seven days per week, including holidays. 6.2 The Contractor may be asked to stop work if abatement activities are disruptive in any way to the Ownerʼs use of the building or neighboring facilities. 7. BUILDING SECURITY 7.1 Contractor shall maintain personnel on the site at all times when portions of the work areas are open or not properly secured. Contractor shall secure work areas completely at the end of each working day. Contractor shall be responsible for any unauthorized entrance of a secured work area during non-working hours. 7.2 Contractor shall provide notification of working hours to owner. Notification shall be made upon any changes to schedule. 8. SEGREGATION OF WORK AREAS 8.1 The Contractor will be required to erect barrier tape as appropriate to segregate work area from non-affected areas. Area bounded by tape is considered the regulated area. 9. SAFETY ORIENTATION 9.1 Safety orientation shall be presented by each individual contractor to their employees relative to the tasks at hand. HAZARDOUS MATERIAL REMEDIATION

18 Merrill Green Stadium Renovations September 4, 2015 Addendum #1 10. OBSERVATION 10.1 Consultant will observe the status and progress of the Work for completeness and general compliance with the requirements of the Specifications. At a minimum, the observations will be conducted at the following times during the Project: Following complete preparation of the work area(s), during removal of asbestos- containing materials, and following final cleaning of the work area(s) prior to final air testing Contractor shall notify Consultant at least 24 hours in advance of the need and readiness for such observations. Should advance notice not be given to the Consultant, Consultant will make reasonable effort to comply with time of requested observations. Contractor may not proceed until such observations by Consultant are made. Any delay in the completion of the Project caused by lack of advance notice by Contractor to Consultant shall not be sufficient cause for any extension of time or extension of the Project completion deadline. Also, compensation for time spent by Consultant on the Project resulting from prearranged meetings at which the Work has not progressed to the designated point shall be the responsibility of the Contractor and will be deducted from future payments due to Contractor Contractor shall notify Construction Manager and Owner immediately when regulatory inspection personnel arrive on site. This includes visits by Texas Department of State Health Services (DSHS) and Occupational Safety and Health Administration (OSHA) field inspectors. 11. SIGN IN/OUT LOG 11.1 Contractor shall maintain a sign-in/out log in the immediate vicinity of the change room of the personnel decontamination enclosure. Maintain sign-in/out log from the time the first activity is performed involving preparation for the disturbance of asbestoscontaining material until acceptance of the final air test results by the Consultant Require all persons entering the work area, including the Contractor's workers, Consultant or Consultant's representatives, Building Owner or agents of the Building Owner, Construction Managerʼs representatives and Building Owner officials to sign in and out each time upon entering and leaving the work area. Indicate name, time, company or agency represented and reason for entering work area. 12. SUPERVISOR/WORKER TRAINING AND LICENSE DOCUMENTATION 12.1 Provide documentation to Construction Manager, Owner, and Consultant that all supervision and workers to be used on the Project have successfully participated in an extensive training program which instructed personnel on proper respirator use, hazards of asbestos exposure and OSHA Asbestos Regulations. Also provide documentation that all supervisors and workers are licensed asbestos abatement supervisors and workers by the DSHS. Provide such documentation on supervisors with Contractors bid. Provide such documentation on workers on site. No worker HAZARDOUS MATERIAL REMEDIATION

19 Merrill Green Stadium Renovations September 4, 2015 Addendum #1 shall be utilized on any portion of the work until documentation has been provided. 13. UTILITIES 13.1 Contractor may temporarily connect to existing permanent utilities during execution of the Project if utilities are accessible. Make connections in locations designated by Construction Manager and Building Owner. Remove connections and all extensions of utilities at Project completion. Removal or relocation of utilities may be required before the completion of the job. The cost of utilities consumed will be paid by the Construction Manager or Building Owner. If utilities are not provided, the Contractor is responsible for providing utilities needed to perform work in accordance with state and federal regulatory agencies. 14. SALVAGEABLE MATERIALS 14.1 Consider all materials and items demolished or removed in execution of the Work unsalvageable unless specifically noted otherwise in the Specifications or by Owner. No materials shall be salvaged by Asbestos Abatement Contractor employees or others. 15. CLEAN-UP 15.1 Leave all areas visibly clean at the end of each work day and at completion of Work. 16. FINAL COMPLETION 16.1 Final Completion will be determined as follows: The Consultant will, within a reasonable time period inspect the Work to determine status of final completion when the Contractor certifies to the Consultant that: 1) The Work has been completed in compliance with the Specifications; 2) The Contractor has inspected the Work for such compliance; and 3) The Work is ready for inspection The Consultant will promptly notify the Contractor if he determines that the Work is incomplete or defective, and give the reasons therefore Contractor shall, upon receipt of notice from Consultant that the Work is not complete, promptly remedy the deficiencies noted by Consultant and notify the Consultant when the Work is ready for re-inspection. Consultant will then within a reasonable time period, re-inspect the Work Contractor shall, upon determination of final completion by Construction Manager and Building Owner and Consultant submit a final Certification and Application for Payment. HAZARDOUS MATERIAL REMEDIATION

20 Merrill Green Stadium Renovations September 4, 2015 Addendum #1 PROJECT DESIGN FOR ASBESTOS REMOVAL 1. SCOPE: The work covered by this section includes furnishing all plans, labor, equipment, materials, and transportation necessary for the proper and safe removal, handling, and disposal of non-friable materials. 1.1 Remove asbestos-containing materials to include the following: Approximately 700 square feet of asbestos containing residual floor mastic under carpet, 15 square feet of floor tile and mastic and 2800 square feet of wallboard with joint compound. 2. TERMINOLOGY 2.1 Abatement - procedures to decrease or eliminate fiber release from precast, spray-on, trowel-applied asbestos-containing building materials. Includes encapsulation, enclosure, and removal. 2.2 Air Monitoring - the process of measuring the fiber content of a specific volume of air during a stated period of time. 2.3 Airlock - system for permitting ingress or egress of personnel without permitting air movement between a contaminated area and an uncontaminated area, typically consisting of two curtained doorways at least three feet apart. 2.4 Amended Water - water to which a surfactant has been added. 2.5 Asbestos - a general term used to describe several fibrous mineral silicates. Although there are many asbestos minerals, only six are of commercial importance. They are: Actinolite, Amosite, Anthophyllite, Chrysotile, Crocidolite, and Tremolite. For the purposes of this Project the term "asbestos" is used interchangeable with "asbestos- containing sprayed material", "dust containing asbestos", and "friable insulating material containing asbestos". 2.6 Asbestos Control Area - an area where asbestos removal operations area performed and which is sealed and isolated by physical barriers to prevent the spread of asbestos contamination. 2.7 ANSI - American National Standards Institute. 2.8 ASTM - American Society for Testing and Materials. 2.9 Clean Room - an uncontaminated area or room which is part of the worker decontamination enclosure system, with provisions for storage of workers' street clothes and protective equipment. Also known as the "Change Room" Critical Barrier - seal applied to openings connecting the abatement area with adjacent spaces that will not be included in the containment. Critical barriers shall not be exposed to the gross critical barriers include, but are not limited to: HVAC vents and diffusers ; doorways ; windows ; floor, wall, and ceiling penetrations; and air plenums Curtained Doorway - a device to allow ingress or egress from one room to another while HAZARDOUS MATERIAL REMEDIATION

21 Merrill Green Stadium Renovations September 4, 2015 Addendum #1 minimizing air movement between the rooms. Typically constructed by placing three overlapping sheets of 6-mil plastic over an existing or temporarily framed doorway, securing each along the top of the doorway, securing the vertical edges of the outer sheets along one vertical edge of the second or middle sheet along the opposite vertical side of the doorway Decontamination Enclosure System - a series of connected rooms, with curtained doorways between any two adjacent rooms, for the decontamination of workers or of materials and equipment. A worker decontamination enclosure system always contains at least five airlocks (rooms). An equipment decontamination system always contains at least three airlocks (rooms) Encapsulation - the sealing of asbestos surfaces involving application of a material (encapsulant) that will envelop or coat the fiber matrix and eliminate fiber fallout and protect against contact damage Enclosure - procedures necessary to completely enclose material containing asbestos behind airtight, impermeable, permanent barriers EPA - United States Environmental Protection Agency Equipment Decontamination Enclosure System - a decontamination enclosure system for materials and equipment, typically consisting of a washroom, an airlock, and a holding area Equipment Room - a contaminated area or room which is part of the worker decontamination enclosure system, with provisions for storage of contaminated clothing and equipment Fixed Object (Immovable Object) - a unit of equipment or furniture in the work area which cannot be removed from the work area CIH - Certified Industrial Hygienist 2.20 HEPA - High Efficiency Particulate Absolute (HEPA) filter capable of trapping and retaining 99.97% of asbestos fibers greater than 0.3 microns in length HEPA - High Efficiency Particulate Air (HEPA) filtered vacuuming equipment with a UL 586 filter system capable of collecting and retaining asbestos fibers Holding Area - a chamber between the washroom and uncontaminated area in the equipment decontamination enclosure system. The holding area comprises an airlock Movable Object - a unit of equipment or furniture in the work area can be removed from the work area NESHAPS - National Emissions Standard for Hazardous Air Pollutants N.E.C. - National Electrical Code NIOSH - National Institute for Occupational Safety and Health OSHA - Occupational Safety and Health Administration. HAZARDOUS MATERIAL REMEDIATION

22 Merrill Green Stadium Renovations September 4, 2015 Addendum # Plastic Sheeting - plastic sheet material of specified thickness used for protection of walls, floors, etc., and used to seal openings into the work area Removal - the act of removing asbestos-containing or contaminated materials from the structure under properly controlled conditions to a suitable disposal site Shower Area - a room constituting an airlock, between the clean room and the equipment room in the worker decontamination enclosure system, with hot and cold or warm running water suitably arranged for complete showering during decontamination Surfactant - a chemical wetting agent added to water to improve penetrating ability, thus reducing the quantity of water required to saturate asbestos-containing materials Wet Cleaning - the process of eliminating asbestos contamination from building surfaces and objects by using cloths, mops, or other cleaning tools which have been dampened with amended water, and by afterwards disposing or these cleaning tools asbestoscontaminated waste Washroom - a room between the work area and the holding area in the equipment decontamination enclosure system. The washroom comprises an airlock Work Area - area or areas of project which undergo abatement or are contaminated Worker Decontamination Enclosure System - a decontamination enclosure system for workers, typically consisting of a clean room, and airlock, a shower room, an airlock, and an equipment room. 3. QUALITY CRITERIA 3.2 Reference Standards, Codes and Standards Acknowledge awareness and familiarity with the contents and requirements of the following regulations, codes, and standards, guidance documents, assume responsibility for the performance of the Work in strict compliance therewith and for every instance of failure to comply therewith. The current issue of document shall govern U.S. Environmental Protection Agency (EPA) Regulations for Asbestos (Code of Federal Regulations Title 40, Part 61, Subparts A and M: National Emissions Standards for Hazardous Air Pollutants (NESHAPS) U.S. Environmental Protection Agency (EPA) Regulation Title 34, Part 231 Appendix C, Procedures for Containing and Removing Building Materials Containing Asbestos U.S. Environmental Protection Agency (EPA) 40 CFR : Resource Conversation and Recovery Act U.S. Department of Labor Occupational Safety and Health Administration (OSHA) Regulations (Code of Federal Regulations Title 29, Part 1910, Section , , , and Part1926, Section ) U.S. Department of Education, Office of Elementary and Secondary Education (Code of Federal Regulations Title 34, Parts 230 and 231), Federal Register, vol. 46, No. 11, January 16, HAZARDOUS MATERIAL REMEDIATION

23 Merrill Green Stadium Renovations September 4, 2015 Addendum # U.S. Environmental Protection Agency (EPA) Office of Pesticide and Toxic Substances Guidance Document, "Guidance for Controlling Friable Asbestos- Containing Materials in Buildings", EPA 560 / , June Texas Department of State Health Servicesʼ "Asbestos Health Protection Rules" and any other state, county, and city codes and ordinances as applicable. Make available for review at the site one copy of EPA, OSHA, and applicable state, county, and City Regulations governing the Work CFR 763 Asbestos Hazard Emergency Response Act (AHERA). 4. TEST REPORTS NOT USED 5. SUBMITTALS NOT USED 6. PRODUCT HANDLING NOT USED 7. WORKER SAFETY AND PROTECTION 7.1 Worker Training. The Contractor shall ensure that all of his employees have received training required by OSHA Standard (k) (3) and applicable state regulations and that training records are on file in his office and available for review, and are maintained for one year beyond the last date of employment. 7.2 Worker Physical Examinations. Contractor shall provide medical examinations for all employees in accordance with OSHA standards (b) and (m) and applicable state regulations. The Contractor shall ensure that all employee results are on file in his office and available for review. 7.3 The Contractor shall further ensure that employee examination results, for each employee utilized on this project, indicate that the employee is physically capable to perform the work and wear the respiratory protection required. 7.4 Worker Protection and Decontamination. The contractor shall take all safety measures and precautions required to protect his employees and building occupants in accordance with OSHA 29 CFR, Part , and EPA, 40 CFR, Part 61, Subpart M, and applicable state regulations. The Contractor shall provide his employees a worker decontamination enclosure system in accordance with OSHA, 20 CFR, Part , and specified herein. 8. BUILDING PROTECTION NOT USED 9. WORKSITE CONDITIONS NOT HAZARDOUS MATERIAL REMEDIATION

24 Merrill Green Stadium Renovations September 4, 2015 Addendum #1 USED 10. PERSONNEL PROTECTION 10.1 Prior to commencement of work, all workers shall be instructed by the Contractor, and shall be knowledgeable in the appropriate procedures for personnel protection and asbestos removal Contractor acknowledges and agrees that he is solely responsible for enforcing worker protection requirements at least equal to those specified in this Section Contractor shall provide workers with personally issued and marked respiratory equipment approved by NIOSH and in compliance with OSHA Standards for the type of work being performed Where respirators with disposable filters are used, provide sufficient filters for replacement as necessary by the workers, or as required by applicable regulations Provide respiratory protection as needed from the time of the first operation involving preparation to remove asbestos-containing materials (including construction of airtight barriers/barricades, and placing of plastic sheeting on walls) until acceptance of final air test results by Building Owner. 11. MATERIALS 11.1 Plastic sheeting - shall be of the thicknesses specified, in sizes to minimize the frequency of joints. Use of "spray-on poly" is not permitted Tape - Shall be glass fiber or other type capable of sealing joints of adjacent sheets of plastic and for attachment of plastic sheet on finished or unfinished surfaces under both dry and wet conditions Surfactant (wetting agent) - shall consist of mixture of "Dust-Set Amended Water Base" (Matheson Chemical Corporation), and water, mixed one part "Dust-Set Amended Water Base" to 19 parts water Sealant (encapsulant) - Shall be manufactured by reputable, established manufacturer of encapsulant/sealant asbestos-contaminated environments. It is the responsibility of the Contractor to determine compatibility of the sealant with the materials and conditions Impermeable Containers - Shall be suitable to receive and retain any asbestos- containing or contaminated materials until disposal at an approved site and shall be labeled in accordance with OSHA Regulation 29 CFR (k) (2) (iii). Containers shall be both air and water tight Other Materials - Provide all other materials, such as lumber, nails, and hardware, which may be required to construct and dismantle the decontamination system and the barriers that isolate the work area. 12. TOOLS AND EQUIPMENT Provide suitable tools for asbestos-containing material removal. HAZARDOUS MATERIAL REMEDIATION

SECTION ALUMINUM-FRAMED HIGH PERFORMANCE THERMAL ENTRANCE DOORS

SECTION ALUMINUM-FRAMED HIGH PERFORMANCE THERMAL ENTRANCE DOORS PART 1 GENERAL SECTION 08 1116 ALUMINUM-FRAMED HIGH PERFORMANCE THERMAL ENTRANCE DOORS 1.01 SECTION INCLUDES A. Aluminum-framed storefront, with vision glass. B. Infill panels of glass. C. Aluminum doors

More information

Tender No Section St. James - Assiniboia Centennial Pool Fitness Facility Addition Page 1

Tender No Section St. James - Assiniboia Centennial Pool Fitness Facility Addition Page 1 Fitness Facility Addition Page 1 PART 1 GENERAL 1.1 SECTION INCLUDES.1 Extruded aluminum windows with fixed sash..2 Factory glazed..3 Perimeter sealant. 1.2 RELATED SECTIONS.1 Section 05500 - Metal Fabrications.2

More information

SECTION ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

SECTION ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS SECTION 08 4113 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Aluminum entrance doors and frames. 2. Glass infill panels. 3. Door hardware. B. Related Sections:

More information

SECTION FOLDING ALUMINUM FRAMED WALL SYSTEM

SECTION FOLDING ALUMINUM FRAMED WALL SYSTEM SECTION 08417 FOLDING ALUMINUM FRAMED WALL SYSTEM PART 1 GENERAL 1.1 SUMMARY A. Section includes: 1. Folding aluminum framed door system. 2. Door hardware. 3. Glass. 1.2 SYSTEM DESCRIPTION A. Aluminum-framed

More information

A. Section includes extruded aluminum windows with operating sash, operating hardware, and insect screens.

A. Section includes extruded aluminum windows with operating sash, operating hardware, and insect screens. SECTION 08 51 13 - Page 1 PART 1 GENERAL 1.1 SUMMARY A. Section includes extruded aluminum windows with operating sash, operating hardware, and insect screens. B. Related Sections: 1. Section 07 92 00

More information

SECTION METAL FRAMED SKYLIGHT. A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system.

SECTION METAL FRAMED SKYLIGHT. A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system. SECTION 08625 METAL FRAMED SKYLIGHT PART 1 GENERAL 1.01 SECTION INCLUDES: A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system. B. Fabrication

More information

Alabama A&M University Laundry Building at Normal Hill Apartments Project No ADDENDUM NUMBER 4

Alabama A&M University Laundry Building at Normal Hill Apartments Project No ADDENDUM NUMBER 4 Laundry Building at Normal Hill Apartments 00 91 13-1 ADDENDUM NUMBER 4 SECTION 00 91 13 ADDENDUM NUMBER 4 PARTICULARS 1.01 DATE: AUGUST 7, 2017 1.02 PROJECT: LAUNDRY BUILDING AT NORMAL HILL APARTMENTS

More information

ARCH 478 OFFICE BUILDING SECTION GLAZING

ARCH 478 OFFICE BUILDING SECTION GLAZING SECTION 08800 GLAZING PART 1 GENERAL 1.01 SECTION INCLUDES A. Glass and plastic glazing. B. Glazing compounds and accessories. 1.02 RELATED SECTIONS A. Section 06200 - Finish Carpentry: Glazed relites

More information

SECTION ALUMINUM WINDOWS

SECTION ALUMINUM WINDOWS SECTION 08520 ALUMINUM WINDOWS 1. PART 1 GENERAL 1.1 WORK INCLUDED: 1. Provide labor, material, equipment and services to furnish and install aluminum windows shown on drawings and specified herein. Window

More information

SECTION GLAZING. A. Section Includes: 1. Glass for other sections referencing this Section.

SECTION GLAZING. A. Section Includes: 1. Glass for other sections referencing this Section. SECTION 08 8000 GLAZING 1.1 SUMMARY A. Section Includes: 1. Glass for other sections referencing this Section. B. Related Sections: 1. Division 01: Administrative and procedural work requirements. 1.2

More information

North Hanover Township School District North Hanover Township, New Jersey

North Hanover Township School District North Hanover Township, New Jersey SECTION 084413 - GLAZED ALUMINUM CURTAIN WALLS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 07 4243 - PART 1 GENERAL 1.01 SECTION INCLUDES A. Composite wall panel system consisting of aluminum-faced composite panels in a rainscreen application as part of the assembly described below.

More information

A. Section includes conventionally glazed aluminum curtain walls installed as stick assemblies.

A. Section includes conventionally glazed aluminum curtain walls installed as stick assemblies. SECTION 084413 GLAZED ALUMINUM CURTAIN WALLS PART 1 - GENERAL 1.1 SUMMARY A. Section includes conventionally glazed aluminum curtain walls installed as stick assemblies. 1.2 PERFORMANCE REQUIREMENTS A.

More information

Cardinal Commercial Products ALUMINUM STOREFRONT SYSTEM SERIES CF450 GUIDE SPECIFICATIONS SECTION ALUMINUM ENTRANCES AND STOREFRONT SYSTEMS

Cardinal Commercial Products ALUMINUM STOREFRONT SYSTEM SERIES CF450 GUIDE SPECIFICATIONS SECTION ALUMINUM ENTRANCES AND STOREFRONT SYSTEMS Cardinal Commercial Products ALUMINUM STOREFRONT SYSTEM SERIES CF450 GUIDE SPECIFICATIONS SECTION 08410 ALUMINUM ENTRANCES AND STOREFRONT SYSTEMS This suggested guide specification has been developed using

More information

SECTION GLAZING ADDENDUM 10 APRIL 20, 2011

SECTION GLAZING ADDENDUM 10 APRIL 20, 2011 SECTION 08800 GLAZING ADDENDUM 10 APRIL 20, 2011 PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Glass. 2. Glazing compounds and accessories. 3. Installation of glass and glazing in storefront frames.

More information

SECTION GLAZING

SECTION GLAZING SECTION 08 8000 - PART 1 GENERAL 1.01 SECTION INCLUDES A. Glass. B. Glazing compounds and accessories. 1.02 REFERENCE STANDARDS A. 16 CFR 1201 - Safety Standard for Architectural Glazing Materials; current

More information

Project No: Pakenham Branch Library, Pakenham, Ontario Section January, 2017 Page 1 of 7

Project No: Pakenham Branch Library, Pakenham, Ontario Section January, 2017 Page 1 of 7 January, 2017 Page 1 of 7 1 GENERAL 1.01 RELATED SECTIONS.1 Section 01 33 00 Submittal Procedures.2 Section 01 78 00 Closeout Submittals.3 Section 07 92 10 Sealants..4 Section 08 80 50 Glazing. 1.02 REFERENCES.1

More information

SECTION ALUMINUM-FRAMED ENTRANCES AND CURTAINWALL

SECTION ALUMINUM-FRAMED ENTRANCES AND CURTAINWALL SECTION 084116 - ALUMINUM-FRAMED ENTRANCES AND CURTAINWALL PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Exterior and interior curtainwall framing. 2. Curtainwall framing for punched openings. 3.

More information

SECTION ALUMINUM WINDOWS

SECTION ALUMINUM WINDOWS SECTION 08520 ALUMINUM WINDOWS PART 1 - GENERAL 1.01 SUMMARY A. Section includes: 1. Storefront systems and aluminum framed glass doors. 2. Hardware, fasteners, accessories, filler pieces, etc., required

More information

FL200 13/4 x41/2 GUIDE SPECIFICATION. Non-Thermal Storefront

FL200 13/4 x41/2 GUIDE SPECIFICATION. Non-Thermal Storefront Manufacturer: Coral Architectural Products 3010 Rice Mine Road Tuscaloosa, AL. 35406 Voice: (800) 772-7737 Fax: (800) 443-6261 SECTION 08410 ALUMINUM ENTRANCES AND STOREFRONT SYSTEMS This suggested guide

More information

SECTION ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

SECTION ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS SECTION 084113 - ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Exterior and interior storefront framing. 2. Exterior and interior manual-swing entrance

More information

SECTION ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS PART 1 - GENERAL 1.1 SUMMARY. A. Section Includes:

SECTION ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS PART 1 - GENERAL 1.1 SUMMARY. A. Section Includes: SECTION 084113 - ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Exterior storefront framing. 2. Storefront framing for ribbon walls. 3. Storefront framing

More information

SECTION GLASS AND GLAZING (WINDOWS)

SECTION GLASS AND GLAZING (WINDOWS) SECTION 08801 GLASS AND GLAZING (WINDOWS) PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Glazing accessories B. Related Work Specified Elsewhere: 1. Section 08500, 08510 & 08520 Aluminum Windows 1.02

More information

Repair Maintenance Hangar Phase II August 2010

Repair Maintenance Hangar Phase II August 2010 SECTION 08800 GLASS AND GLAZING PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Monolithic glass. 2. Insulating glass. 3. Mirror glass. 4. Glazing accessories. B. Types of work in this section include

More information

.2 Section Waste Management and Disposal.

.2 Section Waste Management and Disposal. Issued 2005/06/01 Section 08800 Glazing Page 1 of 6 PART 1 GENERAL 1.1 RELATED SECTIONS.1 Section 01330 Submittal Procedures.2 Section 01355 Waste Management and Disposal..3 Section 01450 Quality Control.4

More information

SILVER LINE BUILDING PRODUCTS. Series 1700 Heavy Commercial Aluminum Double Hung. HC65 48 x84 / HC50 60 x96 Replacement Window

SILVER LINE BUILDING PRODUCTS. Series 1700 Heavy Commercial Aluminum Double Hung. HC65 48 x84 / HC50 60 x96 Replacement Window DIVISION 08 / SECTION 08505 METAL WINDOWS SILVER LINE BUILDING PRODUCTS SPECIFICATIONS: GENERAL Series 1700 Heavy Commercial Aluminum Double Hung 1. SECTION INCLUDES 2. RELATED SECTIONS 3. QUALITY ASSURANCE

More information

B. Mirror glass for toilet rooms is specified in Section "Toilet Accessories."

B. Mirror glass for toilet rooms is specified in Section Toilet Accessories. SECTION 08800 - GLASS AND GLAZING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General, Supplementary, and Special Conditions and Division 1 Specification

More information

SECTION ALUMINUM CURTAIN WALL PART 1 - GENERAL

SECTION ALUMINUM CURTAIN WALL PART 1 - GENERAL SECTION 08921 - ALUMINUM CURTAIN WALL PART 1 - GENERAL 1.01 DESCRIPTION A. Work of this section is subject to requirements of the Contract Documents including the General Conditions and Supplementary Conditions

More information

Specification Section Storefront Systems has been revised. Omit previously issued Storefront section.

Specification Section Storefront Systems has been revised. Omit previously issued Storefront section. December 28, 2018 ADDENDUM NO. 2 To: Re: Bidders Corey Pitts, NewQuest Properties This Addendum forms a part of the contract documents identified above. Acknowledge the receipt of this Addendum on the

More information

MPG Series 2250T Thermally Broken Aluminum Window

MPG Series 2250T Thermally Broken Aluminum Window SECTION 08520 ALUMINUM WINDOWS P a g e 1 MPG Series 2250T Thermally Broken Aluminum Window PART 1 GENERAL 1.01 Work Included A. Furnish and install aluminum architectural windows complete with hardware

More information

SECTION DETAILS (MECHANICALLY ASSEMBLY)

SECTION DETAILS (MECHANICALLY ASSEMBLY) COVER SHEET ELEVATION SHEET SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY) SECTION DETAILS (DOOR ASSEMBLY)

More information

SECTION TRANSLUCENT PANEL SYSTEM

SECTION TRANSLUCENT PANEL SYSTEM SECTION 084523 PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this

More information

SECTION STAINLESS STEEL WALL PANELS

SECTION STAINLESS STEEL WALL PANELS SECTION 07400 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Dry joint, Rainscreen stainless steel wall panel system. 2. Accessories including attachments, clips, sub girts, shims, and fasteners 3.

More information

SECTION (08410) - ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

SECTION (08410) - ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS SECTION 08 41 13 (08410) - ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Interior and Exterior Aluminum Storefront Framing, Doors, Door Frames, Lights, and

More information

Series 4900 Vinyl Single Hung Windows R50/R45/R35/R30 Performance for New Construction

Series 4900 Vinyl Single Hung Windows R50/R45/R35/R30 Performance for New Construction SPECIFICATIONS: Series 4900 Vinyl Single Hung Windows R50/R45/R35/R30 Performance for New Construction GENERAL 1. SECTION INCLUDES 2. RELATED SECTIONS 3. QUALITY ASSURANCE A. General. B. Test Units. 1.

More information

Corium Brick Rainscreen System Specifications

Corium Brick Rainscreen System Specifications CORIUM BRICK RAINSCREEN SYSTEM PART 1 - GENERAL 1.1 SUMMARY A. Work Included: The Work of this Section shall include but not be limited to the following: 1. Corium brick plates 2. Galvanized and coated

More information

SECTION ALUMINUM GLASS FLOOR SKYLIGHT SYSTEMS

SECTION ALUMINUM GLASS FLOOR SKYLIGHT SYSTEMS PART 1: GENERAL 1.01 SUMMARY SECTION 04818 ALUMINUM GLASS FLOOR SKYLIGHT SYSTEMS A. Structural glass floor system, consisting of structural extruded aluminum System or Stainless Steel system and laminated

More information

A. Manufacturer: A firm that produces primary glass or fabricated glass as defined in referenced glazing publications.

A. Manufacturer: A firm that produces primary glass or fabricated glass as defined in referenced glazing publications. SECTION 08800 - GLAZING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017 SECTION 088853 - SECURITY GLAZING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SILVER LINE BUILDING PRODUCTS

SILVER LINE BUILDING PRODUCTS DIVISION 08 / SECTION 08560, VINYL WINDOWS SILVER LINE BUILDING PRODUCTS SPECIFICATIONS: 2200/2300/2600 Vinyl Single Hung Windows R50/R30 Performance for New Construction GENERAL 1. SECTION INCLUDES 2.

More information

SPECIFICATIONS FOR AluSystems Aluminum Composite Panels Series 20 Dry Joint 1.00 GENERAL 1.01 RANGE OF WORK Section includes: Laminated panels and attachment systems for use as exterior cladding. A. Provide

More information

SECTION / METAL FRAMED SKYLIGHTS

SECTION / METAL FRAMED SKYLIGHTS Specifier Notes: This product guide specification is written according to the Construction Specifications Institute (CSI) Format, including MasterFormat, SectionFormat, and PageFormat, contained in the

More information

LOG COLLEGE MIDDLE SCHOOL

LOG COLLEGE MIDDLE SCHOOL PART 1-GENERAL 1.1 SUMMARY A. This section includes the following: 1. Curb-mounted plastic glazed skylights. B. Refer to roofing system sections for roofing accessories to be built into the roofing system

More information

SECTION ALUMINUM STORM WINDOWS

SECTION ALUMINUM STORM WINDOWS PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 08 51 69.11 ALUMINUM STORM WINDOWS SPEC WRITER NOTES: 1. Delete between // // if not applicable to project. 2. Also delete any other item or paragraph not applicable

More information

SECTION ALUMINUM ENTRANCES AND STOREFRONTS. A. Section Includes: Aluminum doors and window wall frames.

SECTION ALUMINUM ENTRANCES AND STOREFRONTS. A. Section Includes: Aluminum doors and window wall frames. SECTION 08410 ALUMINUM ENTRANCES AND STOREFRONTS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Aluminum doors and window wall frames. B. Related Sections: 1. Section 08480 Balanced Doors 2. Section

More information

PART 1 / GENERAL SECTION ALUMINUM PLATE PANEL SYSTEM. ALPLY Insulated Panels. Alply TECH WALL Aluminum Plate System 2002

PART 1 / GENERAL SECTION ALUMINUM PLATE PANEL SYSTEM. ALPLY Insulated Panels. Alply TECH WALL Aluminum Plate System 2002 SECTION 07 42 13 ALUMINUM PLATE PANEL SYSTEM ALPLY Insulated Panels Alply TECH WALL Aluminum Plate System 2002 PART 1 / GENERAL 1.1 SYSTEM DESCRIPTION A. Preformed Aluminum Plate System for Screen wall

More information

FL550 21/2 x5 GUIDE SPECIFICATION. Impact-Resistant Storefront

FL550 21/2 x5 GUIDE SPECIFICATION. Impact-Resistant Storefront Manufacturer: Coral Architectural Products 3010 Rice Mine Road Tuscaloosa, AL. 35406 Voice: (800) 772-7737 Fax: (800) 443-6261 SECTION 08410 ALUMINUM ENTRANCES AND STOREFRONT SYSTEMS This suggested guide

More information

SECTION ALUMINUM WINDOWS

SECTION ALUMINUM WINDOWS SECTION 08520 ALUMINUM WINDOWS PART 1 GENERAL 1.1 SECTION INCLUDES A. Projected windows. B. Fixed windows. 1.2 RELATED SECTIONS A. Section 07900: Joint Sealers. B. Section 08400: Entrances and Storefronts.

More information

Series 2900 Vinyl Single Hung Windows R50/R45/R35/R30 Performance for New Construction

Series 2900 Vinyl Single Hung Windows R50/R45/R35/R30 Performance for New Construction SPECIFICATIONS: Series 2900 Vinyl Single Hung Windows R50/R45/R35/R30 Performance for New Construction GENERAL 1. SECTION INCLUDES 2. RELATED SECTIONS 3. QUALITY ASSURANCE A. General. B. Test Units. 1.

More information

Signature Series 5 Lap SECTION ALUMINUM WINDOWS

Signature Series 5 Lap SECTION ALUMINUM WINDOWS Signature Series 5 Lap SECTION 08 51 13 ALUMINUM WINDOWS PART 1 GENERAL 1.01 SUMMARY A. Related Documents: Conditions of the Contract, Division 1 - General Requirements, and Drawings apply to Work of this

More information

VELUX America Inc. SPECIFICATION FOR MODEL QPF SELF-FLASHED FIXED SKYLIGHT SECTION UNIT SKYLIGHTS

VELUX America Inc. SPECIFICATION FOR MODEL QPF SELF-FLASHED FIXED SKYLIGHT SECTION UNIT SKYLIGHTS SECTION 08620 UNIT SKYLIGHTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Performance and product component information for VELUX QPF selfflashed fixed skylight. B. Unit skylight mounted directly to roof decking.

More information

COVER SHEET ELEVATION SHEET SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY)

COVER SHEET ELEVATION SHEET SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY) COVER SHEET ELEVATION SHEET SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (MECHANICALLY ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY) SECTION DETAILS (WELDED ASSEMBLY) SECTION DETAILS (DOOR ASSEMBLY)

More information

FL550T 21/2 x5. GUIDE SPECIFICATION Series FL550T Thermal (21/2 x 5 ) Impact-Resistant Storefront. Thermal Impact-Resistant Storefront

FL550T 21/2 x5. GUIDE SPECIFICATION Series FL550T Thermal (21/2 x 5 ) Impact-Resistant Storefront. Thermal Impact-Resistant Storefront Series FL550T Thermal (21/2 x 5 ) Impact-Resistant Storefront Manufacturer: Coral Architectural Products 3010 Rice Mine Road Tuscaloosa, AL. 35406 Voice: (800) 772-7737 Fax: (800) 443-6261 SECTION 08410

More information

Architectural Single-Hung Aluminum Window Series L701T SH-AW130 GUIDE SPECIFICATION

Architectural Single-Hung Aluminum Window Series L701T SH-AW130 GUIDE SPECIFICATION Architectural Single-Hung Aluminum Window Series L701T SH-AW130 GUIDE SPECIFICATION Section 08520 Aluminum Windows PART 1: WORK INCLUDED A. The conditions of the contract and applicable sections of Division

More information

A. Manufacturer: A firm that produces primary glass or fabricated glass as defined in referenced glazing publications.

A. Manufacturer: A firm that produces primary glass or fabricated glass as defined in referenced glazing publications. SECTION 08800 - GLAZING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

SECTION TERRA COTTA CLAY TILE RAINSCREEN SYSTEM

SECTION TERRA COTTA CLAY TILE RAINSCREEN SYSTEM SECTION 07400 TERRA COTTA CLAY TILE RAINSCREEN SYSTEM PART 1 GENERAL 1.01 WORK INCLUDED A. The terra cotta clay tile elements and aluminum support system shall be manufactured by NBK Keramik GmbH as represented

More information

SECTION METAL FRAMED SKYLIGHTS

SECTION METAL FRAMED SKYLIGHTS SECTION 08630 - METAL FRAMED SKYLIGHTS PART 1: GENERAL 1.01 SUMMARY A. Section includes: Design, structural engineering, manufacture, fabrication, finishing of metal-framed skylights: 1. Glass and glazing

More information

MPG Series 2780-ZS Thermally Broken Aluminum Window Zero Sightline Series

MPG Series 2780-ZS Thermally Broken Aluminum Window Zero Sightline Series SECTION 08520 ALUMINUM WINDOWS P a g e 1 MPG Series 2780-ZS Thermally Broken Aluminum Window Zero Sightline Series PART 1 GENERAL 1.01 Work Included A. Furnish and install aluminum architectural windows

More information

PW251 21/2 x7 GUIDE SPECIFICATION. Curtain Wall

PW251 21/2 x7 GUIDE SPECIFICATION. Curtain Wall Manufacturer: Coral Architectural Products 3010 Rice Mine Road Tuscaloosa, AL. 35406 Voice: (800) 772-7737 Fax: (800) 443-6261 SECTION 08900 ALUMINUM CURTAIN WALL This suggested guide specification has

More information

SECTION GLAZING

SECTION GLAZING SECTION 088000 GLAZING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

DIVISION VIII - DOORS AND WINDOWS

DIVISION VIII - DOORS AND WINDOWS DIVISION VIII - DOORS AND WINDOWS SECTION 08121 INTERIOR ALUMINUM DOORS, DOOR FRAMES, AND OFFICE FRONT FRAMING (SOLUTIONS II SYSTEM) PART 1 - GENERAL 1.01 SUMMARY A. Related Documents: Provisions established

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 08 - OPENINGS. A. This Section includes fixed and operable aluminum-framed windows.

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 08 - OPENINGS. A. This Section includes fixed and operable aluminum-framed windows. SECTION 085113 - ALUMINUM WINDOWS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes fixed and operable aluminum-framed windows. 1.2 PERFORMANCE REQUIREMENTS A. General: Provide aluminum windows capable

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 088000 - GLAZING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION GLAZED ALUMINUM CURTAIN WALLS PART 1 GENERAL 1.01 RELATED DOCUMENTS

SECTION GLAZED ALUMINUM CURTAIN WALLS PART 1 GENERAL 1.01 RELATED DOCUMENTS SECTION 08 4413 - PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

TMW 450 TECHNICAL MANUAL

TMW 450 TECHNICAL MANUAL ARCHITECTURAL METALS, INC. TMW 450 TMW 450 TECHNICAL MANUAL TMW 450 ARCHITECTURAL METALS, INC. BLANK PAGE FEATURES ARCHITECTURAL METALS, INC. TMW 450 FEATURES TMW 450 is 6 3/4" deep with a 2" wide sightline

More information

SECTION ALUMINUM STORM WINDOWS

SECTION ALUMINUM STORM WINDOWS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 08 51 69.11 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

Heavy Commercial / Architectural Projected Windows Series L900T AW150

Heavy Commercial / Architectural Projected Windows Series L900T AW150 Heavy Commercial / Architectural Projected Windows Series L900T AW150 Section 08520...Aluminum Windows PART 1: WORK INCLUDED GUIDE SPECIFICATION A. The conditions of the contract and applicable sections

More information

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011. DIVISION 05 METALS 05 12 00 STRUCTURAL STEEL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Structural steel framing members, support members. 1.2 RELATED REQUIREMENTS A. Section 05 50 00 - Metal Fabrications:

More information

PART 1 - GENERAL 1.01 SUMMARY 1.02 REFERENCES. Section Glazing. JE Berkowitz, L.P

PART 1 - GENERAL 1.01 SUMMARY 1.02 REFERENCES. Section Glazing. JE Berkowitz, L.P JE Berkowitz, L.P. 08800-1 JE Berkowitz, L.P. Architectural Glazing Guide Specification for Temperfect Heat -Treated Glass Section 08 81 00 Glazing Note to Specification Writers, The specifications below

More information

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 [08 33 13] COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Metal Counter

More information

ALL-ALUMINUM DOOR & WINDOW FRAMING

ALL-ALUMINUM DOOR & WINDOW FRAMING ALL-ALUMINUM DOOR & WINDOW FRAMING WITH INTEGRATED ALUMINUM DOOR STOP SECTION 08 41 13 ALUMINUM FRAMED ENTRANCES AND STOREFRONTS SPECIFICATION PART 1 GENERAL 1.1 SECTION INCLUDES: A. Prefinished aluminum

More information

TMS 114 XT TECHNICAL MANUAL

TMS 114 XT TECHNICAL MANUAL TECHNICAL MANUAL BLANK PAGE FEATURES FEATURES is center set flush glazed systems that are 4 1/2" deep with a 2" wide sightline Glaze from the outside or inside Screw spline or shear block fabrication Glazing

More information

A. Omega-Lite aluminum-faced composite panels, air and vapor barrier, attachments and sealants.

A. Omega-Lite aluminum-faced composite panels, air and vapor barrier, attachments and sealants. Section 07 42 13 Page 1 PART 1 GENERAL 1.1 SECTION INCLUDES A. Omega-Lite aluminum-faced composite panels, air and vapor barrier, attachments and sealants. 1.2 RELATED SECTIONS A. Section 06112 - Framing

More information

Series B450 Guide Specification

Series B450 Guide Specification Boyd Aluminum Manufacturing Company P.O. Box 1565 3248 E. Division Street Springfield, MO 65801-1565 800-737-2800 417-862-1232 fax boydaluminum.com STOREFRONT SERIES B450 Shear Block Air Infiltration:

More information

Aluminum-Framed Entrances and Storefronts

Aluminum-Framed Entrances and Storefronts University of New Hampshire University of New Hampshire Scholars' Repository Division 08 Openings Chapter 5 Technical Construction and Renovation Standards 1-25-2013 084113 - Aluminum-Framed Entrances

More information

SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651

SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651 SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651 PART 1 GENERAL 1.1 DESCRIPTION A. Work Included: 1. Furnish all labor and materials to complete the fabrication of detention windows

More information

SECTION PREHUNG WOOD DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION PREHUNG WOOD DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08 14 00 PREHUNG WOOD DOORS Display hidden notes to specifier. (Don't know how? Click Here) Copyright 2014-2016 ARCAT, Inc. - All rights reserved PART 1 GENERAL 1.1 SECTION INCLUDES A. French Doors.

More information

Michigan State University Construction Standards PAGE

Michigan State University Construction Standards PAGE Construction Standards PAGE 088000-1 SECTION 088000 - PART 1 - GENERAL 1.1 M.S.U. ISSUES A. Fire doors shall have wired safety glass. All other doors shall have tempered safety glass. Side lites and other

More information

SECTION EXTERIOR SOLID PHENOLIC RAINSCREEN PANELS

SECTION EXTERIOR SOLID PHENOLIC RAINSCREEN PANELS SECTION 074233 EXTERIOR SOLID PHENOLIC RAINSCREEN PANELS PART 1 - GENERAL 1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

PROJECT LOCATION SECTION COPPER METAL PLATE WALL PANELS

PROJECT LOCATION SECTION COPPER METAL PLATE WALL PANELS SECTION 07 4213.25 PART 1- GENERAL 1.01 SECTION INCLUDES A. Copper metal plate wall panels. 1.02 RELATED REQUIREMENTS A. Section 05 4000 Cold-Formed Metal Framing: Wall panel substrates support framing.

More information

A. Pre-Installation Conference: Conduct conference at [project site] <insert location>.

A. Pre-Installation Conference: Conduct conference at [project site] <insert location>. SECTION 074213.23 METAL COMPOSITE MATERIAL WALL PANELS PART 1 GENERAL 1.1 SUMMARY A. Exterior cladding consisting of formed metal composite material (MCM) sheet, secondary supports and anchors to structure,

More information

JE Berkowitz, L.P. (updated ) B. The basis of design is the JEB Invisiwall Wall (Point Supported) by JE Berkowitz, LP. C.

JE Berkowitz, L.P. (updated ) B. The basis of design is the JEB Invisiwall Wall (Point Supported) by JE Berkowitz, LP. C. JE Berkowitz, L.P. (updated 10.19.17) JEB Invisiwall Glass Wall (Point Support) General Specification Guide Section 08 44 26.19 GLAZED ASSEMBLIES This general specification is to be used as a guide. It

More information

TRUMAN STATE UNIVERSITY GREENWOOD SCHOOL WINDOW REPLACEMENT

TRUMAN STATE UNIVERSITY GREENWOOD SCHOOL WINDOW REPLACEMENT SECTION 085200 - WOOD WINDOWS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Aluminum Storefront Systems SERIES 200, 300 and 500 DOORS GUIDE SPECIFICATIONS

Aluminum Storefront Systems SERIES 200, 300 and 500 DOORS GUIDE SPECIFICATIONS Aluminum Storefront Systems SERIES 200, 300 and 500 DOORS GUIDE SPECIFICATIONS SECTION 08410 ALUMINUM ENTRANCES AND STOREFRONTS This suggested guide specification has been developed using the current edition

More information

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM PART 1- GENERAL 1.1 SUMMARY A. Section Includes: SECTION 084523 - SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM 1. Flat factory prefabricated structural insulated translucent sandwich panels; with glazed endwalls.

More information

United Window & Door - Series 5500 New Construction Double Hung Windows Specifications

United Window & Door - Series 5500 New Construction Double Hung Windows Specifications United Window & Door - Series 5500 New Construction Double Hung Windows Specifications Part 1 GENERAL 1.01 INCLUSIONS 1. All windows as called for in this specification will be furnished with all necessary

More information

TerraClad TM General Specifications

TerraClad TM General Specifications TerraClad TM General Specifications PRODUCT NAMES: Terra cotta Baguettes/Louvers and Related Work MANUFACTURER: Boston Valley Terra Cotta 6860 S. Abbott Road Orchard Park, NY 14127 Phone: 888-214-3655

More information

SECTION VINYL (PVC) WINDOWS

SECTION VINYL (PVC) WINDOWS SECTION 085313 VINYL (PVC) WINDOWS SERIES 3000/3900 NEW CONSTRUCTION DOUBLE HUNG PART 1 GENERAL 1.01 SECTION INCLUDES A. All windows of the types and sizes called for in this specification shall be furnished

More information

Architectural Wall Products Guide Specifications

Architectural Wall Products Guide Specifications Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 Architectural Wall Products Guide Specifications FORMED METAL WALL PANELS This Guide Specification is

More information

[Project Name] Section [ ]

[Project Name] Section [ ] Page 1 PART 1 - GENERAL 1.1 SECTION INCLUDES 1.1.1 Design, labor, products, equipment and services necessary for interior/exterior Aluminum Facade System (AFS) work, in accordance with the Contract Documents.

More information

AUGUST, 2017 IR 500/501 Framing 1 EC ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS Guide Specs

AUGUST, 2017 IR 500/501 Framing 1 EC ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS Guide Specs AUGUST, 2017 IR 500/501 Framing 1 EC 97909-095 084113 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS Guide Specs SECTION 084113 - ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS This suggested guide specification

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 08 4413 - GLAZED ALUMINUM CURTAIN WALLS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

Guide Specification for Pre-Engineered Skylight System. A. Engineering, design and drafting of the entire skylight system.

Guide Specification for Pre-Engineered Skylight System. A. Engineering, design and drafting of the entire skylight system. Guide Specification for Pre-Engineered Skylight System SECTION 08630 - METAL FRAMED SKYLIGHTS PART 1 GENERAL 1.01 SECTION INCLUDES A. Engineering, design and drafting of the entire skylight system. B.

More information

SECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 SECTION 08 32 20 EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

Impact-Resistant Entrances Series

Impact-Resistant Entrances Series ARCHITECTURAL PRODUCTS Impact-Resistant Entrances Manufacturer: Coral Architectural Products 3010 Rice Mine Road Tuscaloosa, AL. 35406 Voice: (800) 772-7737 Fax: (800) 443-6261 SECTION 08410 ALUMINUM ENTRANCES

More information

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION

More information

DIVISION 8 DOORS AND WINDOWS

DIVISION 8 DOORS AND WINDOWS DIVISION 8 DOORS AND WINDOWS BUSHEY FEIGHT MORIN ARCHITECTS INC. 473 NORTH POTOMAC STREET HAGERSTOWN, MARYLAND 21740 301-733-5600 FAX: 301-733-5612 SECTION 08110 - STEEL DOORS AND FRAMES PART 1 GENERAL

More information

4600 Series Specifications (Section 08520)

4600 Series Specifications (Section 08520) 4600 Series Specifications (Section 08520) I. GENERAL: 1.01 Scope of Work A. Furnish all necessary materials, labor, and equipment for the complete installation of aluminum windows for this project as

More information

Multi-Institutional Academic Health Science & Research Center Evansville, IN

Multi-Institutional Academic Health Science & Research Center Evansville, IN SECTION 08 8300 - MIRRORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

JE Berkowitz, L.P. Architectural Glazing Guide Specification for Enviroscreen Silk-Screened Glass

JE Berkowitz, L.P. Architectural Glazing Guide Specification for Enviroscreen Silk-Screened Glass JE Berkowitz, L.P. 08800-1 JE Berkowitz, L.P. Architectural Glazing Guide Specification for Enviroscreen Silk-Screened Glass Section 08 81 00 Glazing Note to Specification Writers, The specifications below

More information