INDIA HABITAT CENTRE New Delhi
|
|
- Dayna Stanley
- 6 years ago
- Views:
Transcription
1 INDIA HABITAT CENTRE New Delhi Tender For Renovation of Exhaust Air Ducting Works in Basements Date: January, 2014 Prepared by Sterling India Consulting Engineers New Delhi, India
2 TABLE OF CONTENTS S.No. Description Page No. 1. Notice Inviting Tender Technical Specification List of Makes Preamble Bill of Quantities Renovation of Exhaust Air Ducting works in Basements 2 Sterling India Consulting Engineers
3 NOTICE INVITING TENDER Consultants: M/s Sterling India Consulting Engineers Owners: India Habitat Centre, New Delhi India Habitat Centre, New Delhi 1. Tenders are invited on behalf of the owners India Habitat Centre, New Delhi for RENOVATION OF EXHAUST AIR DUCTING IN BASEMENTS at said project. 2. The tender shall be in the prescribed form. 3. Works are required to be completed within 2 (Two) months from the date of award of work. 4. Tenderers are advised to inspect and examine the site and its surroundings and satisfy themselves before submitting their tenders as to the nature of the ground, the form and nature of the site, the means of access to the site, accommodation they may require and in general shall themselves obtain all necessary information as to risks, contingencies and other circumstances which may influence or effect their Tender. A Tenderer shall be deemed to have full knowledge of the site, whether he inspects it or not and no extra charges consequent on any misunderstanding or otherwise shall be allowed. 5. Submission of a Tender by a Tenderer implies that he has read this notice and all other Contract Documents and has made himself aware of the scope and specifications of the work to be done and conditions and rates at which stores, tools, plants, etc. will be issued to him by the Owners and local conditions and other factors having bearing on the execution of the works. 6. A Tenderer should quote in figures as well as in words rates tendered. The amount for each item should be worked out and requisite totals given. Special care shall be taken to write rates in figures as well as in words and the amounts in figures only in such a way that interpolation is not possible. The total; amount shall be written both in figures and in words. 7 All rates shall be quoted on the tender form. 8. Pre Bid meeting shall be held on 15 th Jan, 2015 in the office of the Director, India Habitat Centre, New Delhi at 4:00 pm. 9. Tenders shall be received in the office of the Director, India Habitat Centre, New Delhi on 22 nd of Jan, 2015 at 3:00 pm. 10. A tenderer shall submit the tender which satisfies each and every condition laid 0down in this notice, failing which, the tender will be liable to be rejected. 11. The Owners do not bind themselves to accept the lowest or any tender or to give any reasons for their decision. Renovation of Exhaust Air Ducting works in Basements 3 Sterling India Consulting Engineers
4 12. The Owners reserve to themselves the right of accepting the whole or any part of the tender and tenderer shall be bound to perform the same at his quoted rates. 13. This notice of tender shall form part of the Contract Documents. 14. The validity of the tender(s) shall be upto 30 (Thirty) days from the date of opening of tender(s). 15. The tender should be submitted in sealed envelope. 16. Terms of Payment: a) 10% as mobilization advance along with order. b) 5% against approval of shop drawings (one week s time). c) 45% against delivery of material at site. d) Balance payment shall be released after successful installation, testing, commissioning and handing over the air handling units 17. Retention Money: Retention amount of 10% of the value bill shall be retained which shall be released in two parts, 5% after six months and balance 5% after 12months from the handing over date. : 18. Defect Liability Period The defect liability period shall be 12 months from the date of handing over. The vendor shall attend to the defects which may come up during the defect liability period, repair/replace the defective components and make the system functional in perfect working order. 19. Working hours: The vendor is required to submit the working schedule in advance to enable IHC to coordinate with security/others accordingly. Working hours will be from 8:00 pm to 6:00 pm in working day and full day on Sunday/holidays. 20. Storage: The vendor shall be required to deliver and store the material in a safe custody till the same is installed, commissioned and handed over successfully. IHC, under no circumstances, shall assume the responsibility of any missing part/parts till handed over. A lockable space for storage shall be provided by IHC. Renovation of Exhaust Air Ducting works in Basements 4 Sterling India Consulting Engineers
5 TECHNICAL SPECIFICATION SHEET METAL DUCT WORK 1. GENERAL This section comprises of supply, fabrication, installation and testing of all sheet metal ducts and supply, installation, testing and balancing of grilles with VCD in accordance with these specifications 2. DUCT MATERIAL All ducts shall be fabricated from galvanized steel sheets of the following thickness: Gauge Thickness (mm) Round Ducts Rectangular ducts up to 750mm Rectangular ducts greater than 750 mm and up to 1500mm Rectangular ducts greater than 1500mm and up to 2250mm Renovation of Exhaust Air Ducting works in Basements 5 Sterling India Consulting Engineers
6 Rectangular ducts greater than 2250mm DUCT FABRICATION All Galvanized ducts shall be site fabricated from lock form grade galvanized sheet steel zinc coated conforming with IS: 277, coating grade 120 or aluminum sheets conforming to ISS: (wherever aluminum ducts are specified).and installed in a workman like manner. The ducts shall be fabricated at site as per ISS: 655 latest editions. Ducts shall be straight and smooth on the inside with neatly finished joints. All joints shall be made airtight by applying sealant during the assembly of the ductwork; Sealing of the seams shall be accomplished by using approved sealant. Transverse joints shall be made using sponge rubber sulphur-free foam rubber gasketing (3mm thick and 20mm wide) All exposed ducts within conditioned spaces shall have only slip joints and no flanged joints. The internal ends of slip joints shall be made in the direction of Air flow. Changes in dimensions and shape of ducts shall be gradual. Curved elbows, unless otherwise approved, shall have a center line radius equal to one and half times the width of the duct. Air turns shall be installed in all abrupt elbows and shall consist of curved metal blades or vanes, arranged to permit the air to make the turns without appreciable turbulence. All ducts shall be rigid and shall be adequately supported and braced where required with standing seams to keep the ducts true to shape and to prevent buckling, vibration or breathing. All sheet metal connections, partitions and plenums required to confine the flow of air to and through the filters and fans, shall be constructed out of 20 gauge galvanized steel sheet, thoroughly stiffened with 25mm x 25mm x 3mm angle iron braces and fitted with all necessary doors, to give access to all parts of the apparatus. Doors shall not be less than 45cm x 45cm in size. Volume control dampers wherever required shall be installed as a minimum. The final duct design may call for additional volume control dampers based on final duct configuration. 4. DUCT INSTALLATION All ducts shall be installed generally as per the drawings and in strict accordance with approved shop drawings prepared by the Contractor. The contractor shall provide and neatly erect all sheet metal work as may be required to carry out the intent of these specifications and drawings. This work shall meet with the approval of the Engineer-in-charge in all its parts and details. All necessary allowances and provisions shall be made by the contractor for beams, pipes, or other obstructions in the buildings, whether or not the same are shown on the drawings. Where it becomes necessary to avoid beams or other structural work, plumbing or other pipes, and/or conduits, the ducts shall be Renovation of Exhaust Air Ducting works in Basements 6 Sterling India Consulting Engineers
7 transformed, divided or curved to one side, the required area being maintained as approved or directed by the Engineer-in-charge. If a duct cannot be run as shown on the drawing, the contractor shall install the duct between the required points by any path available, subject to the approval of the Engineer-in-charge. All duct work shall be independently supported from building elements or as required by the Engineer-in-charge. All horizontal ducts shall be rigidly and securely supported, in an approved manner, within hangers formed of GI rods and GI cleats under ducts not greater than 2 meter centers. All vertical duct work shall be supported by structural members at each floor. Ducting on top of the ceiling shall be supported from the slab above, or from beams, after obtaining approval of the Engineer-in-charge. In no case shall a duct be supported from the ceiling hangers or be permitted to rest on a hung ceiling. All metal work in dead or closed down spaces shall be erected in time to occasion no delay to other contractors in the building. All ducts shall be totally free from vibration under all conditions of operations. Whenever duct work is connected to fans, that may cause vibrations in the duct, ducts shall be provided with two flexible connections located close to the unit in mutually perpendicular directions. Flexible connection shall be constructed of fire resistant flexible double canvas sleeves at least 10 cm long, secured properly and bolted at both ends. Sleeve shall be made smooth and the connecting duct work rigidly held by independent supports on both ends. The flexible connection shall be suitable for pressures at the point of installation. The two mating flanges of the ducts being joined with each other shall be made air tight by providing 3mm thick 20mm wide Sulphur-free foam rubber gasket on mating flanges. 5. SUPPLY AIR REGISTERS Supply air registers shall be of approved make and of aluminum construction with individually adjustable bars. Supply air registers shall be double deflection type, with removable key operated volume control dampers. The outer frame shall be made from drawn aluminum sections. All registers shall be selected in consultation with the Engineer.-in-charge, Different spaces shall require horizontal or vertical face bars, and different width of margin frames. All registers shall have a soft, continuous rubber gasket between the periphery of the register and the surface on which it has to be mounted. Registers shall be adjustable pattern as such grill bar shall be pivotable to provide pattern with 0 to 100 degree horizontal arc and upto 30 degree deflection up or down. Bars shall hold deflection settings under all conditions of velocity and pressure. Bars longer than 45 cm shall be reinforced by a setback vertical member. Renovation of Exhaust Air Ducting works in Basements 7 Sterling India Consulting Engineers
8 Registers shall be given a rust inhibiting prime coat and factory applied powder coated finish of approved colour. 6. TESTING AND BALANCING After completion of the installation of the complete air distribution system, all ducts shall be tested for air leaks. Before painting the interiors, air distribution system shall be allowed to run continuously for 48 hours for driving away any dust or foreign material lodged within ducts during installation. The entire air distribution system shall be balanced using approved anemometer. Air quantities at the fan discharge and at various outlets shall be identical to, or less than 5 percent in excess of, those specified and quoted. Leakage in each air distribution system shall be within 3 percent so that supply air volume at each fan shall be identical to, or no greater than 3 percent in excess of, the total air quantity measured at all supply outlets served by the fan. Branch duct adjustments shall be made by volume or splitter dampers. Dampers shall be permanently marked after air balance is complete so that these can be restored to their correct position if disturbed at any time. Complete air balance report shall be submitted to the Engineer.-in-charge. for scrutiny and approval, and six copies of the approved report shall be provided with completion documents. LIST OF APPROVED MAKES S.No Description MAKES The bidders shall quote with first preference of the makes. A. MECHANICAL INSTALLATION 1 G.S. Sheets : TATA/ SAIL / ESSAR 2. Grilles / Diffusers : Caryaire/ Ravistar/ Air Master 3. Grille VCD : Caryaire/ Ravistar/ Air Master 4. Steel fasteners : Fischer / Hilti Renovation of Exhaust Air Ducting works in Basements 8 Sterling India Consulting Engineers
9 PREAMBLE EXHAUST DUCTING SERVICES SCHEDULE OF QUANTITIES 1. All described hereafter shall be in accordance with the specifications. 2. Testing and commissioning shall include furnishing all labour, materials, equipment, instruments, and incidentals necessary for complete testing of each component as per the specifications and manufacturer's recommendations; submission of test results to the Project manager and obtaining their approval and submission of necessary documents. 3. All the ducts shall be fabricated and installed conforming to the relevant Indian standard, and the specifications. 4. Duct installation shall include fabricating and installing the duct splitter dampers, turning vanes and the distribution grids within the ducts in position and providing, installing and making air tight the joints with slips, foam rubber insertions, nuts, bolts and screws as required. In addition, multi-louvered manually adjustable dampers shall be provided in various ducts as required for proper balancing of the airflows. 5. All registers shall be provided with a soft continuous rubber gasket between their periphery and the surface on which these have to be mounted. Renovation of Exhaust Air Ducting works in Basements 9 Sterling India Consulting Engineers
10 6. Registers shall be given at the factory primer coat and powder coating finish of the approved color. 7. After completion of the installation, the entire air distribution system shall be tested for the air leaks by conducting smoke test and balanced in accordance with the specifications. 8. Mode of Measurement The mode of measurement for the various items, unless otherwise specified, shall be as follows: 8.1 Ducting Payment for the ducting shall be made on the basis of the external surface area of the ducting including all materials, labor, supporting arrangement etc. for the installed duct. The rate per Sq.Mtrs. of the external surface shall include flanges, gaskets for joints, bolts and nuts, duct supports and hangers, vibration isolation neoprene pads or suspenders, flexible connection, inspection doors, dampers, turning vanes, and any other item which shall be required to complete the duct installation. The external surface area shall be calculated by measuring the overall width and depth ( including corner joints) in the center of the duct section and overall length of each duct section from flange face in case of duct lengths with uniform cross section. Total area will be arrived at by adding up the area of all the duct sections. In case of the taper piece, average width and depth will be worked out as follows: W1 = Width of the small cross- section W2 = Width of the large cross-section D1 = Depth of small cross -section D2 = Depth of large cross-section Average width = (w1+w2) / 2 Average depth = (d1+d2) / 2 i. Width and depth in the case of taper piece shall be measured at the edge of the collar of the flange for duct sections fitted with angle iron flanges, otherwise at the bottom of the flange where flanges are of the duct sheet. ii. The face length for the taper piece shall be the mean of the lengths measured face to face from the center of the width and depth flanges. iiii. For the special pieces like bends, branches, tees etc., same principle of area measurement as for the linear lengths shall be adopted except for bends, elbows, the lengths of which shall be the average of the lengths of linear and outer periphery along with curvature or angle of the piece. 9. The contractor shall include charges for the following items of work: 9.1 Protecting and cleaning of equipment/materials and work in progress as per Specifications. 9.2 Comply with safety requirements including temporary partitions, "caution" signs, protection of public, maintaining protected egress and access to work at site. Renovation of Exhaust Air Ducting works in Basements 10 Sterling India Consulting Engineers
11 9.3 Issuing of hot permits for welding and cutting works after approval from the owners. 9.4 Submission of the detailed schedule of activities. 9.5 Removal and legal disposal of debris including compliance with local requirements. 9.6 Furnish instruments required for testing, adjusting and balancing. These shall remain the property of the contractor. BILL OF QUANTITIES S.No. DESCRIPTION OF ITEM UNIT QTY RATE AMOUNT A 1 SHEET METAL WORK Supply, Installation, Testing Balancing & Commissioning of the following items as per specifications and requirement G.S.S square/ rectangular site fabricated ducting complete with gaskets, elbows, splitters, vanes, supports etc. as per drawings and as required for air distribution. a) Square/ rectangular i 20 gauge Sqm 270 ii 22 gauge Sqm Supply, installation, testing and balancing of Exhaust air square / rectangular Grille without volume control damper, Sqm 5 Renovation of Exhaust Air Ducting works in Basements 11 Sterling India Consulting Engineers
12 with frame made out of powder coated extruded aluminium sections complete with frame, gasket screws, etc. as specified. 3 4 Supply, installation, testing and balancing of Grille VCD with mil finish extruded aluminium sections complete screws, etc. as specified. Sqm 2 Supply and installation of Fire proof double layered silicon coated fabric, air tight, water proof, to with stand high temperature, non flammable type, canvass cloth connection for FAN outlet complete with drawn M S flanges on both sides for connection to FAN and duct complete with nuts, bolts etc. as per specification. Set 15 5 Supply and installation of 50mm thk wire mesh filters for following sizes: i 500x500 mm Nos. 20 Ii 600x300 mm Nos. 5 iii 500x600 mm Nos Dismantling of existing ducting, shifting to location as per instructions. a) Square/ rectangular i 20 gauge Sqm 270 ii 22 gauge Sqm 225 TOTAL Rs. Important Note: India Habitat centre is operational building. The work shall be carried out without disturbing the normal function. The schedule of work timing shall be as mutually agreed by the vendor and IHC. Vendors are advised to visit and make themselves familiar with site constraints, accessibility, working timings etc. Renovation of Exhaust Air Ducting works in Basements 12 Sterling India Consulting Engineers
INDIA HABITAT CENTRE New Delhi
INDIA HABITAT CENTRE New Delhi Tender For Air Handling Units Date: January 2015 Prepared by Sterling India Consulting Engineers New Delhi, India TABLE OF CONTENTS S.No. Description Page No. 1. Notice Inviting
More informationSECTION DUCTS PART 1 GENERAL 1.01 SUMMARY
1 1 1 1 1 1 1 1 0 1 0 1 SECTION 1 DUCTS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Duct Materials.. Insulated flexible ducts.. Single wall spiral round ducts.. Ductwork fabrication.. Duct cleaning.
More informationUnion County Vocational - Technical Schools Scotch Plains, New Jersey
SECTION 092216 - NON-STRUCTURAL METAL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSECTION AIR OUTLETS AND INLETS
PART 1 - GENERAL 1.1 DESCRIPTION A. Roof Curbs SECTION 23 37 00 AIR OUTLETS AND INLETS SPEC WRITER NOTE: 1. Delete between //----// if not applicable to project. Also delete any other item or paragraph
More information(G) DOORS & WINDOWS LIST OF BUREAW OF INDIAN STANDARD CODE OF PRACTICE (ISI)
(G) DOORS & WINDOWS LIST OF BUREAW OF INDIAN STANDARD CODE OF PRACTICE (ISI) 4021 : Specification for teak wood. 287 : Recommendation for maximum permissible moisture content 1141 : Specification for code
More informationSECTION 1208 CHAIN LINK FENCING DESCRIPTION
SECTION 1208 CHAIN LINK FENCING 1208-1 DESCRIPTION This item covers the requirements for furnishing materials and constructing new chain link fences and gates in accordance with the details included herein
More informationSECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System
SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF MODULAR PAN SYSTEM PART 1 GENERAL 1.1
More informationSMACNA-01Accepted Industry Practice for Industrial Duct Construction. A. Duct work sizes on drawings state inside clear dimensions.
15XXX - 1 Section 15XXX : CORROSIVE EXHAUST DUCT WORK PART 1GENERAL 1.1 REFERENCES SMACNA-01Accepted Industry Practice for Industrial Duct Construction SMACNA-06HVAC Duct Construction Standards SMACNARound
More informationSECTION MISCELLANEOUS METALS THIS SECTION TO BE INCLUDED IN SUB BID FOR SECTION MISCELLANEOUS AND ORNAMENTAL IRON
SECTION 055000 THIS SECTION TO BE INCLUDED IN SUB BID FOR SECTION 050001 MISCELLANEOUS AND ORNAMENTAL IRON PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a
More informationA. The work under this section consists of furnishing and installing gauge steel framing and bracing as indicated on the drawings and as specified.
SECTION 05450 LIGHT GAUGE STEEL FRAMING SYSTEM PART 1 GENERAL 1.1 SUMMARY A. The work under this section consists of furnishing and installing gauge steel framing and bracing as indicated on the drawings
More informationBRANZ FACTS RESILIENT NON-STRUCTURAL ELEMENTS SEISMICALLY RESILIENT NON-STRUCTURAL ELEMENTS # 3. Restraint systems
SEISMICALLY BRANZ FACTS RESILIENT NON-STRUCTURAL ELEMENTS SEISMICALLY RESILIENT DESIGN CRITERIA # 2 NON-STRUCTURAL ELEMENTS # 3 Restraint systems The next step in the non-specific design pathway in NZS
More informationCENTER OF INNOVATIVE & APPLIED BIOPROCESSING
CENTER OF INNOVATIVE & APPLIED BIOPROCESSING Knowledge City, Sector 81, Mohali CIAB/7(34)/2017 Works CORRIGENDUM Due to administrative reasons, the request for quotation for the work of Provision of glass
More informationA. This Section includes ceiling- and wall-mounted diffusers, registers, grilles and louvers.
SECTION 23 37 13 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationB. Qualification Data: For installers specified in Quality Assurance article.
SECTION 233113 METAL DUCTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationDIVISION 5 - STRUCTURAL STEEL AND IRON WORK
DIVISION 5 - STRUCTURAL STEEL AND IRON WORK SECTION 05100 STRUCTURAL METAL FRAMING PART 1.00 GENERAL 1.01 SCOPE OF WORK A. Work Included: 1. 2. Structural steel complete in place. Steel joists complete
More informationSECTION HVAC DUCTS AND CASINGS
SECTION 23 31 00 HVAC DUCTS AND CASINGS PART 1 -GENERAL 1.1 SUMMARY A. Section includes metal ductwork, nonmetallic ductwork, casing and plenums, buried ductwork, kitchen hood ductwork, duct cleaning.
More informationSECTION ALUMINUM HANDRAIL SYSTEMS
SECTION 05520 ALUMINUM HANDRAIL SYSTEMS PART 1 - GENERAL 1.01 SUMMARY A. Section includes aluminum handrails and railings. B. Related Work: 1. Section 03300 - Cast-in-Place Concrete C. References: 1. American
More informationNORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS
PART 1 GENERAL 1.01 SUMMARY Section 15140 PIPE HANGERS, This Section includes the furnishing and subsequent installation of: A. Pipe and equipment hangers, supports, and associated anchors B. Equipment
More information.1 American Institute of Steel Construction (AISC) Specifications for Steel Buildings AISC
05 12 00 STRUCTURAL STEEL FRAMING Page 1 of 3 1 General 1.1 SECTION INCLUDES.1 Structural steel framing and support members 1.2 RELATED SECTIONS.1 Section 05 50 00 Metal Fabrications 1.3 REFERENCES.1 American
More informationSECTION METAL STAIRS
SECTION 05 51 00 METAL STAIRS PART 1 GENERAL 1.1 SUMMARY A. Section includes steel stair frame of structural sections, with closed risers; pan to receive concrete fill stair treads and landings; integral
More informationFABRICATION OF A NEW INDUCED DRAUGHT FAN DUCTING KILN 2
FABRICATION OF A NEW INDUCED DRAUGHT FAN DUCTING KILN 2 SITE INFORMATION The tenderer should, in his own interest, visit the site and familiarize with the site conditions before tendering. For any clarification,
More informationNOTICE INVITING QUOTATION
INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & MAINTENANCE DIVISION MAIDAN GARHI NEW DELHI-110068. IG/CMD/NIQ-civil/2016/ Dated: 13.4.2016 NOTICE INVITING QUOTATION Name of work : Modification of
More informationSECTION STEEL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 08110 - STEEL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General, Supplementary, and Special Conditions and Division 1 Specification
More informationThe fire resistance required for doors in this building is 1 (one) hour resistance in compliance with the below general specifications:
Query No.1 ; we need more specs. about fire resistant doors Answer to Query No. 1: The fire resistance required for doors in this building is 1 (one) hour resistance in compliance with the below general
More informationK. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.
DIVISION 05 METALS 05 12 00 STRUCTURAL STEEL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Structural steel framing members, support members. 1.2 RELATED REQUIREMENTS A. Section 05 50 00 - Metal Fabrications:
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 813 WATER SERVICE FOR FIRELINES
ITEM NO. 813 WATER SERVICE FOR FIRELINES 813.1 DESCRIPTION: This item shall consist of water service for fire line installations in accordance with these specifications and as directed by the Engineer.
More informationDIVISION 15-MECHANICAL PN SECTION DUCTWORK SYSTEMS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Low, medium and high pressure ductwork.
PART 1 - GENERAL 1.01 SECTION INCLUDES A. Low, medium and high pressure ductwork. 1.02 DEFINITIONS A. Duct Sizes: Inside clear dimensions. B. Low Pressure: 1/2 inch, 1 inch and 2 inch wg, positive or negative.
More informationB. Polyethylene samples shall be submitted for Owner approval of color and quality.
Glass Rail ENGINEERED DASHERBOARD SPECIFICATIONS PART 1 - GENERAL 1.01 PROJECT SCOPE A. Contractor shall furnish and install one complete set of steel framed dasherboards as indicated on the drawings and
More informationProject No: Pakenham Branch Library, Pakenham, Ontario Section DECEMBER, 2016 Page 1 of 6
DECEMBER, 2016 Page 1 of 6 1 GENERAL 1.01 RELATED SECTIONS.1 Section 01 33 00 - Submittal Procedures..2 Section 07 21 16 - Batt and Blanket Insulation..3 Section 07 92 10 - Sealants..4 Section 09 91 00
More informationUNISTRUT CORPORATION GENERAL NOTES 1. THIS UNISTRUT SUPPORT SYSTEM IS DESIGNED TO SUPPORT A MAXIMUM UNIFORM LOAD OF PSF.
1. THIS SUPPORT SYSTEM IS DESIGNED TO 4. ALL CHANNEL & FITTINGS TO HAVE STANDARD 1. THIS SUPPORT SYSTEM IS DESIGNED TO 4. ALL CHANNEL & FITTINGS TO HAVE STANDARD 1. THIS SUPPORT SYSTEM IS DESIGNED TO 4.
More informationSECTION PRE-ENGINEERED METAL BUILDING
SECTION 13121 PRE-ENGINEERED METAL BUILDING PART 1 GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required to design, fabricate, deliver to project site, and erect
More informationINSTITUTE OF MICROBIAL TECHNOLOGY (COUNCIL OF SCIENTIFIC AND INDUSTRIAL RESEARCH) Sector 39-A, Chandigarh NOTICE INVITING TENDER
INSTITUTE OF MICROBIAL TECHNOLOGY (COUNCIL OF SCIENTIFIC AND INDUSTRIAL RESEARCH) Sector 39-A, Chandigarh NOTICE INVITING TENDER Sealed tenders are hereby invited for the following work from eligible Contractor(s)
More informationSECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS
SECTION 13096 MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS Prepared by: NELCO 125 Chenoweth Lane, Ste. 206 Louisville, KY 40207 (502) 899-3726 13096-1 MODULAR GALVANIZED RF SHIELDING SYSTEM PART
More informationSECTION NON-STRUCTURAL METAL FRAMING
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 09 22 16 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable
More informationSECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and
More information1. Non-load-bearing steel framing systems for interior gypsum board assemblies. 2. Suspension systems for interior gypsum ceilings and soffits.
SECTION 09 2216 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Non-load-bearing steel framing systems for interior gypsum board assemblies. 2. Suspension systems for interior gypsum ceilings and
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 812 WATER MAIN INSTALLATION
ITEM NO. 812 WATER MAIN INSTALLATION 812.1 DESCRIPTION: This item shall consist of water main installation in accordance with these specifications and as directed by the Engineer. 812.2 MATERIALS: The
More informationSECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate.
SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Welded stainless steel railing systems. 1.2 RELATED SECTIONS A. Section 03300 - Cast-In-Place Concrete; coordination with substrate.
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II
SECTION 052100 - STEEL JOISTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections
More informationA. This Section includes acoustical panel ceilings installed with exposed suspension systems.
SECTION 09511 ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification
More informationEssex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationHOTEL SPECIFICATION SECTION 08100
Part 1 General HOTEL SPECIFICATION SECTION 08100 1.01 Work Included A. The work under this section shall include the furnishing of all items shown on the drawings and as specified including, but not limited
More informationSECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Galvanized System
SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Galvanized System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF MODULAR GALVANIZED SYSTEM PART
More informationCOLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100
COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 Part 1 General 1.01 Work Included A. The work under this section shall include the furnishing of all items shown on the drawings and as specified,
More informationTechnical specifications Prefab Steel Canopy
Canopy Structure: Technical specifications Prefab Steel Canopy Design fabrication and installation of pre-engineered / pre- fabricated steel canopy as per the following specification: The canopy steel
More informationCOLQUITT COUNTY BOARD OF COMMISSIONERS 101 East Central Avenue
COLQUITT COUNTY BOARD OF COMMISSIONERS 101 East Central Avenue TERRY R. CLARK Chairman LUKE STRONG, JR District 1 Commissioner CHRIS HUNNICUTT District 2 Commissioner MARC DEMOTT District 3 Commissioner
More informationVolume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali
Volume-II CENTER OF INNOVATIVE & APPLIED BIOPROCESSING DEPARTMENT OF BIOTECHNOLOGY (Govt. of India) Knowledge City, Sector 81, Mohali FINANCIAL BID DOCUMENT Construction of Parking Shed at Main Campus,
More informationSECTION ALUMINUM GATES
P.O. Box 1058 370 South Athol Rd. Athol, Massachusetts 01331 Phone: (978) 249-7924 Fax: (978) 249-3072 SECTION ALUMINUM GATES PART 1 GENERAL 1.01 SCOPE OF WORK A. The CONTRACTOR shall furnish all labor,
More informationinstallation instructions Combination Fire & Smoke Damper
Combination Fire & Smoke Damper Sleeve Fire Rated Partition Retaining Angle Combination Fire & Smoke Damper Actuator General Notes: Combination Fire & Smoke Dampers are approved for use in static or dynamic
More informationSECTION METAL STAIRS
Tender SECTION 05510 METAL STAIRS PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes internal and external shop fabricated pre assembled steel stairs with integral handrails and ballustrades
More informationSECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)
SECTION 13125 ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationPREAMBLE TO BILLS OF QUANTITIES
Construction of New Buildings for IIT Madras Research Park Phase II, SH: - HVAC Works Package-2 Ventilation System, Ducting & accessories & Air distribution system 1.0 GENERAL PREAMBLE TO BILLS OF QUANTITIES
More informationSECTION 2 DIVISION 05 METALS
SECTION 2 DIVISION 05 METALS DIVISION 5 - METALS Note: This is a guide for Designers only. Contents shall not be used in lieu of specifications as part of the Designer s Contract Documents. GENERAL DESIGN:
More informationDIVISION 5 METALS SECTION COLD-FORMED METAL FRAMING
DIVISION 5 METALS SECTION 05 40 00 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSECTION ACCESS DOORS AND FRAMES
SECTION 08310 ACCESS DOORS AND FRAMES PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. [Fire rated] [and] [Non-fire rated] wall access panels. 2. [Fire rated] [and] [Non-fire rated] ceiling access
More informationSECTION METAL EQUIPMENT LOCKERS
SECTION 10 51 13 - METAL EQUIPMENT LOCKERS PART 1 GENERAL 1.1 SECTION INCLUDES A. DESCRIPTION: Furnish and install factory-assembled Heavy-Duty MIG-Welded Metal Lockers, complete, as shown and specified
More informationNo. NIQ03/2018/IND15589/ Dated:
NATIONAL INSTITUTE OF PHARMACEUTICAL EDUCATION AND RESEARCH (NIPER) Sector 67, S.A.S. Nagar (Mohali) Telephone No. 2214682-87, Fax No. 0172-2214692 No. NIQ03/2018/IND15589/ Dated: 02.07.2018 NOTICE INVITING
More informationSECTION HVAC DUCTS AND CASINGS
SECTION 23 31 00 PART 1 - GENERAL 1.1 SUMMARY A. Work Included: 1. Ductwork, Joints and Fittings 2. Type I, Grease Hood Ductwork 3. Type II, Vapor Hood Ductwork 4. Laundry Clothes Dryer Vent 5. Insulated
More informationINDIA HABITAT CENTRE New Delhi
INDIA HABITAT CENTRE New Delhi Tender For DOD & Oriental Octo. Airwasher Unit Works Date: January 2015 Prepared by Sterling India Consulting Engineers New Delhi-110 019, India TABLE OF CONTENTS S.No. Description
More informationA. Product Data: Identify thermal conductivity, thickness, and jackets (both factory and field applied, if any), for each type of product indicated.
SECTION 23 07 13 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationA. Product Data: Submit manufacturer's descriptive literature, and recommendations and instructions for installation.
SECTION 09512 - ACOUSTICAL TILECEILINGS (ACT-01 and ACT-02) PART 1 - GENERAL 1.01 SUMMARY A. Section includes ceilings consisting of acoustical panels and exposed suspension systems. This ceiling system
More informationSECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION
SECTION 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 - GENERAL 1.1 SUMMARY A. This section supplements all sections in this division, including pipe, fittings, valves, and connections for sprinkler
More informationBILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE. "Beit Hanoun Emergency Water Supply Project"
"Beit Hanoun Emergency Water Supply Project" " Rehabilitation and Construction of Beit Hanoun Water Network " BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE Bill of Quantities PREAMBLE TO
More informationSECTION NON--STRUCTURAL METAL FRAMING
The Collective Voice of America s Steel Framing Industry The Steel Framing Industry Association (SFIA) is dedicated to expanding the market for cold-formed steel in construction through programs and initiatives
More informationSECTION MISCELLANEOUS METALS
PART 1 GENERAL 1.1 WORK OF THIS SECTION A. Contractor shall provide all labor, materials, equipment and incidentals as shown, specified and required to furnish and install all miscellaneous metal fabrications
More informationSECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System
SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF WELDED SYSTEM PART 1 GENERAL 1.1 SECTION
More informationSECTION (16071) - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
SECTION 26 05 48 (16071) - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.01 SUMMARY A. This Section includes seismic restraints and other earthquake-damage-reduction measures for
More informationUNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:
SECTION 092216 - COLD FORMED STEEL FRAMING - NON-STRUCTURAL (CFSF-NS) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 ACTION
More information2.5" Min. Stud or Runner. 1.5" Mineral Fiber Blanket in Cavity, If Required. Wallboard. Retaining Angle. 1" Min. Damper Sleeve on 10" centers.
General Notes: When UL is referred to in this document, it represents UL/ULC. This installation instruction applies to Fire s (static, dynamic, curtain, single and multi-blade types) mounted in the plane
More informationSECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section.
SECTION 10 5300 ALUMINUM WALKWAY COVERS Part 1 General 1.01 Related Documents A. The requirements of Division 1 specifications shall apply to work specified in the section. 1.02 References A. International
More informationSECTION NON-STRUCTURAL METAL FRAMING
SECTION 09 22 16 PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories
More informationK. All mechanical rooms shall be designed with a minimum 3-1/2 dropped floor.
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationSERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651
SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651 PART 1 GENERAL 1.1 DESCRIPTION A. Work Included: 1. Furnish all labor and materials to complete the fabrication of detention windows
More information`AMENDMENT No. 4 TO TENDER DOCUMENTS. Tender No.: RITES/CO/B&A/EE/DTEH-Rohtak Air Cooled Chiller System of HVAC work
`AMENDMENT No. 4 TO TENDER DOCUMENTS Tender No.: RITES/CO/B&A/EE/DTEH-Rohtak Air Cooled Chiller System of HVAC work S.No. Clause of tender 1 1) S.H A, Fashion Design BOQ Item no. 1 a.iii), 2) S.H A, Film
More informationB. American Society for Testing and Materials: 1. ASTM F708 - Standard Practice for Design and Installation of Rigid Pipe Hangers.
SECTION 230529 - HANGERS AND SUPPORTS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe hangers and supports. 2. Hanger rods. 3. Inserts. 4. Flashing. 5. Sleeves. 6. Mechanical sleeve seals. 7. Firestopping
More informationThe Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.
SECTION 05 31 13 STEEL FLOOR DECKING PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 - Specification
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 22 0548 - PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationHOLLOW METAL DOORS AND FRAMES SECTION HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL
13686.00 HOLLOW METAL DOORS AND FRAMES 081113-1 SECTION 081113 - HOLLOW METAL DOORS AND FRAMES 1.1 RELATED DOCUMENTS: PART 1 - GENERAL A. Drawings and general provisions of Contract, including General
More information1. ARI 410 Standard for chilled water, hot water and steam coils. 2. ARI 430 Central Station Air Handling Units
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationSECTION VIBRATION ISOLATION FOR PLUMBING PIPING AND EQUIPMENT
SECTION 220550 - VIBRATION ISOLATION FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL REQUIREMENTS 1.1 SUMMARY A. It is the intent of this specification to provide vibration isolation supports for Plumbing
More informationTrade of Sheet Metalwork. Module 5: Ductwork Unit 3: 90 Radius Bend with Proprietary Flanges Phase 2
Trade of Sheet Metalwork Module 5: Ductwork Unit 3: 90 Radius Bend with Proprietary Flanges Phase 2 Table of Contents List of Figures... 5 List of Tables... 5 Document Release History... 6 Module 5 Ductwork...
More informationSECTION ORNAMENTAL ALUMINUM FENCING
SECTION 032300 ORNAMENTAL ALUMINUM FENCING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSECTION STRUCTURAL METAL FRAMING
SECTION 05100 STRUCTURAL METAL FRAMING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Structural steel framing including lintels, shelf angles, bearing plates, anchor bolts and other items as shown on
More informationSECTION PERSONNEL DUTY LOCKERS. 1. FPPL Series Police Personnel Duty Lockers, including the following:
SECTION 10501 PERSONNEL DUTY LOCKERS PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 specifications
More informationSECTION VIBRATION CONTROLS FOR PLUMBING PIPING AND EQUIPMENT
Page 220548-1 SECTION 220548 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationFF200, FOUR-FOLD DOORS CONSULT MANUFACTURER FOR ADDITIONAL OPTIONS OR MODIFICATIONS.
FF200, FOUR-FOLD DOORS CONSULT MANUFACTURER FOR ADDITIONAL OPTIONS OR MODIFICATIONS. PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary
More information5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationCITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS
CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS PART 1 - GENERAL 1.01 SUMMARY A. Section Includes furnishing and installing chain-link fabric fence, gate, and appurtenances. 1.02
More informationSECTION METAL DUCTS
PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:
More information1.02 Related Sections A. Section Heating, Ventilation and Air Conditioning (HVAC). C. Section Pneumatic and Electric Control HVAC.
PART 1: GENERAL 1.01 Section Includes A. Dual duct terminal units. B. Variable volume regulators. C. Integral damper motor operators. D. Integral controls. 1.02 Related Sections A. Section 23 00 00 Heating,
More informationSECTION TURBINE VENTILATORS
SECTION 07 72 00 TURBINE VENTILATORS **This is a CSI Three-Part Specification using CSI MasterFormat 2004-2010 Section Numbers and Titles. This specification must be edited to suit your particular project.
More informationPRE-ENGINEERED METAL BUILDING SYSTEM
PRE-ENGINEERED METAL BUILDING SYSTEM PART 1 GENERAL 1.1 SUMMARY A. The building shall include all primary and secondary structural framing members, connection bolts, roof and wall covering, flashing, gutter,
More informationDIVISION 20 GENERAL SECTIONS FOR PLUMBING, FIRE SUPPRESSION & HVAC SECTION VIBRATION ISOLATORS
DIVISION 20 GENERAL SECTIONS FOR PLUMBING, FIRE SUPPRESSION & HVAC SECTION 20 05 80 PART 1 GENERAL 1.01 DESCRIPTION A. Provide a complete vibration isolation system to isolate motorized equipment, piping,
More informationSECTION VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT
SECTION 230548 - VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary
More informationSECTION ACCORDION FOLDING PARTITIONS
PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 10 22 26.13 ACCORDION FOLDING PARTITIONS SPEC WRITER NOTE: Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable
More informationMETALS Commissioning of Metals Structural Steel Framing Steel Studs... 2
~ 05-1 ~ 05 00 00 Metals 05 00 00 METALS... 2 05 08 00 Commissioning of Metals... 2 05 12 00 Structural Steel Framing... 2 05 12 30 Steel Studs... 2 05 45 00 METAL SUPPORT ASSEMBLIES... 2 05 50 00 METAL
More informationSECTION METAL DUCTS
SECTION 15815 METAL DUCTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,
More informationSECTION HANGERS AND SUPPORTS FOR PLUMBING
SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationOur Shop is Your Shop
Our Shop is Your Shop Company Number: Company Name: Address: 294 Lee Company 311 Mallory Station Road City: Franklin State: TN Zip: 3767 Company Phone: Fax: 615-567-126 Company Contact: Brad Gipson Job
More information