DATE: August 22, All Proposers
|
|
- Junior Fletcher
- 6 years ago
- Views:
Transcription
1 DATE: August 22, 2017 TO: All Proposers RE: Addendum No. 2 RFP for the Design of Lighting Upgrades for David L. Lawrence Convention Center Roadways and Sidewalks and North Shore Garage Interior and Exterior Please acknowledge receipt of this addendum in your proposal. Proposers shall attach this addendum to the Request for Proposal documents now in their possession. The deadline for submitting inquiries related to this RFP has passed. Questions/Answers Does the project aim to meet PennDOT Tunnel Standards for the 10 th Street Roadway: Answer: The 10 th Street Roadway lighting design should fall within the safety standards that the City of Pittsburgh determines meet safety levels. This may include some meeting some PennDOT or similar requirements reserved for underpasses. Under Ft. Duquesne cantilever Should replacements for the in-grade up lights be considered for the RFP? (See photo C below): Answer: At this time the recessed concrete lighting in Photo C is not within the Scope of the Design. Are the recessed down lights in the loading dock area to be included? Answer: Lighting that affects the parts of the Fort Duquesne BLVD light levels are included but the lighting inside of the loading dock ramps are not affected by this RFP. 10th St. pass through / water feature Could the addition of lighting fixtures at the north end of the water feature, underneath Ft. Duquesne Blvd, be considered as an addition to the scope? Answer: The lighting in the Oculus structure over the North End of the Water Feature bordering the water feature and Ft. Duquesne Blvd has been included, as part of Addendum 1, as an addition to the overall RFP. This will be designed and estimated as a separate line item in the overall final product. Sports & Exhibition Authority 1
2 Along the south side of the building there are wall mounted down lights adjacent to the garage entrance. Should these be included in RFP? (See photo A below) Note: There is also a line of these same fixtures along south side of building on opposite side of 10th St. Answer: The lighting along French Street and above the Garage Lobby and Garage Entrance is not part of this RFP. We consider the sidewalk lighting parameter to end inside the east and west vestibules along 10th street, past the first set of moving doors but stopping at the second set. Is this accurate? Answer: The lighting design should continue through the vestibule/airlock to provide visual continuity with the design. The area between the two sets of sliding doors is a continuation of the sidewalk. Lighting beyond the second set of sliding doors in the interior lobby area is not part of the RFP. North Shore Garage There is a 4th type of exterior sconce/downlight along the east, west, and north facades of the building (see photo B below). Should these fixtures be included in the RFP? Answer: At this time these are not being replaced. They were replaced and refurbished during a recent project. Sports & Exhibition Authority 2
3 BID FORM Bid Package: David L. Lawrence Convention Center and North Shore Garage Design of Lighting Upgrades for David L. Lawrence Convention Center Roadways and Sidewalks and North Shore Garage Interior and Exterior Submitted to: Sports & Exhibition Authority th Street 2 nd Floor Pittsburgh, PA SEA reserves the right to reject any or all bids (including the lowest bid), accept bids in any order or combination, make modifications to the work after bidding, and waive any informalities or irregularities in bids if it is deemed in the best interest of the SEA. Submitted by: (Company) (Address) (Contact Person) (Telephone Number) The undersigned, hereinafter called the Bidder, being familiar with and understanding the Bidding Documents and also having examined the site and being familiar with all local conditions affecting the Project hereby proposes to furnish all labor, material, equipment, supplies and transportation, and to perform all Work in accordance with the Bidding Documents including Project Manual for David L. Lawrence Convention Center and North Shore Garage Design of Lighting Upgrades for David L. Lawrence Convention Center Roadways and Sidewalks and North Shore Garage Interior and Exterior dated August 2017 and subsequent addenda. Sports & Exhibition Authority 3
4 BASE BID Design of Lighting Upgrades for David L. Lawrence Convention Center Roadways and Sidewalks and North Shore Garage Interior and Exterior A. For all labor, material, services and equipment necessary for completion of the work specified, the Bidder bids: Lump Sum Design Items: David L. Lawrence Convention Center WORK ITEM QUANTITY UNIT ITEM DESCRIPTION TOTAL 01 1 LS Design of 10 th Street Roadway Lighting $ Design of Fort Duquesne BLVD 02 1 LS Lighting (Roadway and Sidewalk) $ 03a 1 LS Design of 10 th Street Sidewalk Lighting $ 03b 1 LS Design of 10 th Street Sidewalk Lighting with Programmable features $ 04 1 LS Design of Oculus Retrofit over the 10 th Street Water feature $ 05 1 LS Design of lighting retrofit for the DLCC Garage Vestibule $ GRAND TOTAL $ North Shore Garage WORK ITEM QUANTITY UNIT ITEM DESCRIPTION TOTAL 01 1 LS Design of NSG Interior/Exterior Lighting Retrofits/Replacement GRAND TOTAL $ TOTAL BASE BID PRICE Total base bid price for all work, complete, in accordance with the Bid Package $ (Written) $ (Numerals) Sports & Exhibition Authority 4
5 ALTERNATES: Restatement of Total Base Bid Price EXCLUDING ALL SALES TAX PAYABLE (Written) (Numerals) INDICATE SUBCONTRACTORS AND SUPPLIERS COMPANY SUBCONTRACTOR / SUPPLIER ADDENDA RECEIVED AND ACKNOWLEDGED: MBE/WBE COMMITMENT Bidder commits to the following goals through material purchases, second tier subcontractors or joint ventures and have identified in the attached MBE/WBE Solicitation Statement. SEA s Goals: MBE: 25% WBE: 10% Contractor s Proposed Goals: MBE: % WBE: % Sports & Exhibition Authority 5
6 ATTACHMENTS TO BE SUBMITTED WITH BID 1. Certificate of Minority and Women s Participation 2. MBE/WBE Solicitation Statement Submitted by: (Firm Name) Legal Status Sole Proprietorship Partnership Corporation State of Signature: (Sign in Ink) Date: Name: (Please print or type) Title Sales/Use Tax No: Sports & Exhibition Authority 6
David L. Lawrence Convection Center
DATE: August 14, 2017 TO: All Proposers RE: Addendum No. 1 RFP for the Design of Lighting Upgrades for David L. Lawrence Convention Center Roadways and Sidewalks and North Shore Garage Interior and Exterior
More informationPROJECT MANUAL FOR: CP AGRICULTURAL ENGINEERING RAIN TOWER REPAIRS CP HULSTON HALL STAIR TOWER REPAIRS
ADDENDUM #01 DATE: MAY 6, 2016 Page 1 of 2 TO CONTRACT DOCUMENTS ENTITLED: PROJECT MANUAL FOR: CP151322 AGRICULTURAL ENGINEERING RAIN TOWER REPAIRS CP160372 HULSTON HALL STAIR TOWER REPAIRS AT UNIVERSITY
More informationPeralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department
Peralta Community College District 501 5 th Avenue Oakland, California 94606 Phone (510) 466-7225 Fax (510) 587-7873 Purchasing Department Date: March 30, 2011 ADDENDUM No. 3 BID NO.: 10-11/27 PCCD Smart
More information2014 ARTICLE III IMPROVEMENTS IN THE CITY OF EL CENTRO ADDENDUM NO. 02
2014 ARTICLE III IMPROVEMENTS IN THE CITY OF EL CENTRO ADDENDUM NO. 02 Date: March 3, 2015 To: Prospective Contractors From: Jack Fleming, PE City of El Centro 1275 W. Main St. El Centro, CA 92243 Telephone:
More informationSECTION BID FORM
Attachment 1 Contract 13 Addendum 3 ARTICLE 1 BID RECIPIENT 1.01 This Bid is submitted to: SECTION 00300 BID FORM CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 13 City of Cape Coral,
More informationCITY OF MARSHALL, MINNESOTA
Office of the Director of Public Works/City Engineer 344 West Main Street Marshall, MN 56258 507-537-6773 Fax: 507-537-6830 CITY OF MARSHALL, MINNESOTA SPECIFICATION AND BIDDING DOCUMENTS FOR REMOVAL OF
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES DESIGN & CONSTRUCTION LOBBY AND CAFETERIA FLOORING INSTALLATION EVERETT MIDDLE SCHOOL ADDENDUM NO.
SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES DESIGN & CONSTRUCTION LOBBY AND CAFETERIA FLOORING INSTALLATION ADDENDUM NO. 1 PROJECT: 450 CHURCH STREET DATE: 13 FEBRUARY 2015 San Francisco, 94114 OWNER:
More informationThe following shall be incorporated into the Contract Documents dated 12 MARCH 2018.
ADDENDUM NO. 1 DATE: March 28, 2018 PROJECT: OWNER: BID DATE: L Anse Area Schools Concession Building L Anse Area Schools Monday, April 9, 2018 at 2:00 PM The following shall be incorporated into the Contract
More informationThis Addendum is directed to all prime Contract Bidders, and all others to whom Drawings and Specifications have been issued by the Architect.
North Campus Entrance and related work Wallace State Community College ADDENDUM 3 PART 1 - GENERAL Project: North Campus Entrance and related work [B.C. # 2016259] Owner: Wallace State Community College
More informationAll Approved Contractors / Interested Parties Re: ADDENDUM #1 Project: Burton ISD Rock Building Renovation Date: April 9, 2015
T S G TSG Architects AIA 427 Saint George, Suite 300 Gonzales, Texas 78629 8 3 0. 6 7 2. 7 8 0 1 8 3 0. 6 7 2. 4 3 4 0 f a x Member of the American Institute of Architects To: All Approved Contractors
More informationSECTION BID FORM. Garfield Street Drainage Improvements
SECTION 00410 BID FORM Garfield Street Drainage Improvements ARTICLE 1 - BID RECIPIENT 1.01 This Bid is submitted to: City of Lindsborg, Kansas City Clerk s Office 101 S. Main Street Lindsborg, KS 67456
More informationADDENDUM #3. GRW Project No.: Date: March 19, 2019 Subject: City of Nicholasville Fire Station #4
ADDENDUM #3 GRW Project No.: Date: March 19, 2019 Subject: City of Nicholasville Fire Station #4 Please address inquiries to: Aaron R. Nickerson GRW, Inc. anickerson@grwinc.com TO ALL PROSPECTIVE BIDDERS:
More informationADDENDUM #1. Invitation for Bids PARK EDEN - COMMON AREA FLOORING REPLACEMENT Solicitation No
ADDENDUM #1 Invitation for Bids PARK EDEN - COMMON AREA FLOORING REPLACEMENT Solicitation No. 2018-3020 Addendum 1 Issued February 5, 2019 To Offerors: Cincinnati Metropolitan Housing Authority 1627 Western
More informationADDENDUM NO. 1. Bidders are hereby informed that the construction Plans and/or Specifications are modified as follows:
Page 1 of 4 06-25-2013 ADDENDUM NO. 1 TO: PLANS AND SPECIFICATIONS FOR STATE OF MISSOURI Roof Replacement, Bldg. #28 Farmington Correctional Center 1012 West Columbia Street, Farmington, MO 63640 Project
More informationAugust 19, Addendum No. 2 Roosevelt Hall Interior Renovation Brooklyn College Project No.: BY
The City University Of New York August 19, 2010 Addendum No. 2 Roosevelt Hall Interior Renovation Brooklyn College Project No.: BY600-006 This Addendum is for the purpose of conveying the below Documents
More informationMain Building Auditorium
Main Building Auditorium Theatre and Lighting Upgrade Moberly Area Community College 101 College Avenue Moberly, Missouri This document contains all necessary instructions and specifications to perform
More informationInvitation for Bid - Standard Office Furniture / Task Chair
Invitation for Bid - Bid#2016-09-001 Instructions to Bidders 1. General Information Rice University is issuing this Invitation for Bid (IFB) for the procurement of goods and/or trade services as described
More informationREQUEST FOR PROPOSAL (RFP) for the Construction of Base Building Requirements for the new Alaska Gallery exhibit.
REQUEST FOR PROPOSAL (RFP) for the Construction of Base Building Requirements for the new Alaska Gallery exhibit. 1. INVITATION The Anchorage Museum is soliciting bids from qualified general contractors
More informationSUQUAMISH WAY NE SHOULDER AND SIDEWALK IMPROVEMENT PROJECT
CALL FOR BIDS KITSAP COUNTY DEPARTMENT OF PUBLIC WORKS COUNTY ROAD PROJECT NO. 1589 SUQUAMISH WAY NE SHOULDER AND SIDEWALK IMPROVEMENT PROJECT BID OPENING: DATE: FEBRUARY 27, 2018 TIME: 11:00 AM Sealed
More informationADDENDUM NO. 1 - OUTLINE AND SUMMARY INFORMATION
CAMPUS PLANNING, DESIGN & CONSTRUCTION Sixth Avenue and Grant Street P.O. Box 172760 Bozeman, Montana 59717-2760 Phone: (406) 994-5413 Fax: (406) 994-5665 ADDENDUM NO. 1 - OUTLINE AND SUMMARY INFORMATION
More informationJohn Barton Architect, LLC
John Barton Architect, LLC Bid Addendum # One Via email, please confirm receipt Re: RIO RANCHO HIGH SCHOOL WINDOWS AND EXTERIOR IMPROVEMENTS PROJECT #: 083006-15- 001 ITB #: 2016-001- FAC RIO RANCHO PUBLIC
More informationBID FORM This Bid is submitted to: City of Glasgow 126 East Public Square Glasgow, KY 42141
BID FORM PROJECT DESCRIPTION Ellis Avenue Stream Improvements City of Glasgow, KY PROJECT NUMBER GRW Project No.: 4339 ARTICLE 1 BID RECIPIENT 1.01 This Bid is submitted to: City of Glasgow 126 East Public
More informationA D D E N D U M. REPLACE: Project Summary with attached revised Project Summary. 1 Specification Section Project Summary
A D D E N D U M 1 TO All Plan Holders ISSUE DATE 20 January 2017 PROJECT # 15-028 REGARDING Switchgear Replacement NARRATIVE PAGES 1 15-02812 KVa Switchgear Replacement Project SPECIFICATION PAGES 10 DRAWING
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1
FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 1: Stairs DATE: December 29, 2017 1235 Mission Street San Francisco, California SFUSD Project
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1
FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 2: Roof 2 DATE: December 29, 2017 1235 Mission Street San Francisco, California SFUSD Project
More informationDayton Metropolitan Housing Authority Rosemont/Hoch Electrical Upgrades
Dayton Metropolitan Housing Authority 111071 Rosemont/Hoch Electrical Upgrades Addendum No. 3 August 10, 2011 DMHA 400 Wayne Ave. Dayton, OH 45410 Re: 1432-1438 Rosemont oh5-12b 261 Hoch Street oh5-18d
More informationREQUEST FOR PROPOSAL (RFP) No.: J-19 PRECONSTRUCTION AND CONSTRUCTION SERVICES, MEDIUM VOLTAGE SUBSTATION REPLACEMENT, LAS POSITAS COLLEGE
REQUEST FOR PROPOSAL (RFP) No.: J-19 PRECONSTRUCTION AND CONSTRUCTION SERVICES, MEDIUM VOLTAGE SUBSTATION REPLACEMENT, LAS POSITAS COLLEGE To: All Prospective Bidders Addendum No. One This Addendum One
More informationARCHITECTURE, PLANNING AND HISTORIC PRESERVATION, INC. ADDENDUM NO. 1. September 9, to the BIDDING DOCUMENTS for
AUSTIN ARCHITEXAS DALLAS ARCHITECTURE, PLANNING AND HISTORIC PRESERVATION, INC. ADDENDUM NO. 1 September 9, 2014 to the BIDDING DOCUMENTS for ELLIS COUNTY COMPLEX Records Storage Building Waxahachie, Texas
More informationUAF Combined Heat & Power Replacement (CPHR)
davis JV UAF Combined Heat & Power Replacement (CPHR) REQUEST FOR BIDS Limited 2015 Mechanical Scope PROPOSALS DUE: THURSDAY JULY 2 ND, 2015 2:00PM LOCAL ALASKA TIME Submit to: Haskell Corporation /Davis
More informationREQUEST FOR QUALIFICATIONS DESIGN BUILD SERVICES FACILITY IMPROVEMENTS AT MUSIC HALL, AFRICAN AMERICAN MUSEUM & AQUARIUM ANNEX FAIR PARK DALLAS, TEXAS
REQUEST FOR QUALIFICATIONS for DESIGN BUILD SERVICES for FACILITY IMPROVEMENTS AT MUSIC HALL, AFRICAN AMERICAN MUSEUM & AQUARIUM ANNE at FAIR PARK DALLAS, TEAS ISSUED: MARCH 8, 2018 DUE: APRIL 6, 2018
More informationBoth envelopes must have the following information in the lower left hand corner:
SECTION 001116 INVITATION TO BID The City of Morgantown is requesting a bid for masonry restoration for the City Hall Building in Morgantown, WV. The Project is for building envelope rehabilitation including
More informationGadsden City Schools
Bid # 2017-08 Specifications and Proposal For Athletic Uniform Contract Bid Opening: May 31, 2017 10:00 a.m. Note: All questions concerning these specifications and proposal should be directed in writing
More informationDick s Sporting Goods Demolition Package
REQUEST FOR PROPOSAL FOR COMPETITIVE SEALED PROPOSALS TO PROVIDE: Dick s Sporting Goods Demolition Package at Salt Lake City, UT 2425 E. Camelback Rd. Suite 750 Phoenix AZ 85016 Notice of Extended Payment
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1
SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 3: Roofs 1 & 3 DATE: December 29, 2017 1235 Mission
More informationRevised BID FOR UPGRADES AND REPAIRS TO BULK DOCK 2 MARINE STRUCTURES PORT OF CORPUS CHRISTI AUTHORITY
Revised BID FOR UPGRADES AND REPAIRS TO BULK DOCK 2 MARINE STRUCTURES PORT OF CORPUS CHRISTI AUTHORITY (Company Name) Port Commissioners Port of Corpus Christi Authority P. O. Box 1541 Corpus Christi,
More informationSECTION NEW MARTINSVILLE FIREMAN S DOCK BIDS DUE: 4:30 PM LOCAL TIME ON FRIDAY JANUARY 30 TH, 2015
SECTION 00 91 13.01 NEW MARTINSVILLE FIREMAN S DOCK ADDENDUM #2 ADDENDUM #2 ISSUE DATE: JANUARY 21, 2015 PROJECT NAME: NEW MARTINSVILLE FIREMAN S DOCK BIDS DUE: 4:30 PM LOCAL TIME ON FRIDAY JANUARY 30
More informationREQUEST FOR PROPOSAL
September 20, 2016 REQUEST FOR PROPOSAL Design/Build Services for Wood Frame, Metal Siding, Open Front Storage Building for Sewer Department RFP Due October 12, 2016 @ 2:00 pm (local time) BIDDER NAME:
More informationALASKA. Request for. Anchorage, AK. com. the following: a.) Offeror s Name b.) c.) Project title. e: A Pre-Bid
ALASKA RAILROAD CORPORATION 327 W. Ship Creek Ave. Anchorage, AK 99501 August 4, 2017 Request for Quote #17-205428 The Alaska Railroad Corporation (ARRC) is soliciting bid from interested concerns for
More informationBidding Conditions. March 22, (Project# 0192) at the. Fresno Chaffee Zoo. Project : Warthog Exhibit. Located at. 894 West Belmont Avenue
Bidding Conditions March 22, 2018 (Project# 0192) at the Fresno Chaffee Zoo Project : Warthog Exhibit Located at 894 West Belmont Avenue Fresno, CA 93728 Page 1 of 8 DEFINITIONS Addendum - A document issued
More informationAddendum No. 1. Joliet Junior College 1215 Houbolt Road Joliet, IL DATE: October 11, 2017
Addendum No. 1 DATE: October 11, 2017 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Respondents SUBJECT: Addendum No. 1 PROJECT NAME: Remodel C-Building Restroom JJC PROJECT
More informationPeralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department
Peralta Community College District 501 5 th Avenue Oakland, California 94606 Phone (510) 466-7225 Fax (510) 587-7873 Purchasing Department ADDENDUM No. 2 DATED JULY 2, 2013 TO THE PROJECT MANUAL and PLANS
More informationAttached please find the revised Plan Sheet C3 Proposed Conditions Plan.
ADDENDUM NO. 1 124002-4A RE: FROM: TO: Depot Street Drainage Improvements Charlestown, New Hampshire DuBois & King, Inc. P.O. Box 339 Randolph, Vermont 05060 (802) 728-3376 Prospective Bidders DATE: June
More informationCITY OF KENOSHA PUBLIC WORKS DEPARTMENT- ENGINEERING LAKEFRONT LIGHTING PROJECT LIGHT POLES, LED LUMINAIRE FIXTURES & ARM HARDWARE NOTICE #17-18
CITY OF KENOSHA PUBLIC WORKS DEPARTMENT- ENGINEERING LAKEFRONT LIGHTING PROJECT LIGHT POLES, LED LUMINAIRE FIXTURES & ARM HARDWARE Issued: November 28, 2018 NOTICE #17-18 INSTRUCTIONS TO BIDDERS 1.0 Sealed
More informationIMMEDIATE RESPONSE REQUESTED
DATE: June 1, 2018 IMMEDIATE RESPONSE REQUESTED ADDENDUM NO. 3 Project No. 833450 Owner: City of Dexter Project: 2018 Wastewater Treatment Plant Improvements ADDENDUM ACKNOWLEDGMENT Upon receipt of this
More informationMustang Substation Bank I Replacement Project MAJ 15-SP5054
CALIFORNIA POLYTECHNIC STATE UNIVERSITY FACILITIES PLANNING & CAPITAL PROJECTS San Luis Obispo, CA 93407-0690 p 805/756-2581 f 805.756.7566 http://www.afd.calpoly.edu/facilities/ Mustang Substation Bank
More informationCity of Frederick PURCHASING DEPT.
ADDENDUM #4 RFP #12-D CITY OF FREDERICK WWTP ENR UPGRADE March 12, 2012 TO: SUBJECT: REF: All Potential Proposers RFP #12-D, CITY OF FREDERICK WWTP ENR UPGRADE Revised Proposal Closing Date, Submitted
More informationBID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR
BID PROPOSAL FOR TOWN OF HIGHLAND PARK, TEXAS FOR Miscellaneous Concrete Repairs 2014 3600-3900 Blocks of Potomac Avenue and Town Hall, 2014 To: The Honorable Mayor and Town Council Town of Highland Park
More informationThe Bid Date has changed to 03/16/2010 at 2:30 PM.
, Chinatown / North Beach Campus Main Building & Annex Building Curbs Gutters and Sidewalk CCSF Project No. 107 A 1. Summary DOCUMENT 00900 Bid Package 7.20 Curbs Gutters and Sidewalk ADDENDUM NO. 4 (02/22/2009)
More informationPUBLIC WORKS DEPARTMENT FREMONT SQUARE SIDEWALK RECONSTRUCTION PROJECT NO. PW1438/ATPL-5008(140)
PUBLIC WORKS DEPARTMENT BID FORMS FOR FREMONT SQUARE SIDEWALK RECONSTRUCTION PROJECT NO. PW1438/ATPL-5008(140) DO NOT DETACH ANY OF THIS MATERIAL THIS CONSTITUTES YOUR BID PROPOSAL SUBMIT ONE ORIGINAL
More informationCONTRA COSTA COMMUNITY COLLEGE 500 Court St, Martinez, CA 94553
ADDENDUM #4 CONTRA COSTA COMMUNITY COLLEGE 500 Court St, Martinez, CA 94553 CLASSROOM NOTIFICATION DEVICE INSTALLATION - DISTRICTWIDE Contra Costa College / Diablo College / Los Medanos College Date: May
More informationSection IX. Bidding Forms TABLE OF CONTENTS
Section IX. Bidding Forms TABLE OF CONTENTS Bid Form... 2 Form of Contract Agreement... 4 Omnibus Sworn Statement... 6 Bid Form Date: IAEB 1 N o : To: [name and address of PROCURING ENTITY] Address: [insert
More informationBID FORM (LUMP SUM CONTRACT)
BID FORM (LUMP SUM CONTRACT) Place County of El Paso Purchasing Department Date Project No. 11-016 Proposal of (hereinafter called Bidder), a corporation organized under the laws of the State of /a partnership/an
More informationBowman Outside Plant Splicing Project
Title and Summary Request for Best Value Bid ( RFB ): RFBVB Title: RFB Publication: RFB Composition: RFB Amendments: Contracting Entity: No. FY13 0116 Bowman Outside Plant Splicing Project As follows:
More informationADDENDUM NO. B. TO THE BID DOCUMENTS, dated 1/5/16 FOR THE
ADDENDUM NO. B TO THE BID DOCUMENTS, dated 1/5/16 FOR THE CVUSD M&O/WAREHOUSE/PRINTING SERVICES TENANT IMPROVEMENT 667 Building & 750 Building #DO-15C1024 & #DO-15C1026 CONEJO VALLEY UNIFIED SCHOOL DISTRICT
More informationBidders Name: DOCUMENT 330 BID FORM
Bidders Name: DOCUMENT 330 BID FORM TO: The City of Topeka, Kansas Contracts & Procurement Division 215 S.E. 7th St., Room 60 Topeka, Kansas 66603 Project No. and Description: 1. The undersigned Bidder
More informationCOMMUNICATIONS NETWORK UPGRADES AT VARIOUS LOCATIONS CITY OF SIOUX FALLS, SOUTH DAKOTA Bid Request No ADDENDUM NO.
COMMUNICATIONS NETWORK UPGRADES AT VARIOUS LOCATIONS CITY OF SIOUX FALLS, SOUTH DAKOTA Bid Request No. 15-1079 2015 CONTRACTOR S BID DATE: PLACE FOR CONTRACTOR S TO SUBMIT BIDS: Thursday, June 25th, 2015,
More informationCITY OF DE SOTO Miller Park Trail Extension and Picnic Table Pads
CITY OF DE SOTO Miller Park Trail Extension and Picnic Table Pads City of De Soto Johnson County, Kansas PREPARED BY: City of De Soto, Kansas 32905 West 84 th Street De Soto, Kansas 66018 SPECIFICATIONS
More informationADDENDUM NO. 2 Page 1 of 13
ADDENDUM NO. 2 Page of 3 TO THE CAMPUS WIDE ENERGY MANAGEMENT METERING SYSTEM BID (PROJECT # SBCMP0000027800) FOR THE CAMPUS OF CALIFORNIA STATE UNIVERSITY, SAN BERNARDINO. Prepared by: Procurement and
More informationINVITATION TO BID (Request for Proposal)
INVITATION TO BID (Request for Proposal) July 5, 2017 PROJECT Collaborative Spaces Furniture PROJECT DESCRIPTION The Topeka and Shawnee County Public Library is a 21st-century, landmark library; most recently
More informationMemphis Housing Authority Capital Improvements Department 700 Adams Street, Room 107 Memphis, Tennessee
Memphis Housing Authority Capital Improvements Department 700 Adams Street, Room 107 Memphis, Tennessee 38105-5029 ADDENDUM NO. 2 Issued: March 6, 2018 This addendum shall become and form a part of the
More informationMEMORANDUM. Taylor Schoel with Walter Schoel Engineering. DATE: August 29, Addendum 1 - Green Drive Culvert Replacement.
MEMORANDUM TO: FROM: Bidders Taylor Schoel with Walter Schoel Engineering DATE: August 29, 2013 SUBJECT: Addendum 1 - Green Drive Culvert Replacement The following is part of Addendum 1 and should be included
More informationSAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR HIGH SERVICE PUMP REPAIR ADDENDUM 3
SAN ANTONIO WATER SYSTEM PURCHASING DEPARTMENT Issued By: D. Anthony Rubin Date Issued: April 15, 2014 BID NO.: 14-7033 FORMAL INVITATION FOR BIDS ANNUAL CONTRACT FOR HIGH SERVICE PUMP REPAIR ADDENDUM
More informationSpring Lake Public Schools. Spring Lake, MI. March RE: High School Storage Buildings
Spring Lake Public Schools Spring Lake, MI March 2018 RE: High School Storage Buildings Advertisement for bids Bid Proposal Sealed bids for Spring Lake Public Schools-High School Storage Buildings will
More informationINFORMAL BID PROPOSAL FORM STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION
INFORMAL BID PROPOSAL FORM STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION The bid proposal is to be returned to the buyer via e-mail and will be accepted no later than 10:00 AM on Wednesday, January
More informationAddendum No. 2. Pre-Bid Meeting Notes and Scope of Work Clarifications
Addendum No. 2 Project No. 2016-01EL West Barbour Street 12kV Underground Reconductoring Revisions to Drawings and Specifications Pre-Bid Meeting Notes and Scope of Work Clarifications Replace Section
More informationREQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES. For the renovation of existing apartment buildings. August 15, 2016
REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES For the renovation of existing apartment buildings August 15, 2016 INVITATION Bath Housing Development Corporation is soliciting proposals for
More informationBIDDING DOCUMENTS KRULL DITCH/PARK AVENUE CULVERT REPLACEMENT PROJECT WHEELER, INDIANA
BIDDING DOCUMENTS FOR THE KRULL DITCH/PARK AVENUE CULVERT REPLACEMENT PROJECT IN WHEELER, INDIANA SEPTEMBER 8, 2017 PREPARED BY: PORTER CO. DEPT. OF DEVELOPMENT & STORM WATER MANAGEMENT 155 INDIANA AVE.,
More informationBaltimore City Public Schools City Schools Material Management Department. 200 E. North Avenue, Room #401 Baltimore, MD ADDENDUM #4
Baltimore City Public Schools City Schools Material Management Department. 200 E. North Avenue, Room #401 Baltimore, MD 21202 ADDENDUM #4 Solicitation: IFB-18017 September 15, 2017 New Response Due Date:
More informationCITY OF OCEAN CITY COUNTY OF CAPE MAY, NEW JERSEY ADDENDUM #1 FEBRUARY 16, 2016 CITY CONTRACT NO
CITY OF OCEAN CITY COUNTY OF CAPE MAY, NEW JERSEY ADDENDUM #1 FEBRUARY 16, 2016 CITY CONTRACT NO. 16-01 RESTORATION OF THE HISTORIC TRANSPORTATION CENTER PHASE III BID RECEIPT: o Sealed bids shall be received
More informationThe bid is being postponed to comply with State rules requiring 4 calendar days for receipt of bids after an addendum.
ADDENDUM NO. FOUR March 5, 2018 NORTH IDAHO COLLABORATIVE EDUCATION BUILDING North Idaho College, Coeur d Alene, ID DPW PROJECT 16251 - H2A PROJECT 1616 This addendum is hereby incorporated into and is
More informationADDENDUM NO. 1. City of Fort Worth
00 0 - ADDENDA Page of 8 9 0 8 9 0 8 9 0 8 9 0 ADDENDUM NO. PROJECT: Federal Aid Project Number: CM 00 (80) CSJ: 090 8 CITY PROJECT NUMBER: 00 OWNER: City of Fort Worth CONSULTING ENGINEERS: Freese and
More informationPORTLAND COMMUNITY COLLEGE SW 49 th Avenue Portland, Oregon ADDENDUM NO. 4
RE: ITB: PORTLAND COMMUNITY COLLEGE 12000 SW 49 th Avenue Portland, Oregon 97219 Sylvania Campus Bookstore Remodel Dated: February 22, 2017 April 11, 2017 ADDENDUM NO. 4 This addendum, together with the
More informationBASE BID Description Written & Numeric Price
PROPOSAL Proposal TxDOT CSJ No. Project : Airfield drainage improvements to alleviate storm water conveyance issues at in Liberty, TX. The improvements include: re-grading of existing concrete lined infields,
More informationAUTOMATIC METER READING SYSTEM DETAILED SPECIFICATION
From: TO THE CITY COUNCIL CITY OF CARLYLE, ILLINOIS EQUIPMENT FOR AUTOMATIC METER READING SYSTEM AND HOSTING SERVICES for the MUNICIPAL ELECTRIC and WATER UTILITY. The undersigned, having familiarized
More informationREVISED BID FORM. To Procurement Services, Room 1104, 900 East Broad Street, Richmond, Virginia:
REVISED BID FORM SEALED BIDS WILL BE RECEIVED at the Department of Procurement Services, City Hall, 900 E. Broad Street, Rm. 1104, Richmond, Virginia 23219, UNTIL BUT NOT LATER THAN 2:30 P.M. ON February
More informationSchool Risk Assessment
RSU #14 WINDHAM RAYMOND SCHOOLS AND YARMOUTH SCHOOLS School Risk Assessment RFP # 12-06 Bill Hansen and Judy Paolucci 12/2/2011 RSU #14 Windham Raymond Schools and the Yarmouth School Department are requesting
More informationDate: October 24, 2018 Comm #: SCO ID #: A Code: Item: 307 Clark Nexsen #: 6958
Bid Addendum 02 1523 Elizabeth Ave, Suite 300 Charlotte, NC 28204 Project: UNC at Charlotte: Student Activity Center IT Upgrade Date: October 24, 2018 Comm #: SCO ID #: 17-17027-01A Code: 41626 Item: 307
More informationCITY OF FEDERAL WAY REQUEST FOR PROPOSAL
I. PURPOSE OF REQUEST. CITY OF FEDERAL WAY REQUEST FOR PROPOSAL The City of Federal Way ( City ) is requesting proposals for the purpose of Performing Arts and Event Center Exterior Building Signage. The
More information707 Minnesota Ave., Suite 506 Kansas City, Kansas Tel Fax
ADDENDUM 707 Minnesota Ave., Suite 506 Kansas City, Kansas 66101 Tel. 913.287.1900 Fax. 816.300.4102 www.wskfarch.com A r c h i t e c t u r e I n t e r i o r D e s i g n I l l u s t r a t I o n P l a n
More informationDOCUMENT BID FORM - STIPULATED SUM
DOCUMENT 004113 BID FORM - STIPULATED SUM Architect s Project No. 2007024EXC Project: Excell Academy for Tenant: Excell Academy for Higher Learning, Inc. Higher Learning Interiors Package 6510 Zane Avenue
More information2. Exhibit 2 of the RFP contained in the Project Manual is hereby amended and restated as set forth in Attachment 1, herein.
Pier 26 Upland Park Construction Sitework, Demolition and Concrete Project/Contract #C4891-B Addendum # 1 November 8, 2018 To All Respondents: 1. Part I, Section 2.2.4.1 of the above referenced Request
More informationDocument Bid Form (General Contract) State of Ohio Standard Requirements for Public Facility Construction
Document 00 41 13 - Bid Form (General Contract) State of Ohio Standard Requirements for Public Facility Construction Sealed bids will be received by Miami University at 181 Cole Service Building, Oxford,
More informationADVERTISEMENT TO BID PARTIAL
ADVERTISEMENT TO BID The City of Elkton will receive separate, sealed Bids for their East Main Street Lift Station Generator Pad Addition Project until 10:30 a.m. local time, Tuesday, January 8, 2019 at
More informationSCHEDULE A. Affidavit of Bidder/Proposer MBE / WBE Goal Implementation Plan
Contract Name: SCHEDULE A Affidavit of Bidder/Proposer MBE / WBE Goal Implementation Plan State of: County of: In connection with the above - captioned contract: I HEREBY DECLARE AND AFFIRM that I am a
More informationOUTAGAMIE COUNTY REQUEST FOR BID FOR WALK THROUGH METAL DETECTORS
OUTAGAMIE COUNTY REQUEST FOR BID FOR WALK THROUGH METAL DETECTORS Due Date: February 13, 2018 1.0 Specifications Requesting bids for two (2) walk through metal detectors for the main entrance of the County
More informationCHARLES COUNTY GOVERNMENT ITB NO MATTAWOMAN WATER RECLAMATION FACILITY (MWRF) PRIMARY CLARIFIER NO. 1 IMPROVEMENTS
CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 February 07, 2017 ITB NO. 17-17 MATTAWOMAN WATER RECLAMATION FACILITY (MWRF) PRIMARY
More informationCity of Eagle Point 2017 Paving Instruction to Bidders
City of Eagle Point 2017 Paving Instruction to Bidders Issued: August 2, 2017 Closing Date and Time: Wednesday August 16, 2016 at 2:00 pm Project Summary The City of Eagle Point is requesting bids for
More informationBID PROPOSAL FORM C.I.P. NO PROJECT: VETERANS PARK SHOOTING RANGE LEAD ABATEMENT/DEMO
Bid Proposal Form C.I.P. NO. 2016-012 PROJECT: BIDDER SHALL COMPLETE AND SUBMIT ALL DOCUMENTS AND ATTACHMENTS AS REQUIRED SUBMITTED BY: (Bidder s Name) In accordance with the City of Commerce s Notice
More informationDOCUMENT BID FORM. Village of Middle Point
DOCUMENT 00300 BID FORM PROJECT IDENTIFICATION: Water Treatment Plant Replacement Village of Middle Point THIS BID IS SUBMITTED TO: Village of Middle Point 103 N. Adams Street Middle Point, OH 45863-0191
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1
SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: Longfellow ES Exit Balcony Addition DATE: March 4, 2019 755 Morse Street, SF, CA 94112 SFUSD Project No.12059
More informationREQUEST FOR PROPOSALS
Skyway Concession Company 205 North Michigan Avenue, Suite 2510 Chicago, Illinois 60601 312-552-7100 REQUEST FOR PROPOSALS TO: FROM: Proposal Manager Erick M. Rivera Infrastructure Manager DATE: November
More informationSterling Public Schools 07/13/17 Preschool Addition Sterling, Nebraska ADDENDUM NO. 2
Sterling Public Schools 07/13/17 ADDENDUM NO. 2 The Architect/ Engineer issues this addendum, applicable to the above named project, to all known Contractors before receipt of proposal. This addendum includes
More informationThe purpose of this addendum is to respond to RFI s submitted to the County and issue a revised SECTION BID FORM.
HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS (HCBCC) PURCHASING DEPARTMENT DATE: 6/19/15 BID NO. ITB 15-044 ADDENDUM No. 2 Project.: Owner: Lake Josephine Drive resurfacing Highlands County BCC Attn:
More informationBID Addenda No. Date Issued Addenda No. Date Issued
BID - 004113 BID TO: THE CITY AND BOROUGH OF JUNEAU 1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with the OWNER in the form included in the Contract
More informationAddendum No. 1. Joliet Junior College 1215 Houbolt Road Joliet, IL DATE: October 16, 2017
Addendum No. 1 DATE: October 16, 2017 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Respondents SUBJECT: Addendum No. 1 PROJECT NAME: IT Office Remodel JJC PROJECT NO.: B17027
More informationREVISED BID FORM WILLIAM PATERSON UNIVERSITY OF NEW JERSEY. PROJECT NAME: Renovations & Addition to Hunziker Hall & Wing
REVISED BID FORM WILLIAM PATERSON UNIVERSITY OF NEW JERSEY PROJECT NUMBER: WP-14-14-8/14 PROJECT NAME: Renovations & Addition to Hunziker Hall & Wing Bids are to be returned to The Office of Associate
More informationCHARLES COUNTY GOVERNMENT ITB NO NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) TEMI DRIVE CONSTRUCTION
CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 October 7, 2014 ITB NO. 15-10 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
More informationNOTICE TO OFFERORS ADDENDUM NO. 2 WASTE COLLECTION SITE DEVELOPMENT PLAN FOR THE COUNTY OF SHENANDOAH
September 20, 2018 NOTICE TO OFFERORS ADDENDUM NO. 2 WASTE COLLECTION SITE DEVELOPMENT PLAN FOR THE COUNTY OF SHENANDOAH To Holders of Bid Proposals: Please make the following clarifications, additions,
More informationPROJECT MANUAL for Phantom Canyon Tunnel Repair Project. Location On Fremont County Road miles North of Intersection US Highway 50 with FCR 67
August 28, 2018 PROJECT MANUAL for Phantom Canyon Tunnel Repair Project Location On Fremont County Road 67 7.5 miles North of Intersection US Highway 50 with FCR 67 Fremont County, Colorado OWNER: Fremont
More informationA D D E N D U M N O. 4
A D D E N D U M N O. 4 TO: PROJECT: All Prospective Bidders (T78) Drainage Improvements TxDOT CSJ No. Klotz Project No. 0500.041.002 ISSUE DATE: January 30, 2017 The following information is provided to