1107 E. Madison Street Student Housing Project. Monthly Update May 12, 2017

Size: px
Start display at page:

Download "1107 E. Madison Street Student Housing Project. Monthly Update May 12, 2017"

Transcription

1 1107 E. Madison Street Student Housing Project Monthly Update May 12, 2017 Anticipated Completion: Fall 2018 About the Project: This newly constructed building will be ten stories providing eight floors of additional student housing and two floors of space to consolidate student enrollment services. Seattle University has partnered with a private developer, Capstone Development Partners to finance, design, build, operate and maintain this building. More than 300 new beds of housing will be available for junior and senior students. Capstone Development has hired Howard S. Wright Construction (HSW) as their General Contractor. Capstone Development Partners will provide a project bulletin once a month to keep the campus community informed of their progress and provide notification of any construction impacts. CONSTRUCTION ACTIVITIES FOR MAY: Howard S. Wright Construction has moved some construction trailers into the visitor s parking week and set up will continue into the week of May 15. The construction fence will also be erected next week. HSW will start the excavation in lower parking area behind the storage building and commence demolition of the driveway between Xavier and Stumptown on Monday, 5/15/17. Over the next month there will be some noise and dust associated with the demolition of this driveway and excavation, but nothing related to these activities should be excessive. The contractor will be working on site Monday through Saturday. They are permitted to work between the hours of 7:00 am and 7:00 pm through City noise ordinances and the Master Use Permit for this project. In general, construction activity will take place from 7:00 am - 3:30 pm Monday through Saturday. No work will occur on Sundays. Some activities such as the erection and eventual

2 disassembly of the tower crane, concrete slab placement, etc., will require longer hours on weekdays or Saturdays. Fairly minimal demolition and jack-hammering is anticipated for project. Construction vehicles will enter the site off Spring St. and will exit north onto Madison St. from Madison Court. Current Progress: Mobilization Commencement of construction CONSTRUCTION ACTIVITIES FOR NEXT WEEK: Site Work Erection of construction fencing Set up erosion controls Soil excavation Demolition of existing driveway between Xavier and Stumptown

3 Looking Ahead: Erect tower crane late May WHAT TO EXPECT DURING CONSTRUCTION 1. Noise and Truck Emissions Trucks are not allowed to idle in front of doors and openings. 2. Building Monitoring HSW is required to monitor adjacent buildings for settlement and will conduct weekly surveys through level 1 concrete slab placement at street level. 3. Dust Control This project will adhere to Puget Sound Clean Air Agency's regulation and City of Seattle's best practices regarding demolition activity and dust emissions. During demolition, excavation, and construction, exposed areas will be sprinkled to control dust. Transported material will be covered or wet. Any dirt/debris tracked off site will be cleaned immediately. 4. Trash/Pest Control Phase I (see attached Logistics Plans) Dumpsters and trash/recycling/compost/oil drum containers will be accessible to trash vendors via Madison Court. HSW will coordinate location of bins with bin vendors. Phase 2&3 - Dumpsters/containers to be located at top of south driveway ramp. A temporary enclosure will be erected if needed. Seattle University pest control preventative measures will continue as usual on adjacent properties and on site until construction starts. HSW/Capstone to seek opinion of Pest Control expert on potential for increased activity due to displacement by construction. Areas will be monitored for any increased activity. 5. Construction Traffic and Parking Construction delivery/truck traffic will be isolated to Spring Street and Madison Court. Appropriate signage, fencing, and flaggers will be in place to ensure safety for adjacent properties and pedestrians. Construction workers are not allowed to park on adjacent streets. Enforcement / corrective actions for construction workers:

4 HSW has a Disciplinary Action Program as part of our Site Specific Safety Plan. This includes verbal warning, written warning, and termination. Any of these can be implemented depending on the severity of the offense. WANT TO KNOW MORE? Project Website: City of Seattle Noise Ordinances: 25ENPRHIPR_CH25.08NOCO_SUBCHAPTER_IGEPR City of Seattle Noise Abatement Program: pds pdf How Loud is That?: The following web site will help indicate common daily noise levels as well as those which you may hear in connection with this construction project: If you have questions: Should you have specific questions or concerns caused by the construction activity of the 1107 E Madison, please contact the construction manager, project superintendent or project manager who will be on-site daily during the construction. Rick Meserve, Construction Manager Phone: (206) RMeserve@capston .com Ed Spencer, Project Superintendent Phone: (206) SpencerE@hswc.com Mark Kim, Project Manager Phone: (206) KimM@hswc.com Should you wish to speak with someone at Seattle University:

5 Martha Turnbull, Project Manager Phone: (206) In the event of an emergency, please call 911 and the Department of Public Safety at Capstone Development Construction Phasing Plans: Please refer to the HSW logistics plans located on the project web site for an explanation of what happens on or near our campus during different phases of construction.

6

7

8

9

BARRY S CORNER. Draft Construction Management Plan

BARRY S CORNER. Draft Construction Management Plan 1. Introduction Project description BARRY S CORNER Draft Construction Management Plan 11-21-2013 Prepared for: Boston Transportation Department Project Proponent: Samuels & Associates Construction Manager

More information

MAINE MEDICAL CENTER

MAINE MEDICAL CENTER MAINE MEDICAL CENTER Construction Projects at the East Tower, Visitor Garage, Central Utility Plant Construction Management Plan December 15, 2017 Prepared for: Portland Department of Planning & Urban

More information

Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING Oak Avenue. Evanston, IL 60201

Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING Oak Avenue. Evanston, IL 60201 Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING 1727 Oak Avenue Evanston, IL 60201 General Contractor Owner Architect Construction Management Plan Phase 1 3 October

More information

TRAFFIC MANAGEMENT PLAN REQUIREMENTS FOR COMMERCIAL/LARGE DEVELOPMENT SITES

TRAFFIC MANAGEMENT PLAN REQUIREMENTS FOR COMMERCIAL/LARGE DEVELOPMENT SITES TRAFFIC MANAGEMENT PLAN REQUIREMENTS FOR COMMERCIAL/LARGE DEVELOPMENT SITES The District of West Vancouver requires a Traffic Management Plan (TMP) to be submitted for acceptance by the Land Development

More information

Exhibit G. Construction Mitigation Plan

Exhibit G. Construction Mitigation Plan Exhibit G Construction Mitigation Plan Construction Period Mitigation 1. A construction period mitigation plan shall be prepared by the applicant for approval by the Public Works Department prior to issuance

More information

ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM

ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM Each applicant needs to thoroughly review the conditions of development issued by the Planning Division in the format of a Resolution approving your project

More information

811 Emerson St. - Demolition & Site Prep

811 Emerson St. - Demolition & Site Prep 811 Emerson St. - Demolition & Site Prep 811 Emerson St. Evanston, IL 60201 CA Focus Evanston Property Owner, LLC General Contractor Owner Architect Construction Management Plan Phase I January 24t h,

More information

NEW CONSTRUCTION APPLICATION

NEW CONSTRUCTION APPLICATION NEW CONSTRUCTION APPLICATION CONSTRUCTION COMMITMENT AND CONTRACTOR GUIDELINES The General Contractor is solely responsible for the compliance of these guidelines by all subcontractors, suppliers, and

More information

CONSTRUCTION MANAGEMENT PLAN REQUIREMENTS MANUAL

CONSTRUCTION MANAGEMENT PLAN REQUIREMENTS MANUAL CONSTRUCTION MANAGEMENT PLAN REQUIREMENTS MANUAL This manual applies to all development projects within Pitkin County. Contact the Planning Department at 970-429-2799 with any questions. November 2017

More information

ARCHITECTUS FEBRUARY 2010

ARCHITECTUS FEBRUARY 2010 ARCHITECTUS PEDESTRIAN AND TRAFFIC MANAGEMENT PLAN FOR DEMOLITION, EXCAVATION AND CONSTRUCTION OF COLLEGE OF FINE ARTS CAMPUS, PADDINGTON FEBRUARY 2010 COLSTON BUDD HUNT & KAFES PTY LTD ACN 002 334 296

More information

LAKE + FOREST CONSTRUCTION TIMELINE

LAKE + FOREST CONSTRUCTION TIMELINE LAKE + FOREST CONSTRUCTION TIMELINE Below is a construction timeline in connection with the project at Lake Street and Forest Avenue. All dates are approximate and subject to change based on weather and

More information

Existing Project Conditions. General Conditions Estimate. Michael Vergari Construction Management Advisor: Dr. Riley

Existing Project Conditions. General Conditions Estimate. Michael Vergari Construction Management Advisor: Dr. Riley Existing Project Conditions General Conditions Estimate The Center for Health Research and Rural Advocacy is constructed under the supervision of the Geisinger Facilities Division. The project team develops

More information

Robinson Landing Condominium Pre- Construction Meeting

Robinson Landing Condominium Pre- Construction Meeting Robinson Landing Condominium Pre- Construction Meeting March 22, 2018 Topics of Presentation 1. Team Introductions 2. Project Overview 3. Overall Schedule and Condominium Schedule (Draft) 4. Sequence of

More information

Woodbridge Redevelopment Update. CLC Meeting #6 Wednesday, December 13, 2017

Woodbridge Redevelopment Update. CLC Meeting #6 Wednesday, December 13, 2017 Woodbridge Redevelopment Update CLC Meeting #6 Wednesday, December 13, 2017 1. Introductions Agenda 2. Project Updates 3. Construction Updates Progress to Date What s Happening Now 3 Month Schedule 4.

More information

A. INTRODUCTION AND SUMMARY OF FINDINGS B. CONSTRUCTION SCHEDULE

A. INTRODUCTION AND SUMMARY OF FINDINGS B. CONSTRUCTION SCHEDULE Chapter 17: Construction A. INTRODUCTION AND SUMMARY OF FINDINGS This chapter discusses the various activities that would be involved in constructing Hamilton Green. The potential for significant adverse

More information

This brochure has been prepared by the Village to:

This brochure has been prepared by the Village to: Acknowledgement The Village of Downers Grove wishes to acknowledge the Downers Grove Coalition for Managed Redevelopment for their original publication upon which this was based. Published by Village of

More information

City of West Hollywood Construction Period Mitigation Plan

City of West Hollywood Construction Period Mitigation Plan City of West Hollywood Construction Period Mitigation Plan Construction in an urban environment like the City of West Hollywood, presents challenges that require a well thought-out construction period

More information

Robinson Landing: Townhouse Pre-Construction Presentation January 9, 2018

Robinson Landing: Townhouse Pre-Construction Presentation January 9, 2018 Robinson Landing: Townhouse Pre-Construction Presentation January 9, 2018 Topics of Presentation 1. Team Introductions 2. Project Overview Location, Aerial View & Site Plan 3. Overall Schedule 4. Sequence

More information

CONSTRUCTION MANAGEMENT PLAN LIMELIGHT HOTEL PREPARED FOR THE CITY OF KETCHUM, IDAHO

CONSTRUCTION MANAGEMENT PLAN LIMELIGHT HOTEL PREPARED FOR THE CITY OF KETCHUM, IDAHO CONSTRUCTION MANAGEMENT PLAN LIMELIGHT HOTEL PREPARED FOR THE CITY OF KETCHUM, IDAHO Table of Contents A. General Information and Schedule a. General Information Pg. 1 b. Site Location Map Pg. 2 c. Anticipated

More information

New Stadium Project. Construction Activity Mitigation Program. January 22, 2014

New Stadium Project. Construction Activity Mitigation Program. January 22, 2014 New Stadium Project Construction Activity Mitigation Program January 22, 2014 Construction Mitigation Plan Introduction It is the primary goal of HHRM, JV to minimize negative effects on traffic and the

More information

West Village, 70 Mississauga Road South, Mississauga. Construction Management Plan Phase I: Demolition & Remediation

West Village, 70 Mississauga Road South, Mississauga. Construction Management Plan Phase I: Demolition & Remediation West Village, 70 Mississauga Road South, Mississauga Construction Management Plan Phase I: Demolition & Remediation FINAL, revision 1 January 26, 2018 Table of Contents 1.0 INTRODUCTION... 2 2.0 HOARDING

More information

Date: May 4, Clare M. Look-Jaeger, P.E. Kevin C. Jaeger Linscott, Law & Greenspan, Engineers Weingart Projects Construction Traffic Analysis

Date: May 4, Clare M. Look-Jaeger, P.E. Kevin C. Jaeger Linscott, Law & Greenspan, Engineers Weingart Projects Construction Traffic Analysis MEMORANDUM To: CAJA Environmental Services, LLC Date: From: Subject: Clare M. Look-Jaeger, P.E. Kevin C. Jaeger Linscott, Law & Greenspan, Engineers Weingart Projects Construction Traffic Analysis LLG

More information

STREET ADDRESS OF EVENT: Description of Event:

STREET ADDRESS OF EVENT: Description of Event: TEMPORARY USE PERMIT STREET ADDRESS OF EVENT: Description of Event: To Run from: (Date) (Hour) AM PM To: (Date) (Hour) AM PM Applicant: (Print) Applicant address: (Print) City, State Zip: Phone: Fax: Email:

More information

Construction Method Statement

Construction Method Statement Construction Method Statement Introduction. The project involves the construction of the new Apartment Extra Car Home for Grwp Cynefin in Pothmadog, Gwynedd, Wales. The programme and construction methodology

More information

Construction Environment Management Plan. Planning Condition 5.

Construction Environment Management Plan. Planning Condition 5. Construction Environment Management Plan. Planning Condition 5. No development shall take place, including any works of demolition, until a construction method statement in respect of construction environment

More information

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12 SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and

More information

2018 Utility & Street Reconstruction

2018 Utility & Street Reconstruction 2018 Utility & Street Reconstruction Public Hearing On Proposed Special Assessments/Hookup Fees for Installation and Construction of Public Improvements Introduction of the Village technical staff Laura

More information

Noise Assessments for Construction Noise Impacts

Noise Assessments for Construction Noise Impacts Noise Assessments for Construction Noise Impacts Weixiong Wu a AKRF, Inc., 440 Park Avenue, 7th floor, New York, NY, 10016, USA. ABSTRACT Construction noise is one of the most disruptive noise sources

More information

PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: February 7, 2013

PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: February 7, 2013 PLANNED UNIT DEVELOPMENT & PLANNING APPROVAL STAFF REPORT Date: February 7, 2013 NAME LOCATION MAWSS Shelton Beach Road East side of Shelton Beach Road Extension, 2/10± mile North of Moffett Road CITY

More information

Request for Proposal for Construction Management Services

Request for Proposal for Construction Management Services Request for Proposal for Construction Management Services Sauk Rapid-Rice Public Schools is soliciting Construction Management (CM) proposals for safety and security projects to be completed at each of

More information

AGENDA REPORT. To: Attachments: 1. Site Location and Outreach Map 2. Recommended Permit Conditions 3. Fencing Location

AGENDA REPORT. To: Attachments: 1. Site Location and Outreach Map 2. Recommended Permit Conditions 3. Fencing Location 9 Meeting Date: May 8, 2018 Item Number: D 6 To: From: Subject: AGENDA REPORT Honorable Mayor & City Council Robert Welch, Acting City Engineer Raj Patel, City Building Official ASBESTOS ABATEMENT PERMIT

More information

District of North Vancouver Construction Traffic Management Plan Guidelines

District of North Vancouver Construction Traffic Management Plan Guidelines District of North Vancouver Construction Traffic Management Plan Guidelines The District of North Vancouver is committed to ensuring that the disruptions to the community and traffic associated with construction

More information

McLoughlin Point Wastewater Treatment Plant. CRD Contract No: CAWTP Submittal No: AGJV-PLAN-022. McLoughlin Point Traffic Management Plan

McLoughlin Point Wastewater Treatment Plant. CRD Contract No: CAWTP Submittal No: AGJV-PLAN-022. McLoughlin Point Traffic Management Plan McLoughlin Point Wastewater Treatment Plant CRD Contract No: CAWTP-17-006 Submittal No: AGJV-PLAN-022 McLoughlin Point Traffic Management Plan Quality Information Prepared by Checked by Approved by J.

More information

October 17, Albany MS Logistics Plan. Overview:

October 17, Albany MS Logistics Plan. Overview: October 17, 2017 Albany MS Logistics Plan Overview: The project consists of the development of a former school site which still contains fences, aggregate base, and asphalt surfaces into the new Albany

More information

B. DESCRIPTION OF CONSTRUCTION ACTIVITIES

B. DESCRIPTION OF CONSTRUCTION ACTIVITIES Chapter 15: Construction Impacts A. INTRODUCTION This chapter describes activities required for construction of Alternative A (the no action alternative) and the three build alternatives: Alternatives

More information

El Dorado Avenue

El Dorado Avenue A t t a c h m e n t 1 F i n d i n g s a n d C o n d i t i o n s 1995-1999 El Dorado Avenue Use Permit #08-10000055 JULY 10, 2008 CEQA FINDINGS 1. The project is categorically exempt from the provisions

More information

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES Environmental / Social issue/ aspect/ activity Anticipated negative impact Management and mitigation

More information

PART II - CODE OF ORDINANCES Chapter 16 - CONSTRUCTION, REHABILITATION AND PROPERTY MAINTENANCE REGULATIONS ARTICLE VIII. PROPERTY MAINTENANCE

PART II - CODE OF ORDINANCES Chapter 16 - CONSTRUCTION, REHABILITATION AND PROPERTY MAINTENANCE REGULATIONS ARTICLE VIII. PROPERTY MAINTENANCE Sec. 16-291. Construction site management. (a) Construction site management plan required. No building permit shall be issued unless a construction site management plan has been submitted and approved

More information

UC Press Building 2120 Berkeley Way Berkeley, CA

UC Press Building 2120 Berkeley Way Berkeley, CA CONSTRUCTION NOISE REDUCTION PROGRAM FOR: UC Press Building 2120 Berkeley Way Berkeley, CA RGD Project #: 17-057 PREPARED FOR: Berkeley Way, LLC 1958A University Ave. Berkeley, CA 94704 PREPARED BY: Harold

More information

Company/Product Listing/Logo Send web/print quality for table sign

Company/Product Listing/Logo Send web/print quality for table sign Included with exhibit space 1-6 table with linen 1 or 2 chairs, please specify 1-8 ½ x 11 table sign will be provided o Electrical is available upon request o Easel is not provided o Banners or Signs are

More information

ZAB Hearing May 14, 2015

ZAB Hearing May 14, 2015 ZAB Hearing May 14, 2015 Comments from April 23rd TOPICS Streamlined Environmental Review Protections for Berkeley High School Air Quality, Noise, and Traffic Project Alternatives Water Supply/Wastewater

More information

UCSF Mission Bay & Dogpatch Construction Community Meeting 11/7/2017

UCSF Mission Bay & Dogpatch Construction Community Meeting 11/7/2017 UCSF Mission Bay & Dogpatch Construction Community Meeting Agenda Welcome Project Communications Construction Context Project Updates Minnesota Housing Center for Vision Neuroscience Precision Cancer Medicine

More information

Discussion Demolition of the existing structure is nearly complete. Excavation and shoring will occur between May and August 2012.

Discussion Demolition of the existing structure is nearly complete. Excavation and shoring will occur between May and August 2012. Information Item Date: May 17, 2012 To: From: Subject: Mayor and City Council Martin Pastucha, Director of Public Works Temporary Relocation of Two Trees on 2 nd Street during the Construction of Parking

More information

MacKimmie Redevelopment Project Public Protection Site Safety Plan. Prepared by Stuart Olson Construction Ltd.

MacKimmie Redevelopment Project Public Protection Site Safety Plan. Prepared by Stuart Olson Construction Ltd. Prepared by Stuart Olson Construction Ltd. December 7, 2017 Table of Contents Project Overview...2 Construction Sequence...2 Phase 1 Tower Demolition and Redevelopment...2 Phase 2 Block & Link Demolition

More information

Kings 826 LP Project Manager: Demetri Oarmos Phone:

Kings 826 LP Project Manager: Demetri Oarmos Phone: ~COASTAL PACIFIC CONSTRUCTION. INC. Draft Construction Period Management Plan Project Location: 826 N Kings Road, West Hollywood, CA 90046 Date: March 10, 2015 Construction in an urban environment flke

More information

Discussion of the City of Vernon s COMPREHENSIVE ZONING ORDINANCE

Discussion of the City of Vernon s COMPREHENSIVE ZONING ORDINANCE Discussion of the City of Vernon s COMPREHENSIVE ZONING ORDINANCE Zones and Overlay Zones The Entire City is Zoned General Industrial (I) Overlay zones include: Commercial (C) Slaughtering (S) Rendering

More information

PROPOSED GOOD NEIGHBOUR BYLAW CONSULTATION Spring 2014

PROPOSED GOOD NEIGHBOUR BYLAW CONSULTATION Spring 2014 PROPOSED GOOD NEIGHBOUR BYLAW CONSULTATION Spring 2014 The City of Williams Lake wants to hear what you think about the proposed Good Neighbour Bylaw! E-mail your comments to bylawenforcement@williamslake.ca,

More information

Attachment 1 Findings and Conditions

Attachment 1 Findings and Conditions 2451 Ridge Road Use Permit #04-10000066 Attachment 1 Findings and Conditions APRIL 10, 2008 CEQA FINDINGS 1. The project is categorically exempt from the provisions of the California Environmental Quality

More information

13 February 8, 2012 Public Hearing APPLICANT:

13 February 8, 2012 Public Hearing APPLICANT: 13 February 8, 2012 Public Hearing APPLICANT: MID-ATLANTIC AUTO PROPERTY OWNER: DZR, LLC STAFF PLANNER: Leslie Bonilla REQUEST: Conditional Use Permit (truck rental, automobile service, and automotive/bulk

More information

SECTION TEMPORARY FACILITIES AND CONTROLS

SECTION TEMPORARY FACILITIES AND CONTROLS SECTION 015000 TEMPORARY FACILITIES AND CONTROLS PART 1 - GENERAL 1.1 GENERAL A. Each Contractor shall be responsible for arranging for and providing construction facilities and temporary controls as required

More information

Coto de Caza Community Association

Coto de Caza Community Association ARCHITECTURAL REVIEW PACKAGE Dear Homeowner: Enclosed are the Architectural Application forms that all Coto de Caza Village homeowners are required to submit before making any exterior modifications to

More information

Date of Inspection 10 August 2017 Location of Inspection Manildra Solar Farm. ER Demelza Scott Proponent Representative Bjorn Schultz

Date of Inspection 10 August 2017 Location of Inspection Manildra Solar Farm. ER Demelza Scott Proponent Representative Bjorn Schultz Manildra Solar Farm ER Site Inspection Report Manildra Solar Farm Construction Environmental Representative (ER) Inspection Report For internal project use only. Document not for external release or use.

More information

Construction Notice: Infrastructure Renewal on York and Talbot Streets

Construction Notice: Infrastructure Renewal on York and Talbot Streets Construction Notice: Infrastructure Renewal on York and Talbot Streets Date: March 22, 2019 To: Business owner, resident and/or property owner Project Details: The City of London in partnership with J-AAR

More information

PRESSMAN ACADEMY ECC PROJECT TEMPLE BETH AM

PRESSMAN ACADEMY ECC PROJECT TEMPLE BETH AM The following mitigation measures noted in red are typically required by the City, the italicized mitigation measures are required per the proposed Mitigated Negative Declaration (Case No. ENV-2011-1535-MND)

More information

Expo Operations & Maintenance Facility. Operations and Maintenance Facility Pre-Construction Meeting July 10, 2013

Expo Operations & Maintenance Facility. Operations and Maintenance Facility Pre-Construction Meeting July 10, 2013 Operations and Maintenance Facility Pre-Construction Meeting July 10, 2013 Meeting Agenda Pre-Construction Meeting Meeting Purpose and Format Project Status Update Introduction of Construction Contractor

More information

ATTACHMENT A. Bid # 6793

ATTACHMENT A. Bid # 6793 ATTACHMENT A SCOPE OF WORK TECHNICAL SPECIFICATIONS AND CONTRACT DRAWINGS STORAGE SHED INSTALLATION AT THE SAN JOAQUIN COUNTY HOUSEHOLD HAZARDOUS WASTE FACILITY Bid # 6793 Department of Public Works Solid

More information

Q. CONSTRUCTION IMPACTS

Q. CONSTRUCTION IMPACTS Q. CONSTRUCTION IMPACTS 1. Construction Plan As noted on Exhibit 3Q-1, Overall Phasing Plan and SWPPP Notes, construction of the Proposed Project is anticipated to include five phases. The entire construction

More information

To: Hyoksang Kwon, COBE Construction From: Joshua Marcley, Mei Wu Acoustics

To: Hyoksang Kwon, COBE Construction From: Joshua Marcley, Mei Wu Acoustics Experts in acoustics, noise and vibration To: Hyoksang Kwon, COBE Construction hyoksang@cobeinc.com From: Joshua Marcley, josh@mei-wu.com Mei Wu, meiwu@mei-wu.com Date: May 24, 2016 Subject: Cal Water

More information

CHAPTER INDUSTRIAL DISTRICTS 317 (11/14)

CHAPTER INDUSTRIAL DISTRICTS 317 (11/14) 16.24.010 CHAPTER 16.24 INDUSTRIAL DISTRICTS Sections: 16.24.010 Purpose. 16.24.020 Permitted Uses. 16.24.030 Development Standards for Industrial Districts. Tables: 16.24.1 Uses in Industrial Districts.

More information

AND STATEMENT OF EVIDENCE OF CHRIS FISHER

AND STATEMENT OF EVIDENCE OF CHRIS FISHER IN THE MATTER of the Resource Management Act 1991 AND IN THE MATTER of applications by CYPRESS CAPITAL LIMITED to the TAUPO DISTRICT COUNCIL under section 88 of the Act to authorise construction and use

More information

11 Ways to Avoid Storm Water Fines. No Exceptions!

11 Ways to Avoid Storm Water Fines. No Exceptions! 11 Ways to Avoid Storm Water Fines Do not start until you have gone over this with a SWPPP Rep. No Exceptions! 1. Contact Mark Atwood at 801-319-1331 or Jake Pettersson at 801-709-4463. 2. Submit a Notice

More information

Application for a Residential Building Permit

Application for a Residential Building Permit Town of Chevy Chase 301-654-7144 (phone) 4301 Willow Lane 301-718-9631 (fax) Chevy Chase, MD 20815 townoffice@townofchevychase.org Town Permit No.: Application for a Residential Building Permit Please

More information

DECLARATION OF COVENANTS, CONDITIONS AND RESTRICTIONS RADIANT LAKE ESTATES SUPPLEMENTAL ARCHITECTURAL GUIDELINES ARTICLE I INTRODUCTION AND POLICY

DECLARATION OF COVENANTS, CONDITIONS AND RESTRICTIONS RADIANT LAKE ESTATES SUPPLEMENTAL ARCHITECTURAL GUIDELINES ARTICLE I INTRODUCTION AND POLICY DECLARATION OF COVENANTS, CONDITIONS AND RESTRICTIONS RADIANT LAKE ESTATES SUPPLEMENTAL ARCHITECTURAL GUIDELINES ARTICLE I INTRODUCTION AND POLICY SECTION 1.1. Pursuant to the Declaration of Covenants,

More information

BURNABY BUILDING DEPARTMENT

BURNABY BUILDING DEPARTMENT Building Information BURNABY BUILDING DEPARTMENT Infill Housing - Be a Good Neighbour The purpose of this brochure is to provide contractors, builders and homeowners with information and ideas on what

More information

CONSTRUCTION REGULATIONS

CONSTRUCTION REGULATIONS CONSTRUCTION REGULATIONS JULY 2018 Construction Regulations Table of Contents CHAPTER 1 - CONSTRUCTION REGULATIONS 1 1.1 Building Envelope 2 1.2 OSHA Compliance 2 1.3 Pre-Construction Conference, Construction

More information

Parnassus Construction Projects Community Meeting. August 22, 2018

Parnassus Construction Projects Community Meeting. August 22, 2018 Parnassus Construction Projects Community Meeting August 22, 2018 Agenda 1. Welcome 2. Project Communications 3. 5 th and Kirkham Traffic-Calming Schedule 4. UCSF Parnassus Heights Campus Projects Questions

More information

Sugar Ridge Commons New Home Plans Approval Request Form (Rev. March/2018)

Sugar Ridge Commons New Home Plans Approval Request Form (Rev. March/2018) Sugar Ridge Commons New Home Plans Approval Request Form (Rev. March/2018) ++++++++++++++++++++++++++++++++ Complete the following information and return it to the SRC Architectural Review Committee, Roger

More information

UCLH Community Liaison Group

UCLH Community Liaison Group UCLH Community Liaison Group Tuesday 2 nd June, 6.30pm UCLH Phase 4 Agenda 1. Introductions Bouygues UK Preferred bidder on Phase 4 2. Advanced Works Agreement Planned activities on site by Bouygues UK

More information

Welcome. Welcome to the Wastewater Treatment Project s community meeting about Niagara Street.

Welcome. Welcome to the Wastewater Treatment Project s community meeting about Niagara Street. Welcome NIAGARA STREET COMMUNIT Y MEETING Welcome to the Wastewater Treatment Project s community meeting about Niagara Street. Thank you for coming to the community meeting. We are here to provide information

More information

We re building for your future KEEPING YOU INFORMED ON ALL CONSTRUCTION NEWS FROM TRAFALGAR PLACE HELPLINE ISSUE 01 SUMMER 2013

We re building for your future KEEPING YOU INFORMED ON ALL CONSTRUCTION NEWS FROM TRAFALGAR PLACE HELPLINE ISSUE 01 SUMMER 2013 We re building for your future KEEPING YOU INFORMED ON ALL CONSTRUCTION NEWS FROM TRAFALGAR PLACE HELPLINE 020 3697 6220 elephantandcastle.org.uk ISSUE 01 SUMMER 2013 Investing in Elephant & Castle ISSUE

More information

O. NOISE. 1. Existing Conditions. 2. Future without the Proposed Project

O. NOISE. 1. Existing Conditions. 2. Future without the Proposed Project O. NOISE 1. Existing Conditions Existing ambient noise conditions at the Project Site reflect surrounding land uses. As described previously (see Chapter 3.A, Land Use, Zoning and Public Policy), predominant

More information

RIVER GOOSE ESTATE PLAN SUBMISSION PROCEDURE

RIVER GOOSE ESTATE PLAN SUBMISSION PROCEDURE 1) Plan Submission Procedure 2) Plan Submission Form 3) Building Procedure 4) Site Handover Form 5) Contractors rules and regulations 6) River Goose Builders Contract 7) Architectural Guidelines 8) River

More information

GOOD NEIGHBOUR COMMITMENT

GOOD NEIGHBOUR COMMITMENT GOOD NEIGHBOUR COMMITMENT GOOD NEIGHBOUR COMMITMENT BC Hydro is committed to being a good neighbour in the communities in which we work and to treating our neighbours with respect and consideration. We

More information

GENERAL GUIDELINES FOR CONTRACTORS AND SUB-CONTRACTORS FOR CARTER PLANTATION COMMUNITY

GENERAL GUIDELINES FOR CONTRACTORS AND SUB-CONTRACTORS FOR CARTER PLANTATION COMMUNITY GENERAL GUIDELINES FOR CONTRACTORS AND SUB-CONTRACTORS FOR CARTER PLANTATION COMMUNITY GENERAL REGULATIONS All builders of residences at Carter Plantation must be licensed by the State of Louisiana. At

More information

SECTION 55A1 ROBINSON TOWNSHIP, WASHINGTON COUNTY

SECTION 55A1 ROBINSON TOWNSHIP, WASHINGTON COUNTY WEEK ENDING SEPTEMBER 14, 2018 SECTION 55A1 ROBINSON TOWNSHIP, WASHINGTON COUNTY Contractor: Independence Excavating, Inc 1. Work Shift Day shift (M-F) with Saturday as a makeup day. 2. Traffic Candor

More information

Sydney Port Botany Terminal 3 Project Out of Hours Works Protocol

Sydney Port Botany Terminal 3 Project Out of Hours Works Protocol 1/11 Terms and Definitions The following terms, abbreviations and definitions are used in this plan: Terms Explanation SPBT3 Sydney Port Botany Terminal 3 CEMP EM EPA ERAP OEH PAH OOHWP EIS MCoA Distribution

More information

Ziveli Property Developments

Ziveli Property Developments Drafted by : HOVEKA INC 3 rd FLOOR, WKH HOUSE, AUSSPANNPLATZ, WINDHOEK A SWANEPOEL/ Ziveli Property Developments ZIVELI LIFESTYLE VILLAGE BUILDERS CODE OF CONDUCT OF THE ZIVELI LIFESTYLE VILLAGE 2 Annexure

More information

de-construction of Old City Hall

de-construction of Old City Hall de-construction of Old City Hall for the CITY OF GREEN COVE SPRINGS, FL 229 Walnut Street Green Cove Springs, Florida LOCATION MAP Sheet List Table T-1 COVER SHEET TEMPORARY FENCE PLAN LEGEND: GRAPHIC

More information

811 Emerson St. - Mixed Use Building

811 Emerson St. - Mixed Use Building 8 Emerson St. - Mixed Use Building 8 Emerson St. Evanston, IL 6020 CA Focus Evanston Property Owner, LLC General Contractor Owner Architect Construction Management Plan Phase 2-4 February 4t h, 208 TABLE

More information

PHOTOS- DEMOLITION OF USDA ARS BARLEY MALT RESEARCH FACILITY (LABORATORY) SITE PHOTOS

PHOTOS- DEMOLITION OF USDA ARS BARLEY MALT RESEARCH FACILITY (LABORATORY) SITE PHOTOS PHOTOS- DEMOLITION OF USDA ARS BARLEY MALT RESEARCH FACILITY (LABORATORY) SITE PHOTOS i Site Photos for Property Address: 0 alnut St, Madison, I PHOTOS- DEMOLITION OF USDA ARS BARLEY MALT RESEARCH FACILITY

More information

Parnassus Construction Projects Community Meeting. August 22, 2018

Parnassus Construction Projects Community Meeting. August 22, 2018 Parnassus Construction Projects Community Meeting August 22, 2018 Agenda 1. Welcome 2. Project Communications 3. UCSF Parnassus Heights Campus Projects Questions 4. UCSF Re-Envisioning Process Questions

More information

Introductions Project Updates Summary of Proposed Community Improvements Construction Impacts Management Open House

Introductions Project Updates Summary of Proposed Community Improvements Construction Impacts Management Open House May 22, 2018 1 Introductions Project Updates Summary of Proposed Community Improvements Construction Impacts Management Open House Rendering of Trail and Community Improvements at Project Completion 2

More information

SAFE WORK PROCEDURE 041 CONCRETE WORKS SEPTEMBER 2014 DOC. NO. D14/265945

SAFE WORK PROCEDURE 041 CONCRETE WORKS SEPTEMBER 2014 DOC. NO. D14/265945 MORELAND CITY COUNCIL Operations Centre 7-9 Walter Street Hadfield Vic 3046 Tel: 8311 4300 Approved by the Walter Street OHS committee Date: September 2014 Operation Brief Description of Activity Construction

More information

Delaware Street

Delaware Street A t t a c h m e n t 1 F i n d i n g s a n d C o n d i t i o n s 2004-06 Delaware Street Use Permit #09-10000052 APRIL 22, 2010 CEQA FINDINGS 1. The project is categorically exempt from the provisions of

More information

Welcome.

Welcome. Welcome Welcome to the consultation event for the proposed Construction and Environmental Management Plan (CEMP) for Taylor Wimpey Central London s development of Mount Pleasant. The CEMP relates to Phoenix

More information

Environmental Control Plan

Environmental Control Plan Environmental Control Plan Environmental Control Plan In accordance with Watts & Hughes Construction Waikato Bay of Plenty Limited. corporate strategies the Company has an Environment Control Plan which

More information

RE: Jackson Row - truck route

RE: Jackson Row - truck route Will Rasbach From: Sent: To: Cc: Subject: Mayor Pat Patterson Tuesday, January 13, 2015 3:46 PM Will Rasbach; Bart Robinson; Randy Barber (rbarber@oxfordms.net); jowens@oxfordpolice.net

More information

REPORT ON RESIDENTIAL INFILL HOUSING. City of Des Peres, Missouri. By Malcolm Drummond, AICP. Gartenberg Consulting Services. Creve Coeur, Missouri

REPORT ON RESIDENTIAL INFILL HOUSING. City of Des Peres, Missouri. By Malcolm Drummond, AICP. Gartenberg Consulting Services. Creve Coeur, Missouri REPORT ON RESIDENTIAL INFILL HOUSING City of Des Peres, Missouri By Malcolm Drummond, AICP Gartenberg Consulting Services Creve Coeur, Missouri March, 2005 1 TABLE OF CONTENTS Page INTRODUCTION... 3 INFILL

More information

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS

SECTION CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS PART 1 GENERAL 1.1 DESCRIPTION A. Temporary Utilities: Electricity, lighting, heating, cooling, ventilation, water, and sanitary facilities. B. Temporary Controls: Barriers, fencing, erosion control, exterior

More information

INTRODUCTION. A. Overview. A. Scope of Work. B. Additional Requirements

INTRODUCTION. A. Overview. A. Scope of Work. B. Additional Requirements RFP 2019-01 Reeta s Building Demolition City of Morgantown REQUEST FOR PROPOSALS Demolition Contractors INTRODUCTION A. Overview This Request for Proposals ( RFP ) is being issued by the City of Morgantown

More information

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc. 2004 Specifications CSJ 0299-04-049, Etc. SPECIAL PROVISION 000---979 Detours, Barricades, Warning Signs, Sequence of Work, etc. 1. Description of Project. A. General. This project provides for the construction

More information

SAFEGUARDS DURING CONSTRUCTION

SAFEGUARDS DURING CONSTRUCTION CHAPTER 14 SAFEGUARDS DURING CONSTRUCTION SECTION 1401 GENERAL [B] 1401.1 Scope. The provisions of this chapter shall govern safety during construction that is under the jurisdiction of this code and the

More information

TOWN OF OCEAN RIDGE CONSTRUCTION SITE MANAGEMENT HANDBOOK

TOWN OF OCEAN RIDGE CONSTRUCTION SITE MANAGEMENT HANDBOOK TOWN OF OCEAN RIDGE CONSTRUCTION SITE MANAGEMENT HANDBOOK I, swear (affirm) that I have read the Town of Ocean Ridge s Construction Site Management Handbook in its entirety and do hereby agree to comply

More information

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of July 18, 2015

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of July 18, 2015 ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of July 18, 2015 DATE: July 9, 2015 SUBJECT: U-3372-13-1, USE PERMIT AMENDMENT for an amendment to Condition #12.A.5) to permit construction

More information

ROCKAWAY BOARDWALK. PROJECT INFORMATIONAL SESSION Phase 4A Construction Logistics November 24, 2014

ROCKAWAY BOARDWALK. PROJECT INFORMATIONAL SESSION Phase 4A Construction Logistics November 24, 2014 ROCKAWAY BOARDWALK PROJECT INFORMATIONAL SESSION Phase 4A Construction Logistics November 24, 2014 Construction Phases Phase 3A B106-B115 Phase 3B B117-B126 Phase 2 B97-B107 Phase 1 B86 B97 Phase 4A B73-B86

More information

Mitigation Monitoring Program Campus Master Plan 2015

Mitigation Monitoring Program Campus Master Plan 2015 Mitigation Program Campus Master Plan 2015 California State University, Sacramento May 2015 Environmental Mitigation Program Sacramento Campus Master Plan 2015 Project Section 1: Authority This Environmental

More information

SMMUSD LINCOLN MIDDLE SCHOOL ATHLETIC FIELD PROJECT

SMMUSD LINCOLN MIDDLE SCHOOL ATHLETIC FIELD PROJECT ADDENDUM 01 SMMUSD LINCOLN MIDDLE SCHOOL ATHLETIC FIELD PROJECT 06/08/2017 DSA NO. A03-117787/File No.19-96 Prepared By DLR Group Project No. 75-07256-24 SECTION 00 91 00 GENERAL ADDENDUM 01 1.01 The following

More information

CONSTRUCTION PROJECT TEMPORARY FACILITIES SITING POLICY February 19, 2003

CONSTRUCTION PROJECT TEMPORARY FACILITIES SITING POLICY February 19, 2003 CONSTRUCTION PROJECT TEMPORARY FACILITIES SITING POLICY February 19, 2003 Authority: This policy has been approved by the Vice-Provost for Lands and Buildings. Summary: This policy outlines a procedure

More information

A D M I N I S T R A T I V E U S E P E R M I T

A D M I N I S T R A T I V E U S E P E R M I T Planning and Development Department Land Use Planning Division A D M I N I S T R A T I V E U S E P E R M I T 901 Arlington Avenue Project Description: To construct a 726 square foot, one-story addition

More information

OVERVIEW. Work Progress to Date Action Items Follow Up Community Relations Update Construction Phasing

OVERVIEW. Work Progress to Date Action Items Follow Up Community Relations Update Construction Phasing OVERVIEW Work Progress to Date Action Items Follow Up Community Relations Update Construction Phasing Construction Liaison Group Nov 7th, 2013 1 WORKS IN PROGRESS Construction Liaison Group Nov 7 th, 2013

More information