CONCRETE FORMWORK CHECKLIST AT SITE

Size: px
Start display at page:

Download "CONCRETE FORMWORK CHECKLIST AT SITE"

Transcription

1 CONCRETE FORMWORK CHECKLIST AT SITE Concrete formwork is a temporary supporting structure for concrete when it is placed at the construction site to keep the concrete in position and shape till it gets hardened. Checks for formwork should be carried out before concreting, during concreting and after removal of formwork. Concrete formwork possesses both quality and safety threats. If the formwork is not right for the concrete and work is being done at height, it may cause safety issue. Quality of concrete is affected when the formwork is not properly aligned, not leak proof etc. Proper storage of concrete formworks is also required to for cost economy of the project. CONCRETE FORMWORK CHECKLIST AT SITE: FORMWORK CHECKLIST FOR WALLS:

2 1. Ensure lateral bracings provided firmly supports the forms at all points of support. 2. Block out (stop end) braced to resist vertical and lateral loads. 3. Form panels are adequately braced and tied with each other. 4. Formwork corners shall be adequately tied to prevent leakage or bulging and spreading of concrete. 5. Ensure sufficient length is provided for wall ties and has sufficient strength and spacing as required. 6. Check wales for proper spacing and joints between should be staggered from one tier to the next. 7. In double member wales, one member left continuous across the location of form ties. 8. Wall ties and bolts tightened properly.

3 9. In case double member wales is used, both wales should have identical depths. 10. Check for adequate lap between forms and previously cast concrete. 11. Ensure that grout leakage does not occur at joints between panels and joints between old concrete and panels above them. 12. Check the provision of resistance against uplift in case of sloping faces of concrete formwork. 13. Ensure experienced supervisor is available at site while installing the wall forms and while placing concrete. FORMWORK CHECKLIST DURING CONCRETING: 1. Before concreting commences ensure proper access for workers involved in placing, compacting and finishing concrete. 2. Presence of experienced supervisor keeping a continuous watch for any dangerous situation. 3. Adequate supply of spare props, clamps, bolts, wedges and skilled workers at site. 4. Alignment, camber, level and plumb (verticality) maintained while concreting is in progress. 5. Effective depth between top and bottom reinforcement not disturbed. 6. Cover of concrete around reinforcement steel maintained as specified. 7. Grout loss due to movement at joints and corrective action taken against it.

4 8. Loosening of wedges and fixings due to vibrations transmitted to the formwork and corrective action against it. 9. Spilt concrete and/or grout cleaned immediately. 10. All wooden spreaders, to hold vertical form faces apart, removed after placing concrete. 11. Wooden members for creating pockets eased before concrete sets fully. 12. Concrete pouring sequence as per that shown on formwork drawing (avoid eccentric loading). 13. Prevention of heaping of concrete and high impact drops from concrete buckets. 14. Rate of concreting within allowable limits as shown on working drawing or as assumed while designing the formwork against lateral pressures. 15. Proper bond between layers of concrete, in case concrete is placed in layers, by ensuring that needle vibrator while vibrating the top layer also penetrates the lower layer.

5 CHECKLIST DURING FORMWORK STRIKING (STRIPPING OR REMOVAL): 1. Formwork design and layout such that smooth striking of formwork in sequential manner is possible. 2. Strength of concrete capable of taking self-weight and construction load on it. 3. Removal time to be ascertained depending on size, shape and span of the member, grade of concrete mix and its rate of gain of strength, type of cement, ambient temperature and weather conditions and extent of curing executed. 4. At the time of removal of side form, corners and edges not damaged. 5. Ties, clamps and wedges loosened and removed gradually. 6. Removal time in line with those specified in code of practice (IS ). 7. Props in case of beams and slabs removed in stages from mid-span working outwards. 8. Bolts, nuts, clamps, wedges collected in a box and not dropped carelessly. 9. Use of crowbars to prise open forms avoided. 10. Formwork prised loose using wooden wedges. 11. Formwork carefully lowered and not dropped and damaged. 12. Panel faces should be carefully removed and lowered without them hitting the scaffold projections. 13. Panels placed on leveled surface after removal.

6 14. Nail projections hammered down. 15. Cordoning off the area below the location where formwork removal is proposed. 16. Presence of competent crane operator and foreman. CHEKLIST FOR CLEANING AND STORAGE OF FORMWORK: 1. Formwork as soon as it is removed, cleaned with a stiff brush. 2. Dust, dirt, stubborn bits of concrete or grout removed. 3. Timber surface and uncoated ply coated with release agent before storing. 4. Steel form coated lightly with oil to prevent corrosion. 5. Damaged formwork sorted out and repaired before storage. 6. Depressions, nail holes repaired with suitable materials and lightly rubbed down to give smooth surface. 7. Panels and plywood sheets stored on a horizontally leveled floor. 8. Panels stored face to face to protect the surface. 9. Storage area protected from rain and moisture and well ventilated. 10. All formwork materials stacked off the ground. 11. Loose wailing, soldiers (struts) etc. stored with respective panels after numbering for proper match when reused. 12. Bolts, nuts, champs, pins, wedges, keys and ties stored in separate bins or boxes.

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION ITEM 03100 CONCRETE FORMWORK 1.0 GENERAL 1.1 DESCRIPTION This section defines requirements and limitations for design, construction, erection, and removal of concrete formwork for

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing

More information

Concrete Framing Systems - Walls and Columns

Concrete Framing Systems - Walls and Columns Concrete Framing Systems - Walls and Columns Casting a Concrete Wall Wall Footing Reinforcing Wall Forms Pouring Concrete Finishing the Concrete Controlling Cracking Insulating Concrete Forms (ICF) Tilt-Up

More information

SECTION CONCRETE FORMWORK AND ACCESSORIES

SECTION CONCRETE FORMWORK AND ACCESSORIES SECTION 03100 CONCRETE FORMWORK AND ACCESSORIES Part 1 GENERAL 1.01 SUMMARY A. Furnish equipment, materials, and labor required for construction and removal of forms for the containment of concrete to

More information

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK DIVISION 03 CONCRETE SPECIFICATION 031000: FORMS AND FORMWORK PART 1.0 GENERAL 1.1 DESCRIPTION The work of this specification includes furnishing of all labor, materials, equipment and incidentals to install,

More information

Reinforced Earth wall Construction Manual

Reinforced Earth wall Construction Manual COVER PAGE CT-PE-W02 Rev: 5 Reinforced Earth wall Construction Manual Concrete Facing Reinforced Earth Malaysia Sdn Bhd 80-1, Jalan 8/62A Bandar Menjalara 52200 Kuala Lumpur Tel : 03-62746162, Fax : 03-62747212

More information

GLOBALITE SYSTEMS. A Better Way of Building. The Patented Modular Extruded Aluminum Formwork System

GLOBALITE SYSTEMS. A Better Way of Building. The Patented Modular Extruded Aluminum Formwork System GLOBALITE SYSTEMS A Better Way of Building The Patented Modular Extruded Aluminum Formwork System Globalite Aluminum Form Panels, Fillers & Accessories Metric Sizes Copyright 2007 (01) Structural Contours,

More information

CONCRETE FORMWORK. .2 CSA , Supplement No.1 to CAN/CSA , Engineering Design in Wood. .4 CSA O151, Canadian Softwood Plywood.

CONCRETE FORMWORK. .2 CSA , Supplement No.1 to CAN/CSA , Engineering Design in Wood. .4 CSA O151, Canadian Softwood Plywood. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 03100-1 PART 1 GENERAL 1.1 Related Work.1 All Division 1 Specification Sections.2 Section 02233 Granular Base.3 Section 02311 Site Grading.4 Section 03200

More information

Interiors Sources Decor LLC. Method Statement BLOCK WORK. Civil Works 6/26/2016

Interiors Sources Decor LLC. Method Statement BLOCK WORK. Civil Works 6/26/2016 Method Statement BLOCK WORK Civil Works 6/26/2016 The purpose of this Work Method Statement for Block Works (Concrete Masonry Units) is to outline and describe in detail the procedure such as setting and

More information

FORMWORK PROCEDURES MANUAL CONTENTS Isometric Profile of MFE System Formwork 3 SECTION (1) - PRE-CONCRETE ACTIVITIES 1. Receipt Of Equipment On Site 2

FORMWORK PROCEDURES MANUAL CONTENTS Isometric Profile of MFE System Formwork 3 SECTION (1) - PRE-CONCRETE ACTIVITIES 1. Receipt Of Equipment On Site 2 FORMWORK PROCEDURES MANUAL ALL RIGHTS RESERVED. NO PART OF THIS PUBLICATION MAY BE REPRODUCED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS, INCLUDING PHOTOCOPYING AND RECORDING, WITHOUT THE WRITTEN PERMISSION

More information

Formwork being erected

Formwork being erected CONCRETE FORMWORK Formwork being erected Most of the pads and concrete footing poured Formwork for the parkade walls is built for each pour Most of the parkade walls been completed 2 TYPES OF FORMWORK

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 808 REINFORCED CONCRETE VAULTS

San Antonio Water System Standard Specifications for Construction ITEM NO. 808 REINFORCED CONCRETE VAULTS San Antonio Water System Standard Specifications for Construction ITEM NO. 808 REINFORCED CONCRETE VAULTS 808.1 DESCRIPTION: Reinforced concrete vaults shall be cast-in-place and shall include reinforcing

More information

1 Exam Prep Prov Module: Vertical Formwork Questions and Answers

1 Exam Prep Prov Module: Vertical Formwork Questions and Answers 1 Exam Prep Prov Module: 27308-14 Vertical Formwork Questions and Answers 1. The amount of formwork needed for a job can be influenced by. A. The size of the forming crew B. The project budget C. Materials

More information

SP Prop Steel prop. // Versatile, strong, safe

SP Prop Steel prop. // Versatile, strong, safe Steel prop // Versatile, strong, safe IMPORTANT: Any safety provisions as directed by the appropriate governing agencies must be observed when using our products. The pictures in this brochure are snapshots

More information

CONCRETE WORK CONCRETE WORK. Underground Electric Distribution Standards I. SCOPE APPLICABLE STANDARDS

CONCRETE WORK CONCRETE WORK. Underground Electric Distribution Standards I. SCOPE APPLICABLE STANDARDS Underground Electric Distribution Standards I. SCOPE This section includes the standards for concrete, reinforcing steel, formwork, concrete placement, curing, and construction joints. Concrete work for

More information

Division 03 - Concrete Section New Westminister Multi-Use Civic Facility & Office Building Project No Page 1

Division 03 - Concrete Section New Westminister Multi-Use Civic Facility & Office Building Project No Page 1 Project No. 210022 Page 1 PART 1 GENERAL 1.7 Documents.1 The General Conditions of the Canadian Standard Construction Document CCDC-2, together with all amendments and supplements and Division 1 General

More information

SECTION CONCRETE FORMWORK

SECTION CONCRETE FORMWORK SECTION 03100 CONCRETE FORMWORK PART 1 GENERAL 1.1 REFERENCES A. The following is a list of standards which may be referenced in this section: 1. American Concrete Institute (ACI): a. 117, Standard Specifications

More information

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate Colphene BSW Training and Application Guide Colphene BSW Waterproofing Membrane. 1. Prepare substrate Substrate must be structurally sound. Surface must be free of voids, spalled areas, loose aggregate,

More information

Lecture 2: Concrete Formworks Overview

Lecture 2: Concrete Formworks Overview CB 523 Methods and Equipment for Construction 1 Lecture 2: Concrete Formworks Overview Instructor: Dr. Ahmed Elyamany Courtesy of Dr. Ahmed Alhady Agenda Introduction to concrete Formwork Materials Used

More information

This article mainly focuses on the importance of Formwork

This article mainly focuses on the importance of Formwork Formwork Codes & Design - Key Points K.V. Srikanth Director, M/s.Formpro Engineers 96 This article mainly focuses on the importance of Formwork codes and the key points to be taken into account in Design

More information

2.15 CONCRETE PLACEMENT

2.15 CONCRETE PLACEMENT 2.15 CONCRETE PLACEMENT PRE-PLACEMENT CHECKLIST DATE: FOREMAN: JOB: Prior to placing concrete in Logix insulated concrete forms, be certain to mark off each item on the checklist provided in this section.

More information

INSTALLATION CHECKLIST 2 ND EDITION. Fox Blocks Abbott Drive Omaha, NE

INSTALLATION CHECKLIST 2 ND EDITION. Fox Blocks Abbott Drive Omaha, NE Fox Blocks INSTALLATION CHECKLIST ND EDITION Fox Blocks Installation Checklist: ND Edition 6110 Abbott Drive Omaha, NE 6110-69-6 WWW.FOXBLOCKS.COM INSTALLATION CHECKLISTS The Checklists on the following

More information

CONCRETE FOOTINGS AND WALLS Job Ready Checklist

CONCRETE FOOTINGS AND WALLS Job Ready Checklist CONCRETE FOOTINGS AND WALLS Job Ready Checklist This list is to be reviewed by the Builder/Superintendent to verify that the job site is ready for the Trade Contractor to arrive and begin work. Check box

More information

HANDSET WALL FORM. Handset Wall Form. Quick Assembly - can be built using only a hammer. Reduced weight increases productivity

HANDSET WALL FORM. Handset Wall Form. Quick Assembly - can be built using only a hammer. Reduced weight increases productivity HANDSET WALL FORM Quick Assembly - can be built using only a hammer Reduced weight increases productivity Unsurpassed flexibility in design and availability of panels for a wide variety of applications

More information

Heartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785)

Heartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785) Perma-Column Installation Instructions Unlike any other concrete post-frame foundation system, Perma-Column Precast Concrete Piers use 10,000 psi concrete and our unique Sturdi-Wall Plus wet-set bracket

More information

ITEM NO. 307 CONCRETE STRUCTURES

ITEM NO. 307 CONCRETE STRUCTURES ITEM NO. 307 CONCRETE STRUCTURES This item shall govern the construction of box culverts, headwalls, wingwalls, bridges, box transitions, approach slabs, retaining walls, inlets, storm sewer structures,

More information

***************************************************************************************************************

*************************************************************************************************************** 03100 CONCRETE FORMWORK *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 11 00 ***************************************************************************************************************

More information

SOUND & VIBRATION CONTROL FOR BUILDINGS. ISO-SEP 25HD High Dimple Rubber Isolation Mat Specification

SOUND & VIBRATION CONTROL FOR BUILDINGS. ISO-SEP 25HD High Dimple Rubber Isolation Mat Specification July, 2010 Fabricated Sound and Vibration Control Assemblies 13 48 23 [Project] SOUND & VIBRATION CONTROL FOR BUILDINGS ISO-SEP 25HD High Dimple Rubber Isolation Mat Specification This specification has

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 307 CONCRETE STRUCTURES

San Antonio Water System Standard Specifications for Construction ITEM NO. 307 CONCRETE STRUCTURES ITEM NO. 307 CONCRETE STRUCTURES 307.1 DESCRIPTION: This item shall govern the construction of box culverts, headwalls, wingwalls, bridges, box transitions, approach slabs, retaining walls, inlets, storm

More information

Important: Before You Start

Important: Before You Start Advantage ICF System Advantage ICF System TM Field Guide Important: Before You Start Does Your Building Inspector Know You Are Building with the Advantage ICF System? You are required to check with your

More information

Rapid Ply versatile, modular formwork

Rapid Ply versatile, modular formwork Rapid Ply Rapid Ply versatile, modular formwork Rapid Ply is an extremely cost effective formwork system because it can be used without the use of a crane and it only needs two workers to erect it. The

More information

VARIOUS TYPES, MATERIALS AND CONSTRUCTION TECHNIQUES

VARIOUS TYPES, MATERIALS AND CONSTRUCTION TECHNIQUES BW01 TECHNOLOGY OF CONSTRUCTIONS I 4th WEEK FORMWORK VARIOUS TYPES, MATERIALS AND CONSTRUCTION TECHNIQUES INTRODUCTION WHAT IS FORMWORK? 1. Formwork in construction is the use of support structures and

More information

SITE VISIT REPORT DATE: JOB: NO. OF VISIT: PAGE OF : PURPOSE OF VISIT: CONTRACTOR: Items to be checked Observations Actions SETTING OUT

SITE VISIT REPORT DATE: JOB: NO. OF VISIT: PAGE OF : PURPOSE OF VISIT: CONTRACTOR: Items to be checked Observations Actions SETTING OUT SETTING OUT Correct to boundaries Correct to building lines? Diagonals accurate? Levels correct? EXCAVATIONS Adjoining structures OK? Centres of foundations line with walls? Bottoms of trenches uniform,

More information

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS. A. Formwork complete with shoring, bracing and anchorage.

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS. A. Formwork complete with shoring, bracing and anchorage. SECTION 02528 CONCRETE CURBS, GUTTERS AND SIDEWALKS PART 1 GENERAL 1.01 WORK INCLUDED A. Formwork complete with shoring, bracing and anchorage. B. Concrete reinforcement complete with required supports,

More information

Site Preparation... 2

Site Preparation... 2 TRUFIREWALLS INSTALLATION MANUAL This Installation Manual is intended to assist in the preparation and installation of TruFireWalls products manufactured by Oldcastle Enclosure Solutions. The TruFireWalls

More information

SECTION RESINOUS FLOORING

SECTION RESINOUS FLOORING SECTION 09705 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work of this Section includes all materials and installation necessary to provide resinous flooring system with integral cove base and top finish

More information

User Manual. Formwork System.

User Manual. Formwork System. User Manual Formwork System www.scformwork.com Content Square column system...3 Specs & Capability...4 How to set up...5 Clamps...7 Pour rate & Safe filling height...09 Circular column system...11 Detail

More information

KIM Best Practices Guide for Shotcrete Nov 2013

KIM Best Practices Guide for Shotcrete Nov 2013 Contents 1. What This Document Is For 2. Materials You Will Need 3. Receiving Surfaces For Shotcrete 4. Pre-Shoot Inspection and Preparation 5. Control Joint Spacing 6. How to Install Control Joints o

More information

Temporary Structures. Formwork For Concrete ATCE--II. Advanced Topics in Civil Engineering Formwork for Concrete ATCE-II

Temporary Structures. Formwork For Concrete ATCE--II. Advanced Topics in Civil Engineering Formwork for Concrete ATCE-II Temporary Structures Formwork For Concrete : Temporary Structures The first part of will deal with the materials, methods and techniques associated with temporary structures utilized in various construction

More information

CONCRETE SLABS Job Ready Checklist

CONCRETE SLABS Job Ready Checklist CONCRETE SLABS Job Ready Checklist This list is to be reviewed by the Builder/Superintendent to verify that the job site is ready for the Trade Contractor to arrive and begin work. Check box when complete

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

Concrete Prestressed Concrete Pretensioned Concrete Posttensioned Concrete Typical Tendon Layout

Concrete Prestressed Concrete Pretensioned Concrete Posttensioned Concrete Typical Tendon Layout Concrete 45 1.13.0 Prestressed Concrete Concrete in which internal stresses (forces) are induced by means of prestressing steel tendons such that tensile stresses resulting from loads are counteracted

More information

ORDINANCE NO BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BOULDER, COLORADO: CHAPTER 98 - Baled Straw Structures SECTION PURPOSE

ORDINANCE NO BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BOULDER, COLORADO: CHAPTER 98 - Baled Straw Structures SECTION PURPOSE ORDINANCE NO. 5891 AN ORDINANCE AMENDING CHAPTER 10-5, B.R.C. 1981, CONCERNING ALTERNATIVE BUILDING MATERIALS, INCLUDING ADOBE AND STRAW BALE CONSTRUCTION AND RECYCLED LUMBER. BE IT ORDAINED BY THE CITY

More information

PRODUCTION SPECIFICATIONS INSULATED CONCRETE FORMS

PRODUCTION SPECIFICATIONS INSULATED CONCRETE FORMS PRODUCTION SPECIFICATIONS SECTION 03135 INSULATED CONCRETE FORMS PART 1 GENERAL 1.1 SECTION INCLUDES A. Insulated panel permanent concrete form system for: 1. Exterior structural wall panels. 2. Interior

More information

PRODUCTION SPECIFICATIONS INSULATED CONCRETE FORMS

PRODUCTION SPECIFICATIONS INSULATED CONCRETE FORMS PRODUCTION SPECIFICATIONS SECTION 03135 INSULATED CONCRETE FORMS PART 1 GENERAL 1.1 SECTION INCLUDES A. Insulated panel permanent concrete form system for: 1. Exterior structural wall panels. 2. Interior

More information

CHAPTER 13 - MECHANICALLY STABILIZED EARTH WALLS AND PATENTED EARTH RETAINING SYSTEMS

CHAPTER 13 - MECHANICALLY STABILIZED EARTH WALLS AND PATENTED EARTH RETAINING SYSTEMS CHAPTER 13 - MECHANICALLY STABILIZED EARTH WALLS AND PATENTED EARTH RETAINING SYSTEMS DS Temple 13.1 SCOPE This section covers the inspection of mechanically stabilized earth walls and other patented earth

More information

11/09/2018 LBP licence classes

11/09/2018 LBP licence classes LBP licence classes Occupational Licensing aims to ensure that people in the building industry are competent and accountable so that homes and buildings are designed and built right first time. Summary

More information

Below-grade pours (such as foundations) can be done out of the chute of the concrete truck or conveyer, however using a pump is best.

Below-grade pours (such as foundations) can be done out of the chute of the concrete truck or conveyer, however using a pump is best. Concrete Placement Below-grade pours (such as foundations) can be done out of the chute of the concrete truck or conveyer, however using a pump is best. Above-grade pours require lifting equipment. Most

More information

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site Installing DELTABEAM Installation of DELTABEAM These DELTABEAM installation instructions are intended to complement the project s erection plan. Peikko s technical support can help with the erection plan

More information

Reinforced Concrete. S.Sreenath 17 May 2016

Reinforced Concrete. S.Sreenath 17 May 2016 Reinforced Concrete S.Sreenath 17 May 2016 Curing of Concrete Hardening of concrete is dependent on the presence of water. During mixing normally more water for full hydration. It is always necessary to

More information

Concrete weighs about 150 pounds per cubic foot

Concrete weighs about 150 pounds per cubic foot At Bassora, where they have no timber, they make arches without any frame. The mason, with a nail and a bit of string, marks a semicircle on the ground, lays his bricks, fastened together with a gypsum

More information

4.16. APPLICATION INSTRUCTIONS Construction Joints & Details

4.16. APPLICATION INSTRUCTIONS Construction Joints & Details APPLICATION INSTRUCTIONS Construction Joints & Details 4.16 Krystol Waterstop System DESCRIPTION The Krystol Waterstop System is used to permanently waterproof concrete construction joints. It is installed

More information

Glasboard Liners. installation details. Installation Guide for Glasbord Fibreglass Reinforced Plastic (FRP) panels

Glasboard Liners. installation details. Installation Guide for Glasbord Fibreglass Reinforced Plastic (FRP) panels Glasboard Liners installation details Installation Guide for Glasbord Fibreglass Reinforced Plastic (FRP) panels PLEASE READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION These guidelines are provided

More information

Pulaski County, Virginia

Pulaski County, Virginia Pulaski County, Virginia Typical Retaining Wall Details Based on the 2009 International Residential Code CONTENTS Timber Retaining Wall... 2 General Requirements... 2 Wall Construction... 2 Deadmen...

More information

Table of Contents Big expertise. Real convenience. Concrete commitment.

Table of Contents Big expertise. Real convenience. Concrete commitment. Table of Contents General Shoring Safety Rules As Recommended By The Scaffolding, Shoring And Forming Institute... 1 General Guidelines... 1 Single And Independent Post Shore System Safety Rules As Recommended

More information

Elevated Slab Sequence

Elevated Slab Sequence Elevated Slab Sequence The following group of photos shows the sequence for installa4on of a one- way elevated slab. (Slab & Beam with Reinforcing & Post- Tensioning) Columns Placed & Form Support (Scaffolding)

More information

SECTION DAMPPROOFING AND MEMBRANE WATERPROOFING. 2. Cast-in-place concrete structures; Section

SECTION DAMPPROOFING AND MEMBRANE WATERPROOFING. 2. Cast-in-place concrete structures; Section 07100-1 of 7 SECTION 07100 DAMPPROOFING AND MEMBRANE WATERPROOFING 07100.01 GENERAL A. Description Dampproofing and membrane waterproofing shall include, but not necessarily be limited to, furnishing and

More information

SECTION ARCHITECTURAL CONCRETE

SECTION ARCHITECTURAL CONCRETE SECTION 033300 PART 1 - GENERAL 1.1 SUMMARY Section includes cast-in-place architectural concrete including form facings, reinforcement accessories, concrete materials, concrete mixture design, placement

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

Lecture 13 CONCRETE WORKS

Lecture 13 CONCRETE WORKS Lecture 13 TSP-308 MPK Ferdinand Fassa CONCRETE WORKS Concrete works Concrete is a man-made (rock) construction material, which is a mixture of portland cement, water, aggregates, and in some cases, admixtures.

More information

Temporary Structures. Form Materials and Accessories ATCE--II. Advanced Topics in Civil Engineering Form Materials and Accessories ATCE-II

Temporary Structures. Form Materials and Accessories ATCE--II. Advanced Topics in Civil Engineering Form Materials and Accessories ATCE-II Temporary Structures Form Materials and Accessories Practically all formwork jobs require some lumber. Local supplier will advise what material and sizes are in stock or promptly obtainable, and the designer

More information

Installation Guidelines Plibrico. Plastic Refractories. Technical Bulletin

Installation Guidelines Plibrico. Plastic Refractories. Technical Bulletin Technical Bulletin Plibrico Plibrico plastic refractories are stiff, moist, putty-like materials. Plibrioc plastics are available with two different bonding systems: clay/air bond plastics and chemically

More information

TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:

TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following: PART 1 GENERAL 1.01 SUMMARY SECTION 03460 TILT-UP PRECAST CONCRETE SANDWICH PANELS A. Work includes, but is not limited to, the following: 1. Architectural precast concrete sandwich wall panels. 2. Integral

More information

Heavy Rib. Page 1 of 6. Expanded Mesh & Metal Products. Key Product Features:

Heavy Rib. Page 1 of 6. Expanded Mesh & Metal Products. Key Product Features: TMI- is used widely in construction work for joints, stop-end, retaining walls and columns. It creates a strong bond base for successive pours. is fixed as permanent formwork. Key Product Features: Unique

More information

AAG R-MAX. installation & maintenance. knowledge matters world of opportunities safe solutions

AAG R-MAX. installation & maintenance. knowledge matters world of opportunities safe solutions AAG R-MAX installation & maintenance knowledge matters world of opportunities safe solutions INTRODUCTION This manual gives the main list of the most important operations to correctly install the AAG bridge

More information

SECTION CONCRETE PAVING

SECTION CONCRETE PAVING SECTION 32 13 13 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for providing portland cement concrete work and all other incidental concrete improvements for the project

More information

1. Cast-in-place concrete is specified in Section

1. Cast-in-place concrete is specified in Section SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record

More information

Technical Notes 11B - Guide Specifications for Brick Masonry, Part 3 Rev [Feb. 1972] (Reissued Sept. 1988) INTRODUCTION

Technical Notes 11B - Guide Specifications for Brick Masonry, Part 3 Rev [Feb. 1972] (Reissued Sept. 1988) INTRODUCTION Technical Notes 11B - Guide Specifications for Brick Masonry, Part 3 Rev [Feb. 1972] (Reissued Sept. 1988) INTRODUCTION This Technical Notes contains the guide specifications in CSI format for Part III

More information

GOVIND SHUTTERING STORE. Quality Assured Consistent Delivery

GOVIND SHUTTERING STORE. Quality Assured Consistent Delivery GOVIND SHUTTERING STORE Quality Assured Consistent Delivery About us Govind Shuttering Store is a performance based service driven, renowned name in scaffolding and shuttering material supplier industry.

More information

1.02 RELATED WORK: Refer to the following sections for related work:

1.02 RELATED WORK: Refer to the following sections for related work: SECTION 4200 - CONCRETE STRUCTURES PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of header curb, retaining walls, energy dissipation structures for drainage channels, reinforced concrete

More information

INDEX. introduction 4. access scaffolding 5. selflock system 16. wall system 17. column boxes 29. slab system 31. props 36. contact details 40

INDEX. introduction 4. access scaffolding 5. selflock system 16. wall system 17. column boxes 29. slab system 31. props 36. contact details 40 PRODUCT BROCHURE INDEX introduction 4 access scaffolding 5 selflock system 16 wall system 17 column boxes 29 slab system 31 props 36 contact details 40 INTRODUCTION Augusta Manufacturing was established

More information

3.3 Wall Construction

3.3 Wall Construction 3.3 Wall Construction Introduction Sections 3.1 and 3.2 deal with the specifics of laying and the fixing of reinforcing steel. This section primarily looks at the grouting and general construction of the

More information

PREPRUFE 300R LT & 160R LT

PREPRUFE 300R LT & 160R LT PREPRUFE 300R LT & 160R LT Pre-applied fully-bonded waterproofing membranes for low temperature applications Product Description GCP Applied Technologies ( GCP ) PREPRUFE Low Temperature Membranes (300R

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

FrameFast Shoring System

FrameFast Shoring System FrameFast FrameFast Shoring System The FrameFast shoring system is engineered for maximum strength, labor productivity and reuse capabilities. FrameFast components feature high strengthto-weight ratios.

More information

SECTION TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:

SECTION TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following: PART 1 GENERAL 1.01 SUMMARY SECTION 03460 TILT-UP PRECAST CONCRETE SANDWICH PANELS A. Work includes, but is not limited to, the following: 1. Architectural precast concrete sandwich wall panels. 2. Integral

More information

Formwork Direct International. Tel: Heavy Duty Panel System

Formwork Direct International. Tel: Heavy Duty Panel System Formwork Direct International Tel: 0151 532 0179 sales@formworkdirect.co.uk www.formworkdirect.co.uk Heavy Duty Panel System Product Overview The FD Max panel is a heavy duty wall formwork system capable

More information

Contents. Before you begin. Introduction: Installing trench support 1. Element 1: Planning and preparing 3

Contents. Before you begin. Introduction: Installing trench support 1. Element 1: Planning and preparing 3 Contents Contents Before you begin v Introduction: Installing trench support 1 Element 1: Planning and preparing 3 Section 1.1 Accessing, interpreting and applying compliance documentation 4 to the work

More information

APPENDIX 5: CONSTRUCTION CHECKLISTS

APPENDIX 5: CONSTRUCTION CHECKLISTS APPENDIX 5: CONSTRUCTION CHECKLISTS This appendix presents the construction checklists for the various retaining wall mitigation strategies: 10.1 Void Fill 10.2 Surface Bond Overlay 10.3 Reinforced Overlay

More information

ALISPLY. Scaffold Plank. Aligner. Plate Washer ½ x 6 x 6

ALISPLY. Scaffold Plank. Aligner. Plate Washer ½ x 6 x 6 Alisply components and accessories illustrated herein have been designed with safety and performance in mind to help achieve a safe and productive forming operation. It is recommended that all construction

More information

CIRCULAR COLUMN SK 100

CIRCULAR COLUMN SK 100 CIRCULAR COLUMN SK 100 www.variant-factory.eu 1 2 VARIANT FACTORY LTD. CIRCULAR COLUMN SK 100 Contents GENERAL INSTRUCTIONS.....................................................................................

More information

SECTION BUILT-UP BITUMINOUS WATERPROOFING

SECTION BUILT-UP BITUMINOUS WATERPROOFING SECTION 07 12 00 BUILT-UP BITUMINOUS WATERPROOFING SPEC WRITER NOTE: Delete any item or paragraph not applicable in the section and renumber the paragraphs. PART 1 - GENERAL 1.1 DESCRIPTION: This section

More information

New Zealand Concrete Masonry Manual

New Zealand Concrete Masonry Manual Manual 3.3 Introduction Sections 3.1 and 3.2 deal with the specifics of laying and the fixing of reinforcing steel. This section primarily looks at the grouting and general construction of the wall. Clean-out

More information

Bridge Installation Guide

Bridge Installation Guide BAC ADVANCED COMPOSITE TECHNOLOGIES Bridge Installation Guide Revision 1: 11 March 2016 Prepared By: Lachlan Nicol 11/03/16 Page 1 of 10 Contents 1. Introduction... 3 1.1 BAC Bridges... 3 1.2 Purpose of

More information

Noetop is a versatile, robust integrated formwork panel system. The basic panels incorporate the strongbacks and

Noetop is a versatile, robust integrated formwork panel system. The basic panels incorporate the strongbacks and NOEtop Noetop is a versatile, robust integrated formwork panel system. The basic panels incorporate the strongbacks and walers into one timber faced panel. The panel range provides economic forming with

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

Installation Guidelines for Flygt Pumps Pump Anchoring Recommendations

Installation Guidelines for Flygt Pumps Pump Anchoring Recommendations Issued: Installation Guidelines for Flygt Pumps Pump Anchoring Recommendations Introduction Proper installation and anchorage of Flygt pumps and installation accessories is critical to limiting vibration

More information

FORMDECK. constructions. constructions

FORMDECK. constructions. constructions FORMDECK constructions constructions Introduction Formdeck300 (FD300) is a very efficient and durable permanent metal tray formwork, reinforcement and ceiling system used for suspended concrete slab construction.

More information

CONCRETE WALKS AND CURBS SECTION CONCRETE WALKS AND CURBS PART 1 - GENERAL

CONCRETE WALKS AND CURBS SECTION CONCRETE WALKS AND CURBS PART 1 - GENERAL 13686.00 CONCRETE WALKS AND CURBS 033015-1 1.1 RELATED DOCUMENTS: SECTION 033015 CONCRETE WALKS AND CURBS PART 1 - GENERAL A. Drawings and general provisions of Contract, including General and Supplementary

More information

Health & Safety Policy and Procedures Manual SECTION 23 MASONRY CONSTRUCTION

Health & Safety Policy and Procedures Manual SECTION 23 MASONRY CONSTRUCTION SECTION 23 MASONRY CONSTRUCTION 1. Masonry Construction: A. Whenever a masonry wall is being constructed, a limited access zone will be established prior to construction meeting the following requirements.

More information

Installation guidelines System: Cofraplus 220

Installation guidelines System: Cofraplus 220 Edition: February 2012 Installation guidelines System: Cofraplus 220 ArcelorMittal Construction International Industriestrasse 19 8112 Otelfingen / Zürich Switzerland www.arcelormittal.com/arval Summary

More information

Joint Free Slabs On Grade Website:

Joint Free Slabs On Grade Website: Joint Free Slabs On Grade Website: www.jointfreeslabs.com Specification Revised March 2014 Warwick Colefax Robert Colefax Phone (02) 9999 6688 Phone (07) 4051 9466 Fax (02) 9999 6680 Fax (07) 4051 9477

More information

PART A: JOB PROCDRE FOR PLASTERING

PART A: JOB PROCDRE FOR PLASTERING PART A: JOB PROCDRE FOR PLASTERING 1. SCOPE: The scope of this procedure shall apply to all cement plaster finishes to column, ceilings, walls and similar surfaces on backgrounds met with such as brick,

More information

P: F: Resi-Ply FORMING SYSTEM BY DAYTON SUPERIOR

P: F: Resi-Ply FORMING SYSTEM BY DAYTON SUPERIOR Resi-Ply FORMING SYSTEM BY DAYTON SUPERIOR Resi-Ply System The Resi-Ply forming system is a 1 1 thick plywood with steel backing bars designed especially for residential foundations and low industrial

More information

SECTION PORTLAND CEMENT CONCRETE

SECTION PORTLAND CEMENT CONCRETE PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including the supplemental documents as indicated in the Site Work General Provisions, apply to work of this

More information

Strengthened Soil Wall Construction Manual

Strengthened Soil Wall Construction Manual Strengthened Soil Wall Construction Manual This information has been prepared by Shaw Technologies, Inc. as an aid in constructing their Strengthened Soil Wall system. Final determination of the suitability

More information

WORLDSKILLS STANDARD SPECIFICATION

WORLDSKILLS STANDARD SPECIFICATION WORLDSKILLS STANDARD SPECIFICATION Skill 46 Concrete Construction Work WSC2017_WSSS46 THE WORLDSKILLS STANDARDS SPECIFICATION (WSSS) GENERAL NOTES ON THE WSSS The WSSS specifies the knowledge, understanding

More information

SPECIAL SPECIFICATION 4491 Type CAC Concrete

SPECIAL SPECIFICATION 4491 Type CAC Concrete 2004 Specifications SPECIAL SPECIFICATION 4491 Type CAC Concrete 1. Description. Remove unsound concrete and replace with Type CAC, calcium aluminate concrete for ultra high early strength concrete repairs.

More information

National Occupational Standards Development Pack for Sub-Structure Work Occupations (Construction)

National Occupational Standards Development Pack for Sub-Structure Work Occupations (Construction) National Occupational Standards Development Pack for Sub-Structure Work Occupations (Construction) NOS WORK 2014 Full suite review (See Standard Template Update 2010 and 2011-13 for full details of generic

More information

MULTIFLEX Girder Slab Formwork. Instructions for Assembly and Use Standard Configuration

MULTIFLEX Girder Slab Formwork. Instructions for Assembly and Use Standard Configuration MULTIFLEX Girder Slab Formwork Instructions for Assembly and Use Standard Configuration Edition 08 l 2014 Content Introduction Overview, Main Components 1 Intended Use 2 Misapplications 2 General Safety

More information