ALTERNA ENGINEERED Tiles & Plank

Size: px
Start display at page:

Download "ALTERNA ENGINEERED Tiles & Plank"

Transcription

1 ALTERNA ENGINEERED Tiles & Plank Installation System Product Gauge Size Adhesive Comment 8"x8" (20.3 cm x 20.3 cm) ALTERNA ALTERNA RESERVE ALTERNA PLANK (4.1 mm) 8"x16"(20.3 cm x 40.6 cm) 12"x12"(30.5 cm x 30.5 cm) 12"x24"(30.5 cm x 61 cm) 16 x16 (40.6 cm x40.6 cm) S-288 For grouted installation use Armstrong S-693 FlexStrong Grout Premixed Sanded Acrylic Grout 6 x36 (15.2 cm x 91.4 cm) Installation: Location: Method: All grade levels Tight fit or groutable *Multiple tile size installations/basketweave single tile installation require a 1/8 grout line for installation. Non-grouted installations are not recommended for multiple tile size installations. WARNING: EXISTING IN-PLACE RESILIENT FLOOR COVERING AND ASPHALTIC ADHESIVES. DO NOT SAND, DRY SWEEP, DRY SCRAPE, DRILL, SAW, BEADBLAST, OR MECHANICALLY CHIP OR PULVERIZE EXISTING RESILIENT FLOORING, BACKING, LINING FELT OR ASPHALTIC CUT-BACK ADHESIVES. These existing in- place products may contain asbestos fibers and/or crystalline silica refer to the caution section below. Avoid creating dust, inhalation of such dust is a cancer and respiratory tract hazard. Smoking by individuals exposed to asbestos fibers greatly increases the risk of serious bodily harm. Unless positively certain that the existing in-place product is a nonasbestos-containing material, you must presume it contains asbestos. Regulations may require that the material be tested to determine asbestos content and may govern removal and disposal of material. See current edition of the Resilient Floor Covering Institute publications recommended work practices for removal of resilient floor coverings for instructions on removing all resilient floor covering structures. Contact your retailer or Armstrong Flooring Inc for questions. The floor covering in this package does NOT contain asbestos. General Information: ALTERNA tile can be installed by two installation methods. It can be installed with a standard butt fit as in traditional resilient tile installations; or, ALTERNA can be spaced and grouted with Armstrong S-693 FlexStrong Grout, Premixed Sanded Acrylic Grout. Both methods require the use of Armstrong S-288 Flooring Adhesive. For a grouted installation, the tiles should be laid with a grout joint spacing of 1/16" (1.6 mm) to 1/4" (6.4 mm) utilizing tile spacers designed for this purpose. Because of the rounded edges, the appearance of the finished grout joint will be approximately 1/16" (1.6 mm) wider than the actual tile spacing.

2 Due to ALTERNA s large format and increased thickness, extra care is required in handling and storage to keep the product from becoming damaged or distorted. Always store the product on a flat surface. Temperature control and subfloor flatness are important in the prevention of raised or curled edges, and performance of the grouted joints. Maintain the temperature of the room, subfloor, tile and adhesive at a minimum of 65 F (18 C) and a maximum of 85 F (29 C) for 48 hours prior to installation, during installation, and for 48 hours after installation. Maintain a minimum room temperature of 55 F (13 C) thereafter. CAUTION: Do not use high temperature heat sources to aid in cutting or making the tile conform to irregularities in the substrate. Multi-layered engineered tile structures such as ALTERNA can warp or curl after significant heating from sources such as hot plates and heat guns. Condition the room and all flooring materials to the temperature guidelines stated above. If you must warm the tile, always heat from the back and limit the temperature of the tile to warm conditions- less than 110 F (43 C). When using tile from two or more cartons, check to be sure all pattern and lot numbers are the same to ensure proper color match. On larger installations, open several cartons and mix them as they are installed to help blend any slight shade differences from one carton to the next. For best appearance, the directional arrows on the back of ALTERNA must be randomized when laying the tile (rather than aligned in one direction or in a forced turnblock layout). Suitable Substrates: All substrates listed below must be properly prepared and meet the requirements discussed in Chapter 3, Subfloors and Underlayments. There may be certain exceptions and special conditions for these substrates to be suitable for ALTERNA Flooring installation. All subfloors must be minimum 1 in thickness. Concrete (on all grade levels) Approved Suspended Wood Underlayments Most Single-layer, Fully Adhered, Existing Resilient Floors (on approved subfloors and underlayments) Ceramic Tile, Terrazzo, Marble Properly mixed and applied powder underlayments and embossing levelers Polymeric Poured (seamless) Floors S-1841 Quiet Comfort underlayment Can be installed over the following subfloors when using S-1841 Quiet Comfort Underlayment Particleboard, waferboard, OSB or single-layer Sturd-I-Floor panels Existing Resilient Tile Floors that are Below Grade Existing cushion-backed vinyl flooring Job Conditions/Preparation: Resilient flooring should only be installed in temperature-controlled environments. It is necessary to maintain a constant temperature before, during and after the installation. Therefore, the permanent or temporary HVAC system must be in operation before the installation of resilient flooring. Portable heaters are not recommended as they may not heat the room and subfloor sufficiently. Kerosene heaters should never be used. The surface shall be free of dust, solvents, varnish, paint, wax, oil, grease, sealers, curing compounds, residual adhesive, adhesive removers and other foreign materials that might affect the adhesion of resilient flooring to the substrate or cause a discoloration of the flooring from below. Spray paints, permanent markers and other indelible ink markers must not be used to write on the back of the flooring material or used to mark the substrate as they could bleed through, telegraphing up to the surface and permanently staining the flooring material. If these contaminants are present on the substrate they must be mechanically removed prior to the installation of the flooring material. All substrates must be flat. Variations in flatness must not exceed 1/16" (1.6 mm) in 1' (30.5 cm) or 3/16" (4.8 mm) in

3 10' (3.05 m). Fill low areas in the substrate with S-194 Patch, Underlayment & Embossing Leveler/S-195 Underlayment Additive. Because of ALTERNA s size and stiffness, when using the grouted installation method, suspended wood subfloors and underlayments must have a total thickness of 1" (2.5 cm) and a minimum 18" (45.7 cm) well-ventilated air space below. Joist spacing should be on 16" (40.6 cm) centers to minimize subfloor deflection. In renovation or remodel work, remove any existing adhesive residue* so that no ridges or puddles are evident and what remains is a thin, smooth film. Allow all flooring materials and adhesives to condition to the room temperature for a minimum of 48 hours before starting the installation. The area to receive the resilient flooring and the flooring materials and adhesives should be maintained at a minimum of 65 F (18 C) and maximum of 85 F (29 C) for 48 hours prior to installation, during installation and for 48 hours after completion. Maintain a minimum temperature of 55 F (13 C) thereafter. For concrete substrates, conduct moisture testing (moisture vapor emission rate [MVER]) and/or percent relative humidity (in-situ probe). Bond tests must also be conducted for compatibility with the substrate. Please refer to Chapter 3, Subfloors and Underlayments. Radiant heated substrates must not exceed a maximum surface temperature of 85 F (29 C). Because of ALTERNA s size and stiffness, when using the grouted installation method, suspended wood subfloors and underlayments must have a total thickness of 1" (2.5 cm) and a minimum 18" (45.7 cm) well-ventilated air space below. Joist spacing should be on 16" (40.6 cm) centers to minimize subfloor deflection. In renovation or remodel work, remove any existing adhesive residue* so that no ridges or puddles are evident and what remains is a thin, smooth film. Allow all flooring materials and adhesives to condition to the room temperature for a minimum of 48 hours before starting the installation. The area to receive the resilient flooring and the flooring materials and adhesives should be maintained at a minimum of 65 F (18 C) and maximum of 85 F (29 C) for 48 hours prior to installation, during installation and for 48 hours after completion. Maintain a minimum temperature of 55 F (13 C) thereafter. For concrete substrates, conduct moisture testing (moisture vapor emission rate [MVER]) and/or percent relative humidity (in-situ probe). Bond tests must also be conducted for compatibility with the substrate. Please refer to Chapter 3, Subfloors and Underlayments. Radiant heated substrates must not exceed a maximum surface temperature of 85 F (29 C Layout Adhesive Trowel Porous and Non-Porous S-288 S-891 Fine notch Trowel 1/32 x 1/16 X 5/64 (0.8mm x 1.6mm x 2mm) Dry to touch- 30 min. or more Before installing the ALTERNA Tile Installation System, plan the layout so the tile joints fall at least 6" (15.2 cm) away from subfloor/underlayment joints. Do not install over expansion joints. When installing over an existing resilient floor, plan the layout so the new tile joints are a minimum of 6" (15.2 cm) away from the original seams. When installing over tile floors, avoid having the tile joints in the same area as the joints in the existing flooring. Taking the most prominent walls in the room into consideration, find the center point in the room. Divide the room into equal quadrants by making two perpendicular lines on the subfloor intersecting at the center point. Starting from the center point, and either by measurements, or by doing a dry layout of the tiles (with proper grout joint spacing), determine the distance between the last full tile and the perimeter walls and cabinets. A balanced layout will result in border tiles being 8" (20.3 cm) or greater for the 16" x 16" (40.6 cm x 40.6 cm) tiles. If the border pieces are less than 8" (20.3 cm) wide, particularly at the prominent walls, you will need to shift the starting point in the middle of the room 1/2 the dimension of the tile [8" (20.3 cm) for a 16" x 16" (40.6 cm x 40.6

4 cm) tile] to balance the layout. After you have balanced the room to achieve larger pieces at the borders, make two new perpendicular lines on the subfloor intersecting at the new starting point near the center of the room. Normally you will apply adhesive to 1/4 or 1/2 of the room area at a time so that you can start the installation where the guidelines intersect. Begin at the starting point and install the tile along the chalk lines, laying the field area first in step fashion. Complete installation of full tile in all quadrants of the room. Do not slide the tile into place. Press tile firmly into the adhesive. NOTE: Tile spacers do a very good job of maintaining tile alignment; however, the installer must also recheck for proper alignment by using measurements or creating additional lines on the subfloor about every 4' (every 3 rows of tile) to ensure straight lines and rows of tile. This is very important on larger installations. Next, cut and fit the border tile at the perimeter. Mechanical tile cutters are available for cutting larger format tile. The score and snap method of using a utility knife to score through the wear surface also works well. Be sure to allow for the grout joint and a 1/8" (3.2 mm) gap at perimeter walls when cutting the border pieces. For irregular cuts, make a pattern out of Kraft paper or cardboard and transfer it to the tile. Score along the markings and snap off small pieces. Ceramic tile nippers or a coping saw are useful in making more intricate cutouts for complicated fittings. After the ALTERNA is installed, remove all tile spacers and immediately roll the entire floor with a 100-lb. roller. Roll the floor diagonally across the tile joints in both directions. Use a hand roller in confined areas where the large floor roller will not reach, such as under toe kicks. For Alterna Reserve Installation Open several cartons Refer to room layout to mark quadrants Sort product into groups of similar design and color For the best results, dry layout the first quadrant by randomly selecting and placing tiles from each group Once desired look is achieved pick up tiles and lay adhesive to quarter of the room Repeat in additional quadrants Follow installation instructions below Applying Adhesive/Spacers Apply adhesive to a quarter or half of the room area at one time NOTE: adhesive MUST be applied with the recommended trowel notching and the adhesive MUST be DRY TO THE TOUCH before installing the tile. None of the adhesive should transfer to your fingers this will depend on room temperature, humidity and airflow Do NOT use fans on adhesive/ substrate to accelerate drying Standard room balancing and layout procedures have to be followed prior to installation of tile Lay tile spacers 1/16 to 1/4 to allow for grouted installation. Do not use tile spacers if installing without grout. For Alterna Plank Installation Whenever possible, plan the layout so that the joints in the planks do not fall on top of joints or seams in the existing substrate. The end joints of the planks should be staggered a minimum of 6" apart. Do not install over expansion joints. To minimize repeats always work out of three cartons at time. Determine which direction the planks will run. Find the center of each of the end walls (the walls perpendicular to the long dimension of the planks) and place a pencil mark on the floor. Connect these points by striking a chalk line down the center of the room. Do a dry layout of planks from the center line to the wall running parallel to the long direction of the planks to determine the width of the last row of planks.

5 Avoid having border pieces less than 2" (5.1cm) wide for the 4" (10.2cm) wide planks and less than 3" (7.6cm) wide for the 6" (15.2cm) wide planks. If you find the border planks will be less than 1/2 the width of the plank, the center starting line should be shifted a distance equal to 1/2 the plank width. This will "balance" the room and provide for a larger cut piece at the wall. Apply S-288 adhesive to 1/2 of the area at a time so that you can start the installation along the center starting line. Begin laying planks along the center starting line and install row by row including the cut pieces at the perimeter until 1/2 of the installation is complete. Use Tile spacers to maintain proper space between each plank. Stagger the end joints by at least 6 inches (15.2 cm). Apply adhesive to the remaining portion of the room, allow the adhesive to dry-to-touch and complete the installation of planks in similar fashion. After the planks are installed, remove all spacers and immediately roll the entire floor with a 100 lb. roller. Use a hand roller in confined areas where the large floor roller will not reach, such as under toe kicks. The planks may be walked on immediately; however, the floor should not be exposed to heavy rolling load traffic for 72 hours after the installation. Use pieces of hardboard or underlayment panels to protect the floor when moving heavy furniture and appliances back into the room. Grouting Grouting may be done immediately or the following day Use only Armstrong FlexStrong Premixed Sanded Acrylic Grout. Traditional cement Grouts can NOT be used with Armstrong Premium Tile or Plank Flooring, Engineered Tile and Planks. Be sure that all tile edges are firmly seated in the adhesive before starting the grouting process Follow the application instructions as specified on the grout container, working small sections of the floor at a time Use a soft rubber grout float to apply the grout Do NOT spread grout over the entire surface of the tile or plank. Apply the grout and pack it down in the immediate area of the open joints Hold float in almost vertical position and strike off excess grout, pulling the float diagonally across the joints. You will need two five gallon buckets and sponge to loosen the grout on the face of the tile or planks. But the preferred method is to have three buckets of water available. Having clean water will reduce the haze on the face of the tile or plank. Use one bucket of water to wipe excess grout off the tiles as you install. This prevents the grout from drying to the tile this can be a tile sponge. Hold sponge flat and wipe diagonally across the joints Do not allow rinse water to accumulate in ungrouted joints, Be careful not to wipe grout out of the joints The other bucket is for the final removal of residue and for smoothing the joints. The second sponge should be damp with no excess water. Use a square-edged cellulose sponge that is just damp move the sponge slowly over the surface to pick up the excess water. A dry terry cloth towel may be pulled across the surface of the Tile or Plank as a final cleaning step. If sponges are not sufficient to clean the face of the tile use a white 3M pad with light pressure or a terry cloth towel. It is normal to have a grout haze remaining after the initial clean up. This will be removed in the final clean up once the grouted joints have completely dried Traffic should be kept off the installation until the grout has completely dried minimum of 24 hrs. Joints that are wider then 1/16 to 1/8 may take longer to dry Replace wall base and trim moldings Clean-Up Once Grout Dries Use one bucket of properly diluted Armstrong Once n Done Resilient & Ceramic Floor Cleaner For small areas use Once n Done spray bottle Use 3M pad to remove grout haze that remains Have a second bucket of clear clean water for the final rinse and clean up Buff dry with a soft cloth

6 Warning Do not wash or scrub the new flooring for at least 5 days after installation Do NOT use solvents or grout haze removers Do NOT use Armstrong New Beginning Floor Stripper or other floor strippers to clean the grout or maintain Alterna Only use Armstrong Premixed Sanded Acrylic Grout S-693 Tile maybe walked on immediately however, NO heavy rolling traffic for an additional 72 hours after installation Use pieces of hardboard or underlayment panels to protect the floor when moving heavy furniture and appliances back into the room Do NOT use mats with latex or rubber backing as they can cause permanent discoloration of your floor Do NOT use vacuums that use a beater bar or turn beater bar off Do NOT use electric brooms with hard plastic bottoms with no padding Do NOT use abrasive scrubbing tools Do not use detergents abrasive, cleaners or mop and shine products Helpful Maintenance/Care Tips Use floor protectors such as Armstrong Floor Protectors, under furniture Wipe up spills immediately Wash your floor regularly with Armstrong Once n Done Resilient & Ceramic Floor Cleaner Caution Engineered Tile Flooring, like other types of smooth floors, may become slippery when wet Allow time for floor to dry after washing Immediately wipe up wet areas from spills, foreign substances or wet feet * Some previously manufactured asphaltic cutback adhesives contain asbestos (see warning statement on page xii). For removal instructions, refer to the Resilient Floor Covering Institute s publication Recommended Work Practices for Removal of Resilient Floor Coverings.

RITZ FLOORING LVT INSTALLATION INSTRUCTIONS

RITZ FLOORING LVT INSTALLATION INSTRUCTIONS 14909 Calvert Street, Van Nuys, CA 91411 (818) 901-0001 info@ritzflooring.com PREMIUM. INNOVATIVE. SOLUTIONS. RITZ FLOORING LVT INSTALLATION INSTRUCTIONS I. GENERAL INFORMATION These instructions cover

More information

ALETTE GLUE DOWN INSTALLATION INSTRUCTIONS

ALETTE GLUE DOWN INSTALLATION INSTRUCTIONS ALETTE GLUE DOWN INSTALLATION INSTRUCTIONS No floor covering is better than the subfloor over which it is installed. The finished appearance and performance of any floor covering will be affected by the

More information

American Guild Vinyl Flooring - Steadcrest Collection Installation Instructions

American Guild Vinyl Flooring - Steadcrest Collection Installation Instructions American Guild Vinyl Flooring - Steadcrest Collection Installation Instructions Recommended Adhesive: DuChâteau DUAG-58 Premium Resilient Flooring Adhesive Available in 1- and 4-gallon containers, DUAG-58

More information

Luxury Vinyl Planks with Interlocking Joints (Glueless) Installation Instructions

Luxury Vinyl Planks with Interlocking Joints (Glueless) Installation Instructions Luxury Vinyl Planks with Interlocking Joints (Glueless) Installation Instructions Luxury Vinyl Planks are constructed with a joint that locks the planks together to form a tight, durable, water resistant

More information

Installation Instructions Vinyl Glue Down Flooring - Pro

Installation Instructions Vinyl Glue Down Flooring - Pro Installation Instructions Vinyl Glue Down Flooring - Pro 1 of 5 Installation Instructions for GoHaus Vinyl Glue Down Flooring - Pro PLEASE READ BEFORE INSTALLATION Congratulations on your purchase of GoHaus

More information

Rigid Core (White Label) Planks with Interlocking Joints (Glueless) Installation Instructions

Rigid Core (White Label) Planks with Interlocking Joints (Glueless) Installation Instructions Rigid Core (White Label) Planks with Interlocking Joints (Glueless) Installation Instructions Rigid Core Planks are constructed with a joint that locks the planks together to form a tight, durable, water

More information

ALL DRAWINGS/ILLUSTRATIONS ARE LOCATED AT THE END OF THE INSTRUCTIONS.

ALL DRAWINGS/ILLUSTRATIONS ARE LOCATED AT THE END OF THE INSTRUCTIONS. Saxony Installation Instructions Planks are constructed with a joint that locks the planks together to form a tight, durable, water resistant joint. Saxony is installed as a floating floor so it's quick

More information

Berkshires Glueless and Full Spread Installation Instructions

Berkshires Glueless and Full Spread Installation Instructions INSTALLATION INSTRUCTIONS Berkshires Glueless and Full Spread Installation Instructions March 22, 2012 PRIOR TO INSTALLATION Carefully check flooring material for any defects. Contact your supplier immediately

More information

MARATHON & MARATHON PLUS RUBBER TILE

MARATHON & MARATHON PLUS RUBBER TILE SITE CONDITIONS 1. Store the flooring and adhesive in the installation area. 2. The temperature must be kept between 18 C (65 F) and 24 o C (75 o F) for 48 hours before, during and after installation.

More information

5G Click Floating Floor Installation Instructions

5G Click Floating Floor Installation Instructions 5G Click Floating Floor Installation Instructions Market Place RPF Can be installed right out of the carton with no acclimation. SUBFLOOR REQUIREMENTS While Market Place RPF is water resistant, it is not

More information

LOOSE LAY INSTALLATION GUIDE PAGE 1 of 6

LOOSE LAY INSTALLATION GUIDE PAGE 1 of 6 INSTALLATION GUIDE PAGE 1 of 6 MATERIALS REQUIRED FOR INSTALLATION: Tape Measurer Square Ruler Utility Knife 100lb Roller (if using adhesive) ACCEPTABLE SUBFLOORS: Happy Feet International will not warrant

More information

Installation Guide LVP Glue Down

Installation Guide LVP Glue Down 734 SOUTH RIVER STREET CALHOUN, GEORGIA 1.844.225.3100 www.encorehospitalitycarpet.com Installation Guide LVP Glue Down Materials Required for Installation: Tape Measure Square ruler Chalk line Utility

More information

Premium Glueless Luxury Vinyl with Interlocking Joints Installation Instructions

Premium Glueless Luxury Vinyl with Interlocking Joints Installation Instructions Premium Glueless Luxury Vinyl with Interlocking Joints Installation Instructions Premium Glueless Luxury Vinyl planks are constructed with the patented Uniclic interlocking joint that locks the planks

More information

ENGINEERED LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING

ENGINEERED LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING ENGINEERED LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING WARNING Prior to installation, please ensure that the product received is the correct style and color as well as to

More information

TEXAS GRANITE COMMERCIAL VINYL TILES

TEXAS GRANITE COMMERCIAL VINYL TILES SITE CONDITIONS 1. Store the flooring and adhesive in the installation area. 2. The temperature must be kept between 18 C (65 F) and 24 C (75 F) for 48 hours before, during and after installation. 3. Both

More information

ENGINEERED WATERPROOF FLOORING GENERAL INSTALLATION INSTRUCTIONS FOR VÄLINGE 2G LOCKING FLOORING

ENGINEERED WATERPROOF FLOORING GENERAL INSTALLATION INSTRUCTIONS FOR VÄLINGE 2G LOCKING FLOORING ENGINEERED WATERPROOF FLOORING GENERAL INSTALLATION INSTRUCTIONS FOR VÄLINGE 2G LOCKING FLOORING SITE CONDITIONS Always store the boxes of Engineered Waterproof Flooring (EWF) on a flat and level surface;

More information

WATER TUFF VINYL FLOORING ATTENTION! READ BEFORE INSTALLING! Angle-Tap Installation Instructions

WATER TUFF VINYL FLOORING ATTENTION! READ BEFORE INSTALLING! Angle-Tap Installation Instructions WATER TUFF VINYL FLOORING ATTENTION! READ BEFORE INSTALLING! Angle-Tap Installation Instructions FLOORING MATERIAL SHOULD BE INSPECTED PRIOR TO INSTALLATION Responsibility for the suitability of this flooring

More information

LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR DRYBACK FLOORING

LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR DRYBACK FLOORING LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR DRYBACK FLOORING WARNING Prior to installation, please ensure that the product received is the correct style and color as well as to the customer s satisfaction.

More information

Scuba Seal Installation / Floor Care Instructions With Video Link

Scuba Seal Installation / Floor Care Instructions With Video Link Scuba Seal Installation / Floor Care Instructions With Video Link 04/12/18 Congratulations on choosing ScubaSeal. ScubaSeal Rigid Core Flooring has the beautiful designs that are perfect for your active

More information

Click Refresh with In*Step Locking System

Click Refresh with In*Step Locking System 1. Test before starting installation All substrates to receive moisture sensitive floor covering must be tested for moisture. CONCRETE SUBSTRATES: Internal Relative Humidity tests should be performed per

More information

Commercial Resilient Sheet Flooring

Commercial Resilient Sheet Flooring Commercial Resilient Sheet Flooring INSTALLATION 160 South Industrial Blvd. Calhoun, GA. 30701 MohawkGroup.com Technical Services Department 508 East Morris St. Dalton, GA 30721 800.833.6954 product_tech@mohawkind.com

More information

LVP GLUE DOWN INSTALLATION GUIDE PAGE 1 of 6

LVP GLUE DOWN INSTALLATION GUIDE PAGE 1 of 6 INSTALLATION GUIDE PAGE 1 of 6 MATERIALS REQUIRED FOR INSTALLATION: Tape Measurer Square Ruler Chalk Line Utility Knife Hand/Seam Roller 100lb Roller ACCEPTABLE SUBFLOORS: Happy Feet International will

More information

PRE-INSTALLATION INSTRUCTIONS. QuietX Acoustical Luxury Vinyl INSTALLATION INSTRUCTIONS. Concrete Substrates CONTENTS:

PRE-INSTALLATION INSTRUCTIONS. QuietX Acoustical Luxury Vinyl INSTALLATION INSTRUCTIONS. Concrete Substrates CONTENTS: PRE-INSTALLATION INSTRUCTIONS IMPORTANT: All substrates must be tested for moisture before QuietX Acoustical Luxury Vinyl INSTALLATION INSTRUCTIONS CONTENTS: 1. PRE-INSTALLATION INSTALLATIONS 2. MATERIAL

More information

1. TEST BEFORE STARTING INSTALLATION All substrates to receive moisture sensitive floor covering must be tested for moisture.

1. TEST BEFORE STARTING INSTALLATION All substrates to receive moisture sensitive floor covering must be tested for moisture. LVT With In*Step Locking System 1. TEST BEFORE STARTING INSTALLATION All substrates to receive moisture sensitive floor covering must be tested for moisture. CONCRETE SUBSTRATES: Internal Relative Humidity

More information

IVC US. Light Commercial Installation Guide - Sheet Vinyl. Leading the Way

IVC US. Light Commercial Installation Guide - Sheet Vinyl. Leading the Way IVC US Light Commercial Installation Guide - Sheet Vinyl Leading the Way v. 5/2013 IVC US Light Commercial Installation Guide - Sheet Vinyl Flooring IVC US recommends the following guidelines for preparation

More information

ALL DRAWINGS/ILLUSTRATIONS ARE LOCATED AT THE END OF THE INSTRUCTIONS.

ALL DRAWINGS/ILLUSTRATIONS ARE LOCATED AT THE END OF THE INSTRUCTIONS. Normandy Installation Instructions Planks are constructed with a joint that locks the planks together to form a tight, durable, water resistant joint. Normandy is installed as a floating floor so it's

More information

ATTENTION! READ BEFORE INSTALLING!

ATTENTION! READ BEFORE INSTALLING! ATTENTION! READ BEFORE INSTALLING! FOR BEST VISUAL REPRESENTATION OF YOUR FLOOR This flooring replicates the look of a natural product which has natural variations in color and texture. For best visual

More information

Adura Luxury Floors Installation Guide. Adura. General Installation Adura 53

Adura Luxury Floors Installation Guide. Adura. General Installation Adura 53 Adura Luxury Floors Installation Guide Adura General Installation Adura 53 54 Adura General Installation Adura Luxury Floors Installation Guide Adura Luxury Floors Installation Guide General Information

More information

LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR LOCKING FLOORING

LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR LOCKING FLOORING LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR LOCKING FLOORING ACCLIMATION Acclimation is required prior to the installation of Luxury Vinyl Flooring (LVF). Store the UNOPENED BOXES in the room where

More information

COMMERCIAL LINOLEUM SHEET FLOORING

COMMERCIAL LINOLEUM SHEET FLOORING COMMERCIAL LINOLEUM SHEET FLOORING Installation System SEAMING OPTIONS Highly Recommended Optional Optional Required Full-Spread/S-760 Full-Spread/ Full-Spread/ Full-Spread/ May Flash and Heat Weld Seams

More information

PLEASE READ BEFORE INSTALLATION

PLEASE READ BEFORE INSTALLATION PLEASE READ BEFORE INSTALLATION Comprehensive Installation and Maintenance Instructions It is important to work out of several cartons to mix the patterns when installing this select flooring product to

More information

HDWPC Flooring Installation Guidelines

HDWPC Flooring Installation Guidelines HDWPC Flooring Installation Guidelines 02.22.17 The purpose of this manual is to provide general installations recommendations based on certain installation environments. If there are other questions about

More information

Installation instruction

Installation instruction TACKY TILE Installation instruction Introduction Tacky Tile has a Tacky technology backing that bonds firmly but not permanently to the subfloor, making installation easy, fast and clean. If at any time

More information

IVC US Residential Installation Guide - LVT. Leading the Way

IVC US Residential Installation Guide - LVT. Leading the Way IVC US Residential Installation Guide - LVT Leading the Way IVC US Residential Installation Guide - LVT Click Materials Required for Installation: Tape Measure Square ruler Utility knife Chalk line Small

More information

LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR LOOSE LAY FLOORING

LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR LOOSE LAY FLOORING LUXURY VINYL FOR LOOSE LAY FLOORING WARNING Prior to installation, please ensure that the product received is the correct style and color as well as to the customer s satisfaction. If there are any doubts,

More information

Commercial Vinyl-Backed Flooring Installation System

Commercial Vinyl-Backed Flooring Installation System Commercial Vinyl-Backed Flooring Installation System Concentrated Static & Dynamic Load Product Full Spread Perimeter Plus Areas S-599 Set in Wet or S-230 S-599/S-230 S-240 Dry to Touch TRANSLATIONS Sheet

More information

DO-IT-YOURSELF SELF ADHESIVE PLANK INSTALLATION

DO-IT-YOURSELF SELF ADHESIVE PLANK INSTALLATION Woodland Creek Series Self-Adhesive Residential Vinyl Plank Pattern Numbers: Sku 725-6664 PLK1102 Sable Sku 725-6666 PLK1106 Gray Wolf DO-IT-YOURSELF SELF ADHESIVE PLANK INSTALLATION MATERIALS YOU MAY

More information

FiberFloor Glueless and Full Spread Installation Instructions

FiberFloor Glueless and Full Spread Installation Instructions TECHNICAL SERVICE FiberFloor Glueless and Full Spread Installation Instructions September 22, 2016 PRODUCTS All Tarkett Fiberglass reinforced material for residential application INSTALLATION SYSTEMS Glueless

More information

EXPANKO RESILIENT FLOORING PRE-INSTALLATION GUIDELINES

EXPANKO RESILIENT FLOORING PRE-INSTALLATION GUIDELINES TECHNICAL SUPPORT 800.345.6202 These guidelines apply to the installation of all Expanko Resilient Flooring products. For instructions on the installation of specific Expanko products, please refer to

More information

PREMIUM LUXURY VINYL FLOORING LOOSE LAY INSTALLATION & MAINTENANCE

PREMIUM LUXURY VINYL FLOORING LOOSE LAY INSTALLATION & MAINTENANCE PREMIUM LUXURY VINYL FLOORING LOOSE LAY INSTALLATION & MAINTENANCE All instructions and recommendations are based on the most recent information available. If you receive a printed copy of these instructions,

More information

HIGUERA HARDWOODS SOLID STRAND WOVEN FLOORING PRE-INSTALLATION JOBSITE REQUIREMENTS

HIGUERA HARDWOODS SOLID STRAND WOVEN FLOORING PRE-INSTALLATION JOBSITE REQUIREMENTS HIGUERA HARDWOODS SOLID STRAND WOVEN FLOORING PRE-INSTALLATION JOBSITE REQUIREMENTS Carefully examine the wood flooring prior to installation for color, finish and quality. Ensure adequate lighting for

More information

Pry Bar or Pull bar Hammer Spacing Wedges Rubber Mallet Safety Equipment (Goggles and Mask)

Pry Bar or Pull bar Hammer Spacing Wedges Rubber Mallet Safety Equipment (Goggles and Mask) strand at ease installation instructions strand at ease installation instructions: ECOFINISHES RECOMMENDS USING THE SERVICES OF A PROFESSIONAL HARDWOOD FLOORING INSTALLER. READ THESE INSTRUCTIONS THOROUGHLY

More information

VINYL COMPOSITION TILE

VINYL COMPOSITION TILE ASSET Reference Specification ASTM F 1066-99 Standard Specification for Vinyl Composition Floor Tile Products: Azrock s Vinyl Composition Tile -Standard Price Products -Premium Priced Products -Slip Resistant

More information

Luxury Vinyl Plank Installation Manual 2017

Luxury Vinyl Plank Installation Manual 2017 Luxury Vinyl Plank Installation Manual 2017 The van Gelder, Inc. Installation Manual has been created as a guide for people who specify, sell and install van Gelder, Inc. Solid Vinyl Floor Tile for commercial

More information

MILLIKEN FREE LAY INSTALLATION & INITIAL CLEANING INSTRUCTIONS

MILLIKEN FREE LAY INSTALLATION & INITIAL CLEANING INSTRUCTIONS MILLIKEN FREE LAY INSTALLATION & INITIAL CLEANING INSTRUCTIONS All instructions and recommendations are based on the most recent information available. They should be followed for an ideal installation.

More information

VESDURA ENGINEERED VINYL PLANK INSTALLATION GUIDE

VESDURA ENGINEERED VINYL PLANK INSTALLATION GUIDE VESDURA ENGINEERED VINYL PLANK INSTALLATION GUIDE Vesdura Engineered Vinyl Plank features the patented Unilin interlocking planks for easy installation and is installed as a glueless floating floor. The

More information

IVC US. Commercial Installation Guide - Sheet Vinyl. Leading the Way

IVC US. Commercial Installation Guide - Sheet Vinyl. Leading the Way IVC US Commercial Installation Guide - Sheet Vinyl Leading the Way IVC US Commercial Installation Guide - Sheet Vinyl Flooring IVC US recommends the following guidelines for preparation and installation

More information

DURAfusion - Installation Instructions

DURAfusion - Installation Instructions DURAfusion - Installation Instructions Carefully check the planks for any defects, ensure that you have the correct material and that all the cartons are from the same production lot, DO NOT install any

More information

ToughGuard II Installation System

ToughGuard II Installation System ToughGuard II Installation System Product Gauge Comments StrataMax Good 0.065" (1.65 mm) Modified loose lay 0.070" (1.78 mm) method: Acrylic double-faced tape British Autumn Caspia CastleRock Colonial

More information

Xulon Luxury Vinyl Planks- Click. Installation Guide

Xulon Luxury Vinyl Planks- Click. Installation Guide Xulon Luxury Vinyl Planks- Click Installation Guide Luxury Vinyl Planks Xulon s Luxury Vinyl Click Planks can be installed on any grade level (On, Above or Below) that are temperature controlled using

More information

Installation Guidelines: Magnolia

Installation Guidelines: Magnolia Installation Guidelines: Magnolia 3/8 Engineered Hardwood Staple Down Installation ATTENTION Inspect ALL materials carefully BEFORE Warranties DO NOT cover materials with visible defects once they are

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS About PROTECH Luxury Vinyl Planks 8.7mm WPC Click Lock Contemporary Collection features patented interlocking planks for easy installation and is installed as a glue less floating floor. The interlocking

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS VINYL PLANKS 6.5MM HDPC CLICK LOCK REVIVAL COLLECTION General Information 1. Flooring should be transported and stored in a neatly stacked fashion on a smooth flat surface. Be sure to inspect the run numbers/production

More information

Installation Instructions for Hercules Rib 52

Installation Instructions for Hercules Rib 52 Page 1 of 5 Installation Instructions These instructions supersede any verbal or written instructions from connexus representatives, and must be followed in order for the warranty to be in effect. Delivery

More information

ADURA Flex Installation Guidelines

ADURA Flex Installation Guidelines ADURA Flex GENERAL INFORMATION Wood Subfloors These installation specifications are for fully adhered ADURA Flex. All recommendations are based on the most recent available information. All instructions

More information

SOUND-TEC ENGINEERED LVT

SOUND-TEC ENGINEERED LVT INSTALLATION GUIDE: SOUND-TEC ENGINEERED LVT In any floor covering installation there are six basic requirements to insure a proper long lasting and attractive floor. These requirements are the same for

More information

Modular Carpet Tile Installation Instructions

Modular Carpet Tile Installation Instructions Modular Carpet Tile Installation Instructions UltraSet Vinyl Back 160 South Industrial Blvd. Calhoun, GA. 30701 Dalton, GA 30721 www.mohawkflooring.com Technical Services Department 508 East Morris St.

More information

Quick Step Studio Laminate Flooring Installation Instructions

Quick Step Studio Laminate Flooring Installation Instructions Quick Step Studio Laminate Flooring Installation Instructions Tools Required for Installation Job Site Site Requirements Laminate is a durable floor covering, not intended as structural material. Laminate

More information

IVC US Commercial Installation Guide - LVT. Leading the Way

IVC US Commercial Installation Guide - LVT. Leading the Way IVC US Commercial Installation Guide - LVT Leading the Way IVC US Commercial Installation Guide - LVT Click Materials Required for Installation: Tape Measure Square ruler Utility knife Chalk line Small

More information

Installation ECOWORX / ECOLOGIX INSTALLATION 1. CONDITION YOUR SITE AND TEST 2. PREPARE THE FLOOR

Installation ECOWORX / ECOLOGIX INSTALLATION 1. CONDITION YOUR SITE AND TEST 2. PREPARE THE FLOOR ECOWORX / ECOLOGIX INSTALLATION Notice: For best results review the following guidelines prior to installation. Shaw will not be responsible for improper installation and failure to follow these guidelines

More information

Modular Carpet. Installation Instructions. Ecoflex AIR Cushion Back Ecoflex ICT Vinyl Back Ecoflex NXT PVC Free Back

Modular Carpet. Installation Instructions. Ecoflex AIR Cushion Back Ecoflex ICT Vinyl Back Ecoflex NXT PVC Free Back Modular Carpet Installation Instructions Ecoflex AIR Cushion Back Ecoflex ICT Vinyl Back Ecoflex NXT PVC Free Back 160 South Industrial Blvd. Technical Services Department Calhoun, GA. 30701 508 East Morris

More information

FEATHERWEIGHT Uniclic Luxury Vinyl Installation Sheet

FEATHERWEIGHT Uniclic Luxury Vinyl Installation Sheet FEATHERWEIGHT Uniclic Luxury Vinyl Installation Sheet page 1 PLEASE READ ALL INSTRUCTIONS PRIOR TO INSTALLATION FIGURE 1 FIGURE 2 FIGURE 3 FIGURE 4 TOOLS REQUIRED Utility Knife Tape Measure Straight Edge

More information

StrataWorx Tile. Installation Guidelines 1. CONDITION YOUR SITE AND TEST 2. PREPARE THE FLOOR

StrataWorx Tile. Installation Guidelines 1. CONDITION YOUR SITE AND TEST 2. PREPARE THE FLOOR Notice: For best results, review the following guidelines prior to installation. Shaw will not be responsible for improper installation and failure to follow these guidelines may result in limiting warranty

More information

INSTALLATION GUIDELINE 5MM LOOSE LAY LUXURY VINYL

INSTALLATION GUIDELINE 5MM LOOSE LAY LUXURY VINYL Parterre Flooring Systems 5mm Loose Lay Luxury Vinyl Plank is a long lasting, easy-to-install floor with the real look of wood plank in its patterns and texture. The product is ideal for new construction,

More information

SOUND-TEC ENGINEERED LVT

SOUND-TEC ENGINEERED LVT INSTALLATION GUIDE: SOUND-TEC ENGINEERED LVT In any floor covering installation there are six basic requirements to insure a proper long lasting and attractive floor. These requirements are the same for

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS VINYL PLANKS 6.5MM HDPC CLICK LOCK PERSPECTIVE COLLECTION General Information 1. Flooring should be transported and stored in a neatly stacked fashion on a smooth flat surface. Be sure to Inspect the run

More information

Medi-Flex TRUE TM SHEET RUBBER INSTALLATION INSTRUCTIONS

Medi-Flex TRUE TM SHEET RUBBER INSTALLATION INSTRUCTIONS SITE CONDITIONS 1. Store the flooring and adhesive in the installation area. 2. The temperature must be kept between 18 C (65 F) and 24 o C (75 o F) for 48 hours before, during and after installation.

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS VINYL PLANKS 4MM HDPC CLICK LOCK FORESIGHT COLLECTION General Information 1. Flooring should be transported and stored in a neatly stacked fashion on a smooth flat surface. Be sure to Inspect the run numbers/production

More information

INSTALLATION MANUAL FULLY ADHERED INSTALLATIONS

INSTALLATION MANUAL FULLY ADHERED INSTALLATIONS SHOCKPAD BL41 MANUAL FULLY ADHERED S Manufactured in the U.S.A. by: Revised 07/08/2015 Supersedes all previous versions. Check website for updates. 866-795-2732 www.ecoreathletic.com 1 TABLE OF CONTENTS

More information

Armstrong Flooring Installation Accessories

Armstrong Flooring Installation Accessories 13 Armstrong Flooring Installation Accessories Armstrong Flooring Installation Accessories S-32 Edge Trimmer Blades The cutting blade for the S-33 Edge Trimmer. 5/package. S-33 Edge Trimmer Designed to

More information

UNDERLAYMENT INSTALLATION INSTRUCTIONS

UNDERLAYMENT INSTALLATION INSTRUCTIONS UNDERLAYMENT INSTALLATION INSTRUCTIONS Table of Contents BASE PREPARATION I. General Information... 3 II. Job Site Conditions... 3 III. Subfloor Requirements & Preparation...3 IV. Hazards... 4 V. Material

More information

INSTALLATION GUIDELINE 5MM LOOSE LAY LUXURY VINYL

INSTALLATION GUIDELINE 5MM LOOSE LAY LUXURY VINYL Updated 2.1.2019 Parterre Flooring Systems 5mm Loose Lay Luxury Vinyl Plank is a long lasting, easy-to-install floor with the real look of wood plank in its patterns and texture. The product is ideal for

More information

SECTION RESILIENT TILE FLOORING. A. Section includes vinyl composition floor tile and accessories indicated and as specified.

SECTION RESILIENT TILE FLOORING. A. Section includes vinyl composition floor tile and accessories indicated and as specified. SECTION 09 65 19 RESILIENT TILE FLOORING PART 1 - GENERAL 1.1 SUMMARY A. Section includes vinyl composition floor tile and accessories indicated and as specified. 1.2 SUBMITTALS A. Product Data: Submit

More information

Prefinished Cork Flooring Installation and Maintenance SECTION I. INSTALLATION MANUAL SUB-FLOOR PREPARATION

Prefinished Cork Flooring Installation and Maintenance SECTION I. INSTALLATION MANUAL SUB-FLOOR PREPARATION 6999.6999 Prefinished Cork Flooring Installation and Maintenance SECTION I. INSTALLATION MANUAL SUB-FLOOR PREPARATION Proper sub-floor preparation is critical. All guidelines contained in these instructions

More information

Carpet Tile & Plank Direct Glue Down

Carpet Tile & Plank Direct Glue Down Carpet Tile & Plank Direct Glue Down INSTALLATION EcoFlex ICT EcoFlex NXT EcoFlex AIR 160 South Industrial Blvd. Calhoun, GA. 30701 MohawkGroup.com Technical Services Department 508 East Morris St. Dalton,

More information

Rubber Flooring Installation Guidelines

Rubber Flooring Installation Guidelines Rubber Flooring Installation Guidelines 10.12.18 The purpose of this manual is to provide general installations recommendations based on certain installation environments. If there are other questions

More information

MANNINGTON COMMERCIAL GENERAL INSTALLATION GUIDE. Welcome

MANNINGTON COMMERCIAL GENERAL INSTALLATION GUIDE. Welcome MANNINGTON COMMERCIAL GENERAL INSTALLATION GUIDE Welcome This Guide has been created for installers and specifiers of Mannington floor covering products. It will prove especially helpful to those who require

More information

Rigid Core Installation & Maintenance Instructions

Rigid Core Installation & Maintenance Instructions Rigid Core Installation & Maintenance Instructions Suitability Rigid Core Click Vinyl Flooring is completely waterproof floating floor and has got exceptional acoustic and insulation properties due to

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS INSTALLER / OWNER RESPONSIBILITIES Mission Collection LVF features the patented Uniclic interlocking planks for easy installation and is installed as a glueless floating floor.

More information

KINETICS INSTALLATION GUIDELINES ISOLayment QT-F (FLAT)

KINETICS INSTALLATION GUIDELINES ISOLayment QT-F (FLAT) KINETICS INSTALLATION GUIDELINES ISOLayment QT-F (FLAT) ISOLayment QT-F sound control underlayment is a flat, resilient underlayment used directly under a variety of floor finishes including ceramic tile,

More information

INSTALLATION PROCEDURES FOR RUBBER FLOORING

INSTALLATION PROCEDURES FOR RUBBER FLOORING ! INSTALLATION PROCEDURES FOR RUBBER FLOORING Installation of rubber flooring will only mirror the characteristics of the existing substrate. Proper subfloor preparation is paramount to a successful installation.

More information

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING WARNING Prior to installation, please ensure that the product received is the correct style and color as well as to the customer s

More information

INSTALLATION INSTRUCTIONS - Please read before installation

INSTALLATION INSTRUCTIONS - Please read before installation INSTALLATION INSTRUCTIONS - Please read before installation The floor panels should be transported in a lying down position. Floor panels should be stored in this position in their unopened packages in

More information

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING

LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING WARNING Prior to installation, please ensure that the product received is the correct style and color as well as to the customer s satisfaction.

More information

DeZign Glue Down Luxury Vinyl

DeZign Glue Down Luxury Vinyl DeZign Glue Down Luxury Vinyl v.8-17 Concrete Tiles Tumbled Marble Tiles Pearl 18 x 18 x 3mm DEDST-509 $3.38/sf Sunkissed 18 x 18 x 3mm DEDST-074 $3.38/sf Gray 18 x 18 x 3mm DEDST-076 $3.38/sf Moon Dust

More information

Installation Products

Installation Products TM TM TM Installation Products LVT/Vinyl Sheet Adhesives Flip Spray Adhesive High-moisture guarantee Recommended for heavy rolling loads Simple one-step application process Allows immediate traffic Open

More information

Signature Sports Flooring Installation Instructions. For SignaDeck Premium Rubber Tiles

Signature Sports Flooring Installation Instructions. For SignaDeck Premium Rubber Tiles Signature Sports Flooring Installation Instructions For SignaDeck Premium Rubber Tiles These instructions supersede any verbal or written instructions from Signature Sports Flooring representatives and

More information

AttainSilence & Attain

AttainSilence & Attain AttainSilence & Attain Attain 4.2mm Click over 1mm ECOsilence, Attain 4.2mm Click AttainSilence Click 4.2.1 & Attain Click 4.2 Technical Manual Installation Maintenance Warranty Manufactured in the U.S.A.

More information

SHEET INSTALLATION INSTRUCTIONS Using EXPANKO XCR4 ADHESIVE-or-HENRY452 (2-PART EPOXY)

SHEET INSTALLATION INSTRUCTIONS Using EXPANKO XCR4 ADHESIVE-or-HENRY452 (2-PART EPOXY) Expanko Resilient Flooring 180 Gordon Drive Suite 107 Exton, PA 19341 800.345.6202 sales@expanko.com www.expanko.com SHEET INSTALLATION INSTRUCTIONS Using EXPANKO XCR4 ADHESIVE-or-HENRY452 (2-PART EPOXY)

More information

ATTENTION! READ BEFORE INSTALLING!

ATTENTION! READ BEFORE INSTALLING! ATTENTION! READ BEFORE INSTALLING! FOR BEST VISUAL REPRESENTATION OF YOUR FLOOR This flooring replicates the look of a natural product which has natural variations in color and texture. For best visual

More information

Installation Guide. LooseLay Flooring

Installation Guide. LooseLay Flooring Installation Guide LooseLay Flooring Before you Start Things to Consider The following are guidelines for installing MAXX Floors LooseLay Vinyl Flooring. 1. All areas where the product will be installed

More information

Product Size Thickness Installation direction Seams treatment

Product Size Thickness Installation direction Seams treatment INSTALLATION INSTRUCTIONS FOR GERFLOR SAGA 2, CREATION TILES AND PLANKS This document refers to the following products: Product Size Thickness Installation direction Seams treatment Creation Tiles See

More information

ELECTROSTATIC FLOORING Installation Instructions

ELECTROSTATIC FLOORING Installation Instructions ELECTROSTATIC FLOORING Installation Instructions Toro EL and Granit AS (Sheet and Tile) HANDLING AND STORAGE 1. Johnsonite Electrostatic Flooring and adhesives must be site conditioned at room temperature

More information