1 Seminar Objectives 1) IPD and its impact on team behavior 2) Lean and its role in a collaborative process. 3) Pre-Fabrication 4) How Lean, BIM and collaborative processes impact project value.

2 The Project Texas Health Resources, Methodist Alliance Hospital, Fort Worth, Texas. Hospital; 188,000 s.f. $46.5m 58 beds with growth potential of 300 beds MOB; 74,000 s.f. $10m Project of identical scale completed within the last year set the base budget number.

3 The Project Text Text Text Text Text THR Presbyterian Hospital, Flower Mound, Texas Final Cost $43,500,000

4 The Project

5 The Project

6 The Project

7 The Project

8 Contractual Issues Perkins + Will in Dallas is the architect, no IPD experience, no Lean experience. Beck is the contractor, internal integrated experience, but no IPD experience, no Lean experience Owner representative, Denton Wilson, had become a national spokesman for IPD and Lean, left halfway through the project. Unique selection process

9 The Project Initial Budget; $43,500,00 Budget with Additional Scope; $46,500,000 Initial Design Estimate; $49,500,000 Mechanical Upgrades; $2,500,000 -Heat pump chillers -Additional Generator -Fanwall technology Final Cost; $46,500,000

10 Contractual Issues AIA C191 contract-multi party agreement, similar to C195 but does not require the formation of an LLC. Owner/Architect/Contractor agree to waive all claims. Not operating under a true C191 cost-plus model; Architect has a fixed fee Contractor has a GMP Project began $3m above baseline goal, project ended $800,000 below budget, with $2.5m in added value. No accounting for added value.

11 Incentive Plan Fee at risk; Beck $230,000 (.05%) P+W $230,000 (.05%) Savings incentive; Beck $230,000 (.05%) P+W $230,000 (.05%) THR retained savings; $460,000 Any additional savings beyond $1,380,000 will be split equally between the owner, architect, and contractor.

12

13 Incentive Plan Fee at risk recovered with four factors; 1-Overall client satisfaction achieved 2-Final cost less than target cost 3-Substantial completion achieved 4-Quality meets owner standards

14 Incentive Plan Project Savings Incentive Distribution based on the average survey score from a 20 question survey taken by the team. A sample; -Team members demonstrate trust and respect across all levels within the Team -Project participant's time is used wisely and productively -Team successfully incorporates and executes Building Information Modeling for the betterment of the project. -The project team uses LEAN principles for making project decisions that are based upon current relevant data and are for the betterment of the PROJECT.

15 Incentive Plan

16 Incentive Plan

17 Incentive Plan

18 Incentive Plan

19 Project Budget vs. Estimate Texas Health HM Alliance TARGET COST Base Budget Approved Alternates Approved Cost Benefit Analysis Pending Cost Benefit Analysis TARGET COST Current Estimate $50,500,000 $50,000,000 $49,500,000 $49,000,000 $48,500,000 $48,000,000 $47,500,000 $47,000,000 $46,500,000 $46,000,000 $45,500,000 $45,000,000 $44,500,000 $44,000,000 $43,500,000 $43,000,000 $42,500,000 $42,000,000 $41,500,000 $41,000,000 $40,500,000 $40,000,000 6/24/2010 7/19/2010 8/13/2010 9/7/ /2/ /27/ /21/ /16/2010 1/10/2011

20 Project Savings Distribution

21 Contractual Lessons The reward structure has to be sufficient to compensate the architect for the additional work. The reward structure modified the architect s behavior, but they felt that they would prefer to collaborate without the fee incentive. Not including Structural and MEP engineers in the reward structure caused problems on the team. Without an active and supportive owner the process will not succeed.

22 Contractual Lessons The waiver of liability was valuable in creating an environment of collaboration and BIM sharing. On another project with the same owner rep and ambition, but without the contract, the collaboration has been different.

23 Contractual Lessons

24 Contractual Lessons

25 LEAN Process

26 LEAN Process THR hired a Lean consultant to assist on the project. He was an Industrial Engineer with experience on refineries and industrial projects. The processes used were; A3; suggestions fit onto an 11x17 piece of paper Scorecards; the team s monthly self-rating Pull schedule; starting at the end result Weekly Work Plan; review tasks at the start of each week, PPC was not consistently carried out. Target value design; designing to a set budget Retrospective; a one month review of process

27 LEAN Process- Big Room

28 LEAN Process

29 LEAN Process-Promise Wall

30 LEAN Process Target Value Design

31 LEAN Process Target Value Design Hospital building structural steel system using target value design;.05% over budget MOB structural steel not using target based design; 8.0% over budget. Engineer was out of fee to continue meetings. Fabricator completed the steel detailing to minimize tube and angle steel, minimizing the labor while adding slightly to the tonnage.

32 Lean Lessons Very difficult to match the flow between architecture and construction. Architect felt financially challenged because of the process. 25% more hours than in a traditional process, half of those hours based on owner decisions. Architectural team found the process rewarding, architectural management not so much. Architectural management struggled with the risk and inability to predict profit on the job.

33 LEAN Lessons LEAN does not mesh with typical efficient architectural processes; go slow to go fast, target based design, many more meetings. If I had to do this on every project we would go broke. P+W Associate Principal...? Be careful when selecting a consultant, begin by implementing a few key processes; PPC, Last Planner, Pull Scheduling... The greatest benefits accrued to the owner

34 Pre-fabrication Strategy Value Proposition for Pre-fab Strategies Reduction in Project Schedule Reduction of peak manpower by leveling resources Significant reduction on labor (50-55%) Productivity loss due to weather Quality Controlled environment Repetition Quality control Safety

35 Pre-fabrication Strategy Prefabrication What systems were targeted? MEP Corridor Racks Typical rack length is 16 feet but total length is 20 feet Maximizes the use of stock length for piping, conduits, etc. Reduces material waste Work is done in somewhat controlled environment Work is also done at table height rather than on ladders, reduces hazards Prefabricating system offsite reduces the peak manpower on the project Patient Room Headwalls The quality of the work produced is high and consistent The coordination allows each system to be perfectly located on the wall The amount of rework is virtually eliminated Patient Room Toilets Finishes can be installed (ie. wall or floor tiles.) Coordination of everything in a toilet room is conducted resulting in consistent location of accessories, outlets, sinks, mirrors, etc. The efficiency of the process produces significant savings in labor

36 Pre-fabrication Strategy MEP Corridor Racks

37 Pre-fabrication Strategy MEP Corridor Racks

38 Pre-fabrication Strategy MEP Corridor Racks

39 Pre-fabrication Strategy MEP Corridor Racks

40 Pre-fabrication Strategy MEP Corridor Racks

41 Pre-fabrication Strategy MEP Corridor Racks

42 Pre-fabrication Strategy MEP Corridor Racks

43 Pre-fabrication Strategy MEP Corridor Racks

44 Pre-fabrication Strategy Patient Room Headwalls

45 Pre-fabrication Strategy Patient Room Headwalls

46 Pre-fabrication Strategy Patient Room Headwalls

47 Pre-fabrication Strategy Patient Room Headwalls

48 Pre-fabrication Strategy Patient Room Headwalls

49 Pre-fabrication Strategy Patient Room Headwalls

50 Pre-fabrication Strategy Sequence of Headwalls and Pods

51 Pre-fabrication Strategy Modeling Studs with piping

52 Pre-fabrication Strategy Restroom Mock-Ups

53 Pre-fabrication Strategy Restroom pre-fabrication shop

54 Pre-fabrication Strategy Qnty Estimated MH's Actual MH's MH Reduction Estimated Labor $ Actual Labor $ Savings Savings / Unit Patient Rest Room 35 3,945 1,474 2,471 $96,653 $36,113 $60,540 $1,730 63% Headwalls 28 1, $47,318 $21,538 $25,780 $921 48% MEP System Racks* 35 1, $32,122 $24,693 $7,428 $212 23% TOTAL: 3,553 $93,748 53% Waste Reduction 19k lbs 9k lbs 10k lbs over 50% reduction in waste generation

55 Pre-fabrication Strategy Baseline vs. First-Run Study vs. Actual

56 Pre-fabrication Strategy Pre-fabrication Strategy; it will be very difficult without strong owner commitment. Implementation must start in design Early Approvals Detailed Planning Mind shift: Construction to Manufacturing Supply Chain Assemble the units do not build them Coordination of Shops (Navis)

57 Pre-fabrication Strategy Location Warehouse Shipping Storage Buy-out Strategy Self Perform Pod Manufacturer Timing!

58 BIM in IPD Signed the AIA E202 but referred to the P+W BIM protocol for more detail. Model is no longer primarily for 2D documentation, it is now a tool for estimating, coordination, and phasing. Everything gets modeled, eliminate 2D content in the 3D model. Accuracy of model is critical, floor and roof slopes modeled, walls modeled to correct height.

59 BIM in IPD P+W agreed to follow some key BIM standards from Beck, these have now been adopted for all their projects.

60 BIM in IPD 2.0 Separation of model elements into objects that match estimating elements. Coding all library items into cost database. Focus on model not drawings as building tool to minimize notation. Generating datapoints to feed directly into Trimble for layout. Model generated by the team for the team.

61 BIM final thoughts BIM is not a substitute for an experienced estimator. Without the IPD liability waiver true BIM cooperation becomes more challenging. He/she who controls the model controls the process. The general standard of architectural documentation is currently low, this will hurt the profession. How to get paid for higher quality?

62 Completed Project

63 Completed Project

64 Completed Project

65 Completed Project

66 Completed Project

67 Completed Project

68 Final result Compared to the comparable building used to set the base budget, this project was; -Delivered in three months less time. -Cost the owner $584,000 less. -Contained $2,500,000 of upgraded mechanical. -Significantly upgraded design.

Engineer/Trade Partner Collaboration

Engineer/Trade Partner Collaboration Engineer/Trade Partner Collaboration ccrd Overview 10 Offices across the United States Major projects over the past 7 years 25 million sq. ft. of healthcare Proven experience in IPD/LEAN delivery techniques

More information

Prefabrication and Modular Construction: Providing Value from a Builders Perspective Shannon Lightfoot McCarthy Building Companies, Inc.

Prefabrication and Modular Construction: Providing Value from a Builders Perspective Shannon Lightfoot McCarthy Building Companies, Inc. Shannon Lightfoot McCarthy Building Companies, Inc. CR3099-P A prefabrication strategy allows for the practice of lean concepts, while delivering a successful project. Prefabrication of MEP systems has

More information

Design-Assist Delivery for Prefabricated Building Components

Design-Assist Delivery for Prefabricated Building Components Design-Assist Delivery for Prefabricated Building Components Darren Olsen, Duncan Varner, Mark Taylor, Salman Azhar and Mark Tatum Auburn University Auburn Alabama Prefabrication offers a potential means

More information

Construction coordination

Construction coordination SBS5322 Basics of Building Information Modelling http://ibse.hk/sbs5322/ Construction coordination Ir. Dr. Sam C. M. Hui Faculty of Science and Technology E-mail: cmhui@vtc.edu.hk Jan 2018 Contents Construction

More information

Projectwide ROI. A team approach to gaining BIM Benefits (Arizona State University ISTB IV) Dan Russell / Sundt Construction / November 2, 2011

Projectwide ROI. A team approach to gaining BIM Benefits (Arizona State University ISTB IV) Dan Russell / Sundt Construction / November 2, 2011 Projectwide ROI A team approach to gaining BIM Benefits (Arizona State University ISTB IV) Dan Russell / Sundt Construction / November 2, 2011 The Associated General Contractors of America (AGC) is a Registered

More information

The benefits of reinventing the wheel BIM AND IPD BRING FUNDAMENTAL CHANGES TO ROLES IN A STRUCTURAL ENGINEERING FIRM

The benefits of reinventing the wheel BIM AND IPD BRING FUNDAMENTAL CHANGES TO ROLES IN A STRUCTURAL ENGINEERING FIRM Page 1 of 5 The benefits of reinventing the wheel BIM AND IPD BRING FUNDAMENTAL CHANGES TO ROLES IN A STRUCTURAL ENGINEERING FIRM By Rick Oehmcke, S.E. Not that many years ago, few structural engineers

More information

HEALTHCARE OF THE FUTURE INTEGRATED CARE + FACILITY DESIGN

HEALTHCARE OF THE FUTURE INTEGRATED CARE + FACILITY DESIGN HEALTHCARE OF THE FUTURE INTEGRATED CARE + FACILITY DESIGN PROJECT INTRODUCTION PROGRAM + DESIGN RESPONSE Built-to-Suit prototype Medical Clinic was designed in response to tenant s extensive development

More information

Lean Practices from Competition through Construction

Lean Practices from Competition through Construction Lean Practices from Competition through Construction UCSF MISSION HALL PROJECT RUDOLPH & SLETTEN, INC WRNS STUDIO Introductions RUDOLPH & SLETTEN, INC Gary Taylor Senior Project Executive Kelli Quinn Senior

More information

Minitab Headquarters

Minitab Headquarters Minitab Headquarters State College, PA Erin E. Hess www.arche.psu.edu/thesis/eeh124 Consultant: Dr. David Riley This project delivery evaluation report researches and analyzes the agreements and commitments

More information

INTEGRATED PROJECT DELIVERY

INTEGRATED PROJECT DELIVERY INTEGRATED PROJECT DELIVERY IPD For Facility Professionals THE PANEL Doug Kitlar GEF Seniors Housing Pete Wardell Chandos Construction Jonathan Rockliff Rockliff Pierzchajlo Kroman Architects Ltd. Bert

More information

BIM Competency Delivers Competitive Advantages

BIM Competency Delivers Competitive Advantages Volume 9, Number 2 Summer 2014 The official publication of the PHCC Wisconsin Association and Master Plumbers/Heating & Cooling Contractors of Wisconsin BIM Competency Delivers Competitive Advantages INSIDE:

More information

VICTAULIC VIRTUAL DESIGN

VICTAULIC VIRTUAL DESIGN VICTAULIC VIRTUAL DESIGN AND CONSTRUCTION ESTIMATING, BIM, AND SOFTWARE SOLUTIONS FOR THE COMMERCIAL, INDUSTRIAL AND PIPELINE CONSTRUCTION BUSINESS SM FASTER FROM THE START VICTAULIC VIRTUAL DESIGN AND

More information

Lean Project Delivery Operating System

Lean Project Delivery Operating System Lean Project Delivery Operating System David MacNeel & Dan Passick, On Point Lean OCTOBER 16, 2017 LCI Education & Training Lean Construction Institute Provider Number H561 LCI Learning Module: Introduction

More information

Meeting the Challenge of a Difficult Job GC The Beck Group Colorado Mills Mall Restoration 1

Meeting the Challenge of a Difficult Job GC The Beck Group Colorado Mills Mall Restoration 1 2018 AGC ACE Awards Entry Category 3 Meeting the Challenge of a Difficult Job GC Contractor The Beck Group Project Name Colorado Mills Mall Restoration When the costliest storm in state s history unleashed

More information

Measuring the Impact of BIM in Design-Bid-Build

Measuring the Impact of BIM in Design-Bid-Build Measuring the Impact of BIM in Design-Bid-Build A Case Study Dace A. Campbell, AIA, LEED AP // BNBuilders // 2 November 2011 The Associated General Contractors of America (AGC) is a Registered Provider

More information

Adolfson & Peterson Construction, Megan Bond; ; CATEGORY 3: Meeting the Challenge of a Difficult Job General Contractor

Adolfson & Peterson Construction, Megan Bond; ; CATEGORY 3: Meeting the Challenge of a Difficult Job General Contractor Vanguard Classical School K-12 Adolfson & Peterson Construction, Megan Bond; 303-326-5842; mbond@a-p.com CATEGORY 3: Meeting the Challenge of a Difficult Job General Contractor Overview Statement: Every

More information

Taking Design to Operation

Taking Design to Operation Taking Design to Operation Presenters: Jacob D Albora Associate VP, Director of BIM-FM Services McVeigh & Mangum Engineering, Inc. Bernie Sublette, CHC Project Executive, Project Development Healthcare

More information

BRINGING THE BEST OF MANUFACTURING TO CONSTRUCTION January 29, 2018

BRINGING THE BEST OF MANUFACTURING TO CONSTRUCTION January 29, 2018 BRINGING THE BEST OF MANUFACTURING TO CONSTRUCTION January 29, 2018 definition of PROJECT MANAGEMENT The planning, scheduling, and controlling of project activities to achieve performance, cost and time

More information

6 BIM FAILURES. The design is complete, contracts are written, the project team is assembled and ready to build. Optimism is at its peak!

6 BIM FAILURES. The design is complete, contracts are written, the project team is assembled and ready to build. Optimism is at its peak! 6 BIM FAILURES The design is complete, contracts are written, the project team is assembled and ready to build. Optimism is at its peak! To meet the owner s performance requirements and complete the project

More information

Enhancing the Environment in Which People Live, Learn, Heal, Work and Play. HEALTHCARE INTERIOR SOLUTIONS

Enhancing the Environment in Which People Live, Learn, Heal, Work and Play. HEALTHCARE INTERIOR SOLUTIONS TM Enhancing the Environment in Which People Live, Learn, Heal, Work and Play. HEALTHCARE INTERIOR SOLUTIONS DESIGNED FOR HEALTHCARE PSI s Healthcare products include custom casework, millwork, wall panel

More information

Carolinas HealthCare System Case Study Collaborate Bid Build (CB 2 ) A Different Approach to Project Delivery

Carolinas HealthCare System Case Study Collaborate Bid Build (CB 2 ) A Different Approach to Project Delivery Carolinas HealthCare System Case Study Collaborate Bid Build (CB 2 ) A Different Approach to Project Delivery Carolinas HealthCare System Case Study Behavioral Health Davidson, NC Project Team Carolinas

More information

Off-Site Wood Construction:

Off-Site Wood Construction: Off-Site Wood Construction: What, Why, How and the Future. Randall S. Walter, AIA, LEED AP Disclaimer: This presentation was developed by a third party and is not funded by WoodWorks or the Softwood Lumber

More information

Operational Modeling: Informed solutions for complex problems

Operational Modeling: Informed solutions for complex problems Operational Modeling: Informed solutions for complex problems 16 th LCI Congress October 7-10, 2014 Our Big Idea Adapting standard practices from the semiconductor industry enables new techniques in design

More information

Integrated Design Build and a Lean Delivery

Integrated Design Build and a Lean Delivery Integrated Design Build and a Lean Delivery Managing a complex business case while delivering a lean project Holly Cindell, Jim Bostic and John Vaught Background Agenda Contracts and Creating an integrated

More information

LEAN PROJECT MANAGEMENT THE HARD WAY

LEAN PROJECT MANAGEMENT THE HARD WAY LEAN PROJECT MANAGEMENT THE HARD WAY 11.18.11 Mary Heger Vice President, Information Technology and ASC 1 THE CHALLENGE Outdated design which no longer reflected the way we were organized or our corporate

More information

AN OVERVIEW OF DESIGN-BUILD. Presented by: David Umstot, PE, CEM Umstot Project and Facilities Solutions, LLC January 20, 2014

AN OVERVIEW OF DESIGN-BUILD. Presented by: David Umstot, PE, CEM Umstot Project and Facilities Solutions, LLC January 20, 2014 AN OVERVIEW OF DESIGN-BUILD Presented by: David Umstot, PE, CEM Umstot Project and Facilities Solutions, LLC January 20, 2014 Design-Build Not a New Concept In California: Multiple statutes govern design-build

More information

LEGAL ISSUES WITH INTEGRATED PROJECT DELIVERY UNC Charlotte ERIK M. ROSENWOOD HAMILTON STEPHENS STEELE & MARTIN, PLLC

LEGAL ISSUES WITH INTEGRATED PROJECT DELIVERY UNC Charlotte ERIK M. ROSENWOOD HAMILTON STEPHENS STEELE & MARTIN, PLLC LEGAL ISSUES WITH INTEGRATED PROJECT DELIVERY UNC Charlotte - 2013 ERIK M. ROSENWOOD HAMILTON STEPHENS STEELE & MARTIN, PLLC ERIK ROSENWOOD PARTNER HAMILTON, STEPHENS, STEELE & MARTIN 704.227.1078 EROSENWOOD@LAWHSSM.COM

More information

Design Build - Project Delivery Model Trends

Design Build - Project Delivery Model Trends Drag picture to placeholder or click icon to add Drag picture to placeholder or click icon to add Drag picture to placeholder or click icon to add Design Build - Project Delivery Model Trends Sean M. Collins,

More information

Target Value Design and BIM: Delivering the targets of construction 2025

Target Value Design and BIM: Delivering the targets of construction 2025 Target Value Design and BIM: Delivering the targets of construction 2025 Prof Lauri Koskela, University of Huddersfield Dr Paul Coates, University of Salford Amit Kaushik, MSc, University of Salford Presentation

More information

Dallas City Performance Hall: Building Information Modeling as a Decision-Making Tool

Dallas City Performance Hall: Building Information Modeling as a Decision-Making Tool Dallas City Performance Hall: Building Information Modeling as a Decision-Making Tool Will Mitchell Corgan Associates, Inc. DL5395 Dallas City Performance Hall is a 750-seat theater facility scheduled

More information

Session: Date: Thursday, September 29, 2016

Session: Date: Thursday, September 29, 2016 Session: 092908 Date: Thursday, September 29, 2016 Bringing Efficiencies to the Industry Millennial Style Presented by: Luke Voiland, Principal, Shepley Bulfinch Terry This program is registered with the

More information

Three Opportunities Created by Lean Construction

Three Opportunities Created by Lean Construction Three Opportunities Created by Lean Construction Gregory Howell, P.E. Lean Project Consulting How do we manage projects now? Determine client requirements including quality, time and budget limits and

More information

ADVERTISEMENT FOR QUALIFICATION AND PROPOSALS OF DESIGN/ASSIST TRADE PARTNER

ADVERTISEMENT FOR QUALIFICATION AND PROPOSALS OF DESIGN/ASSIST TRADE PARTNER ADVERTISEMENT FOR QUALIFICATION AND PROPOSALS OF DESIGN/ASSIST TRADE PARTNER PROJECT NOTICE Skanska USA Inc. hereinafter called SKANSKA, intends to award a design-assist subcontract to a Framing & Drywall

More information

Massive but Lean: How Design + Construction Efficiency Led One Mass Timber Project to Success

Massive but Lean: How Design + Construction Efficiency Led One Mass Timber Project to Success Massive but Lean: How Design + Construction Efficiency Led One Mass Timber Project to Success Presented by: W illiam Silva Disclaimer: This presentation was developed by a third party and is not funded

More information

Offsite modular construction

Offsite modular construction 4 SEPTEMBER 2018 Offsite modular construction INTRODUCTION This practice note explains how the NEC4 suite of contracts can be used to support the use of offsite modular construction. OFFSITE MODULAR CONSTRUCTION

More information

Meeting the Standard of Care in an Evolving Project Delivery Environment

Meeting the Standard of Care in an Evolving Project Delivery Environment Meeting the Standard of Care in an Evolving Project Delivery Environment Russell Jumper & Tim Fandrey Gray Reed & McGraw Texas Society of Professional Engineers Denton Chapter March 9, 2018 Gray Reed &

More information

BU21079 Building Information Modeling to Facilities Information Management and Beyond

BU21079 Building Information Modeling to Facilities Information Management and Beyond BU21079 Building Information Modeling to Facilities Information Management and Beyond Meghan Ruffo, BIM Manager / Carolinas HealthCare System Thomas Koltoniak, BIM Specialist / Carolinas HealthCare System

More information

Structural Breadth Study

Structural Breadth Study Structural Breadth Study Connection Redesign Structural Breadth Study Connection Redesign Existing EIFS Connection The expansion project is a steel frame structure with concrete slab on deck. There is

More information

AIA 2009 BIM AWARDS. Category B: Design/Delivery Process Innovation Using BIM

AIA 2009 BIM AWARDS. Category B: Design/Delivery Process Innovation Using BIM Introduction AIA 2009 BIM AWARDS Category B: Design/Delivery Process Innovation Using BIM Project: UNIVERSITY OF COLORADO - DENVER HEALTH SCIENCE CENTER RESEARCH COMPLEX II Owner s Statement Architect

More information

PREFAB AND MODULAR SYSTEMS A CASE STUDY ON RISKS/REWARDS

PREFAB AND MODULAR SYSTEMS A CASE STUDY ON RISKS/REWARDS Workshop W4 Wednesday, November 14 9:00 10:15 a.m. and 10:45 a.m. noon PREFAB AND MODULAR SYSTEMS A CASE STUDY ON RISKS/REWARDS Presented by Panelists: Workshop W4 Robert G. Compton Director of Product

More information

Leveraging BIM to Reduce Risk. Kyle Holmes Vice President of Support Operations The Brandt Companies, LLC

Leveraging BIM to Reduce Risk. Kyle Holmes Vice President of Support Operations The Brandt Companies, LLC Leveraging BIM to Reduce Risk Kyle Holmes Vice President of Support Operations The Brandt Companies, LLC kholmes@brandt-companies.com TOPICS Very Brief Corporate Overview Myths To Dispel Why do BIM? The

More information

Construction Fabrication Integration The Future is Here: Benefits of Advanced Technology for Subcontractors Presenter: Steve Hunt Dee Cramer, Inc.

Construction Fabrication Integration The Future is Here: Benefits of Advanced Technology for Subcontractors Presenter: Steve Hunt Dee Cramer, Inc. Introduction Presenter Steve Hunt / Dee Cramer, Inc. / Holly, MI BIM Manager & Estimating Manager Sheet Metal Pre-Apprentice 1988-1990 Sheet Metal Apprentice 1990-1994 Sheet Metal Journeyman 1994 Sheet

More information

Current Status of Building Information Modeling (BIM) Adoptability in the U.S. Electrical Construction Industry

Current Status of Building Information Modeling (BIM) Adoptability in the U.S. Electrical Construction Industry Fifth International Conference on Construction in the 21 st Century (CITC-V) Collaboration and Integration in Engineering, Management and Technology May 20-22, 2009, Istanbul, Turkey Current Status of

More information

Benjamin D. Hall Interdisciplinary Research Building

Benjamin D. Hall Interdisciplinary Research Building Benjamin D. Hall Interdisciplinary Research Building Design. Build. Operate. Maintain. 2007 BIM AWARDS AIA Technology in Architectural Practice Table of Contents ARCHITECT S STATEMENT DESCRIPTIVE DATA

More information

Analysis 1: Project Sequencing. Analysis 2: MEP Prefabrication. Analysis 3: Green Roof Implementation. Analysis 4: Alternate Delivery Method

Analysis 1: Project Sequencing. Analysis 2: MEP Prefabrication. Analysis 3: Green Roof Implementation. Analysis 4: Alternate Delivery Method The purpose of this proposal is to outline four construction analyses and two breadth studies that will be explored in an effort to provide feasible solutions to increase the success of the Mary J. Drexel

More information

Technology Transforms Existing Building Into 21st Century Workspace

Technology Transforms Existing Building Into 21st Century Workspace Project Overview Technology Transforms Existing Building Into 21st Century Workspace The Northwestern Mutual - Van Buren Office Building project included the complete remodel of a seven-story, 162,087-square-foot

More information

Presentation Outline. Project Background. ANALYSIS#1: Multi-Trade Prefabrication Study. ANALYSIS#2: Cost Estimating Through 3D Modeling

Presentation Outline. Project Background. ANALYSIS#1: Multi-Trade Prefabrication Study. ANALYSIS#2: Cost Estimating Through 3D Modeling Presentation Outline Project Background ANALYSIS#1: Multi-Trade Prefabrication Study ANALYSIS#2: Cost Estimating Through 3D Modeling ANALYSIS#3: Feasibility of Solar PV-System Electrical Breadth Structural

More information

LEAN design for life cycle information. Steen Sunesen Senior Project Manager / Digitalisation Lead LINK arkitektur

LEAN design for life cycle information. Steen Sunesen Senior Project Manager / Digitalisation Lead LINK arkitektur LEAN design for life cycle information Steen Sunesen Senior Project Manager / Digitalisation Lead LINK arkitektur sts@linkarkitektur.no LEAN in design LEAN design for life-cycle information Steen Sunesen

More information

Tekla Structures for Precast Concrete Industry TRANSFORMING THE WAY THE WORLD WORKS

Tekla Structures for Precast Concrete Industry TRANSFORMING THE WAY THE WORLD WORKS Tekla Structures for Precast Concrete Industry Model, Fabricate and Erect all Precast Structures Faster and with Better Quality Working with the constructible Tekla models minimizes costly surprises and

More information

DALLAS-FORT WORTH INTERNATIONAL AIRPORT

DALLAS-FORT WORTH INTERNATIONAL AIRPORT DALLAS-FORT WORTH INTERNATIONAL AIRPORT ADDENDUM NO. 2 TO THE REQUEST FOR BIDS Contract No. 9500445 Restroom Rehabilitation at Terminal B (Phase 3 & 4) December 20, 2010 THE REQUEST FOR BIDS (RFB) FOR

More information

Off-Site Wood Construction:

Off-Site Wood Construction: Off-Site Wood Construction: What, Why, How and the Future. Randall S. Walter, AIA, LEED AP Disclaimer: This presentation was developed by a third party and is not funded by WoodWorks or the Softwood Lumber

More information

Different Ways to Contract for Lean Project Delivery. Joel Darrington San Diego COP 3/27/19

Different Ways to Contract for Lean Project Delivery. Joel Darrington San Diego COP 3/27/19 Different Ways to Contract for Lean Project Delivery Joel Darrington San Diego COP 3/27/19 Relevance of Contracts? Increase alignment among parties Parameters for Lean behavior and activities First collaborative

More information

- DATA REQUIREMENTS BIM

- DATA REQUIREMENTS BIM UHS BIM Protocol S E C T I O N 1 - DATA REQUIREMENTS BIM authoring software: The design team is required to use parametric BIM authoring software for creation of models that include all geometry, physical

More information

Three Opportunities Glenn Ballard Lean Construction Institute University of California, Berkeley

Three Opportunities Glenn Ballard Lean Construction Institute University of California, Berkeley Three Opportunities Glenn Ballard Lean Construction Institute University of California, Berkeley ballard@ce.berkeley.edu Graphic courtesy of Extemin Lean in the Construction Industry: Three Connected Opportunities

More information

Descriptive Data Sheet

Descriptive Data Sheet Descriptive Data Sheet Project Name: Patient Care Pavilion Facility type: Acute Care Hospital Project Type: Patient Tower Replacement Project Location: Oakland, California Project Stats: 13 Stories 35,000

More information

BUILDING INFORMATION MODELING (BIM) THE WHOLE TRUTH 10:30am 12:00pm. Presenter: Rod Yeoh, Principal, Omicron Architecture Engineering Construction

BUILDING INFORMATION MODELING (BIM) THE WHOLE TRUTH 10:30am 12:00pm. Presenter: Rod Yeoh, Principal, Omicron Architecture Engineering Construction BUILDING INFORMATION MODELING (BIM) THE WHOLE TRUTH 10:30am 12:00pm Presenter: Rod Yeoh, Principal, Omicron Architecture Engineering Construction Omicron AEC + Architecture, Engineering, & Construction

More information

Inspire. Educate. Unite.

Inspire. Educate. Unite. Cogent Project Management 12 May 2017 Mission + Purpose Cogence (Latin) To drive together or Thinking that is well organized The purpose of the Alliance is to bring Owners and Developers, Architects and

More information

Contracted Scope ABC of the Carolinas Excellence in Construction Awards Carolinas HealthCare System CMC Kitchen Healthcare.

Contracted Scope ABC of the Carolinas Excellence in Construction Awards Carolinas HealthCare System CMC Kitchen Healthcare. Contracted Scope Provide a detailed description of your scope for this project. Responses should include: type of construction; size of project; contract value; length of project; and percentage of labor

More information

Company Profile LYNX TRADING & CONTRACTING W.L.L. Delivering the promise

Company Profile LYNX TRADING & CONTRACTING W.L.L. Delivering the promise Company Profile 2017 an overview of who we are WHO WE ARE Lynx Trading & Contracting W.L.L., is a multi-disciplined company established to cater for the growing and multifaceted needs of Qatar's industry.

More information

BIM Standard and Specifications for San Mateo County. Project Development Unit

BIM Standard and Specifications for San Mateo County. Project Development Unit BIM Standard and Specifications for San Mateo County Project Development Unit Table of Contents A. INTRODUCTION AND GENERAL REQUIREMENTS... 2 B. DEFINITIONS, TERMS, AND DESCRIPTIONS... 3 C. BIM KICK OFF

More information

Methodist Hospital for Surgery Addison, Texas. CLIENTS Methodist Health System Private Physician Consortium SRP Medical Medica Development

Methodist Hospital for Surgery Addison, Texas. CLIENTS Methodist Health System Private Physician Consortium SRP Medical Medica Development Team First: A Case Study Discussing the Benefits of Team Collaboration and Building Information Modeling on the Design and Construction of a Physician-Owned Surgery Hospital Impacted by Federal Health

More information

Integrated Project Delivery

Integrated Project Delivery Integrated Project Delivery Suzanne H. Harness Consulting Architects of Alberta November 5, 2014 This presentation is protected by US and International copyright laws. Reproduction, distribution, display

More information

IPD. Who Are We? 25/04/2017. The Red Deer Catholic Story. Red Deer is located between Edmonton & Calgary Population - 100,000

IPD. Who Are We? 25/04/2017. The Red Deer Catholic Story. Red Deer is located between Edmonton & Calgary Population - 100,000 IPD The Red Deer Catholic Story PNW A4LE, Banff, Alberta May 18, 2017 Ken Jaeger, Red Deer Catholic Regional Schools Who Are We? Red Deer is located between Edmonton & Calgary Population - 100,000 Red

More information

TOWSON TIGER ARENA TOWSON, MD. Derek Stoecklein Construction Management Option Advisor: Ray Sowers

TOWSON TIGER ARENA TOWSON, MD. Derek Stoecklein Construction Management Option Advisor: Ray Sowers TOWSON TIGER ARENA TOWSON, MD Advisor: Ray Sowers Project Background Fabric Duct System Prefabricated Terra Cotta Production Planning Cisco StadiumVision Overview Location Site Planning Existing System

More information

Emergent models in integration Nature as model: Declaration of interdependence Lean thinking Building information modeling Lean thinking

Emergent models in integration Nature as model: Declaration of interdependence Lean thinking Building information modeling Lean thinking Emergent models in integration Emergent models in integration Nature as model: Declaration of interdependence Lean thinking Building information modeling Lean thinking A substantially Building information

More information

AIA TAP / 2012 BIM Awards Leveraging BIM from Design Concept to Facility Management Category A: BIM Excellence Awards

AIA TAP / 2012 BIM Awards Leveraging BIM from Design Concept to Facility Management Category A: BIM Excellence Awards AIA TAP / 2012 BIM Awards Leveraging BIM from Design Concept to Facility Management Category A: BIM Excellence Awards 1 Introduction Project Data: Site Area 11 acres Total GSF (gross square feet) 288,415

More information

Sunnyvale Plaza. Mid-Atlantic Region, United States. Nathan Braskey Construction Management. November 15, Technical Assignment #3

Sunnyvale Plaza. Mid-Atlantic Region, United States. Nathan Braskey Construction Management. November 15, Technical Assignment #3 November 15, 2013 Sunnyvale Plaza Mid-Atlantic Region, United States Nathan Braskey Construction Management FACULTY CONSULTANT: CRAIG DUBLER EXECUTIVE SUMMARY The following technical report explores several

More information

2012 Kristine Fallon Associates, Inc. Complete Facility Lifecycle Management

2012 Kristine Fallon Associates, Inc. Complete Facility Lifecycle Management Complete Facility Lifecycle Management BIM Strategies for Owners KFA BIM Experience Consulted to Revit Technology prior to initial product release Construction phase MEP coordination > 3 million SF GSA

More information

SECTION PAYMENT PROCEDURES

SECTION PAYMENT PROCEDURES SECTION 012900 PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract including General and Supplementary Conditions and other Division 01 Specifications Sections apply

More information

REQUEST FOR PROPOSAL. Design-Build Services for Intensive Care Unit and Patient Tower Expansion St. Charles Medical Center - Bend.

REQUEST FOR PROPOSAL. Design-Build Services for Intensive Care Unit and Patient Tower Expansion St. Charles Medical Center - Bend. REQUEST FOR PROPOSAL Design-Build Services for Intensive Care Unit and Patient Tower Expansion St. Charles Medical Center - Bend For St. Charles Health System Issued: May 9, 2016 Proposal Due: June 9,

More information

Insulated Cold-Formed Steel Wall Panels: A case study of a contractor-manufacturer

Insulated Cold-Formed Steel Wall Panels: A case study of a contractor-manufacturer Insulated Cold-Formed Steel Wall Panels: A case study of a contractor-manufacturer Submitted to: Partnership for Advancing Technology in Housing U.S. Department of Housing and Urban Development Washington,

More information

Continuing Education Credits

Continuing Education Credits Recent Developments in (IPD) for NECA Members October 14, 2013 9:00-9:50 AM Following this session, you will be able to: Explain the concept and structure of an IPD project. Identify the issues and risks

More information

Bringing Order out of Chaos

Bringing Order out of Chaos Bringing Order out of Chaos How architects can use simple Lean concepts to double the project team s productivity and maximize client satisfaction Susan Pratt Susan@PrattAandM.com AEC Labor Productivity

More information

Recent developments in contract procurement models

Recent developments in contract procurement models Recent developments in contract procurement models 5 th Annual Contract Management Masterclass Michael Creedon Partner 7 September 2010 ME_80102001 Overview 1. Introduction The current environment Alliancing

More information

Architectural Services

Architectural Services Architectural Services 2016 Capital Improvement Program Request for Proposal Number: 18-20 Title of the Projects: Renovations to Weaver Middle School Procurement Department Bibb County School District

More information

Design & Detailing, or why every structural steel project is not profitable

Design & Detailing, or why every structural steel project is not profitable How to maximize the benefits of 3D models throughout Intelligent Steel Fabrication PART 1 Design & Detailing, or why every structural steel project is not profitable Contents Background: Model behavior

More information

Mueller Laboratory Renovation. Technical Report #3 By Mark Jackson Construction Management Option 11/14/14

Mueller Laboratory Renovation. Technical Report #3 By Mark Jackson Construction Management Option 11/14/14 Mueller Laboratory Renovation Technical Report #3 By Mark Jackson Construction Management Option 11/14/14 Table of Contents Executive Summary 3 Staying on Schedule 4 Value Engineering 5 Constructability

More information

For years, on-screen quantity takeoff has been the trusted

For years, on-screen quantity takeoff has been the trusted Is Takeoff Dead? Much has been written about the demise of Quantity Takeoff due to the continual integration of takeoff functionality in BIM systems. But, is takeoff really dead? BY ALLEN L. CROWLEY, JR.,

More information

Building Information Modeling to Facilities Information Management and Beyond

Building Information Modeling to Facilities Information Management and Beyond Building Information Modeling to Facilities Information Management and Beyond Meghan Ruffo, Thomas Koltoniak, & Geoffrey Coon Carolinas HealthCare System Join the conversation #AU2016 Class summary Carolinas

More information

TOWSON TIGER ARENA TOWSON, MD. Derek Stoecklein Construction Management Option Advisor: Ray Sowers

TOWSON TIGER ARENA TOWSON, MD. Derek Stoecklein Construction Management Option Advisor: Ray Sowers TOWSON TIGER ARENA TOWSON, MD Advisor: Ray Sowers Project Background Fabric Duct System Prefabricated Terra Cotta Production Planning Cisco StadiumVision Overview Location Site Planning Existing System

More information

STRATEGIC ARCHITECTURAL DESIGN: HOW TO MEET BUSINESS GOALS AND MAXIMIZE ROI

STRATEGIC ARCHITECTURAL DESIGN: HOW TO MEET BUSINESS GOALS AND MAXIMIZE ROI STRATEGIC ARCHITECTURAL DESIGN: HOW TO MEET BUSINESS GOALS AND MAXIMIZE ROI TABLE OF CONTENTS PART I: STRATEGIC PROJECT PLANNING AND SMARTER DESIGN...4 PART II: STRATEGIES TO CAPTURE VALUE AND SAVINGS

More information

Integrated Project Delivery: A Case Study on Process Improvement and Embracing a True Collaborative Team Approach.

Integrated Project Delivery: A Case Study on Process Improvement and Embracing a True Collaborative Team Approach. Integrated Project Delivery: A Case Study on Process Improvement and Embracing a True Collaborative Team Approach October 14, 2015 1 Brenda Bullied Project Manager, Lawrence + Memorial Hospital Josh DiGloria

More information

Introduction to Lean Construction: What is Lean Construction and How Can It Benefit You?

Introduction to Lean Construction: What is Lean Construction and How Can It Benefit You? Introduction to Lean Construction: What is Lean Construction and How Can It Benefit You? BY DAVID UMSTOT, PE, CEM UMSTOT PROJECT AND FACILITIES SOLUTIONS, LLC ABC Webinar November 19, 2013 1 Lean Construction

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL DATE: February 24, 2015 Shimizu North America LLC 909 3rd Avenue, 28th Floor New York, NY 10022 RFP Queries (646) 205-4722 Fax (212) 223-1930 PROJECT: The Japan Foundation New York

More information

1/4/2014. Alternative Project Delivery Methods 1. Agenda

1/4/2014. Alternative Project Delivery Methods 1. Agenda Steven. C. Thweatt Assistant Vice Chancellor Facilities Management University of Colorado @ Boulder Steven.thweatt@colorado.edu Introduction Fun in the air More Fun in Chattanooga Licensed Architect Georgia

More information

Produkt og Procesmodeller (PPM) i byggeriet. Product and Process models in Construction. 6. Process Models

Produkt og Procesmodeller (PPM) i byggeriet. Product and Process models in Construction. 6. Process Models ICT Enhanced Buildings Potentials Produkt og Procesmodeller (PPM) i byggeriet. Product and Process models in Construction. 6. Process Models Cand. Scient. Bygningsinformatik. Semester 1, 2010. CONTENT

More information

Section 5 Crew Requirements

Section 5 Crew Requirements Section 5 Crew Requirements Panel Fabrication After the home s design has been approved by the client and permitting agencies, Nexframe will begin production according to the construction schedule. The

More information

JOHNS HOPKINS HOSPITAL NEW CLINICAL BUILDING

JOHNS HOPKINS HOSPITAL NEW CLINICAL BUILDING JOHNS HOPKINS HOSPITAL NEW CLINICAL BUILDING Baltimore, Maryland Dan Weiger Architectural Engineering, 5th Year Construction Management Option Thesis Proposal Advisor: Dr. John I. Messner January 26, 2009

More information

How to estimate the cost of new air conditioning system to an existing storage warehouse.

How to estimate the cost of new air conditioning system to an existing storage warehouse. How to estimate the cost of new air conditioning system to an existing storage warehouse. 1 How to estimate the cost of new air conditioning system to an existing storage warehouse. Table of Contents Section

More information

Design-Bid-Build Vs Design Build Projects: Performance Assessment of Commercial Projects In Sri Lanka

Design-Bid-Build Vs Design Build Projects: Performance Assessment of Commercial Projects In Sri Lanka Design-Bid-Build Vs Design Build Projects: Performance Assessment of Commercial Projects In Sri Lanka S. Ratnasabapathy and R. Rameezdeen Department of Building Economics, University of Moratuwa, Sri Lanka.

More information

THE LEADER IN PREFABRICATED BATHROOM PODS

THE LEADER IN PREFABRICATED BATHROOM PODS THE LEADER IN PREFABRICATED BATHROOM PODS 2 why MODULAR SPEED SAFETY SIMPLICITY SUPERIOR QUALITY Bathroom pods have been in use across Europe and Asia for decades, and we are proud to have been the first

More information

JOHNS HOPKINS HOSPITAL NEW CLINICAL BUILDING

JOHNS HOPKINS HOSPITAL NEW CLINICAL BUILDING JOHNS HOPKINS HOSPITAL NEW CLINICAL BUILDING Baltimore, Maryland Dan Weiger Architectural Engineering, 5th Year Construction Management Option Thesis Proposal Advisor: Dr. John I. Messner December 12,

More information

6/10/2018. Building Information Modeling Overview. Pirtle s History with Building Information Modeling (BIM)

6/10/2018. Building Information Modeling Overview. Pirtle s History with Building Information Modeling (BIM) Building Information Modeling Overview Pirtle s History with Building Information Modeling (BIM) 1 Pirtle & BIM Pirtle & BIM Pirtle delivers first As-Build Model to FAU and UF Pirtle delivers 4D model

More information

P6, Acumen Fuse & Risk, and Synchro Putting it all Together on a Major Infrastructure Program. Presented by: Project Controls Cubed (PC 3 )

P6, Acumen Fuse & Risk, and Synchro Putting it all Together on a Major Infrastructure Program. Presented by: Project Controls Cubed (PC 3 ) P6, Acumen Fuse & Risk, and Synchro Putting it all Together on a Major Infrastructure Program Presented by: Project Controls Cubed (PC 3 ) 1 Overview 2 Project Controls Cubed (PC 3 ) Small company it doesn

More information

[FISK CORPORATE HEADQUARTERS]

[FISK CORPORATE HEADQUARTERS] Thesis Proposal Stephen Blanchard 12/14/2012 Advisor: Dr. Messner [FISK CORPORATE HEADQUARTERS] Houston, Texas Executive Summary With the completion of the Fisk Corporate Headquarters project taking place

More information

GETTING STARTED WITH LEAN CONSTRUCTION. A guide for project teams

GETTING STARTED WITH LEAN CONSTRUCTION. A guide for project teams GETTING STARTED WITH LEAN CONSTRUCTION A guide for project teams HOW TO USE THIS DOCUMENT Outlined in this guide are foundational steps for helping project teams improve the predictability and profitability

More information

Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at

Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at http://www.leanconstruction.org/usage.pdf when using this file. Thank you. LEVERAGING VIRTUAL DESIGN &

More information

Growing Already Lean Operations Without Additional Labor

Growing Already Lean Operations Without Additional Labor Growing Already Lean Operations Without Additional Labor Sponsored by: Presented by: Tim Archer Sales Training Manager 2013 MHI Copyright claimed as to audiovisual works of seminar sessions and sound recordings

More information

CS21793 Transition to Operations with Building Ops: The (Eye) in BIM

CS21793 Transition to Operations with Building Ops: The (Eye) in BIM CS21793 Transition to Operations with Building Ops: The (Eye) in BIM Mark Mergenschroer Bernhard TME Learning Objectives Learn how to track maintenance data before taking ownership Learn how to increase

More information

Off-site manufacturing for construction. Response to the House of Lords Science and Technology Committee, 4 May 2018

Off-site manufacturing for construction. Response to the House of Lords Science and Technology Committee, 4 May 2018 Off-site manufacturing for construction Response to the House of Lords Science and Technology Committee, 4 May 2018 Introduction The Royal Academy of Engineering welcomes this opportunity to submit evidence

More information