1 STRUCTURES SPECIFICATIONS FOR BRIDGE CONSTRUCTION ISSUES John Westphal, P.E. State Construction Office January 2017
2 Introduction Discuss Defective Materials, as defined within the Specifications Recent changes related to Defective Materials in Section 6 Engineering Analysis Report (EAR) 2
3 Think about it How to deal with defects? The reality is they occur Defective Materials must be either Repaired or Removed and Replaced Ultimately, Public Safety most important! 3
4 EAR Specs 6 CONTROL OF MATERIALS 6-4 Defective Materials Materials not meeting Specification requirements considered Defective Alternative to rejection, Engineering Analysis Initiate within 30 days of rejection 4
5 EAR Specs 6 CONTROL OF MATERIALS Engineering Analysis Two-part approach Engineering Analysis Scope Signed & Sealed Engineering Analysis Report (EAR) Respective engineer designation given in affected Specification Sections to perform EAR 5
6 Pop Quiz Who is designated in the Specs to do repair work? a. The Engineer of Record b. The Specialty Engineer c. The Contractor s Engineer of Record d. Both b and c e. None of the above The Contractor s Engineer of Record and the Specialty Engineer are designations given in the Specifications that grant authority to perform respective categories of work. 6
7 EAR Specs 6 CONTROL OF MATERIALS Engineering Analysis Scope must contain at a minimum: 1. Description of defective materials 2. Supporting info, testing, photos, drawings, and crack maps 3. Proposed approach of investigation and analysis 4. Specialty Engineer or Contractor s Engineer of Record 5. Testing labs 7
8 EAR Specs 6 CONTROL OF MATERIALS EAR must be Signed & Sealed and contain at a minimum: 1. Approved Engineering Analysis Scope 2. Investigations and results 3. Analysis and conclusion 4. Performance and durability of proposed repair Provide as appropriate: 1. Previously approved repair of similar deficiency 2. Research showing effectiveness of proposed repair 3. Engineering calculations 8
9 Engineering analysis who can do what? 9
10 Construction Specifications Covered by 6-4 Defective Materials Provisions 10
11 346 PORTLAND CEMENT CONCRETE Drilled Shaft Concrete Maintain a minimum 5 inch slump throughout elapsed time Elapsed time exceeding slump loss data EAR by Specialty Engineer to address structural adequacy and voids Mass Concrete Concrete not in compliance with Mass Concrete Control Plan 35 F differential or 180 F max temperature exceeded EAR by Specialty Engineer to address strength and durability 11
12 346 PORTLAND CEMENT CONCRETE Chloride Content Limits for Concrete Construction Chloride test results exceed allowable, per Table 4 EAR by Specialty Engineer to address service life of the concrete and address corrosion Investigation and Determination of Structural Adequacy Concrete greater than 500 psi below minimum strength EAR required with full structural analysis that addresses strength and durability of the concrete 12
13 400 CONCRETE STRUCTURES Disposition of Cracked Concrete Engineer documents cracking Width, length and location documented on crack maps" Cracks monitored for growth throughout construction Engineer classifies cracks as either: nonstructural or structural 13
14 400 CONCRETE STRUCTURES Nonstructural Cracks, Tables 1 & 2 Disposition of Cracked Concrete: Crack significance Average crack width Environmental classification Elevation relative to Mean High Water (MHW) 14
15 400 CONCRETE STRUCTURES Nonstructural Cracks, Tables 1 & 2 Repair Methods for treating cracks Treatment not always required Per the Tables either: Repair by EI, M or PS Investigate to Determine Appropriate Repair or Rejection Reject and Replace 15
16 400 CONCRETE STRUCTURES Structural Cracks EAR required for structural cracks to determine strength and durability Cracks extending deeper than ½ considered structural as are cracks fully or partially underwater 16
17 450 PRECAST PRESTRESSED CONCRETE CONSTRUCTION Noncomplying Prestressed Products Defects defined within Spalls, Chips, Honeycombing and Cracks Minor vs. Major categorization Minor defects and their repair described in the Specification 17
18 450 PRECAST PRESTRESSED CONCRETE CONSTRUCTION Submittal of Proposal to Accept or Repair Deficiencies Major Defects handled through similar process to that of an EAR Non-complying Prestressed/Precast Concrete Component Data Sheet 18
19 450 PRECAST PRESTRESSED CONCRETE CONSTRUCTION Repair proposal by Contractor s Engineer of Record: 1. Cover Letter 2. Description and proposed repairs 3. Structural and durability evaluation: a. Previous repair use b. Research c. Calculations 4. Proposed credit proportionate to deficiency 5. Documentation and Signed & Sealed evaluation 19
20 455 STRUCTURES FOUNDATIONS (B. PILING) Deviation From Above Tolerances Tolerances are exceeded: Position Axial Alignment Elevation Redesign by Contractor s Engineer of Record Signed & Sealed drawings and computations 20
21 455 STRUCTURES FOUNDATIONS (C. DRILLED SHAFTS) Drilled Shaft Excavations Constructed out of Tolerance Tolerances not met, per : Position Axial Alignment Vertical position Concentricity of cage and shaft Redesign by Contractor s Engineer of Record Signed & Sealed drawings and computations 21
22 455 STRUCTURES FOUNDATIONS (E. STRUCTURES (OTHER THAN BRIDGE) FOUNDATIONS-AUGER CAST PILES) Testing Cement Grout Cement grout acceptance strength greater than 500 psi below minimum strength Structural analysis by Contractor s Engineer of Record Strength and durability must be adequate to remain in place 22
23 460 STRUCTURAL STEEL AND MISCELLANEOUS METALS Evaluation of Work Corrective procedures in Producer s Department-approved QC Plan Notify Engineer of Nonconforming work beyond scope of QC Plan Nonconforming Steel and Miscellaneous Metal Component Data Sheet (NCR) Cover letter along with supporting documentation submitted with NCR 23
24 460 STRUCTURAL STEEL AND MISCELLANEOUS METALS Specialty Engineer Signs & Seals supporting information for the NCR: Sketches Documentation Calculations Pictures Signed & Sealed structural and durability evaluation may be required by a Specialty Engineer 24
25 Questions? 25
GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410
GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 Note to user: These guide specifications are provided by Mid- States Concrete Products as a service to you; they are NOT specific
More informationTolerances- Section
Tolerances- Section 346-6.4 Do not add water to delivered concrete when it is within the target Range for slump 1 346-6.4 Tolerances: Meet the following tolerances from target values for plastic concrete
More informationTECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , &
TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS Financial Project ID 429140-1-52-01, 429140-2-52-01 & 428267-1-52-01 The official record of this Technical Special Provision is the electronic file signed
More informationSPECIAL SPECIFICATION 4900 Sacrificial Cathodic Protection Pile Jacket
1993 Specifications CSJ 0331-04-045 SPECIAL SPECIFICATION 4900 Sacrificial Cathodic Protection Pile Jacket 1. Description. This Item shall govern for the furnishing, installing and energizing a sacrificial
More informationfor Mortar-Set Concrete Tiling Installations
The following specification refers to the Stepstone, Inc. product known as: Large Scale CalArc Pavers for Mortar-Set Concrete Tiling Installations Large Scale CalArc Pavers are part of the California Architectural
More informationProject Address: Name of Person Completing Form:
Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties
More informationCONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures
Preferred QC/QA Procedures The Federal Highway Administration (FHWA) has provided QC/QA guidance for this technology as noted below. The reference document also contains information about construction
More informationCONCRETE REPAIR IN ACTION: USING THE MANUAL AS A GUIDE. Christen Longoria, P.E. San Antonio District Project Engineer
CONCRETE REPAIR IN ACTION: USING THE MANUAL AS A GUIDE Christen Longoria, P.E. San Antonio District Project Engineer TxDOT CONCRETE REPAIR MANUAL Step-by-Step repair procedures for use on new and existing
More information***************************************************************************************************************
03365 POST-TENSIONED CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 38 00. ***************************************************************************************************************
More informationSPECIFICATION : BORING AND JACKING
SPECIFICATION 330524: BORING AND JACKING PART 1.0 GENERAL 1.1 DESCRIPTION 1.1.1 The work of this specification includes all labor, machinery, construction equipment and appliances required to perform in
More informationMANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems
SECTION 02607-1 1.0 GENERAL 1.1 SCOPE: A. This section covers the work necessary for the construction of sanitary and storm system manholes, catch basins, and miscellaneous concrete structures complete.
More informationSECTION TRENCHLESS INSTALLATION
SECTION 02250 PART 1 GENERAL 1.01 Section Includes A. Trenchless installation of casing pipe. B. Trenchless installation of carrier pipe. C. Open cut installation of casing pipe. 1.02 Description of Work
More informationBest Management Standards / Specifications. For Concrete Slab Raising. Prepared in conjunction with the Concrete Repair Association
For Concrete Slab Raising Prepared in conjunction with the Concrete Repair Association DETAILED SPECIFICATIONS 1. Description: 2. Slab Raising: These specifications cover the furnishing, boring, drilling,
More informationSECTION SITE CONCRETE
SECTION 321313 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationSPECIFICATIONS PRECAST PRESTRESSED CONCRETE PART 1 GENERAL 1.6.2.5 Openings, inserts and related reinforcement 1.6.3 Each drawing submitted to bear stamp of 1.1 Related Work qualified Professional Engineer
More informationSECTION CONCRETE PAVING SLABS SET IN MORTAR
SECTION 32 14 13.16 CONCRETE PAVING SLABS SET IN MORTAR (1995 MasterFormat Section 02784) Note: This guide specification for the U.S. is for paving slabs mortared to a concrete base and grouted joints
More informationINDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2
INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...
More informationSECTION STRUCTURAL PRECAST HOLLOW CORE SLABS
PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish all labor, materials, equipment and incidentals to provide a complete structural precast hollow core slab system as shown on the Contract
More information3/5/2014. Disclaimer and Waiver of Liability. Learning Objectives. Portland Cement Association
Disclaimer and Waiver of Liability W-52 Concrete Surface Defects: Causes, Prevention, and Cure. Michelle L. Wilson, FACI Director, Education Portland Cement Association www.cement.org Wednesday, March
More informationTRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)
PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without
More informationODOT Design & Construction Requirements for MSE Walls
ODOT Design & Construction Requirements for MSE Walls Peter Narsavage, P.E. Foundation Engineering Coordinator Ohio Department of Transportation Office of Structural Engineering 2006 Ohio Transportation
More informationNarrow Modular Pavers (NMP) for Sand-Set Installations
The following specification refers to the Stepstone, Inc. product known as: Narrow Modular Pavers (NMP) for Sand-Set Installations Narrow Modular Pavers are part of the California Architectural Paver line
More informationSIDEWALK REPAIR GUIDE
SIDEWALK REPAIR GUIDE Below are examples of sidewalk deficiencies as defined by Chapter 136 of the Altoona Code of Ordinances. Included with each example is a repair suggestion. Some examples may have
More informationSUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation)
PART 1 GENERAL SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation) 1.01 SCOPE This specification includes the materials and procedures required for the internal sealing of the frame-chimney
More informationSchnabel Foundation Company
Micropiles for Roadway Support, Bridge Abutments and Metal Signal Poles on US-158 from US-17B to East of Pasquotank River, in Elizabeth City, NC Schnabel Foundation Company Presenter: Stephen Dimino, P.E.
More informationDesign-Builder Quality Control System Paul Moyer, P.E., Gill Engineering. July 17, 2011
Design-Builder Quality Control System Paul Moyer, P.E., Gill Engineering July 17, 2011 Project Quality Assurance Program Quality Assurance All those planned and systematic actions necessary to provide
More informationHydrodynamic Separation Product Calculator
Hydrodynamic Separation Product Calculator Example Project BMP #1 CDS 2015-4 Project Information Project Name Example Project Option # A Country US State Kentucky City Covington Contact Information First
More informationThe Leader in Underwater Piling Repair Technology
Typical Spalling of square concrete piling on a Mooring Dolphin Completed Mooring Dolphin with Structural Jackets Pilecap offers the strongest structural repair in the industry for application on concrete
More informationSECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT
SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Permeable Articulating
More informationDIVISION 03 CONCRETE CONCRETE Maintenance of Concrete
DIVISION 03 CONCRETE 03 00 00 CONCRETE 03 01 00 Maintenance of Concrete 03 01 10 Maintenance of Concrete Forming and Accessories 03 01 20 Maintenance of Concrete Reinforcing 03 01 23 Maintenance of Stressing
More informationSECTION CAST-IN-PLACE CONCRETE
SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing
More informationVDOT s New High Performance Concrete Specifications
VDOT s New High Performance Concrete Specifications Celik Ozyildirim, Ph.D., P.E. A partnership of the Virginia Department of Transportation and the University of Virginia since 1948 3/4/2010 1 HPC in
More informationTECHNICAL SESSION 3. Strengthening, Repair & Rehabilitation
TECHNICAL SESSION 3 Strengthening, Repair & Rehabilitation 2004 PTI Technical Session 3 T. Theryo, P. Garcia - Repair of Sunshine Skyway Bridge The Post-Tensioning Column Repair of High Level Approaches
More informationCTP STITCH-TIE AGAIN! Quick and easy way to re-anchor existing veneers to back-up structures.
Helical Wall Tie System for Stabilizing Veneers and Structural Repair AGAIN! ANOTHER CTP SOLUTION! CTP STITCH-TIE Quick and easy way to re-anchor existing veneers to back-up structures. Brick to Concrete
More informationREPAIR OF PRECAST PRE-TENSIONED GIRDERS USING EXTERNAL POST-TENSIONING ASIT N. BAXI BAXI ENGINEERING MIGUEL FORERO SUNCOAST POST-TENSION
REPAIR OF PRECAST PRE-TENSIONED GIRDERS USING EXTERNAL POST-TENSIONING ASIT N. BAXI BAXI ENGINEERING MIGUEL FORERO SUNCOAST POST-TENSION PROJECT INFORMATION Project name: Laketown Wharf Retrofit Location:
More informationA. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section.
SECTION 03 01 30 MAINTENANCE OF CAST-IN-PLACE CONCRETE SECTION 03 01 40 MAINTENANCE OF PRECAST CONCRETE SECTION 03 01 50 MAINTENANCE OF CAST DECKS AND UNDERLAYMENT SECTION 03 01 60 MAINTENANCE OF GROUTING
More information1.1 Related Work Specified in Other Sections (Delete if Not Applicable):
NOTE TO SPECIFIER: Concrete Resurfacing (Broom Finish) System provides an economical alternative to the removal and replacement of existing concrete. This system creates a flexible and durable finish that
More informationWhere WVDOH is at with Mass Concrete
Where WVDOH is at with Mass Concrete History of Mass Concrete and the WVDOH In 2005, a large bridge crossing the Ohio River was being constructed (Blennerhassett Bridge) Because of the large size of some
More informationFB-MULTIPIER: P-Y MODEL VALIDATION
FB-MULTIPIER: P-Y MODEL VALIDATION FB-MultiPier V4.19 vs. LPILE V6.0.15 July 2014 Jae Chung, Ph.D. Anand Patil, E.I. Henry Bollmann, P.E. Bridge Software Institute 1 EXECUTIVE SUMMARY This report summarizes
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3
CITY OF TORONTO TS 3.65 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS 3.65.01 SCOPE...3 TS 3.65.02 TS 3.65.03 REFERENCES...3
More informationThe Hashemite University Department of Civil Engineering. Dr. Hazim Dwairi. Dr. Hazim Dwairi 1
Department of Civil Engineering Lecture 2.1 Methods of Prestressing Advantages of Prestressing Section remains uncracked under service loads Reduction of steel corrosion (increase durability) Full section
More informationWall Modular Block Mechanically Stabilized Earth, Item S.
Wall Modular Block Mechanically Stabilized Earth, Item 532.0300.S. A Description (1) This special provision describes designing, furnishing materials and erecting a permanent earth retention system in
More informationSPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006
Michigan Department Of Transportation 3703C (11/06) 1 Materials 1.1 Pipe SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Page 1 of 5 The type of pipe used for the pipe jacking method shall be capable
More informationWell Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.
Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Presentation Outline Project History Project Scope Construction Alternatives Plan
More informationBIO-AQUIFER STORM SYSTEM
BIO-AQUIFER STORM SYSTEM Specifications for Construction PART 1 GENERAL 1.01 SECTION INCLUDES A. Providing labor, materials, tools and equipment to furnish and install a permeable concrete paving stone
More informationSECTION ARCHITECTURAL CAST STONE
PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 047200 ARCHITECTURAL CAST STONE A. RELATED DRAWINGS All drawings, to include supplemental drawings, instructions and conditions of this contract. B. RELATED
More informationSPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular
More informationBi-Directional Static Load Testing of Driven Piles
Bi-Directional Static Load Testing of Driven Piles Paul J. Bullock, PhD Fugro Consultants Inc. Loadtest Bi-Directional Osterberg Cell Testing Specialized jack in pile uses bearing to mobilize side shear
More information1. Cast-in-place concrete is specified in Section
SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record
More informationSPECIFICATIONS FOR CAST-IN-PLACE CONCRETE SLAB DUNN COUNTY TRANSFER STATION MENOMONIE, WISCONSIN
SPECIFICATIONS FOR CAST-IN-PLACE CONCRETE SLAB DUNN COUNTY TRANSFER STATION MENOMONIE, WISCONSIN 1. SUMMARY A. Work includes: 1. Pavement removal, topsoil stripping, and site grading for concrete slab.
More informationTile on Existing. Viewpoint
Viewpoint Tile on Existing Exterior Reinforced Concrete BalconieS By Steven C. Turner Exterior reinforced concrete balconies are often covered by tile set in mortar beds with grouted joints. These installations
More informationLOAD FACTOR RESISTANCE DESIGN
LRFD LOAD FACTOR RESISTANCE DESIGN HOW CONSTRUCTION ACTIVITIES & SPECIFICATIONS ARE AFFECTED LOUISIANA TRANSPORTATION CONFERENCE 2009 Kim Martindale Garlington, P.E. LADOTD Pavement and Geotechnical Engineer
More informationMinimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08
Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08 Table of Contents 1. Title 2. Designation 3. List of Figures 4. Scope 5. Referenced
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-34 73 13 (April 2008) Change 1-11/14 -------------------------- Preparing Activity: USACE Superseding UFGS-34 73 13 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationConcrete Batch Plant Operator Study Guide
Concrete Batch Plant Operator Study Guide Developed by the FLORIDA DEPARTMENT OF TRANSPORTATION This 2004 Revision was carried out under the direction of STATE MATERIALS OFFICE Originally written by: DISTRICT
More informationSPECIFICATIONS FOR ERECTION OF PRECAST PRESTRESSED CONCRETE GIRDERS
SPECIFICATIONS FOR ERECTION OF PRECAST PRESTRESSED CONCRETE GIRDERS 1.0 DESCRIPTION The Work shall consist of:.1 Transportation, unloading, and erection of precast prestressed concrete girders;.2 Supply
More informationChanging Needs In Sulfur Capacity For In- Ground Reinforced Concrete Sulfur Pits
Changing Needs In Sulfur Capacity For In- Ground Reinforced Concrete Sulfur Pits April 13-16, 16 2010 League City, Texas, USA Thomas R. Kline tkline@structural.net 281.479.0391 Concrete Problems Defects
More informationSECTION 347 PORTLAND CEMENT CONCRETE CLASS 1 (NON-STRUCTURAL)
Section 347 SECTION 347 PORTLAND CEMENT CONCRETE CLASS 1 (NON-STRUCTURAL) 1 Version 1.0-7/20/06 1 Class 1 Non-Structural Structural vs- Nonstructural? 2 Photographs of concrete structures and a sidewalk.
More informationSECTION RESINOUS MATRIX TERRAZZO FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 09 66 23 - RESINOUS MATRIX TERRAZZO FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More information1. Decks, balconies, and sun porches 2. Walkways, ramps, and stairways 3. Patios and courtyards
SECTION 07185 TRAFFIC MEMBRANE PART 1 GENERAL 1.1 SECTION INCLUDES A. Traffic membrane, consisting of welded seam PVC waterproofing, over f following surfaces: 1. Decks, balconies, and sun porches 2. Walkways,
More informationSECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS
SECTION 11000 MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 DESCRIPTION A. This section contains general information required to install mechanical equipment as shown on the plans and
More informationSECTION EPOXY TERRAZZO
SECTION 09 66 23.16 EPOXY TERRAZZO THIS GUIDE SPECIFICATION HAS BEEN PREPARED BY THE NATIONAL TERRAZZO AND MOSAIC ASSOCIATION, INC., AND IS DISTRIBUTED FOR USE BY ITS MEMBERS AND DESIGN PROFESSIONALS.
More informationHIGH PERFORMANCE CONCRETE. by John J. Roller CTLGroup
HIGH PERFORMANCE CONCRETE by John J. Roller CTLGroup Early Louisiana HPC Research Law & Rasoulian (1980) Adelman & Cousins (1990) Bruce, Russell & Roller (1990-1993) Law & Rasoulian (1980) Concrete strengths
More informationSteel Fiber Reinforced Concrete (SFRC) for TBM Tunnel Segmental Lining Case Histories in the Middle East. 1 Ing. Guido Castrogiovanni, COWI
Steel Fiber Reinforced Concrete (SFRC) for TBM Tunnel Segmental Lining Case Histories in the Middle East 1 Ing. Guido Castrogiovanni, COWI COWI COWI BTM participates in some of the world s landmark projects
More information3 rd PARTY MATERIALS TESTING MANUAL
3 rd PARTY MATERIALS TESTING MANUAL CITY PLANNING & DEVELOPMENT DEPARTMENT DEVELOPMENT SERVICES - LAND DEVELOPMENT DIVISION City of Kansas City, Missouri Implementation of Public Works Department Materials
More informationMay 8, 2017 ADDENDUM #1. IFB Resin Floor System For Highway Department Central District Building
May 8, 2017 ADDENDUM #1 IFB 17-082 Resin Floor System For Highway Department Central District Building Addendum #1 is being issued to offer an alternate resin flooring system. 096700 FLUID-APPLIED FLOORING
More informationThe Technical and Contractual Matters of Bored Piling Works. By Wallace Yeung Vibro (H.K.) Ltd.
The Technical and Contractual Matters of Bored Piling Works By Wallace Yeung Vibro (H.K.) Ltd. What is large diameter bored pile? How to construct a large diameter bored pile? Its advantages and limitation
More informationSurface Repair Using Form-and- Pour Techniques
ACI RAP Bulletin 4 American Concrete Institute Advancing concrete knowledge FIELD GUIDE TO CONCRETE REPAIR APPLICATION PROCEDURES Surface Repair Using Form-and- Pour Techniques Surface Repair Using Form-and-Pour
More information1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.
SECTION 260529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. 1.2
More informationQuality Assurance Program for CDA / Design-Build Projects with a Capital Maintenance Agreement with Three Optional 5-Year Terms.
Quality Assurance Program for CDA / Design-Build Projects with a Capital Maintenance Agreement with Three Optional 5-Year Terms August 29, 2017 2017 by Texas Department of Transportation 512/506-5808 All
More informationEvaluation of Pile Jackets on the Hampton Roads Bridge and Tunnel
Evaluation of Pile Jackets on the Hampton Roads Bridge and Tunnel March 5 th 2010 Brian M. Pailes, M.S., E.I.T. Research Scientist, Structural Stephen R. Sharp, Ph.D., P.E. Research Scientist, Materials
More informationStructural and Geotechnical Issues Impacting The Dalles Spillwall Construction and Bay 1 Erosion Repair
Structural and Geotechnical Issues Impacting The Dalles Spillwall Construction and Bay 1 Erosion Repair Jeffrey M. Ament, PE U.S. Army Corps of Engineers, Portland District (503) 808-4950 Jeffrey.M.Ament@usace.army.mil
More informationThe Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects
The Chief Estimator Software Item Cost Summary Bridge & Overpass Projects Elevated Transit Guideways Precast Girder Elevated Guideway 10 Abutment Excavation & Backfill 1,500.00 m3 222 10,368 8,634 1,309
More informationSPECIAL INSPECTION* AND OBSERVATION MANUAL
SPECIAL INSPECTION* AND OBSERVATION MANUAL PBCC (Based on I Codes) *Special Inspections are in addition to the required City of Phoenix Building Safety Inspections (PBCC 1704.1) TABLE OF CONTENTS INTRODUCTION
More informationIn Service Replacement of Box Girder Bottom Slab
In Service Replacement of Box Girder Bottom Slab WSDOT Bridge No. 5/537S - Span 11 Craig R. Boone, P.E., S.E. Lynn Peterson Secretary of Transportation 2015 Western Bridge Engineers Seminar Reno, Nevada
More informationProtective Coatings for Underground Utility Concrete Structures. By: John E. Davis Inside Sales & Marketing Specialist: Sauereisen, Inc.
Protective Coatings for Underground Utility Concrete Structures By: John E. Davis Inside Sales & Marketing Specialist: Sauereisen, Inc. As our cities and municipalities grow older, the utility and wastewater
More informationLANDSCAPE RETAINING WALLS
SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9070 - Landscape Retaining Walls LANDSCAPE RETAINING WALLS PART - GENERAL.0 SECTION INCLUDES A. Modular Block Retaining Walls
More informationAAPA Facilities and Engineering Seminar. Robert Tolsma PE, PPM, D.PE Division Manager Atkins North America San Diego, CA Oct 22, 2015
AAPA Facilities and Engineering Seminar Robert Tolsma PE, PPM, D.PE Division Manager Atkins North America San Diego, CA Oct 22, 2015 Realizing the Value of Port Infrastructure Reinvestment Through Life
More informationSpecialty Expansion Joint Systems
www.dsbrown.com Specialty Expansion Joint Systems Bridges Expansion Joint Systems for Architectural, Parking Garage and Bridge Applications Bridge the World with Leading Infrastructure Solutions Corporate
More informationStrengthening of Concrete Structures. Shaun Loeding, P.E. Director Strengthening Division
Strengthening of Concrete Structures Shaun Loeding, P.E. Director Strengthening Division Overall Intent??? Design and implement structural solutions based on our experience and technologies. Shaun Loeding,
More informationNEW PERFORMANCE CRITERIA FOR FRESH TREMIE CONCRETE
NEW PERFORMANCE CRITERIA FOR FRESH TREMIE CONCRETE Karsten Beckhaus (1), Martin Larisch (2), Habib Alehossein (3,4) (1) BAUER Spezialtiefbau GmbH, Deutschland (2) Keller Australia Pty Ltd, Australia (3)
More informationCold In-Place Recycling
Cold In-Place Recycling Dan Schellhammer, P.E. Midstate Reclamation and Trucking In 1991, Midstate brought the first reclaimer into the state of Minnesota Emphasis on asphalt recycling techniques (milling,
More informationRedi Rock Specification and Installation Manual
Redi Rock Specification and Installation Manual 1.0 General Scope This Specification covers the Design, Materials and Installation of Redi Rock modular block Retaining and Freestanding Wall systems as
More informationSection Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers
STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm Sewers B. Abandonment of Storm Sewers 1.02 DESCRIPTION OF WORK A. Construct storm sewers. B. Abandon storm sewers. 1.03 SUBMITTALS Comply with
More informationPartial Depth Deck Panel Guidelines
Partial Depth Deck Panel Guidelines PCI Northeast Bridge Technical Committee Second Edition Report No: Copyright 2017 By Northeast Second Edition, first printing, 2017 All rights reserved. This guide or
More informationTILE TILE
09300 - TILE 09300-1 PART ONE: GENERAL 1.1 Description TILE 1.1.1 Work of this Section, as shown or specified, shall be provided by the Interior Contractor and shall be in accordance with the requirements
More informationSECTION FOUNDATION DRAINAGE
SECTION 33 41 13 SPEC WRITER NOTES: Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section
More informationDESIGN & CONSTRUCTION CONSIDERATIONS OF REINFORCED CONCRETE STRUCTURES FOR WATER UTILITIES
DESIGN & CONSTRUCTION CONSIDERATIONS OF REINFORCED CONCRETE STRUCTURES FOR WATER UTILITIES Maine Water Association Michael E. Malenfant, P.E. Metcalf & Eddy CONTENTS Introduction Examples of reinforced
More informationSTANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe.
STANDARD SPECIFICATIONS SECTION 02445 BORING AND JACKING PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for boring and jacking casing pipe. 1.2 DEFINITIONS A. Carrier Pipe: Sewer or water
More informationSECTION CHAIN-LINK FENCES AND GATES 02821/1
SECTION 02821 - CHAIN-LINK FENCES AND GATES 02821/1 PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Chain-Link Fences: 2. Gates: horizontal slide or swing. 3. Fences installed where
More informationQCS 2014 Section 04: Foundations and Retaining Structures Page 1 Part 01: General Requirements for Piling Work
2014 Section 04: Foundations and Retaining Structures Page 1 Part 01: General Requirements for Piling Work 1 GENERAL REQUIREMENTS FOR PILING WORK... 2 1.1 GENERAL... 2 1.1.1 Scope 2 1.1.2 References 2
More informationSUNSHINE SKYWAY BRIDGE
SUNSHINE SKYWAY BRIDGE Retrofit of the Post-Tensioned Precast Transition Pier Columns on the Sunshine Skyway Bridge Presented by: Antonio Ledesma, P.E. May 7, 2012 SUNSHINE SKYWAY BRIDGE, FLORIDA Presentation
More informationSECTION QUALITY CONTROL - CONSTRUCTION MANAGER EDITION
Montgomery County Public Schools Facilities DIVISION 1 - GENERAL REQUIREMENTS SECTION 01450 - QUALITY CONTROL - CONSTRUCTION MANAGER EDITION PART 1 - GENERAL 1.1 Summary: A Independent testing, inspection
More informationSTRUCTURAL MASONRY SPECIAL INSPECTOR. Study Guide
STRUCTURAL MASONRY SPECIAL INSPECTOR Study Guide May 2017 Examination: The Structural Masonry Inspector Examination is based on the references cited in this document. It is 3 hours in length, is an open-book
More informationStandard Guidelines for the Design and Installation of Pile Foundations
ASCE 20-96 American Society of Civil Engineers Downloaded from ascelibrary.org by 46.3.199.16 on 01/25/18. Copyright ASCE. For personal use only; all rights reserved. Standard Guidelines for the Design
More informationSTANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL
STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL 1. SCOPE 2. DESIGN 3. MATERIALS 4. CONSTRUCTION 5. METHOD OF MEASUREMENT AND PAYMENT SCOPE This Specification sets out requirements for the design,
More informationJULY 2014 LRFD BRIDGE DESIGN 5-1
JULY 014 LRFD BRIDGE DESIGN 5-1 5. CONCRETE STRUCTURES Reinforced and prestressed concrete are used extensively in bridge projects. In addition to general design guidance and information on detailing practices,
More informationCQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015
CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015 SCOPE This document establishes the minimum quality program requirements for a contractor providing equipment, material,
More informationInstalling DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site
Installing DELTABEAM Installation of DELTABEAM These DELTABEAM installation instructions are intended to complement the project s erection plan. Peikko s technical support can help with the erection plan
More information