1 BIDDER REQUEST FOR INFORMATION #001 CONSOLIDATED Project: Los Chingones and HashTAG Location: E. 29 th Drive Denver, CO Date: 12/5/16 1. There are existing PVC roof drains in the space and this is a plenum rated ceiling. Will these have to be changed out to cast iron or wrapped in plenum wrap? - Yes the roof drains will need to be changed to cast iron or wrapped in plenum wrap. 2. The plans show new water and sewer run into the space. The grease waste, sanitary waste and water is already stubbed into space. Please advise. - The plumbing plans show the existing utilities based on the existing drawings of the space that were available at the time of design. Coordinate the exact location of connections with the plans and the existing conditions a required. 3. For the waste piping there is 6 future stubs above the ground, are we to tie into one of these or multiple? - The plumbing plans show the existing utilities based on the existing drawings of the space that were available at the time of design. Coordinate the exact location of connections with the plans and the existing conditions a required. 4. Are we to provide floor clean outs for all waste stubs not used and used? - For all waste stubs that are not used, provide a floor cleanout. Coordinate the floor cleanouts with the finished floor materials in which they are installed. 5. The 2 ½ water main runs the length of the space, there are (2) future stubs with 1 ½ water meters. The plans call for a 2 and a 2 ½ water line run into the space. Please advise how we are to price the water piping. - The 2-1/2 CW is required for the Los Chingones space, and the 2 CW is required for the TAG space. The connections to existing are shown on the plans based on the existing drawings that were available at the time of design. Coordinate the exact location of the connections with the existing conditions. 6. Please confirm if we will need to change out both the existing water meters to a 2 and a 2 ½.
2 - The water meters will need to be replaced with proper size meters 7. The locations for both of the existing RTU s does not appear to be correct, they are actually closer to the new stair case in the front of the space than shown. Will this affect the duct sizes? - No this will not affect the duct sizing. Please verify that the RTU s sizes are correct since they were supposed to be swapped during core and shell construction. 8. The sleeve for the gas piping to the fire pit is not shown at the actual location shown on the plans. It is stubbed at the west door but towards the back of the space, not the front. Please advise if this will change the design. - The gas piping is shown in the proper location (based on the fire pit location provided to us by the architect). The underground gas conduit and piping will need to be routed from the location shown on the plumbing plans, to the fire pit location shown on the architectural plans. The fire pit is not shown on the plumbing plans, as it is more than 5 outside the building. Coordinate the exact location of the fire pit with the architect. 9. Is BASF Ucrete in lieu of Dur-A-Flex Polycrete for Epoxy Flooring (EF-1) acceptable? - It is acceptable to price BASP Ucrete in lieu of Dur-A-Flex Polycrete for EF Who is responsible for the free standing tables on both sides? - Free-standing tables are provided by Owner as part of FFE package. 11. HashTAG: Office 006 Assume 2 Pl. Lam Tops with metal brackets? Please verify. - Confirmed, Plastic Lam tops with metal brackets suspended from wall. Provide blocking within wall at a.f.f. 12. HashTAG: Far north table in the dining with hexagons nearby, what should we assume there as the scope pertaining to the millwork? - Hexagonal shapes at community table are stools. These are provided by Owner as part of FFE package. 13. HashTAG: UP-2 Spec for the pillows on the banquette? Please verify spec upholstery and if these are within scope. - Pillows will be provided by Owner as part of FFE package. 14. HashTAG: Wood Hexagonal Paneling on ceiling and wall is called out as WD-x on the RCP and on the finish floor plan. Should this be WD-1?
3 - Yes, Hexagon Panels will be WD-1 finished plywood. Depths to vary with patterning of wall and ceiling panels. 15. Los Chingones: Hostess Station 001 No detail, assume same as A.M Eatery? - Similar details of construction and size. Materials to be confirmed through shop drawings. Assume steel finish exterior to match adjacent wall panels. 16. Los Chingones: Is there a spec for the booths and drink rail upholstery? Are these OFCI or CFCI? - Upholstery: - Seat: Maharam, Mineral Back: Momentum Textiles, Docket, color: island To be CFCI 17. Los Chingones: Back Bar 201 Which section should we assume? Plan shows continuous top and elevation shows two separate. - Continuous Top 18. Finish plan shows a transition from concrete to quarry tile but finish schedule shows flooring in kitchen to be epoxy flooring, is this a misprint or is the kitchen going to have quarry tile? - Misprint, kitchen to have epoxy flooring 19. If Kitchen 106 is to be epoxy, what is the desired cove height? What is the correct material for the floor in Los Chingones Kitchen 106? EF-1 or QT- 1? - EF Quarry tile is not listed in the finishes on Page A0.4, who is the manufacturer the client wants for the quarry tile? - Quarry Tile has been removed from the project scope. 22. RB-1 base is indicated as Straight base, is this correct at Entry 001 over the ceramic tile? Or should it be coved type? - Straight base in Dining and Entry.
4 23. There is no elevation for the wall on the east side of the Chef s table 105 looking west towards the kitchen. Finish plan shows CT-4 to wrap around to go upstairs, will there be an updated elevation drawing to show this? - Tile to be full height along wall, no updated drawing forthcoming. 24. Can the Architect identify the elevation view location along with heights of the tile for clarity? The only area identified is the restrooms at this time. - Tile to be full height unless noted otherwise. 25. Finish floor plan shows wall tile in Dining 200, is this wall tile full height along the east wall? - Tile to be full height unless noted otherwise. 26. Finish schedule shows CT-2 cove base and wall tile for restrooms, elevations show CT-4 base and wall tile. Which is preferred for the restroom walls? - Base to have Schluter aluminum cove transition between wall and floor tile. 27. Is there a count of each type for the tables with CT-5 and CT-6 tile if these are to be contractor provided? - Each square or rectilinear table in Los Chingones (upper and lower interior) to get tile (round tables excluded). CFCI. 28. Elevation for Chef s Prep 003 west wall is not clear for the tile take-off. Is the wall tile full height from edge of countertop to entry way of kitchen? - Correct, full height tile where noted. 29. Does the client have preferred transition finish for the project? - Satin Anodized Aluminum by Schluter 30. No detail or notes regarding waterproofing. What areas does the client want waterproofing? - Any roof penetrations to be performed and water proofed by the Landlord approved base building roofing contractor. - Modifications to the existing storefront for door or overhead door installations shall be waterproofed where required.
5 31. Please confirm that the quarry tile will run into the coolers. - Epoxy flooring will run into the coolers. 32. Which CPT 1 are we to price? See below - 24 x24 tile 33. MTL-5 is called out on the plans but not the Finish Legend. Please clarify if the wire mesh at the stairs and above the bars is MTL-5 and please provide spec for the mesh. - Wire mesh to be McNichols, hexagon perforated mesh. ½ holes, 9/16 staggered, 22 ga., black. Provide samples to arch for approval. 34. WF-1 is called out on the plans at A7.7 elevation 2, but is not on the Finish Legend. Please clarify material. WF-1 is VG-1. Wolf Gordon Digital Graphic. Arch to provide graphic. CPCI. 35. Please clarify if mural in Dining 200 is provided by other and installed by contractor? - The mural will be provided and installed by Owner as part of FFE package. 36. Are we to provide and install planter and landscape? Is there anything besides the completion of the handrail? - Planters to be part of FFE package - Firepit to be American Fyre 48 dia. Marseille Concrete Fire Bowl, Smoke finish. Natural Gas w/ river rock in lieu of glass. 37. A0.3 states Furniture is not in contract, and A0.6 state contractor will provide all furniture. Please confirm what we are providing? I.E. booths, tables, loose furniture? - Booths and tables
6 38. Office equipment states by contractor, need more information on office spec. - Plastic Laminate top w/ metal brackets anchored to wall. Provide blocking in wall for deck and shelving 39. Please clarify if existing 4 sleeve on patio is to pull the utilities for the gas fire pit. - Correct 40. Please clarify if the fire pit is to be provided and installed by the contractor. If we are providing the fire pit, please provide spec. - Fire Pit is to be provided by Contractor. Firepit to be American Fyre 48 dia. Marseille Concrete Fire Bowl, Smoke finish. Natural Gas w/ river rock in lieu of glass Please provide spec and drawing on hand rail at Patio. - Please see Sheet A Please confirm if overhead door behind back bar on rooftop patio is by core and shell contract. - Overhead door on second floor to be provided by core and shell contractor. 43. Please provide information on the original contractor for tile on rooftop patio. - Creative Hardscape - POC: Daniel Cameron 44. Please provide spec and detail on steel header and jamb at new storefront roll-up door 1.1/A5.1. The header and jamb steel are not called out. - Steel tube header and jamb to be 2 x 4 x Please confirm if brushed stainless steel counter tops are to be furnished and installed by contractor. - Stainless Steel counter tops are to be furnished by Contractor. 46. Please clarify the number of overhead heater on rooftop patio. Architectural and Electrical drawings indicate 8 each, but Plumbing drawings indicate 10 each. - There should be 8 heaters.
7 47. Please clarify we see GL-1 on finish schedule but do not find on drawings. Is this being used anywhere? - No 48. Please clarify if duct work is to be painted. Note 5 A3.1 only calls out structure and deck only. - Exposed duct work should be paint-lock but not painted. 49. Please provide spec for the quarry tile in the walk-in coolers. - Flooring within coolers should be Epoxy Flooring. 50. What is the base for the quarry tile? - The quarry tile has been removed from the project scope. 51. Transitions at the tile to the concrete is Satin Anodized Aluminum by Schluter acceptable? - Yes
Division 09 FINISHES TABLE OF CONTENTS
Division 09 FINISHES TABLE OF CONTENTS 09 1000 GENERAL... 3 A. RELATED SECTIONS... 3 B. MAINTENANCE OF FINISHES... 3 C. PUBLIC AREAS... 3 D. CUTTING AND PATCHING... 3 E. CLEANING... 3 F. RECOMMENDED FLOORING
More informationMODERNFOLD GWS 100SR-G MOVEABLE GLASS WALLS
MODERNFOLD GWS 100SR-G MOVEABLE GLASS WALLS Ideal for applications requiring space division, visibility and security Used in bank lobbies, offices, conference areas, interior storefronts and arena skyboxes
More informationwww.arizonawholesalepoolcontractors.com The Swimming Pool Construction Checklist is designed to give you some guidelines and hints of items to look for while you re building your own pool. It s outline
More informationA/E Design Deliverable Checklist
A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic
More informationDemolition Plan A1 A3. Scale: 3/32" = 1'-0" Arch. Men N.I.C. Elev. Lobby. Stairs N.I.C. N.I.C. Women N.I.C. Issued for Tender.
inc. 400-7 avenue edmonton, alberta, canada tr y t: (780) 48 47 f: (780) 48 00 e: lesnider@shaw.ca 4 door to North Common Corridor doors to door to F. H. C. Men Women ELEC/TEL UP Stairs DN F. H. C. DN
More informationTENANT DESIGN MANUAL UPDATED JULY 2015
TENANT DESIGN MANUAL UPDATED JULY 2015 PROJECT OVERVIEW Woodland Hills Mall is located at the intersection of East 71st Street South and South Memorial Drive, near I-64 in Tulsa. The center opened in 1976
More informationNew Homes Starting at $124,900
Chicora New Homes Starting at $124,900 New Homes - The Best Locations - The Right Price Sales & Marketing By: Keller Williams New Homes Division www.newhomesatmyrtlebeach.com Chicora C & R Builders, with
More informationTable of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities
Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)
More informationEdouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com
Edouard Modern Living Made Easy uichomes.com - new construction - 3 stories + full basement - 4 bedrooms - 2.5 baths - 2,380 s.f. call 314.881.2333 or e-mail sales@uicstl.com PLAN NTS DECK 13' 0" X 12'-0"
More informationKIOSK DESIGN CRITERIA
KIOSK DESIGN CRITERIA ADDENDUM LOG July, 2008 Full Update September, 2011 Content update (image replacements and content additions) November, 2011 Grammar corrections, minor cleanup. (5, 11) January, 2012
More informationCOLONIAL PLANS. 708 North Street US Highway Route 1 Houlton, Maine (207)532,2444
COLONIAL PLANS 8US Highway Route 1 Hancock, Maine 04640 1(877)767 0664*(207)667 0664 708 North Street US Highway Route 1 Houlton, Maine 04730 (207)532,2444 DEXTER COLONIAL 28 X 34 1904 SQ. FT. DEXTER COLONIAL
More informationArbor Heights Elementary School. Concrete for South Building Foundation Stem Walls
Arbor Heights Elementary School Concrete for South Building Foundation Stem Walls Arbor Heights Elementary School Workers Placing Concrete for South Building Foundation Stem Walls Arbor Heights Elementary
More informationSTATE OF NEW HAMPSHIRE DEPARTMENT OF NATURAL AND CULTURAL RESOURCES DIVISION OF PARKS AND RECREATION SKI PATROL HUT PROJECT #: CAP 1804
STATE OF NEW HAMPSHIRE DEPARTMENT OF NATURAL AND CULTURAL RESOURCES DIVISION OF PARKS AND RECREATION PROJECT #: CAP 1804 FRANCONIA NOTCH STATE PARK FRANCONIA, NEW HAMPSHIRE BID SET 8/4/2017 DRAWING LIST:
More informationPembridge The Country Club Collection TOWNHOMES AT CRYSTAL SPRINGS
Pembridge The Country Club Collection TOWNHOMES AT CRYSTAL SPRINGS STANDARD FEATURES LIST Foundation Concrete walls 4 concrete floor slab Interior basement unfinished Standard nine foot foundation walls
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS
USACE / NAVFAC / AFCEC / NASA UFGS-09 06 00 (May 2009) Change 1-11/13 ----------------------------- Preparing Activity: USACE Superseding UFGS-09 06 90 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationHERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW
HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW 27 September 2007 prepared by: J. CHRIS EVANS ARCHITECT 3220 E. Terra Alta Blvd. No. 9 Tucson, Arizona 85716 520.319.8835 evansarch@hotmail.com
More information3. Has a hazardous materials survey been completed for the project to identify any potential contaminates? Answer: Yes.
1. Page A401 details 3, 4, 5 show storefront sections, but no storefront specification exists. Can this be provided? Answer: This frame these sections apply to is to be changed to hollow metal. Delete
More informationHighland Park. Exceptional Interiors (cont.) Green Technology. Designer Kitchen Features. Distinctive Exterior Features
unit 2 HOMES 650 Mill Valley Parkway 2332 Sq.Ft. 3-Car 4/3 $542,800 6 Mt. Shasta Views 643 Mill Valley Parkway 2332 Sq.Ft. 3-Car 4/3 $552,800 8 Mt. Shasta Views Under construction 945 Rollingview Raised
More informationQuality Inspection 8618 London Heights San Antonio, TX Phone: (210)
Quality Inspection 8618 London Heights San Antonio, TX 78254 Phone: (210) 240-0476 PRE DRYWALL INSPECTION REPORT Prepared For: DELETED (Name of Client) Concerning: DELETED, San Antonio, TX 78258 (Address
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1
SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 3: Roofs 1 & 3 DATE: December 29, 2017 1235 Mission
More informationSubject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3
MEMORANDUM To: Ashley Rosenthal Payne, Indianapolis Historic Preservation Commission Adrienne Schmetzer, Indiana Housing and Community Development Authority Architecture Preservation Interior Design Landscape
More informationThe Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage
The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco
More informationThe Inspection Process. Waxhaw N.C.
The Inspection Process In Waxhaw N.C. This information is provided by the Waxhaw Enforcement Division to assist you in the progression of your project. Nothing in this document should be considered "Code"
More informationCommunications Page 1 of 9
Page 1 of 9 Last Update: April 23 rd, 2014 Introduction Design In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a
More informationFLOORPLAN /ELEVATION SQ.FT. BDRM BATHS GARAGE BASE PRICE
FLOORPLAN /ELEVATION SQ.FT. BDRM BATHS GARAGE BASE PRICE PROVIDENCE Prairie 1713 2 + Den 2 2 $341,400 Country Cottage 1713 2 + Den 2 2 $343,400 Craftsman 1713 2 + Den 2 2 $349,400 2 bedrooms + den or optional
More informationSECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS
SECTION 270528 PATHWAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Communications equipment coordination and installation. 2. Sleeves for pathways and cables. 3. Raceway
More informationPHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS
1 Introduction 1.1 In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a utility. It should be assumed that all new
More informationHOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS
St. Louis County Department of Public Works Division of Code Enforcement HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS This guide is intended to provide the homeowner or contractor with the
More informationA/E Design Deliverable Checklist
A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic
More informationBudget Estimate Basic Tenant Improvement
Building work rules, conditions and insurance: 1. Review the work rules. If they are not available no budget should be provided. 2. Hours available for construction 3. Insurance requirements 4. Entities
More informationIntroduction. Disclaimer. Table of contents
Updated July 18, 2012 Introduction The Cambridge Elevating Limited-Use / Limited-Application Elevator is designed to service schools, libraries, low rise, low occupancy commercial buildings, churches and
More informationMeriter Heights Renovations Madison, Wisconsin
Urban Design Submittal s 12 ebruary 2007 Owner Developer W. Mifflin St. STATE CAPITOL SQUARE Meriter Retirement Services, LLC 333 West Main Street 53703 W. Washington Ave. S. airchild St. STATE CAPITOL
More informationADDENDUM NUMBER ONE (1) September 30, 2015
ADDENDUM NUMBER ONE (1) September 30, 2015 TO: LAWRENCE H. PEEK ARCHITECTS P.O. Box 2932; Homer, Alaska 99603 CITY OF WHITTIER PUBLIC SAFETY FACILITY WHITTIER, ALASKA ARCHITECT S PROJECT NUMBER - 14003
More informationEstimate Form for Bathroom Design and Installation
Estimate Form for Bathroom Design and Installation Name: Home Address: City: State: Phone (Home): Phone (Office): Phone (Office): Phone (Office): Phone (Jobsite): Jobsite Address: City: State: By: Hereafter
More informationAddendum # 1 Perdue Stadium Seating Bowl Improvements Date of Addendum: 09/07/16
Wicomico County Purchasing 125 N. Division St. Room B-3 Salisbury, MD 21801 Ph. 410-548-4805 Fax 410-334-3130 Email: purchasing@wicomicocounty.org Addendum # 1 Perdue Stadium Seating Bowl Improvements
More informationChandler Fashion Center 3111 West Chandler Blvd., Chandler, AZ 85226
ADDENDUM LOG June, 2009 TCM Generated July, 2009 Toe kick not updated. November, 2012 Added Automatic Gas Shut-off Valve language (pg. fc19) February, 2014 Waterproof membrane language updated (fc10, fc16)
More informationSchluter -KERDI-BOARD Substrate, building panel, bonded waterproofing
Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing Schluter -KERDI-BOARD The universal substrate for tiles Flat. Level. Plumb. Square. No matter the quality, cost, or extravagance of
More informationThe Oaks at Powers Ferry. A Townhome Community
The Oaks at Powers Ferry One visit to The Oaks at Powers Ferry and you ll understand why it has been ranked as one of the top ten townhome community locations in metro Atlanta. Positioned in prestigious
More informationSECTION CERAMIC TILE
SECTION 09300 CERAMIC TILE PART 1 GENERAL 1.1 SCOPE A. Drawings and general provisions of the Contract, including General and Supplementary General Conditions, Division 00 & 01 Specification Sections,
More informationRevision 1 RAM ELEVATORS. Elevator Electrical Planning Guide. RAM Manufacturing Ltd
RAM ELEVATORS Elevator Electrical Planning Guide This guide is intended for people with an understanding of electricity. If you are not, please consult a licensed electrician as errors in application of
More informationDRAWING INDEX MILLWORK SECTIONS
A B C D E F G H J K L M N P Q CONTACTS: LANDLORD: ONE PROPERTIES CONTACT: JEFFREY VAN DYKE TELEPHONE: 780.498.89 EMAIL: jvandyke@oneproperties.com TENANT: DESIGNER: WOLSKI DESIGN GROUP LTD. CONTACT: CELINE
More information1. Unified Facilities Criteria - Design: General Building Requirements (UFC ).
1. GENERAL GUIDANCE REGARDING DESIGN A. Commissary facilities are Department of Defense (DoD) projects, and as such must be constructed in accordance with the following criteria, codes, and standards.
More informationExhibit A Declaration of Restrictions Development and Design Standards For Ridge Park Estates
Exhibit A Declaration of Restrictions Development and Design Standards For Ridge Park Estates Spokane County, Washington For All Property Owners The following Development and Design Standards shall be
More informationSIDEWALK & RAILING REPLACEMENT BOARD OF ED BUILDING
PROJECT: 25 E 5 S SALT LAKE CITY, UTAH 84111 CODE ANALYSIS APPLICABLE CODES 675 E. 5 S. Suite 4 DFCM PROJECT NUMBER: 182782 DFCM CONTRACT NUMBER: 18793 STRUCTURAL ENGINEER: REAVELEY ENGINEERS + ASSOCIATES
More informationCHARTRES COURT Washington Avenue Houston, Texas ChartresCourtHouston.com CHARTRES COURT LLC
CHARTRES COURT 713-868 - 7226 5023 Washington Avenue Houston, Texas 77007 ChartresCourtHouston.com CHARTRES COURT LLC Features Open floor concept living/dining with spacious island kitchen Great master
More informationSECTION ORNAMENTAL ALUMINUM RAILING. ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products.
SECTION 05720 ORNAMENTAL ALUMINUM RAILING ** NOTE TO SPECIFIER ** Superior Aluminum Products, Inc.; Ornamental aluminum railing products. This section is based on the products of Superior Aluminum Products,
More informationTHE CONSTRUCTION SUPERVISOR
City of Aurora Building Inspections 15151 E Alameda Pkwy Aurora, CO 80012 (303) 739-7420 THE CONSTRUCTION SUPERVISOR When a building permit has been issued for any construction within the City, the Supervisor
More informationSECTION SWIMMING POOLS STAINLESS, FULL TILE, OR TILE TRIM
SECTION 13 1100 SWIMMING POOLS STAINLESS, FULL TILE, OR TILE TRIM This section includes editing notes to assist the user in editing the section to suit project requirements. These notes are included as
More informationKelly Village Apartments 3118 Green Houston, Texas 77020
Kelly Village Apartments 3118 Green Houston, Texas 77020 Houston Housing Authority J. Allen Management Managing Agent Scope for Kelly Village Unit #1125 Overall Scope: Demolition, Renovation, and Restoration
More informationRequirements for Additions/Enclosed Deck/Finished Bonus Room/Dormer
Requirements for Additions/Enclosed Deck/Finished Bonus Room/Dormer Architectural prints one (1) set floor plan addressing the following items: o Decay-resistant sill plates o Show how and where combustion
More informationTENANT DESIGN MANUAL UPDATED JUNE 2015
TENANT DESIGN MANUAL UPDATED JUNE 2015 PROJECT OVERVIEW The Fashion Mall at Keystone is located at the intersection of 86th Street and Keystone Avenue (SR 431), directly adjacent to I-465. It serves all
More informationNew Homes Forestbrook Road. Yes, it s INCLUDED!
Sugar Mill is a Covenant Restricted Community. New Homes Forestbrook Road Yes, it s INCLUDED! Granite Countertops Ceramic Tile Kitchen Floors Front Brick Accents Upgraded Kitchen Cabinets Ceramic Tile
More informationVillage of Arlington Heights. Sewer Back-up Rebate Program
Village of Arlington Heights Sewer Back-up Rebate Program (Including Enhanced Program Information) Updated: October 1, 2017 Village of Arlington Heights Building & Life Safety Department 33 S. Arlington
More informationB. Polyethylene samples shall be submitted for Owner approval of color and quality.
Glass Rail ENGINEERED DASHERBOARD SPECIFICATIONS PART 1 - GENERAL 1.01 PROJECT SCOPE A. Contractor shall furnish and install one complete set of steel framed dasherboards as indicated on the drawings and
More informationCENTRAL GREAT PLAINS SERIES
CENTRAL GREAT PLAINS SERIES 1 2 MADE FOR LIVING A heritage of excellence. Atlantic Homes has been providing families with quality homes for generations. With a unique combination of state-of-the-art manufacturing
More informationMaterial Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5
Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey 01-2320 sqft.spf] Page 1 of 5 PREPARATION PRELIM PERMITS & FEES Building Permit 1 each 2200.00 _ 2200.00
More informationSuperstition Springs Center 6555 E. Southern Ave., Mesa, AZ 85206
ADDENDUM LOG September, 2009 Full update to current layout February, 2014 Waterproof membrane language updated (fc10, fc16) April, 2014 Carbon monoxide sensor language added (fc19) November, 2014 Drink
More informationArchitectural Specifications, Section Phenolic Lockers
Architectural Specifications, Section 10500 Phenolic Lockers Hollman, Inc., 1825 W. Walnut Hill Lane, Irving, TX 75038, (972) 815-4000, www.hollman.com 1.0 GENERAL 1.1 SECTION INCLUDES A. Phenolic Lockers.
More informationSECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS
SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,
More informationCATAMARAN TOWER - 1 Seef Area Plot 19, 20
STATUS REPORT NO 18 [As on September 30, 2017] This report is intended as a status report and covers only the activities completed till date, non-completed works and work-in-progress. A. Project Details
More informationSECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection
SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION
More informationJEFFERSON PARISH SHERIF S OFFICE
ADDENDUM NO. 1 TO THE BID DOCUMENTS FOR: NEW JEFFERSON PARISH SHERIFF S OFFICE 1 ST DISTRICT STATION 3620 HESSMERAVENUE METAIRIE, LOUISIANA 70002 JEFFERSON PARISH SHERIF S OFFICE Jefferson Parish Bid No.:
More informationINDUSTRIAL GUARDRAIL SYSTEMS
INDUSTRIAL GUARDRAIL SYSTEMS STRONGEST GUARDRAIL ON THE MARKET MANUFACTURED IN THE U.S.A. BEST PRICES MOST VARIETIES HEAVY DUTY ONE-LINE OR TWO-LINE Posts: 4 Sched 80 pipe Rail: 6 Sched 40 pipe Sleeved
More informationSECTION FOUNTAINS
PART 1 - GENERAL SECTION 13121 FOUNTAINS 1.1 SUMMARY A. Section includes design and complete installation of decorative fountains complete as shown on Drawings and as specified, including: 1. Equipment
More informationMODULAR BUILDING SPECIFICATIONS
Use Group A - Assembly B Business E Education I - Institutional Construction Type Type II Non Combustible Type V - Wood Floor 12 Outrigger Frame with Cross members Frame: 12 Perimeter Steel Main Beams
More informationGUIDE SPECIFICATION EXETER VERSA SHIELD SECURITY SCREEN SYSTEM
1 GUIDE SPECIFICATION EXETER VERSA SHIELD SECURITY SCREEN SYSTEM 1.01 WORK INCLUDED PART 1: GENERAL A. Provide for all labor, equipment, materials, and services to furnish and install VERSA SHIELD Window
More informationSECTION SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS. Display hidden notes to specifier. (Don't know how?
SECTION 08360 SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Glazed Aluminum
More informationBASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)
BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018) PERMIT SUBMITTAL CHECKLIST: Signed and completed Building Permit application form. A separate Electrical permit is required from
More informationstandard features Power Exhaust Fans w/light - Both Baths GFCI Receptacles Upgrade Light Fixture - Bath 1 Vanity - Per Lav GFCI Receptacles
2017 standard features INTERIOR Cornice w / Full Length Drapes Panels-Main Living Areas only Shaw Moxie Carpet with Pad and Tack Designer Select Congoleum No Wax Vinyl Flooring 8 Flat Ceilings Throughout
More informationBUREAU Joe Iuviene, AIA January 20, 2017
architectural BUREAU Joe Iuviene, AIA January 20, 2017 Alterations & Additions NEW TOWN HALL for TOWN OF AUSTERLITZ 816 State Route 203, Spencertown, New York 12165 ADDENDUM NO. 1 This addendum amends
More informationBUILDING SCOPE OF WORK
BUILDING SCOPE OF WORK 1. The Contractor shall furnish all supervision, materials, labor, equipment, tools, supplies, incidental items, etc, (unless noted otherwise) to complete all sections of the Building
More informationRETAIL TENANT TECHNICAL CRITERIA VERSION 2 MAY 2015
RETAIL TENANT TECHNICAL CRITERIA VERSION 2 MAY 2015 CONTENTS INTRODUCTION 4 PROJECT PLANS 7 BELOW GRADE ZONES WEST STREET 13 TRANSPORTATION HUB 21 WALL STREET 33 2 WTC 43 ABOVE GRADE ZONES 3 WTC 47 4
More informationDeptford Mall 1750 Deptford Center Rd., Deptford, NJ 08096
ADDENDUM LOG July, 2009 Revision August, 2009 VP changes made March, 2012 Revisions per TC (fc11) October, 2012 Revised Flooring requirements (fc11) June, 2013 Revised Flooring requirements per TC (fc11-fc12)
More informationPANERA BREAD BAKERY-CAFE # EAST EAU GALLIE BLVD. INDIAN HARBOUR BEACH, FL BREVARD COUNTY
SHEET INDEX. CONSTRUCTION DOCUMENTS (DRIVE-THRU ADDITION) GENERAL G-CS COVER SHEET G-ADA ACCESSIBILITY GUIDELINES G-SL SYMBOLS, LEGEND, & ABBREVIATIONS LSP-1 LIFE SAFETY PLAN ARCHITECTURAL SP-1.0 SITE
More informationBuilding Inspection Report
Building Inspection Report Sample Commercial Inspection Report Inspection Date: Prepared For: Prepared By: Professional Property Inspection Consultants 4857 Winterset Drive Columbus, OH 43220 (614) 459-5941
More informationCITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements
CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT 1 East Franklin Street Phone: 301-790-4163 Third Floor Hagerstown, MD 21740 Fax: 301-791-2650 BUILDING PERMIT APPLICATION FOR RESIDENTIAL ACCESSORY
More informationOur Service. Our Mission
H e a v y G l a s s S t i k S t a l l P i v o t & H i n g e S l i d e r s A L U M A X S H O W E R Our Product Alumax is the brand most chosen by the professional installer. Ease of installation, safety,
More informationSCHEDULE OF FINISHES FOR THE AGREEMENT BETWEEN ZOTOS BROTHERS (PTY) LTD AND
SCHEDULE OF FINISHES FOR THE AGREEMENT BETWEEN ZOTOS BROTHERS (PTY) LTD Zotos Place, 37 Old Kilcullen Road, Bryanston P O Box 68012, Bryanston, 2021 Tel: 011 463 2124 Fax: 011 463 2129 AND ERF: TOWNSHIP:
More informationCITY OF SELMA, TEXAS Inspection Guidelines: Residential
Selma, Texas, located in Bexar, Comal, and Guadalupe Counties Responsible party: Larry Verner, P.E. City Engineer Ph. (210) 651-7828 lverner@ci.selma.tx.us The Permits and Inspections Department welcomes
More informationElement Z General Design Requirements Room Standards
Toilet Room Guidelines PART 1 - GENERAL 1.01 OVERVIEW A. This document provides design and construction criteria for public/patient, and staff toilet rooms at (Owner). PART 2 - DESIGN CRITERIA 2.01 GENERAL
More information1. Decks, balconies, and sun porches 2. Walkways, ramps, and stairways 3. Patios and courtyards
SECTION 07185 TRAFFIC MEMBRANE PART 1 GENERAL 1.1 SECTION INCLUDES A. Traffic membrane, consisting of welded seam PVC waterproofing, over f following surfaces: 1. Decks, balconies, and sun porches 2. Walkways,
More informationCANNING WAREHOUSE CANNERY DISTRICT BOZEMAN, MT
CANNING WAREHOUSE CANNERY DISTRICT BOZEMAN, MT DESIGN DEVELOPMENT CQ + MA 100% DD Set 04-28-2015 Canning Warehouse CQ + MA 04-28-2015 Canning Warehouse EXISTING CONDITIONS CQ + MA 04-28-2015 Canning Warehouse
More informationGLASS WALL SPECIFICATIONS
GLASS WALL SPECIFICATIONS Series GA2 Ultra Acoustical, STC 45/46 Paired, Glass Wall PRODUCT OVERVIEW: Top Supported Center Stack Paired s Manually Operated Maximum Opening Height: 12' 2 [3.7m] Maximum
More informationCompleted. Project. Melbourne High School. Comprehensive Additions and Renovations
Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project
More informationMidwester State University Health Science Center
Bid Proposal For: Bid Due: Bids Received At: Email Bid to: Midwester State University Health Science Center 8-Aug-17 Midwestern State University Attn: Steven Shelley - Director of Purchasing/Contract Management
More informationTable of Contents. Page Title
Page Title Table of Contents 1 Floor plan/ Room utilization 2 Elevation (EAST) 3 Elevation (SOUTH) 4 Elevation (WEST) 5 Elevation (NORTH) 6 Foundation plan details 7 Foundation cross sections A Main grade
More informationFeasibility Report. Property Inspection Engineers, Inc. (248) Property Address. 405 Fairgrove Royal Oak, MI.
Feasibility Report Property Inspection Engineers, Inc. (248) 644-8798 Inspection ate: 10/27/2010 Consultant's Job No: Consultant: Christopher J. aggy Applicant ark Beard Property Address 405 Fairgrove
More informationSPECIFICATION FOR THE DEVELOPMENT OF LPA CLEAN ROOM INFRASTRUCTURE Description of work
SPECIFICATION FOR THE DEVELOPMENT OF LPA CLEAN ROOM INFRASTRUCTURE Description of work Creation of Three clean area rooms (Master Mix, Amplification and Hybridization rooms) for Line Probe Assay with two
More informationDARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES
SECTION 15420 DRAINAGE AND VENT SYSTEMS PART 1 DESIGN DIRECTIVES 1.1 DESIGN CRITERIA A. All cleanouts above finished (accessible and non-accessible) ceilings shall be extended to the floor above. B. Do
More informationSeries - 1
SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word
More informationBasement Renovation Guide For Residential Dwellings
1 Development Services Department Building Permit & Inspection Services Basement Renovation Guide For Residential Dwellings This document is a guide for home owners and does not cover all possible conditions.
More informationCARL E. SCHLUTER ELEMENTARY SCHOOL
CARL E. SCHLUTER ELEMENTARY SCHOOL Carl E. Schluter Elementary School Campus Data CARL E. SCHLUTER ELEMENTARY SCHOOL 1220 Mesa Crest Drive, Haslet, Texas 76052 Year Built 2011 Approx. Total Square Footage
More informationSECTION IMPACT RESISTANT WALL PROTECTION
SECTION 10265 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work under this Section shall include all materials and installation necessary to provide Impact-Resistant Wall Protection including Wall guards,
More informationSPECIFICATION SECTION 05515: LADDERS O Keeffe s Aluminum Ladders
Welcome to the O Keeffe s Guide Specification System prepared as an aid to specify in preparing written construction documents. For specification assistance with specific product applications, please contact
More informationUniversity Apartments on Brooklyn PROJECT MANUAL
Section 122100 Horizontal Louver Blinds University Apartments on Brooklyn PART 1 - GENERAL 1.1 SECTION INCLUDES A. Horizontal slat louver blinds. B. Operating hardware. 1.2 RELATED SECTIONS A. Section
More informationQualifying Process for Handyman Online Qualifying Questions. Name: Street Address: City: State: Zip Code. Home Phone: Cell Phone: Address:
Qualifying Process for Handyman Online Qualifying Questions Please type in your answers and email to info@pittsburghsbestremodeling.com or print out this form and write in your answers and fax to 412-829-1664
More informationGUIDELINES FOR SANITARY DESIGN AND CONSTRUCTION OF MILK PRODUCTS PLANTS (rev )
Milk and Dairy Food Safety Branch 1220 N Street, Sacramento, CA 95814 GUIDELINES FOR SANITARY DESIGN AND CONSTRUCTION OF MILK PRODUCTS PLANTS (rev. 10-20-2011) The outline below lists sanitary requirements
More informationGLASS WALL SPECIFICATIONS
GLASS WALL SPECIFICATIONS Series GA1 Ultra Acoustical, STC 45/46, Omni, Glass Wall PRODUCT OVERVIEW: Top Supported Side Stack Individual, Omni-Directional s Manually Operated Maximum Opening Height: 12'
More informationBRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING
PROPOSED MAIN ENTRY - EXTERIOR RENDERING EXISTING SITE AERIAL PHOTOGRAPH 6TH STREET NW PEDESTRIAN ACCESS School access to existing alley leads students through vehicular path CHAIN LINK ENCLOSED PARKING
More information