Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features

Size: px
Start display at page:

Download "Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features"

Transcription

1 DESIGN CRITERIA FOR STANDARD CONSTRUCTION: These standard design elements of the P.E.I. Power Equipment Center are utilized to meet the following design criteria per ASCE 7-05 as adopted by the IBC (International Building Code) 2006 and 2009 Edition: Occupancy Category: III House Dead Load: 65 PSF Plus Equipment Load as Noted Equipment Loads 150 PSF Power Distribution House 70 PSF Control House Floor Live Load: 250 PSF (Unless Noted Otherwise) Roof Live Load: 50 PSF Deflection Limits: Base Member Total Load = L/240 Snow Load Criteria: Ground Snow Load: 50 PSF Importance Factor: 1.10 Thermal Factor: CT = 1.0 Exposure Factor: CE = 1.0 Wind Load Criteria Wind Speed: 125 MPH Exposure Category: C Importance Factor: 1.15 Topographic Factor: KZT = 1.0 Component and Cladding Wind Loads Used for Design of Wall & Roof Panels Seismic Load Criteria Importance Factor: 1.25 Site Class: D Spectral Response Acceleration Ss = 0.35 S1 = 0.13 Max Seismic Design Category is C Page 1 of 8

2 1.0 DEFINITION: The PEI Packaged Equipment Center (PEC) is a factory manufactured NEMA 3R walk-in module designed to house customer specific electrical equipment. The module shall be completely fabricated, assembled and tested in a factory environment and shall be pre-installed and pre-wired with PEI manufactured or customer specific equipment prior to shipment. The PEI PEC is delivered to the customer's site as a pre-designed, factory manufactured and tested unit. 2.0 GENERAL GUIDELINES Design and construction techniques shall follow industry standards to support the manufacturing of the components and the complete assembly of the PEC. At a minimum, the latest revision of the applicable sections of the following standards shall govern: IBC - International Building Code UBC - Uniform Building Code BOCA - Building Ordinance Code of America SBC - Southern Building Code NEC - National Electrical Code AWS D1.1 - American Welding Society SSPC - Steel Structures Painting Council AISC - American Institute of Steel Construction The manufacturing, assembly, and testing of the PEI PEC shall be controlled by a written Quality Control Manual outlining the procedures used to guarantee performance. When required, stage checks shall be administered throughout the design and manufacturing steps to verify compliance with the quality standards detailed in the manual. Copies of certificates of conformance shall be made available to the customer when required. 3.0 GENERAL DESCRIPTION 3.1 The PEI PEC shall be of the highest quality and all material shall be new, unused and free from defects affecting performance, serviceability and appearance. 3.2 The exterior dimensions of the PEC shall range between 8 to 18 feet wide, 8 to 80 feet long and 11 to 13 1/2 feet high in a single unit. All PEC's over 16 feet wide will be made in sections. All PEC's shall have a nominal interior height dimension of 10, 10.5, 11 or 11.5 feet. Interior widths and lengths shall be 6 inches less than exterior. 3.3 The PEI PEC shall be fabricated and constructed using non-combustible materials. Additionally, all insulation shall have a flame spread of less than 25 Page 2 of 8

3 3.4 Unless otherwise specified, the PEI PEC shall be designed for an Industrial, general purpose, non - hazardous, seismic one environment. Unless otherwise specified, the PEC shall be suitable for installation in a 104 degree F maximum temperature and a -10 degree F minimum temperature. 3.5 Special designs and manufacturing techniques shall be employed for PEC installation in seismic and hazardous areas. Structural design calculations shall be provided when specified. 3.6 The following PEI designed and manufactured equipment may be pre-installed, pre-wired and tested in the PEI PEC: Simplex Panels Duplex Panels PLC Systems Consoles Instrumentation Panels Graphic Control Panels Swing Rack cabinets Transformer/Rectifier Panels 3.7 The following customer furnished or PEI procured equipment may be pre -installed, pre-wired and tested in the PEI PEC: Low Voltage MCC Medium Voltage MCC Low Voltage Switchgear Medium Voltage Switchgear Low Voltage Variable Frequency Drives Medium Voltage Variable Frequency Drives Distribution Dry type transformers AC and or DC Panels Battery Systems and UPS Automatic Transfer Switches HVAC Systems Pressurization Systems Explosion Proof Fixtures and Devices Other Page 3 of 8

4 3.8 Engineering drawings shall be designed using the latest revision of AUTOCAD. Drawings for approval shall include plan, elevation and wiring diagrams of the PEC utility circuits and a detailed Bill of Material. 3.9 The PEI PEC shall be designed for future expansion, when specified. 4.0 DESIGN CRITERIA 4.1 BASE & FLOOR The PEI PEC base shall be fabricated from ASTM A-36 structural steel members sized and arranged in such a manner to limit deflection during lifting and transportation of the completed module. Each base shall be completely welded with certified welders (AWS D1.1) whom are skilled in working and handling structural steel. The base structural members shall be so arranged as to not interfere with floor openings and / or other bottom entrance / exit areas The flooring of the base shall consist of 3/16 inch or ¼ inch carbon steel plate welded to the top of the structural support frame. Gaps between floor plate butts shall be less than 1/16 inch or shall be continuously welded and ground smooth. The floor loading shall be rated not less than 250 pounds per square foot, unless otherwise specified. The flooring shall be flat and free from bows and indents Deflection during lifting shall not exceed ¼ inch per 10 feet. Base shall be designed for mounting on piers, pilings or slab foundations. 4.2 WALLS: The PEI PEC exterior wall shall be constructed from formed 14 gauge galvanealed steel, Type 304 or Type 316 Stainless Steel or type 5051 aluminum. Exterior panels shall be designed to provide a weather resistant barrier. Exterior wall panels are to be a maximum of 4 feet wide and 12 feet high. Stiffeners shall be welded in the midpoint between each panel Each exterior wall panel shall be welded or bolted to the base frame Page 4 of 8

5 4.2.3 The interior wall shall be fabricated from 16 gauge galvanealed steel, and be mechanically fastened to the formed exterior wall. Interior wall pans shall be a maximum of 4 feet wide and 12 feet high The wall cavity shall be a nominal 3 inches Each exterior wall seam shall be liberally caulked using high quality caulking compound designed for this purpose The walls shall be designed to withstand wind Levels of 125 MPH Page 5 of 8

6 4.3 ROOF / CEILING: The roof pans shall be fabricated from 14 gauge galvanealed steel or type 5052 aluminum. The roof pans shall be formed to provide a weather resistant barrier The roof shall be gable type with a minimum 1/4 inch per 12 inch slope. A minimum of 3/4 inch overhang from the exterior wall shall be provided Each exterior roof seam shall be continuously seam welded The ceiling pans shall be fabricated from 16 gauge galvanealed steel and mechanically fastened to the roof truss system. The ceiling structure shall be designed to retain the insulation and provide a steel surface to install light fixtures and overhanging cable tray when required The roof / ceiling system shall be designed for 40 pounds per square foot loading. 4.4 ENTRANCE: The PEI PEC shall have an industrial grade, double walled, Class B, double door. Each leaf shall be 36 inches wide and 84 inches high. When required by customer or NEC, an additional personnel door shall be provided of the same quality The door shall open outwardly and have a low profile panic device opening feature. All door hardware shall be brushed aluminum finish and of industrial quality The door shall be provided with a key lockable knob and an automatic door closure with hold open feature. Door threshold shall be bumper style When specified, a door window shall be provided. Door window shall be safety plate glass A drip shield shall be provided over the door, and a removable transom shall be provided, when specified. 4.5 INSULATION: Fiberglass bat insulation with a flame spread of 25 or less shall be used in all exterior walls and ceilings. Page 6 of 8

7 4.5.2 Exterior walls shall be insulated to a minimum of R11 value Ceiling shall be insulated to a minimum of R19 value. When specified, higher values of insulation can be provided Floor insulation will be provided, when specified When rear access equipment doors and removable transoms are provided, they shall also be insulated with fiberglass or other non-combustible insulation. 4.6 WIRING: PEI PEC wiring shall consist of type THHN, 600V, 90 C, gray stranded number 12 AWG for utility circuits Installed equipment shall be interconnected with cable or wire depending on manufacturers and /or customer requirements All interconnecting wiring shall be installed in EMT conduit or other approved raceway or wireway Grounding of the PEC and switchboards within the PEC shall be to customer requirements. 4.7 LIGHTING / RECEPTACLES / LOADCENTER: The PEI PEC shall be supplied with fluorescent lamps with reflectors that provided 50 foot candles of illumination. Lighting shall be controlled by a switch located near the door. Three way light switches shall be provided on units with two doors The PEI PEC shall be furnished with adequate industrial grade, 120V, 20 A duplex convenience outlets. Receptacles shall be mounted 18 inches from finished floor and spaced approximately 8' apart along the wall Exterior and Emergency lighting shall be provided, if required Lighting and receptacles shall be wired on independent circuits The PEI PEC shall be furnished with one 12 circuit AC loadcenter, 100A main, with twelve (12) 20A branch circuit breakers. Page 7 of 8

8 5.0 TESTING AND CHECKOUTS: 5.1 After manufacturing, equipment installation, and wiring of the PEI PEC, the manufacturer shall perform the following test to conform to engineering drawings and specifications Physical inspection of PCR and mounted equipment Physical inspection of wiring and verification of circuit correctness Physical inspection of structural integrity Continuity checks of all wires installed by PEI Functional test of PEC utility circuits, HVAC, pressurization systems, fire detection and other auxiliary equipment when required Dielectric Hi-Pot test of all power cable installed by PEI Other customer specified tests. 6.0 SHIPPING: 6.1 The PEI PEC shall be provided with lifting lugs strategically located on the base to facilitate loading and placement at the jobsite. 6.2 If the unit is being shipped in multiple sections, the sections shall be match-marked and proper hardware and instructions for field connections will be provided. 6.3 Removable or loose items shall be marked, tagged, and shipped with the unit(s) they support. These items shall be properly packed to insure protection during transit. Page 8 of 8

Power Zone Center. Your solution for power distribution and control systems

Power Zone Center. Your solution for power distribution and control systems Power Zone Center Your solution for power distribution and control systems The Strength of One Powerful When you need to install a new power distribution center in your facility, you need it done in fastest

More information

Outdoor + Switchgear, Walk-in Equipment Buildings Low & Medium Voltage NEMA 3R

Outdoor + Switchgear, Walk-in Equipment Buildings Low & Medium Voltage NEMA 3R Outdoor + Switchgear, Walk-in Equipment Buildings Low & Medium Voltage NEMA 3R Product Brochure www.apt-power.com 433 N. 36 th Street PROVIDING A COMPREHENSIVE Lafayette, IN 47905 www.apt-power.com 433

More information

SECTION PRE-ENGINEERED MEMBRANE STRUCTURE

SECTION PRE-ENGINEERED MEMBRANE STRUCTURE SECTION 13125 PART 1 - GENERAL 1.1 SUMMARY A. Section includes the design, engineering, fabrication and erection of a frame-supported, tensilemembrane structure complete with entrance and exit doors and

More information

A. Submit the following in addition to the standard requirements.

A. Submit the following in addition to the standard requirements. SECTION [13120] OMNIFLEX 300 MODULAR WALL SYSTEM SECTION 1 GENERAL 1.01 SECTION INCLUDES A. This Section specifies all requirements necessary to furnish and install a complete modular wall system including,

More information

SECTION FIBERGLASS REINFORCED POLYMER (FRP) PANELS

SECTION FIBERGLASS REINFORCED POLYMER (FRP) PANELS SECTION 07 44 50 FIBERGLASS REINFORCED POLYMER (FRP) PANELS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Design, Engineering, manufacturing and erection of fiberglass reinforced panels. Delegated Design of

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL ROOF PANELS SECTION: METAL WALL PANELS REPORT HOLDER:

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL ROOF PANELS SECTION: METAL WALL PANELS REPORT HOLDER: 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 4 6587 (562) 699 0543 www.icc es.org ESR 3152 Reissued 08/2017 This report is subject to renewal 08/2018. DIVISION: 07 00 00

More information

Section BUILDINGS, SHELTERS, ENCLOSURES

Section BUILDINGS, SHELTERS, ENCLOSURES Section 13121 BUILDINGS, SHELTERS, ENCLOSURES Part 1 GENERAL 1.1 SECTION INCLUDES 1.2 A. Pre-engineered buildings. B. Pre-engineered shelters. C. Pre-engineered enclosures. D. Electrical wiring and devices

More information

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 48-05 Van Dam Street Long Island City, NY 11101 ELECTRIC METER SHOP DEPARTMENT METER ENGINEERING SPECIFICATION MES-350 REVISION 3 June 2016 EFFECTIVE DATE

More information

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows: SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ROOFING AND SIDING PANELS REPORT HOLDER: KINGSPAN INSULATED PANELS, INC.

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: ROOFING AND SIDING PANELS REPORT HOLDER: KINGSPAN INSULATED PANELS, INC. 0 Most Widely Accepted and Trusted ICC-ES Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-1143 Reissued 04/2017 This report is subject to renewal 04/2018. DIVISION: 07 00 00 THERMAL

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM PART 1- GENERAL 1.1 SUMMARY A. Section Includes: SECTION 084523 - SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM 1. Flat factory prefabricated structural insulated translucent sandwich panels; with glazed endwalls.

More information

SST-II HYDRAULIC BI-FOLD SPECIFICATIONS

SST-II HYDRAULIC BI-FOLD SPECIFICATIONS PART 1 GENERAL 1.01 DESCRIPTION A. General 1. Furnish SST-II Hydraulic Bi-Fold System complete from one manufacturer. Provide all labor, materials, tools and equipment to furnish the SST-II Bi-Fold System

More information

Hansen Pole Buildings Planning Guide. Toll Free / Toll Free FAX

Hansen Pole Buildings Planning Guide. Toll Free / Toll Free FAX Hansen Pole Buildings Planning Guide Toll Free 866-200-9657 / Toll Free FAX 866-200-9658 While we strive to earn your business, whether you purchase from us or not, we would hope you would utilize this

More information

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

Telecommunication Spaces

Telecommunication Spaces Telecommunication Spaces October 19, 2016 Page 1 Revision History Telecommunication Spaces Standard Effective Date Email Version Contact Phone OIT-TS strevena@csustan.edu 1.0 Stan Trevena 209.667.3137

More information

SECTION 1043 FENCE MATERIAL

SECTION 1043 FENCE MATERIAL SECTION 1043 FENCE MATERIAL 1043.1 Scope. This specification covers the material required in the construction of chainlink fence and woven wire fence. 1043.2 Basis of Acceptance. The basis of acceptance

More information

PORT OF SAN FRANCISCO ELECTRICAL CODE. Based on the 2016 California Electrical Code

PORT OF SAN FRANCISCO ELECTRICAL CODE. Based on the 2016 California Electrical Code 2016 PORT OF SAN FRANCISCO ELECTRICAL CODE Based on the 2016 California Electrical Code The complete 2016 Port of San Francisco Electrical Code adopts and amends the 2013 edition of the California Electrical

More information

RESIDENTIAL BUILDING REQUIREMENTS

RESIDENTIAL BUILDING REQUIREMENTS RESIDENTIAL BUILDING REQUIREMENTS Residential Building Requirements This is an informational booklet with some of the general residential construction requirements taken from the codes adopted by Campbell

More information

(Condensed from National Electric Code)

(Condensed from National Electric Code) WIRING, SPECIFICATIONS, INSPECTION, AND METER INSTALLATION PROCEDURES FOR RESIDENTIAL CUSTOMERS SERVED BY SOUTHWEST ARKANSAS ELECTRIC COOPERATIVE CORPORATION Effective April 1, 1974 Revised February 3,

More information

STREET LIGHTING. Springville City Power standard street lights will be installed in accordance with Springville City Power's Line Extension Policy.

STREET LIGHTING. Springville City Power standard street lights will be installed in accordance with Springville City Power's Line Extension Policy. General The following general requirements shall apply to street lights installed in new underground residential subdivisions or developments located within the service area of Springville City Power (within

More information

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519 METAL CLAD CABLE - MC-PLUS Neutral

More information

PREFABRICATED STEEL TRUSS SPECIFICATIONS

PREFABRICATED STEEL TRUSS SPECIFICATIONS PREFABRICATED STEEL TRUSS SPECIFICATIONS 1. GENERAL 1.1 Scope All engineering design and related detailing of the bridge(s) shall be provided by the supplier. The design and detailing shall conform to

More information

Approval Standard. for. Flammable and Combustible Liquid Storage Buildings

Approval Standard. for. Flammable and Combustible Liquid Storage Buildings Approval Standard for Flammable and Combustible Liquid Storage Buildings Class Number 6049 August 1991 (Effective Date: August 1, 1992) 2002 FM Global Technologies LLC. All rights reserved. Foreword FM

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL WALL PANELS REPORT HOLDER: FCP, INC.

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL WALL PANELS REPORT HOLDER: FCP, INC. 0 Most Widely Accepted and Trusted ICC ES Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 2937 Reissued 05/2016 This report is subject to renewal 05/2018. DIVISION: 07 00 00 THERMAL

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:

More information

GUIDE SPECIFICATION EXETER SECURITY SHIELD SECURITY WINDOW BARRIER SYSTEM

GUIDE SPECIFICATION EXETER SECURITY SHIELD SECURITY WINDOW BARRIER SYSTEM 1 GUIDE SPECIFICATION EXETER SECURITY SHIELD SECURITY WINDOW BARRIER SYSTEM 1.01 WORK INCLUDED PART 1: GENERAL A. Provide for all labor, equipment, materials and services to furnish and install SECURITY

More information

Modular CABANA Kit 16 x 16 (6x6) Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16" long / 1/2" thick or 16 oz. copper

Modular CABANA Kit 16 x 16 (6x6) Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16 long / 1/2 thick or 16 oz. copper Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16" long / 1/2" thick or 16 oz. copper Modular CABANA Kit 16 x 16 (6x6) Hipped Roof & Build-in Transoms Entry Key Lock Set (bright brass or dark bronze)

More information

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) 2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of Project: Address:

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: COMPOSITE WALL PANELS REPORT HOLDER: FUNDERMAX GMBH

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: COMPOSITE WALL PANELS REPORT HOLDER: FUNDERMAX GMBH 0 Most Widely Accepted and Trusted ICC-ES Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-3340 Reissued 05/2017 This report is subject to renewal 05/2018. DIVISION: 07 00 00 THERMAL

More information

Corium Brick Rainscreen System Specifications

Corium Brick Rainscreen System Specifications CORIUM BRICK RAINSCREEN SYSTEM PART 1 - GENERAL 1.1 SUMMARY A. Work Included: The Work of this Section shall include but not be limited to the following: 1. Corium brick plates 2. Galvanized and coated

More information

1. Section Steel Doors and Frames. 2. Section Flush Wood Doors 3. Section Aluminum Storefront Doors.

1. Section Steel Doors and Frames. 2. Section Flush Wood Doors 3. Section Aluminum Storefront Doors. PROPOSED ALTERATIONS FOR REIMS PINECREST 124, LLC PINECREST, FLORIDA SECTION 08710 DOOR HARDWARE PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Mechanical door hardware for the following: B. Related

More information

Electric Service Standards

Electric Service Standards V: 1 of 6 A. Padmounted Requirements Complete requirements are contained in FPL specifications given to Customers for individual projects. Typical pad mounted transformer requirements include, but are

More information

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE This specification is intended to describe the general requirements applicable to a proper structural cantilever rack design. In addition, it is

More information

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: STRUCTURAL PANELS REPORT HOLDER: ENERCEPT, INC.

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: STRUCTURAL PANELS REPORT HOLDER: ENERCEPT, INC. 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 1780 Reissued 11/2017 This report is subject to renewal 11/2019. DIVISION: 06 00

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: COMPOSITE WALL PANELS REPORT HOLDER: PARKLEX USA

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: COMPOSITE WALL PANELS REPORT HOLDER: PARKLEX USA 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 3462 Reissued 09/2017 This report is subject to renewal 09/2018. DIVISION: 07 00

More information

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number PART 1 GENERAL 01 02 03 04 SCOPE Furnish and install Manual Transfer Switches (MTS) and

More information

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

A. Access doors and frames are part of an access door and frame allowance.

A. Access doors and frames are part of an access door and frame allowance. SECTION 08 31 13 ACCESS DOORS AND FRAMES PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

MODERNFOLD GWS 100SR-G MOVEABLE GLASS WALLS

MODERNFOLD GWS 100SR-G MOVEABLE GLASS WALLS MODERNFOLD GWS 100SR-G MOVEABLE GLASS WALLS Ideal for applications requiring space division, visibility and security Used in bank lobbies, offices, conference areas, interior storefronts and arena skyboxes

More information

Structural System. Design Criteria Fire Resistance Concrete designed for 2 HR rating (worst case) Geotechnical Report Allowable Bearing Capacity

Structural System. Design Criteria Fire Resistance Concrete designed for 2 HR rating (worst case) Geotechnical Report Allowable Bearing Capacity System Codes and Criteria Design Codes and Standards The design code used is the Wisconsin Administrative Code along with the State of Wisconsin Department of Commerce-Safety & Buildings Chapters Comm

More information

Project Address: Name of Person Completing Form:

Project Address: Name of Person Completing Form: Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards Date Description of Change Pages / Sections Modified ID 6/15/16 Updated format, division title, and removed references to other sections. - mgl44 A. Summary This section contains design criteria for the

More information

2012 International Building Code Errata (Portions of text and tables not shown are unaffected by the errata)

2012 International Building Code Errata (Portions of text and tables not shown are unaffected by the errata) SEVENTH PRINTING (Updated October 13, 2014) Figure 1608.2 GROUND SNOW LOADS, p g, FOR THE UNITED STATES (psf) (Revise southern California values as indicated in the figure) SIXTH PRINTING (Updated June

More information

The Inspection Process. Waxhaw N.C.

The Inspection Process. Waxhaw N.C. The Inspection Process In Waxhaw N.C. This information is provided by the Waxhaw Enforcement Division to assist you in the progression of your project. Nothing in this document should be considered "Code"

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: COMPOSITE WALL PANELS REPORT HOLDER: 3A COMPOSITES USA INC.

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: COMPOSITE WALL PANELS REPORT HOLDER: 3A COMPOSITES USA INC. 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 1114 Reissued 09/2017 This report is subject to renewal 09/2019. DIVISION: 07 00

More information

Central Dartmouth Section Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Dartmouth, NS

Central Dartmouth Section Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Dartmouth, NS Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Part 1 General 1. RELATED SECTIONS 1. Section 07 92 10 Joint Sealing 2. Section 08 71 00 Door Hardware 2. REFERENCES 1. American Society

More information

Name: McNaughton - McKay Elec. Designed by JMadrid. Address: None RM-BALLASTED FLAT ROOF. City, State: Unknown, Watt Panels

Name: McNaughton - McKay Elec. Designed by JMadrid. Address: None RM-BALLASTED FLAT ROOF. City, State: Unknown, Watt Panels U-BUILDER PROJECT REPORT VERSION: 1.2.24 JUL 25, 2016, 02:55 PM PROJECT TITLE: YPSILANTI FIRE STATION PROJECT ID: E841C2DF Name: McNaughton - McKay Elec. Designed by JMadrid Address: None RM-BALLASTED

More information

City and County of San Francisco CONTRACT No A SFO - Data Center, Building 60 SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

City and County of San Francisco CONTRACT No A SFO - Data Center, Building 60 SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SCOPE OF WORK A. Cable Trays for Communications Cabling 1. Cable Trays 2. Cable Runways 3. Basket Tray B. Cable Tray Support

More information

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS SECTION 270528 PATHWAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Communications equipment coordination and installation. 2. Sleeves for pathways and cables. 3. Raceway

More information

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466 BUSWAY LOW VOLTAGE (POW-R-WAY III) PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the busway system including all necessary fittings, hangers and accessories as specified herein

More information

Building Design Data

Building Design Data Building Design Data.. 1. Building Design The KORE ICF System is designed to meet the requirements of the Building Regulations 1997-2006, in the case of two storeys, single occupancy dwellings. If the

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE Magnetic Shielding

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE Magnetic Shielding SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE Magnetic Shielding Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 MAGNETIC SHIELDING PART 1 GENERAL 1.1 GENERAL

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL ROOF PANELS SECTION: METAL WALL PANELS REPORT HOLDER:

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL ROOF PANELS SECTION: METAL WALL PANELS REPORT HOLDER: 0 Most idely Accepted and Trusted ICC-ES Report ICC-ES 000 (800) 423-687 (62) 699-043 www.icc-es.org ESR-199 Reissued 0/2017 This report is subject to renewal 0/2019. DIVISION: 07 00 00 THERMAL AND MOISTURE

More information

Architectural Details. Walls. Including PVC cove, UL Listed Raceway, & Integration to Flooring. AES Pharma Wall & Walk-On Ceiling Cleanroom System

Architectural Details. Walls. Including PVC cove, UL Listed Raceway, & Integration to Flooring. AES Pharma Wall & Walk-On Ceiling Cleanroom System Architectural Details Section One Walls Including PVC cove, UL Listed Raceway, & Integration to Flooring AES Pharma Wall & Walk-On Ceiling Cleanroom System Architectural Components AES PHARMA SYSTEM AES

More information

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project. SECTION 14651 FREE STANDING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and industrial

More information

Individual Truss Marking Is it a Building Code Requirement?

Individual Truss Marking Is it a Building Code Requirement? Introduction: Individual Truss Marking Is it a Building Code Requirement? Released April 1, 2010 On January 1, 2008, the 2007 edition of the California Building Code (CBC) 1 was adopted for use and replaced

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

UNDERGROUND SERVICES SECONDARY

UNDERGROUND SERVICES SECONDARY Reference UNDERGROUND SERVICES SECONDARY Underground services secondary... U- 1 General requirements for underground service... U- 2 Name of parts for underground service... U- 3 Conduit layouts... U-

More information

MINIMUM SPECIFICATIONS

MINIMUM SPECIFICATIONS MINIMUM SPECIFICATIONS A) GREENHOUSE STRUCTURE: (EDUCATOR) 30 X 96 Galvanized Steel Frame Consisting of: A. Column Post: Allied 2 x 4 Rectangle 6 Spacing B. Bows: Allied 2 x 3 Rectangle 6 Spacing C. Trusses:

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: COMPOSITE WALL PANELS REPORT HOLDER:

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: COMPOSITE WALL PANELS REPORT HOLDER: 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 2653 Reissued 09/2016 This report is subject to renewal 09/2018. DIVISION: 07 00

More information

Design & Construction Standards, Revised January

Design & Construction Standards, Revised January PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

ESR-2894 Reissued April 2014 This report is subject to renewal April 1, 2016.

ESR-2894 Reissued April 2014 This report is subject to renewal April 1, 2016. ICC-ES Evaluation Report ESR-894 Reissued April 04 This report is subject to renewal April, 0. www.icc-es.org (800) 4-87 () 99-04 A Subsidiary of the International Code Council DIVISION: 07 00 00 THERMAL

More information

E-Series Steel Gantry Crane

E-Series Steel Gantry Crane SPANCO PRODUCT SPECIFICATIONS 1 E-Series Steel Gantry Crane This guide can be used to prepare a bid specification for the incorporation of an E-Series Gantry Crane into a competitive bid project or application.

More information

Communications Page 1 of 9

Communications Page 1 of 9 Page 1 of 9 Last Update: April 23 rd, 2014 Introduction Design In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a

More information

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION CHAPTER 26 PLASTIC SECTION BC 2601 GENERAL 2601.1 Scope. These provisions shall govern the materials, design, application, construction and installation of foam plastic, foam plastic insulation, plastic

More information

2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property 2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property A brief summary of the most used code references for residential wiring State of Idaho Division of Building Safety Electrical

More information

The University of Texas at Austin September 30, 2011

The University of Texas at Austin September 30, 2011 SECTION 27 05 26 GROUNDING AND BONDING FOR COMMUNICATIONS PART 1 - GENERAL 1.1 SUMMARY A. This section governs the products and execution requirements relating to furnishing and installing grounding and

More information

B. Provide a complete conduit system with associated couplings, connectors, and fittings.

B. Provide a complete conduit system with associated couplings, connectors, and fittings. SECTION 26 05 33 PART 1 - GENERAL 1.01 WORK INCLUDED A. Comply with the provisions of Sections 260500. B. Provide a complete conduit system with associated couplings, connectors, and fittings. 1.02 RELATED

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: COMPOSITE WALL PANELS REPORT HOLDER: CITADEL ARCHITECTURAL PRODUCTS, INC.

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: COMPOSITE WALL PANELS REPORT HOLDER: CITADEL ARCHITECTURAL PRODUCTS, INC. 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 1015 Reissued 04/2017 This report is subject to renewal 04/2019. DIVISION: 07 00

More information

Assemblies Evaluated For 1. Non Axial Load Bearing Wall 2. Transverse Load Capacity 3. Fire Resistance 4. Abuse Resistance

Assemblies Evaluated For 1. Non Axial Load Bearing Wall 2. Transverse Load Capacity 3. Fire Resistance 4. Abuse Resistance Pei Evaluation Service is an accredited ISO Standard 17065 Product Certifier, accredited by the IAS. This Assembly Evaluation Report represents a product that Pei ES has Evaluated. This Assembly Evaluation

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Pewaukee, WI 53072 Inspection Date: 1/6/15 Prepared For: Report Number: Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar Dr. Pewaukee, WI 53072

More information

A. This Section includes automatic entrance door systems operating as follows: 1. Swinging operation.

A. This Section includes automatic entrance door systems operating as follows: 1. Swinging operation. SECTION 08462 - SWINGING AUTOMATIC ENTRANCE DOORS PART 1 - GENERAL.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General, Supplementary, and Special Conditions and Division

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

SECTION LIGHTING

SECTION LIGHTING PART 1 - GENERAL 1.1. RELATED SECTIONS: 1.2. SCOPE OF SECTION: This section contains the requirements for equipment and installation related to exterior, interior, and special lighting applications. 1.3

More information

GARAGES/ONE-STORY City of Grand Rapids Building Safety Division

GARAGES/ONE-STORY City of Grand Rapids Building Safety Division GARAGES/ONE-STORY City of Grand Rapids Building Safety Division 218-326-7601 www.cityofgrandrapidsmn.com This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building

More information

FOUR FOLD DOORS-WITH SINGLE OVERHEAD MTD OPERATOR

FOUR FOLD DOORS-WITH SINGLE OVERHEAD MTD OPERATOR FOUR FOLD DOORS-WITH SINGLE OVERHEAD MTD OPERATOR Section 083713- Four Fold Doors- With Single Overhead Mounted Operator Part 1-General 1.1 Related Document: A. Drawing and general provisions of contract,

More information

SECTION PERSONNEL DUTY LOCKERS. 1. FPPL Series Police Personnel Duty Lockers, including the following:

SECTION PERSONNEL DUTY LOCKERS. 1. FPPL Series Police Personnel Duty Lockers, including the following: SECTION 10501 PERSONNEL DUTY LOCKERS PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 specifications

More information

BUILDING CODES & DESIGN CRITERIA

BUILDING CODES & DESIGN CRITERIA BUILDING CODES & DESIGN CRITERIA Adopted Building Codes: 2006 International Building Code (IBC) 2006 International Residential Code (IRC) 2006 International Mechanical Code (IMC) 2006 International Plumbing

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: COMPOSITE WALL PANELS REPORT HOLDER: ARCONIC ARCHITECTURAL PRODUCTS, LLC

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: COMPOSITE WALL PANELS REPORT HOLDER: ARCONIC ARCHITECTURAL PRODUCTS, LLC 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 3435 Reissued 07/2017 This report is subject to renewal 07/2018. DIVISION: 07 00

More information

ELECTRIC METERING GENERAL

ELECTRIC METERING GENERAL 1.0 INDEX 1.0 INDEX 2.0 SCOPE 3.0 GENERAL REQUIREMENTS 4.0 EQUIPMENT 5.0 METER REQUIREMENTS 6.0 METER FACILITIES 7.0 ELECTRICAL CONNECTIONS 2.0 SCOPE This guide covers general requirements and codes for

More information

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: STRUCTURAL PANELS REPORT HOLDER: FOUR SEASONS SOLAR PRODUCTS

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: STRUCTURAL PANELS REPORT HOLDER: FOUR SEASONS SOLAR PRODUCTS 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 2445 Reissued 08/2017 This report is subject to renewal 08/2018. DIVISION: 06 00

More information

A-Series Aluminum Gantry Crane

A-Series Aluminum Gantry Crane SPANCO PRODUCT SPECIFICATIONS 1 A-Series Aluminum Gantry Crane This guide can be used to prepare a bid specification for the incorporation of an A-Series Gantry Crane into a competitive bid project or

More information

Combustible Exterior Wall Cladding Systems: An ICC Perspective

Combustible Exterior Wall Cladding Systems: An ICC Perspective Combustible Exterior Wall Cladding Systems: An ICC Perspective The tragic Grenfell Tower fire in London brought extensive public focus on combustible exterior wall systems, often called cladding, prompting

More information

NEUTRAL GROUNDING TRANSFORMERS INSTALLATION AND MAINTENANCE INSTRUCTIONS

NEUTRAL GROUNDING TRANSFORMERS INSTALLATION AND MAINTENANCE INSTRUCTIONS 1 Table of Contents SECTION 1 Unpacking... 3 1.1 Shipping... 3 1.2 Receiving... 3 SECTION 2 Installation... 3 SECTION 3 Inspection... 4 SECTION 4 Connection... 4 4.1 Neutral Lead... 5 4.2 Ground Lead...

More information

Typical Finished Basement Details

Typical Finished Basement Details Albemarle County, Virginia Typical Finished Basement Details Based on the 2012 Virginia Residential Code Finished basements must be constructed in conformance with these details. For requirements, details

More information

THOMAS JEFFERSON UNIVERSITY HOSPITAL STANDARD OPERATING PROCEDURE FOR THE BUILD OUT OF TELECOMMUNICATIONS ROOMS AND ASSOCIATED SPACES

THOMAS JEFFERSON UNIVERSITY HOSPITAL STANDARD OPERATING PROCEDURE FOR THE BUILD OUT OF TELECOMMUNICATIONS ROOMS AND ASSOCIATED SPACES THOMAS JEFFERSON UNIVERSITY HOSPITAL STANDARD OPERATING PROCEDURE FOR THE BUILD OUT OF TELECOMMUNICATIONS ROOMS AND ASSOCIATED SPACES PREPARED BYBALA CONSULTING ENGINEERS, INC FOR THOMAS JEFFERSON UNIVERSITY

More information

ANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists

ANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists SECTION 412213- BRIDGE CRANES Part 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

DIVISION 13 - SPECIAL CONSTRUCTION SECTION ACOUSTICAL PANEL ENCLOSURE

DIVISION 13 - SPECIAL CONSTRUCTION SECTION ACOUSTICAL PANEL ENCLOSURE DIVISION 13 - SPECIAL CONSTRUCTION SECTION 13080 - ACOUSTICAL PANEL ENCLOSURE 1 GENERAL 1.01 SUMMARY A. ACOUSTIC ENCLOSURE CONSISTING OF WALLS, CEILING, STRUCTURAL FRAMING, CONNECTING MEMBERS, DOORS, WINDOWS,

More information

St. Clair County Electrical Code Regulations

St. Clair County Electrical Code Regulations St. Clair County Electrical Code Regulations St. Clair County has adopted the 2011 National Electrical Code as amended with the following listed articles as the St. Clair County version of the National

More information

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. SECTION 260529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. 1.2

More information

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

Details for Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses

Details for Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses Details for Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses Released May 20, 2009 Updated March 9, 2011 Introduction: Wood frame structures with attached brick masonry veneer

More information

Training Certification Categories

Training Certification Categories Training Certification Categories Residential Residential Building Inspector structures are free from hazardous structural conditions and comply with the UCC. Duties include inspection of footings and

More information

SECTION STRUCTURAL PRECAST HOLLOW CORE SLABS

SECTION STRUCTURAL PRECAST HOLLOW CORE SLABS PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish all labor, materials, equipment and incidentals to provide a complete structural precast hollow core slab system as shown on the Contract

More information

CITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO

CITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO SECTION 07220 - ROOF INSULATION PART 1 - GENERAL 1.01 DESCRIPTION A. Work included: The Roofing Contractor will provide all polyisocyanurate insulation and high density wood fiber roof insulation (tapered

More information

adaptable 2014 CONCEPT MODULAR PREFAB - MODULI ABITATIVI PREFABBRICATI

adaptable 2014 CONCEPT MODULAR PREFAB - MODULI ABITATIVI PREFABBRICATI The accurate study of the proportions and modularity, led us to design a elementary module from the standard dimensions of around 2,5 x 5,5 x 3 meters. All modules are designed for minimal waste of space

More information

GUIDE SPECIFICATION EXETER VERSA SHIELD SECURITY SCREEN SYSTEM

GUIDE SPECIFICATION EXETER VERSA SHIELD SECURITY SCREEN SYSTEM 1 GUIDE SPECIFICATION EXETER VERSA SHIELD SECURITY SCREEN SYSTEM 1.01 WORK INCLUDED PART 1: GENERAL A. Provide for all labor, equipment, materials, and services to furnish and install VERSA SHIELD Window

More information

DESIGN AND CONSTRUCTION STANDARDS. Section 2: Standards for Specific Categories of Work. Laboratory Standards

DESIGN AND CONSTRUCTION STANDARDS. Section 2: Standards for Specific Categories of Work. Laboratory Standards Laboratory Standards These criteria include general planning guidelines. They are intended for use of Designers during the design phases of the project. Planning Assumptions Overview In order to maximize

More information