POLYETHYLENE LINED PRODUCTS PROJECTS TABLE OF CONTENTS IMPACT BAFFLES CATCH BASINS MANHOLE MATERIALS LARGE DIAMETER ROUND MANHOLES

Size: px
Start display at page:

Download "POLYETHYLENE LINED PRODUCTS PROJECTS TABLE OF CONTENTS IMPACT BAFFLES CATCH BASINS MANHOLE MATERIALS LARGE DIAMETER ROUND MANHOLES"

Transcription

1 2018

2 PROJECTS

3 TABLE OF CONTENTS 3 2 PROJECTS 11 POLYETHYLENE LINED PRODUCTS 3 TABLE OF CONTENTS 12 IMPACT BAFFLES 4 CATCH BASINS 13 INLET/TURNOUTS 5 MANHOLE MATERIALS 14 FLARED END SECTIONS 6 LARGE DIAMETER ROUND MANHOLES 15 CHECK/DROP STRUCTURES 7 CONNECTION OPTIONS 16 PANEL WALLS 8 STANDARD VAULTS 17 BUILDINGS 9 MULTI-PANEL VAULTS 18 TRENCH DRAINS/UTILITY DUCTS 10 STORM POND STRUCTURES 19 BOX CULVERT 20 VALUE ADDED ACCESSORIES 21 HYDROGUARD 22 PRECAST SLABS & BASES 23 MECHANICAL

4 4 CATCH BASINS CATCH BASIN MATERIAL Precon manufactures several Catch Basin pieces including tops, barrels, bases and adjuster rings to accommodate the requirements of Alberta various cities and municipalities. For Catch Basin Manhole materials please see Manhole Material on page Municipal storm sewer infrastrucure 2. Leachate Collection Systems SIZES Precon manufactures both 600mm and 900mm diameter catch basin material. Precon is committed to maintaining a wide range of catch basin material in stock. There are many different sizes ranging from 1070mm to 1220mm high monobases and 600mm to 1200mm high barrels (600mm diameter material only comes in an 1850mm high monobase).

5 MANHOLE MATERIALS 5 MANHOLE MATERIALS Precon s precast concrete Manhole Materials are a combination of tops, barrels and bases and when configured, allow the creation of manhole systems to suit a variety of needs. Custom Prebench Bases are built to specification, with watertight pipe connections at the appropriate angle, height and slope. Bases are also prebenched with the correct trough, making installation easy, fast and worry-free. Precon s Slab Tops come in a variety of openings to suit any installation. Conical Tops are also available for 1200 diameter material. 1. Municipal Infrastructure 2. Lift Stations 3. Leachate collection systems 4. Toe drain collection systems SIZES Precon has a wide range of manhole material in stock. There are many different sizes, ranging from 300mm to 2000mm high barrels and 50mm to 150mm high grade rings. Any desired height can easily be achieved. Precon is the only CSA Certified Producer of Manhole Material in Alberta

6 6 LARGE DIAMETER ROUND MANHOLES LARGE DIAMETER MATERIAL Precon s large diameter precast concrete Manhole Materials also consist of a combination of tops, barrels and bases and when configured, allow the creation of manhole systems to suit a variety of needs. Precon provides custom Prebench Bases for its large diameter Manholes too. Like the standard 1200mm diameter Manholes, the large diameter Manholes are built to specification, with sized pipe connections at the appropriate angle, height and slope. Bases are also prebenched with the correct trough, making installation easy, fast and worry-free. Precon s Slab Tops come in a variety of openings to suit any installation. 1. Municipal Infrastructure 2. Lift Stations 3. Leachate Collection Systems 4. Toe Drain Collection Systems SIZES Precon can provide the following sizes for large diameter requirements: 1500mm, 1800mm, 2400mm and 3000mm.

7 CONNECTION OPTIONS 7 Weldable F Thimble Boot Connection F Type Thimbles Grout Connection *flat wall only *flat wall only Steel Sleeve Link Seal E Type Thimbles Kwik Seal Connection *flat wall only *supplied by contractor *flat wall only Grout Connection CONNECTIONS INCLUDE: Kwik Seal Connection Boot Connection Link Seal A-Lok *supplied by contractor

8 8 STANDARD VAULTS STANDARD VAULTS One of Precon s most versatile products, the Standard Vault is an engineered, concrete box that can be used in a variety of applications from manholes to water meter chambers. Precon s Standard Vaults are typically used to accommodate smaller vault installations. These stackable pieces are available in standard 400mm increment riser sections so that the required structure height is easily achieved. Custom riser heights are also available. The Standard Vault piece, much like the rest of our product line, can also have many different types of accessories cast in. It can also be poured with almost any size of hole. These pieces are quick and easy to install. 1. Municipal Infrastructure 2. Lift Stations 3. Valve Chambers 4. Drain Chambers 5. Air Valve Chambers 6. Water Reservoirs 7. Water Meter Chambers 8. Pump Stations 9. Storm Pond Control Structures

9 MULTI-PANEL VAULTS 9 MULTI-PANEL VAULTS Precon s Multi-Panel Vault Structure is an engineered, multi-piece structure that is assembled on-site. The Multi-Panel Vault is typically used to accommodate larger vault installations. The structure is highly versatile in its assembly. Large structures can be designed, produced and shipped with minimal assembly. Typically, installation and backfill can be achieved in one day. This structure can accommodate all kinds of pipe penetrations, grout holes, thimbles and personnel access. Integrated splitter walls, weir walls and intermediate floors are also possible with Multi-Panel Vaults allowing for wet well/dry well combinations, energy dissipation and access to large mechanical or valve equipment. The installation process provides unique opportunities for accommodating difficult installations. For instance, when installing large diameter water mains with valve assemblies, a portion of the structure can be installed, followed by the installation of the interior piping and valve assembly and completed with the installation of the remaining pieces of the structure. 1. Large Vaults Exceeding Standard Vault Sizing 2. Lift Stations 3. Valve Chambers 4. Drain Chambers SIZES 5. Air Valve Chambers 6. Water Reservoirs 7. Water Meter Chambers 8. Pump Stations 9. Storm Pond Control Structures Multi-Panel vaults can be produced in sizes up to and including 5000mm ID x 6500mm ID. The width and length are in increments of 250mm and the height is in increments of 250mm. All Multi-Panel Vaults range from 1250mm 8000mm inside height with wall thicknesses of 204mm or 254mm.

10 10 STORM POND STRUCTURES STORM POND STRUCTURES Precon s Storm Pond Structures are engineered structures consisting of Standard or Multi-Panel Vaults. These storm pond structures can be used in a variety of applications, with or without weir walls and built to accommodate gates and ICD control devices, and super catch basin vaults. Precon vaults can accommodate grated, straight, or sloped tops to be used as large catch basins. These structure tops can accommodate a variety of slopes. The storm pond structures, like the rest of our product line, can also have many of the different types of accessories cast in, or can be poured with almost any size of rough hole.

11 POLYETHYLENE LINED PRODUCTS 11 POLYETHYLENE LINED PRODUCTS Precon can cast a polyethylene liner onto the inner surface of most of our products*. The polyethylene liner protects against corrosion, permeation and groundwater intrusion. Precon s polyethylene liner is resistant to most acids, bases, hydrocarbons, vapors and microbiological attacks. For more details please see * requires field welding at joints

12 12 IMPACT BAFFLES IMPACT BAFFLES Precon s Impact Baffle Structure is an outlet style structure, with an engineered basin and headwall, designed to dissipate energy as water is introduced into a drainage system or natural water course. The dissipation of energy is controlled by a baffle wall that is cast into the structure and can handle flows up to 5.6m 3 /second. The headwall is also constructed with a unique anchoring system that acts as a seepage barrier. The Impact Baffle is easy to handle and install. It has been designed to USBR standards and Precon can accommodate many different thimbles or pipes that can be cast directly into the structure. 1. Pipeline terminal structures requiring energy dissipation during normal or event type flow situations SIZES Precon s Impact Baffle Structures are produced in five standard sizes to accommodate flows between 0.4m 3 /second to 5.6m 3 /second and pipe sizes up to 1350mm diameter.

13 INLET/TURNOUTS 13 INLET/TURNOUTS Precon s Inlet/Turnout Structure is an engineered structure consisting of a headwall and basin designed for water inlet and outlet control. The structure is exceptionally easy to handle and install and the unique design of the headwall acts as an anchoring system as well as a seepage barrier. The Inlet/Turnout is ideal for municipal, irrigation and farm turnouts or pond inlets. This structure compliments Precon s Check and Check/Drop structures, creating a system that allows efficient water control in a water conveyance system. The Inlet/Turnout is designed based on the shape of the canal or existing topography, required flow, and pipe size. Several different types of connection accessories (eg. 86 or 150 psi thimbles) can also be cast into the headwall that can accommodate numerous gates, pipe thimbles and valves with a variety of bolt hole patterns. 1. Inlets for Irrigation Pipelines 2. Inlet/Turnout for Irrigation Water Delivery 3. Inlet/Turnout for Storm Pond Control 4. Outlet for Drainage Control SIZES Precon Inlet/Turnouts sizes are sized based on the slope of the canal or pond and the size of the conveyance pipe. Precon can accommodate slopes of 2:1, 2.5:1 and 3:1.

14 14 FLARED END SECTIONS FLARED END SECTIONS Precon s precast concrete headwalls offer a cost effective alternative to in-situ structures for connecting pipework discharging into open watercourses such as rivers, ditches, ponds and swales. These precast headwalls allow contractors to quickly complete pipe runs without extending time spent in environmentally sensitive areas, and preventing the requirement of using the costly cast in place option. Precon s headwalls come in standard sizes for 200mm to 1200mm diameter pipe and are available to suit most pipe types. Headwalls can be configured with dissipaters, handrails, grillages and other custom items such as bolt on icd plates, sluice or flap gates. Precast headwalls also control erosion and scour resulting from excessive velocities and turbulences.

15 CHECK/DROP STRUCTURES 15 CHECK/DROP STRUCTURES Precon s Check/Drop Structure is a multi-piece (typically using 9-13 pieces) precast concrete structure that assembles in the shape of an H and is installed in an irrigation canal perpendicular to the flow of water. The shape of the structure provides a double water cutoff, helping to prevent bank erosion by ensuring that water cannot migrate around or under the structure. The Check/Drop Structure is engineered and designed to USBR standards and is a reliable solution for water level and grade control in a water conveyance system, where there is also a change in elevation. The Check/Drop Structure allows the designer to control water levels and water velocity. It works well in conjunction with Precon s Inlet/Turnout as a way to obtain necessary water levels for water delivery. The structure is designed for canals with flows as large as 3.0m 3 /second. The width of the canal at the top and bottom, the flow of water and the type of gate are taken into account when designing the structure. The structure can accommodate Overshot gates, Stop Log Systems and several other popular gate systems. The Check/Drop Structure can also be used to measure the flow of the water. 1. Level and grade control in the storage, delivery and drainage of water systems where there is a change in elevation 2. Weir Structure 3. Check/Drop Structure 4. Drop Structure SIZES Precon Inlet/Turnouts sizes are sized based on the slope of the canal or pond and the size of the conveyance pipe. Precon can accommodate slopes of 2:1, 2.5:1 and 3:1.

16 16 PANEL WALLS PANEL WALLS Precon s precast concrete Panel Walls are constructed using smaller, more manageable pieces that are assembled to make a wall of any length. The Panel Wall is engineered and designed based on the opening required and the depth necessary to eliminate seepage. The product is shipped in pieces. On site, it is easily assembled, making it ideal for remote areas. Stability of the wall must be taken into account when selecting this structure 1. Simple Canal Weir Structure 2. Pond Level Control SIZES Panel Walls can be built to a maximum height of 4000mm and any length. Wall pieces can be poured 152mm, 204mm or 254mm thick.

17 BUILDINGS 17 BUILDINGS Precon s precast concrete Building is an engineered, two piece structure that combines a safe, secure location for electrical, computer or automated equipment with a maintenance-free exterior. The precast concrete Building, when equipped with a heavy duty steel door, is vandal resistant. It is water tight, fire resistant and vermin proof, making it ideal in harsh environments. The precast concrete Building can be insulated (R20) and several other accessories or options can be built in. Installation is quick and easy and, when compared with alternative steel or wood products, the precast concrete Building provides a long lasting solution. 1. Control Buildings 2. Generator Sites 3. Accessory to Lift or Pump Stations 4. Mechanical Room SIZES Precon s Buildings are produced in four standard sizes BD2025 (2.0m OD x 2.5m OD), BD2530 (2.5m OD x 3.0m OD), BD3040 (3.0m OD x 4.0m OD), BD3050 (3.0m OD x 5.0m OD). Insulation can vary in thickness depending on the application.

18 18 TRENCH DRAINS/UTILITY DUCTS TRENCH DRAINS/UTILITY DUCTS Trench Drains/Utility Ducts are engineered, 3-sided concrete boxes that can be used in a wide variety of applications from cableways to fluid conveyance trenches. Precon s Standard Trenches are available in a wide variety of spans from 508mm to 4000mm wide. These connectable pieces are also available with a variety of tops types (eg. CL-800 precast tops and grating tops). Trench Drains/Utility Ducts, much like the rest of our product line, can also have many different types of accessories cast in. It can also be poured with almost any size of hole. These pieces are quick and easy to install. 1. Trench Drains 2. Utility Ducts 3. Cableways 4. Rupture Disk Trenches

19 BOX CULVERT 19 BOX CULVERT Precon s precast box culvert is ideal for channeling storm and stream water and are designed for a wide range of bury depth and loading applications. Our box culvert is compliant with Alberta Transportation s CL-800 traffic loading requirements for road crossings (engineer stamped shop drawings provided upon request). Each section can be poured monolithically, or 3-sided with a removable lid for future access or maintenance. We have the ability to provide a mechanical connection between each section creating a secure joint that is simple and efficient to install. SIZES Standard Sizes Include: 1.2m x 1.2m 1.5m x 1.5m 1.8m x 1.8m 1.8m x 2.4m 2.5m x 3.0m 3.0m x 4.0m

20 20 VALUE ADDED ACCESSORIES PRECON HAS A WIDE VARIETY OF ACCESSORIES INCLUDING: Ladder Rungs Ladder Extensions Hatches Lifting Devices Grates, Walkways and Safety Platforms Water Control Gates Lifting Davits Trash Racks Inlet Control Devices Various Sealants Spray Foam Insulation 3-D Printing

21 HYDROGUARD STORMWATER HYDRODYNAMIC SEPARATOR HYDROGUARD 21 BENEFITS lower capital cost compared to other competitive structural stormwater quality measures treats low and high flows separate low flow path minimizes scour at high flows removes trash captures oil spills removes fine suspended solids supports Smart Growth principles since Hydroguard is installled underground maximizing the development density potential engineered for traffic loading and anti-bouyancy minimum elevation difference between inlet and outlet pipe can be used as a bend structure sized based on local hydrology and continuous simulation technical support to assist with design and approval minimal maintenance for typical applications multiple access points for inspection and maintenance. MODEL Structure Inside Diameter (SID) in (mm) Structure Depth ft(mm) Sediment Volume ft3 (m3) Oil/Floating Trash Volume US gal (L) Permanent Pool Wet Volume US gal (L) HG 4 4 (1200mm) 5 (1500mm) 38 (1.1) 76 (288) 470 (1779) HG5 5 (1500mm) 5.5 (1650mm) 64 (1.8) 123 (465) 808 (3059) HG6 6 (1800mm) 6 (1800mm) 92 (2.6) 203 (768) 1269 (4803) HG8 8 (2400mm) 7 (2000mm) 163 (4.6) 457 (1730) 2507 (9490) HG (3000mm) 7.6 (2300mm) 268 (7.6) 893 (3380) 4455 (16864)

22 22 PRECAST SLABS/BASES PRECAST SLABS/BASES Precon s precast concrete slab and bases are engineered and designed for each individual project and application. These products are highly customizable. Slabs and bases, much like the rest of our product line, can also have many different types of accessories cast in. These pieces can also be poured with almost any size of opening. On site, they are easily installed, making them ideal for remote areas. 1. CSP Bases 2. Pipeline Protection Slabs 3. Boat Ramp Slabs 4. Anti-Floatation Slabs 5. Compressor Bases

23 MECHANICAL 23 MECHANICAL Precon offers complete packages for Valve Chambers and PRV s, including the mechanical. All Precon s Valve Chambers are engineered to meet Alberta s CL-800 loading and all installed mechanical components are pressure tested prior to shipping. Precon s prepackaged mechanical structures are one less thing for you to worry about. 1. PRV s 2. Backflow Valves Chambers 3. Flow Meters 4. Air Relief Valve Manholes

24 35 Sales Office Ave NW Edmonton, Alberta T5S 2C6 Phone: Main Office/Production Plant #2, CP Rail Road, Kipp Road Coalhurst, Alberta Phone: Sales Office #333, Avenue SE Calgary, Alberta T2C 5J3 Phone: Toll Free:

STANDARD SPECIFICATION STORMWATER QUALITY MEMBRANE FILTRATION TREATMENT DEVICE

STANDARD SPECIFICATION STORMWATER QUALITY MEMBRANE FILTRATION TREATMENT DEVICE STANDARD SPECIFICATION STORMWATER QUALITY MEMBRANE FILTRATION TREATMENT DEVICE PART 1 GENERAL 1.1 WORK INCLUDED Specifies requirements for construction and performance of an underground stormwater quality

More information

PRECAST RECTANGULAR CHAMBERS

PRECAST RECTANGULAR CHAMBERS STANDARD MODELS GENERAL ROUGH SKETCH Available for: Sewer manhole, valve chamber, trouser manhole, and pumping station. Ø60-Ø762 ADJUSTMENT RING 7-00-2-0 20-2 30-60 RING 200-30 60-60 000-220 9ø 6 FLAT

More information

16. Design of Pipeline Structures.

16. Design of Pipeline Structures. 16. Design of Pipeline Structures. a. General. 1) The following guidelines are for the design of structures for water and sewer pipelines including structural concrete and miscellaneous metals design.

More information

THE ADVANTAGES HDPE MANHOLES

THE ADVANTAGES HDPE MANHOLES NIC HDPE manholes are custom fabricated for many varied applications including municipal and industrial manholes, sewer and storm water manholes, leach ate collection, sewer lift stations, siphon structures,

More information

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems SECTION 02607-1 1.0 GENERAL 1.1 SCOPE: A. This section covers the work necessary for the construction of sanitary and storm system manholes, catch basins, and miscellaneous concrete structures complete.

More information

Engineering Design Center. Standard Drawings. 1st Edition -January 2016

Engineering Design Center. Standard Drawings. 1st Edition -January 2016 Engineering Design Center Standard Drawings 1st Edition -January 2016 Golden State Water Company Standard Drawings 1/11/2016 Table of Contents PART A STANDARD DRAWINGS Section I Pipeline Construction P-1

More information

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction. Design Manual Chapter 3 - Sanitary Sewers 3C - Facility Design 3C-1 Facility Design A. Capacity of Pipe Pipe sizes 15 inches and smaller should carry the peak flow at a depth of no more than 0.67 of the

More information

New Fulton State Hospital Energy Control Center and Services Building (ECC/SVC) Project Number: M

New Fulton State Hospital Energy Control Center and Services Building (ECC/SVC) Project Number: M SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08

(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08 (b) Discuss in brief shaft spillway with neat sketches. Marks 04 OR Q (2) Explain in brief USBR stilling basin. Marks 08 Stilling Basins The basins are usually provided with special appurtenances including

More information

DIVISION 3: SEWER. Improvement Design Standards City of Dundee Oregon. Division 3 : Sewer Page 1

DIVISION 3: SEWER. Improvement Design Standards City of Dundee Oregon. Division 3 : Sewer Page 1 DIVISION 3: SEWER 3.1 DESIGN CRITERIA A. APPLICABILITY 1. These Design Standards shall govern all construction and upgrading of public sanitary sewer facilities in the City of Dundee and applicable work

More information

Pre-Sloped Drain System

Pre-Sloped Drain System SportsEdge PolyDrain Pre-Sloped Drain System www.sportsedge.com Quality. Safety. Versatility. Aesthetics. 2 PolyDrain FORMULA www.sportsedge.com ABT, Inc. manufactures PolyDrain trench drains; the standard

More information

THE WORLD LOOKS UP TO COMPOSITE ELEVATED TANK

THE WORLD LOOKS UP TO COMPOSITE ELEVATED TANK THE WORLD LOOKS UP TO COMPOSITE ELEVATED TANK or our breadth of capability. Of all the storage tank manufacturers doing business today, no other offers Caldwell s range of capability. We are the only manufacturer

More information

Section [ ] Storm Water Treatment Device

Section [ ] Storm Water Treatment Device PART 1 GENERAL Section [ ] Storm Water Treatment Device 01.01.00 Purpose The purpose of this specification is to establish generally acceptable criteria for Storm Water Treatment Devices (SWTD) that treat

More information

CATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE

CATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE 3.33' 3.0' 2.0' 4.33' 4.0' 3.0' 1.00' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3067-V OR AS NOTED ON PLANS. "INFA-SHIELD" SEAL OR EQUAL. RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR).

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY PHASE II SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

TANK SUMPS SINGLE WALL & DOUBLE WALL

TANK SUMPS SINGLE WALL & DOUBLE WALL TANK SUMPS SINGLE WALL & DOUBLE WALL FIBERGLASS TANK SUMPS Containment Solutions, Inc. (CSI), pioneered a technology in 1965 to manufacture the first fiberglass petroleum storage tank to combat the shortcomings

More information

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. SECTION 33 05 13 MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. B. Related Sections: 1. Section 03 20 00 - Concrete

More information

Table of Contents Con Cast Pipe Price List - Page 1

Table of Contents Con Cast Pipe Price List - Page 1 2018 PRICE LIST Table of Contents Conditions of Sale - Pages 2 & 3 Reinforced Concrete Pipe, Caps, and Plugs - Page 4 Scribed Holes & Knockouts - Page 4 Reducers & Increasers - Page 4 Concrete Pipe Approximate

More information

iv) Alberta fish weirs

iv) Alberta fish weirs Fish passage at culverts in New Zealand 36 iv) Alberta fish weirs The fish weirs used by Alberta Transportation are weir baffles with a partial slot (Figure 16). The best designs from Rajaratnam et al.

More information

SECTION UTILITY MANHOLES AND STRUCTURES

SECTION UTILITY MANHOLES AND STRUCTURES SECTION 33 05 14 UTILITY MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Precast reinforced concrete manholes and structures with tongue-and-groove joints with masonry transition

More information

TYPE "A" CATCH BASIN

TYPE A CATCH BASIN 27" 1.67' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3250-BV OR APPROVED EQUAL. "INFI SHIELD" SEAL OR APPROVED EQUAL RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR). PLASTER OUTSIDE,

More information

GV 001 Equipment Bases and Enclosures General Information

GV 001 Equipment Bases and Enclosures General Information Eq u ip me n tba s e s a n d En c lo s u re s Ge n e ra lin fo rma tio n E n g in e e r :R.An th o n GV0 0 1 Ap p r o v e r :Jo s h u a Jo n e s Ap r 1 7 2 0 Ap r1 7 GV 001 Equipment Bases and Enclosures

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 02630 - STORM DRAINAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Hydrodynamic Separation Product Calculator

Hydrodynamic Separation Product Calculator Hydrodynamic Separation Product Calculator Example Project BMP #1 CDS 2015-4 Project Information Project Name Example Project Option # A Country US State Kentucky City Covington Contact Information First

More information

Inlets & Catch Basins

Inlets & Catch Basins A Delivering Reliability Inlets & Catch Basins Water-Conveyance & Drainage A Environmentally Responsible Oldcastle Precast to the Rescue All of our products are produced in a controlled environment helping

More information

ROLES AND RESPONSIBILITIES Small Pond Approval. SWM MD-378 Pond Checklist Training 10/17/07. Exemptions EMBANKMENT HEIGHT. Height of Dam Weir Wall

ROLES AND RESPONSIBILITIES Small Pond Approval. SWM MD-378 Pond Checklist Training 10/17/07. Exemptions EMBANKMENT HEIGHT. Height of Dam Weir Wall SWM MD-378 Pond Checklist Training 10/17/07 Ken Wolfe Warren Johnson USDA, NRCS Frederick, Maryland ROLES AND RESPONSIBILITIES Small Pond Approval MDE, WMA, Dam Safety Division Authority (COMAR 26.17.04.03)

More information

Aqua-Swirl Stormwater Treatment System

Aqua-Swirl Stormwater Treatment System Aqua-Swirl Stormwater Treatment System Inspection and Maintenance Manual AquaShield TM, Inc. 2705 Kanasita Drive Chattanooga, TN 37343 Toll free (888) 344-9044 Phone: (423) 870-8888 Fax: (423) 826-2112

More information

Storm Drainage

Storm Drainage University of New Hampshire University of New Hampshire Scholars' Repository Division 33 Utilities Chapter 5 Technical Construction and Renovation Standards 4-23-2015 334100 - Storm Drainage Sandra Hickey

More information

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1 CITY OF THORNTON Standards and Specifications Revised: October 2012 SECTION 400 - STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 401 GENERAL PROVISIONS 400-1

More information

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS COMPLETE THROUGH REVISION #18 April 2009 CITY STANDARD DETAILS REVISIONS Revision No. Revision Date Effective Date 2 August

More information

Storm. Section. B. General Design and Drawing Standards Design

Storm. Section. B. General Design and Drawing Standards Design Section Storm 5 General Plans for the existing stormwater system are maintained in digital and printed form by the City. Copies may be obtained from the Utility Division of the Public Works Department.

More information

A reliable solution for ditching, underpassing and rainwater drainage

A reliable solution for ditching, underpassing and rainwater drainage PIPES AND CHAMBERS CULVERT PIPES A reliable solution for ditching, underpassing and rainwater drainage Culvert pipes are used to convey drain pipe water or rainwater under the ground. The smallest (110

More information

SEPTIC TANK CONSTRUCTION GUIDELINES

SEPTIC TANK CONSTRUCTION GUIDELINES SEPTIC TANK CONSTRUCTION GUIDELINES Septic tank for this airport will be designed/ built by the general contractor of the building facilities. At the time of the project design, availability of a septic

More information

SECTION XXXX POLYMER CONCRETE PUMP STATIONS

SECTION XXXX POLYMER CONCRETE PUMP STATIONS SECTION XXXX POLYMER CONCRETE PUMP STATIONS PART 1 GENERAL 1.1 SUMMARY A. This specification shall govern for the furnishing of all work necessary for installation of polymer concrete pump stations to

More information

Attachment D-1: Civil/Structural Scope of Work

Attachment D-1: Civil/Structural Scope of Work Attachment D-1: Civil/Structural Scope of Work Project: Location: Targa Sound Renewable Fuels Project Tacoma, WA Prepared by: NORWEST ENGINEERING Consulting Engineers 4110 N.E. 122 nd Avenue, Portland,

More information

***************************************************************************************************************

*************************************************************************************************************** 02720 STORM DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 40 00. ***************************************************************************************************************

More information

ENGINEERING DESIGN & IMPROVEMENT STANDARDS

ENGINEERING DESIGN & IMPROVEMENT STANDARDS ENGINEERING DESIGN & IMPROVEMENT STANDARDS 2016 Prepared by: Engineering Division For latest edition of these Improvement Standards, refer to City of Visalia website at: www.visalia.city/engineeringdocuments

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.

More information

Welcome: What is U-Drain? Drain Materials. Flow

Welcome: What is U-Drain? Drain Materials. Flow Welcome: Thank you for looking into the U-Drain floor drain system. This paper will explore the functional features of the U-Drain and why it is superior to other grated systems in the marketplace. We

More information

MODEL Stormwater Local Design Manual. City of Centerville

MODEL Stormwater Local Design Manual. City of Centerville MODEL Stormwater Local Design Manual City of Centerville Adopted December 6, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 1 2.1. DETENTION REQUIREMENTS... 1 2.1.1. Discharge

More information

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building... Contents 11. Construction processes and materials... 11-2 11.1 Power House... 11-2 11.2 Maintenance Building... 11-2 11.3 Fuel Treatment Building... 11-3 11.4 Roads & Paths... 11-3 11.5 Fencing... 11-3

More information

Fabrication and Installation Table of Contents

Fabrication and Installation Table of Contents Fabrication and Installation Table of Contents HDPE AQUASHIELD PRODUCTS 2 Fabrication and Installation 2 System Fabrication 3 Aqua-Swirl Installation 4 Step 1 Excavation and Bedding 4 Step 2 Pipe Connection

More information

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect.

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Stormwater Local Design Manual For Houston County, Georgia

Stormwater Local Design Manual For Houston County, Georgia Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.

More information

FLOOR AND AREA DRAINS

FLOOR AND AREA DRAINS Pictorial Index Product Recommendations Floor Drain Selection Factors Load Rating Grate Free Area Material & Characteristics Pipe Connection Commonly Specified Options Typical Installations FLOOR AND AREA

More information

CHAPTER 6. Sanitary Sewer

CHAPTER 6. Sanitary Sewer CHAPTER 6 Sanitary Sewer A. Introduction All proposed developments, subdivisions, and buildings must have a properly designed and constructed sanitary sewer collection system. The system shall provide

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

TAMDID PIPES GRP MANHOLE BROCHURE

TAMDID PIPES GRP MANHOLE BROCHURE TAMDID PIPES GRP MANHOLE BROCHURE 1) Types & Description of Manholes: Tamdid Pipes offer two types of Manholes; Structural and Liner Manholes: a. Structural Manholes Tamdid Pipes offers concentric and

More information

INDUSTRIAL GUARDRAIL SYSTEMS

INDUSTRIAL GUARDRAIL SYSTEMS INDUSTRIAL GUARDRAIL SYSTEMS STRONGEST GUARDRAIL ON THE MARKET MANUFACTURED IN THE U.S.A. BEST PRICES MOST VARIETIES HEAVY DUTY ONE-LINE OR TWO-LINE Posts: 4 Sched 80 pipe Rail: 6 Sched 40 pipe Sleeved

More information

The Inspection Process. Waxhaw N.C.

The Inspection Process. Waxhaw N.C. The Inspection Process In Waxhaw N.C. This information is provided by the Waxhaw Enforcement Division to assist you in the progression of your project. Nothing in this document should be considered "Code"

More information

ADDENDUM NO. 1. Mallory Valley Utility District Technical Specifications & Design Criteria for Water Supply & Distribution Facilities

ADDENDUM NO. 1. Mallory Valley Utility District Technical Specifications & Design Criteria for Water Supply & Distribution Facilities ADDENDUM NO. TO Mallory Valley Utility District Technical Specifications & Design Criteria for Water Supply & Distribution Facilities Date of Addendum: December, 00 Hethcoat & Davis, Inc. 78 Franklin Road,

More information

Training Certification Categories

Training Certification Categories Training Certification Categories Residential Residential Building Inspector structures are free from hazardous structural conditions and comply with the UCC. Duties include inspection of footings and

More information

This is only a general checklist; please refer to the CVWD Development Design Manual (DDM) for all requirements and regulations.

This is only a general checklist; please refer to the CVWD Development Design Manual (DDM) for all requirements and regulations. COACHELLA VALLEY WATER DISTRICT DOMESTIC WATER CHECKLIST Tract/Parcel No: Project Common Name: Developer: Engineer: Engineer Signature: Date: Phone: Phone: Print: This is only a general checklist; please

More information

CHAPTER 12: DRAINAGE

CHAPTER 12: DRAINAGE CHAPTER 12: DRAINAGE CHINOOK WINDS AND WINTER SNOWS A combination which frequently results in hazardous winter conditions on shaded portions of roadways under bridges. Icing conditions are a danger in

More information

Operation and Maintenance Manual

Operation and Maintenance Manual Operation and Maintenance Manual Downstream Defender Vortex Separator for Stormwater Treatment Stormwater Solutions Turning Water Around... Page 2 Downstream Defender Operation and Maintenance Manual Page

More information

On Site Detention System.

On Site Detention System. On Site Detention System. Setting new standards. NOTE: This OSD (On site detention system) brief should be read in conjunction with the Landscape Tanks brochure, which outlines all the features and benefits

More information

A.2.a Random Riprap... Table

A.2.a Random Riprap... Table 3601 RIPRAP MATERIAL 3601.1 SCOPE Provide stone and filter layer material for use in random or hand-placed riprap, gabion, and revet mattress construction. 3601.2 REQUIREMENTS A Stones A.1 Quality Provide

More information

We Offer Solutions. Temporary Storage

We Offer Solutions. Temporary Storage We Offer Solutions Temporary Storage Why Temporary Storage? It Makes Economic Sense The Union Iron Works Temp-Stor temporary grain storage systems are an inexpensive alternative to traditional permanent

More information

SECTION FACILITY SANITARY SEWERS

SECTION FACILITY SANITARY SEWERS SECTION 22 13 13 FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The work covered by this Section includes all labour, materials, equipment, and supervision necessary to complete the site services as shown

More information

Delivering Reliability. Electrical Vaults. Power & Energy-Underground Structures

Delivering Reliability. Electrical Vaults. Power & Energy-Underground Structures A Delivering Reliability Electrical Vaults Power & Energy-Underground Structures A The Benefits of Precast Vaults Electrical vaults house power cables and transformers, and are a preferred alternative

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:

More information

CORRUGATED HDPE PIPES FOR SEWER AND STORMWATER

CORRUGATED HDPE PIPES FOR SEWER AND STORMWATER 50 corrugated pipes CORRUGATED HDPE PIPES FOR SEWER AND STORMWATER TECHNICAL SPECIFICATIONS SANS 21138-3 ISO 9001/2008 The pipe is black outside and blue on the inside Supplied in lengths of 6 meters.

More information

Light Duty Ramps. Loadingdocksupply.com PHONE:

Light Duty Ramps. Loadingdocksupply.com PHONE: Light Duty Ramps Light Duty Aluminum Dockplates Designed for use by pallet trucks, carts, and foot traffic the A & B model Aluminum Dockplate is lightweight and portable. Accomodates differentials up to

More information

Pipe blocked by sand - NOW. Sand will block the pipe completely after some time. How can I do it better?

Pipe blocked by sand - NOW. Sand will block the pipe completely after some time. How can I do it better? Design Construction O & M Environmental Impact Usable water flow - NOW Pipe blocked by sand - NOW Suggestion: add wall to keep sand away from outlet pipe Outlet pipe Sand will settle here Water level NOW

More information

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges. STANDARD BRIDGE & CULVERT COMPONENTS Alberta Bridge Inventory In Alberta there are about 13,300 bridges. Types of bridges in Alberta: Standard bridges 3521 (26%) Bridge size culverts 8348 (63%) Major bridges

More information

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY Section Includes: 1. Pipe and fittings. 2. Drain Basin. 3. De-chlorination tablet feeder. 4. Non-pressure transition couplings.

More information

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN CHECKLIST FOR STREETS, INLETS, I. STREET CLASSIFICATION AND DESIGN CRITERIA A. Determine drainage classification for the roadway section using Table 7-1 or Table 7-2. B. Determine the allowable flow depth

More information

ENGINEERED SOLUTIONS. Terre Arch Concrete Detention/Infiltration. Solutions Guide

ENGINEERED SOLUTIONS. Terre Arch Concrete Detention/Infiltration. Solutions Guide ENGINEERED SOLUTIONS Terre Arch Concrete Detention/Infiltration Solutions Guide Stormwater Solutions from Contech Selecting the Right Stormwater Solution Just Got Easier... It s simple to choose the right

More information

Inspection of New One- and Two- Family Dwellings

Inspection of New One- and Two- Family Dwellings Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: permitservices@opkansas.org Inspection of New One- and Two- Family Dwellings Planning and Development

More information

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS SECTION 270528 PATHWAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Communications equipment coordination and installation. 2. Sleeves for pathways and cables. 3. Raceway

More information

Table of Contents AQUA-SWIRL 2

Table of Contents AQUA-SWIRL 2 Table of Contents AQUA-SWIRL 2 STORMWATER TREATMENT SOLUTIONS 2 System Operation 2 Custom Applications 4 Retrofit Applications 4 Installation 5 Buoyancy 5 Traffic Loading 6 Inspection and Maintenance 6

More information

CONCRETE PIPE JOINTS, YOUR BEST CHOICE

CONCRETE PIPE JOINTS, YOUR BEST CHOICE CONCRETE PIPE JOINTS, YOUR BEST CHOICE www.concretepipe.org FREQUENTLY ASKED QUESTIONS Q. Are joints covered by National Standards? A. Yes. There are ASTM and AASHTO standards for concrete products joints.

More information

SERVICE LINES, METERS AND APPURTENANCES

SERVICE LINES, METERS AND APPURTENANCES AUGUST02 SECTION 02646 SERVICE LINES, METERS AND APPURTENANCES PART 1 - GENERAL 1.1 DESCRIPTION A. This section concerns materials and installation of corporation stops, curb stops, service lines, meters,

More information

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management Husam Al-Najar Storm water management : Collection System Design principles The Objectives

More information

Concrete Pipe Joints Your Best Choice

Concrete Pipe Joints Your Best Choice Frequently Asked Questions Q. Are joints covered by National Standards? A. Yes. There are ASTM and AASHTO standards for concrete products joints. The various standards are discussed in this publication.

More information

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements SECTION 3 DRAINAGE 3-1 General All Drainage plans for proposed development shall be prepared by a Professional Engineer registered in Virginia, except as noted below. Further, their seal and signature

More information

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu

SLAB ON GRADE Insul-Joint or Expansion Joint Material as Required by A/E Specifications AquaCheck Liquid Coating 400 (Waterproofing Membrane) with Aqu INSTALLATION INSTRUCTIONS Note: The following installation instructions are based off of ASTM E 1643 (Standard Practice for Installation of Water Vapor Retarders Used in Contact with Earth or Granular

More information

Project Type: Drainage and Storm Systems

Project Type: Drainage and Storm Systems 580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install

More information

Box Culverts. Easy to install, suitable for very shallow or deep fill, ideal for use in a wide variety of civil engineering applications.

Box Culverts. Easy to install, suitable for very shallow or deep fill, ideal for use in a wide variety of civil engineering applications. Box Culverts Box Culverts Easy to install, suitable for very shallow or deep fill, ideal for use in a wide variety of civil engineering applications. 2 3 System Overview Forterra is one of the largest

More information

Smarter. Safer. Leaner.

Smarter. Safer. Leaner. Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter

More information

TYPES OF SEWAGE PUMPS. Solids Handling Pumps: Grinder Pumps: Effluent Pumps:

TYPES OF SEWAGE PUMPS. Solids Handling Pumps: Grinder Pumps: Effluent Pumps: Effluent Pumps: Effluent pumps are the pumps most often used in small on-site systems. They are designed to pump effluent, the effluent flowing out of a septic tank. This effluent is relatively clear liquid

More information

TYPICAL INSTALLATION INSTRUCTIONS

TYPICAL INSTALLATION INSTRUCTIONS TYPICAL INSTALLATION INSTRUCTIONS Environment One Grinder Pump Feature Identification 1. Grinder Pump Basin High density polyethylene (HDPE) 2. Accessway Cover Painted Steel 3. Electrical Quick Disconnect

More information

Sediment Basin. Fe= (Depends on soil type)

Sediment Basin. Fe= (Depends on soil type) 3.9 Sediment Control Description: A sediment basin is an embankment with a controlled outlet that detains stormwater runoff, resulting in the settling of suspended sediment. The basin provides treatment

More information

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Electrical Work. NOV Embankments Over Swamps and Compressible Soils GENERAL & CONSTRUCTION S OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 100 OPS General Conditions of Contract DIVISION 1 - GENERAL S 106 Electrical Work 120 180 The Use of Explosives General Specification

More information

Installation Instructions

Installation Instructions EconoDrain Trench Forming System Installation Instructions MultiDrain We Drain Your Site, Not Your Budget MultiDrain Systems, Inc. P.O. Box 88, Barium Springs, NC 28010 (704) 508-1010 or Toll Free 800-433-1119

More information

SECTION STORM UTILITY DRAINAGE PIPING

SECTION STORM UTILITY DRAINAGE PIPING SECTION 33 41 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

General Discussion of Corrosion Monitoring Considerations in Pipeline Design

General Discussion of Corrosion Monitoring Considerations in Pipeline Design Rohrback Cosasco Systems, Inc. 11841 East Smith Avenue Santa Fe Springs, CA 90670 Tel: +1 (562) 949-0123 Fax: +1 (562) 949-3065 www.rohrbackcosasco.com General Discussion of Corrosion Monitoring Considerations

More information

TS 4"x3" 4 7 6 ( 9 5 3 ( C L GUIDE POST & OFFSET BRACKET G (100x75) 1 6 ( HEXHEAD BOLT WITH HEX NUTS () 350 (14") 75 (3") TOP OF CURB 50 (2") CLR. 25 ODx52 LONG ( 1 " O D x SLEEVE h 175+ h ( 6! (3") 75

More information

CONSTRUCTION PROCEDURES. AWWA D110 Type I Prestressed Concrete Tanks

CONSTRUCTION PROCEDURES. AWWA D110 Type I Prestressed Concrete Tanks CONSTRUCTION PROCEDURES AWWA D110 Type I Prestressed Concrete Tanks 2-3 4-5 6-7 8-9 10-11 12-13 14-15 16-17 Site Preparation Floor & Footings Wall Construction Roof Options Vertical Prestressing Abrasive

More information

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs November 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements....................................

More information

Dam Safety Inspection Checklist

Dam Safety Inspection Checklist Dam Safety Inspection Checklist Complete All Portions of This Section (Pre-inspection) Date of Inspection: Name of Dam: EAP: (yes, no) OM&I: (yes, no) File Number: Review Inventory - Highlight missing

More information

A. Codes and Standards that are Standards at the University. A. Provide floor drains in all toilet rooms, janitor closets, and mechanical rooms.

A. Codes and Standards that are Standards at the University. A. Provide floor drains in all toilet rooms, janitor closets, and mechanical rooms. PART 1: GENERAL 1.01 Purpose A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Administrative Changes

Administrative Changes Revised 11/29/06 Knox County Residential Building Codes Significant Changes From The 1995 CABO One And Two Family Dwelling Code To The 2006 International Residential Code All one and two family dwellings

More information

HIGH DENSITY CROSSLINKED POLYETHYLENE STORAGE TANKS WITH OXIDATION RESISTANT LINING SYSTEM (NSF/ANSI 61)

HIGH DENSITY CROSSLINKED POLYETHYLENE STORAGE TANKS WITH OXIDATION RESISTANT LINING SYSTEM (NSF/ANSI 61) PART 1-GENERAL INTEGRALLY MOLDED FLANGED OUTLET (IMFO ) - COMPLETE DRAIN HIGH DENSITY CROSSLINKED POLYETHYLENE STORAGE TANKS WITH OXIDATION RESISTANT LINING SYSTEM (NSF/ANSI 61) 1.01 Requirements 1. The

More information

SPECIFICATION FOR SPHERICAL VESSELS (PROJECT STANDARDS AND SPECIFICATIONS)

SPECIFICATION FOR SPHERICAL VESSELS (PROJECT STANDARDS AND SPECIFICATIONS) Page : 1 of 1 April 01 #03-1 Block Aronia, TABLE OF CONTENTS 1. GENERAL 1.1 Scope. DESIGN.1 Shell Design. Support Column Design.3 Opening Reinforcement. Nozzles and Manholes.5 Internals and Externals.

More information

200 Series In-Slab Pool Fittings

200 Series In-Slab Pool Fittings 230 Series nti-vortex Plate 2-2 231 Series Sump 2-3 234 Series Sump 2-4 236 Series Sump 2-5 253 Series Overflow 2-6 255 Series Overflow/Drain 2-7 261 Series Vacuum Fitting 2-8 263 Series Eyeball Fitting

More information