1 3930-PM-WM0511 7/2004 COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATERSHED MANAGEMENT WATER OBSTRUCTION AND ENCROACHMENT DEP USE ONLY Acknowledged Date GP PASPGP-2 Authorization included: YES NO Transfer Date BWM-GP-11 GENERAL PERMIT REGISTRATION Maintenance, Testing, Repair, Rehabilitation, or Replacement of Water Obstructions and Encroachments SECTION A. APPLICANT INFORMATION Check One: New Permit Transfer of Existing Permit complete Sections A, C & H and transfer form PM-WM0016 Existing Permit(s) Number for Project(s) with a Submerged Lands License Agreement (if applicable) N/A Applicant Name PENNSYLVANIA DEPARTMENT OF TRANSPORTATION Contact Person Last Name First Name MI Telephone SWAN KRISTEN (814) Mailing Address City State Zip NORTH JUNIATA STREET HOLLIDAYSBURG PA Address kswan@state.pa.us SECTION B. CONSULTANT (if applicable) Consultant - Last Name First Name MI Smith Raymond L Consulting Firm The EADS Group Mailing Address City State Zip Eighth Avenue Altoona PA Telephone FAX (814) (814) rsmith@eadsgroup.com - 1 -

2 3930-PM-WM0511 7/2004 SECTION C. INSTRUCTIONS If you have any questions concerning whether your project qualifies for GP-11 please contact your regional office (Exhibit B). 1. Prepare a project location map using the appropriate portion of the USGS 7½ Minute Quadrangle Map or other suitable mapping with the project site(s) identified. Number each activity making sure it corresponds with the activity number found in the Project Inventory Chart (Section D1). 2. Project Description: Describe the project in enough detail to allow Department to determine that the proposed work complies with both the terms and environmental and engineering conditions of the General Permit. (A project can be one structure or a series of structures that are related to one another located in one county.) See Attached Project Description (attach additional sheets if necessary) 3. Using the Project Inventory Chart (Section D1), list each water obstruction and/or encroachment that requires maintenance. Please fill out the row for each activity in its entirety. Please make sure the activity number corresponds with the area identified on the site location map. 4. If you are proposing a bridge or culvert replacement or the proposed work will change the waterway opening, please complete and provide the chart in Section D2. If the project consists of similar work (replacement or change in waterway opening) on more than one structure, submit the data requested in Section D2 for each structure included in this registration. 5. For bridges and culverts across a watercourse which are to be used by the general public such as an access to an industrial, commercial, or residential development, etc., plans, specifications and hydrologic and hydraulic reports shall be prepared and submitted by a registered professional engineer and shall be affixed with their seal and certification. 6. For bridge or culvert replacements, activities that reduce the size of the waterway opening, or work on a structure that poses a threat to human life or a substantial potential risk to property, plans, specifications and hydrologic and hydraulic reports shall be prepared and submitted by a registered professional engineer and shall be affixed with their seal and certification

3 PROJECT DESCRIPTION for SR 4015, Section Bridge Replacement Over Bells Gap Run Antis Township, Blair County, Pennsylvania Project Description This project is the replacement of a deteriorating two-span steel I-beam bridge carrying S.R over Bell s Gap Run in Antis Township, Blair County with a single-span prestressed concrete adjacent box beam bridge. The bridge is located north of the community of Bellwood. (See Location Maps, Appendix A) The bridge will be placed on the existing horizontal alignment. A construction baseline is used to tie the proposed roadway to the existing roadway, leading into the bridge, because the existing roadway centerline has moved from the right-of-way centerline over years of widening and resurfacing. The vertical alignment is raised to maintain the existing 100- year floodwater elevation. The approach roadway work is kept to a minimum. The length of vertical curve required to tie the bridge grade to the existing roadway using a 30mph design speed establishes the limits of work. The length of the reconstructed roadway, including the bridge, is 575 feet. The grade for the roadway is controlled by the bridge elevations. The grade was determined by holding the existing low chord elevation, assuming the use of 8-30 inch deep adjacent concrete box beams, applying the deck depth (including a 2.5 inch bituminous surface course), and the appropriate shoulder and roadway cross slopes. The break point for the roadway and shoulder is at the edge of the 11-foot lane. The roadway grade of 0.6% is used on the bridge and ties to the existing vertical alignment with vertical curves. The vertical alignment ties to the existing vertical alignment in a curve. To ensure a smooth pavement transition within a curve the contractor will mill the existing pavement and resurface the roadway form the P.C. of the curve to the point of pavement reconstruction. Traffic will be detoured during construction. SR 4015 will be closed at the intersections with SR 4020 and Traffic will travel south on SR 0865 to the intersection with SR 4019 in Bellwood. From there it will travel south on SR 4019 to the intersection with SR From this intersection traffic will proceed north on SR 4020 to SR A 30-inch pipe will be constructed across the roadway to carry surface runoff to Bells Gap Run. The pipe will outlet into a ditch that parallels Bells Gap Run. This ditch eventually meets the main stream. -2a-

4 This pipe is also the outlet of a private pond that is adjacent to the roadway, just south of the bridge. This pond is not a flood control structure and appears to serve no purpose other than as a recreational facility. The property that the pond is on also has a smaller pond west of the above pond. This pond also has no apparent use other than recreational. The Blair Gap Water Supply Company, a predecessor of the Altoona Water Authority, once owned the property in question. According to the FEMA Report there was a dam just upstream of the bridge. The dam has since been removed. Neither pond will be impacted by this project. Wetland Impacts Two palustrine emergent wetlands (PEM) have been identified in the project area. One, located in the area between the existing roadway and the larger of the two ponds adjacent to the project area (west of roadway), will be impacted by the project. The planned fill slope (for roadway widening) will impact an area of acres ( square feet) of wetland 1. Wetland 2 is located to the east of the roadway, opposite of wetland one, and will not be impacted by the project. Deminimus wetlands impacts will be accounted for at the Mowry Advanced Wetland Compensation site as a good faith effort towards the Net Loss policy. Environmental Treatment during construction Stream diversion devices will be constructed at each abutment permitting work to be performed in a dry environment. The existing pier will be demolished and removed with equipment located behind the stream diversion device at the near abutment. The bridge will be constructed behind shoring to limit the extent of excavation (in the direction of the stream) required for the new structure foundations. This project is estimated to be a borrow project. To accommodate the proposed structure, the existing road will be raised slightly. As a result, a fair amount of embankment will be constructed. The toe of the embankments will be protected with silt barrier fence throughout the construction area. The silt fence will be erected parallel to contours and extended a minimum of 8 feet up the slope and an angle of 45 degrees. Protective fencing will be installed to protect adjacent wetlands not directly impacted by the proposed construction. Inlet filter bags will be used to protect all functioning inlets from sediment accumulation. All slopes will be seeded immediately upon their completion to prevent erosion. As soon as vegetation becomes established with 80% cover, erosion control devices will be removed from the project area. -2b-

5 3930-PM-WM0511 7/2004 Activity Number** Type of Water Obstruction (Bridge, Culvert, Utility Stream Crossing, Utility Wetland Crossing) SECTION D1. PROJECT INVENTORY For Blair Activity Type (Maintenance, testing, repair, rehabilitation, or replacement) Earth Disturbance (acres) Name of USGS Quadrangle Map Municipality Where Project is Located County* Name of Stream 1 Bridge Replacement Bellwood, PA Antis Twp Bells Gap Run TSF Chapter 93 Stream Designation Special PFBC Designation (Wild Trout, Stocked Trout, Migratory Fishes) Wild Trout, Stocked Trout 2 30 Culvert Pipe Replacement Bellwood, PA Antis Twp Unnamed Tributary to Bells Gap Run TSF *For multiple structures attach additional sheets that provide the same information requested in the chart. **The number used for a particular water obstruction from Section D1 should match the number in Section D2 for the same water obstruction

6 3930-PM-WM0511 7/2004 SECTION D2. BRIDGE AND/OR CULVERT REPLACEMENT PROJECTS OR PROJECTS THAT CHANGE THE WATERWAY OPENING* Bridge/Culvert Existing Bridge/Culvert Proposed Activity Number** Waterway Opening (sq. ft.) (span (ft.) x underclearance (ft.)) Span (ft.) Underclearance (ft.) Length (ft.) (upstream to downstream) Material Type (RCP, CMP, etc.) Waterway Opening (sq. ft.) (span (ft.) x underclearance (ft.)) Span (ft.) Underclearance (ft.) Length (ft.) (upstream to downstream) Material Type (RCP, CMP, etc.) Span Steel Girder Single Span P/S Concrete Adjacent Box Beam N/A CMP 4.91 N/A RCP *For multiple structures attach additional sheets that provide the same information requested in the chart. **The number used for a particular water obstruction from Section D1 should match the number in Section D2 for the same water obstruction

7 3930-PM-WM0511 7/2004 SECTION E. COMPLIANCE REVIEW Is the applicant (owner and/or operator) currently in violation of any permits issued by the Department? If yes, please provide: 1. Permit Number: 2. Nature of the violation (if any): 3. Status of violation (i.e., schedule for compliance, etc.): SECTION F. OTHER PERMITS Are any other Chapter 105 permits required for this project? SECTION G. CERTIFICATION I certify that the information provided in this permit registration is true and correct to the best of my knowledge and information. Signature of Permittee (Person Responsible for Installation, Operation and Maintenance of Authorized Activity) Date Type or Print Name AN ACKNOWLEDGED COPY OF THIS GENERAL PERMIT AND THE EROSION AND SEDIMENT CONTROL PLAN REVIEWED BY THE DEP REGIONAL OFFICE MUST BE AVAILABLE AT THE PROJECT SITE DURING CONSTRUCTION

8 3930-PM-WM0511 7/2004 SECTION H. REGISTRATION CHECKLIST In order to register use of this General Permit, confirm the following: I/we have notified the Municipality and County. I/we hereby notify the Department that BDWM-GP-8, Temporary Road Crossing will also be utilized during the maintenance activity. Please Submit: Completed Permit Registration Form. LOCATION MAP. An 8 ½ by 11 photocopy of a portion of the U.S.G.S. 7 ½ Minute Quadrangle Map or suitable mapping with the project site(s) identified. Wetland Information Data Sheets, Field tes, or Photos of the wetland area. Engineering plan or sketch drawing that provides the necessary information. Project cross-section drawing. Completed copy of a PNDI Search Form (Supplement. 1) with Search Receipt. For bridge or culvert replacements, activities that reduce the size of the waterway opening, or work on a structure that poses a threat to human life or a substantial potential risk to property, plans, specifications and hydrologic and hydraulics report shall be prepared and submitted by a registered professional engineer and shall be affixed with their seal and certification. Erosion and Sediment Control Plan for earth disturbance activities Any existing Submerged Lands License Agreements Please submit where required: Photographs For projects involving a waterway opening, photos upstream and downstream of the existing structure are required. Bog Turtle Habitat Screening Form (where required). This screening is required for General Permits 5, 6, 7, 8, 9, and 11 which may impact wetlands in the following counties: Adams, Berks, Bucks, Chester, Cumberland, Delaware, Franklin, Lancaster, Lebanon, Lehigh, Monroe, Montgomery, rthampton, Schuylkill (Swatara Watershed), and York

9 3930-PM-WM0511 7/2004 SECTION I1. DRAWINGS/PLANS 1) Engineering drawings prepared and sealed by a Professional Engineer are required for the following types of projects: a) bridge and culvert replacements b) activities that reduce the size of the waterway opening c) bridges or culverts across a watercourse which are to be used by the general public d) work on a structure that poses a threat to human life or a substantial potential risk to property 2) Prepared plans or sketch plans maybe submitted for activities not listed in 1 a) through d). *Please make sure the information below is provided on all engineering plans, drawings, and other prepared plans or sketch plan required for registration. SECTION I2. DRAWINGS/PLANS CHECKLIST YES N/A YES N/A Stream Impacts with Dimensions Total Length 100 Total sq. ft. 6,725 Wetland Acreage Onsite Permanent Wetland Impacts sq. ft. Stream Name Bells Gap Run Chapter 93 Stream Designation TSF Location of Property Lines Relative to the Project Existing Utilities Temporary Wetland sq. ft. Proposed Utilities Stream Limits and Flow Direction Floodway Limits (if known) *Shown on Plan Profile Limits of Earth Disturbance Associated with this Activity Use the next sheet for sketch if applicable Existing Buildings, Roadways, Other Structures Proposed Buildings, Roadways, Other Structures Other Waters (i.e. pond, lakes) Please indicate rth Please indicate photo locations - 7 -

10 3930-PM-WM0511 7/2004 SKETCH PLAN (if applicable) PADOT Applicant Name Please refer to Exhibit E, Engineering Plans and Cross Sections. Scale 1" = ft

11 3930-PM-WM0511 7/2004 PROJECT CROSS SECTIONS PADOT Applicant Name Provide a cross section of the project if not included on the Engineering Drawings, showing the dimensions of the waterway opening, area of fill materials used, and other pertinent information necessary to accurately depict the scope of your project, and allow the Department to determine that the project complies with the terms and conditions of this General Permit. Please refer to Exhibit E, Engineering Plans and Cross Sections

12 8000-PM-IT0001 Rev 06/07/2002 CHECKLIST COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERAL INFORMATION FORM -- AUTHORIZATION APPLICATION APPLICANT S CHECKLIST This final checklist is to assist the applicant in assuring that all requests for responses, contacts, additional documentation, etc. have been addressed. Please check the following list to make sure that you have included all the required information. Failure to provide all of the requested information will delay the processing of the application and may result in the application being placed on hold with no action, or will be considered withdrawn and the application file closed. This applicant s checklist need not be returned to DEP with your completed application. REQUIREMENTS 1. ATTACHMENTS. The completion of the GIF may require the submission of some or all of the following. Where appropriate, include the appropriate attachment(s) with the completed GIF. a) Site Information, Written Directions to Site - Attach additional sheets as necessary. b) Facility Information, Latitude/Longitude Attach additional sheets as necessary. c) Project Information, Project Description Attach additional sheets as necessary. d) Project Information, Time Schedules -- Attach additional sheets as necessary. e) Land Use Information If the project has already received local planning approvals, building permits or special exemptions or conditional approvals to the local zoning ordinance, attach such documentation if possible. If the site is grand-fathered as a pre-existing use or a vested right, document that information as well. If the early opt-out option is being used, attach approval letters from local municipality(ies) and county(ies) where project is being proposed. For more information on this, see the GIF Instructions and the Department s policy on the land use review process for permitting Document ID: f) Coordination Information - If land is disturbed, it may be the applicant s responsibility to also notify the PA Historical and Museum Commission, Bureau of Historic Preservation, 400 rth Street, Floor 2, Harrisburg, PA , (717) PHMC notification is required for: 1) purposes of construction activities for Individual NPDES permits disturbing 10 or more acres; and 2) Erosion & Sediment Control permits. General NPDES permits disturbing 10 or more acres are exempt from PHMC notification. For additional information, see Cultural Resource tice instructions to determine whether submission of information to PHMC is required for this permit application. g) Coordination Information, Question Attach copy Act 537 Approval Letter. te: Approval required prior to 105/NPDES approval. h) Coordination Information, Question Attach copy - Public Water Supplier s Agreement Letter to Serve the Project. 2. CONTACTS MADE. According to information provided in the Coordination Information section, the appropriate DEP office may need to be contacted; as well as some agencies outside DEP. See the Instructions document for appropriate contact per coordination question. In addition to contacts referenced above, prior to proceeding with any project, DEP encourages applicants to be in touch with municipal and county governments to get information on and secure, if possible, any local permits or approvals that might be required for the project. By doing so, potential conflicts at the local level can be resolved prior to application submission to DEP. 3. BEFORE YOU DIG -- CONTACT. Pennsylvania One Call System at APPLICATION SUBMITTED. Application has been completed and properly signed according to instructions and type codes; and will be submitted to the appropriate DEP office. Page 1

13 8000-PM-IT0001 Rev 06/07/2002 FORM COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERAL INFORMATION FORM AUTHORIZATION APPLICATION Before completing this General Information Form (GIF), read the step-by-step instructions provided in this application package. This version of the General Information Form (GIF) must be completed and returned with any programspecific application being submitted to the Department. Related ID#s (If Known) DEP USE ONLY Client ID# APS ID# Date Received & General tes Site ID# Auth ID# Facility ID# CLIENT INFORMATION DEP Client ID# Client Type / Code State - State Agency Organization Name or Registered Fictitious Name Employer ID# (EIN) Dun & Bradstreet ID# PENNSYLVANIA DEPARTMENT OF TRANSPORTATION Individual Last Name First Name MI Suffix SSN N/A Additional Individual Last Name First Name MI Suffix SSN N/A Mailing Address Line 1 Mailing Address Line 2 PENNSYLVANIA DEPARTMENT OF TRANSPORTATION 1620 NORTH JUNIATA STREET Address Last Line City State ZIP+4 Country HOLLIDAYSBURG PA USA Client Contact Last Name First Name MI Suffix SWAN KRISTEN Client Contact Title Phone Ext DISTRICT REGULATORY PERMIT COORDINATOR Address FAX kswan@state.pa.us SITE INFORMATION DEP Site ID# Site Name SR 4015 Section 001 EPA ID# Estimated Number of Employees to be Present at Site 0 Description of Site BRIDGE REPLACEMENT & ROADWAY IMPROVEMENT County Name Municipality City Boro Twp State BLAIR ANTIS County Name Municipality City Boro Twp State Site Location Line 1 Site Location Line 2 Site Location Last Line City State ZIP+4 Detailed Written Directions to Site US RT. 220 TO BELLWOOD, SR 0865 NORTH TO SR 4015, LEFT ONTO SR 4015 TO BRIDGE SITE Site Contact Last Name First Name MI Suffix YOCUM THOMAS Site Contact Title Site Contact Firm DISTRICT ENVIRONMENTAL MANAGER PENNSYLVANIA DEPARTMENT OF TRANSPORTATION Mailing Address Line 1 Mailing Address Line 2 ENGINEERING DISTRICT NORTH JUNIATA STREET Mailing Address Last Line City State ZIP+4 HOLLIDAYSBURG PA Phone Ext FAX Address tyocum@state.pa.us Page 1 of 7

14 8000-PM-IT0001 Rev 06/07/2002 NAICS Codes (Two- & Three-Digit Codes List All That Apply) 6-Digit Code (Optional) 221, 234, 484 Client to Site Relationship OWNOP OWNER / OPERATOR FACILITY INFORMATION Modification of Existing Facility 1. Will this project modify an existing facility, system, or activity? 2. Will this project involve an addition to an existing facility, system, or activity? If, check all relevant facility types and provide DEP facility identification numbers below. Facility Type DEP Fac ID# Facility Type DEP Fac ID# Air Emission Plant Beneficial Use (water) Blasting Operation Captive Hazardous Waste Operation Coal Ash Beneficial Use Operation Coal Mining Operation Coal Pillar Location Commercial Hazardous Waste Operation Dam Location Deep Mine Safety Operation -Anthracite Deep Mine Safety Operation -Bituminous Deep Mine Safety Operation -Ind Minerals Encroachment Location (water, wetland) Erosion & Sediment Control Facility Explosive Storage Location Industrial Minerals Mining Operation Laboratory Location Land Recycling Cleanup Location MineDrainageTrmt/LandRecyProjLocation Municipal Waste Operation Oil & Gas Encroachment Location Oil & Gas Location Oil & Gas Water Poll Control Facility Public Water Supply System Radiation Facility Residual Waste Operation Storage Tank Location Water Pollution Control Facility Water Resource Other: Transportation Latitude/Longitude Latitude Longitude Point of Origin Degrees Minutes Seconds Degrees Minutes Seconds Horizontal Accuracy Measure Feet --or-- Meters Horizontal Reference Datum Code rth American Datum of 1927 rth American Datum of 1983 World Geodetic System of 1984 Horizontal Collection Method Code Reference Point Code Altitude Feet --or-- Meters Altitude Datum Name The National Geodetic Vertical Datum of 1929 The rth American Vertical Datum of 1988 (NAVD88) Altitude (Vertical) Location Datum Collection Method Code Geometric Type Code Data Collection Date Source Map Scale Number Inch(es) = Feet --or-- Centimeter(s) = Meters PROJECT INFORMATION Project Name SR 4015 Section 001 Project Description BRIDGE REPLACEMENT & ROADWAY IMPROVEMENT Project Consultant Last Name First Name MI Suffix Smith Raymond L Project Consultant Title Consulting Firm Project Manager The EADS Group Mailing Address Line 1 Mailing Address Line 2 The EADS Group, Inc Eighth Avenue Address Last Line City State ZIP+4 Altoona PA Phone Ext FAX Address rsmith@eadsgroup.com Page 2 of 7

15 8000-PM-IT0001 Rev 06/07/2002 Time Schedules Project Milestone (Optional) 1. Is this application for an authorization type on the list of authorizations affected by the land use policy? te: If, you must complete the following Land Use Information section, unless exempted by Questions 2 or 3 below. If, skip Questions 2 & 3 below as well as the following Land Use Information section. For referenced list, see Appendix A attached to the GIF Instructions. 2. For an Air program authorization only. All other authorizations continue with Question 3 below. Will the permit authorize the construction of facilities outside an existing permitted area? te: If, you must complete the following Land Use Information section unless exempted by Question 3 below. If, skip Question 3 below as well as the following Land Use Information section. 3. Have you attached or submitted municipal and county Early Opt Out approval letters for the project? te: If to Question 3, skip the following Land Use Information section. This should only be checked if applicant is choosing the early opt-out option. Required approval letters described in the GIF Checklist and Instructions should be attached. If to Question 3, continue with the following Land Use Information section. LAND USE INFORMATION te: Applicants are encouraged to submit copies of local land use approvals or other evidence of compliance with local comprehensive plans and zoning ordinances. 1. Is there a municipal comprehensive plan(s)? 2. Is there a county comprehensive plan(s)? 3. Is there a multi-municipal or multi-county comprehensive plan? 4. Is the proposed project consistent with these plans? If no plan(s) exists, answer. 5. Is there a municipal zoning ordinance(s)? 6. Is there a joint municipal zoning ordinance(s)? 7. Will the proposed project require a zoning approval (e.g., special exception, conditional approval, re-zoning, variance)? If zoning approval has already been received, attach documentation. 8. Are any zoning ordinances that are applicable to this project currently the subject of any type of legal proceeding? 9. Will the project be located on a site that has been or is being remediated under DEP s Land Recycling Program? 10. Will the project result in reclamation of abandoned mine lands through remining or as part of DEP s Reclaim PA Program? 11. Will the project be located in an agricultural security area or an area protected under an agricultural conservation easement? 12. Will the project be located in a Keystone Opportunity Zone or Enterprise Development Area? 13. Will the project be located in a Designated Growth Area as defined by the Municipalities Planning Code? Page 3 of 7

16 8000-PM-IT0001 Rev 06/07/2002 COORDINATION INFORMATION te: The PA Historical and Museum Commission must be notified of proposed projects in accordance with DEP Technical Guidance Document and the accompanying Cultural Resource tice Form. If the activity will be a mining project (i.e., mining of coal or industrial minerals, coal refuse disposal and/or the operation of a coal or industrial minerals preparation/processing facility), respond to questions 1.0 through 2.5 below. If the activity will not be a mining project, skip questions 1.0 through 2.5 and begin with question Is this a coal mining project? If, respond to If, skip to Question 2.0. (DEP Use/48y1) 1.1 Will this coal mining project involve coal preparation/ processing activities in which the total amount of coal prepared/processed will be equal to or greater than 200 tons/day? (DEP Use/4x70) 1.2 Will this coal mining project involve coal preparation/ processing activities in which the total amount of coal prepared/processed will be greater than 50,000 tons/year? (DEP Use/4x70) 1.3 Will this coal mining project involve coal preparation/ processing activities in which thermal coal dryers or pneumatic coal cleaners will be used? (DEP Use/4x70) 1.4 For this coal mining project, will sewage treatment facilities be constructed and treated waste water discharged to surface waters? (DEP Use/4x62) 1.5 Will this coal mining project involve the construction of a permanent impoundment meeting one or more of the following criteria: (1) a contributory drainage area exceeding 100 acres; (2) a depth of water measured by the upstream toe of the dam at maximum storage elevation exceeding 15 feet; (3) an impounding capacity at maximum storage elevation exceeding 50 acre-feet? (DEP Use/3140) 1.6 Will this coal mining project involve underground coal mining to be conducted within 500 feet of an oil or gas well? (DEP Use/4z41) 2.0 Is this a non-coal (industrial minerals) mining project? If, respond to If, skip to Question 3.0. (DEP Use/48y1) 2.1 Will this non-coal (industrial minerals) mining project involve the crushing and screening of non-coal minerals other than sand and gravel? (DEP Use/4x70) 2.2 Will this non-coal (industrial minerals) mining project involve the crushing and/or screening of sand and gravel with the exception of wet sand and gravel operations (screening only) and dry sand and gravel operations with a capacity of less than 150 tons/hour of unconsolidated materials? (DEP Use/4x70) 2.3 Will this non-coal (industrial minerals) mining project involve the construction, operation and/or modification of a portable non-metallic (i.e., non-coal) minerals processing plant under the authority of the General Permit for Portable n-metallic Mineral Processing Plants (i.e., BAQ-PGPA/GP-3)? (DEP Use/4x70) 2.4 For this non-coal (industrial minerals) mining project, will sewage treatment facilities be constructed and treated waste water discharged to surface waters? (DEP Use/4x62) 2.5 Will this non-coal (industrial minerals) mining project involve the construction of a permanent impoundment meeting one or more of the following criteria: (1) a contributory drainage area exceeding 100 acres; (2) a depth of water measured by the upstream toe of the dam at maximum storage elevation exceeding 15 feet; (3) an impounding capacity at maximum storage elevation exceeding 50 acre-feet? (DEP Use/3140) Page 4 of 7

17 8000-PM-IT0001 Rev 06/07/ Will your project, activity, or authorization have anything to do with a well related to oil or gas production, site development for such activity, or the waste from such a well? If, respond to If, skip to Question 4.0. (DEP Use/4z41) 3.1 Does the oil- or gas-related project involve any of the following: placement of fill, excavation within or placement of a structure, located in, along, across or projecting into a watercourse, floodway or body of water (including wetlands)? (DEP Use/4z41) 3.2 Will the oil- or gas-related project involve discharge of industrial wastewater or stormwater to a dry swale, surface water, ground water or an existing sanitary sewer system or storm water system? If, discuss in Project Description. (DEP Use/4z41) 3.3 Will the oil- or gas-related project involve the construction and operation of industrial waste treatment facilities? (DEP Use/4z41) 4.0 Will the project involve a construction activity that results in earth disturbance? If, specify the total disturbed acreage. (DEP Use/4x66) Total Disturbed Acreage 0.85 acres 5.0 Does the project involve any of the following: placement of fill, excavation within or placement of a structure, located in, along, across or projecting into a watercourse, floodway or body of water (including wetlands)? (DEP Use/4x66) 6.0 Will the project involve discharge of industrial wastewater or stormwater to a dry swale, surface water, ground water or an existing sanitary sewer system or separate storm water system? If, discuss in Project Description. (DEP Use/4x62) 7.0 Will the project involve the construction and operation of industrial waste treatment facilities? (DEP Use/4x62) 8.0 Will the project involve construction of sewage treatment facilities, sanitary sewers, or sewage pumping stations? If, indicate estimated proposed flow (gal/day). Also, discuss the sanitary sewer pipe sizes and the number of pumping stations/treatment facilities/name of downstream sewage facilities in the Project Description, where applicable. (DEP Use/4x62) Estimated Proposed Flow (gal/day) 9.0 Was sewage planning submitted and approved? If, attach the Act 537 approval letter unless the submitted application is actually requesting Act 537 approval (Approval required prior to 105/NPDES approval). (DEP Use/4x61) Is Act 537 Approval Letter attached? 10.0 Is this project for the beneficial use of biosolids for land application within Pennsylvania? If indicate how much (i.e. gallons or dry tons per year). (DEP Use/4X62) Gallons Per Year (residential septage) Dry Tons Per Year (biosolids) 11.0 Does the project involve construction, modification or removal of a dam? If, identify the dam. (DEP Use/3140) Dam Name 12.0 Will the project interfere with the flow from, or otherwise impact, a dam? If, identify the dam. (DEP Use/3140) Dam Name 13.0 Will the project involve operations (excluding during the construction period) that produce air emissions (i.e., NOX, VOC, etc.)? If, identify each type of emission followed by the amount of that emission. (DEP Use/4x70) Enter all types & amounts of emissions; separate each set with semicolons. Page 5 of 7

18 8000-PM-IT0001 Rev 06/07/ Is an on-site drinking water supply (well), other than individual house wells, proposed for your project? If, indicate total number of people served and/or the total number of connections served, if applicable. Also, check all proposed sub-facilities. (DEP Use/4x81) Number of Persons Served Number of Employee/Guests Number of Connections Sub-Fac: Distribution System Sub-Fac: Water Treatment Plant Sub-Fac: Source Sub-Fac: Pump Station Sub-Fac: Entry Point Sub-Fac: Transmission Main Sub-Fac: Storage Facility 15.0 Will your project involve purchasing water in bulk, excluding during the construction period? If, name the provider. Also, indicate the daily number of employees or guests served. (DEP Use/4x81) Provider s Name Number of Employees/Guests 16.0 Is your project to be served by public water supply? If, indicate name of supplier and attach letter from supplier stating that it will serve the project. (DEP Use/4x81) Supplier s Name Letter of Approval from Supplier is Attached 17.0 Will this project involve a new or increased drinking water withdrawal from a stream or other water body? If, provide name of stream. (DEP Use/4x81) Stream Name 18.0 Will the construction or operation of this project involve treatment, storage, reuse, or disposal of waste? If, indicate what type (i.e., hazardous, municipal (including infectious & chemotherapeutic), residual) and the amount to be treated, stored, re-used or disposed. (DEP/Use4x32) Type & Amount 19.0 Will your project involve the removal of coal, minerals, etc. as part of any earth disturbance activities? (DEP Use/48y1) 20.0 Does your project involve installation of a field constructed underground storage tank? If, list each Substance & its Capacity. te: Applicant may need a Storage Tank Site Specific Installation Permit. (DEP Use/2570) Enter all substances & capacity of each; separate each set with semicolons Does your project involve installation of an aboveground storage tank greater than 21,000 gallons capacity at an existing facility? If, list each Substance & its Capacity. te: Applicant may need a Storage Tank Site Specific Installation Permit. (DEP Use/2570) Enter all substances & capacity of each; separate each set with semicolons Does your project involve installation of a tank greater than 1,100 gallons which will contain a highly hazardous substance as defined in DEP s Regulated Substances List, 2570-BK-DEP2724? If, list each Substance & its Capacity. te: Applicant may need a Storage Tank Site Specific Installation Permit. (DEP Use/2570) Enter all substances & capacity of each; separate each set with semicolons. Page 6 of 7

19 8000-PM-IT0001 Rev 06/07/ Does your project involve installation of a storage tank at a new facility with a total AST capacity greater than 21,000 gallons? If, list each Substance & its Capacity. te: Applicant may need a Storage Tank Site Specific Installation Permit. (DEP Use/2570) Enter all substances & capacity of each; separate each set with semicolons. CERTIFICATION I certify that I have the authority to submit this application on behalf of the applicant named herein and that the information provided in this application is true and correct to the best of my knowledge and information. Type or Print Name Signature Title Date Page 7 of 7

CLIENT INFORMATION SITE INFORMATION

CLIENT INFORMATION SITE INFORMATION Form COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERAL INFORMATION FORM AUTHORIZATION APPLICATION Before completing this General Information Form (GIF), read the step-by-step

More information

PHASE I APPLICATION CAMP HOPE RUN LANDFILL BOGGS TOWNSHIP, CLEARFIELD COUNTY, PENNSYLVANIA

PHASE I APPLICATION CAMP HOPE RUN LANDFILL BOGGS TOWNSHIP, CLEARFIELD COUNTY, PENNSYLVANIA PHASE I APPLICATION CAMP HOPE RUN LANDFILL BOGGS TOWNSHIP, CLEARFIELD COUNTY, PENNSYLVANIA FORM GIF GENERAL INFORMATION FORM JUNE 2017 1300-PM-BIT0001 5/2012 Form COMMONWEALTH OF PENNSYLVANIA DEPARTMENT

More information

Erosion and Sediment Control Plan for a Timber Harvesting Operation

Erosion and Sediment Control Plan for a Timber Harvesting Operation 3930-FM-WM0155 Rev. 7/2004 Erosion and Sediment Control Plan for a Timber Harvesting Operation 1. GENERAL INFORMATION A. Location Municipality B. Timber sale area = acres Date County C. Landowner Name

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

Stormwater Local Design Manual For Houston County, Georgia

Stormwater Local Design Manual For Houston County, Georgia Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.

More information

Erosion & Sedimentation Control Policy

Erosion & Sedimentation Control Policy Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of

More information

MODEL Stormwater Local Design Manual. City of Centerville

MODEL Stormwater Local Design Manual. City of Centerville MODEL Stormwater Local Design Manual City of Centerville Adopted December 6, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 1 2.1. DETENTION REQUIREMENTS... 1 2.1.1. Discharge

More information

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517) Date Issued Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI 48854 PH. (517) 676-8395 FAX (517) 676-8364 APPLICATION FOR SOIL EROSION AND SEDIMENTATION POLLUTION

More information

STORMWATER AND EROSION CONTROL PERMIT

STORMWATER AND EROSION CONTROL PERMIT STORMWATER MANAGEMENT AND EROSION CONTROL PERMIT INSTRUCTIONS AND INFORMATION Any project that involves the disturbance of ANY quantity of land requires the applicant to receive approval for the project

More information

Holly Swartz and Jason Shirey

Holly Swartz and Jason Shirey Chapter 105 General Permits for Stream and Wetland Impacts DEP Ch. 105 CONTACTS FOR BERKS COUNTY: Holly Swartz and Jason Shirey What DEP Regulates Under Chapter 105 Waters of the Commonwealth, which includes

More information

Location Drainage Study

Location Drainage Study Location Drainage Study PROJECT ROUTE: LIMITS: MUNICIPALITY/COUNTY: JOB NUMBER: IL 47 at Burlington Road 750ft NW to 750ft SE of IL 47(Burlington), & 1000ft S to 1000ft N of Burlington (IL47) Kane County

More information

Application for Gas Exploration and Production

Application for Gas Exploration and Production 1800 Washington Blvd. Suite 655 Baltimore Maryland 21230 Application for Gas Exploration and Production This application is to be used to obtain a permit to Drill and Operate a well, within the State for

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection. Design Criteria - Wetlands Replacement/Monitoring

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection. Design Criteria - Wetlands Replacement/Monitoring DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection DOCUMENT NUMBER: 363-0300-001 TITLE: Design Criteria - Wetlands Replacement/Monitoring EFFECTIVE DATE: February 11, 1997 AUTHORITY:

More information

Application For Waste Regulation (Check all that apply)

Application For Waste Regulation (Check all that apply) Environmental Protection and Growth Management Department ENVIRONMENTAL ENGINEERING AND PERMITTING DIVISION 1 North University Drive, Mailbox #201 Plantation, Florida 33324 954-519-1483 FAX 954-519-1412

More information

INSTRUCTIONS FOR USING THE GENERAL PERMIT...i A. GENERAL DESCRIPTION AND FEES

INSTRUCTIONS FOR USING THE GENERAL PERMIT...i A. GENERAL DESCRIPTION AND FEES COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATERWAYS ENGINEERING AND WETLANDS GENERAL PERMIT BWEW-GP-1 FISH HABITAT ENHANCEMENT STRUCTURES TABLE OF CONTENTS PAGE INSTRUCTIONS

More information

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements SECTION 3 DRAINAGE 3-1 General All Drainage plans for proposed development shall be prepared by a Professional Engineer registered in Virginia, except as noted below. Further, their seal and signature

More information

UPRR criteria for sizing waterway openings under bridges and through culverts are as follows:

UPRR criteria for sizing waterway openings under bridges and through culverts are as follows: UNION PACIFIC RAILROAD SCOPE OF HYDROLOGIC/HYDRAULIC DESIGN ENGINEERING AND PERMITTING SERVICES FOR SIZING WATERWAY OPENINGS AT NEW AND REPLACEMENT STRICTURES These flood passage criteria were developed

More information

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS PART 3 - STANDARDS FOR SEWERAGE FACILITIES 3.3 - DESIGN OF STORM SEWERS 3.301 Design of Storm Sewers A. General Information B. Investigations and Surveys C. Special Projects 3.302 Design Criteria for Storm

More information

UNINCORPORATED JACKSON COUNTY BUILDING PERMITS

UNINCORPORATED JACKSON COUNTY BUILDING PERMITS UNINCORPORATED JACKSON COUNTY BUILDING PERMITS May, 2014 Department of Public Works Planning and Environmental Health PREFACE The purpose of this manual is to provide an overview of the procedures to apply

More information

All driveways shall have a separate site plan when the application is submitted.

All driveways shall have a separate site plan when the application is submitted. Driveway Submittal Requirements All driveways shall have a separate site plan when the application is submitted. Within 24 hours of application submittal, all proposed driveways shall: be addressed with

More information

Chapter 11 Culverts and Bridges

Chapter 11 Culverts and Bridges Chapter 11 Culverts and Bridges Contents 1.0 Introduction... 1 2.0 General Design... 1 2.1 Design Criteria... 1 2.2 Design Flows... 1 2.3 Permitting and Regulations... 1 2.4 Aesthetics and Safety... 2

More information

SECTION CONSTRUCTION SERVICES

SECTION CONSTRUCTION SERVICES SECTION 01100 CONSTRUCTION SERVICES PART 1 GENERAL 1.01 - Section Includes A. Mobilization. B. Construction Surveys. C. Record Documents. 1.02 Description Of Work A. Mobilization: includes the preparatory

More information

Municipal Stormwater Ordinances Summary Table

Municipal Stormwater Ordinances Summary Table APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which

More information

U.S. Army Corps of Engineers Permit Application Tips

U.S. Army Corps of Engineers Permit Application Tips U.S. Army Corps of Engineers Permit Application Tips MnDOT Environmental Conference Ben Orne and Sarah Wingert, USACE 4-29-2015 US Army Corps of Engineers BUILDING STRONG Outline Introduction to Corps

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432 PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION:

More information

ENVIRONMENTAL RESOURCE PERMIT APPLICATION

ENVIRONMENTAL RESOURCE PERMIT APPLICATION ENVIRONMENTAL RESOURCE PERMIT APPLICATION SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT 2379 BROAD STREET, BROOKSVILLE, FL 34604-6899 (352) 796-7211 OR FLORIDA WATS 1 (800) 423-1476 SECTION E INFORMATION

More information

Cass County Soil Erosion & Sedimentation Control Program

Cass County Soil Erosion & Sedimentation Control Program Cass County Soil Erosion & Sedimentation Control Program Both residents and visitors of Cass County enjoy the beauty of over 250 lakes and ponds, along with numerous streams, creeks, and wetlands that

More information

APPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO.

APPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO. APPENDIX B Construction Surface Water Management Plan PLANT CITY, FLORIDA SYDNEY ROAD RECLAIMED WATER PROJECT INVITATION TO BID ITB NO. 11-91360-001 ADVERTISED: November 5, 2010 MANDATORY PRE-BID MEETING:

More information

C. Foundation stabilization for pipe and utility structures.

C. Foundation stabilization for pipe and utility structures. PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization

More information

SECTION 11: REGULATORY FLOODWAYS

SECTION 11: REGULATORY FLOODWAYS SECTION 11: REGULATORY FLOODWAYS Contents 11.1. The Floodway... 11-2 11.1.1. The floodway concept... 11-2 11.1.2. Floodway map... 11-2 11.1.3. Floodway permitting... 11-3 11.1.4. Changing the floodway...

More information

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards

More information

INSTRUCTIONS FOR SUBMITTING A COMMERCIAL SEWAGE DISPOSAL PERMIT APPLICATION

INSTRUCTIONS FOR SUBMITTING A COMMERCIAL SEWAGE DISPOSAL PERMIT APPLICATION Permits will be processed only when ALL required information is provided Application MUST be accompanied by the following: Property address or road location with distance from nearest intersection. IT

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION. Coal Refuse Disposal - Site Selection

DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION. Coal Refuse Disposal - Site Selection DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION DOCUMENT NUMBER: 563-2113-660 TITLE: Coal Refuse Disposal - Site Selection EFFECTIVE DATE: February 8, 1999 AUTHORITY: The Coal Refuse

More information

Good morning, Chairman Yaw, Chairman Yudichak, Chairman Vulakovich, Chairman Costa,

Good morning, Chairman Yaw, Chairman Yudichak, Chairman Vulakovich, Chairman Costa, Testimony of Patrick McDonnell, Secretary Pennsylvania Department of Environmental Protection Joint Hearing on Flooding and Emergency Response Senate Environmental Resources & Energy and Veterans Affairs

More information

RESIDENTIAL BUILDING PERMIT

RESIDENTIAL BUILDING PERMIT A APPLICATION FOR A RESIDENTIAL BUILDING PERMIT JACKSON CO. MS. PLAN CASE NUMBER: PERMIT NUMBER: ACCEPTED BY: APPROVED BY: Application is hereby made for a permit under the provisions of the Comprehensive

More information

ARTICLE XII RECREATIONAL VEHICLE PARK REGULATIONS

ARTICLE XII RECREATIONAL VEHICLE PARK REGULATIONS ARTICLE XII RECREATIONAL VEHICLE PARK REGULATIONS ARTICLE XII RECREATIONAL VEHICLE PARK REGULATIONS Section 1201 Applicability For the purpose of this Article, recreation vehicles and recreational vehicle

More information

Department of the Army Permit Application

Department of the Army Permit Application Department of the Army Permit Application DA File Number U.S. Army Corps of Engineers Honolulu District Date Received by CEPOH-RO Send Completed Application to: Honolulu District, U.S. Army Corps of Engineers

More information

CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2

CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2 CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2 7.1. GENERAL.... 2 7.1.1. Inspection Restriction Dates.... 2 7.1.2. Complete Improvements.... 2 7.1.3. Public Improvements.... 2 7.1.4. Warranty

More information

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. July 2007 Update to Design Bulletin #16/2003: Added under Design Criteria Culverts of 600mm diameter are commonly used to

More information

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision Plat Name: Location Description/ Nearest Intersection: Acreage:

More information

3.0 Planning and Submittal Requirements

3.0 Planning and Submittal Requirements October 2003, Revised February 2005 Chapter 3.0, Planning and Submittal Requirements Page 1 3.0 Planning and Submittal Requirements 3.1 Drainage Studies and Drawings The City of Greenwood Village (Village)

More information

CHAPTER 2 STORMWATER MANAGEMENT

CHAPTER 2 STORMWATER MANAGEMENT CHAPTER 2 STORMWATER MANAGEMENT REVISED SEPTEMBER 11, 2002 WHATCOM COUNTY DEVELOPMENT STANDARDS CHAPTER 2 - STORMWATER MANAGEMENT TABLE OF CONTENTS PART 1: ADMINISTRATIVE PROVISIONS Section 201. Regulatory

More information

VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION. FORM B - ANIMAL FEEDING OPERATIONS (AFOs)

VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION. FORM B - ANIMAL FEEDING OPERATIONS (AFOs) VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION FORM B - ANIMAL FEEDING OPERATIONS (AFOs) Department of Environmental Quality Rev. 02-2013 VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION FORM

More information

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: CONSTRUCTION SURVEY PART 1 - GENERAL 1.01 SECTION INCLUDES Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: A. Construction Survey: 1. Project

More information

WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR

WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR All the documents shown today are in the MN Stormwater Manual on the page titled 2018 Construction Stormwater Permit Public Notice and Public Informational

More information

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT 901.1 DESCRIPTION Design, implement, inspect and maintain appropriate best management practices to minimize or eliminate erosion, sediment and other pollutants

More information

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application Good for 90 days from the Date Issued This permit is only required if the work location is owned or controlled by the City of Homestead and

More information

Utility and Sanitary Sewer Permitting & Design. Gibson-Thomas Engineering Co., Inc. Consulting Engineers

Utility and Sanitary Sewer Permitting & Design. Gibson-Thomas Engineering Co., Inc. Consulting Engineers Utility and Sanitary Sewer Permitting & Design Gibson-Thomas Engineering Co., Inc. Consulting Engineers Utility Line Design Provide service to communities in need with minimal piping needed minimize $$

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department

More information

KABA DEMOLITION INFORMATION PACKET

KABA DEMOLITION INFORMATION PACKET I. Demolition Process Checklist Structures Requiring No Permit Residential Structures 200 Square Feet or Less Commercial Structures 120 Square Feet or Less Structures Requiring No Bond 1 and 2 Family Residential

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01 Stormwater Management Studies PDS Engineering Services Division Revised Date: 2/28/08 INTRODUCTION The City of Overland Park requires submission of a stormwater management study as part of the development

More information

Wetland Permit Application

Wetland Permit Application DAVID J. KLOTZLE WETLAND INSPECTOR, PHILIPSTOWN, NY 238 Main Street Cold Spring, NY 10516 (914) 736-7132 Wetland Permit Application MEMO TO APPLICANT 1. Use this form to apply for a Wetlands Permit as

More information

Index. Composition and Order of Plan Set. Utility Plan... 5

Index. Composition and Order of Plan Set. Utility Plan... 5 City of Des Plaines Public Works and Engineering Department Revised-October 5, 2012 Index Composition and Order of Plan Set Title Page Number Cover Sheet... 1 Requirements for Site Development... 2 Grading

More information

S.O.P. No. HMD

S.O.P. No. HMD Page: 1 of 9 PURPOSE: To establish (SOP) for submission requirements, review process and approval of applications for Non-vehicular Access Permits for the purpose of connection or discharge to any MassDOT

More information

Roscommon County Soil Erosion and Sedimentation Control (SESC) Program Guide

Roscommon County Soil Erosion and Sedimentation Control (SESC) Program Guide Roscommon County SESC Program 500 Lake Street Roscommon, Michigan 48653 Phone: 989-275-8323 Fax: 989-275-8640 Roscommon County Soil Erosion and Sedimentation Control (SESC) Program Guide INCLUDED ATTACHMENTS

More information

UNDERSTANDING THE LAW. In Pennsylvania, both state and federal law govern water pollution caused by stormwater. We briefly examine both.

UNDERSTANDING THE LAW. In Pennsylvania, both state and federal law govern water pollution caused by stormwater. We briefly examine both. UNDERSTANDING THE LAW In Pennsylvania, both state and federal law govern water pollution caused by stormwater. We briefly examine both. FEDERAL REQUIREMENTS In the United States, the Environmental Protection

More information

7. EXCAVATION IN PUBLIC STREETS The E-Permit & U-Permit

7. EXCAVATION IN PUBLIC STREETS The E-Permit & U-Permit 7. EXCAVATION IN PUBLIC STREETS The E-Permit & U-Permit 7.1 E-Permit and U-Permit Permit Description and Purpose The Excavation Permit (E-Permit) and the Utility Permit (U-Permit) are issued to allow construction,

More information

SACHSE EROSION CONTROL GUIDELINES

SACHSE EROSION CONTROL GUIDELINES SACHSE EROSION CONTROL GUIDELINES Section I. Definitions The following words, terms, and phrases, when used in this guideline, shall have the meanings ascribed to them in this Section, except where the

More information

Small Site Stormwater Quality Permit Application

Small Site Stormwater Quality Permit Application Small Site Stormwater Quality Permit Application PUBLIC WORKS ADMINISTRATION BUILDING (PWA) STORMWATER DIVISION 2525 WEST FIRST STREET LOVELAND, CO 80537 GENERAL INFORMATION (970) 962-2772 www.cityofloveland.org/stormwater

More information

City: Stormwaterville Zip Code: County: Addison. City: Stormwaterville Zip Code: County: Addison

City: Stormwaterville Zip Code: County: Addison. City: Stormwaterville Zip Code: County: Addison NOTICE OF INTENT TO USE GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II MUNICIPAL SEPARATE STORM SEWER SYSTEMS (RULE 62-621.300(7)(b), F.A.C.) For FDEP Internal Use Only Permit : FLR INSTRUCTIONS:

More information

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW SUBCHAPTER 8 STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW 7:45-8.1 Purpose and scope of review Except for those projects expressly exempted by this chapter or waived by the Commission, the Commission

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Field Operations

DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Field Operations DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Field Operations DOCUMENT NUMBER: 021-0200-001 TITLE: Policy for Pennsylvania Natural Diversity Inventory (PNDI) Coordination During Permit Review and Evaluation

More information

JEFFERSON COUNTY STORM WATER MANAGEMENT

JEFFERSON COUNTY STORM WATER MANAGEMENT JEFFERSON COUNTY STORM WATER MANAGEMENT B-210 Courthouse, Birmingham, Alabama 35203 Telephone: (205) 325-8741 Erosion and Sedimentation Control Measures for Commercial Projects (Plans Requirements) -All

More information

CHAPTER 110 SEWAGE DISPOSAL

CHAPTER 110 SEWAGE DISPOSAL 110-1. Title. 110-6. System rehabilitation. 110-2. Purpose. 110-7. Liability. 110-3. Definitions. 110-8. Conflict with other 110-4. Applicability. regulations. 110-5. Applicable standards for sewage 110-9.

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification 7. Introduction This chapter summarizes methods to evaluate runoff conveyance in various street cross sections and curb types in the Town of Castle Rock and identifies acceptable upper limits of street

More information

KRISTOPHER J. KRZYSTON, CEI, CEM

KRISTOPHER J. KRZYSTON, CEI, CEM PERMITTING IN NEW JERSEY KRISTOPHER J. KRZYSTON, CEI, CEM Kristopher J. Krzyston Rutgers graduate 1994 B.S. Environmental Planning Certificate in G.I.S. Assistant Division Manager Environmental Science

More information

ORDINANCE. AMENDMENT TO THE CECIL COUNTY ROAD CODE and STANDARD SPECIFICATIONS

ORDINANCE. AMENDMENT TO THE CECIL COUNTY ROAD CODE and STANDARD SPECIFICATIONS ORDINANCE AMENDMENT TO THE CECIL COUNTY ROAD CODE and STANDARD SPECIFICATIONS WHEREAS, by virtue of Chapter 242-1.A. of the Cecil County Code of Public Laws, the Board of County Commissioners of Cecil

More information

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL 901.1 DESCRIPTION Install, maintain and remove temporary erosion and pollution control devices as required during the construction of the project. BID

More information

NJDEP Regulations that impact or soon will impact agricultural operations. April 1, 2007 Horses 2007

NJDEP Regulations that impact or soon will impact agricultural operations. April 1, 2007 Horses 2007 NJDEP Regulations that impact or soon will impact agricultural operations. April 1, 2007 Horses 2007 Peter L. Kallin, Ph.D., P.W.S. Phone: 732-499-3600 Ext. 237 E-mail: pkallin@aesop.rutgers.edu www.water.rutgers.edu

More information

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit: TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be

More information

Florida Department of Environmental Protection. Bureau of Mining and Minerals Regulation. Regulation of Mines. Howard J. Hayes, Program Administrator

Florida Department of Environmental Protection. Bureau of Mining and Minerals Regulation. Regulation of Mines. Howard J. Hayes, Program Administrator Florida Department of Environmental Protection Bureau of Mining and Minerals Regulation Regulation of Mines Howard J. Hayes, Program Administrator April 2011 What is a mine? Nonphosphate mine: Subsections

More information

ARTICLE V: STORMWATER MANAGEMENT AND DRAINAGE SYSTEMS

ARTICLE V: STORMWATER MANAGEMENT AND DRAINAGE SYSTEMS ARTICLE V: STORMWATER MANAGEMENT AND DRAINAGE SYSTEMS Section 501: Purpose An adequate drainage system including necessary ditches, pipes, culverts, drains, inlets, bridges, detention ponds, etc. shall

More information

FIRM NAME DESIGNER: CHECKER: DATE: FPID #: DESCRIPTION: COUNTY: DRAINAGE DESIGN CHECKLIST. Designers Initials. Checkers Initials.

FIRM NAME DESIGNER: CHECKER: DATE: FPID #: DESCRIPTION: COUNTY: DRAINAGE DESIGN CHECKLIST. Designers Initials. Checkers Initials. I. Drainage Report A. Executive Summary - Brief Overview of Project Drainage Design B. Project Description 1. Existing Conditions 2. Proposed Project Conditions 3. Project Justification Narrative - Basin

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Virginia Stormwater Management Program SPECIFIC SUBJECT: Application of the

More information

General Permit No.: OHR Page 53 of 146

General Permit No.: OHR Page 53 of 146 Page 53 of 146 Part 8 Sector-Specific Requirements for Industrial Activity Subpart J Sector J Non-Metallic Mineral Mining and Dressing. You shall comply with Part 8 sector-specific requirements associated

More information

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN CHECKLIST FOR STREETS, INLETS, I. STREET CLASSIFICATION AND DESIGN CRITERIA A. Determine drainage classification for the roadway section using Table 7-1 or Table 7-2. B. Determine the allowable flow depth

More information

EXCAVATION PERMIT CHECKLIST

EXCAVATION PERMIT CHECKLIST EXCAVATION PERMIT CHECKLIST Complete These Forms ST. LOUIS COUNTY/MUNICIPAL ZONING APPROVAL FOR PERMIT APPLICATION EXCAVATION PERMIT APPLICATION Present These Documents Drawing showing location of excavation

More information

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS 8.1 INTRODUCTION To minimize the detrimental effects of erosion and sedimentation, Henrico County requires that those individuals responsible for

More information

PERMIT APPLICATION UNDER THE EROSION AND SEDIMENT POLLUTION CONTROL PERMIT

PERMIT APPLICATION UNDER THE EROSION AND SEDIMENT POLLUTION CONTROL PERMIT COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATERWAYS ENGINEERING AND WETLANDS ID # Date Received OFFICIAL USE ONLY PERMIT APPLICATION UNDER THE EROSION AND SEDIMENT POLLUTION

More information

West Virginia Department of Health & Human Resources Department of Health

West Virginia Department of Health & Human Resources Department of Health SS-182A Rev 6/07 West Virginia Department of Health & Human Resources Department of Health Application for a Permit to Install or Modify an Onsite Sewage Disposal System Property Owner Phone (H) (W) Address

More information

PARK COUNTY PLANNING DEPARTMENT 1002 SHERIDAN AVE. CODY, WY OR

PARK COUNTY PLANNING DEPARTMENT 1002 SHERIDAN AVE. CODY, WY OR PARK COUNTY PLANNING DEPARTMENT 1002 SHERIDAN AVE. CODY, WY 82414 307-527-8540 OR 307-754-8540 PARK COUNTY PUBLIC WORKS 1131 11 th ST CODY, WY 82414 307-527-8520 OR 307-754-8520 ANYONE CONSTRUCTING, PLACING

More information

Industrial waste pretreatment facilities that discharge to public sewers.

Industrial waste pretreatment facilities that discharge to public sewers. Bureau of Point and Non-Point Source Management Standard Operating Procedure (SOP) 1 for Clean Water Program Water Quality Management Permits for Industrial Waste Treatment Facilities SOP No. BPNPSM-PMT-024

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated June 27, 2016 BEAVER COUNTY SR 7446(LBB) #92912 PROPOSAL:$54.72 PLANS:$42.46 12X18:$52.11 24X36:$752.70 EXSTRUCT:$48.62 12X18:$59.67 24X36:$861.90 The description and location of the project is

More information

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination Highway Drainage Proper drainage is a very important consideration in design of a highway. Inadequate drainage facilities can lead to premature deterioration of the highway and the development of adverse

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

Closure Plan Ash Disposal Area PGE Boardman Power Plant

Closure Plan Ash Disposal Area PGE Boardman Power Plant FIRST ISSUE REVISION 0 Closure Plan Ash Disposal Area PGE Boardman Power Plant Prepared for Portland General Electric September 2015 2020 SW 4th Avenue, Suite 300 Portland, Oregon 97201 This document was

More information

PART 1 GENERAL REQUIREMENTS

PART 1 GENERAL REQUIREMENTS PART 1 GENERAL REQUIREMENTS Contract Closeout Plan 110 Arrow diagram for project close-out...3 Erosion Control 121 Straw bale barrier... 5 122 Silt fence... 7 123 Diversion dike... 9 124 Inlet protection...

More information

Keys Edge Community Development District. Engineer s Report Infrastructure Improvements

Keys Edge Community Development District. Engineer s Report Infrastructure Improvements Keys Edge Community Development District Engineer s Report Infrastructure Improvements Prepared for Keys Edge Community Development District Board of Supervisors Miami-Dade County, Florida Prepared by

More information

STORMWATER DEVELOPMENT GUIDELINES

STORMWATER DEVELOPMENT GUIDELINES 1600 Battle Creek Road, Morrow, Georgia 30260 STORMWATER DEVELOPMENT GUIDELINES Second Edition November 2006 Program Management & Engineering Department Office: (770) 961-2130 Fax: (770) 960-5229 STORMWATER

More information

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with

More information

CITY OF TAMPA WASTEWATER DEPARTMENT TECHNICAL STANDARDS GUIDELINE. FOR CONSTRUCTION OF WASTEWATER FACILITIES July 2014 Version 6

CITY OF TAMPA WASTEWATER DEPARTMENT TECHNICAL STANDARDS GUIDELINE. FOR CONSTRUCTION OF WASTEWATER FACILITIES July 2014 Version 6 CITY OF TAMPA WASTEWATER DEPARTMENT TECHNICAL STANDARDS GUIDELINE FOR CONSTRUCTION OF WASTEWATER FACILITIES July 2014 Version 6 2545 Guy N Verger Boulevard, Tampa, FL 33605 www.tampagov.net TECHNICAL STANDARDS

More information

Ottumwa Generating Station Project No Closure Plan for Existing CCR Revision: 0 Surface Impoundments TABLE OF CONTENTS

Ottumwa Generating Station Project No Closure Plan for Existing CCR Revision: 0 Surface Impoundments TABLE OF CONTENTS Surface Impoundments Page No. i TABLE OF CONTENTS 1. INTRODUCTION... 1 2. PROPOSED CCR IMPOUNDMENTS CLOSURE PROCEDURE... 3 3. PROPOSED COVER SYSTEM... 4 4. ESTIMATED MAXIMUM INVENTORY OF CCR... 4 5. ESTIMATED

More information

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department: Permit Requirements: Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install,

More information

MONROE COUNTY ZONING OFFICE

MONROE COUNTY ZONING OFFICE MONROE COUNTY ZONING OFFICE 100 South Main Street Waterloo, IL 62298 618-939-8681 Ext. 260 mczoning@htc.net PROCEDURES FOR NEW CONSTRUCTION 1. Applicant must provide a recorded copy of deed to the property

More information

Richland County Department of Public Works Engineering (Land Development) Division

Richland County Department of Public Works Engineering (Land Development) Division Richland County Department of Public Works Engineering (Land Development) Division Commercial Projects What is a Commercial Project? Projects that are not related to residential single family homes and/or

More information

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3

More information

Temporary Watercourse Crossing: Culverts

Temporary Watercourse Crossing: Culverts Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol

More information