1 SECTION METAL FABRICATIONS This performance guide specification is part of an architectural specification and is intended to provide a guideline for product selection and may not be appropriate for needs of specific projects. Use of this specification is voluntary and the user needs to edit the guide specification to fit the needs of a specific project, applicable laws and regulations, end user requirements and safety considerations. This performance guide specification provides no guarantee as to product performance, merchantability, or fitness for a particular purpose. Please read the full disclaimer here. PART 1 - GENERAL 1.1 SUMMARY A. General: Read this Section in conjunction with other related Sections. B. Prescriptive Work 1. Supply, deliver, install and warrant the work in strict compliance with the materials and workmanship requirements of the Architectural Specification. 2. Where required to prepare Shop Drawings, these shall be limited to final detailing of components, systems, etc. indicated on the Design Drawings, necessary to demonstrate their safe installation. 3. Where products are offered by the Contractor for acceptance by the Engineer, provide full supporting documentation in respect of the complete system or installation. C. Section Includes 1. Floor grillage/ platforms D. Related Work Sections and documentation 1. Section Shop Applied Coatings for Metal. 2. Section Metal Fastenings. 3. Section Joint Sealants. 4. Section Metal Railings. 5. Section Metal Stairs. 6. Section Glazing. 7. Structural Engineer's specification. 8. Estidama Pearl Rating System (PRS) - The Pearl Rating System for Estidama, 1

2 Building Rating System: Design and Construction document by Abu Dhabi Urban Planning Council (UPC). 9. Main Contractor Estidama PBRS and LEED CS Toolkit document. 10. LEED Green Building Rating System for Core and Shell Development, by U.S. Green Building Council, Inc. (USGBC). PART 2 - PRODUCTS 2.1 PRODUCT SELECTION A. General 1. Do not use products that bear names, logos or references on visible surfaces. B. Bridge Platform Assembly 1. Bridge platform assembly comprising glass panel platform supported by steel supports including all necessary brackets and fastenings to complete the installation. 2. Floor Assembly Components: Glass flooring units comprising triple laminated glass panels with slip resistant surface finish supported by steel angles, silicone pointed. 3. Framework: Fabricated steel angle brackets. 4. Finish: To be confirmed by the Engineer during the next project stage. 5. Size/ Configuration: As indicated on the Design Drawings. 6. Support: Structural steel framing and channels. Refer to the Structural Engineer's specification and drawings. 2.2 PERFORMANCE REQUIREMENTS A. Specific Movements 1. The work shall be fabricated and installed to withstand all movements of the building structure under all specified design loads or combination of loads without damage or any reduction in the performance of the work. 2. All fastenings shall be capable of providing adequate adjustment with the minimal use of packing shims, which shall be agreed with the Engineer. 3. All necessary movement joints shall accommodate the maximum movements that can be derived from the specified design loads and movements. Under maximum movements the joints shall meet the requirements of the Architectural Specification. 4. The work shall resist all specified static and dynamic loads likely to be encountered without causing permanent deformation of components or the failure of members or seals and shall transmit such loads safely to the points of support. 5. The work shall not deflect under loading in any way that is detrimental to any elements of the work or adjacent structural or building elements. 2

3 6. The work shall accommodate the following movements without any permanent deformation or reduction in the specified performance: a) Deflection under design loads. b) The effects of internal/ external wind and pressure loadings. c) Changes in dimension and shape of components arising from building movements, including settlement, creep, twisting and racking. d) Movement of any joint whether designed to permit movement or not. e) Thermal movements. B. Specific Live Loads 1. The work shall be capable of accommodating the following specified live loads without any reduction in performance: a) All loads resulting from movements of the building structure and support structure. b) A horizontal line load applied to the work, due to the occupants and vehicles, in accordance with the International Building Code (IBC) and Structural Engineer's requirements. c) Impact loads, or transferred impact loads, that occur during the service life of the work, without deterioration in performance and without sustaining nonrepairable damage. d) Loads imposed during replacement. C. Deflections 1. ***The maximum allowable deflection of any element of the work, when carrying full design loads, shall not exceed ***15mm or 1/ 175*** of their clear span in a direction normal to the plane of that element, whichever is the lesser value.*** 2. The work shall not deflect under loading in any way that is detrimental to any element of themselves or adjacent structural or building elements. 3. All components, couplings and fastenings shall be capable of accommodating all of the above deflection without permanent distortion, deformation or failure. 4. The work shall accommodate differential structural movements arising from any loads imposed by adjacent structures. 5. The magnitude of the allowable deflections shall be reduced if they are detrimental to any part of the work, their support structure or internal finishes. 3

4 D. Structural Integrity 1. The work indicated on the Shop Drawings and described in the Architectural Specification shall be in accordance with the conditions specified in the IBC, unless stated otherwise. 2. Construction of barriers shall be in accordance with the conditions specified in the IBC, unless stated otherwise. E. Specific Fire Performance Requirements 1. Refer to the Life Safety Drawings and the NFPA. 2. Surface Spread of Flame Classification: In accordance with UL 723 and ASTM E 84. F. ***Demountability*** 1. Elements of the work shall be individually and independently removable ensuring access for maintenance and/ or replacement of solid units in the event of breakage or damage. 2. The removal of units shall not affect the performance or safety of adjacent or any other part of the work. G. Thermal Movements: Allow for thermal movements from ambient and surface temperature changes acting on exterior metal fabrications by preventing buckling, opening of joints, overstressing of components, failure of connections, and other detrimental effects. 1. Temperature Change: ***67 C, ambient; 100 C***, material surfaces. H. Durability 1. The work shall retain its original appearance and performance throughout the life of the building without failure when maintained in accordance with an agreed maintenance program. Failure shall be defined as the occurrence of one or more of the following defects arising from deficiencies in design, material selection or workmanship. a) Collapse, damage or excessive deflection resulting from the application of specified loads. b) Distortion, displacement or other damage to a woven metal fabric that renders it unserviceable or unattractive. c) Atmospheric corrosion, stress corrosion, bi-metallic/ electro-chemical corrosion or other premature deterioration of a material. d) Degradation of protective coatings causing galvanised items to suffer corrosion 4

5 during their life and painted items to suffer coating breakdown in the period up to first maintenance. e) Component parts that may suffer damage under design safety loading shall permit easy replacement with the minimum amount of disturbance to the building users. I. Impact and Abrasion Resistance 1. The work shall resist abrasion from agreed cleaning methods and maintenance systems without any noticeable change in surface appearance. Generally, surfaces shall be sufficiently hard to resist all reasonable impacts from hand-held objects. 2. Impact tests shall be carried out to all work adjacent to pedestrian areas in accordance with the conditions specified in the IBC, unless stated otherwise. 3. The extent of any damage determined through testing shall be recorded and, where possible, quantified. Details shall be submitted to the Engineer. 4. Details of tests shall be provided to demonstrate the performance of materials and finishes in resisting abrasion from pedestrian traffic (hands, rings, luggage, cloth, shoes, etc.) and any other abrasion resulting from adjacent traffic movements. J. Glazing: Refer to Section Glazing. 2.3 MATERIALS A. Low Toxicity Materials: All building materials shall comply with the low toxicity material requirements as stated in PBRS Credit SM-1 within the UPC's Pearl Building Rating System: Design & Construction document. 1. To meet this PBRS Credit, all building materials must not contain materials or compounds with over 1% of constituent materials with the designated R-phrases listed in the UPC document. Submit confirmation that materials comply with the EU Risk Phrases (R-Phrases) Directive 67/ 548/ EEC. Annex III. B. General 1. Metal Surfaces, General: Provide materials with smooth, flat surfaces unless otherwise indicated. For metal fabrications exposed to view in the completed Work, provide materials without seam marks, roller marks, rolled trade names, or blemishes. C. Glazing: Refer to Section Glazing. D. Sealants: Refer to Section Joint Sealants. E. Ferrous Metals in accordance with the following. 5

6 1. Steel Plates, Shapes, and Bars: ASTM A 36/ A 36M. 2. Stainless-Steel Sheet, Strip, and Plate: ASTM A 240/ A 240M or ASTM A 666, Type 304/ Type 316L. 3. Stainless-Steel Bars and Shapes: ASTM A 276, Type 304/ Type 316L. 4. Stainless Steel Castings: ASTM A 743/ A 743M. 5. Steel Pipe: ASTM A 53/ A 53M, standard weight (Schedule 40) unless otherwise indicated. 6. Slotted Channel Framing: Cold-formed metal box channels (struts) complying with MFMA-4. F. Fasteners in accordance with the following. 1. General: Unless otherwise indicated, provide Type 304/ Type 316 stainless-steel fasteners for exterior use and zinc-plated fasteners with coating complying with ASTM B 633 or ASTM F 1941M, Class Fe/ Zn 5, at exterior walls. Select fasteners for type, grade, and class required. a) Provide stainless-steel fasteners for fastening stainless steel. b) Provide stainless-steel fasteners for fastening nickel silver. c) Provide bronze fasteners for fastening bronze. 2. Steel Bolts and Nuts: Regular hexagon-head bolts, ASTM F 568M, Property Class 4.6; with hex nuts, ASTM A 563M; and, where indicated, flat washers. 3. Steel Bolts and Nuts: Regular hexagon-head bolts, ASTM A 325M, Type 3; with hex nuts, ASTM A 563M, Class 8S3; and, where indicated, flat washers. 4. Stainless-Steel Bolts and Nuts: Regular hexagon-head annealed stainless-steel bolts, ASTM F 738M; with hex nuts, ASTM F 836M; and, where indicated, flat washers; Alloy ***Group A1/ Group A4***. 5. Anchor Bolts: ASTM F 1554, Grade 36, of dimensions indicated; with nuts, ASTM A 563; and, where indicated, flat washers. a) Hot-dip galvanize or provide mechanically deposited, zinc coating where item being fastened is indicated to be galvanized. 6. Eyebolts: ASTM A Machine Screws: ASME B18.6.7M. 8. Lag Screws: ASME B M. 9. Plain Washers: Round, ASME B18.22M. 6

7 10. Lock Washers: Helical, spring type, ASME B M. 11. Anchors, General: Anchors capable of sustaining, without failure, a load equal to six times the load imposed when installed in unit masonry and four times the load imposed when installed in concrete, as determined by testing according to ASTM E 488, conducted by a qualified independent testing agency. 12. Cast-in-Place Anchors in Concrete: Either threaded type or wedge type unless otherwise indicated; galvanized ferrous castings, either ASTM A 47/ A 47M malleable iron or ASTM A 27/ A 27M cast steel. Provide bolts, washers, and shims as needed, all hot-dip galvanized per ASTM F Post-Installed Anchors: ***Torque-controlled expansion anchors*** or ***chemical anchors***. a) Material for Interior Locations: Carbon-steel components zinc plated in accordance with ASTM B 633 or ASTM F 1941M, Class Fe/ Zn 5, unless otherwise indicated. b) Material for Exterior Locations and Where Stainless Steel is Indicated: Alloy ***Group A1/ Group A4*** stainless-steel bolts, ASTM F 738M, and nuts, ASTM F 836M. 14. Slotted-Channel Inserts: Cold-formed, hot-dip galvanized-steel box channels (struts) complying with MFMA-4, provide with temporary filler and tee-head bolts, complete with washers and nuts, all zinc-plated in accordance with ASTM B 633, Class Fe/ Zn 5, as needed for fastening to inserts. G. Miscellaneous Materials 1. Welding Rods and Bare Electrodes: Select according to AWS specifications for metal alloy welded. 2. Shop Primers: Provide primers that comply with ***Sections Painting***. ***Section High-Performance Coatings. *** ***Sections Painting and Section High-Performance Coatings. *** 3. Galvanizing Repair Paint: High-zinc-dust-content paint complying with SSPC-Paint 20 and compatible with paints specified to be used over it. 4. Bituminous Paint: Cold-applied asphalt emulsion complying with ASTM D Nonshrink, Metallic Grout: Factory-packaged, ferrous-aggregate grout complying with ASTM C 1107, specifically recommended by manufacturer for heavy-duty loading applications. 7

8 6. Nonshrink, Nonmetallic Grout: Factory-packaged, nonstaining, noncorrosive, nongaseous grout complying with ASTM C Provide grout specifically recommended by manufacturer for interior and exterior applications. 7. Concrete: Comply with requirements in Section Cast-in-Place Concrete for normal-weight, air-entrained, concrete with a minimum 28-day compressive strength of 20 MPa. H. All painting and coating shall comply with LEED CS-IEQ Credit 4.2 Low Emitting Materials - Paints and Coatings requirements given in the USGBC document. 2.4 FABRICATION, GENERAL A. General 1. Systems shall include fastenings, brackets, support framing and all other components/ accessories necessary to complete the work in accordance with the Architectural Specification and the design intent indicated on the Design Drawings 2. Shop Assembly: Preassemble items in the shop to greatest extent possible. Disassemble units only as necessary for shipping and handling limitations. Use connections that maintain structural value of joined pieces. Do not weld joints designed to be bolt fixed. Clearly mark units for reassembly and coordinated installation. 3. Cut, drill, and punch metals cleanly and accurately. Remove burrs and ease edges to a radius of approximately 1mm unless otherwise indicated. Remove sharp or rough areas on exposed surfaces. 4. Form bent-metal corners to smallest radius possible without causing grain separation or otherwise impairing work. 5. Form exposed work with accurate angles and surfaces and straight edges. 6. Welding/ Brazing General: a) Weld corners and seams continuously in accordance with the following: 1. Thoroughly clean surfaces to be joined. 2. Ensure accurate fit using clamps and jigs where practicable. Use tack welds only for temporary attachment. 3. Make joints with parent and filler metal fully bonded throughout with no inclusions, holes, porosity or cracks. 4. Prevent weld spatter falling on surfaces of materials that will be self-finished 8

9 and visible in completed work. 5. Use materials and methods that minimize distortion and develop strength and corrosion resistance of base metals. 6. Obtain fusion without undercut or overlap. 7. Remove welding flux immediately. 8. At exposed connections, finish exposed welds and surfaces smooth and blended so no roughness shows after finishing and contour of welded surface matches that of adjacent surface. 9. Metal arc welding shall be to AWS D1.1/ D1.1M, "Structural Welding Code - Steel" and AWS D1.2/ D1.2M, "Structural Welding Code - Aluminum.", or other methods subject to review by the Engineer. 10. Where site or shop welding is required, it shall be by the process known as manual inert gas tungsten-arc welding and it shall be carried out by a procedure qualified and certified to AWS D1.1/ D1.1M, "Structural Welding Code - Steel" and AWS D1.2/ D1.2M, "Structural Welding Code - Aluminum". 7. Form exposed connections with hairline joints, flush and smooth, using concealed fasteners or welds where possible. Where exposed fasteners are required, use Phillips flat-head (countersunk) fasteners unless otherwise indicated. Locate joints where least conspicuous. 8. Fabricate seams and other connections that will be exposed to weather in a manner to exclude water. Provide weep holes where water may accumulate. 9. Cut, reinforce, drill, and tap metal fabrications as indicated to receive finish hardware, screws, and similar items. 10. Provide for anchorage of type indicated; coordinate with supporting structure. Space anchoring devices to secure metal fabrications rigidly in place and to support indicated loads. 11. Wall mounting brackets shall be two part, with the connection plate fixed to either structural concrete walls, or concealed mild steel members with suitable countersunk fastenings prior to commencement of the following trades. 12. Infills shall be to profiles positioned horizontally at centers indicated on the Design Drawings, and in accordance with IBC requirements. Where necessary, rods shall be factory bent to suit balustrade layout. 13. Metals used in exposed work shall have smooth surfaces, free of blemishes 9

10 including pitting, seam marks, roller marks, waves, striations, tool and die marks. Profiles shall be true to angle or curvature as required with sharp edges and corners. 14. Fabricate metal items free of stress corrosion or cracking. 15. Select materials and methods of fabrication to achieve accuracy and fit. 16. Fabricate members and components straight, free of distortion and to the specified tolerances. Heat-treat components to relieve residual stresses. 17. Visible surfaces to be true to line and level, free from imperfection, with sharp angles and straight corners. 18. Incorporate dowels and spigots into joints to accurately align components. 19. Isolate dissimilar materials to prevent galvanic action. 20. Do not permit contact between dissimilar metals in components that are to be fixed where moisture may be present or occur. 21. Clearly mark items for proper assembly and installation, using methods that will not mar protective finishes. 22. Paint finished components shall have fully welded connections, unless otherwise accepted, to protect unprotected joint faces from corrosion. 23. ***The Detailed Design of sections, material thicknesses and the dimensions indicated on the Design Drawings shall be maintained within specified tolerances.*** 24. Before and after making permanent connections in frames and other structural elements, which are assembled before delivery to Site, the fit shall be checked for accuracy. 25. Unless otherwise specified, concealed items shall be mill finished aluminum in internal conditions only, or ***hot dip galvanized steel***. Any cut edges shall be treated to ensure that the level of protection is maintained. 26. Finished components shall be rigid and free from distortion, cracks, burrs and sharp arrises. Moving parts shall move freely and without binding. 27. Unless specified otherwise, miter corner junctions of identical sections. 28. Cold Formed Work: Use brake presses or cold rolling to produce accurate profiles with straight arrises. 29. Adhesive Bonding: a) Prepare surfaces of metals to receive adhesives by degreasing and abrading mechanically or chemically. 10

11 b) Use adhesives to the manufacturer's written recommendations. c) Form bond under pressure. 30. ***Lightning Protection and Earth Bonding:*** a) Bonding between the work and structural steelwork shall be carried out at intervals as indicated on the Design Drawings. The first level of bonding to the structural steelwork shall be at the highest floor level of each part of the building. b) All straps/ connections shall be concealed. 31. Fabrication Tolerances - Non-cumulative: a) Deviations in panel length, width and diagonal dimension tolerances shall not exceed ±1mm. b) Straightness: L/ 1000 or 2mm, whichever is the lesser. c) Squareness of Cut Profiles: Depth of profile/ d) Squareness of Fabricated Items: Maximum ***2***mm difference between diagonals. e) Flatness of Fabricated Items: Maximum ***2***mm difference between one corner and another. f) Plumbness: ± ***2 to 1***mm/ m. g) Level: ± ***1***mm/ m. h) The twist and warping shall not cause any point of the panel to be more than 0.5mm out of plane. The twist and warping shall not cause any point of the structural frame to be more than 2mm out of plane. B. Miscellaneous Framing and Supports 1. General: Provide steel framing and supports not specified in other Sections as needed to complete the Work. 2. Fabricate units from steel shapes, plates, and bars of welded construction unless otherwise indicated. Fabricate to sizes, shapes, and profiles indicated and as necessary to receive adjacent construction. a) Fabricate units from slotted channel framing where indicated. b) Furnish inserts for units installed after concrete is placed. C. Miscellaneous Steel Trim 1. Unless otherwise indicated, fabricate units from steel shapes, plates, and bars of profiles indicated with continuously welded joints and smooth exposed edges. Miter 11

12 corners and use concealed site splices where possible. 2. Provide cutouts, fittings, and anchorages as needed to coordinate assembly and installation with other work. a) Provide with integrally welded steel strap anchors for embedding in concrete or masonry construction. D. Steel Weld Plates and Angles 1. Provide steel weld plates and angles not specified in other Sections, for items supported from concrete construction as needed to complete the Work. Provide each unit with no fewer than two integrally welded steel strap anchors for embedding in concrete. 2.5 FINISHES, GENERAL A. General 1. Refer to Section Shop Applied Coatings for Metal. 2. Finish metal fabrications after assembly. 3. Finish exposed surfaces to remove tool and die marks and stretch lines, and to blend into surrounding surface. B. Steel and Iron Finishes 1. Galvanizing: Hot-dip galvanize items as indicated in accordance with ASTM A 153/ A 153M for steel and iron hardware and with ASTM A 123/ A 123M for other steel and iron products. a) Do not quench or apply post galvanizing treatments that might interfere with paint adhesion. 2. Shop prime iron and steel items not indicated to be galvanized unless they are to be embedded in concrete, sprayed-on fireproofing, or masonry, or unless otherwise indicated. a) Shop prime with primers specified in ***Section Exterior Painting/ Section Interior Painting/ Section High Performance Coatings.*** 3. Preparation for Shop Priming: Prepare surfaces in accordance with ***SSPC-SP 6/ NACE No. 3, "Commercial Blast Cleaning."/ SSPC-SP 3, "Power Tool Cleaning."/ requirements indicated below:*** a) Exterior Items: SSPC-SP 6/ NACE No. 3, "Commercial Blast Cleaning." b) Items Indicated to Receive Zinc-Rich Primer: SSPC-SP 6/ NACE No. 3, 12

13 "Commercial Blast Cleaning." c) Items Indicated to Receive Primers Specified in Section High-Performance Coatings: SSPC-SP 6/ NACE No. 3, "Commercial Blast Cleaning." d) Other Items: SSPC-SP 3, "Power Tool Cleaning." 4. Shop Priming: Apply shop primer in accordance with SSPC-PA 1, "Paint Application Specification No. 1: Shop, Site, and Maintenance Painting of Steel," for shop painting. a) Stripe paint corners, crevices, bolts, welds, and sharp edges. End of Section 13

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 055113 - METAL PAN STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Multi-Institutional Academic Health Science & Research Center Evansville, IN

Multi-Institutional Academic Health Science & Research Center Evansville, IN SECTION 05 5000 - METAL FABRICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017 SECTION 055213 - PIPE AND TUBE RAILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION METAL FLOOR PLATE STAIRS

SECTION METAL FLOOR PLATE STAIRS SECTION 05513 - METAL FLOOR PLATE STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION PIPE AND TUBE RAILINGS PART 1- GENERAL 1.1 RELATED DOCUMENTS 1.2 SUMMARY 1.3 PERFORMANCE REQUIREMENTS

SECTION PIPE AND TUBE RAILINGS PART 1- GENERAL 1.1 RELATED DOCUMENTS 1.2 SUMMARY 1.3 PERFORMANCE REQUIREMENTS SECTION 055213- PIPE AND TUBE RAILINGS PART 1- GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION ALUMINUM RAILINGS

SECTION ALUMINUM RAILINGS SECTION 05522 ALUMINUM RAILINGS PART 1 GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Aluminum pipe and tube railings. B. Related Sections include the following: 1. Division 5 Section "Ornamental

More information

PIPE AND TUBE RAILINGS

PIPE AND TUBE RAILINGS SECTION 05521 - PIPE AND TUBE RAILINGS PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

B. Products furnished, but not installed, under this Section include the following:

B. Products furnished, but not installed, under this Section include the following: SECTION 055000 - METAL FABRICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION METAL FABRICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION METAL FABRICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 05 50 00 - METAL FABRICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION PRE-ENGINEERED ALUMINUM STAIRS AND RAILINGS

SECTION PRE-ENGINEERED ALUMINUM STAIRS AND RAILINGS SECTION 05 51 20 - PRE-ENGINEERED ALUMINUM STAIRS AND RAILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

Daytona Beach Pier Building Renovation Jun 2010

Daytona Beach Pier Building Renovation Jun 2010 SECTION 15060 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 13686.00 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 230529-1 SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 1.1 SUMMARY A. Section Includes: 1. Metal pipe hangers and supports.

More information

PIPE AND TUBE RAILINGS

PIPE AND TUBE RAILINGS SECTION 05521 - PIPE AND TUBE RAILINGS PART 1 - GENERAL 1.01 DESCRIPTION A. Work of this section is subject to requirements of the Contract Documents including the General Conditions and Supplementary

More information

Division 11 - Equipment Section 11401

Division 11 - Equipment Section 11401 PART 1 - GENERAL 1.1 GENERAL A. Division 1 General Requirements applies and becomes a part of this Section of the Specification as fully as if repeated herein. B. Items of equipment which are included

More information

A. This Section includes automatic entrance door systems operating as follows: 1. Swinging operation.

A. This Section includes automatic entrance door systems operating as follows: 1. Swinging operation. SECTION 08462 - SWINGING AUTOMATIC ENTRANCE DOORS PART 1 - GENERAL.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General, Supplementary, and Special Conditions and Division

More information

SECTION ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS PART 1 - GENERAL 1.1 SUMMARY. A. Section Includes:

SECTION ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS PART 1 - GENERAL 1.1 SUMMARY. A. Section Includes: SECTION 084113 - ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Exterior storefront framing. 2. Storefront framing for ribbon walls. 3. Storefront framing

More information

SECTION DECORATIVE METAL AND GLASS RAILING

SECTION DECORATIVE METAL AND GLASS RAILING SECTION 05 73 00 DECORATIVE METAL AND GLASS RAILING PART 1 GENERAL 1.1 SUMMARY A) This section includes both standard and custom handrails as shown in the contract drawings. B) These include aluminum,

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Steel pipe hangers and supports. 2. Metal framing systems. 3. Thermal-hanger shield inserts. 4. Fastener systems.

More information

SECTION PIPE AND TUBE RAILINGS

SECTION PIPE AND TUBE RAILINGS HV A C, Roofing, Interior & Exterior Renovations- Missouri Hills Youth Center SECTION 055213 -PIPE AND TUBE RAILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract,

More information

SECTION STRUCTURAL STEEL

SECTION STRUCTURAL STEEL SECTION 05120 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work under this Section shall include all materials and installation necessary to provide Structural Steel as shown and detailed on the Drawings

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING SECTION 05400 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work of this Section shall include all materials and installation necessary to provide all cold formed metal framing. B. This Section includes:

More information

Louis Armstrong New Orleans International Airport NOAB Project # North Terminal Development Program Phase 1

Louis Armstrong New Orleans International Airport NOAB Project # North Terminal Development Program Phase 1 Louis Armstrong New Orleans International Airport NOAB Project # 8910-01233 PART 1 - GENERAL SECTION 07 71 29 - MANUFACTURED ROOF EXPANSION JOINTS 1.1 RELATED DOCUMENTS A. Drawings and general provisions

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 055000 - METAL FABRICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. Steel framing and supports for overhead doors.

More information

Aluminum-Framed Entrances and Storefronts

Aluminum-Framed Entrances and Storefronts University of New Hampshire University of New Hampshire Scholars' Repository Division 08 Openings Chapter 5 Technical Construction and Renovation Standards 1-25-2013 084113 - Aluminum-Framed Entrances

More information

SECTION HANGERS AND SUPPORTS PART 1 - GENERAL. A. Drawings and Division 1 Specification Sections, apply to this Section.

SECTION HANGERS AND SUPPORTS PART 1 - GENERAL. A. Drawings and Division 1 Specification Sections, apply to this Section. 1.01 RELATED DOCUMENTS SECTION 15060 HANGERS AND SUPPORTS PART 1 - GENERAL A. Drawings and Division 1 Specification Sections, apply to this Section. 1.02 SUMMARY A. This Section includes hangers and supports

More information

MASTERSPEC - SHORT FORM. B. See Division 5 Section "Metal Stairs" for steel tube railings associated with metal stairs.

MASTERSPEC - SHORT FORM. B. See Division 5 Section Metal Stairs for steel tube railings associated with metal stairs. SECTION 05721 - ORNAMENTAL RAILINGS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Glass supported railings. B. See Division 5 Section "Metal Stairs" for steel tube railings associated

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

SECTION HVAC GRAVITY VENTILATORS

SECTION HVAC GRAVITY VENTILATORS SECTION 23 37 23 HVAC GRAVITY VENTILATORS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

MC BEAMLINE ENCLOSURE

MC BEAMLINE ENCLOSURE MC BEAMLINE ENCLOSURE 6-10-22 SECTION 05500-METAL FABRICATIONS PART 1. GENERAL 1.01 SECTION INCLUDES A. Extent of metal fabrications work is shown on the drawings and includes items fabricated from steel

More information

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING

More information

SECTION FIBERGLASS REINFORCED POLYMER (FRP) PANELS

SECTION FIBERGLASS REINFORCED POLYMER (FRP) PANELS SECTION 07 44 50 FIBERGLASS REINFORCED POLYMER (FRP) PANELS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Design, Engineering, manufacturing and erection of fiberglass reinforced panels. Delegated Design of

More information

SECTION METAL BUILDING SYSTEMS

SECTION METAL BUILDING SYSTEMS SECTION 13 3419 PART 1 GENERAL 1.01 SECTION INCLUDES A. Manufacturer-engineered, shop-fabricated structural steel building frame. B. Insulated Metal wall and roof panels including gutters and downspouts.

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING

SECTION HANGERS AND SUPPORTS FOR PLUMBING SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION MANUFACTURED ROOF EXPANSION JOINTS

SECTION MANUFACTURED ROOF EXPANSION JOINTS SECTION 07 71 29 - MANUFACTURED ROOF EXPANSION JOINTS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

SECTION DECORATIVE METAL FENCES AND GATES

SECTION DECORATIVE METAL FENCES AND GATES SECTION 32 31 19 SPEC WRITER NOTE: Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The General Conditions, Special Conditions and Division 1 through Division 22 as set forth in

More information

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. SECTION 260529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. 1.2

More information

A. Access doors and frames are part of an access door and frame allowance.

A. Access doors and frames are part of an access door and frame allowance. SECTION 08 31 13 ACCESS DOORS AND FRAMES PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

BEARING METAL STUD FRAMING

BEARING METAL STUD FRAMING L-1 Section 05410 Long Form Specification LOAD BEARING METAL STUD FRAMING This section includes axially loaded steel studs, with unique slotted top channels, usually of 0.91, 1.2 and 1.5 mm (16, 18, or

More information

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION 230529 - HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and other Division 1 Specification Sections,

More information

ITEM 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)

ITEM 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL) ITEM 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL) 686.1. Description. This Item shall govern for designing, fabricating, furnishing and erecting steel traffic signal pole assemblies of the various types

More information

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

This Addendum is directed to all prime Contract Bidders, and all others to whom Drawings and Specifications have been issued by the Architect.

This Addendum is directed to all prime Contract Bidders, and all others to whom Drawings and Specifications have been issued by the Architect. OPEN-END AGREEMENT FOR MISC. PROJECTS, PACKAGE A ADDENDUM 4 PART 1 - GENERAL Project: Open-End Agreement for Misc. Projects, Pkg. A Beck Conference Center [B.C. # 2017060, Pkg. A] Owner: Gadsden State

More information

SECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING

SECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING 7160 Krick Rd., Walton Hills, OH 44146 800-321-3827 - Tel 440-439-8650 - Fax 440-439-6889 SECTION 12 48 16 ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING PART 1. GENERAL 1.01 SUMMARY: This section includes

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 10505 - METAL STUDENT LOCKERS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION IMPACT RESISTANT WALL PROTECTION

SECTION IMPACT RESISTANT WALL PROTECTION SECTION 10265 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work under this Section shall include all materials and installation necessary to provide Impact-Resistant Wall Protection including Wall guards,

More information

SPECIFICATIONS: Architectural Aluminum Railings

SPECIFICATIONS: Architectural Aluminum Railings PART ONE: GENERAL 1.1 SUMMARY SPECIFICATIONS: Architectural Aluminum Railings A. Work in this section includes custom and standard Interior and Exterior aluminum railings and guardrails. 1.2 PERFORMANCE

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS PART 1 GENERAL 1.01 SUMMARY Section 15140 PIPE HANGERS, This Section includes the furnishing and subsequent installation of: A. Pipe and equipment hangers, supports, and associated anchors B. Equipment

More information

SPECIFICATIONS FOR AluSystems Aluminum Composite Panels Series 20 Dry Joint 1.00 GENERAL 1.01 RANGE OF WORK Section includes: Laminated panels and attachment systems for use as exterior cladding. A. Provide

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 22 0529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 [08 33 13] COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Metal Counter

More information

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

Corium Brick Rainscreen System Specifications

Corium Brick Rainscreen System Specifications CORIUM BRICK RAINSCREEN SYSTEM PART 1 - GENERAL 1.1 SUMMARY A. Work Included: The Work of this Section shall include but not be limited to the following: 1. Corium brick plates 2. Galvanized and coated

More information

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT Page 220529-1 SECTION 220529 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Aluminum Component Pipe Railings

Aluminum Component Pipe Railings 1 SECTION 05 7360 ALUMINUM COMPONENT PIPE RAILINGS PART 1 GENERAL 1.01 SECTION INCLUDES A. Aluminum component pipe handrails and railings. 1.02 RELATED REQUIREMENTS A. Section 02 9000: Landscaping: Installation

More information

SECTION EXTERIOR GRILLS AND SCREENS

SECTION EXTERIOR GRILLS AND SCREENS SECTION 10 82 13 PART 1 GENERAL PART 1 1 SUMMARY A. Section Includes: 1. Exterior perforated aluminum screen wall system with Ombrae TM Optical Tile imaging technology. 2. Accessories including attachments,

More information

SECTION PANEL AND POST AND PYLON SIGNAGE. 1. Non-illuminated Panel and Post signs. 2. Internal illumination Pylon (Cabinet and Post) signs.

SECTION PANEL AND POST AND PYLON SIGNAGE. 1. Non-illuminated Panel and Post signs. 2. Internal illumination Pylon (Cabinet and Post) signs. PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Non-illuminated Panel and Post signs. 2. Internal illumination Pylon (Cabinet and Post) signs. 1.2 PERFORMANCE REQUIREMENTS A. Structural

More information

SECTION GLASS BALUSTRADE RAILING SYSTEMS

SECTION GLASS BALUSTRADE RAILING SYSTEMS SECTION 05 73 13 GLASS BALUSTRADE RAILING SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Division 01 - General Requirements,

More information

ST. JOHNS COUNTY ARCH. PROJ. NO SECTION PREFABRICATED ALUMINUM CANOPIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

ST. JOHNS COUNTY ARCH. PROJ. NO SECTION PREFABRICATED ALUMINUM CANOPIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 10530 PREFABRICATED ALUMINUM CANOPIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Signature Series 5 Lap SECTION ALUMINUM WINDOWS

Signature Series 5 Lap SECTION ALUMINUM WINDOWS Signature Series 5 Lap SECTION 08 51 13 ALUMINUM WINDOWS PART 1 GENERAL 1.01 SUMMARY A. Related Documents: Conditions of the Contract, Division 1 - General Requirements, and Drawings apply to Work of this

More information

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9080 - Concrete Steps, Handrails, and Safety Rail CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL PART - GENERAL.0 SECTION INCLUDES

More information

SECTION EXPANSION CONTROL

SECTION EXPANSION CONTROL SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

B. Polyethylene samples shall be submitted for Owner approval of color and quality. Glass Rail ENGINEERED DASHERBOARD SPECIFICATIONS PART 1 - GENERAL 1.01 PROJECT SCOPE A. Contractor shall furnish and install one complete set of steel framed dasherboards as indicated on the drawings and

More information

A. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein.

A. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein. SECTION 10530 - EXTRUDED ALUMINUM WALKWAY COVERS PART I - GENERAL.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General, Supplementary, and Special Conditions and Division

More information

B. Shop Drawings: For metal lockers. Include plans, elevations, sections, details, and attachments to other work.

B. Shop Drawings: For metal lockers. Include plans, elevations, sections, details, and attachments to other work. SECTION 10 5113 - METAL LOCKERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

SECTION ALUMINUM WINDOWS

SECTION ALUMINUM WINDOWS SECTION 08520 ALUMINUM WINDOWS PART 1 - GENERAL 1.01 SUMMARY A. Section includes: 1. Storefront systems and aluminum framed glass doors. 2. Hardware, fasteners, accessories, filler pieces, etc., required

More information

Architectural Single-Hung Aluminum Window Series L701T SH-AW130 GUIDE SPECIFICATION

Architectural Single-Hung Aluminum Window Series L701T SH-AW130 GUIDE SPECIFICATION Architectural Single-Hung Aluminum Window Series L701T SH-AW130 GUIDE SPECIFICATION Section 08520 Aluminum Windows PART 1: WORK INCLUDED A. The conditions of the contract and applicable sections of Division

More information

MAINTENANCE MEZZANINE PROJECT NO CONTRACT NO

MAINTENANCE MEZZANINE PROJECT NO CONTRACT NO PORT OF TACOMA FILE: D:\OneDrive\Vector\Clients\04-Cardno\Maintenance Mezzanine\CAD\Sheet Files\MID 040.0 COVER_MEZZ PROJECT NO. 040.0 CONTRACT NO. 070735 PORT COMMISSIONERS: CONSTANCE T. BACON DON MEYER

More information

SECTION METAL FABRICATIONS

SECTION METAL FABRICATIONS SECTION 05500 - METAL FABRICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 29 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply

More information

Retain "Preinstallation Conference" Paragraph below if Work of this Section is extensive or complex enough to justify a conference.

Retain Preinstallation Conference Paragraph below if Work of this Section is extensive or complex enough to justify a conference. SECTION 05 40 00 - COLD-FORMED METAL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Page 1 of 5

Page 1 of 5 SPECIFICATIONS COMPOSITE MATERIAL PANEL SYSTEM ESTOLGA 1000 DRY SEAL SYSTEM PART 1 GENERAL 1.01 SECTION INCLUDES A. Exterior cladding consisting of formed metal composite material (MCM) sheet, secondary

More information

SECTION TURBINE VENTILATORS

SECTION TURBINE VENTILATORS SECTION 07 72 00 TURBINE VENTILATORS **This is a CSI Three-Part Specification using CSI MasterFormat 2004-2010 Section Numbers and Titles. This specification must be edited to suit your particular project.

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 DEFINITIONS

More information

Houston Community College 3200 Main Parking Garage November 15, 2010 Houston Community College

Houston Community College 3200 Main Parking Garage November 15, 2010 Houston Community College SECTION 323113 - CHAIN LINK FENCES AND GATES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes pipe and equipment supports, hangers, anchors, bases sleeves and the sealing of

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 23 0529 - MECHANICAL SUPPORTING DEVICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF WELDED SYSTEM PART 1 GENERAL 1.1 SECTION

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

PROJECT LOCATION SECTION COPPER METAL PLATE WALL PANELS

PROJECT LOCATION SECTION COPPER METAL PLATE WALL PANELS SECTION 07 4213.25 PART 1- GENERAL 1.01 SECTION INCLUDES A. Copper metal plate wall panels. 1.02 RELATED REQUIREMENTS A. Section 05 4000 Cold-Formed Metal Framing: Wall panel substrates support framing.

More information

SECTION METAL MATERIALS, METHODS AND FASTENING

SECTION METAL MATERIALS, METHODS AND FASTENING PART 1 - GENERAL 1.01 DESCRIPTION SECTION 05025 METAL MATERIALS, METHODS AND FASTENING Work Specified Herein and Elsewhere: A. This Section includes the basic materials and methods required for the work

More information

SECTION ALUMINUM STORM WINDOWS

SECTION ALUMINUM STORM WINDOWS PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 08 51 69.11 ALUMINUM STORM WINDOWS SPEC WRITER NOTES: 1. Delete between // // if not applicable to project. 2. Also delete any other item or paragraph not applicable

More information

GUIDE SPECIFICATION EXETER SECURITY SHIELD SECURITY WINDOW BARRIER SYSTEM

GUIDE SPECIFICATION EXETER SECURITY SHIELD SECURITY WINDOW BARRIER SYSTEM 1 GUIDE SPECIFICATION EXETER SECURITY SHIELD SECURITY WINDOW BARRIER SYSTEM 1.01 WORK INCLUDED PART 1: GENERAL A. Provide for all labor, equipment, materials and services to furnish and install SECURITY

More information

American Metal Specialties, Inc.

American Metal Specialties, Inc. American Metal Specialties, Inc. www.cablerailings.com (253) 272-9344 (253) 627-3843 Fax PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 05 73 00 STAINLESS STEEL ORNAMENTAL HANDRAILS AND RAILINGS For best

More information

Repair Maintenance Hangar Phase II August 2010

Repair Maintenance Hangar Phase II August 2010 SECTION 08800 GLASS AND GLAZING PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: 1. Monolithic glass. 2. Insulating glass. 3. Mirror glass. 4. Glazing accessories. B. Types of work in this section include

More information

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes pipe and equipment supports, hangers, anchors, bases sleeves and the sealing of work

More information

SECTION COPPER WALL PANELS. ***This section has been updated to IBC. Verify for specific project conditions.***

SECTION COPPER WALL PANELS. ***This section has been updated to IBC. Verify for specific project conditions.*** ***This section has been updated to IBC. Verify for specific project conditions.*** PART 1 GENERAL 1.1 SUMMARY ***Edit to project requirements*** A. Section Includes: 1. Clear copper and preweathered copper

More information

SECTION LIGHT DUTY SLIDING AND STACKING GLASS DOOR SYSTEMS

SECTION LIGHT DUTY SLIDING AND STACKING GLASS DOOR SYSTEMS Page 1 of 9 SECTION 10 2238.13 LIGHT DUTY SLIDING AND STACKING GLASS DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED FOLDING GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

SECTION HEAVY GLASS TOP HUNG SLIDING BI-FOLD DOOR SYSTEMS

SECTION HEAVY GLASS TOP HUNG SLIDING BI-FOLD DOOR SYSTEMS Page 1 of 6 SECTION 08 32 20 HEAVY GLASS TOP HUNG SLIDING BI-FOLD DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED BI-FOLD GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

SECTION ROLLER GATES

SECTION ROLLER GATES GENERAL SUMMARY A. The Contractor shall provide all labor, materials, equipment, and incidentals required to furnish and install roller gates, complete and operational with all necessary accessories as

More information

MODERNFOLD GWS 100SR-G MOVEABLE GLASS WALLS

MODERNFOLD GWS 100SR-G MOVEABLE GLASS WALLS MODERNFOLD GWS 100SR-G MOVEABLE GLASS WALLS Ideal for applications requiring space division, visibility and security Used in bank lobbies, offices, conference areas, interior storefronts and arena skyboxes

More information

Specifiers: Click on the icon in the WORD toolbar to reveal detailed instructions

Specifiers: Click on the icon in the WORD toolbar to reveal detailed instructions Specifiers: Click on the icon in the WORD toolbar to reveal detailed instructions (Specifier Note: The purpose of this guide specification is to assist the specifier in correctly specifying perforated

More information

TECHNICAL STANDARDS SECTION

TECHNICAL STANDARDS SECTION TECHNICAL STANDARDS SECTION 05 41 00 JULY, 2016 PAGE 1 OF 6 This document contains standards that are the minimum requirements for BCIT construction projects. The information in the document is organized

More information

SECTION ORNAMENTAL HANDRAILS AND RAILINGS

SECTION ORNAMENTAL HANDRAILS AND RAILINGS SECTION 05720 PART 1 - GENERAL ORNAMENTAL HANDRAILS AND RAILINGS 1.1 SUMMARY A. Section Includes: 1. Ornamental Handrails and Railings. 2. Glazed Panel Railings. 1.2 DEFINITIONS A. Guardrail: System of

More information

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) SECTION 13125 ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 08 1113 - HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information