1 Noise Technical Report 2015 Addendum NOISE TECHNICAL REPORT 2015 Addendum PREPARED FOR: Federal Highway Administration and Georgia Department of Transportation PREPARED BY: Parsons Brinckerhoff Project No. CSNHS (256) PI No The preparation of this document has been financed by the Georgia Department of Transportation through funding assistance provided by the Federal Highway Administration.

2 THIS PAGE INTENTIONALLY BLANK Noise Technical Report 2015 Addendum

3 Table of Contents Noise Technical Report 2015 Addendum 1. INTRODUCTION Project Description Project Changes Documented in Previous Studies Project Description Changes NOISE ABATEMENT CONCLUSIONS List of Figures Figure 1-1. Project Location Study Area... 3 Figure 3-1. Sound Barrier 2 Adjacent to I-575 Corridor Figure 3-2. Sound Barriers 3 and 9 Adjacent to I-575 Corridor Figure 3-3. Sound Barriers 4 and 5 Adjacent to I-575 Corridor Figure 3-4. Sound Barriers 4 and 5 Adjacent to I-575 Corridor (continued) Figure 3-5. Sound Barriers 6, 7 and 8 Adjacent to I-575 Corridor Figure 3-6. Sound Barriers 7 and 8 Adjacent to I-575 Corridor (continued) Figure 3-7. Sound Barrier 10 Adjacent to I-575 Corridor List of Tables Table 1-1. Summary of the I-575 Sound Barrier Redesign... 6 Table 2-1. Phase III versus Sound Barrier Acoustic Benefit Analysis Comparison List of Appendices APPENDIX A SOUND BARRIER ANALYSIS RESULTS APPENDIX B TNM PRINTOUTS Page i

4 Noise Technical Report 2015 Addendum THIS PAGE INTENTIONALLY BLANK Page ii

5 Noise Technical Report 2015 Addendum 1. INTRODUCTION The purpose of this report is to provide updated information for each sound barrier location based on the refined design and to optimize the reasonable heights of each noise wall based on these revised locations, while meeting the GDOT mitigation goals presently configured under the Northwest Express Roadbuilders (NWER) final sound barrier design. The project is a design, build, and finance (DBF) project and has been procured as a public-private partnership (P3). As part of the design-build process, the P3 Developer (Northwest Express Roadbuilders [NWER]) has refined the project design, resulting in adjustments to both the horizontal location and vertical heights of the previously recommended sound barriers. The Federal Highway Administration (FHWA) and Georgia Department of Transportation (GDOT) propose to make transportation improvements to Interstate 75 (I-75) and Interstate 575 (I-575) in the Atlanta metropolitan area. The improvements extend along the I-75 corridor from the Akers Mill Road overpass to just north of Hickory Grove Road and along I-575 from the I-75 interchange to Sixes Road. The roadway improvements are collectively referred to as the Northwest Corridor Project (NWCP) and are identified by GDOT Project No. CSNHS (256). In October 2011, the Northwest Corridor Project, Final Environmental Impact Statement (FEIS) (FHWA and GDOT, 2011) was published. In March 2013, a reevaluation of the noise analysis contained in the FEIS was conducted based on highway design refinements (Parsons Brinckerhoff, 2013). Following that reevaluation, a Record of Decision (ROD) was issued on May 23, Since the ROD, residents and property owners were given an opportunity to vote on construction of these recommended sound barriers. The final assessment of the cost and acoustic effectiveness of those sound barriers are incorporated into the Phase III Noise Technical Report. The purpose of this study is to reevaluate abatement requirements based on the refined noise barrier design changes within the I-575 project limits that have occurred since the completion of the Phase III study. 1.1 Project Description The FHWA and GDOT propose to make transportation improvements to I-75 and I-575 in the Atlanta metropolitan region with these improvements collectively referred to as the NWCP. As shown in Figure 1-1 the project area extends northwest along I-75 from Akers Mill Road to north of Hickory Grove Road in Cobb County; and extends along I-575 from the I-75/I-575 interchange in Cobb County to Sixes Road in Cherokee County. The project corridor lies northwest of downtown Atlanta. For the current report, the study area includes the noise barrier design changes within the I-575 project limits. The Northwest Corridor s I-75 is a primary route for commuters traveling within the region and traveling to and from downtown Atlanta. As a major north-south route through Georgia, I-75 also serves the transportation needs for regional travel and freight trucking. In Atlanta, I-75 merges with I-85 through the downtown area. North of the I-75/I-85 split in midtown Atlanta, I-75 turns to the northwest and intersects with the I-285 beltway around Atlanta. Between I-85 and I-285, I-75 consists of 10 lanes, with four general-purpose lanes and a high-occupancy-vehicle (HOV) lane in each direction. North of I-285, I-75 widens to as many as 15 lanes and then narrows to eight lanes and finally transitions to six lanes north of the I-575 interchange. The I-575 highway continues in a northeasterly direction into Cherokee County from the interchange with I-75 in Cobb County. The I-575 highway generally has four general-purpose lanes, two in each direction. Page 1

6 Noise Technical Report 2015 Addendum The GDOT Project CSNHS (256) proposes to make transportation improvements to I-75 and I-575. The proposed improvements include the addition of reversible managed lanes on both I-75 and I-575. The lanes will be managed by using a variable toll rate depending on traffic conditions. The lanes will be reversible; meaning the direction of travel will change during the day. During the morning peak commute period, the lanes will accommodate only southbound traffic leading towards downtown Atlanta. During the afternoon peak period, the directional flow of the traffic will be reversed to accommodate only northbound traffic leading towards suburban communities. From I-285 north to the I-75/I-575 interchange, two reversible managed lanes are proposed. For the I-75 corridor north of the I-575 interchange to the project terminus north of Hickory Grove Road, a single reversible managed lane is proposed. A single reversible managed lane is proposed on I-575 from the I-75 interchange to Sixes Road. Along I-575, the proposed improvements include the addition of one reversible managed lane, within the at-grade median between the I-75/I-575 interchange and Sixes Road. The managed lane on I-575 will include slip ramp accesses between the managed lane and the generalpurpose lanes. A slip ramp is a short connector allowing traffic to move from one roadway to another. In the southbound direction, slip ramp access points are proposed at the following locations: south of Sixes Road, south of Shallowford Road, and north of Barrett Parkway. In the northbound direction, the slip ramp access points are proposed at the following locations: north of Barrett Parkway, south of Shallowford Road, and south of Sixes Road. Page 2

7 Noise Technical Report 2015 Addendum Figure 1-1. Project Location Study Area Page 3

8 Noise Technical Report 2015 Addendum 1.2 Project Changes Documented in Previous Studies The purpose of this report is to document that adequate noise reduction is achieved in the same areas where noise impacts were previously estimated to occur as a result of the proposed roadway improvements as presented in earlier studies. Under the current GDOT policy, the acoustically effective sound barrier design goal is to achieve noise reduction of 5 dba or greater at all impacted receivers and a reduction of 7 dba at a minimum of one impacted receiver. Noise impacts were previously identified and the sound barrier abatement measures were initially recommended during the Northwest Corridor Project, Noise Technical Report 2013 Addendum (Parsons Brinckerhoff, 2013) study and subsequently refined during the Northwest Corridor Project, Noise Technical Report 2014 Addendum Phase I Areas (Parsons Brinckerhoff, 2014a) and Northwest Corridor Project, Noise Technical Report 2014 Addendum Phase II Areas (Parsons Brinckerhoff, 2014c) studies. The public outreach period for the proposed sound barriers started on June 3, 2014 and concluded on October 25, The official 30-day voting period ended on July 5, 2014; however, ballots were also counted if they were received after the initial 30-day period. In addition, a second outreach was completed in the communities behind several proposed sound barriers that received zero votes. Furthermore, upon completion of the Phase II Noise Technical Report during September 2014, several additional sound barrier locations were identified and added to account for land use changes. As a result, a third public outreach and voting period was undertaken starting on September 25, 2014 and concluding on November 17, A total of 10 sound barriers along the I-575 corridor were found to be both feasible and reasonable in the Phase II study and the impacted residences voted in favor of construction of nine of these barriers. Sound Barrier 1 was voted against by the affected property owner. Additionally refinements of the project design, which subsequently resulted in adjustments to both the horizontal location and vertical heights of the previously recommended sound barriers, along with adjustments to ground elevations derived from updated DTM data of the study area, were incorporated into the Northwest Corridor Project, Noise Technical Report 2015 Addendum Phase III (Parsons Brinckerhoff, 2015) study. A total of nine sound barriers along the I-575 corridor were evaluated for final design. Sound Barrier 1 was not part of the final sound barrier evaluation presented in the Phase III study. For the Phase III study, the sound barrier locations and noise abatement results precedes the current document. Page 4

9 Noise Technical Report 2015 Addendum 1.3 Project Description Changes The analysis includes the design changes as presently configured under the Northwest Express Roadbuilders (NWER) final highway and sound barrier design. The noise analysis has been prepared in accordance with the FHWA noise standards in 23 Code of Federal Regulations (CFR) 772 Procedures for Abatement of Highway Traffic and Construction Noise and the GDOT mitigation standards as outlined in the GDOT s Highway Noise Abatement Policy for Federal-Aid Projects (GDOT, 2011). Compliance with these noise regulations is mandatory for all proposed federal-aid highway projects. The noise analysis has been updated to reflect the refined design location of proposed sound barriers along the I-575 corridor. A reevaluation of the noise abatement analysis was completed in the proposed nine sound barriers along the I-575 corridor. The nine sound barriers along the I-575 corridor are identified as: I-575 Wall 2 I-575 Wall 3 I-575 Wall 4 I-575 Wall 5 I-575 Wall 6 I-575 Wall 7 I-575 Wall 8 I-575 Wall 9 I-575 Wall 10 The majority of sound barriers locations were redesigned due to updated and refined survey data, drainage concerns; avoiding existing and new overhead sign structure support, proposed ITS equipment, safety concerns, such as providing guardrail protection and sufficient guardrail deflection. Sound Barriers 2B, 3, and 7B proposed location of the barrier has minor changes from their Phase III proposed locations. A summary detailing the reason for the redesign of each sound barrier under the study is provided in Table 1-1. Page 5

10 Noise Technical Report 2015 Addendum Table 1-1. Summary of the I-575 Sound Barrier Redesign Sound Barrier Location Approx. Station Begin End Length (LF) Side of the Roadway Description of Sound Barrier Redesign 2A I-575 ML LT 2B I-575 ML LT 3 I-575 ML LT 3A I-575 ML LT The current location of Barrier 2A is at the edge of the roadway shoulder. It is recommended to shift the barrier because more detailed survey data has accurately identified the existing edge of shoulder. An offset from the shoulder is also needed for the guardrail shielding the barrier plus the required guardrail deflection space. In addition, more detailed design work has shown a need for a localized bump out for an existing overhead sign structural support. The current location of Barrier 2B is at the top of the slope along the right of way line. The proposed location of the barrier has not moved. Rather, the original barrier alignment depicted the back face of the barrier and provided the minimum GDOT offset of 5 feet to the right of way line; whereas the new barrier alignment depicts the front face of the barrier and is offset from the original alignment by one foot, the nominal width of the barrier system. The current location of Barrier 3 is at the top of the slope along the right of way line. The majority of the proposed location of the barrier has not moved. Rather, the original barrier alignment depicted the back face of the barrier and provided the minimum GDOT offset of 5 feet to the right of way line; whereas the new barrier alignment depicts the front face of the barrier and is offset from the original alignment by one foot, the nominal width of the barrier system. However, more detailed design work has shown the need to shift a short segment of the barrier 6 feet from the original alignment in order to accommodate drainage needs. In addition, it is recommended to extend Barrier 3 transversely to connect to Barrier 3A, located adjacent to the roadway shoulder. The current location of Barrier 3A is at the edge of the roadway shoulder. It is recommended to shift the barrier because more detailed survey data has accurately identified the existing edge of shoulder and barrier offset from the shoulder is needed to get the barrier out of the clear zone and eliminate the need for guardrail. In addition, more detailed design work has shown a need for a localized bump out for an existing ITS camera pole and proposed ITS equipment. Page 6

11 Noise Technical Report 2015 Addendum Sound Barrier Location Approx. Station Begin End Length (LF) Side of the Roadway Description of Sound Barrier Redesign 4A/4B/4C I-575 ML RT 4D I-575 ML RT 4E I-575 ML RT The current locations of Barriers 4A and 4C are at the edge of the roadway shoulder. It is recommended to shift the barriers because more detailed survey data has accurately identified the existing edge of shoulder and barrier offset from the shoulder is needed for the guardrail shielding the barrier, including the required guardrail deflection space. The magnitude of the shift is reduced at the Hawkins Store Road bridge because no deflection space is required for bridge rail. The current location of Barrier 4B is along the right of way line. It is recommended to shift Barrier 4B to the edge of I-575 shoulder because of drainage concerns. In addition, one localized bump out will be needed for ITS equipment. Runoff currently sheet flows directly off of GDOT property onto residential properties at this location. If placed near the ROW line, a sound barrier would block the sheet flow and result in concentrated flow discharging onto these properties, with potentially adverse impacts. A portion of Sound Barrier 4D was shifted to better accommodate drainage needs. The current location of Barrier 4D is at the top of the slope along the right of way line. The majority of the proposed location of the barrier has not moved. Rather, the original barrier alignment depicted the back face of the barrier and provided the minimum GDOT offset of 5 feet to the right of way line; whereas, the new barrier alignment depicts the front face of the barrier and is offset from the original alignment by one foot, the nominal width of the barrier system. However, more detailed design work has shown the need to shift 2 segments of barrier, with a total length of about 675 feet, an offset distance of 9 feet from the original alignment in order to accommodate drainage needs. The current location of Barrier 4E is at the edge of the roadway shoulder. It is recommended to shift the barrier because more detailed survey data has accurately identified the existing edge of shoulder. An offset from the shoulder is also needed for the guardrail shielding the barrier plus the required guardrail deflection space. In addition, more detailed design work has shown a need for a localized bump out for an existing ground mounted sign including about 195 feet of barrier adjustment for a sightline (to provide visibility of the sign). Page 7

12 Noise Technical Report 2015 Addendum Sound Barrier Location Approx. Station Begin End Length (LF) Side of the Roadway Description of Sound Barrier Redesign 5A/5B I-575 ML LT 6A I-575 ML LT 6B Entrance Ramp from Bells Ferry Road to I-575 SB LT 7A I-575 ML LT The current location of Barrier 5A/5B is located along the edge of the roadway shoulder. The recommendation to shift the barrier is because a more detailed survey data has accurately identified the existing edge of shoulder. An offset from the shoulder is also needed for the guardrail shielding the barrier plus the required guardrail deflection space. The magnitude of the shift is reduced at the Hawkins Store Road bridge because no deflection space is required for bridge rail. In addition, more detailed design work has shown a need for a localized bump out for ITS equipment. The current location of Barrier 6A is along the right of way. Except for several hundred feet at the north end, the original barrier alignment depicted the back face of the barrier and provided the minimum GDOT offset of 5 feet to the right of way line. Except for the north end, the barrier has not moved. Rather, the original barrier alignment depicted the back face of the barrier and provided the minimum GDOT offset of 5 feet to the right of way line; whereas the new barrier alignment depicts the front face of the barrier and is offset from the original alignment by one foot, the nominal width of the barrier system. The several hundred feet of sound barrier that is recommended to move at the north end will result in the entire length of barrier 6A being located along the right of way line with GDOT's minimum 5 feet of clearance. The current location of Barrier 6B is located along the edge of the roadway shoulder. The recommendation to shift the barrier is because a more detailed survey data has accurately identified the existing guardrail at the site. It is proposed that the new guardrail connect to the existing guardrail and that the required guardrail deflection space be provided. In addition, more detailed design work has shown a need for a localized bump out for the existing ramp meter signal equipment. The current location of Barrier 7A is at the edge of the roadway shoulder except for some deviation from the shoulder at the northern end, where detailed design work has indicated potential drainage issues. It is recommended to shift the barrier at its north end to alleviate the drainage concerns. The result is the entire barrier being located along the edge of the roadway shoulder except for one localized bump out that was added to accommodate a new overhead sign structure support and ITS equipment. Page 8

13 Noise Technical Report 2015 Addendum Sound Barrier Location Approx. Station Begin End Length (LF) Side of the Roadway Description of Sound Barrier Redesign 7B I-575 ML LT 8 Entrance Ramp from Chastain Road to I-575 NB / I-575 ML RT 9 I-575 ML RT Entrance Ramp from 10 Chastain Road to I-575 SB Source: NWER, LT The current location of Barrier 7B is at the top of the slope along the right of way line. The proposed location of the barrier has not moved. Rather, the original barrier alignment depicted the back face of the barrier and provided the minimum GDOT offset of 5 feet to the right of way line; whereas the new barrier alignment depicts the front face of the barrier and is offset from the original alignment by one foot, the nominal width of the barrier system. The current location of Barrier 8 is at the edge of the roadway shoulder. It is recommended to shift the barrier because more detailed survey data has accurately identified the existing edge of shoulder; and a barrier offset is needed for the guardrail shielding the barrier, including the required guardrail deflection space. In addition, more detailed design work has shown a need for four localized bump outs. The first bump out is for existing ramp meter signal equipment; the second bump out is for the existing ramp meter signal support; the third bump out is for the support for a proposed overhead sign; and the fourth bump out is for a ground mounted sign including about 240 feet of barrier adjustment for a sightline (to provide visibility of the sign). The current location of Barrier 9 is both at the edge of the roadway shoulder and along the right of way line. The portion of the barrier along the right of way line has not moved. Rather, the original barrier alignment depicted the back face of the barrier and provided the minimum GDOT offset of 5 feet to the right of way line; whereas the new barrier alignment depicts the front face of the barrier and is offset from the original alignment by one foot, the nominal width of the barrier system. It is recommended to shift the portion of the barrier that is along the edge of shoulder, a length of about 200 feet, because more detailed survey data has accurately identified the existing edge of existing shoulder. An offset from the shoulder is also needed for the guardrail shielding the barrier plus the required guardrail deflection space. The current location of Barrier 10 is at the edge of the roadway shoulder. It is recommended to shift the barrier because more detailed survey data has accurately identified the existing edge of shoulder. A barrier offset from the shoulder is also needed for the guardrail shielding the barrier, including the required guardrail deflection space. Page 9

14 Noise Technical Report 2015 Addendum 2. NOISE ABATEMENT This chapter presents a summary of the noise abatement analysis findings which incorporate the final sound barrier redesign and additional refinements outlined in Section 1.3. A comparison of the total number of benefited receptors behind each proposed sound barrier attained in the Phase III study versus those achieved in the present study is provided below in Table 2-1. The locations of the nine sound barriers are depicted in Figures 3-1 to 3-7. The noise analysis findings summarized below indicate that for Sound Barriers 6, 7 and 8 the square footage increased from what was required under the previous Phase III barrier design. In addition, the decrease in the overall square footage associated with Sound Barriers 2, 3, 4, 5, 9 and 10 does not compromise their overall acoustic effectiveness compared to the Phase III design. Furthermore, with the exception of Sound Barrier 3, the noise analysis findings indicate that the total number of benefiting receptors (impacted and non-impacted receivers) behind each of the sound barriers, under the design, would be equal to or greater than the number of benefits attained under the Phase III design. Lastly, each sound barrier provides benefit for all impacts that were previously benefited under the Phase III design. Table 2-1. Phase III versus Sound Barrier Acoustic Benefit Analysis Comparison Sound Barrier Sound Barrier Square Footage Number of Equivalent Benefited Receptors Phase III Phase III Does Barrier Benefit all Impacts Previously Benefited in Phase III? 2 16,087 15, Yes 3 32,716 32, Yes * 4 119, , Yes 5 42,458 42, Yes 6 21,485 21, Yes 7 25,846 26, Yes 8 32,218 32, Yes 9 8,768 8, Yes 10 26,048 26, Yes Source: Parsons Brinckerhoff, 2015 * Sound Barrier 3, receiver S192, a non-impacted receiver, representing two receptor sites was not benefitted under the design. Thus, resulting in two less benefitted receptors than what was reported under the Phase III design. Page 10

15 Noise Technical Report 2015 Addendum 3. CONCLUSIONS A reevaluation of the noise abatement analysis was completed to address final design changes in the proposed nine sound barriers along the I-575 corridor. The noise analysis findings indicate that all Phase III identified impacted receiver sites achieve a 5 dba or greater noise reduction under the sound barrier design. Additionally, all identified impacts achieve a 5 dba or greater noise reduction benefit. Furthermore, with the exception of Sound Barrier 3, the noise analysis findings indicate that the total number of benefiting receptors (impacted and nonimpacted receivers) behind each of the sound barriers, under the design, would be equal to or greater than the number of benefits attained under the Phase III design. A description and location of each of the redesigned sound barriers in greater detail is provided below: Proposed Sound Barrier 2, as shown in Figure 3-1, would be constructed and split into two sections identified as Sound Barrier segments 2A and 2B. Both segments are proposed to be located adjacent to the southbound lanes along I-575 between the Dupree Road overpass and State Route 92 overpass. Sound Barrier 2A will be constructed along a small berm just inside the highway right-of-way and Sound Barrier 2B will be constructed along the highway shoulder. The total length of Sound Barrier 2 is approximately 1,813 feet in length and ranges from 6 to 12 feet in height. Behind Sound Barrier 2 there are two impacted receiver sites representing a total of 26 equivalent receptors. Together, the combined Sound Barrier 2 design achieves noise reduction of 5 dba or greater at all impacted properties with a noise reduction of 7 dba or greater attained at one receiver identified as S21 representing 11 benefiting receptors. A summary of the noise reduction levels achieved at all evaluated sites behind Sound Barrier 2 is provided in Appendix A, Table A-1. Proposed Sound Barrier 3, as shown in Figure 3-2, will be located adjacent to the southbound lanes along I-575 just north of the Shallowford Road overpass and be composed of two connected barrier segments identified as SB 3 and SB 3A. The total combined length of the sound barrier begins along the shoulder and then transitions to just inside the highway right-of-way for the rest of the sound barrier. The proposed sound barrier will be approximately 2,917 feet in length and ranges from 6 feet to 24 feet in height. Behind Sound Barrier 3 there are four impacted receiver sites representing 14 equivalent receptors. Sound Barrier 3 achieves noise reduction of 5 dba at all impacted properties with a noise reduction level of 7 dba attained at receiver M30 for a total of 14 benefiting receptors. Receiver S192, a non-impacted receiver, achieved a noise reduction of 4.9 dba and therefore was not benefitted under the design, thus resulting in two less benefits than what was previously reported under the Phase III design. A summary of the noise reduction levels achieved at all evaluated sites behind Sound Barrier 3 is provided in Appendix A, Table A-2. Proposed Sound Barrier 4, as shown in Figures 3-3 and 3-4, consists of five separate barrier segments identified as 4A, 4B, 4C, 4D and 4E. The sound barrier segments will be located adjacent to the northbound lanes along I-575 between the Bells Ferry Road onramp and Shallowford Road. Segment 4B was proposed near the right-of-way line in Phase III, but is proposed to be located on the I-575 northbound shoulder in. Segment 4D would remain proposed near the right-of-way line. The total length of Sound Barrier 4 is approximately 7,419 feet in length and ranges from 6 to 22 feet in height. Noise reduction of 5 dba or greater is achieved at all 11 impacted receivers representing 42 equivalent receptors. A noise reduction level of 7 dba or greater was attained at 18 receiver locations: M28, S130, S131, S132, S133, S134, S135, S136, S138, S139, S140, S143, S145, S146, S147, S148, S171 and S172 representing 58 benefiting receptors. Seven out of the 18 receiver locations achieving a 7 dba or greater noise Page 11

16 Noise Technical Report 2015 Addendum reduction were identified as impacted receiver sites: S130, S135, S138, S140, S145, S171 and S172. An additional 20 non-impacted receivers representing 55 equivalent receptors will also benefit with a 5 dba or greater noise reduction. Receivers M29 and S177 were impacts under the Phase III but are not identified as impacts under the design. A summary of the noise reduction levels achieved at all evaluated sites behind Sound Barrier 4 is provided in Appendix A, Table A-3. Proposed Sound Barrier 5, as shown in Figure 3-3, will be located adjacent to the southbound lanes along I-575 between the Shallowford Road overpass and the Bells Ferry Road off-ramp. The proposed sound barrier will be constructed along the highway shoulder. The sound barrier will be approximately 3,519 feet in length and range from 10 to 14 feet in height. Behind Sound Barrier 5 there are nine impacted receivers representing 21 equivalent benefiting receptors with an additional seven non-impacted receptors also achieving benefit. The proposed Sound Barrier 5 achieves noise reduction of 5 dba at all impacted properties with a noise reduction level of 7 dba or greater attained at four receiver locations: M41, S156, S157 and S158, representing eight benefiting receptors. A summary of the noise reduction levels achieved at all evaluated sites behind Sound Barrier 5 is provided in Appendix A, Table A-4. Proposed Sound Barrier 6, as shown in Figure 3-5, consists of two separate barrier segments identified as 6A and 6B. The sound barrier segments will be located adjacent to the southbound lanes along I-575 between the Bells Ferry Road on-ramp and the North Booth Road overpass. Sound Barrier 6B will be constructed along the proposed highway shoulder of the Bells Ferry Road on-ramp, and Sound Barrier 6A will be constructed along a small berm just inside the highway right-of-way. The total length of Sound Barrier 6 is approximately 2,659 feet in length and ranges from 6 to 14 feet in height. Behind Sound Barrier 6 there are two impacted receivers representing 11 equivalent benefiting receptors. The proposed Sound Barrier 6 design achieves noise reduction levels of 5 dba or greater at all impacted properties with a noise reduction level of 7 dba or greater attained at receiver S250, representing six benefiting receptors. A summary of the noise reduction levels achieved at all evaluated sites behind Sound Barrier 6 is provided in Appendix A, Table A-5. Proposed Sound Barrier 7, as shown in Figures 3-5 and 3-6, consists of two separate barrier segments identified as 7A and 7B. The sound barrier segments will be located adjacent to southbound lanes between the North Booth Road overpass and the Chastain Road off-ramp. Sound Barrier 7B will be constructed along a small berm just inside the highway right-of-way and Sound Barrier 7A will be constructed along the shoulder and then transitions to just inside the highway right-of-way along the off-ramp. The total length of Sound Barrier 7 is approximately 2,787 feet in length and ranges from 6 to 20 feet in height. There are two impacted receiver sites (S230 and M26) representing a total of seven equivalent receptors. The Sound Barrier 7 design achieves a noise reduction of 7 dba or greater at both impacted receivers. A summary of the noise reduction levels achieved at all evaluated sites behind Sound Barrier 7 is provided in Appendix A, Table A-6. Proposed Sound Barrier 8, as shown in Figures 3-5 and 3-6, will be located adjacent to the northbound lanes along I-575 between the Chastain Road on-ramp and the North Booth Road overpass. The proposed barrier will be constructed along the highway shoulder along the on-ramp and the highway shoulder. Sound Barrier 8 will be approximately 3,785 feet in length and range from 6 to 14 feet in height. There are three impacted receiver sites representing 18 equivalent benefiting receptors. The Sound Barrier 8 design achieves a noise reduction of 5 dba or greater at all impacted properties with a Page 12

17 Noise Technical Report 2015 Addendum maximum noise reduction of 8.3 dba achieved at the Chalker Elementary School (M35) representing 14 benefiting receptors. A summary of the noise reduction levels achieved at all evaluated sites behind Sound Barrier 8 is provided in Appendix A, Table A-7. Proposed Sound Barrier 9, as shown in Figure 3-2, will be located adjacent to the northbound lanes along I-575 just north of the Shallowford Road overpass. The beginning of the proposed barrier will be constructed just inside the highway right-of-way and then transition to the build design shoulder for the remainder of the proposed barrier. Sound Barrier 9 will be approximately 872 feet in length and range from 6 to 12 feet in height. There is one impacted receiver site, S206, behind proposed Sound Barrier 9 representing a total of four receptors. The proposed Sound Barrier 9 design achieves a noise reduction of 7.5 dba at the impacted property. A summary of the noise reduction levels achieved at all evaluated sites behind Sound Barrier 9 is provided in Appendix A, Table A-8. Proposed Sound Barrier 10, as shown in Figure 3-7, will be located adjacent to the southbound lanes between the Chastain Road on-ramp and the Big Shanty Road underpass. Sound Barrier 10 will be constructed along the highway shoulder of the southbound on-ramp at Chastain Road at Chastain Road transitioning to the mainline shoulder for the remainder of the sound barrier. Sound Barrier 10 will be approximately 1,533 feet in length and range from 12 to 20 feet in height. There are five impacted receivers representing 57 receptors behind Sound Barrier 10. The sound barrier design achieves a noise reduction of 5 dba or greater at all 57 impacted receptor sites with an additional benefit achieved at one non-impacted receiver representing one receptor for a total of 58 benefiting receptors. One impacted receiver site, KSU-1, representing thirty receptors, receives a noise reduction level of 7 dba or greater. A summary of the noise reduction levels achieved at all evaluated sites behind Sound Barrier 10 is provided in Appendix A, Table A-9. Page 13

18 THIS PAGE INTENTIONALLY BLANK Noise Technical Report 2015 Addendum

19 Noise Technical Report 2015 Addendum Figure 3-1. Sound Barrier 2 Adjacent to I-575 Corridor Page 14

20 THIS PAGE INTENTIONALLY BLANK

21 Noise Technical Report 2015 Addendum Figure 3-2. Sound Barriers 3 and 9 Adjacent to I-575 Corridor Page 15

22 THIS PAGE INTENTIONALLY BLANK

23 Noise Technical Report 2015 Addendum Figure 3-3. Sound Barriers 4 and 5 Adjacent to I-575 Corridor Page 16

24 THIS PAGE INTENTIONALLY BLANK

25 Noise Technical Report 2015 Addendum Figure 3-4. Sound Barriers 4 and 5 Adjacent to I-575 Corridor (continued) Page 17

26 THIS PAGE INTENTIONALLY BLANK

27 Noise Technical Report 2015 Addendum Figure 3-5. Sound Barriers 6, 7 and 8 Adjacent to I-575 Corridor Page 18

28 THIS PAGE INTENTIONALLY BLANK

29 Noise Technical Report 2015 Addendum Figure 3-6. Sound Barriers 7 and 8 Adjacent to I-575 Corridor (continued) Page 19

30 THIS PAGE INTENTIONALLY BLANK

31 Noise Technical Report 2015 Addendum Figure 3-7. Sound Barrier 10 Adjacent to I-575 Corridor Page 20

32 THIS PAGE INTENTIONALLY BLANK

33 Noise Technical Report 2015 Addendum NWCP APPENDIX A SOUND BARRIER ANALYSIS RESULTS

34 Noise Technical Report 2015 Addendum THIS PAGE INTENTIONALLY BLANK

35 Table A-1. Sound Barrier 2. I-575 NWER Build Noise Technical Report 2015 Addendum Page A-1

36 Table A-2. Sound Barrier 3. I-575 NWER Build Noise Technical Report 2015 Addendum Page A-2

37 Noise Technical Report 2015 Addendum Table A-3. Sound Barrier 4. I-575 NWER Build Page A-3

38 Noise Technical Report 2015 Addendum Table A-3. Sound Barrier 4. I-575 NWER Build (continued) Page A-4

39 Table A-4. Sound Barrier 5. I-575 NWER Build Noise Technical Report 2015 Addendum Page A-5

40 Table A-5. Sound Barrier 6. I-575 NWER Build Noise Technical Report 2015 Addendum Page A-6

41 Table A-6. Sound Barrier 7. I-575 NWER Build Noise Technical Report 2015 Addendum Page A-7

42 Noise Technical Report 2015 Addendum Table A-7. Sound Barrier 8. I-575 NWER Build Page A-8

43 Table A-8. Sound Barrier 9. I-575 NWER Build Noise Technical Report 2015 Addendum Page A-9

44 Table A-9. Sound Barrier 10. I-575 NWER Build Noise Technical Report 2015 Addendum Page A-10

45 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts NWCP APPENDIX B TNM PRINTOUTS

46 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts THIS PAGE INTENTIONALLY BLANK

47 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts I-575 BUILD WITH BARRIER SCENARIO SOUND BARRIERS 2, 3, 4, 5, 6, 7, 8, 9, AND 10

48 THIS PAGE INTENTIONALLY BLANK Noise Technical Report 2015 Addendum

49 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-1

50 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-2

51 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-3

52 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-4

53 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-5

54 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-6

55 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-7

56 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-8

57 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-9

58 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-10

59 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-11

60 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-12

61 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-13

62 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-14

63 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts I-575 BUILD (WITHOUT ABATEMENT) SCENARIOS

64 THIS PAGE INTENTIONALLY BLANK Noise Technical Report 2015 Addendum

65 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-15

66 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-16

67 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-17

68 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-18

69 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-19

70 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-20

71 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-21

72 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-22

73 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-23

74 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-24

75 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-25

76 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-26

77 Noise Technical Report 2015 Addendum, Appendix B TNM Printouts Page B-27

78 Noise Technical Report 2015 Addendum THIS PAGE INTENTIONALLY BLANK

A comparison of the Northwest Corridor (NWC) Project Noise Analysis Completed under the 2005 GDOT Noise Policy versus the 2011 FHWA Noise Policy

A comparison of the Northwest Corridor (NWC) Project Noise Analysis Completed under the 2005 GDOT Noise Policy versus the 2011 FHWA Noise Policy A comparison of the Northwest Corridor (NWC) Project Noise Analysis Completed under the 2005 GDOT Noise Policy versus the 2011 FHWA Noise Policy Presented by Keisha Jackson, Georgia Department of Transportation

More information

A. INTRODUCTION B. NOISE ANALYSIS METHODOLOGY

A. INTRODUCTION B. NOISE ANALYSIS METHODOLOGY Chapter 8: and Vibration A. INTRODUCTION This chapter assesses the potential noise impacts resulting from operation of the proposed Wyandanch Intermodal Transit Facility by comparing existing noise levels

More information

Appendix F: Noise Report

Appendix F: Noise Report Appendix F: Noise Report HIGHWAY 404 HIGHWAY 407 TO GREEN LANE (W.O. 03-20024) REGIONAL MUNICIPALITY OF YORK NOISE REPORT Preliminary Design and Class Environmental Assessment Study Class Environmental

More information

I 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT

I 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT I 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT February 2016 INTERSTATE 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION PROJECT Commonwealth of Virginia Virginia

More information

Existing vs. Proposed Ramp Noise Sensitivity Analysis Austin Boulevard Interchange

Existing vs. Proposed Ramp Noise Sensitivity Analysis Austin Boulevard Interchange I-290 Phase I Study West of US 45 (Mannheim Road) to Racine Avenue Existing vs. Proposed Ramp Noise Sensitivity Analysis Austin Boulevard Interchange Technical Memorandum Prepared By: Huff & Huff, Inc.

More information

NOISE REPORT ADDENDUM July 2003

NOISE REPORT ADDENDUM July 2003 Coalfields Expressway Section A Buchanan County, Virginia NOISE REPORT ADDENDUM July 2003 Current VDOT Project Number: 0121-013-101, PE101 Former VDOT Project Number: R000-961-101, PE101 Noise Study Addendum

More information

Appendix F. Traffic Noise Analysis and Traffic Noise Analysis Attachments A-C

Appendix F. Traffic Noise Analysis and Traffic Noise Analysis Attachments A-C Appendix F Traffic Noise Analysis and Traffic Noise Analysis Attachments A-C This page left blank intentionally. Traffic Noise Analysis Summary Traffic Noise Analysis Summary The Highway 100 Reconstruction

More information

DRAFT. Draft Carbon Monoxide (CO) Traffic Air Quality Analysis

DRAFT. Draft Carbon Monoxide (CO) Traffic Air Quality Analysis Draft Carbon Monoxide (CO) Traffic Air Quality Analysis North Houston Highway Improvement Project From US 59/I-69 at Spur 527 To I-45 at Beltway 8 North Harris County TxDOT Houston District CSJ: 0912-00-146

More information

Final Air Quality Report

Final Air Quality Report Florida Department of Transportation - District VII County Line Road (C.R. 578) Project Development and Environment Study From U.S. 19 (S.R. 55) to U.S. 41 (S.R. 45) Work Program Item Segment Number: 257298

More information

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 WELCOME IL 47 Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 MEETING PURPOSE MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Process/Schedule

More information

Alternatives Evaluation Report. Appendix C. Alternatives Evaluation Report

Alternatives Evaluation Report. Appendix C. Alternatives Evaluation Report s Evaluation Report Appendix C s Evaluation Report I-35W North Corridor Project EA Minnesota Department of Transportation Final Project s Report I-35W North Corridor Preliminary Design Project Report Version

More information

Noise Abatement Decision Report. Addendum. Supplemented by the August 2015 Noise Study Report Addendum

Noise Abatement Decision Report. Addendum. Supplemented by the August 2015 Noise Study Report Addendum Interstate 10 Corridor Project Draft NADR Addendum Noise Abatement Decision Report Addendum Supplemented by the August 2015 Noise Study Report Addendum San Bernardino and Los Angeles Counties 07-LA-10

More information

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0 SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605/SR-60 EA# 3101U0 October 9, 2017 Contents 1 Purpose of ICE Memo... 1 2 Background... 1 3 Existing Interchange Deficiencies... 1 4 Context Sensitive

More information

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS SECTION PAGE NO. SECTION TITLE NO. EXECUTIVE SUMMARY -------------------------------------------------------------------- ES-1 1.0 INTRODUCTION

More information

FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS

FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS Prepared for: City and County of Denver 201 West Colfax Avenue, Department 509 Denver,

More information

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018 What is the Carolina Crossroads Project? The South Carolina Department of Transportation (SCDOT), in cooperation with the Federal Highway Administration (FHWA), is proposing to upgrade and redesign a key

More information

MEMORANDUM: INITIAL CONCEPTS SUMMARY

MEMORANDUM: INITIAL CONCEPTS SUMMARY MEMORANDUM: INITIAL CONCEPTS SUMMARY INTRODUCTION This memo presents a summary of initial concepts that have been identified as development of the project study has progressed, along with a recommendations

More information

Conceptual Design Report

Conceptual Design Report Conceptual Design Report I-244/Arkansas River Multimodal Bridge Tulsa, Oklahoma Prepared for the Oklahoma Department of Transportation Prepared by: August 2009 I-244 / ARKANSAS RIVER MULTIMODAL BRIDGE

More information

Appendix E I-73 North Noise Report

Appendix E I-73 North Noise Report Appendix E I-73 North Noise Report NOISE IMPACT ASSESSMENT I-73 North Section: From Future I-74 in Richmond County, NC to I-95 in Dillon County, SC (Conceptual Design) SCDOT PIN No.: 36358 RD01 NCDOT TIP

More information

APPENDIX E EAW ITEM 17 NOISE

APPENDIX E EAW ITEM 17 NOISE APPENDIX E EAW ITEM 17 NOISE TH 10 TRAFFIC NOISE STUDY TH 10 (SB I-35W TO CSAH 96) SP 6205-39 ARDEN HILLS, MINNESOTA Prepared for Minnesota Department of Transportation October 2017 Minnesota Department

More information

Active Traffic Management in Michigan. Patrick Johnson, P.E. HNTB Michigan Inc.

Active Traffic Management in Michigan. Patrick Johnson, P.E. HNTB Michigan Inc. Active Traffic Management in Michigan Patrick Johnson, P.E. HNTB Michigan Inc. Active Traffic Management (ATM) Active Traffic Management Strategies: Dynamic Lane Use Dynamic Shoulder Use Queue Warning

More information

APPENDIX D NOISE QUALITY ANALYSIS, PROCEDURES AND RESULTS

APPENDIX D NOISE QUALITY ANALYSIS, PROCEDURES AND RESULTS APPENDIX D NOISE QUALITY ANALYSIS, PROCEDURES AND RESULTS Overview Ambient noise measurements were taken at 24 sites along the proposed project alignment alternatives. These sites were located to represent

More information

WOO-SR Feasibility Study (PID 90541) Feasibility Study Report April 22, 2011

WOO-SR Feasibility Study (PID 90541) Feasibility Study Report April 22, 2011 TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 CHAPTER 1: INTRODUCTION... 5 1.1 Study Purpose and background... 5 1.2 Study Approach... 6 1.3 Study Area... 6 CHAPTER 2: DESCRIPTIONS OF ALTERNATIVES... 7 2.1

More information

STATE OF NEVADA DEPARTMENT OF TRANSPORTATION TRAFFIC AND CONSTRUCTION NOISE ANALYSIS AND ABATEMENT POLICY

STATE OF NEVADA DEPARTMENT OF TRANSPORTATION TRAFFIC AND CONSTRUCTION NOISE ANALYSIS AND ABATEMENT POLICY STATE OF NEVADA DEPARTMENT OF TRANSPORTATION TRAFFIC AND CONSTRUCTION NOISE ANALYSIS AND ABATEMENT POLICY Effective July 13, 2011 Last Revised December 1, 2017 INTRODUCTION This document presents the State

More information

TRANSPORTATION PROJECT REPORT DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002

TRANSPORTATION PROJECT REPORT DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002 TRANSPORTATION INTERSTATE 87 INTERCHANGE 11A TOWN OF MALTA SARATOGA COUNTY, NY DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002 PROJECT REPORT NEW YORK STATE DEPARTMENT OF TRANSPORTATION JOSEPH

More information

9.0 I-26 & I-526 Interchange Improvements

9.0 I-26 & I-526 Interchange Improvements 9.0 I-26 & I-526 Interchange Improvements The I-26 & I-526 System-to-System interchange currently consists of a combination of directional and loop ramps providing for all movements from one Interstate

More information

Traffic Noise Introduction to Traffic Noise Analysis and Abatement

Traffic Noise Introduction to Traffic Noise Analysis and Abatement Traffic Noise Introduction to Traffic Noise Analysis and Abatement NW Bethany Blvd Improvement Project Michael Minor, President Michael Minor & Associates Inc. Introduction to Acoustics What is Noise?

More information

Douglas Woods Wind Farm

Douglas Woods Wind Farm Traffic Evaluation and Access Management Report Douglas Woods Wind Farm Douglas,Massachusets Prepared for American Pro Wind 195 Libbey Parkway - Unit Two Weymouth, MA 02189 Prepared by Transportation,

More information

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 INTERCHANGE MODIFICATION REPORT FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 PREPARED BY: VIRGINIA DEPARTMENT OF TRANSPORTATION STAUNTON DISTRICT DECEMBER 13, 2006

More information

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES 4.0 INTRODUCTION The ability to accommodate high volumes of intersecting traffic safely and efficiently through the arrangement of one or more interconnecting

More information

DECISION REGARDING NEED FOR ENVIRONMENTAL IMPACT STATEMENT

DECISION REGARDING NEED FOR ENVIRONMENTAL IMPACT STATEMENT IV. DECISION REGARDING NEED FOR ENVIRONMENTAL IMPACT STATEMENT A. Type, Extent, and Reversibility of Impacts Traffic Noise Analysis Traffic Noise Analysis Summary Construction of the Interstate 123 (I-123)

More information

Puget Sound Gateway Program Phase 1 of the SR 509 Completion Project

Puget Sound Gateway Program Phase 1 of the SR 509 Completion Project Puget Sound Gateway Program Phase 1 of the SR 509 Completion Project 23 CFR 771.129 Washington State Department of Transportation/Federal Highway Administration REGION/MODE SR PROJECT PROGRAM# FEDERAL

More information

LOCATION HYDRAULIC REPORT

LOCATION HYDRAULIC REPORT Draft LOCATION HYDRAULIC REPORT Florida Department of Transportation District One US 41 at Fruitville Road (CR 780) Intersection Improvements - PD&E STUDY Sarasota County, Florida Financial Project ID

More information

Attachment E2 Noise Technical Memorandum SR 520

Attachment E2 Noise Technical Memorandum SR 520 Attachment E2 Noise Technical Memorandum SR 520 Prepared for: Prepared by: Jodi Ketelsen Michael A. Minor Date: November 4, 2012 Subject: Project: Noise Modeling Results: NE 51st Street to NE 65th Street

More information

12 Evaluation of Alternatives

12 Evaluation of Alternatives 12 Evaluation of Alternatives This chapter evaluates the effectiveness of the No-Build Alternative and the proposed METRO Blue Line Light Rail Transit (BLRT) Extension project based on the information

More information

Traffic Noise Analysis

Traffic Noise Analysis Traffic Noise Analysis For Interstate 10: Las Cruces to Texas State Line AC-GRIP-010-2(108)144; CN G18A1 Submitted to: Taschek Environmental Consulting and New Mexico Department of Transportation Prepared

More information

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction Chapter 1 Bridge Design Manual General Design Information Section 1.02 Selection and Geometry Introduction Selection or Rehabilitation Report This section of the design manual provides guidance on the

More information

Dulles Toll Road Highway Traffic Noise Policy. February 2, 2011

Dulles Toll Road Highway Traffic Noise Policy. February 2, 2011 Dulles Toll Road Highway Traffic Noise Policy February 2, 2011 as revised February 1, 2012 Table of Contents 1. Purpose... 1 2. Definitions... 1 3. Applicability... 5 4. Sound Fundamentals... 6 5. Highway

More information

Oklahoma Department of Transportation Environmental Programs Division Office Fax

Oklahoma Department of Transportation Environmental Programs Division Office Fax Oklahoma Department of Transportation Environmental Programs Division Office 521-3050 Fax 522-5193 Documented Categorical Exclusion (DCE) for I-40: Pavement Reconstruction and Added Lanes from the Douglas

More information

Exit 73 I-29 Interchange Modification Justification Study

Exit 73 I-29 Interchange Modification Justification Study xit 73 I-29 Interchange Modification Justification tudy Introduction Figure 1 shows the location of xit 73. This interchange is proposed to be the connecting point of the ast and West Corridors to I-29.

More information

Why does MnDOT build noise barriers? What is a Type I project?

Why does MnDOT build noise barriers? What is a Type I project? Why does MnDOT build noise barriers? Noise barriers generally prove to be quite effective in providing noise reduction at receptors near transportation facilities. In 1972, the U.S. Congress passed legislation

More information

FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION

FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION AUGUST 2015 Table of Contents 1 Decision... 1 1.1 Project Description... 2 1.2 Basis for the FHWA Decision... 7 1.2.1

More information

I-10 CORRIDOR IMPROVEMENTS STAGE 0 FEASIBILITY STUDY STATE PROJECT NUMBER H FEDERAL AID PROJECT NUMBER H004100

I-10 CORRIDOR IMPROVEMENTS STAGE 0 FEASIBILITY STUDY STATE PROJECT NUMBER H FEDERAL AID PROJECT NUMBER H004100 JULY 2016 I-10 CORRIDOR IMPROVEMENTS STAGE 0 FEASIBILITY STUDY STATE PROJECT NUMBER H.004100 FEDERAL AID PROJECT NUMBER H004100 EAST BATON ROUGE AND WEST BATON ROUGE PARISHES, LOUISIANA Section TABLE OF

More information

Transportation Problems and Issues Excerpts from WWW Links

Transportation Problems and Issues Excerpts from WWW Links Transportation Problems and Issues Excerpts from WWW Links Reference Bok, D. (2018). Transportation policy and planning. https://www.hks.harvard.edu/courses/transportation-policy-and-planning Transportation

More information

Environmental Consequences and Mitigation

Environmental Consequences and Mitigation Chapter 4 Environmental Consequences and Mitigation 4.1 Introduction This chapter provides a detailed description of the impacts (and indirect impacts where applicable) associated with the alternatives

More information

HIGHWAY 412 EXECUTIVEXECUTIVE SUMMARYUMMARY FINAL ENVIRONMENTAL IMPACT STATEMENT. Benton and Washington Counties. October 2005

HIGHWAY 412 EXECUTIVEXECUTIVE SUMMARYUMMARY FINAL ENVIRONMENTAL IMPACT STATEMENT. Benton and Washington Counties. October 2005 EXECUTIVEXECUTIVE SUMMARYUMMARY FINAL ENVIRONMENTAL IMPACT STATEMENT SPRINGDALE NORTHERN BYPASS HIGHWAY 412 Benton and Washington Counties October 2005 Federal Highway Administration Arkansas State Highway

More information

Alternatives Evaluation Methodology

Alternatives Evaluation Methodology Alternatives Evaluation Methodology www.vision54 56.com B 1 Phase 2 Alternatives Evaluation Methodology PASCO COUNTY METROPOLITAN PLANNING ORGANIZATION 8731 Citizens Drive New Port Richey, FL 34654 Ph

More information

500 Interchange Design

500 Interchange Design 500 Interchange Design Table of Contents 501 Interchange Design... 5-1 July 2015 501.1 General... 5-1 501.2 Interchange Type... 5-1 501.2.1 General... 5-1 502 Interchange Design Considerations... 5-2 502.1

More information

Air Quality Analysis Technical Memorandum

Air Quality Analysis Technical Memorandum Air Quality Analysis Technical Memorandum Segment 2: State Road 400 (SR 400) / Interstate 4 (I-4) from West of SR 528 (Beachline Expressway) to West of SR 435 (Kirkman Road) Orange County (75280), Florida

More information

5.0 PRELIMINARY ENVIRONMENTAL REVIEW

5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.0 PRELIMINARY ENVIRONMENTAL REVIEW 5.1 INTRODUCTION A preliminary environmental review was performed on the proposed freeway improvements that form Concept C, which encompasses the three freeway corridors

More information

Final Air Quality Report

Final Air Quality Report Florida Department of TRANSPORTATION Final Air Quality Report PD&E Study From East of Babcock Street (SR 507) to US 1 Brevard County, Florida Financial Project ID: 430136-1-22-01 ETDM Project Number: 13026

More information

Sunrise Project South I-205 Corridor Improvement Project

Sunrise Project South I-205 Corridor Improvement Project Sunrise Project South I-205 Corridor Improvement Project January 24, 2007 Sunrise and I-205 Project Summary Conclusions Sunrise Scoping Study Key Results South I-205 Scoping Study Key Results South I-205

More information

Why does MnDOT build noise barriers? What is a Type I project? What is an impacted location?

Why does MnDOT build noise barriers? What is a Type I project? What is an impacted location? Why does MnDOT build noise barriers? Noise barriers generally prove to be quite effective in providing noise reduction at receptors near transportation facilities. In 1972, the U.S. Congress passed legislation

More information

MEMORANDUM. Date: July 14, 2006 Project #: To: US 97 & US 20 Refinement Plan Steering Committee

MEMORANDUM. Date: July 14, 2006 Project #: To: US 97 & US 20 Refinement Plan Steering Committee MEMORANDUM Date: July 14, 2006 Project #: 6389 To: US 97 & US 20 Refinement Plan Steering Committee From: Sonia Hennum, P.E., Andrew Cibor, E.I.T., & Julia Kuhn, P.E. Project: US 97 & US 20 Refinement

More information

.Related Plans and Efforts

.Related Plans and Efforts 6.0 RELATED PLANS AND EFFORTS GA 400 CORRIDOR ALTERNATIVES ANALYSIS 6.Related Plans and Efforts Several previous planning studies are relevant to this GA 400 Corridor AA and the development of the GA 400

More information

FINDINGS OF FACT and CONCLUSIONS

FINDINGS OF FACT and CONCLUSIONS FINDINGS OF FACT and CONCLUSIONS I-694/ I-494/ I-94 Interchange Improvements State Project No. 8286-81 Prepared by: Minnesota Department of Transportation July, 2018 CONTENTS STATEMENT OF ISSUE... 2 ADMINISTRATIVE

More information

TRAFFIC NOISE Noise and Policy. Date. Date. Footer Text

TRAFFIC NOISE Noise and Policy. Date. Date. Footer Text TRAFFIC NOISE 2016 Noise and Policy O Sound/Noise Noise Analyses V E R V I E W Highway Traffic Sound Source < Propagation Medium > Receiver Decibel A-weighting Equivalent Level PRESSURE micro Pascals LEVEL

More information

POLICY FOR CONSTRUCTION OF NOISE BARRIERS IN RESIDENTIAL AREAS

POLICY FOR CONSTRUCTION OF NOISE BARRIERS IN RESIDENTIAL AREAS POLICY FOR CONSTRUCTION OF NOISE BARRIERS IN RESIDENTIAL AREAS I. Introduction Effective Date: October 31, 2006 The New Jersey Turnpike Authority (the Authority ) has reviewed and reexamined its current

More information

vi Figures viii Summary S.1

vi Figures viii Summary S.1 Contents Contents iii Tables vi Figures viii Summary S.1 Chapter 1: Purpose and Need Project History A.1 Project Description A.2 Project Purpose A.5 Transportation Need A.6 Highway Capacity and Congestion

More information

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects SEPTEMBER 1989 Arkansas State Highway and Transportation Department GEOMETRIC DESIGN CRITERIA for Non-freeway

More information

Railway noise mitigation factsheet 05: Cuttings and earth berms

Railway noise mitigation factsheet 05: Cuttings and earth berms Railway noise mitigation factsheet 05: Cuttings and earth berms 1.1 Overview In certain locations, the best option for the mitigation of railway noise may be to place the railway line low relative to the

More information

APPENDIX C NOISE STUDY TECHNICAL REPORT

APPENDIX C NOISE STUDY TECHNICAL REPORT APPENDIX C NOISE STUDY TECHNICAL REPORT Noise Study Technical Report Watertown South Connector US 81 to 29 th Street SE Watertown, South Dakota HDR Project No. 39319 Prepared by 6300 So. Old Village Place

More information

Proceedings of Meetings on Acoustics

Proceedings of Meetings on Acoustics Proceedings of Meetings on Acoustics Volume 19, 2013 http://acousticalsociety.org/ ICA 2013 Montreal Montreal, Canada 2-7 June 2013 Engineering Acoustics Session 5aEA: Sound Emission from Vehicle and Rotating

More information

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance APPENDICES Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance D.1 Functional classification identifies the role a highway or street plays in the transportation

More information

Appendix D. EAW Item 17: Noise. Traffic Noise Analysis Report

Appendix D. EAW Item 17: Noise. Traffic Noise Analysis Report Appendix D EAW Item 17: Noise Traffic Noise Analysis Report Appendix D Traffic Noise Analysis Report for I-694/494/94 Bridge Preservation and Mobility Improvements In the Cities of Oakdale & Woodbury Washington

More information

Appendix J RFP No (Addendum No. 1)

Appendix J RFP No (Addendum No. 1) 3. Current State 3.1. Overview This section evaluates SRTA s current ERP configuration environment related to the following functional areas: General Ledger Budget Procurement Project Management Contract/

More information

Contra Costa Transportation Authority STAFF REPORT February 15, 2017 Page 2 of 3 Background MTC is expected to seek authorization from the State Legis

Contra Costa Transportation Authority STAFF REPORT February 15, 2017 Page 2 of 3 Background MTC is expected to seek authorization from the State Legis Contra Costa Transportation Authority STAFF REPORT Meeting Date: February 15, 2017 Subject Summary of Issues Regional Measure 3 (RM3) Candidate Projects for Submittal to the Metropolitan Transportation

More information

Truck Route Access Evaluation: Norfolk Southern Rail Terminal, Louisville, Site #1767

Truck Route Access Evaluation: Norfolk Southern Rail Terminal, Louisville, Site #1767 Transportation Kentucky Transportation Center Research Report University of Kentucky Year 1999 Truck Route Access Evaluation: Norfolk Southern Rail Terminal, Louisville, Site #1767 Lisa Aultman-Hall Kenneth

More information

content chapter Highway Noise Policy and Regulations 15.1 Purpose 15.2 Definitions 15.3 Applicability

content chapter Highway Noise Policy and Regulations 15.1 Purpose 15.2 Definitions 15.3 Applicability chapter 15 Highway Noise Policy and Regulations content 15.1 Purpose 15.2 Definitions 15.3 Applicability 15.4 Summary of Key Legislation, Regulations, and Guidance 15.5 General Methodology of Evaluation

More information

APPENDIX F. Noise Impact Analysis

APPENDIX F. Noise Impact Analysis APPENDIX F Noise Impact Analysis NOISE IMPACT ANALYSIS U.S. 17 WIDENING EA AND PERMITTING JASPER COUNTY, SOUTH CAROLINA November, 2016 Prepared For: South Carolina Department of Transportation and Jasper

More information

PROJECT STUDY REPORT. Cal Poly Pomona Senior Project

PROJECT STUDY REPORT. Cal Poly Pomona Senior Project 06/2014 PROJECT STUDY REPORT (Cal Poly Pomona Senior Project) For Conceptual Approval of an Interchange Improvement And Cooperative Agreement with The City of Lake Elsinore for completion of Project Approval

More information

500 Interchange Design

500 Interchange Design 500 Interchange Design Table of Contents 501 Interchange Design... 1 501.1 General... 1 501.2 Interchange Type... 1 501.2.1 General... 1 502 Interchange Design Considerations... 2 502.1 Determination of

More information

Island Park U.S. 20. Targhee Pass Environmental Assessment. Traffic Noise Analysis Report

Island Park U.S. 20. Targhee Pass Environmental Assessment. Traffic Noise Analysis Report Island Park U.S. 2 Targhee Pass Environmental Assessment Traffic ise Analysis Report Prepared for Idaho Transportation Department, District 6, Rigby, Idaho Prepared by Horrocks Engineers, Pleasant Grove,

More information

Section 13. Guidelines for the Design of Ground Mounted Sign Supports

Section 13. Guidelines for the Design of Ground Mounted Sign Supports Section 13 BDC11MR-04 13.1 Introduction Highway signs fall into two main categories, which are subdivided as follows: 1. Overhead Signs a. Sign Bridge Structures (GO) b. Sign Cantilever Structures (GO)

More information

Draft Preliminary Design -- Traffic Noise Report

Draft Preliminary Design -- Traffic Noise Report Draft Preliminary Design -- Traffic Noise Report Pennsylvania Turnpike Commission Milepost 28 to Milepost 31 Roadway and Bridge Reconstruction Allegheny and Butler Counties Project Number T-028.45T001-2

More information

GDOT s Design-Build Program Past, Present and Future

GDOT s Design-Build Program Past, Present and Future GDOT s Design-Build Program Past, Present and Future John D. Hancock, P.E. Assistant State Innovative Program Delivery Engineer September 16, 2013 Agenda Program Overview GA Code 32-2-81 (SB 70) Look Ahead

More information

FINAL. Sound Transit Long-Range Plan Update Issue Paper S.6: Potential Tacoma Link Extension - East. Prepared for: Sound Transit

FINAL. Sound Transit Long-Range Plan Update Issue Paper S.6: Potential Tacoma Link Extension - East. Prepared for: Sound Transit Sound Transit Long-Range Plan Update Issue Paper S.6: Potential Tacoma Link Extension - East Prepared for: Sound Transit Prepared by: Parsons Brinckerhoff Quade & Douglas, Inc. FINAL March 2005 Foreword

More information

Harlem Avenue Interchange Design Discussion. August 24, 2015

Harlem Avenue Interchange Design Discussion. August 24, 2015 Harlem Avenue Interchange Design Discussion August 24, 2015 1 Expressway Construction Pre-dates Modern Design Standards Expressway designed and constructed in 1950 s No past experience to base design standards

More information

6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS

6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS 6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS 6.1 MODEL RUN SUMMARY NOTEBOOK The Model Run Summary Notebook (under separate cover) provides documentation of the multiple

More information

HIGHWAY 71 CORRIDOR IMPROVEMENT STUDY BELLA VISTA BYPASS MISSOURI STATE LINE BENTON COUNTY

HIGHWAY 71 CORRIDOR IMPROVEMENT STUDY BELLA VISTA BYPASS MISSOURI STATE LINE BENTON COUNTY HIGHWAY 71 CORRIDOR IMPROVEMENT STUDY BELLA VISTA BYPASS MISSOURI STATE LINE BENTON COUNTY DRAFT December 2017 Highway 71 Corridor Improvement Study Bella Vista Bypass to Missouri State Line BENTON COUNTY

More information

University Region FY 2023 Final Scoping Package

University Region FY 2023 Final Scoping Package September 30, 2016 University Region FY 2023 Final Scoping Package I-496/US-127 Scoping From I-96 to the I-496/US- 127 Interchange CS 33045 JN 126442 I-496/US-127 STUDY EXECUTIVE SUMMARY UNIVERSITY REGION

More information

Appendix D Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

Appendix D Functional Classification Criteria and Characteristics, and MnDOT Access Guidance Appendix D Functional Classification Criteria and Characteristics, and MnDOT Access Guidance Functional classification identifies the role a highway or street plays in the transportation system. Some highways

More information

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE The Existing Roadway Condition Assessment Report (ERCAR) should include the evaluation of all elements against new construction criteria.

More information

I-15 South, MP 0 to MP 16 Environmental Assessment. Public Hearing. August 7, :00 PM to 7:00 PM

I-15 South, MP 0 to MP 16 Environmental Assessment. Public Hearing. August 7, :00 PM to 7:00 PM I-15 South, MP 0 to MP 16 Environmental Assessment Public Hearing August 7, 2012 5:00 PM to 7:00 PM 1 PROJECT OVERVIEW The Federal Highway Administration (FHWA) and the Utah Department of Transportation

More information

IH 30/IH 35E Reconstruction Project Pegasus Final Technical Memorandum - Evaluation of Conceptual Alternatives Task 7.5

IH 30/IH 35E Reconstruction Project Pegasus Final Technical Memorandum - Evaluation of Conceptual Alternatives Task 7.5 MEMO TO: Timothy Nesbitt, P.E. DATE: August 26, 2002 FROM: SUBJECT: Sandy Wesch-Schulze, P.E., AICP IH 30/IH 35E Reconstruction Project Pegasus Final Technical Memorandum - Evaluation of Conceptual Alternatives

More information

Changes to the following sections of Tollway Structure Design Manual shall apply:

Changes to the following sections of Tollway Structure Design Manual shall apply: DESIGN BULLETIN No. 18-02 Changes to the following sections of Tollway Structure Design Manual shall apply: 1. Section 7.1.4 Note 25. (Revise to) Horizontal design loads for retaining walls with moment

More information

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges I. ABSTRACT Keith A. Riniker, PE, PTOE This paper presents the Folded Interchange design and compares

More information

APPENDIX B. Excerpts from the October 2002 Conceptual Alternatives Report

APPENDIX B. Excerpts from the October 2002 Conceptual Alternatives Report APPENDIX B Excerpts from the October 2002 Interstate 83 and PA Route 921 The objective for the SR 921 interchange site was to study alternatives for construction of a new interchange. There are no short-term

More information

CLA /10.54, PID Project Description:

CLA /10.54, PID Project Description: Project Description: The proposed project will consist of widening IR 70 to three lanes from Enon Road (SLM 06.75) to the US 68 interchange ramps (SLM 10.55). IR 70 is a component of the Strategic Highway

More information

NEPA and Design Public Hearings

NEPA and Design Public Hearings NEPA and Design Public Hearings Monday, December 5, 2016 Washington-Lee High School 1301 N. Stafford Street Arlington, VA 22201 Thursday, December 8, 2016 Mary Ellen Henderson Middle School 7130 Leesburg

More information

MOUNTAIN VISTA SUBAREA PLAN FORT COLLINS, COLORADO TRAFFIC NOISE EVALUATION REPORT

MOUNTAIN VISTA SUBAREA PLAN FORT COLLINS, COLORADO TRAFFIC NOISE EVALUATION REPORT MOUNTAIN VISTA SUBAREA PLAN FORT COLLINS, COLORADO TRAFFIC NOISE EVALUATION REPORT Prepared for: City of Fort Collins 250 N. Mason Street Fort Collins, CO 80522 Prepared by: Felsburg Holt & Ullevig 6300

More information

T.H. 100 Reconstruction in St. Louis Park Environmental Assessment. Appendix C Traffic Noise Analysis Report

T.H. 100 Reconstruction in St. Louis Park Environmental Assessment. Appendix C Traffic Noise Analysis Report T.H. 100 Reconstruction in St. Louis Park Environmental Assessment Appendix C Traffic Noise Analysis Report Highway 100 Reconstruction (State Project Number: 2734-33) July 2012 Prepared For: Minnesota

More information

NOISE TECHNICAL MEMORANDUM. Inland Rail Trail Project Cities of San Marcos and Vista, San Diego County DISTRICT 11 SD CML 5381(003)

NOISE TECHNICAL MEMORANDUM. Inland Rail Trail Project Cities of San Marcos and Vista, San Diego County DISTRICT 11 SD CML 5381(003) NOISE TECHNICAL MEMORANDUM Inland Rail Trail Project Cities of San Marcos and Vista, San Diego County DISTRICT 11 SD CML 5381(003) Attention: Kevin Hovey, Environmental Branch Chief, Caltrans District

More information

3. Existing Conditions and 3.6 Environmental Noise Consequences

3. Existing Conditions and 3.6 Environmental Noise Consequences 3.6 Environmental Consequences 3.5 3.5.1 WHAT IS NOISE AND HOW COULD NOISE IMPACT PEOPLE? is typically defined as any sound that is undesired or interferes with one s hearing of something. 1 The basic

More information

CHAPTER 3 SCOPE SUMMARY

CHAPTER 3 SCOPE SUMMARY CHAPTER 3 SCOPE SUMMARY GENERAL The SDDOT is an active member of AASHTO to share common national design standards for the state highway system. The AASHTO Task Force on Geometric Design has completed the

More information

PennDOTDistrict 8 I-83 East Shore Section 1 Improvements Project. Final Design Noise Analysis & Mitigation Recommendations

PennDOTDistrict 8 I-83 East Shore Section 1 Improvements Project. Final Design Noise Analysis & Mitigation Recommendations PennDOTDistrict 8 I-83 East Shore Section 1 Improvements Project Final Design Noise Analysis & Mitigation Recommendations Open House Formal Presentation Project Overview/Schedule Definitions of Common

More information

Draft Noise Abatement Guidelines

Draft Noise Abatement Guidelines Document under Separate Cover refer to IMLC01-13 Draft Noise Abatement Guidelines April 2013 Legislative & Planning Services Table of Contents 1.0 Introduction...1 1.1 Key Definitions...1 2.0 Existing

More information

b. Include an evaluation of maintenance of traffic for ramps, local roads and cross streets.

b. Include an evaluation of maintenance of traffic for ramps, local roads and cross streets. 630-5 Maintenance of Traffic Alternative Analysis As noted in Section 630-1, Section 1400 of the L&D Manual indicates that a Maintenance of Traffic Alternative Analysis will be performed. This analysis

More information

DRAFT Noise Analysis Technical Report

DRAFT Noise Analysis Technical Report State Project: 0064-114-F12, PE-102 UPC: 99587 From: I-664/Monitor-Merrimac Memorial Bridge Tunnel in Hampton Roads, VA To: I-564 at Naval Station Norfolk in Norfolk, VA and to Route 164 in Portsmouth,

More information

St. Francis Drive through the City of Santa Fe Corridor Study

St. Francis Drive through the City of Santa Fe Corridor Study VIII. ENGINEERING AND ENVIRONMENTAL EVALUATION INTERSECTION IMPROVEMENTS SOUTHERN For the southern end of the corridor, traffic volumes are expected to increase over existing levels. The Phase A Report

More information