William R. Bennett Bridge. W.R. Bennett Bridge, Kelowna, B.C. Canada. July 2005 to December 2008

Size: px
Start display at page:

Download "William R. Bennett Bridge. W.R. Bennett Bridge, Kelowna, B.C. Canada. July 2005 to December 2008"

Transcription

1 William R. Bennett Bridge W.R. Bennett Bridge, Kelowna, B.C. Canada. July 2005 to December 2008

2 Contract Details Scope: Design & Build the new W.R. Bennett Floating Bridge & Decommission existing Okanagan Lake Floating Bridge (built in 1956) Duration: July 2005 to December 2008 (3.5 years) Location: Okanagan Lake, Kelowna, BC, Canada. Owner: B.C. Ministry of Transportation Type: Public Private Partnership (3P) General Contractor: WRB Bridge Group JV between SNC Lavalin & CMIR Holdings OK Bridge PT Sub Contractor: Harris Rebar / Harris PT. Project Engineers: Buckland and Taylor. Contract Value: $145 Million CND

3 W.R. Bennett Bridge Facts: 1 of 8 Floating Bridges in the World Total Bridge Length is 1.0 km Floating Pontoon Length is 0.7 km 5 Piers supporting the fixed structure Graving Dock installed on lake 9 Floating Concrete Pontoon Sections Navigation Span for sail boats. 5 Piers (steel piles w/ concrete caps)

4 Insert last slide text here. Insert last slide text here!

5

6 The Graving Dock Graving Dock is a facility used for building floating structures (ie. concrete pontoons) Essentially a large dewatered hole in the ground with a large gate to the lake The final Graving Dock dimensions were 100m long x 30m wide x 7m deep(330 ft x 100 ft x 23 ft) The base slab had tubes running through it, used for heating and cooling the slab during construction. The lake level varies approximately 2 feet over a year. Maximum water depth in Graving Dock is 13 ft.

7 The Graving Dock

8 Picture caption goes here. Picture caption goes here. Picture caption goes here. Picture caption goes here. Picture caption goes here. Picture caption goes here. Picture caption goes here. Picture caption goes here. Picture caption goes here. Picture caption goes here. Picture caption goes here. Picture caption goes here. Picture caption goes here. Brief picture description goes here.

9 Construction Challenges Accelerated schedule to design / build the graving dock Shutdown by Natives due to discovery of bones (animal bones) on site (3 month delay) Working during extreme hot and cold temperatures (40deg C to -20deg. C) with high winds. Graving Dock length extended after 5 months from 65m to 100m to Accelerate Schedule and lengthen the pontoons from 200ft to 300ft. Narrow heavily congested site.

10 The Graving Dock, 100m

11 The Pontoons All pontoons had : 42-7/0.6 tendons in the base slab. 6-7/0.6 tendons in each long external walls 35-5/0.6 tendons in the upper deck slab (Road way) /0.6 tendons in each connection point.

12

13 Building The Pontoons Average length of 300ft. heights 15ft to 18 ft. Average width 75ft. Longitudinal / transverse walls (Cells were 15ft x 15ft x 18ft). Continuous pours for both the top and bottom PT slabs.

14 Post tensioning the Pontoons 9 Pontoons over 2 years Lengths ranged from 100ft to 300ft long, with 6 of the pontoons at 300ft 2 at 200ft and 1 at 100ft. Post tensioning was used to compress the concrete in the longitudinal direction for the entire length. 1.3 million feet (246 miles) of.6 270ksi Domestic Canadian strand was used. Pt strand was used to make the connection on site.

15

16 Preparations for winching tendons into the structure.

17 Connections

18 Design details for the connections

19 The original designed used a 44mm radius, high grade Threaded bars. Each bar was replaced with a 7 strand, Bonded PT Tendons. Resulting in over 8,120pcs of.6 strands being installed and tensioned 1 at a time Making a Change

20 Stressing details for the connections

21 Making the connections There were 8 connections. 145pcs. 7/0.6 tendons each. 12 temporary bar connections

22 Stressing equipment went from a 485lbs ram to a 49lbs 30to aluminum ram.

23 Installing the Pontoons

24 Making the connections

25 Sealing the Joint

26 Grouting the connections

27 Making the connections

28 Making the connections

29 Strand installation

30 Tensioning the connections

31 Completed connections

32 Completed connections

33 Anchoring the Pontoons.

34 Large pumps were used to position anchors into the Lake bed. Using jet pumps

35 Anchors positioning.

36 Anchoring the Pontoons.

37 Adjusting the anchors.

38 Connecting BC s Wine Country.

Bonner Bridge Replacement Update:

Bonner Bridge Replacement Update: Bonner Bridge Replacement Update: Jerry D. Jennings, PE - NCDOT Division 1 Engineer Pablo A. Hernandez, - NCDOT Resident Engineer September 18, 2017 Bonner Bridge Replacement Timeline Refresher Bonner

More information

Post-Tensioning Products

Post-Tensioning Products Introduction ECCO s post-tensioning products have been used extensively in Canada and the USA. From a few small knockouts to water tanks, highrise buildings, reactors and bridges, ECCO s commitment to

More information

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc. Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on

More information

SUNSHINE SKYWAY BRIDGE

SUNSHINE SKYWAY BRIDGE SUNSHINE SKYWAY BRIDGE Retrofit of the Post-Tensioned Precast Transition Pier Columns on the Sunshine Skyway Bridge Presented by: Antonio Ledesma, P.E. May 7, 2012 SUNSHINE SKYWAY BRIDGE, FLORIDA Presentation

More information

JULY 2014 LRFD BRIDGE DESIGN 5-1

JULY 2014 LRFD BRIDGE DESIGN 5-1 JULY 014 LRFD BRIDGE DESIGN 5-1 5. CONCRETE STRUCTURES Reinforced and prestressed concrete are used extensively in bridge projects. In addition to general design guidance and information on detailing practices,

More information

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION

DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION Vireak Hinh, P.Eng. R.V. Anderson Associates Ltd., Toronto, Canada Jennifer Trimble Region of Halton, Oakville, Canada

More information

Bijan Khaleghi, Ph, D. P.E., S.E.

Bijan Khaleghi, Ph, D. P.E., S.E. 0 Submission date: July, 0 Word count: 0 Author Name: Bijan Khaleghi Affiliations: Washington State D.O.T. Address: Linderson Way SW, Tumwater WA 0 INTEGRAL BENT CAP FOR CONTINUOUS PRECAST PRESTRESSED

More information

Lesner Bridge Replacement

Lesner Bridge Replacement Lesner Bridge Replacement Rendering of the Completed Lesner Bridge Structure Construction Camera A Construction Camera has been installed to view images of the bridge construction. Images are updated on

More information

1/26/2015 DETAILS CIP DETAIL EXAMPLES WHY SIMPLIFY DETAILS? CIP DETAIL EXAMPLES DETAILING FOR SIMPLICITY

1/26/2015 DETAILS CIP DETAIL EXAMPLES WHY SIMPLIFY DETAILS? CIP DETAIL EXAMPLES DETAILING FOR SIMPLICITY Detailing of ABC Bridges for Simplicity and Durability Michael P. Culmo, P.E. CME Associates, Inc. East Hartford, CT DETAILS This presentation contains many preferred details My favorite details will be

More information

Masonry Wall Bracing. A Simplified Approach To Bracing Masonry Walls Under Construction. Masonry Bracing Task Force.

Masonry Wall Bracing. A Simplified Approach To Bracing Masonry Walls Under Construction. Masonry Bracing Task Force. Masonry Wall Bracing A Simplified Approach To Bracing Masonry Walls Under Construction Produced by the Masonry Wall Bracing A Simplified Approach to Bracing Masonry Walls Under Construction Produced by

More information

PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV

PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV NORTH SHORE CONNECTOR TUNNELS AND STATION SHELL LIGHT RAIL PROJECT PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV North Shore Connector Alignment 7300 lf Extension to existing 25 mile system 18 Contracts $435

More information

In Service Replacement of Box Girder Bottom Slab

In Service Replacement of Box Girder Bottom Slab In Service Replacement of Box Girder Bottom Slab WSDOT Bridge No. 5/537S - Span 11 Craig R. Boone, P.E., S.E. Lynn Peterson Secretary of Transportation 2015 Western Bridge Engineers Seminar Reno, Nevada

More information

These guidelines are to ensure systematic and consistent pier construction throughout the Jonathan s Landing development.

These guidelines are to ensure systematic and consistent pier construction throughout the Jonathan s Landing development. PIER GUIDELINES 1 PIER CONSTRUCTION GUIDELINES These guidelines are to ensure systematic and consistent pier construction throughout the Jonathan s Landing development. 1. DEFINITIONS The following definitions

More information

LRFD Bridge Design Manual Changes

LRFD Bridge Design Manual Changes LRFD Bridge Design Manual Changes Dave Dahlberg Bridge Design Manual & Policy Engineer May 17, 2017 Bridge Office mndot.gov/bridge Overview 1) Concrete mix designations 2) Reinforcing bar development and

More information

NDT in Grouted PT Inspection for Bridges

NDT in Grouted PT Inspection for Bridges NDT in Grouted PT Inspection for Bridges PTI Technical Conference & Exhibition Miami, FL May 8, 2007 Hong-gang gang Cao CTLGroup (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 1 of 37

More information

Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle

Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle Overall Information Location: Singapore Date of Completion: 2010 Cost: $5.7 billion Architect: Moshe Safdie Executive Architect: Aedas, Pte

More information

Principal Bridge Engineer Middle East & India Atkins Abu Dhabi, UAE

Principal Bridge Engineer Middle East & India Atkins Abu Dhabi, UAE Design of continuity slabs and the 020 Gajanan Chaudhari Principal Bridge Engineer Middle East & India Atkins Abu Dhabi, UAE Anand Panpate Senior Bridge Engineer Middle East & India Atkins Abu Dhabi, UAE

More information

ST7008 PRESTRESSED CONCRETE

ST7008 PRESTRESSED CONCRETE ST7008 PRESTRESSED CONCRETE QUESTION BANK UNIT-I PRINCIPLES OF PRESTRESSING PART-A 1. Define modular ratio. 2. What is meant by creep coefficient? 3. Is the deflection control essential? Discuss. 4. Give

More information

Critical Structures Construction Issues

Critical Structures Construction Issues Critical Structures Construction Issues FLORIDA DEPARTMENT OF TRANSPORTATION STATE CONSTRUCTION OFFICE Specification 1-3: Definitions Contractor s Engineer of Record Specialty Engineer CLASS OF CONTRACTOR

More information

SCHEDULE THREE TECHNICAL PROPOSAL SUBMISSION REQUIREMENTS

SCHEDULE THREE TECHNICAL PROPOSAL SUBMISSION REQUIREMENTS SCHEDULE THREE TECHNICAL PROPOSAL SUBMISSION REQUIREMENTS Each Technical Proposal (Volume A of Package 2 of the Proposal) should address each of the items and requests for information described in this

More information

September 1, 2003 CONCRETE MANUAL SPECIAL TYPES OF CONCRETE

September 1, 2003 CONCRETE MANUAL SPECIAL TYPES OF CONCRETE September 1, 2003 CONCRETE MANUAL 5-694.800 5-694.810 GENERAL SPECIAL TYPES OF CONCRETE 5-694.800 In the general use of the word concrete, the idea implied is the conventional placement of the material

More information

Houston Community College 3200 Main Parking Garage November 15, 2010 Houston Community College

Houston Community College 3200 Main Parking Garage November 15, 2010 Houston Community College SECTION 323113 - CHAIN LINK FENCES AND GATES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Marine 15. Planning & Infrastructure for Marina Development

Marine 15. Planning & Infrastructure for Marina Development Marine 15 Planning & Infrastructure for Marina Development Who is this Pompous American? Jesse Ellenz Vice President of Special Projects What Makes Him So Special? Nothing Not a PHD Not a Professor Not

More information

SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE

SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE NOTE: MOMENT DIAGRAM CONVENTION In PT design, it is preferable to draw moment diagrams to the tensile

More information

Executive Summary. Champlain Bridge Approach Spans Edge Girder Condition Assessment and Rehabilitation Requirements.

Executive Summary. Champlain Bridge Approach Spans Edge Girder Condition Assessment and Rehabilitation Requirements. Executive Summary "Les Ponts Jacques Cartier et Champlain Incorporée" (PJCCI) requested that Buckland & Taylor (B&T) study the overall condition of the approach span edge girders of the Champlain Bridge

More information

The bridge over the Georges River at Alfords Point has been duplicated with a new incrementally launched bridge.

The bridge over the Georges River at Alfords Point has been duplicated with a new incrementally launched bridge. The Design and Construction of Alfords Point Bridge Mark Bennett, Senior Bridge Engineer (New Design) RTA Harry Cheung, Project Engineer, RTA Trung Doan Project Engineer, RTA Synopsis The bridge over the

More information

Title Page: Modeling & Load Rating of Two Bridges Designed with AASHTO and Florida I-Beam Girders

Title Page: Modeling & Load Rating of Two Bridges Designed with AASHTO and Florida I-Beam Girders Catbas, Darwash, Fadul / 0 0 0 Title Page: Modeling & Load Rating of Two Bridges Designed with AASHTO and Florida I-Beam Girders F.N. Catbas, H. Darwash and M. Fadul Dr. F. Necati Catbas, P.E. Associate

More information

Boeing North Bridge: Lessons Learned in Accelerated Bridge Construction

Boeing North Bridge: Lessons Learned in Accelerated Bridge Construction Boeing North Bridge: Lessons Learned in Accelerated Bridge Construction Gregory A. Banks, Myles Parrish, Charles W. Spry WSDOT ABC Workshop April 2015 Project Overview Location Located in Renton, WA PROJECT

More information

Lecture 13: Practical Design, The Future of Prestressed Concrete, and Concluding Thoughts...

Lecture 13: Practical Design, The Future of Prestressed Concrete, and Concluding Thoughts... Lecture 13: Practical Design, The Future of Prestressed Concrete, and Concluding Thoughts... LECTURE 13 May 17, 2005 May 17, 2005 1 Where we have been Basics Allowable Stress Ultimate Strength Shear Camber

More information

7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by

7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by Construction Technology B (CON4313) Self Assessment Questions: Chapter 1 Prestressed Concrete 1. How does the prestressing of steel tendons in prestressed concrete offer a higher loading capacity than

More information

ACCELERATED BRIDGE CONSTRUCTION IN TEXAS. Michael D. Hyzak, PE 1 Gregg A. Freeby, PE 2 Lloyd M. Wolf, PE 3 David P. Hohmann, PE 4 John M.

ACCELERATED BRIDGE CONSTRUCTION IN TEXAS. Michael D. Hyzak, PE 1 Gregg A. Freeby, PE 2 Lloyd M. Wolf, PE 3 David P. Hohmann, PE 4 John M. ACCELERATED BRIDGE CONSTRUCTION IN TEXAS Michael D. Hyzak, PE 1 Gregg A. Freeby, PE 2 Lloyd M. Wolf, PE 3 David P. Hohmann, PE 4 John M. Holt, PE 5 ABSTRACT The Texas Department of Transportation (TxDOT)

More information

High Strength Epoxy tested in accordance to ICC-ES AC308

High Strength Epoxy tested in accordance to ICC-ES AC308 ADHESIVE ANCHORING SPECIALISTS High Strength Epoxy tested in accordance to ICC-ES AC308 2006 IBC Compliant ICC-ES Report No. 1137 DESCRIPTION/SUGGESTED SPECIFICATIONS* The epoxy resin and hardener are

More information

Tagus Crossing at Carregado (Portugal): A project respectful of its sensitive environment

Tagus Crossing at Carregado (Portugal): A project respectful of its sensitive environment Tailor Made Concrete Structures Walraven & Stoelhorst (eds) 2008 Taylor & Francis Group, London, ISBN 978-0-415-47535-8 Tagus Crossing at Carregado (Portugal): A project respectful of its sensitive environment

More information

EVALUATION REPORT. PFC-5551 Reissued April 1, Filing Category: DESIGN Steel (038)

EVALUATION REPORT. PFC-5551 Reissued April 1, Filing Category: DESIGN Steel (038) ICBO Evaluation Service, Inc. 5360 WORKMAN MILL ROAD WHITTIER, CALIFORNIA 90601-2299 A subsidiary corporation of the International Conference of Building Officials EVALUATION REPORT Copyright 2001 ICBO

More information

In-plane testing of precast concrete wall panels with grouted sleeve

In-plane testing of precast concrete wall panels with grouted sleeve In-plane testing of precast concrete wall panels with grouted sleeve P. Seifi, R.S. Henry & J.M. Ingham Department of Civil Engineering, University of Auckland, Auckland. 2017 NZSEE Conference ABSTRACT:

More information

STAY-FORM TRANSFORMING MATERIALS. into products that make a better world

STAY-FORM TRANSFORMING MATERIALS. into products that make a better world STAY-FORM TRANSFORMING MATERIALS into products that make a better world TABLE OF CONTENTS Product Information... Page 1 Blindside Walls...Pages 2-4 Bulkheads...Page 5 Pile Caps...Page 6 Grade Beams...

More information

BRIDGE DESIGN MANUAL UPDATES. Jamie F. Farris, P.E.

BRIDGE DESIGN MANUAL UPDATES. Jamie F. Farris, P.E. BRIDGE DESIGN MANUAL UPDATES Jamie F. Farris, P.E. October 2015 Table of Contents 1 BDM Chapter 2 Limit States and Loads 2 BDM Chapter 3 Superstructure Design 3 BDM Chapter 4 Substructure Design 4 Questions

More information

Construction Techniques of The 3 rd Bosphorus Bridge in Istanbul, Turkey

Construction Techniques of The 3 rd Bosphorus Bridge in Istanbul, Turkey International Symposium on Industrial Chimneys and Cooling Towers, Prague, Oct 8-11, 2014 Construction Techniques of The 3 rd Bosphorus Bridge in Istanbul, Turkey M. Orçun TOKUÇ 1 and Tamer TUNCA 2 1 Engineer

More information

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course.

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course. SECTION 02750 RIGID PAVEMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Portland Cement Concrete (PCC) pavement. B. Related Sections: 1.2 REFERENCES 1. Section 02315 Excavation. 2. Section 02721

More information

Structural Technical Report 1 Structural Concepts / Existing Conditions

Structural Technical Report 1 Structural Concepts / Existing Conditions Chris Shelow Structural Advisor: M. Kevin Parfitt Koshland Integrated Natural Science Center 10/05/05 AE 481W Structural Technical Report 1 Structural Concepts / Existing Conditions Executive Summary The

More information

TECHNICAL SESSION 3. Strengthening, Repair & Rehabilitation

TECHNICAL SESSION 3. Strengthening, Repair & Rehabilitation TECHNICAL SESSION 3 Strengthening, Repair & Rehabilitation 2004 PTI Technical Session 3 T. Theryo, P. Garcia - Repair of Sunshine Skyway Bridge The Post-Tensioning Column Repair of High Level Approaches

More information

1. Cast-in-place concrete is specified in Section

1. Cast-in-place concrete is specified in Section SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record

More information

Flexure Design Sequence

Flexure Design Sequence Prestressed Concrete Beam Design Workshop Load and Resistance Factor Design Flexure Design Flexure Design Sequence Determine Effective flange width Determine maximum tensile beam stresses (without prestress)

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

DUCTILE IRON PILES ARE HIGHLY EFFECTIVE, FAST AND VERSATILE MODULAR DRIVEN MICROPILE SYSTEMS

DUCTILE IRON PILES ARE HIGHLY EFFECTIVE, FAST AND VERSATILE MODULAR DRIVEN MICROPILE SYSTEMS DUCTILE IRON PILES DUCTILE IRON PILES ARE HIGHLY EFFECTIVE, FAST AND VERSATILE MODULAR DRIVEN MICROPILE SYSTEMS Designed to resist both compression and tension loads in either end-bearing or friction,

More information

Recovery. An emergency replacement of the Lake Champlain Bridge helps to restore a region s mobility. By Theodore P. Zoli, P.E.

Recovery. An emergency replacement of the Lake Champlain Bridge helps to restore a region s mobility. By Theodore P. Zoli, P.E. An emergency replacement of the Lake Champlain Bridge helps to restore a region s mobility. Rapid Recovery By Theodore P. Zoli, P.E. Trey Cambern Photography, photo courtesy HNTB Much has been written

More information

Boeing North Bridge in Washington State

Boeing North Bridge in Washington State Boeing North Bridge in Washington State Gregory A. Banks ABC-UTC Webinar May 2015 Project Overview -Location Located in Renton, WA PROJECT SITE RENTON 2 Project Overview Site Layout Lake Washington Existing

More information

Technical Assignment 1 10/8/03

Technical Assignment 1 10/8/03 Executive Summary Technical Assignment 1 10/8/03 The is 55 story high-rise condominium being built off the northern Miami coast. The structural design presented in this building is a direct result of its

More information

SECTION PRECAST CONCRETE BUILDING PREFABRICATED. ACI , "Building Code Requirements for Reinforced Concrete".

SECTION PRECAST CONCRETE BUILDING PREFABRICATED. ACI , Building Code Requirements for Reinforced Concrete. SECTION 13120 PRECAST CONCRETE BUILDING PREFABRICATED PART I - GENERAL 1.01 SUMMARY Contractor to furnish precast concrete building. Building to be field erected on customer prepared crushed stone foundation

More information

ABRAHAM LINCOLN BRIDGE

ABRAHAM LINCOLN BRIDGE ABRAHAM LINCOLN BRIDGE PROJECT LOCATION: CONNECTING LOUISVILLE, KY WITH JEFFERSON, IN ACROSS THE OHIO RIVER. CATEGORY B: TRANSPORTATION PROJECT OWNER: KENTUCKY TRANSPORTATION CABINET COWI North America

More information

IABSE-JSCE Joint Conference on Advances in Bridge Engineering-II, August 8-10, 2010, Dhaka, Bangladesh. ISBN:

IABSE-JSCE Joint Conference on Advances in Bridge Engineering-II, August 8-10, 2010, Dhaka, Bangladesh. ISBN: IABSE-JSCE Joint Conference on Advances in Bridge Engineering-II, August 8-10, 2010, Dhaka, Bangladesh. ISBN: 978-984-33-1893-0 Amin, Okui, Bhuiyan (eds.) www.iabse-bd.org Construction of Hazrat Shah Paran

More information

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT Oct. 1, 2015 to December 31, 2015 Period Submitted by M. Saiidi, A. Itani, and A. Mohebbi Department of Civil and Environmental Engineering

More information

D D TYPE A1, A2 & B MICHIGAN DEPARTMENT OF TRANSPORTATION 5-40 CONNECTION. L4" x 4" x 3/8" Brace. C8 x 4.25 Strut. WT9 x 17.5.

D D TYPE A1, A2 & B MICHIGAN DEPARTMENT OF TRANSPORTATION 5-40 CONNECTION. L4 x 4 x 3/8 Brace. C8 x 4.25 Strut. WT9 x 17.5. Sign length minus Adjust to avoid interference with sign legend A Deck fascia A 6" Equal Equal 6" Sign length (L) varies 6 to 12 PLAN 0 CONNECTION (DECK FASCIA) Angle connection assembly F Face of concrete

More information

Structural - Engineering Review Checklist

Structural - Engineering Review Checklist Structural - Engineering Review Checklist Project: List Corridor Criteria ID Review Priority (H,M,L) TOPICS S-_-## Structural Design Codes, Manuals and Specifications 6.1.0 REFERENCES DESIRED Criteria

More information

Seismic Performance of Precast Concrete Bents used for Accelerated Bridge Construction. Bijan Khaleghi 1

Seismic Performance of Precast Concrete Bents used for Accelerated Bridge Construction. Bijan Khaleghi 1 Seismic Performance of Precast Concrete Bents used for Accelerated Bridge Construction Bijan Khaleghi 1 Abstract Ductility of precast prestressed girder bridges can be achieved by proper detailing of pier

More information

US Pool Lift Model #114 (Independence) Installation Guide

US Pool Lift Model #114 (Independence) Installation Guide US Pool Lift Model #114 (Independence) Installation Guide This manual has been provided to assist with lift installation. For further assistance please contact your authorized US Pool Lift dealer. Toll

More information

BRIDGE GIRDERS TECHNICAL GUIDE

BRIDGE GIRDERS TECHNICAL GUIDE ARMTEC.COM BRIDGE MATERIALS / / TECHNICAL GUIDE REGIONal SPECIFICATIONS / AB / MB / SK PRECAST CONCRETE GIRDERS AND BEAMS DESIGNED TO SUPPORT BRIDGE DECKS AND TRAFFIC LOADS Proven strength In-house engineering

More information

CONCRETE SPLICED GIRDERS IN TEXAS. Nicholas Nemec, P.E. TxDOT-BRG

CONCRETE SPLICED GIRDERS IN TEXAS. Nicholas Nemec, P.E. TxDOT-BRG CONCRETE SPLICED GIRDERS IN TEXAS Nicholas Nemec, P.E. TxDOT-BRG October 15, 2014 What is a Concrete Spliced Girder? 2 What is a Concrete Spliced Girder? What it is NOT : Continuous For Live Load 3 What

More information

Structural System Design

Structural System Design Structural System Design STRUCTURAL SYSTEM DESIGN DESIGN CRITERIA The primary goals and criteria governing the alternate concrete superstructure design are as follows: -maintain an open office layout,

More information

Update on CWR on Open Deck Bridges

Update on CWR on Open Deck Bridges Update on CWR on Open Deck Bridges R.A.P.Sweeney, PhD, D. Eng., P. Eng. Richard B. Joy, P.E., and Duane E. Otter, PhD, P.E. 2011 AREMA Update on CWR on Open Deck Bridges R.A.P.Sweeney, PhD, D. Eng., P.

More information

Get In, Get Out, Stay Out!

Get In, Get Out, Stay Out! Get In, Get Out, Stay Out! FHWA Accelerated Bridge Construction Program By Gary Jakovich, P.E. Senior Bridge Engineer, FHWA Virginia Concrete Conference Richmond, VA March 6-7, 2007 Federal Highway Administration

More information

ADAPT-PTRC 2016 Getting Started Tutorial ADAPT-PT mode

ADAPT-PTRC 2016 Getting Started Tutorial ADAPT-PT mode ADAPT-PTRC 2016 Getting Started Tutorial ADAPT-PT mode Update: August 2016 Copyright ADAPT Corporation all rights reserved ADAPT-PT/RC 2016-Tutorial- 1 This ADAPT-PTRC 2016 Getting Started Tutorial is

More information

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT October 1, 2016 to December 31, 2016 Period Year 1 Project Development and Seismic Evaluation of Pier Systems w/ Pocket Connections and Square

More information

TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , &

TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , & TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS Financial Project ID 429140-1-52-01, 429140-2-52-01 & 428267-1-52-01 The official record of this Technical Special Provision is the electronic file signed

More information

PRECAST CONCRETE PRODUCTS

PRECAST CONCRETE PRODUCTS R LEADERS IN THE INDUSTRY TM CONCRETE PRODUCTS SILLS THRESHOLDS PARKING BUMPERS U - LINTELS SCUPPERS February 2012 COMPANY HISTORY Cast-Crete was founded in Tampa Bay, Florida in 1955 as a producer of

More information

REQUIREMENTS FOR CONCRETE MIX DESIGN

REQUIREMENTS FOR CONCRETE MIX DESIGN REQUIREMENTS FOR CONCRETE MIX DESIGN Requirements of concrete mix design should be known before calculations for concrete mix. Mix design is done in the laboratory and samples from each mix designed is

More information

AASHTOWare BrD 6.8 Substructure Tutorial Solid Shaft Pier Example

AASHTOWare BrD 6.8 Substructure Tutorial Solid Shaft Pier Example AASHTOWare BrD 6.8 Substructure Tutorial Solid Shaft Pier Example Sta 4+00.00 Sta 5+20.00 (Pier Ref. Point) Sta 6+40.00 BL SR 123 Ahead Sta CL Brgs CL Pier CL Brgs Bridge Layout Exp Fix Exp CL Brgs Abut

More information

SECTION CHAIN LINK FENCES AND GATES

SECTION CHAIN LINK FENCES AND GATES SECTION 32 31 13 CHAIN LINK FENCES AND GATES SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Use this section in specifying permanent chain

More information

THE RION ANTIRION BRIDGE DESIGN AND CONSTRUCTION

THE RION ANTIRION BRIDGE DESIGN AND CONSTRUCTION THE RION ANTIRION BRIDGE DESIGN AND CONSTRUCTION Jean-Paul TEYSSANDIER 1, Jacques COMBAULT 2 And Pierre MORAND 3 SUMMARY The RION-ANTIRION Bridge (Greece) is located in a zone of difficult environmental

More information

Benefits of Ultra-High Performance Concrete for the Rehabilitation of the Pulaski Skyway

Benefits of Ultra-High Performance Concrete for the Rehabilitation of the Pulaski Skyway Benefits of Ultra-High Performance Concrete for the Rehabilitation of the Pulaski Skyway Michael D. McDonagh, P.E., P.Eng., WSP Parsons Brinckerhoff Andrew J. Foden, Ph.D., P.E., WSP Parsons Brinckerhoff

More information

High Strength Epoxy Tested in Accordance with ICC-ES AC308

High Strength Epoxy Tested in Accordance with ICC-ES AC308 ADHESIVE ANCHORING SPECIALISTS DESCRIPTION/SUGGESTED SPECIFICATIONS* The 100% epoxy resin and hardener are completely mixed as they are dispensed from the dual cartridge through a static mixing nozzle,

More information

2008 Bridge Load Rating Class 101

2008 Bridge Load Rating Class 101 2008 Bridge Load Rating Class 101 Workshop Agenda VIII. Load Rating Example #2 IX. Simple Span Nail Laminated Timber Deck (without distress) Class Exercise Simple Span Nail Laminated Timber Deck (with

More information

MIDAS Training Series

MIDAS Training Series MIDAS midas Civil Title: All-In-One Super and Sub Structure Design NAME Edgar De Los Santos / MIDAS IT United States 2016 Substructure Session 1: 3D substructure analysis and design midas Civil Session

More information

HOLLOW CORE FLOORS SPEED AND STRENGTH

HOLLOW CORE FLOORS SPEED AND STRENGTH HOLLOW CORE FLOORS SPEED AND STRENGTH CONTENTS 2 3 4 5 7 8 9 10 12 13 14 INTRODUCTION PRECAST CONCRETE FLOORS T HE A DVANTAGES BISON HOLLOW CORE FLOORS BEARINGS FALSE CEILINGS AND SOFFIT FIXINGS BISON

More information

Washoe County PLAN SUBMITTAL

Washoe County PLAN SUBMITTAL Washoe County PLAN SUBMITTAL Washoe County PLAN SUBMITTAL SPECIAL INSPECTION AND TESTING AGREEMENTS SEPTEMBER 2013 Washoe County Permits Plus Zone 1001 East Ninth Street PO Bo 11130 Reno, NV 89520-0027

More information

Precast segmental design and construction in China

Precast segmental design and construction in China Tailor Made Concrete Structures Walraven & Stoelhorst (eds) 2008 Taylor & Francis Group, London, ISBN 978-0-415-47535-8 Precast segmental design and construction in China Dong, Xu, Huichi Li & Chao Liu

More information

Recent Developments in Stay Cable Systems

Recent Developments in Stay Cable Systems Recent Developments in Stay Cable Systems PTI Technical Conference, Reno- 2006 Khaled Shawwaf, Technical Director (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED Page 1 of 45 * Cable Stayed

More information

Prestressed Concrete Girder Continuity Connection

Prestressed Concrete Girder Continuity Connection Report No: Title: Developing Organization: Precast/Prestressed Concrete Institute Technical Committee Phone - 888-700-5670 Email contact@pcine.org Website- www.pcine.org Report Date: Revision Date: Status

More information

REPAIR OF PRECAST PRE-TENSIONED GIRDERS USING EXTERNAL POST-TENSIONING ASIT N. BAXI BAXI ENGINEERING MIGUEL FORERO SUNCOAST POST-TENSION

REPAIR OF PRECAST PRE-TENSIONED GIRDERS USING EXTERNAL POST-TENSIONING ASIT N. BAXI BAXI ENGINEERING MIGUEL FORERO SUNCOAST POST-TENSION REPAIR OF PRECAST PRE-TENSIONED GIRDERS USING EXTERNAL POST-TENSIONING ASIT N. BAXI BAXI ENGINEERING MIGUEL FORERO SUNCOAST POST-TENSION PROJECT INFORMATION Project name: Laketown Wharf Retrofit Location:

More information

THE DESIGN OF LONG CANTILEVER BEAM USING POST-TENSIONED TENDONS IN KUMJUNG STADIUM

THE DESIGN OF LONG CANTILEVER BEAM USING POST-TENSIONED TENDONS IN KUMJUNG STADIUM D.S. Choi (E-353) 1/6 THE DESIGN OF LONG CANTILEVER BEAM USING POST-TENSIONED TENDONS IN KUMJUNG STADIUM Dong-Sub Choi Jong-Soo Kim Dong-Hwan Kim C.S Structural Engineers Inc., #413-4, Tokok2 dong, Kangnam-Gu,

More information

ADAPT-PT 2010 Tutorial Idealization of Design Strip in ADAPT-PT

ADAPT-PT 2010 Tutorial Idealization of Design Strip in ADAPT-PT ADAPT-PT 2010 Tutorial Idealization of Design Strip in ADAPT-PT Update: April 2010 Copyright ADAPT Corporation all rights reserved ADAPT-PT 2010-Tutorial- 1 Main Toolbar Menu Bar View Toolbar Structure

More information

Schnabel Foundation Company

Schnabel Foundation Company Micropiles for Roadway Support, Bridge Abutments and Metal Signal Poles on US-158 from US-17B to East of Pasquotank River, in Elizabeth City, NC Schnabel Foundation Company Presenter: Stephen Dimino, P.E.

More information

The Hashemite University Department of Civil Engineering. Dr. Hazim Dwairi. Dr. Hazim Dwairi 1

The Hashemite University Department of Civil Engineering. Dr. Hazim Dwairi. Dr. Hazim Dwairi 1 Department of Civil Engineering Lecture 2.1 Methods of Prestressing Advantages of Prestressing Section remains uncracked under service loads Reduction of steel corrosion (increase durability) Full section

More information

DeckFast DAYTONSUPERIOR.COM FORMING. Shoring System

DeckFast DAYTONSUPERIOR.COM FORMING. Shoring System DeckFast Shoring System FORMING DeckFast is a highly productive, two component slab form system. It is as simple and quick as erecting two components to provide a ready to pour slab surface. American Owned

More information

High Strength Epoxy Tested in Accordance with ICC-ES AC308

High Strength Epoxy Tested in Accordance with ICC-ES AC308 ADHESIVE ANCHORING SPECIALISTS High Strength Epoxy Tested in Accordance with ICC-ES AC308 DESCRIPTION/SUGGESTED SPECIFICATIONS* The epoxy resin and hardener are completely mixed as they are dispensed from

More information

Reinforced Concrete Column Design

Reinforced Concrete Column Design Reinforced Concrete Column Design Compressive Strength of Concrete f cr is the average cylinder strength f c compressive strength for design f c ~2500 psi - 18,000 psi, typically 3000-6000 psi E c estimated

More information

151 First Side. Technical Assignment 2 November 16 th, William J. Buchko. AE 481w Senior Thesis The Pennsylvania State University

151 First Side. Technical Assignment 2 November 16 th, William J. Buchko. AE 481w Senior Thesis The Pennsylvania State University November 16 th, 2007 William J. Buchko AE 481w Senior Thesis The Pennsylvania State University Thesis Advisor: Kevin Parfitt Table of Contents Executive Summary... 3 Structural System Overview Foundation...

More information

Bridge Design. II. Bridge Types. Praveen Chompreda. Substructure. Superstructure. which support the roadway. Pier (Column) Abutment.

Bridge Design. II. Bridge Types. Praveen Chompreda. Substructure. Superstructure. which support the roadway. Pier (Column) Abutment. Components of Bridge EGCE 406 Bridge Design II. Bridge Types Substructure Superstructure Foundation (Pile/ Spread Footing) Any structures above bearing Pier (Column) which support the roadway Abutment

More information

Grain Silo Strengthening South Dakota. Prepared for Vector Construction Group

Grain Silo Strengthening South Dakota. Prepared for Vector Construction Group Grain Silo Strengthening South Dakota Prepared for Vector Construction Group May 20, 2002 Table of Contents General...3 nalysis...4 Vertical...4 Horizontal...4 Crack Control...6 Strengthening...7 Vertical...8

More information

Copyright. magazine. CFS Load Bearing Construction

Copyright. magazine. CFS Load Bearing Construction Progressive Collapse Requirements Cold-Formed Steel Load Bearing Construction By Nabil A. Rahman, Ph.D., P.E., Michael Booth and Gary Bennett Figure 1: Cold formed steel load bearing mid-rise construction.

More information

Tips For Designing Constructable Concrete Buildings

Tips For Designing Constructable Concrete Buildings Tips For Designing Constructable Concrete Buildings by Clifford Schwinger, P.E. The Harman Group, Structural Engineers King of Prussia, Pa. Structural Engineers Association of Ohio Annual Conference Presentation

More information

CFRP Strengthening and Load Testing of the Concrete Deck of I-10 KCS Railroad Overpass Mohsen Shahawy, Ph.D, PE SDR Engineering Consultants, Inc.

CFRP Strengthening and Load Testing of the Concrete Deck of I-10 KCS Railroad Overpass Mohsen Shahawy, Ph.D, PE SDR Engineering Consultants, Inc. CFRP Strengthening and Load Testing of the Concrete Deck of I-10 KCS Railroad Overpass Mohsen Shahawy, Ph.D, PE SDR Engineering Consultants, Inc. SDR Engineering Consultants, Inc. 2260 Wednesday Street,

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2014

More information

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications

MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications Mar/2008 v1.0 SECTION 02255 HYDRAULICLY DRIVEN STEEL UNDERPINNING PILES PART 1 GENERAL 1.01 SCOPE OF WORK The work shall

More information

Accelerated and Innovative Bridge Construction In Washington State

Accelerated and Innovative Bridge Construction In Washington State Accelerated and Innovative Bridge Construction In Washington State Bijan Khaleghi Bijan.Khaleghi@WSDOT.WA.Gov Washington State Department of Transportation Bridge and Structures Office Olympia Washington

More information

Section 4 - Design and Construction Overview

Section 4 - Design and Construction Overview Section 4 - Design and Construction Overview 4-1 Building Architecture/Enclosure The Pearland Recreation Center and Natatorium houses a recreation center and natatorium as shown in Figures 4-1.1 First

More information

Avoiding Falsework Failure

Avoiding Falsework Failure PDHonline Course G153 (1 PDH) Avoiding Falsework Failure Instructor: Eugene G. Washington, P.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org