1 William R. Bennett Bridge W.R. Bennett Bridge, Kelowna, B.C. Canada. July 2005 to December 2008
2 Contract Details Scope: Design & Build the new W.R. Bennett Floating Bridge & Decommission existing Okanagan Lake Floating Bridge (built in 1956) Duration: July 2005 to December 2008 (3.5 years) Location: Okanagan Lake, Kelowna, BC, Canada. Owner: B.C. Ministry of Transportation Type: Public Private Partnership (3P) General Contractor: WRB Bridge Group JV between SNC Lavalin & CMIR Holdings OK Bridge PT Sub Contractor: Harris Rebar / Harris PT. Project Engineers: Buckland and Taylor. Contract Value: $145 Million CND
3 W.R. Bennett Bridge Facts: 1 of 8 Floating Bridges in the World Total Bridge Length is 1.0 km Floating Pontoon Length is 0.7 km 5 Piers supporting the fixed structure Graving Dock installed on lake 9 Floating Concrete Pontoon Sections Navigation Span for sail boats. 5 Piers (steel piles w/ concrete caps)
4 Insert last slide text here. Insert last slide text here!
5
6 The Graving Dock Graving Dock is a facility used for building floating structures (ie. concrete pontoons) Essentially a large dewatered hole in the ground with a large gate to the lake The final Graving Dock dimensions were 100m long x 30m wide x 7m deep(330 ft x 100 ft x 23 ft) The base slab had tubes running through it, used for heating and cooling the slab during construction. The lake level varies approximately 2 feet over a year. Maximum water depth in Graving Dock is 13 ft.
7 The Graving Dock
8 Picture caption goes here. Picture caption goes here. Picture caption goes here. Picture caption goes here. Picture caption goes here. Picture caption goes here. Picture caption goes here. Picture caption goes here. Picture caption goes here. Picture caption goes here. Picture caption goes here. Picture caption goes here. Picture caption goes here. Brief picture description goes here.
9 Construction Challenges Accelerated schedule to design / build the graving dock Shutdown by Natives due to discovery of bones (animal bones) on site (3 month delay) Working during extreme hot and cold temperatures (40deg C to -20deg. C) with high winds. Graving Dock length extended after 5 months from 65m to 100m to Accelerate Schedule and lengthen the pontoons from 200ft to 300ft. Narrow heavily congested site.
10 The Graving Dock, 100m
11 The Pontoons All pontoons had : 42-7/0.6 tendons in the base slab. 6-7/0.6 tendons in each long external walls 35-5/0.6 tendons in the upper deck slab (Road way) /0.6 tendons in each connection point.
12
13 Building The Pontoons Average length of 300ft. heights 15ft to 18 ft. Average width 75ft. Longitudinal / transverse walls (Cells were 15ft x 15ft x 18ft). Continuous pours for both the top and bottom PT slabs.
14 Post tensioning the Pontoons 9 Pontoons over 2 years Lengths ranged from 100ft to 300ft long, with 6 of the pontoons at 300ft 2 at 200ft and 1 at 100ft. Post tensioning was used to compress the concrete in the longitudinal direction for the entire length. 1.3 million feet (246 miles) of.6 270ksi Domestic Canadian strand was used. Pt strand was used to make the connection on site.
15
16 Preparations for winching tendons into the structure.
17 Connections
18 Design details for the connections
19 The original designed used a 44mm radius, high grade Threaded bars. Each bar was replaced with a 7 strand, Bonded PT Tendons. Resulting in over 8,120pcs of.6 strands being installed and tensioned 1 at a time Making a Change
20 Stressing details for the connections
21 Making the connections There were 8 connections. 145pcs. 7/0.6 tendons each. 12 temporary bar connections
22 Stressing equipment went from a 485lbs ram to a 49lbs 30to aluminum ram.
23 Installing the Pontoons
24 Making the connections
25 Sealing the Joint
26 Grouting the connections
27 Making the connections
28 Making the connections
29 Strand installation
30 Tensioning the connections
31 Completed connections
32 Completed connections
33 Anchoring the Pontoons.
34 Large pumps were used to position anchors into the Lake bed. Using jet pumps
35 Anchors positioning.
36 Anchoring the Pontoons.
37 Adjusting the anchors.
38 Connecting BC s Wine Country.
Bonner Bridge Replacement Update:
Bonner Bridge Replacement Update: Jerry D. Jennings, PE - NCDOT Division 1 Engineer Pablo A. Hernandez, - NCDOT Resident Engineer September 18, 2017 Bonner Bridge Replacement Timeline Refresher Bonner
More informationPost-Tensioning Products
Introduction ECCO s post-tensioning products have been used extensively in Canada and the USA. From a few small knockouts to water tanks, highrise buildings, reactors and bridges, ECCO s commitment to
More informationDesign and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.
Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on
More informationSUNSHINE SKYWAY BRIDGE
SUNSHINE SKYWAY BRIDGE Retrofit of the Post-Tensioned Precast Transition Pier Columns on the Sunshine Skyway Bridge Presented by: Antonio Ledesma, P.E. May 7, 2012 SUNSHINE SKYWAY BRIDGE, FLORIDA Presentation
More informationJULY 2014 LRFD BRIDGE DESIGN 5-1
JULY 014 LRFD BRIDGE DESIGN 5-1 5. CONCRETE STRUCTURES Reinforced and prestressed concrete are used extensively in bridge projects. In addition to general design guidance and information on detailing practices,
More informationDESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION
DESIGN AND CONSTRUCTION OF DERRY ROAD AND CANADIAN NATIONAL RAIL GRADE SEPARATION Vireak Hinh, P.Eng. R.V. Anderson Associates Ltd., Toronto, Canada Jennifer Trimble Region of Halton, Oakville, Canada
More informationBijan Khaleghi, Ph, D. P.E., S.E.
0 Submission date: July, 0 Word count: 0 Author Name: Bijan Khaleghi Affiliations: Washington State D.O.T. Address: Linderson Way SW, Tumwater WA 0 INTEGRAL BENT CAP FOR CONTINUOUS PRECAST PRESTRESSED
More informationLesner Bridge Replacement
Lesner Bridge Replacement Rendering of the Completed Lesner Bridge Structure Construction Camera A Construction Camera has been installed to view images of the bridge construction. Images are updated on
More information1/26/2015 DETAILS CIP DETAIL EXAMPLES WHY SIMPLIFY DETAILS? CIP DETAIL EXAMPLES DETAILING FOR SIMPLICITY
Detailing of ABC Bridges for Simplicity and Durability Michael P. Culmo, P.E. CME Associates, Inc. East Hartford, CT DETAILS This presentation contains many preferred details My favorite details will be
More informationMasonry Wall Bracing. A Simplified Approach To Bracing Masonry Walls Under Construction. Masonry Bracing Task Force.
Masonry Wall Bracing A Simplified Approach To Bracing Masonry Walls Under Construction Produced by the Masonry Wall Bracing A Simplified Approach to Bracing Masonry Walls Under Construction Produced by
More informationPAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV
NORTH SHORE CONNECTOR TUNNELS AND STATION SHELL LIGHT RAIL PROJECT PAUL ZICK, PE NORTH SHORE CONSTRUCTORS JV North Shore Connector Alignment 7300 lf Extension to existing 25 mile system 18 Contracts $435
More informationIn Service Replacement of Box Girder Bottom Slab
In Service Replacement of Box Girder Bottom Slab WSDOT Bridge No. 5/537S - Span 11 Craig R. Boone, P.E., S.E. Lynn Peterson Secretary of Transportation 2015 Western Bridge Engineers Seminar Reno, Nevada
More informationThese guidelines are to ensure systematic and consistent pier construction throughout the Jonathan s Landing development.
PIER GUIDELINES 1 PIER CONSTRUCTION GUIDELINES These guidelines are to ensure systematic and consistent pier construction throughout the Jonathan s Landing development. 1. DEFINITIONS The following definitions
More informationLRFD Bridge Design Manual Changes
LRFD Bridge Design Manual Changes Dave Dahlberg Bridge Design Manual & Policy Engineer May 17, 2017 Bridge Office mndot.gov/bridge Overview 1) Concrete mix designations 2) Reinforcing bar development and
More informationNDT in Grouted PT Inspection for Bridges
NDT in Grouted PT Inspection for Bridges PTI Technical Conference & Exhibition Miami, FL May 8, 2007 Hong-gang gang Cao CTLGroup (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 1 of 37
More informationMarina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle
Marina Bay Sands Hotel Arch 631 Kayla Brittany Maria Michelle Overall Information Location: Singapore Date of Completion: 2010 Cost: $5.7 billion Architect: Moshe Safdie Executive Architect: Aedas, Pte
More informationPrincipal Bridge Engineer Middle East & India Atkins Abu Dhabi, UAE
Design of continuity slabs and the 020 Gajanan Chaudhari Principal Bridge Engineer Middle East & India Atkins Abu Dhabi, UAE Anand Panpate Senior Bridge Engineer Middle East & India Atkins Abu Dhabi, UAE
More informationST7008 PRESTRESSED CONCRETE
ST7008 PRESTRESSED CONCRETE QUESTION BANK UNIT-I PRINCIPLES OF PRESTRESSING PART-A 1. Define modular ratio. 2. What is meant by creep coefficient? 3. Is the deflection control essential? Discuss. 4. Give
More informationCritical Structures Construction Issues
Critical Structures Construction Issues FLORIDA DEPARTMENT OF TRANSPORTATION STATE CONSTRUCTION OFFICE Specification 1-3: Definitions Contractor s Engineer of Record Specialty Engineer CLASS OF CONTRACTOR
More informationSCHEDULE THREE TECHNICAL PROPOSAL SUBMISSION REQUIREMENTS
SCHEDULE THREE TECHNICAL PROPOSAL SUBMISSION REQUIREMENTS Each Technical Proposal (Volume A of Package 2 of the Proposal) should address each of the items and requests for information described in this
More informationSeptember 1, 2003 CONCRETE MANUAL SPECIAL TYPES OF CONCRETE
September 1, 2003 CONCRETE MANUAL 5-694.800 5-694.810 GENERAL SPECIAL TYPES OF CONCRETE 5-694.800 In the general use of the word concrete, the idea implied is the conventional placement of the material
More informationHouston Community College 3200 Main Parking Garage November 15, 2010 Houston Community College
SECTION 323113 - CHAIN LINK FENCES AND GATES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationMarine 15. Planning & Infrastructure for Marina Development
Marine 15 Planning & Infrastructure for Marina Development Who is this Pompous American? Jesse Ellenz Vice President of Special Projects What Makes Him So Special? Nothing Not a PHD Not a Professor Not
More informationSECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE
SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE NOTE: MOMENT DIAGRAM CONVENTION In PT design, it is preferable to draw moment diagrams to the tensile
More informationExecutive Summary. Champlain Bridge Approach Spans Edge Girder Condition Assessment and Rehabilitation Requirements.
Executive Summary "Les Ponts Jacques Cartier et Champlain Incorporée" (PJCCI) requested that Buckland & Taylor (B&T) study the overall condition of the approach span edge girders of the Champlain Bridge
More informationThe bridge over the Georges River at Alfords Point has been duplicated with a new incrementally launched bridge.
The Design and Construction of Alfords Point Bridge Mark Bennett, Senior Bridge Engineer (New Design) RTA Harry Cheung, Project Engineer, RTA Trung Doan Project Engineer, RTA Synopsis The bridge over the
More informationTitle Page: Modeling & Load Rating of Two Bridges Designed with AASHTO and Florida I-Beam Girders
Catbas, Darwash, Fadul / 0 0 0 Title Page: Modeling & Load Rating of Two Bridges Designed with AASHTO and Florida I-Beam Girders F.N. Catbas, H. Darwash and M. Fadul Dr. F. Necati Catbas, P.E. Associate
More informationBoeing North Bridge: Lessons Learned in Accelerated Bridge Construction
Boeing North Bridge: Lessons Learned in Accelerated Bridge Construction Gregory A. Banks, Myles Parrish, Charles W. Spry WSDOT ABC Workshop April 2015 Project Overview Location Located in Renton, WA PROJECT
More informationLecture 13: Practical Design, The Future of Prestressed Concrete, and Concluding Thoughts...
Lecture 13: Practical Design, The Future of Prestressed Concrete, and Concluding Thoughts... LECTURE 13 May 17, 2005 May 17, 2005 1 Where we have been Basics Allowable Stress Ultimate Strength Shear Camber
More information7. Draw an equipment set up for the production of a beam by post tensioning. 10. What are the common concrete structures which are produced by
Construction Technology B (CON4313) Self Assessment Questions: Chapter 1 Prestressed Concrete 1. How does the prestressing of steel tendons in prestressed concrete offer a higher loading capacity than
More informationACCELERATED BRIDGE CONSTRUCTION IN TEXAS. Michael D. Hyzak, PE 1 Gregg A. Freeby, PE 2 Lloyd M. Wolf, PE 3 David P. Hohmann, PE 4 John M.
ACCELERATED BRIDGE CONSTRUCTION IN TEXAS Michael D. Hyzak, PE 1 Gregg A. Freeby, PE 2 Lloyd M. Wolf, PE 3 David P. Hohmann, PE 4 John M. Holt, PE 5 ABSTRACT The Texas Department of Transportation (TxDOT)
More informationHigh Strength Epoxy tested in accordance to ICC-ES AC308
ADHESIVE ANCHORING SPECIALISTS High Strength Epoxy tested in accordance to ICC-ES AC308 2006 IBC Compliant ICC-ES Report No. 1137 DESCRIPTION/SUGGESTED SPECIFICATIONS* The epoxy resin and hardener are
More informationTagus Crossing at Carregado (Portugal): A project respectful of its sensitive environment
Tailor Made Concrete Structures Walraven & Stoelhorst (eds) 2008 Taylor & Francis Group, London, ISBN 978-0-415-47535-8 Tagus Crossing at Carregado (Portugal): A project respectful of its sensitive environment
More informationEVALUATION REPORT. PFC-5551 Reissued April 1, Filing Category: DESIGN Steel (038)
ICBO Evaluation Service, Inc. 5360 WORKMAN MILL ROAD WHITTIER, CALIFORNIA 90601-2299 A subsidiary corporation of the International Conference of Building Officials EVALUATION REPORT Copyright 2001 ICBO
More informationIn-plane testing of precast concrete wall panels with grouted sleeve
In-plane testing of precast concrete wall panels with grouted sleeve P. Seifi, R.S. Henry & J.M. Ingham Department of Civil Engineering, University of Auckland, Auckland. 2017 NZSEE Conference ABSTRACT:
More informationSTAY-FORM TRANSFORMING MATERIALS. into products that make a better world
STAY-FORM TRANSFORMING MATERIALS into products that make a better world TABLE OF CONTENTS Product Information... Page 1 Blindside Walls...Pages 2-4 Bulkheads...Page 5 Pile Caps...Page 6 Grade Beams...
More informationBRIDGE DESIGN MANUAL UPDATES. Jamie F. Farris, P.E.
BRIDGE DESIGN MANUAL UPDATES Jamie F. Farris, P.E. October 2015 Table of Contents 1 BDM Chapter 2 Limit States and Loads 2 BDM Chapter 3 Superstructure Design 3 BDM Chapter 4 Substructure Design 4 Questions
More informationConstruction Techniques of The 3 rd Bosphorus Bridge in Istanbul, Turkey
International Symposium on Industrial Chimneys and Cooling Towers, Prague, Oct 8-11, 2014 Construction Techniques of The 3 rd Bosphorus Bridge in Istanbul, Turkey M. Orçun TOKUÇ 1 and Tamer TUNCA 2 1 Engineer
More informationSECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course.
SECTION 02750 RIGID PAVEMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Portland Cement Concrete (PCC) pavement. B. Related Sections: 1.2 REFERENCES 1. Section 02315 Excavation. 2. Section 02721
More informationStructural Technical Report 1 Structural Concepts / Existing Conditions
Chris Shelow Structural Advisor: M. Kevin Parfitt Koshland Integrated Natural Science Center 10/05/05 AE 481W Structural Technical Report 1 Structural Concepts / Existing Conditions Executive Summary The
More informationTECHNICAL SESSION 3. Strengthening, Repair & Rehabilitation
TECHNICAL SESSION 3 Strengthening, Repair & Rehabilitation 2004 PTI Technical Session 3 T. Theryo, P. Garcia - Repair of Sunshine Skyway Bridge The Post-Tensioning Column Repair of High Level Approaches
More information1. Cast-in-place concrete is specified in Section
SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record
More informationFlexure Design Sequence
Prestressed Concrete Beam Design Workshop Load and Resistance Factor Design Flexure Design Flexure Design Sequence Determine Effective flange width Determine maximum tensile beam stresses (without prestress)
More informationAnchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi
STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel
More informationDUCTILE IRON PILES ARE HIGHLY EFFECTIVE, FAST AND VERSATILE MODULAR DRIVEN MICROPILE SYSTEMS
DUCTILE IRON PILES DUCTILE IRON PILES ARE HIGHLY EFFECTIVE, FAST AND VERSATILE MODULAR DRIVEN MICROPILE SYSTEMS Designed to resist both compression and tension loads in either end-bearing or friction,
More informationRecovery. An emergency replacement of the Lake Champlain Bridge helps to restore a region s mobility. By Theodore P. Zoli, P.E.
An emergency replacement of the Lake Champlain Bridge helps to restore a region s mobility. Rapid Recovery By Theodore P. Zoli, P.E. Trey Cambern Photography, photo courtesy HNTB Much has been written
More informationBoeing North Bridge in Washington State
Boeing North Bridge in Washington State Gregory A. Banks ABC-UTC Webinar May 2015 Project Overview -Location Located in Renton, WA PROJECT SITE RENTON 2 Project Overview Site Layout Lake Washington Existing
More informationTechnical Assignment 1 10/8/03
Executive Summary Technical Assignment 1 10/8/03 The is 55 story high-rise condominium being built off the northern Miami coast. The structural design presented in this building is a direct result of its
More informationSECTION PRECAST CONCRETE BUILDING PREFABRICATED. ACI , "Building Code Requirements for Reinforced Concrete".
SECTION 13120 PRECAST CONCRETE BUILDING PREFABRICATED PART I - GENERAL 1.01 SUMMARY Contractor to furnish precast concrete building. Building to be field erected on customer prepared crushed stone foundation
More informationABRAHAM LINCOLN BRIDGE
ABRAHAM LINCOLN BRIDGE PROJECT LOCATION: CONNECTING LOUISVILLE, KY WITH JEFFERSON, IN ACROSS THE OHIO RIVER. CATEGORY B: TRANSPORTATION PROJECT OWNER: KENTUCKY TRANSPORTATION CABINET COWI North America
More informationIABSE-JSCE Joint Conference on Advances in Bridge Engineering-II, August 8-10, 2010, Dhaka, Bangladesh. ISBN:
IABSE-JSCE Joint Conference on Advances in Bridge Engineering-II, August 8-10, 2010, Dhaka, Bangladesh. ISBN: 978-984-33-1893-0 Amin, Okui, Bhuiyan (eds.) www.iabse-bd.org Construction of Hazrat Shah Paran
More informationRESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO
RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT Oct. 1, 2015 to December 31, 2015 Period Submitted by M. Saiidi, A. Itani, and A. Mohebbi Department of Civil and Environmental Engineering
More informationD D TYPE A1, A2 & B MICHIGAN DEPARTMENT OF TRANSPORTATION 5-40 CONNECTION. L4" x 4" x 3/8" Brace. C8 x 4.25 Strut. WT9 x 17.5.
Sign length minus Adjust to avoid interference with sign legend A Deck fascia A 6" Equal Equal 6" Sign length (L) varies 6 to 12 PLAN 0 CONNECTION (DECK FASCIA) Angle connection assembly F Face of concrete
More informationStructural - Engineering Review Checklist
Structural - Engineering Review Checklist Project: List Corridor Criteria ID Review Priority (H,M,L) TOPICS S-_-## Structural Design Codes, Manuals and Specifications 6.1.0 REFERENCES DESIRED Criteria
More informationSeismic Performance of Precast Concrete Bents used for Accelerated Bridge Construction. Bijan Khaleghi 1
Seismic Performance of Precast Concrete Bents used for Accelerated Bridge Construction Bijan Khaleghi 1 Abstract Ductility of precast prestressed girder bridges can be achieved by proper detailing of pier
More informationUS Pool Lift Model #114 (Independence) Installation Guide
US Pool Lift Model #114 (Independence) Installation Guide This manual has been provided to assist with lift installation. For further assistance please contact your authorized US Pool Lift dealer. Toll
More informationBRIDGE GIRDERS TECHNICAL GUIDE
ARMTEC.COM BRIDGE MATERIALS / / TECHNICAL GUIDE REGIONal SPECIFICATIONS / AB / MB / SK PRECAST CONCRETE GIRDERS AND BEAMS DESIGNED TO SUPPORT BRIDGE DECKS AND TRAFFIC LOADS Proven strength In-house engineering
More informationCONCRETE SPLICED GIRDERS IN TEXAS. Nicholas Nemec, P.E. TxDOT-BRG
CONCRETE SPLICED GIRDERS IN TEXAS Nicholas Nemec, P.E. TxDOT-BRG October 15, 2014 What is a Concrete Spliced Girder? 2 What is a Concrete Spliced Girder? What it is NOT : Continuous For Live Load 3 What
More informationStructural System Design
Structural System Design STRUCTURAL SYSTEM DESIGN DESIGN CRITERIA The primary goals and criteria governing the alternate concrete superstructure design are as follows: -maintain an open office layout,
More informationUpdate on CWR on Open Deck Bridges
Update on CWR on Open Deck Bridges R.A.P.Sweeney, PhD, D. Eng., P. Eng. Richard B. Joy, P.E., and Duane E. Otter, PhD, P.E. 2011 AREMA Update on CWR on Open Deck Bridges R.A.P.Sweeney, PhD, D. Eng., P.
More informationGet In, Get Out, Stay Out!
Get In, Get Out, Stay Out! FHWA Accelerated Bridge Construction Program By Gary Jakovich, P.E. Senior Bridge Engineer, FHWA Virginia Concrete Conference Richmond, VA March 6-7, 2007 Federal Highway Administration
More informationADAPT-PTRC 2016 Getting Started Tutorial ADAPT-PT mode
ADAPT-PTRC 2016 Getting Started Tutorial ADAPT-PT mode Update: August 2016 Copyright ADAPT Corporation all rights reserved ADAPT-PT/RC 2016-Tutorial- 1 This ADAPT-PTRC 2016 Getting Started Tutorial is
More informationRESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO
RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT October 1, 2016 to December 31, 2016 Period Year 1 Project Development and Seismic Evaluation of Pier Systems w/ Pocket Connections and Square
More informationTECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , &
TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS Financial Project ID 429140-1-52-01, 429140-2-52-01 & 428267-1-52-01 The official record of this Technical Special Provision is the electronic file signed
More informationPRECAST CONCRETE PRODUCTS
R LEADERS IN THE INDUSTRY TM CONCRETE PRODUCTS SILLS THRESHOLDS PARKING BUMPERS U - LINTELS SCUPPERS February 2012 COMPANY HISTORY Cast-Crete was founded in Tampa Bay, Florida in 1955 as a producer of
More informationREQUIREMENTS FOR CONCRETE MIX DESIGN
REQUIREMENTS FOR CONCRETE MIX DESIGN Requirements of concrete mix design should be known before calculations for concrete mix. Mix design is done in the laboratory and samples from each mix designed is
More informationAASHTOWare BrD 6.8 Substructure Tutorial Solid Shaft Pier Example
AASHTOWare BrD 6.8 Substructure Tutorial Solid Shaft Pier Example Sta 4+00.00 Sta 5+20.00 (Pier Ref. Point) Sta 6+40.00 BL SR 123 Ahead Sta CL Brgs CL Pier CL Brgs Bridge Layout Exp Fix Exp CL Brgs Abut
More informationSECTION CHAIN LINK FENCES AND GATES
SECTION 32 31 13 CHAIN LINK FENCES AND GATES SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Use this section in specifying permanent chain
More informationTHE RION ANTIRION BRIDGE DESIGN AND CONSTRUCTION
THE RION ANTIRION BRIDGE DESIGN AND CONSTRUCTION Jean-Paul TEYSSANDIER 1, Jacques COMBAULT 2 And Pierre MORAND 3 SUMMARY The RION-ANTIRION Bridge (Greece) is located in a zone of difficult environmental
More informationBenefits of Ultra-High Performance Concrete for the Rehabilitation of the Pulaski Skyway
Benefits of Ultra-High Performance Concrete for the Rehabilitation of the Pulaski Skyway Michael D. McDonagh, P.E., P.Eng., WSP Parsons Brinckerhoff Andrew J. Foden, Ph.D., P.E., WSP Parsons Brinckerhoff
More informationHigh Strength Epoxy Tested in Accordance with ICC-ES AC308
ADHESIVE ANCHORING SPECIALISTS DESCRIPTION/SUGGESTED SPECIFICATIONS* The 100% epoxy resin and hardener are completely mixed as they are dispensed from the dual cartridge through a static mixing nozzle,
More information2008 Bridge Load Rating Class 101
2008 Bridge Load Rating Class 101 Workshop Agenda VIII. Load Rating Example #2 IX. Simple Span Nail Laminated Timber Deck (without distress) Class Exercise Simple Span Nail Laminated Timber Deck (with
More informationMIDAS Training Series
MIDAS midas Civil Title: All-In-One Super and Sub Structure Design NAME Edgar De Los Santos / MIDAS IT United States 2016 Substructure Session 1: 3D substructure analysis and design midas Civil Session
More informationHOLLOW CORE FLOORS SPEED AND STRENGTH
HOLLOW CORE FLOORS SPEED AND STRENGTH CONTENTS 2 3 4 5 7 8 9 10 12 13 14 INTRODUCTION PRECAST CONCRETE FLOORS T HE A DVANTAGES BISON HOLLOW CORE FLOORS BEARINGS FALSE CEILINGS AND SOFFIT FIXINGS BISON
More informationWashoe County PLAN SUBMITTAL
Washoe County PLAN SUBMITTAL Washoe County PLAN SUBMITTAL SPECIAL INSPECTION AND TESTING AGREEMENTS SEPTEMBER 2013 Washoe County Permits Plus Zone 1001 East Ninth Street PO Bo 11130 Reno, NV 89520-0027
More informationPrecast segmental design and construction in China
Tailor Made Concrete Structures Walraven & Stoelhorst (eds) 2008 Taylor & Francis Group, London, ISBN 978-0-415-47535-8 Precast segmental design and construction in China Dong, Xu, Huichi Li & Chao Liu
More informationRecent Developments in Stay Cable Systems
Recent Developments in Stay Cable Systems PTI Technical Conference, Reno- 2006 Khaled Shawwaf, Technical Director (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED Page 1 of 45 * Cable Stayed
More informationPrestressed Concrete Girder Continuity Connection
Report No: Title: Developing Organization: Precast/Prestressed Concrete Institute Technical Committee Phone - 888-700-5670 Email contact@pcine.org Website- www.pcine.org Report Date: Revision Date: Status
More informationREPAIR OF PRECAST PRE-TENSIONED GIRDERS USING EXTERNAL POST-TENSIONING ASIT N. BAXI BAXI ENGINEERING MIGUEL FORERO SUNCOAST POST-TENSION
REPAIR OF PRECAST PRE-TENSIONED GIRDERS USING EXTERNAL POST-TENSIONING ASIT N. BAXI BAXI ENGINEERING MIGUEL FORERO SUNCOAST POST-TENSION PROJECT INFORMATION Project name: Laketown Wharf Retrofit Location:
More informationTHE DESIGN OF LONG CANTILEVER BEAM USING POST-TENSIONED TENDONS IN KUMJUNG STADIUM
D.S. Choi (E-353) 1/6 THE DESIGN OF LONG CANTILEVER BEAM USING POST-TENSIONED TENDONS IN KUMJUNG STADIUM Dong-Sub Choi Jong-Soo Kim Dong-Hwan Kim C.S Structural Engineers Inc., #413-4, Tokok2 dong, Kangnam-Gu,
More informationADAPT-PT 2010 Tutorial Idealization of Design Strip in ADAPT-PT
ADAPT-PT 2010 Tutorial Idealization of Design Strip in ADAPT-PT Update: April 2010 Copyright ADAPT Corporation all rights reserved ADAPT-PT 2010-Tutorial- 1 Main Toolbar Menu Bar View Toolbar Structure
More informationSchnabel Foundation Company
Micropiles for Roadway Support, Bridge Abutments and Metal Signal Poles on US-158 from US-17B to East of Pasquotank River, in Elizabeth City, NC Schnabel Foundation Company Presenter: Stephen Dimino, P.E.
More informationThe Hashemite University Department of Civil Engineering. Dr. Hazim Dwairi. Dr. Hazim Dwairi 1
Department of Civil Engineering Lecture 2.1 Methods of Prestressing Advantages of Prestressing Section remains uncracked under service loads Reduction of steel corrosion (increase durability) Full section
More informationDeckFast DAYTONSUPERIOR.COM FORMING. Shoring System
DeckFast Shoring System FORMING DeckFast is a highly productive, two component slab form system. It is as simple and quick as erecting two components to provide a ready to pour slab surface. American Owned
More informationHigh Strength Epoxy Tested in Accordance with ICC-ES AC308
ADHESIVE ANCHORING SPECIALISTS High Strength Epoxy Tested in Accordance with ICC-ES AC308 DESCRIPTION/SUGGESTED SPECIFICATIONS* The epoxy resin and hardener are completely mixed as they are dispensed from
More informationReinforced Concrete Column Design
Reinforced Concrete Column Design Compressive Strength of Concrete f cr is the average cylinder strength f c compressive strength for design f c ~2500 psi - 18,000 psi, typically 3000-6000 psi E c estimated
More information151 First Side. Technical Assignment 2 November 16 th, William J. Buchko. AE 481w Senior Thesis The Pennsylvania State University
November 16 th, 2007 William J. Buchko AE 481w Senior Thesis The Pennsylvania State University Thesis Advisor: Kevin Parfitt Table of Contents Executive Summary... 3 Structural System Overview Foundation...
More informationBridge Design. II. Bridge Types. Praveen Chompreda. Substructure. Superstructure. which support the roadway. Pier (Column) Abutment.
Components of Bridge EGCE 406 Bridge Design II. Bridge Types Substructure Superstructure Foundation (Pile/ Spread Footing) Any structures above bearing Pier (Column) which support the roadway Abutment
More informationGrain Silo Strengthening South Dakota. Prepared for Vector Construction Group
Grain Silo Strengthening South Dakota Prepared for Vector Construction Group May 20, 2002 Table of Contents General...3 nalysis...4 Vertical...4 Horizontal...4 Crack Control...6 Strengthening...7 Vertical...8
More informationCopyright. magazine. CFS Load Bearing Construction
Progressive Collapse Requirements Cold-Formed Steel Load Bearing Construction By Nabil A. Rahman, Ph.D., P.E., Michael Booth and Gary Bennett Figure 1: Cold formed steel load bearing mid-rise construction.
More informationTips For Designing Constructable Concrete Buildings
Tips For Designing Constructable Concrete Buildings by Clifford Schwinger, P.E. The Harman Group, Structural Engineers King of Prussia, Pa. Structural Engineers Association of Ohio Annual Conference Presentation
More informationCFRP Strengthening and Load Testing of the Concrete Deck of I-10 KCS Railroad Overpass Mohsen Shahawy, Ph.D, PE SDR Engineering Consultants, Inc.
CFRP Strengthening and Load Testing of the Concrete Deck of I-10 KCS Railroad Overpass Mohsen Shahawy, Ph.D, PE SDR Engineering Consultants, Inc. SDR Engineering Consultants, Inc. 2260 Wednesday Street,
More informationIronton Russell Bridge Project
Construction Update October 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2014
More informationMODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications
MODEL SPECIFICATIONS: Hydraulically Driven Steel Underpinning Pile Specifications Mar/2008 v1.0 SECTION 02255 HYDRAULICLY DRIVEN STEEL UNDERPINNING PILES PART 1 GENERAL 1.01 SCOPE OF WORK The work shall
More informationAccelerated and Innovative Bridge Construction In Washington State
Accelerated and Innovative Bridge Construction In Washington State Bijan Khaleghi Bijan.Khaleghi@WSDOT.WA.Gov Washington State Department of Transportation Bridge and Structures Office Olympia Washington
More informationSection 4 - Design and Construction Overview
Section 4 - Design and Construction Overview 4-1 Building Architecture/Enclosure The Pearland Recreation Center and Natatorium houses a recreation center and natatorium as shown in Figures 4-1.1 First
More informationAvoiding Falsework Failure
PDHonline Course G153 (1 PDH) Avoiding Falsework Failure Instructor: Eugene G. Washington, P.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org
More informationFranklin Square Hospital Center Patient Tower
Thomas Weaver Structural Option Franklin Square Hospital Center Patient Tower Baltimore, MD Thomas Weaver Structural Option AE 481W Senior Thesis Consultant: Professor M. Kevin Parfitt 12/14/2009 Page
More information