SPECIAL SPECIFICATION 3504 Septic Tank System

Size: px
Start display at page:

Download "SPECIAL SPECIFICATION 3504 Septic Tank System"

Transcription

1 1993 Specifications CSJ s , etc. & , etc. SPECIAL SPECIFICATION 3504 Septic Tank System 1. Description. This Item shall govern for all materials, equipment and labor necessary for the installation of Septic Tank System and all associated piping, fittings and appurtenances. Installation of the Septic Tank System shall be conducted by a qualified licensed system installation Contractor. The Contractor shall comply with the requirements of all laws, ordinances, rules and regulations of federal, state and local authorities. The Contractor shall provide documentation, which is acceptable to the Engineer, that they are experienced and qualified in Septic Tank System installation. All personnel shall be trained and experienced in the system installation practices and safety precautions. 2. Materials. (1) Summary. (a) This Section includes sewage disposal systems consisting of the following: 1. Concrete septic tanks and manholes. 2. Septic tank filters. 3. Automatic sump pumps. 4. Control panels. 5. Distribution pipes and fittings. 6. Leaching pipes and fittings. 7. Absorption trench fill materials. 8. Absorption field materials. 9. Valves. (b) Refer to Sections included in the Special Specification, Toll Plaza Facility : 1. Division 15 Section Sanitary Waste and Vent Piping for sewer piping from buildings and structures to septic tank system. 2. Division 15 Section Sump Pump for sewage pumps selected for distribution to absorption fields. (2) Definitions. (a) Absorption Field. Subsurface wastewater disposal process. (b) Absorption Trench. System of leaching pipes and filtering materials installed in trenches for wastewater disposal

2 (c) Distribution Piping. Solid pipe and pipe fittings installed with tight joints between septic tank and other septic tank system structures to, but not including, leaching piping. (d) Leaching Piping. Perforated pipe and pipe fittings or plain pipe with open joints in absorption field. (e) PVC. Polyvinyl chloride. (3) Submittals. (a) Product Data. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes as specified on the plans for the following: 1. Concrete septic tanks and manholes. 2. Septic tank filters. 3. Automatic sump pumps. 4. Control panels. 5. Distribution pipes and fittings. 6. Leaching pipes and fittings. 7. Absorption trench fill materials. 8. Absorption field materials. 9. Valves. (b) Shop Drawings. Include manhole openings, covers, pipe connections, and accessories for the following precast, reinforced-concrete structures: 1. Concrete septic tank. 2. Concrete manholes. (c) Coordination Drawings. Show piping, underground structures, and other utilities. Indicate size and invert elevations of piping and structures. (d) Permits. Contractor shall submit an approved On-Site Sewage Facility (OSSF) permit from Williamson County and Cities Health District. (4) Project Conditions. 3. Products. (a) Existing Utilities. Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated: 1. Notify Engineer not less than two days in advance of proposed utility interruptions. 2. Do not proceed with utility interruptions without Engineer's written permission. (1) Precast Concrete Septic Tanks and Manholes. (a) Description. Septic tank, 1500 gallon three-compartment tank with a 400-gallon first compartment, 600 gallon second compartment and 500 gallon pump chamber, precast reinforced-concrete tank and covers, designed for structural loading

3 according to ASTM C 890 and made according to ASTM C 1227, or as described on the plans, or as directed by the Engineer. (b) Description. Manhole, precast reinforced-concrete sections according to ASTM C478, or as specified on the plans, with approved ring and cover. Include manhole over each septic tank compartment top as directed by the Engineer. (c) Inlet and Outlet Access. 15-in. diameter as described on the plans or as directed by the Engineer. (d) Backfill. Select backfill type III fill, or 3/8 in. washed river pea gravel, or as shown on the plans, or as directed by the Engineer. (2) Septic Tank Filters. (a) Description. Septic tank outlet filters, removable filter that restricts discharge solids to specified size and has access from surface for service. Zabel A-1801 Filter or approved equal. (3) Automatic Sump Pumps. (a) Description. Automatic submersible effluent pump. Barnes SP hp Pump or approved equal. (b) Unit Size. Same as tank outlet pipe size, unless otherwise indicated. (4) Control Panels. (a) Description. Control panel with audio/visual high water alarm, separated fused disconnect for alarm circuit and pump circuit. GP-2115 control panel or approved equal. Properly mounted to pressure treated pole or to building. (5) Distribution Pipes and Fittings. (a) Refer to Special Specification, Toll Plaza Facility Division 15 Sanitary Waste and Vent Piping, Part 3 Execution Article for identification of systems where piping materials specified below are used. (b) PVC Sewer Pipe and Fittings. ASTM D 3034, SDR 26, non-perforated, for solvent-cement or elastomeric gasket joints. 1. Solvent Cement. ASTM D Gaskets. ASTM F 477, elastomeric seal. (6) Leaching Pipes and Fittings. (a) Refer to Special Specification, Toll Plaza Facility Division 15 Sanitary Waste and Vent Piping, Part 3 Execution Article for identification of systems where piping materials specified below are used. (b) PVC Sewer Pipe and Fittings. ASTM D 2729, perforated, for solvent-cement joints. 1. Solvent Cement. ASTM D

4 (c) Non-Vehicular-Traffic-Area Cleanouts. PVC pipe and fittings, ASTM D 3034, SDR 26, nonperforated, for solvent-cement or elastomeric gasket joints. Include PVC threaded cleanout plug. (d) Vehicular-Traffic-Area Cleanouts. ASME A M; with round, flanged, cast-iron housing and secured, scoriated, medium-duty loading class, cast-iron cover. Include cast-iron ferrule and countersunk brass cleanout plug. (7) Absorption Trench Fill Materials. (a) Filtering Material. 3/8 to 1 in. of one uniform size of washed crushed stone, or 3/8 in. washed river pea gravel, or as directed by the Engineer. (b) Filter Mat. Geotextile woven or spun filter fabric, in 1 or more layers, for minimum total unit weight of 3 oz./sq. yd. (8) Absorption Field Materials. (a) Fill Material. 6 to 8 in. of sandy loam, or as shown on the plans, or as directed by the Engineer. (b) Vegetation Cover. Seed or hydromulch with perennial grasses or a mixed variety as described under Item 164 Seeding for Erosion Control, or as shown on the plans, or as directed by the Engineer. No shrubs or trees. (9) Valves. 4. Execution. (a) Description. 2 in. brass gate valve with 6 in. PVC valve box and cover, or as shown on the plans, or as directed by the Engineer. (b) Description. 1-1/4 in. pressure adjustment valve, or as shown on the plans, or as directed by the Engineer. (1) Examination. (a) Survey the area for septic tank system installation. Locate and mark existing utilities, underground structures, and aboveground obstructions before beginning and avoid disruption of and damage to services. (b) Examine soil structure, materials, and conditions. (c) Proceed with installation only after unsatisfactory conditions have been corrected. (2) Preparation. (a) Clean exposed surfaces of tanks and other structures and protect as necessary to ensure freedom from damage and deterioration at time of Substantial Completion. (3) Earthwork

5 (a) Excavating, Trenching, and Backfilling for Distribution Pipes and Fittings are specified in Item 400, Excavation and Backfill for Structures : 1. Stockpile topsoil for possible reuse in finish grading without intermixing with other excavated material. Stockpile materials away from edge of excavation and do not store within drip line of remaining trees. 2. Backfill with approved materials in a manner approved by the Engineer. 3. Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust. (b) Excavating and Backfilling for Septic Tanks are specified in Item 400, Excavation and Backfill for Structures : 1. Excavate sufficient width and length for tanks to a depth determined by tank inlet and outlet elevations. Provide level bottom. 2. Backfill with approved materials in a manner approved by the Engineer. (c) Excavating and Backfilling for Absorption Fields are specified in Item 400, Excavation and Backfill for Structures : 1. Excavate trenches a minimum 12 in. in width and 14 in. in depth, minimum, for a single pipe. 2. Backfill absorption trenches immediately with approved backfill materials to the elevations and grades as shown on the plans, or as directed by the Engineer. (4) Identification. (a) Arrange for installation of green warning tape directly over piping (including absorption field piping), at outside edges of underground structures, and at outside edges of absorption fields. (b) Use detectable warning tape over piping, over edges of underground structures, and over edges of absorption fields. (5) Septic Tank Installation. (a) Install precast concrete septic tanks level according to ASTM C 891. (6) Piping Applications. (a) Use pipes, fittings, and joining methods, for all piping sizes, according to the following applications: 1. Install solid piping and fittings to connect septic tank with leaching pipes. 2. Install leaching piping and fittings. Install leaching pipe with perforations at bottom. (7) Pipe Joint Construction and Piping Installation. (a) Join and install solvent-cement-type PVC pipe and fittings according to ASTM D 2855 and ASTM F 402. (b) Join gasketed PVC pipe and fittings with elastomeric seals according to ASTM D

6 (c) Install distribution PVC piping according to ASTM D (d) Install leaching PVC piping according to ASTM D 2321 and ASTM F 481. (8) Absorption Field Installation. (a) Filtering Material. Place a supporting layer of filtering material over the compacted trench base to a compacted depth not less than 12 in. below bottom of pipe, or as shown on the plans. (b) Install distribution piping at a minimum slope of 1% and a maximum slope as determined by the Engineer. (c) Install leaching piping solidly bedded in filtering material, with full bearing for each pipe section throughout its length. Maintain pipe alignment with no slope, or as directed by the Engineer. 1. Install perforated pipe with perforations down and joints tightly closed. Install collars and couplings as required. 2. Install elbow fittings with tight joints. 3. Place additional filtering material as needed and as directed by the Engineer. (d) Install filter mat over filter material before backfilling. (e) Place layers of sandy loom topsoil above area. Provide grass seed or hydromulch with perennial grasser or a mixed variety or as shown on the plans. Provide side slope and tie slope toe smoothly into existing grade as shown on the plans or as directed by the Engineer. (f) Install distribution piping at a minimum slope of 1% and a maximum slope as directed by the Engineer. (9) Cleanout Installation. (a) Install cleanouts and extension from piping to cleanout at grade as indicated. Use 4 in. PVC pipe with threaded PVC cap. Set top of cleanout 2 in. above surrounding grade. (b) Install cleanouts and extension from piping to cleanout at grade as indicated. Set cleanout housing and cover in concrete block 18 by 18 by 12 in. deep, unless location is in concrete pavement. Set top of cleanout 1 in. above surrounding grade or flush with grade if installed in pavement. (c) Refer to Special Specification, Toll Plaza Facility Division 3 Section Cast-in- Place Concrete for formwork, reinforcement, and concrete. (10) Connections. (a) Connect sanitary sewerage piping to septic tank. (b) Connect piping between septic tank system structures and absorption fields. (11) Field Quality Control

7 (a) System Tests. Perform testing of completed septic tank system piping and structures according to authorities having jurisdiction. (b) Additional Tests. Fill underground structures with water and let stand overnight. If water level recedes, locate and repair leaks and retest. Repeat tests and repairs until there is no leakage. (c) Williamson County and Cities Health District Inspections. The Contractor shall coordinate with Williamson County and Cities Health District for the required construction inspections and final acceptance inspection. (12) Cleaning. (a) Clear interior of piping and structures of dirt and other superfluous material as work progresses. (b) Maintain swab or drag in piping, and pull past each joint as it is completed. Place plugs in ends of uncompleted pipe at end of workday or when work stops. 5. Measurement. This Item will be measured by the each, installed, complete in place, made fully operational and tested in accordance with this special specification or as directed by the Engineer. 6. Payment. The work performed and the materials furnished in accordance with this Item and measured as provided under Measurement will be paid for at the unit price bid for Septic Tank System. This price shall be full compensation for furnishing, placing and testing all materials and equipment, seeding, and for all tools, labor, shop drawings, documentation, and incidentals necessary to complete the work

SECTION FACILITY SANITARY SEWERS

SECTION FACILITY SANITARY SEWERS SECTION 22 13 13 FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 221313 - FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 02630 - STORM DRAINAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

A. This Section includes sanitary waste and vent piping inside the building and to locations indicated.

A. This Section includes sanitary waste and vent piping inside the building and to locations indicated. SECTION 221316 SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

A. This Section includes subdrainage systems for foundations and underslab areas. A. Product Data: For each type of drainage panel indicated.

A. This Section includes subdrainage systems for foundations and underslab areas. A. Product Data: For each type of drainage panel indicated. ZGF Partnership Page 1 of 7 SECTION 33 46 00 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes subdrainage systems for foundations and underslab areas. 1.2 SUBMITTALS A. Product Data: For each type

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 22 1316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

***************************************************************************************************************

*************************************************************************************************************** 02720 STORM DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 40 00. ***************************************************************************************************************

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS

SECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY Section Includes: 1. Pipe and fittings. 2. Drain Basin. 3. De-chlorination tablet feeder. 4. Non-pressure transition couplings.

More information

SECTION STORM DRAIN

SECTION STORM DRAIN PART 1 - GENERAL 1-01 SECTION INCLUDED A. Furnishing and installing storm drainage facilities, including pipe, cleanout, manhole structures and inlet structures. 1-02 RELATED SECTIONS A. Division 00 Contract

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle

More information

SEPTIC TANK CONSTRUCTION GUIDELINES

SEPTIC TANK CONSTRUCTION GUIDELINES SEPTIC TANK CONSTRUCTION GUIDELINES Septic tank for this airport will be designed/ built by the general contractor of the building facilities. At the time of the project design, availability of a septic

More information

GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS

GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS UTAH COUNTY HEALTH DEPARTMENT Div. of Environmental Health 151 South University Avenue, Provo 84601 (801) 851-7525 FAX 851-7521 GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS This is intended to

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 33 3400 STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

***************************************************************************************************************

*************************************************************************************************************** 02735 WASTE WATER DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 22 14 00 ***************************************************************************************************************

More information

CHAPTER 6. Sanitary Sewer

CHAPTER 6. Sanitary Sewer CHAPTER 6 Sanitary Sewer A. Introduction All proposed developments, subdivisions, and buildings must have a properly designed and constructed sanitary sewer collection system. The system shall provide

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING SECTION 221316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following soil and waste, sanitary drainage and vent piping inside the building: 1. Pipe, tube,

More information

SECTION FOUNDATION DRAINAGE

SECTION FOUNDATION DRAINAGE SECTION 33 41 13 SPEC WRITER NOTES: Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section

More information

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION 820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing

More information

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES SECTION 15420 DRAINAGE AND VENT SYSTEMS PART 1 DESIGN DIRECTIVES 1.1 DESIGN CRITERIA A. All cleanouts above finished (accessible and non-accessible) ceilings shall be extended to the floor above. B. Do

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

Daytona Beach Pier Building Renovation Jun 2010

Daytona Beach Pier Building Renovation Jun 2010 SECTION 15150 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.

More information

On-lot System Component Requirements

On-lot System Component Requirements On-lot System Component Requirements All system components used with an on-lot system employing an Eljen GSF System must meet either the requirements of Title 25, Chapter 73 or the Eljen GSF Listing. The

More information

SECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation

SECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation SECTION 33 40 00 STORM DRAINAGE UTILITIES 1. PART 1 GENERAL 1.1 RELATED WORK A. Section 31 23 00: Excavation and Fill B. Section 32 00 01: Site Restoration and Rehabilitation C. Special Conditions for

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY PHASE II SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

THIS IS A COURTESY COPY OF THIS RULE. ALL OF THE DEPARTMENT S RULES ARE COMPILED IN TITLE 7 OF THE NEW JERSEY ADMINISTRATIVE CODE.

THIS IS A COURTESY COPY OF THIS RULE. ALL OF THE DEPARTMENT S RULES ARE COMPILED IN TITLE 7 OF THE NEW JERSEY ADMINISTRATIVE CODE. (f) The minimum requirements for construction, materials and foundations of grease traps shall be the same as those required for septic tanks, as prescribed in N.J.A.C. 7:9A-8.2. (g) The inlet and outlet

More information

1. B16.1 Cast Iron Pipe Flanges and Flanged Fittings, Class C 111 Rubber Gasket Joints for Ductile Iron Pressure Pipe and Fittings

1. B16.1 Cast Iron Pipe Flanges and Flanged Fittings, Class C 111 Rubber Gasket Joints for Ductile Iron Pressure Pipe and Fittings SECTION 33 34 00 SANITARY FORCE MAIN PART 1 GENERAL 1.1 SCOPE OF WORK A. This section specifies the requirements for furnishing and installing sanitary force main and appurtenances. The pipe shall be of

More information

New Fulton State Hospital Energy Control Center and Services Building (ECC/SVC) Project Number: M

New Fulton State Hospital Energy Control Center and Services Building (ECC/SVC) Project Number: M SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE SECTION 02632 POLYVINYL CHLORIDE (PVC) WATERLINE PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required, and install polyvinyl chloride (PVC) waterline,

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES SECTION 02221 EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02660 - Water Systems. 3. 02720 - Storm Drainage System. 4.

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 22 1319 - SANITARY WASTE PIPING SPECIALTIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density

More information

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The work covered by this Section includes all labour, materials, equipment, and supervision necessary to complete the site services as shown

More information

SECTION FOUNTAINS

SECTION FOUNTAINS PART 1 - GENERAL SECTION 13121 FOUNTAINS 1.1 SUMMARY A. Section includes design and complete installation of decorative fountains complete as shown on Drawings and as specified, including: 1. Equipment

More information

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows. 403.01 Section 403. DRAINAGE STRUCTURES 403.01 Description. Adjust, construct, or temporarily lower drainage structures. Clean existing drainage structures and leads as directed by the Engineer. Drainage

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL Page 312 VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS-12-01 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the IL ROUTE

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

STORM DRAINAGE CHAPTER 11

STORM DRAINAGE CHAPTER 11 CHAPTER 11 STORM DRAINAGE SECTION 11 GENERAL 11.1 Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. 11.2 Where required. All roofs,

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

SANITARY SEWERAGE AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) AMERICAN RAILWAY ENGINEERING ASSOCIATION (AREA)

SANITARY SEWERAGE AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) AMERICAN RAILWAY ENGINEERING ASSOCIATION (AREA) SANITARY SEWERAGE 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending

More information

SECTION WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING

SECTION WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING SECTION 334701 - WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. The Contractor shall provide all labor, materials, tools, and equipment required

More information

Facility Sanitary Sewers

Facility Sanitary Sewers University of New Hampshire University of New Hampshire Scholars' Repository Division 22 Plumbing Chapter 5 Technical Construction and Renovation Standards 4-23-2015 221313 - Facility Sanitary Sewers Sandra

More information

Commonwealth of Massachusetts Title 5 Official Inspection Form Subsurface Sewage Disposal System Form - Not for Voluntary Assessments

Commonwealth of Massachusetts Title 5 Official Inspection Form Subsurface Sewage Disposal System Form - Not for Voluntary Assessments Inspection results must be submitted on this form. Inspection forms may not be altered in any way. Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use

More information

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.

SECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. SECTION 33 05 13 MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. B. Related Sections: 1. Section 03 20 00 - Concrete

More information

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems SECTION 02607-1 1.0 GENERAL 1.1 SCOPE: A. This section covers the work necessary for the construction of sanitary and storm system manholes, catch basins, and miscellaneous concrete structures complete.

More information

SECTION STORM DRAINAGE AND STORMWATER MANAGEMENT

SECTION STORM DRAINAGE AND STORMWATER MANAGEMENT SECTION 322 - STORM DRAINAGE AND STORMWATER MANAGEMENT 322.01 DESCRIPTION Work includes all labor, material and equipment to construct storm drain systems and stormwater management facilities, including

More information

Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction

Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction 1.00 DESCRIPTION 1.01 WORK INCLUDED: This work shall include the furnishing of all labor, equipment and materials necessary

More information

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of

More information

Residential Sewer Backup Prevention Program

Residential Sewer Backup Prevention Program City of Wheaton Residential Sewer Backup Prevention Program Please Note: The City reserves the right to modify the policies, procedures and rules of this program or discontinue the program in its entirety

More information

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections. SANITARY SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Sanitary Sewer Gravity Mains B. Sanitary Sewer Force Mains C. Sanitary Sewer Services 1.02 DESCRIPTION OF WORK A. Construct sanitary sewer gravity

More information

CHAPTER 200 STORM SEWER CONSTRUCTION STANDARDS

CHAPTER 200 STORM SEWER CONSTRUCTION STANDARDS CHAPTER 200 STORM SEWER CONSTRUCTION STANDARDS Storm Sewer System: 1. Detention/retention of stormwater runoff shall be provided in accordance with the requirements of the DuPage County Countywide Stormwater

More information

SECTION SANITARY WASTE INTERCEPTORS

SECTION SANITARY WASTE INTERCEPTORS SECTION 22 13 23 SANITARY WASTE INTERCEPTORS PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

CW 3530 MANUAL IRRIGATION SYSTEM TABLE OF CONTENTS

CW 3530 MANUAL IRRIGATION SYSTEM TABLE OF CONTENTS October 1990 CW 3530 MANUAL IRRIGATION SYSTEM TABLE OF CONTENTS 1. GENERAL CONDITIONS...1 3. DESCRIPTION...1 5. MATERIALS...1 5.1 General...1 5.2 Testing and Approval...1 5.3 Irrigation Pipe and Fittings...1

More information

SDR26 material is to be used as a minimum on all U-M projects.

SDR26 material is to be used as a minimum on all U-M projects. BuildingName The Description of the Project P00000000 0000 DOCUMENTS SPECIFICATION DIVISION 33 NUMBER SECTION DESCRIPTION DIVISION 33 SANITARY SEWER UTILITIES SECTION 333100 - SANITARY SEWER END OF CONTENTS

More information

DRAINS AND CLEANOUTS. 1. Division 7 - Thermal and Moisture Protection Piping (Plumbing).

DRAINS AND CLEANOUTS. 1. Division 7 - Thermal and Moisture Protection Piping (Plumbing). SECTION 15421 DRAINS AND CLEANOUTS PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. Division 7 - Thermal and Moisture Protection. 2. 15410 - Piping (Plumbing). 1.02 SUBMITTALS A. Product Data: Submit

More information

SECTION GRAVITY IRRIGATION PIPELINES RUBBER GASKETED REINFORCED CONCRETE PIPE (RGRCP)

SECTION GRAVITY IRRIGATION PIPELINES RUBBER GASKETED REINFORCED CONCRETE PIPE (RGRCP) SECTION 02513 GRAVITY IRRIGATION PIPELINES RUBBER GASKETED REINFORCED CONCRETE PIPE (RGRCP) PART 1 GENERAL 1.01 SECTION INCLUDES A. Irrigation pipeline, as herein specified, consists of installing pipe

More information

SECTION 501 GRAVITY SEWERS. U. No pipe length used shall be less than 5 feet.

SECTION 501 GRAVITY SEWERS. U. No pipe length used shall be less than 5 feet. SECTION 501 GRAVITY S PART 2 MATERIALS 2.1 PIPE SIZE, TYPE, AND STRENGTH D. Only concrete or polyvinyl chloride sewer pipe shall be used for sewer line construction unless otherwise approved by the City

More information

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without

More information

GWINNETT COUNTY STORM SEWER PIPE STANDARDS

GWINNETT COUNTY STORM SEWER PIPE STANDARDS 1.0 Standard Specifications GWINNETT COUNTY STORM SEWER PIPE STANDARDS 1.1 Unless otherwise specifically set forth herein or in the Gwinnett County Standard Drawings, all of the materials, methods of the

More information

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS SECTION 02620 PART 1 GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required to install High Density Polyethylene (HDPE) pressure pipe, fittings, and appurtenances

More information

SECTION UTILITY MANHOLES AND STRUCTURES

SECTION UTILITY MANHOLES AND STRUCTURES SECTION 33 05 14 UTILITY MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Precast reinforced concrete manholes and structures with tongue-and-groove joints with masonry transition

More information

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect.

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

On-Site Leaching Chamber Specifications & Features. Design & Installation Manual Ohio

On-Site Leaching Chamber Specifications & Features. Design & Installation Manual Ohio On-Site Leaching Chamber Specifications & Features Design & Installation Manual Ohio 1 This manual provides general design and installation information for use of Arc plastic leaching chambers in the State

More information

PIPE REHABILITATION. Comply with Division 1 - General Provisions and Covenants, as well as the following:

PIPE REHABILITATION. Comply with Division 1 - General Provisions and Covenants, as well as the following: PIPE REHABILITATION PART 1 - GENERAL 1.01 SECTION INCLUDES A. Sliplining Pipe B. Cured-in-place Pipe Lining C. Deformed/Reformed Pipe Lining D. Folded/Formed Pipe Lining E. Spot Repairs by Pipe Replacement

More information

Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility:

Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility: Oklahoma Department of Environmental Quality Water Quality Division Phone: 405-702-8100 Construction Permitting Section 707 N. Robinson, OKC, OK 73102-6010 P.O. Box 1677, OKC, OK 73101-1677 Sanitary Sewer

More information

DRIP EMITTER SYSTEM STUDY GUIDE

DRIP EMITTER SYSTEM STUDY GUIDE DRIP EMITTER SYSTEM STUDY GUIDE Minimum Criteria for Pressurized Subsurface Absorption Fields Utilizing Emitters. Subsurface systems utilizing emitters may be used in lieu of conventional or other alternative

More information

GRAY WATER RECYCLING SYSTEMS

GRAY WATER RECYCLING SYSTEMS GRAY WATER RECYCLING SYSTEMS Note: Section P2601.2 of the International Residential Code requires all plumbing fixtures that receive water or waste to discharge to the sanitary drainage system of the structure.

More information

SECTION STORM UTILITY DRAINAGE PIPING

SECTION STORM UTILITY DRAINAGE PIPING SECTION 33 41 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction. Design Manual Chapter 3 - Sanitary Sewers 3C - Facility Design 3C-1 Facility Design A. Capacity of Pipe Pipe sizes 15 inches and smaller should carry the peak flow at a depth of no more than 0.67 of the

More information

Fabrication and Installation Table of Contents

Fabrication and Installation Table of Contents Fabrication and Installation Table of Contents HDPE AQUASHIELD PRODUCTS 2 Fabrication and Installation 2 System Fabrication 3 Aqua-Swirl Installation 4 Step 1 Excavation and Bedding 4 Step 2 Pipe Connection

More information

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL This section covers the furnishing and installation of ductile iron water pipe, fittings, thrust restraint and pipe disinfection. Ductile Iron Pipe MATERIALS

More information

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction.

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction. General: 1. Construct utilities in accordance to TWA approved plans and shop drawings. Any deviation from the approved plans shall be approved by the DEVELOPER S ENGINEER and TWA 2. A preconstruction meeting

More information

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm Sewers B. Abandonment of Storm Sewers 1.02 DESCRIPTION OF WORK A. Construct storm sewers. B. Abandon storm sewers. 1.03 SUBMITTALS Comply with

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain

More information

SECTION PIPE & PIPE FITTINGS PART 1 GENERAL

SECTION PIPE & PIPE FITTINGS PART 1 GENERAL SECTION 02610 PIPE & PIPE FITTINGS PART 1 GENERAL 1.01 DESCRIPTION A. This Section includes the material and bedding requirements for all pipe and pipe fittings for underground pressure and non-pressure

More information

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies. The language provided in these specifications is meant to serve as a reminder and provide a generic example of the type of language that should be provided in final construction documents. This language

More information

A. BILL OF QUANTITIES FOR SANITARY SEWER

A. BILL OF QUANTITIES FOR SANITARY SEWER Note: Unit prices of BoQ items shall include the execution of all small and unforeseen works not covered by BoQ, but that are necessary to be carried out during construction for smooth process of works

More information

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2 INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...

More information

FS-DUO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62.2 cm)

FS-DUO. Wastewater Flow Distributor Technical Data. Submittal Special Precautions Specifications Installation. (62.2 cm) (62.2 cm) Wastewater Flow Distributor Technical Data Submittal Special Precautions Specifications Installation 24½" (62.2 cm) 12½" (31.8 cm) 24½" (62.2 cm) (30.5 cm) SUBMITTAL STANDARD: 4" plain end inlet/outlet

More information

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY):

PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): PART A : CPVC PIPES AND FITTNGS (EXTERNAL WATERSUPPLY): 01 Providing and Fixing of CPVC pipes confirming to ASTM standard including all CPVC fittings like tees, elbows, bends, unions, coupling, reducer

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01025 - MEASUREMENT AND PAYMENT PART 1 - GENERAL 1.01. BASIS FOR MEASUREMENT AND PAYMENT Measurement and Payment will be made for only those items included in the Schedule of Unit Prices or Contract

More information

A. Codes and Standards that are Standards at the University. A. Provide floor drains in all toilet rooms, janitor closets, and mechanical rooms.

A. Codes and Standards that are Standards at the University. A. Provide floor drains in all toilet rooms, janitor closets, and mechanical rooms. PART 1: GENERAL 1.01 Purpose A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014 1 0 1 0 1 0 1 SECTION 1. TRENCHING BASED ON DFD MASTER SPECIFICATION DATED // P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all work, materials, labor, equipment,

More information

HOLDING TANK PLANNING & INSTALLATION GUIDELINES

HOLDING TANK PLANNING & INSTALLATION GUIDELINES HOLDING TANK PLANNING & INSTALLATION GUIDELINES Under no circumstances is sewage from a holding tank to be discharged onto the surface of the ground or into groundwater or surface waters. TABLE OF CONTENTS

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:

More information

Construction Inspection Checklists

Construction Inspection Checklists III. Construction Inspection Checklists 33 Bioretention - Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: Construction Sequence Satisfactory / Unsatisfactory Comments

More information

BMP 6.4.4: Infiltration Trench

BMP 6.4.4: Infiltration Trench BMP 6.4.4: Infiltration Trench An Infiltration Trench is a leaky pipe in a stone filled trench with a level bottom. An Infiltration Trench may be used as part of a larger storm sewer system, such as a

More information

PERMEABLE INTERLOCKING PAVERS

PERMEABLE INTERLOCKING PAVERS PERMEABLE INTERLOCKING PAVERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subgrade Preparation B. Placement of Storage Aggregate C. Placement of Filter Aggregate D. Placement of Bedding Course E. Placement

More information

WASTEWATER SYSTEM STANDARDS

WASTEWATER SYSTEM STANDARDS 8.1 SCOPE Wastewater pipelines and appurtenances shall be provided as shown on the plans and as specified herein. Clearing, grubbing, trench excavation and backfill, pipe material, valves, cutting and

More information

Attachment D-1: Civil/Structural Scope of Work

Attachment D-1: Civil/Structural Scope of Work Attachment D-1: Civil/Structural Scope of Work Project: Location: Targa Sound Renewable Fuels Project Tacoma, WA Prepared by: NORWEST ENGINEERING Consulting Engineers 4110 N.E. 122 nd Avenue, Portland,

More information

Storm Drainage

Storm Drainage University of New Hampshire University of New Hampshire Scholars' Repository Division 33 Utilities Chapter 5 Technical Construction and Renovation Standards 4-23-2015 334100 - Storm Drainage Sandra Hickey

More information

SERVICE LINES, METERS AND APPURTENANCES

SERVICE LINES, METERS AND APPURTENANCES AUGUST02 SECTION 02646 SERVICE LINES, METERS AND APPURTENANCES PART 1 - GENERAL 1.1 DESCRIPTION A. This section concerns materials and installation of corporation stops, curb stops, service lines, meters,

More information

DUKE UNIVERSITY CONSTRUCTION STANDARDS

DUKE UNIVERSITY CONSTRUCTION STANDARDS 1 33 40 00 Storm Drainage 1. Introduction A. Duke University is divided into the main areas of the Medical Center, West Campus, Central Campus, and East Campus. The University also includes the Washington

More information

GUIDELINES FOR SEPTIC SYSTEM DESIGN

GUIDELINES FOR SEPTIC SYSTEM DESIGN GUIDELINES FOR SEPTIC SYSTEM DESIGN Single Family Residential For multi family or commercial buildings, Or If in the Oakdale area, contact the Department of Environmental Resources Regarding septic system

More information

DOCUMENT ADDENDUM No. 2

DOCUMENT ADDENDUM No. 2 DOCUMENT ADDENDUM No. 2 PART 1 GENERAL 1.1 DOCUMENT INCLUDES A. Clarifications 1.2 CONSTRUCTION CONTRACT A. The Construction Contract is known as SU095 9 th Street and SU096 Downs Drive Storm Drain Projects.

More information

Summary of the 2011 Changes

Summary of the 2011 Changes The following is a list of amendments to the Residential Site Improvement s, N.J.A.C. 5:21, adopted in 2011. The Notice of Adoption of these changes appeared in the New Jersey Register on May 16, 2011.

More information