1 HWY 99 & 196 TH STREET SW SECTION STRUCTURAL STEEL PART 1 GENERAL 1.1 SUMMARY A. This Section specifies the construction of all structural metal framing, including columns, beams, lintels attached to steel columns, lintels over 200 lbs in weight, masonry bearing plates, connectors, shelf angles, primer, and grout. B. Contractor shall provide all labor, materials, equipment, and services necessary to design, fabricate, deliver, and install all structural metal framing work, as indicated on the Drawings, in accordance with local codes and standards, or as specified herein. This work shall include but not be limited to fabricating, delivering, and erecting structural metal framing, cutting, fitting, welding, cleaning, painting, providing temporary supports, and removing all temporary steel elements necessary for erection of structural metal. C. Coordinate delivery with other work to avoid delay. All work shall be coordinated with other sections. 1. Related Sections: a. Section 05500, "Metal Fabrications" for furnishing steel lintels for unit masonry. b. Section 07620, "Sheet Metal Flashing and Trim" for furnishing manufactured reglets installed in masonry joints for metal flashing. 1.2 SUBMITTALS A. Submittals shall be provided in accordance with Sections 01330, and B. Product Data: For each type of product indicated. C. Shop Drawings: 1. For structural metal framing: Base drawings on Construction Documents, and details. 2. Shop drawings shall clearly show plans, elevations, sections, details, and attachments to other work, location, fastening and anchorage details, and materials required. 3. Submit complete shop fabrication details and erection diagrams. Such shop details and erection diagrams shall give all pertinent information of construction methods proposed, together with all required dimensions for the proper fitting for the connection with other work and materials. 4. Show, in detail, fabrication of all structural metal components included in the Contract. D. Samples for review in accordance with Sections and E. Material certificates for each type of product indicated. Include statements of material properties indicating compliance with requirements, standards, and type designations within standards. Include material test reports, substantiating compliance with requirements. F. Welding certificates. G. Mill test reports. H. Qualification Data. I. Source quality control test reports. J. Substitutions shall be requested in accordance with Sections and QUALITY ASSURANCE A. Installer Qualifications: Experience in performing work of this section, specializing in installation of work similar to that required for this project, employing workers who are skilled in this area of work, and whose projects have a record of successful in-service performance. 1. Welding: Qualified procedures and personnel according to AWS D1.1, Structural Welding Code. B. Manufacturers shall meet the industry standards and codes for the materials identified on the Drawings and in the Specifications herein, including but not limited to: 1. American Institute of Steel Construction a. Specifications for the Design, Fabrication and Erection of Steel for Buildings. STRUCTURAL STEEL

2 HWY 99 & 196 TH STREET SW b. Code of Standard Practice c. Manual of Steel Construction 2. American Welding Society: Code for Welding in Building Construction AWS D Latest edition of each of above governing standards shall apply. 4. Fabricate in accordance with the AISC Quality Certification Program. C. Certification: Product certificates signed by manufacturer, certifying materials comply with specified performance characteristics, criteria, and physical requirements. D. Manufacturer s instructions for installation shall be delivered and stored with the materials. E. Testing: As required by the latest industry codes and standards. 1. Field tests: Where a welded splice is fabricated in beams or columns, other than those detailed, the fabricator shall have the splice connection tested using one of the following methods: a. magnetic particle b. radiographic c. ultrasonic 2. The testing shall be conducted by an independent testing laboratory and a report submitted to the Architect and Owner Representative. 3. The costs of this testing shall be borne by the fabricator. F. Performance requirements: 1. Provide assemblies capable of withstanding design loads within limits and under conditions indicated on the Drawings. 2. Connections: Provide details of simple shear connections required by the Contract Documents to be selected or completed by structural-steel fabricator to withstand ASD-service and LRFD loads indicated, and comply with other information and restrictions indicated. 3. Select and complete connections using schematic details indicated, and AISC's "Manual of Steel Construction, Load and Resistance Factor Design," Volume 2, Part 9. G. Tolerances shall conform to industry codes and standards, except as otherwise noted. H. Warranty: 1. Manufacturer s Warranty: Submit, for Owner s acceptance, manufacturer s standard warranty document executed by authorized company official. Manufacturer s warranty is in addition to, and not a limitation of, other rights Owner may have under Contract Documents. 2. Warranty Period: two (2) years commencing on Date of Certificate of Occupancy. 3. Additional requirements for product warranties are included in Section DELIVERY, STORAGE AND HANDLING A. Transport and handle all materials in such a manner as to prevent damage. Dumping on the ground is not permitted. B. Locate storage piles, stacks, or bins to avoid or protect material from heavy and unnecessary traffic. C. Furnish temporary protection for all exposed edges and corners. D. Deliver all packaged materials in original, unopened, undamaged containers, with identification labels intact, and bearing the name of the manufacturer and brand. E. Ordering: Comply with manufacturer s ordering instructions and lead time requirements to avoid construction delays. F. Store all steel materials off the ground, and protect materials from corrosion and deterioration. Store fasteners in a protected location. Clean and lubricate bolts and nuts that become dry or rusty before use. G. Protect materials from exposure to harmful weather conditions, and at temperature and humidity conditions recommended by manufacturer. Some materials may need to be stored in protected enclosures, and handled by methods which avoid exposure to moisture. Store materials off the ground, under cover, and in a dry location. Additional requirements for product delivery, storage and handling are in Section STRUCTURAL STEEL

3 HWY 99 & 196 TH STREET SW PART 2 PRODUCTS 2.1 STRUCTURAL STEEL MATERIALS A. Structural steel shapes, plates and bars shall conform to ASTM A36 (Fy = 36,000 PSI), except A992 ' W' shapes (Fy=50,000 PSI). B. Steel pipe columns shall conform to ASTM A53, Grade B. C. Steel tube columns shall conform to ASTM A500, Grade B. D. Anchor rods, bolts and nuts and machine bolts shall conform to ASTM A307, unless otherwise indicated. E. Welding rods shall conform to AWS A5.0, E70 series, low hydrogen type. F. Expansion bolts shall be Hilti anchors with a 360 deg expansion steel wedging action, unless noted otherwise. G. Sections shall be of dimensions, weight and design as indicated, assembled complete at the shop, with base plates and other detailed materials attached. Furnish 1/4" thick leveling plates at all columns where base plates are shop fabricated to columns. H. All material must be new, of uniform quality, suitable and without defects affecting the strength of service of the structure. I. W-Shapes: ASTM A 992/A 992M, ASTM A572/A572M, Grade 50. J. Channels, Angles, M, S-Shapes: ASTM A36/A36M, [ASTM A 572/A 572M, Grade PRIMER A. All metals shall be shop primed per SATM standards unless indicated otherwise. B. Metal primer shall conform to FS TT-P GROUT A. Nonmetallic, Shrinkage-Resistant Grout: ASTM C1107, factory-packaged, nonmetallic aggregate grout, noncorrosive, nonstaining, mixed with water to consistency suitable for application and a 30-minute working time. 2.4 FABRICATION A. All workmanship, details of construction, etc., except as otherwise indicated or specified, shall conform with AISC "Specifications for Design, Fabrication and Erection of Structural Steel for Buildings", AISC "Code of Standard Practice", and applicable building codes. B. Shop fabricate and assemble steel to the greatest extent possible prior to delivery to site. C. Make connections as indicated or detailed, on the Drawings, and the approved shop and erection drawings. D. Mark materials for field assembly. Arrange fabrication order for most efficient delivery sequence for field assembly. E. All exposed steel shall have smooth, clean surfaces with no identifying trademarks, names, etc., exposed to view. 1. Leave in condition for finish painting. F. Machine bolts shall have proper length shanks with no bearing on threaded portions. G. Erect all work to the proper lines and levels, plumb and true, and in correct relation to other work. 1. Secure all parts in a rigid and substantial manner during construction. H. Bolted connections shall be as detailed or shall conform to AISC standard bolted connections with maximum number of 3/4" diameter bolts. 1. See Framed Beam Connections Table I, II, III, or IV of AISC Manual of Steel Construction. I. No slotted holes permitted at steel connections unless approved by Architect. J. Where bolt holes in steel members are enlarged to more than 1/16" diameter oversize, provide 3/16" x 2-1/2" x 2-1/2" plate washers with proper diameter hole. STRUCTURAL STEEL

4 HWY 99 & 196 TH STREET SW 1. Weld plate washers to steel members with 1/8" fillet weld all around. K. Structural Steel: Fabricate according to AISC's "Code of Standard Practice for Steel Buildings and Bridges" and AISC's "Specification for Structural Steel Buildings--Allowable Stress Design and Plastic Design, or Load and Resistance Factor Design Specification for Structural Steel Buildings", as required. L. Shear Connectors: Prepare steel surfaces as recommended by manufacturer of shear connectors. Use automatic end welding of headed-stud shear connectors according to AWS D1.1 and manufacturer's written instructions. 2.5 WELDING A. Make welds by the electric-arc process. B. Welders shall be duly qualified [test passed in the preceding twelve (12) months] for the position in which they are to weld. Qualifications and specifications for workmanship shall comply with the AWS requirements "AWS Structural Welding Code-Steel". C. Grind all exposed welds smooth. D. Where weld size is not indicated, it shall develop full strength of member and connection. 2.6 PAINTING - SHOP COAT A. Items of steel and ironwork indicated or specified to be encased in concrete or receive spray fireproofing shall not be painted. B. Clean all steel work by wire brushing, or by other means selected by the fabricator, of loose mill scale, loose rust, accessible weld slag or, flux deposit, dirt and other foreign matter. 1. Remove oil and grease deposits by solvent. C. After cleaning, give all steel work one coat of metal primer. 1. Apply primer thoroughly and evenly to dry surfaces, by brush, spray, roller coating, flow coating or dipping at the selection of the fabricator. 2. Apply primer at a rate of 350 SF per gallon to provide a wet film of 4.5 mils. D. Paint erection marks on painted surfaces. E. Touch-up all surfaces where welding, grinding of welds, joints, etc., are done in the field. F. Paint shall be thoroughly dry before the members are handled or loaded. 2.7 SOURCE QUALITY CONTROL A. Comply with testing and inspection requirements of Part 3, Article "Field Quality Control." B. Correct deficiencies in Work that test reports and inspections indicate does not comply with the Contract Documents. C. In addition to visual inspection, shop-welded shear connectors will be tested and inspected according to requirements in AWS D1.1 for stud welding. PART 3 EXECUTION 3.1 INSPECTION A. Verify all anchor bolt locations, grouting and elevation of base and setting plates and other material set by other trades, etc., before commencing work. B. Notify the Architect of any work set by others if out of tolerances specified, and do not erect any material upon such work until it has been corrected satisfactorily. C. Starting work implies acceptance of the work of other trades affecting erection of the structural frame. D. Final results are the entire responsibility of the Contractor. STRUCTURAL STEEL

5 HWY 99 & 196 TH STREET SW 3.2 ERECTION A. Erect material plumb and level and maintain this condition to completion. B. Connect members temporarily and align completely before making permanent connections. C. Temporary conditions shall consist of bolts in no less than one-third of the holes and in no case less than 3 bolts in any single connection. D. Surfaces in contact shall be thoroughly clean when assembled. E. Provide necessary temporary bracing and guying to align the structure properly for permanent connections, and safely resist all erection, dead load and wind stress. F. Take particular care to have the work plumb and level (maximum tolerance 1 to 500 for interior members, 1 to 1000 for exterior members) before making permanent connections. 1. Remove bracing and guys only after permanent alignment, and assembly and structure is capable of completely sustaining design and temporary construction loads. G. Examination: Verify elevations of concrete- and masonry-bearing surfaces and locations of anchor rods, bearing plates, and other embedments, with steel erector present, for compliance with requirements. 1. Proceed with installation only after unsatisfactory conditions have been corrected. H. Set structural steel accurately in locations and to elevations indicated and according to AISC's "Code of Standard Practice for Steel Buildings and Bridges", and "Specification for Structural Steel Buildings-- Allowable Stress Design and Plastic Design, and Load and Resistance Factor Design Specification for Structural Steel Buildings" as applicable. I. Base and Bearing Plates: Clean concrete and masonry-bearing surfaces of bond-reducing materials, and roughen surfaces prior to setting base and bearing plates. Clean bottom surface of base and bearing plates. 1. Set base and bearing plates for structural members on wedges, shims, or setting nuts as required. 2. Weld plate washers to top of base plate. 3. Snug-tighten anchor rods after supported members have been positioned and plumbed. Do not remove wedges or shims but, if protruding, cut off flush with edge of base or bearing plate before packing with grout. 4. Promptly pack grout solidly between bearing surfaces and base or bearing plates so no voids remain. Neatly finish exposed surface. Protect grout and allow it to cure. Comply with manufacturer's written installation instructions for shrinkage-resistant grouts. J. Maintain erection tolerances of structural steel within AISC's "Code of Standard Practice for Steel Buildings and Bridges." 3.3 CONNECTIONS A. Machine Bolting: 1. Fair-up holes with pins to align holes before bolting. 2. Ream unfair holes to obtain alignment or drill new holes. 3. Enlargement of holes with drift pins or burning of new holes is not permitted. 4. Draw bolts up tight after members are aligned and leveled, and set or deform threads to prevent loosening. B. Welding: 1. Weld by shielded arc method per AWS standard code for arc and gas welding in building construction. 2. Submit certification that welders have passed AWS code qualification tests. 3. Certification must be dated no earlier than three (3) months prior to beginning of project. 4. Refer to shop drawings for weld size and dimensions. 5. Close all joints exposed to weathering with continuous 1/8" weather welds. 6. Grind smooth all exposed welds, but grinding shall not reduce weld strength or required cross section. 7. Protect all finish material from damage due to welding. 8. Remove unsatisfactory welds by chipping or arc air method. STRUCTURAL STEEL

6 HWY 99 & 196 TH STREET SW C. Field Painting: 1. Spot paint all abrasions, field bolts and field welds with same paint used for shop coat. 2. Remove all temporary guys, bracing and bracing clips and grind flush all burrs remaining, before painting. 3. Remove all welding slag, spatter, rust and burnt paint and wire brush clean all welds before touchup. D. High-Strength Bolts: Install high-strength bolts according to RCSC's "Specification for Structural Joints Using ASTM A325 or A490 Bolts" for type of bolt and type of joint specified. E. Weld Connections: Comply with AWS D1.1 for welding procedure specifications, tolerances, appearance, and quality of welds and for methods used in correcting welding work. 1. Comply with AISC's "Code of Standard Practice for Steel Buildings and Bridges" and "Specification for Structural Steel Buildings - Allowable Stress Design and Plastic Design, or Load and Resistance Factor Design Specification for Structural Steel Buildings" as required for bearing, adequacy of temporary connections, alignment, and removal of paint on surfaces adjacent to field welds. 3.4 FIELD QUALITY CONTROL A. Testing Agency: Owner will engage a qualified independent testing and inspecting agency to inspect field welds and high-strength bolted connections. B. Contractor is responsible for quality control of all materials and workmanship including the workmanship and materials furnished by subcontractors and suppliers. C. Ensure alignments and elevations are correct prior to welding or permanently fastening components together. D. Bolted Connections: Bolted connections will be tested and inspected according to RCSC's "Specification for Structural Joints Using ASTM A325 or A490 Bolts." E. Welded Connections: Field welds will be visually inspected according to AWS D In addition to visual inspection, field welds will be tested according to AWS D1.1 and the following inspection procedures, at testing agency's option: a. Liquid Penetrant Inspection: ASTM E165. b. Magnetic Particle Inspection: ASTM E709; performed on root pass and on finished weld. Cracks or zones of incomplete fusion or penetration will not be accepted. c. Ultrasonic Inspection: ASTM E164. d. Radiographic Inspection: ASTM E94. F. Remove temporary shoring, bracing, and guy lines. G. Correct deficiencies in Work that test reports and inspections indicate do not comply with the Contract Documents. END OF SECTION STRUCTURAL STEEL

7 SECTION STEEL JOISTS PART 1 GENERAL 1.1 SUMMARY A. This Section specifies the construction of all structural steel joists, joist girders, joist accessories and painting. B. Contractor shall provide all labor, materials, equipment, and services necessary to design, fabricate, deliver, and install all structural metal framing work, as indicated on the Drawings, in accordance with local codes and standards, or as specified herein. This work shall include but not be limited to fabricating, delivering, and erecting structural metal framing, cutting, fitting, welding, cleaning, painting, providing temporary supports, and removing all temporary steel elements necessary for erection of structural metal. C. Coordinate delivery with other work to avoid delay. All work shall be coordinated with other sections. 1.2 SUBMITTALS A. Submittals shall be provided in accordance with Sections 01330, and B. Product Data: For each type of joist, accessory, and product indicated. C. Shop Drawings: Showing layout, mark, number, type, location, and spacings of joists. Include joining and anchorage details, bracing, bridging, accessories; splice and connection locations and details; and attachments to other construction. 1. Base drawings on Construction Documents, and details. 2. Shop drawings shall clearly show layout of joists to include mark, type, size, spacing of joists and bridging, details at all field connections, and materials required. 3. Submit complete shop fabrication details and erection diagrams. Such shop details and erection diagrams shall give all pertinent information of construction methods proposed, together with all required dimensions for the proper fitting for the connection with other work and materials. 4. Fabrication shall not commence until approval is received from Structural Engineer and Architect. D. Material certificates for each type of product indicated. Include statements of material properties indicating compliance with requirements, standards, and type designations within standards. Include material test reports, substantiating compliance with requirements. E. Welding certificates. F. Mill test reports. G. Qualification Data. H. Source quality control test reports. 1.3 QUALITY ASSURANCE A. Manufacturer Qualifications: A firm experienced in manufacturing joists similar to those indicated for this Project and with a record of successful in-service performance. 1. Manufacturer must be a member of the Steel Joist Institute (SJI) and certified by SJI to manufacture joists complying with SJI standard specifications and load tables. B. Installer Qualifications: Experience in performing work of this section, specializing in installation of work similar to that required for this project, employing workers who are skilled in this area of work, and whose projects have a record of successful in-service performance. 1. Welding: Qualify personnel according to AWS D1.1, "Structural Welding Code-Steel," and AWS D1.3, "Structural Welding Code--Sheet Steel." Qualify procedures per SJI requirements. C. All open web steel joists and steel joist girders shall be of the type, size, and spacing as shown in the drawings and shall comply with the Steel Joist Institute (SJI) "Standard Specifications, Load Tables, and Weight Tables for Steel Joists and Joist Girders", latest edition. STEEL JOISTS

8 1.4 DELIVERY, STORAGE AND HANDLING A. Transport and handle all materials in such a manner as to prevent damage. Dumping on the ground is not permitted. B. Locate storage piles, stacks, or bins to avoid or protect material from heavy and unnecessary traffic. C. Furnish temporary protection for all exposed edges and corners. D. Deliver all packaged materials in original, unopened, undamaged containers, with identification labels intact, and bearing the name of the manufacturer and brand. E. Ordering: Comply with manufacturer s ordering instructions and lead time requirements to avoid construction delays. F. Store all steel materials off the ground, and protect materials from corrosion and deterioration. Store fasteners in a protected location. Clean and lubricate bolts and nuts that become dry or rusty before use. G. Protect materials from exposure to harmful weather conditions, and at temperature and humidity conditions recommended by manufacturer. Some materials may need to be stored in protected enclosures, and handled by methods which avoid exposure to moisture. Store materials off the ground, under cover, and in a dry location. Additional requirements for product delivery, storage and handling are in Section PART 2 PRODUCTS 2.1 MATERIALS A. Steel: Comply with SJI's "Specifications" for chord and web members. B. Carbon-Steel Bolts and Threaded Fasteners: ASTM A , Grade A, carbon-steel, hex-head bolts and threaded fasteners; carbon-steel nuts; and flat, unhardened steel washers; plain, uncoated. C. High-Strength Bolts and Nuts: ASTM A 325, Type 1, heavy hex steel structural bolts, heavy hex carbonsteel nuts, and hardened carbon-steel washers; plain, uncoated. 2.2 PRIMER A. All joists, joist girders and bridging members shall be cleaned of foreign matter and loose scale. After cleaning, these members shall receive one shop coat of gray primer which meets the minimum performance requirements of one of the following: 1. The Society for Protective Coatings (SSPC) 15-68T or, 2. Federal Specification TT-P STEEL JOISTS A. Manufacture steel joists according to SJI's "Specifications," with steel-angle top- and bottom-chord members. B. Comply with AWS requirements and procedures for shop welding, appearance, quality of welds, and methods used in correcting welding work. 2.4 JOIST GIRDERS A. Manufacture joist girders according to "Standard Specifications for Joist Girders," in SJI's "Specifications, "with steel-angle top- and bottom-chord members. B. Comply with AWS requirements and procedures for shop welding, appearance, quality of welds, and methods used in correcting welding work. STEEL JOISTS

9 2.5 JOIST ACCESSORIES A. Bridging: Provide bridging anchors and number of rows of horizontal or diagonal bridging of material, size, and type required by SJI's "Specifications" for type of joist, chord size, spacing, and span. B. Bridging: Schematically indicated. Detail and fabricate according to SJI's "Specifications." Bridging shall be located to avoid conflicting with skylights, exhaust fans, and roof top HVAC units. C. Supply miscellaneous accessories, including splice plates and bolts required by joist manufacturer to complete joist installation. 2.6 PAINTING - SHOP COAT A. Clean and remove loose scale, heavy rust, and other foreign materials from fabricated joists and accessories by hand-tool cleaning or power-tool cleaning per SJI requirements. B. Apply 1 shop coat of primer to joists and joist accessories to be primed to provide a continuous, dry paint film not less than 0.5 mil thick. C. Touch-Up Painting: After joist installation, field paint bolt heads and nuts and welded areas, abraded or rusty surfaces on joists and steel supporting members. Wire brush surfaces and clean with solvent before painting. Use same type paint as used for shop painting. PART 3 EXECUTION 3.1 INSTALLATION A. Pre-Erection Survey: Check vertical and horizontal dimensions of all points of support/tie-in, before erection work proceeds and report discrepancies to Owner. Do not proceed with erection until corrections have been made, or until compensating adjustments have been agreed upon with Owner. Also report any other conditions detrimental to proper/timely completion of work. B. Do not install joists until supporting construction is in place and secured. C. Install joists and accessories plumb, square, and true to line; securely fasten to supporting construction according to SJI's "Specifications," joist manufacturer's written recommendations, and requirements in this Section. D. Field weld joists to supporting steel bearing plates. Coordinate welding sequence and procedure with placement of joists. Comply with AWS requirements and procedures for welding, appearance and quality of welds, and methods used in correcting welding work. E. Bolt joists to supporting steel framework using carbon-steel bolts, unless otherwise indicated. F. Bolt joists to supporting steel framework using high-strength structural bolts, unless otherwise indicated. Comply with RCSC's "Allowable Stress Design Specification for Structural Joints Using ASTM A325 or ASTM A 490 Bolts" for high-strength structural bolt installation and tightening requirements. G. Install and connect bridging concurrently with joist erection, before construction loads are applied. Anchor ends of bridging lines at top and bottom chords if terminating at walls or beams. H. Inspection/Testing: Joists welded in place are subject to inspection/testing. Expense of removing/replacing any portion of steel joists for testing purposes will be born by Owner if welds are found to be satisfactory. Replace/remove work found to be defective and provide new acceptable work. END OF SECTION STEEL JOISTS

10 THIS PAGE INTENTIONALLY LEFT BLANK

11 SECTION STEEL DECK (Roof Deck) PART 1 GENERAL 1.1 SUMMARY A. This Section specifies the construction of all metal roof decking assemblies including fabrication of metal parts, fasteners, accessories, delivery, and installation. B. Contractor shall provide all labor, materials, equipment, and services necessary to design, fabricate, deliver, and install all metal roof deck units, as indicated on the Drawings, in accordance with local codes and standards, or as specified herein. This work shall include but not be limited to fabrication of the roof deck units and miscellaneous steel shapes, welding, fasteners, additional metal reinforcement and closure pieces, support of other work, cutting and fitting the deck units, accessories, cleaning, priming and painting. C. Some materials identified in the section are National Account items purchased by Owner, received, stored and installed by General Contractor. Refer to Section for National Account vendor contact information. D. All work shall be coordinated with other sections. Coordinate delivery with other work to avoid delay. 1.2 SUBMITTALS A. Submittals shall be provided in accordance with Sections 01330, and B. Product Data: For each type of deck, accessory, and product indicated. C. Shop Drawings: 1. Shop drawings shall clearly show layout and types of deck panels, anchorage details, reinforcing channels, pans, cut deck openings, special joints, accessories, and attachments to other construction. Also show designation, number, type, location and materials required. 2. Note diaphragm deck welding pattern on shop drawings. D. Samples for review in accordance with Sections and E. Material certificates for each type of product indicated. Include statements of material properties indicating compliance with requirements, standards, and type designations within standards. Include material test reports substantiating compliance with requirements. F. Fabrication shall not commence until approval is received from Owner/Architect. G. Product Certificates. H. Welding Certificates. I. Field quality control test and inspection reports. J. Research/Evaluation Reports: For steel deck. K. No Substitutions on National Account items. 1.3 QUALITY ASSURANCE A. Steel deck shall be fabricated in accordance with the requirements of Steel Deck Institute (SDI) Specification, the drawings, and as specified herein. B. Panel configurations and method of forming shall be in accordance with SDI Specifications for type and gauge as indicated on the drawings. C. Installer Qualifications: Experience in performing work of this section, specializing in installation of work similar to that required for this project, employing workers who are skilled in this area of work, and whose projects have a record of successful in-service performance. 1. Welding: Qualify procedures and personnel according to AWS D1.3, "Structural Welding Code - Sheet Steel." D. Manufacturers shall meet the industry standards and codes for the materials identified on the Drawings and in the Specifications herein. STEEL DECK (Roof Deck)

12 1. Sections and properties of metal shall conform to minimum Specifications for the design of "Light Gauge Cold Formed Steel Structural Members" as published by AISI. E. Certification: Product certificates signed by manufacturer, certifying materials comply with specified performance characteristics, criteria, and physical requirements. 1. Fire-Test-Response Characteristics: Where indicated, provide steel deck units identical to those tested for fire resistance per ASTM E119 by a testing and inspecting agency acceptable to authorities having jurisdiction. 2. Fire-Resistance Ratings: Indicated by design designations of applicable testing and inspecting agency. 3. Steel deck units shall be identified with appropriate markings of applicable testing and inspecting agency. 4. AISI Specifications: Comply with calculated structural characteristics of steel deck according to AISI's "North American Specification for the Design of Cold-Formed Steel Structural Members." F. Manufacturer s instructions for installation shall be delivered and stored with the materials. G. Testing: As required by industry codes and standards. H. Tolerances shall conform to applicable codes and standards, except as otherwise noted. I. Warranty: 1. Manufacturer s Warranty: Submit, for Owner s acceptance, manufacturer s standard warranty document executed by authorized company official. Manufacturer s warranty is in addition to, and not a limitation of, other rights Owner may have under Contract Documents. 2. Warranty Period: Two (2) years commencing on Date of Certificate of Occupancy. 3. Additional requirements for product warranties are included in Section DELIVERY, STORAGE AND HANDLING A. Deliver, store, and handle metal decking and all other materials in such a manner that it will not be damaged, deformed, or corroded. B. Steel deck shall be handled with utmost care to minimize scratching and deformation. Deck units sustaining irreparable deformation/damage shall be replaced at the discretion of the Owner/Architect. C. Exercise special care so as not to damage or overload the decking during the entire construction period. D. Do not use metal decking for storage or as a working platform until the sheets have been welded in position. E. Locate materials away from heavy and unnecessary traffic. F. Furnish temporary protection for all exposed corners and edges. G. Deliver all packaged materials in original, unopened, undamaged containers, with identification labels intact, and bearing the name of the manufacturer and brand. H. Ordering: Comply with manufacturer s ordering instructions and lead time requirements to avoid construction delays. I. If site storage is required, the bundles of deck shall be stored off the ground with one end elevated to provide drainage, and should be protected against condensation with a ventilated waterproof covering. J. Stack decking stored at the site before erection on platforms or pallets, and protect materials from exposure to harmful weather conditions, and at temperature and humidity conditions recommended by manufacturer. K. Some materials may need to be stored in protected enclosures, and handled by methods which avoid exposure to moisture. L. Additional requirements for product delivery, storage and handling are in Section PART 2 PRODUCTS 2.1 MANUFACTURERS STEEL DECK (Roof Deck)

13 A. Contractor shall provide products per the National Account vendor. Refer to Section for vendor contact information. 2.2 FABRICATION A. General: Fabricate panels to comply with SDI specifications, and as indicated on the drawings. B. Form deck units in lengths to span 3 or more support spacings, with flush, telescoped or nested 3" end laps and interlocking side laps, unless otherwise shown or specified. 2.3 STEEL A. Steel for Painted Deck: ASTM A611, Grade C. 1. Depth: As indicated on Structural Drawings. 2. Gauge: As indicated on Structural Drawings. 3. Width: As indicated on Structural Drawings. 4. Values (minimum): a. S per 1'-0" of width - As indicated on Structural Drawings. b. I per 1'-0" of width - As indicated on Structural Drawings. c. Minimum diaphram shear - As indicated on Structural Drawings. B. Miscellaneous Steel Shapes: ASTM A36, unless otherwise noted. PART 3 EXECUTION 3.1 INSTALLATION A. Install deck units and accessories in accordance with manufacturer's recommendations, SDI requirements, final shop drawings, and as specified herein. B. Install deck panels flat, square, and without any warp or deflection. C. Cut and fit deck panels and accessories around openings and other work projecting through or adjacent to decking. D. Provide additional reinforcement and closure pieces as required for strength, and support of other work. E. Comply with AWS requirements and procedures for quality, appearance, and methods for welding. 3.2 PLACING A. Do not start placement of deck units before all supporting members are installed. B. Place deck units on supporting steel framework and adjust to final position with ends bearing on supporting members and accurately aligned end to end before being permanently fastened. C. Lap ends not less than 2". D. Do not stretch or contract the side-lap interlocks. E. Do not place deck units on concrete supporting structure until concrete has cured properly and is dry. F. Coordinate and cooperate with structural steel erector in locating decking bundles to prevent overloading of structural members. G. Do not use deck units for storage or working platforms until permanently secured in position. 3.3 FASTENING A. Permanently fasten deck units to steel supporting members by welds at end laps and at intermediate supports as indicated. B. Comply with AWS requirements and procedures for manual shielded metal-arc welding, the appearance and quality of welds, and the methods used in correcting welding work. STEEL DECK (Roof Deck)

14 C. Lock side laps between adjacent deck units at intervals not exceeding 12" O.C. by welding, screws, button punching, or as shown on structural documents. 3.4 CUTTING AND FITTING A. Cut and fit deck units and accessories around other work projecting through or adjacent to the decking. Provide neat, square, and trim cuts. 3.5 REINFORCEMENT AT OPENINGS A. Provide additional metal reinforcement and closure pieces as required for strength, continuity of decking and support of other work, unless otherwise shown. 3.6 TOUCH-UP PAINTING A. After decking installation, wire brush, clean and paint scarred areas, welds, and rust spots on the top and bottom surfaces of decking units and supporting steel members. B. Touch-up galvanized surfaces with galvanized repair paint applied in accordance with the manufacturer's instructions. C. In areas where touch-up painted surfaces are to be exposed, apply the paint to blend into the adjacent surfaces in a manner that will minimize visual discontinuity in the coatings. 3.7 FIELD QUALITY CONTROL A. Testing Agency: Owner will engage a qualified independent testing and inspecting agency to perform field tests and inspections and prepare test reports. B. Field welds will be subject to inspection. C. Testing agency will report inspection results promptly and in writing to Contractor and Architect. D. Remove and replace work that does not comply with specified requirements. E. Additional inspecting, at Contractor's expense, will be performed to determine compliance of corrected work with specified requirements. 3.8 REPAIRS A. Galvanizing Repairs: Prepare and repair damaged galvanized coatings on both surfaces of deck with galvanized repair paint according to ASTM A780 and manufacturer's written instructions. B. Repair Painting: Wire brush and clean rust spots, welds, and abraded areas on all surfaces of primepainted deck immediately after installation, and apply repair paint. END OF SECTION STEEL DECK (Roof Deck)

15 SECTION HEAVY GAUGE FRAMING PART 1 GENERAL 1.1 SUMMARY A. This Section specifies the construction of all heavy gauge (structural steel stud) framing assemblies including studs, braces, channels, sills, headers, load bearing wall framing, roof framing, miscellaneous metal parts, primer, paint, and tests. B. Contractor shall provide all labor, materials, equipment, and services necessary to design, fabricate, deliver, and install all heavy gauge framing assembly work, as indicated on the Drawings, in accordance with local codes and standards, or as specified herein. This work shall include but not be limited to design and fabrication of structural steel studs and associated metal shapes, welding, reinforcement, support of other work, cutting, fitting, testing, cleaning and painting. C. Coordinate delivery with other work to avoid delay. All work shall be coordinated with other sections. 1.2 SUBMITTALS A. Submittals shall be provided in accordance with Sections and B. Product Data: For each type of structural steel material, accessory, and product indicated. C. Shop Drawings: 1. Shop drawings shall clearly show layout and types of structural steel shapes, designation, fabrication, quantity, spacings, sizes, thicknesses, type, location, and materials required. 2. Fastening and anchorage details, including mechanical fasteners. D. Samples for review in accordance with Sections and E. Material certificates for each type of product indicated. Include statements of material properties indicating compliance with requirements, standards, and type designations within standards. Include material test reports substantiating compliance with requirements. F. Mill and product test reports (or data from a qualified independent testing agency indicating steel sheet complies with requirements.) G. Welding Certificates. H. Qualification Data. I. Field quality control test and inspection reports. J. Research/evaluation reports. K. Substitutions shall be requested in accordance with Sections and QUALITY ASSURANCE A. Installer Qualifications: Experience in performing work of this section, specializing in installation of work similar to that required for this project, employing workers who are skilled in this area of work, and whose projects have a record of successful in-service performance. B. Manufacturers shall meet the industry standards and codes for the materials identified on the Drawings and in the Specifications herein. C. Certification: Product certificates signed by manufacturer, certifying materials comply with specified performance characteristics, criteria, and physical requirements. 1. For cold-formed metal framing indicated to comply with design loads, include structural analysis data signed and sealed by the qualified professional engineer responsible for their preparation. 2. Comply with AISI's "Standard for Cold-Formed Steel Framing - Truss Design." 3. Comply with AISI's "Standard for Cold-Formed Steel Framing - Header Design." 4. Welding: Qualify procedures and personnel according to AWS D1.3, "Structural Welding Code - Sheet Steel." D. Structural Performance: Provide cold-formed metal framing capable of withstanding design loads within deflection limits and under conditions indicated. HEAVY GAUGE FRAMING

16 E. Manufacturer s instructions for installation shall be delivered and stored with the materials. F. Testing: As required by the latest industry codes and standards. G. Tolerances shall conform to industry codes and standards, except as otherwise noted. H. Warranty: 1. Manufacturer s Warranty: Submit, for Owner s acceptance, manufacturer s standard warranty document executed by authorized company official. Manufacturer s warranty is in addition to, and not a limitation of, other rights Owner may have under Contract Documents. 2. Warranty Period: Two (2) years commencing on Date of Certificate of Occupancy. 3. Additional requirements for product warranties are included in Section I. Fire-Test-Response Characteristics: Where indicated, provide cold-formed metal framing identical to that of assemblies tested for fire resistance per ASTM E119 by a testing and inspecting agency acceptable to authorities having jurisdiction. J. AISI Specifications and Standards: Comply with AISI's "North American Specification for the Design of Cold-Formed Steel Structural Members" and its "Standard for Cold-Formed Steel Framing - General Provisions." 1. Comply with AISI's "Standard for Cold-Formed Steel Framing - Truss Design." 2. Comply with AISI's "Standard for Cold-Formed Steel Framing - Header Design." 1.4 DELIVERY, STORAGE AND HANDLING A. Transport and handle all materials in such a manner as to prevent damage. B. Locate materials away from heavy and unnecessary traffic. C. Furnish temporary protection for all exposed corners and edges. D. Deliver all packaged materials in original, unopened, undamaged containers, with identification labels intact, and bearing the name of the manufacturer and brand. E. Ordering: Comply with manufacturer s ordering instructions and lead time requirements to avoid construction delays. F. Store and protect materials from exposure to harmful weather conditions, and at temperature and humidity conditions recommended by manufacturer. Some materials may need to be stored in protected enclosures, and handled by methods which avoid exposure to moisture. Store mortar, grout, and other moisture-sensitive materials off the ground, under cover, and in a dry location. Additional requirements for product delivery, storage and handling are in Section PART 2 PRODUCTS 2.1 MANUFACTURERS A. Subject to compliance with requirements, manufacturer offering products that may be incorporated into the work include the following: 1. Dietrich Industries, Inc. 2. Unimast, Inc. 3. Clark Steel Framing Systems 4. Approved equal. 2.2 MATERIALS A. Steel sheet shall be fabricated as required by ASTM A1003, Steel Sheet for Cold Formed Framing Members. B. Fabricate steel framing accessories from steel sheet, ASTM A1003, structural grade, Type H, metallic coated, of same grade and coating weight used for framing members, unless otherwise indicated. C. Steel shapes and clips: ASTM A36, zinc coated by hot dip process according to ASTM A123. D. Structural steel studs shall be sizes as indicated on the Drawings and as Specified herein. HEAVY GAUGE FRAMING

17 E. Manufacturer s standard C-shaped studs of web depths indicated, punched with stiffened flanges and as follows: 1. Steel for load bearing steel studs, runners, and bracing or bridging shall conform to ASTM C Steel for non structural steel framing studs shall conform to ASTM C Studs shall be type as indicated on the drawings, and as manufactured by Metal Stud Manufacturer s Association. F. Steel track: Manufacturer s standard U-shaped steel track, of web depth indicated. G. All structural stud components shall have a shop coat of rust resisting paint conforming to FS TT-P-636. H. Anchor bolts: ASTM F1554, Grade 36 threaded carbon steel hex head bolts with carbon steel nuts and flat hardened washers, zinc coated by hot dip process according to ASTM A153. I. Expansion anchors fabricated from corrosion resistant material capable of handling a load five (5) times design load, per ASTM E488. J. Mechanical fasteners: ASTM C1513, corrosion resistant coated. K. Braces shall be 16 gauge with minimum flange width of 1-5/16". L. Provide jack studs or channels between bottom track and sill openings: 1. Between opening and door lintel or headers and top track; 2. Elsewhere as required to provide adequate support for collateral wall materials. M. Provide sills and headers as required for all exterior wall openings. 2.3 FABRICATION A. Saw cut all structural stud components squarely, or on an angle as in bracing, to fit squarely against abutting members. 1. Hold members firmly in position until properly fastened. B. Attach similar components by welding. C. Attach dissimilar stud components by welding, screw attachment, or bolting. D. Wire tying will not be permitted. PART 3 EXECUTION 3.1 INSTALLATION - GENERAL A. Install cold formed metal framing according to AISI s Standard for Cold-Formed Steel Framing-General Provisions, and manufacturer s written instructions, unless more stringent requirements are indicated on the drawings or the specifications herein. B. Install cold-formed metal framing and accessories plumb, square, and true to line, and with connections securely fastened. 1. Set studs plumb, except as needed for diagonal bracing or required for non plumb walls or warped surfaces and similar configurations. 2. Where studs cannot be aligned, continuously reinforce track to transfer loads. 3. Anchor studs abutting structural columns or walls, including masonry walls, to supporting structure as indicated. C. Install framing members in one-piece lengths. D. Install temporary bracing and supports to secure framing and support loads comparable in intensity to those for which structure was designed. Maintain braces and supports in place, undisturbed, until entire integrated supporting structure has been completed and permanent connections to framing are secure. E. Do not bridge building expansion and control joints with cold-formed metal framing. Independently frame both sides of joints. F. Securely anchor track to floor with 1/2" diameter bolts, at 48" o.c. maximum, or with 1/8" power driven inserts at 8" o.c. maximum with minimum 2 bolts or inserts per any track sections; provide top track. HEAVY GAUGE FRAMING

18 G. Seat studs squarely in the track with the stud web and flanges abutting the track web, plumb or align, and securely attach to the flanges or web of both the upper and lower tracks by welding flanges to track; or by 4 sheet metal screws, bolts or rivets, 2 at top and 2 at bottom. H. Space studs on centers indicated but in no instance any further than 16" o.c. I. Triple up studs with 2 studs full height at all jambs. J. Use butt welds or splices at all but joints in track. K. Splices in studs will not be permitted. L. All welds shall be fillet, plug, butt or seam. M. Provide cold rolled steel channel bridging minimum 1-1/2" deep with 9/16" flange 48" o.c. vertically, welded at each stud. N. Secure headers or lintels by welding, bolts, or rivets as required. O. Furnish and install 1/8" x 3" steel strap bracing as indicated on the Drawings. 3.2 PAINT A. Touch-up field abrasions and welds in the field after erection using the same materials as shop coat paint. 3.3 PREPARATION A. Install load bearing shims or grout between the underside of wall bottom track or rim track and the top of foundation wall or slab at stud or joist locations to ensure a uniform bearing surface on supporting concrete or masonry construction. B. Install sealer gaskets to isolate the underside of wall bottom track or rim track and the top of foundation wall or slab at stud or joist locations. 3.4 INSTALLATION A. Install insulation, specified in Division 7 Section "Miscellaneous Building Insulation," in built-up exterior framing members, such as headers, sills, boxed joists, and multiple studs at openings, that are inaccessible on completion of framing work. B. Fasten hole reinforcing plate over web penetrations that exceed size of manufacturer's standard punched openings. C. Erection Tolerances: Install cold-formed metal framing level, plumb, and true to line to a maximum allowable tolerance variation of 1/8" in 10'-0" and as follows: 1. Space individual framing members no more than plus or minus 1/8" from plan location. Cumulative error shall not exceed minimum fastening requirements of sheathing or other finishing materials. 3.5 FIELD QUALITY CONTROL A. Testing: Owner will engage a qualified independent testing and inspecting agency to perform field tests and inspections and prepare test reports. B. Field and shop welds will be subject to testing and inspecting. C. Testing agency will report test results promptly and in writing to Contractor and Architect. D. Remove and replace work where test results indicate that it does not comply with specified requirements. E. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements. 3.6 REPAIRS AND PROTECTION A. Galvanizing Repairs: Prepare and repair damaged galvanized coatings on fabricated and installed coldformed metal framing with galvanized repair paint according to ASTM A780 and manufacturer's written instructions. HEAVY GAUGE FRAMING

SECTION STRUCTURAL STEEL

SECTION STRUCTURAL STEEL SECTION 05120 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work under this Section shall include all materials and installation necessary to provide Structural Steel as shown and detailed on the Drawings

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING SECTION 05400 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work of this Section shall include all materials and installation necessary to provide all cold formed metal framing. B. This Section includes:

More information

Tnemec 394 Proprietary Long Form Coatings Schedule

Tnemec 394 Proprietary Long Form Coatings Schedule 1.1 PRIMER Tnemec 394 Proprietary Long Form Coatings Schedule A. Primer: Tnemec Series 394 PerimePrime Aromatic Polyurethane Mio/Zinc filled Primer applied @ 2.5-3.5 mils DFT and conforming to the following

More information

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns. PAGE 051200-1 SECTION 051200 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers. SECTION 05 31 23 - STEEL ROOF DECKING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 - Specification

More information

SECTION METAL FLOOR PLATE STAIRS

SECTION METAL FLOOR PLATE STAIRS SECTION 05513 - METAL FLOOR PLATE STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers. SECTION 05 31 13 STEEL FLOOR DECKING PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 - Specification

More information

SECTION (05400) - COLD-FORMED METAL FRAMING

SECTION (05400) - COLD-FORMED METAL FRAMING PART 1 GENERAL 1.01 SUMMARY SECTION 05 40 00 (05400) - COLD-FORMED METAL FRAMING A. Section includes: 1. Exterior Load-Bearing Wall Framing 2. Exterior Non-Load-Bearing Curtain-Wall Framing 3. Roof Trusses

More information

Retain "Preinstallation Conference" Paragraph below if Work of this Section is extensive or complex enough to justify a conference.

Retain Preinstallation Conference Paragraph below if Work of this Section is extensive or complex enough to justify a conference. SECTION 05 40 00 - COLD-FORMED METAL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

A. Types of lightgauge metal framing units include the following: 1. C-shaped structural steel studs Uniform Building Code.

A. Types of lightgauge metal framing units include the following: 1. C-shaped structural steel studs Uniform Building Code. SECTION 05400 COLD-FORMED METAL FRAMING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification

More information

A. Product Data: For each type of deck, accessory, and product indicated.

A. Product Data: For each type of deck, accessory, and product indicated. SECTION 053100 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Roof deck. 2. Composite floor deck. 3. Noncomposite form deck. 1.2 SUBMITTALS A. Product Data: For each type of deck, accessory, and

More information

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers. SECTION 05 31 33 - STEEL FORM DECKING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 - Specification

More information

SECTION WELDED STEEL PICKET FENCE. 1. Fusion welded and rackable ornamental steel picket fence system.

SECTION WELDED STEEL PICKET FENCE. 1. Fusion welded and rackable ornamental steel picket fence system. PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Fusion welded and rackable ornamental steel picket fence system. B. Related sections: 1. Section 03310 Concrete Work for post support. 2. Section 09960

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

BEARING METAL STUD FRAMING

BEARING METAL STUD FRAMING L-1 Section 05410 Long Form Specification LOAD BEARING METAL STUD FRAMING This section includes axially loaded steel studs, with unique slotted top channels, usually of 0.91, 1.2 and 1.5 mm (16, 18, or

More information

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 Part 1 General 1.01 Work Included A. The work under this section shall include the furnishing of all items shown on the drawings and as specified,

More information

SECTION STEEL DECKING

SECTION STEEL DECKING SECTION 05 31 00 STEEL DECKING SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Refer to Section 05 36 00, COMPOSITE METAL DECKING for floor

More information

Daytona Beach Pier Building Renovation Jun 2010

Daytona Beach Pier Building Renovation Jun 2010 SECTION 15060 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

LAGUARDIA COMMUNITY COLLEGE - CUNY August 3, 2009

LAGUARDIA COMMUNITY COLLEGE - CUNY August 3, 2009 SECTION 051200 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.01 SUMMARY A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 13686.00 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 230529-1 SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 1.1 SUMMARY A. Section Includes: 1. Metal pipe hangers and supports.

More information

GUIDE SPECIFICATIONS CURA ADJUSTABLE REROOF FRAMING SYSTEMS SECTION REROOFING ADJUSTABLE FRAMING SYSTEM

GUIDE SPECIFICATIONS CURA ADJUSTABLE REROOF FRAMING SYSTEMS SECTION REROOFING ADJUSTABLE FRAMING SYSTEM - --- -- ----..-------~------------------------------------ GUIDE SPECIFICATIONS CURA ADJUSTABLE REROOF FRAMING SYSTEMS SECTION 07415 REROOFING ADJUSTABLE FRAMING SYSTEM PART 1 - GENERAL 1.01 SCOPE A.

More information

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017 SECTION 055213 - PIPE AND TUBE RAILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION INTERIOR STONE INTERIOR STONE

SECTION INTERIOR STONE INTERIOR STONE SECTION 04401- INTERIOR STONE 04401-1 PART ONE: GENERAL 1.1 Description INTERIOR STONE 1.1.1 Work of this Section, as shown or specified, shall be provided by the Interior Contractor/Vendor and shall be

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-05 21 00 (May 2015) --------------------------- Preparing Activity: USACE Superseding UFGS-05 21 13 (August 2009) UFGS-05 21 16 (August 2009) UFGS-05 21 19 (July 2007)

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 055113 - METAL PAN STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Division 11 - Equipment Section 11401

Division 11 - Equipment Section 11401 PART 1 - GENERAL 1.1 GENERAL A. Division 1 General Requirements applies and becomes a part of this Section of the Specification as fully as if repeated herein. B. Items of equipment which are included

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

***************************************************************************************************************

*************************************************************************************************************** 03450 ARCHITECTURAL PRECAST CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 45 13 ***************************************************************************************************************

More information

ST. JOHNS COUNTY ARCH. PROJ. NO SECTION PREFABRICATED ALUMINUM CANOPIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS

ST. JOHNS COUNTY ARCH. PROJ. NO SECTION PREFABRICATED ALUMINUM CANOPIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 10530 PREFABRICATED ALUMINUM CANOPIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Page 1 of 5

Page 1 of 5 SPECIFICATIONS COMPOSITE MATERIAL PANEL SYSTEM ESTOLGA 1000 DRY SEAL SYSTEM PART 1 GENERAL 1.01 SECTION INCLUDES A. Exterior cladding consisting of formed metal composite material (MCM) sheet, secondary

More information

CONSTRUCTION SPECIFICATION FOR STRUCTURAL STEEL

CONSTRUCTION SPECIFICATION FOR STRUCTURAL STEEL ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 906 FEBRUARY 1993 CONSTRUCTION SPECIFICATION FOR STRUCTURAL STEEL 906.01 SCOPE 906.02 REFERENCES 906.03 DEFINITIONS TABLE OF CONTENTS 906.04 SUBMISSION

More information

PIPE AND TUBE RAILINGS

PIPE AND TUBE RAILINGS SECTION 05521 - PIPE AND TUBE RAILINGS PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING

SECTION HANGERS AND SUPPORTS FOR PLUMBING SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

PRE-ENGINEERED METAL BUILDING SYSTEM

PRE-ENGINEERED METAL BUILDING SYSTEM PRE-ENGINEERED METAL BUILDING SYSTEM PART 1 GENERAL 1.1 SUMMARY A. The building shall include all primary and secondary structural framing members, connection bolts, roof and wall covering, flashing, gutter,

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Steel pipe hangers and supports. 2. Metal framing systems. 3. Thermal-hanger shield inserts. 4. Fastener systems.

More information

Project Address: Name of Person Completing Form:

Project Address: Name of Person Completing Form: Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:

More information

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 [08 33 13] COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Metal Counter

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB #

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # SECTION 26 0529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION

More information

SECTION PLATE CONNECTED WOOD TRUSSES

SECTION PLATE CONNECTED WOOD TRUSSES SECTION 06173 PLATE CONNECTED WOOD TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Shop fabricated wood trusses for roof and floor framing. 2. Bridging, bracing, and anchorage. B. Related Sections:

More information

SECTION NON-STRUCTURAL METAL FRAMING

SECTION NON-STRUCTURAL METAL FRAMING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 09 22 16 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

1.02 STANDARD REFERENCES: The following standard specifications shall apply to the Work of this Section as indicated:

1.02 STANDARD REFERENCES: The following standard specifications shall apply to the Work of this Section as indicated: SECTION 04220 CONCRETE UNIT MASONRY PART 1 - GENERAL 1.01 SCOPE: A. The CONTRACTOR shall furnish all labor, materials and equipment necessary for the masonry construction as shown on the drawings or as

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 10505 - METAL STUDENT LOCKERS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION METAL BUILDING SYSTEMS

SECTION METAL BUILDING SYSTEMS SECTION 13 3419 PART 1 GENERAL 1.01 SECTION INCLUDES A. Manufacturer-engineered, shop-fabricated structural steel building frame. B. Insulated Metal wall and roof panels including gutters and downspouts.

More information

Specifiers: Click on the icon in the WORD toolbar to reveal detailed instructions

Specifiers: Click on the icon in the WORD toolbar to reveal detailed instructions Specifiers: Click on the icon in the WORD toolbar to reveal detailed instructions (Specifier Note: The purpose of this guide specification is to assist the specifier in correctly specifying perforated

More information

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014 STATE STRUCTION FUND DIRECTIVE 5-1 Issue date: October 2014 STRUCTURAL STEEL 1. General: It is the Fund's policy that the design of the structural steel is the prime responsibility of the project's Structural

More information

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 Note to user: These guide specifications are provided by Mid- States Concrete Products as a service to you; they are NOT specific

More information

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2) Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction

More information

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. SECTION 260529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. 1.2

More information

Multi-Institutional Academic Health Science & Research Center Evansville, IN

Multi-Institutional Academic Health Science & Research Center Evansville, IN SECTION 05 5000 - METAL FABRICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Section PANEL SIGNAGE

Section PANEL SIGNAGE Section 10 14 23 PANEL SIGNAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including FDOT DIVISION I GENERAL REQUIREMENTS & COVENANTS Specification Sections,

More information

Specifications for FL-100 Soffit Panel

Specifications for FL-100 Soffit Panel Union Corrugating Company Specifications for FL-100 Soffit Panel SECTION 07410 METAL SOFFIT PANELS PART 1 GENERAL 1.1 DESCRIPTON A. Section Includes: 1. Preformed metal soffit panel system 2. Associated

More information

SECTION OVERHEAD COILING FIRE DOORS MODEL 662 OVERHEAD COILING COUNTER FIRE DOORS WITH INTEGRAL FRAME

SECTION OVERHEAD COILING FIRE DOORS MODEL 662 OVERHEAD COILING COUNTER FIRE DOORS WITH INTEGRAL FRAME SECTION 08331 OVERHEAD COILING FIRE DOORS MODEL 662 OVERHEAD COILING COUNTER FIRE DOORS WITH INTEGRAL FRAME Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The General Conditions, Special Conditions and Division 1 through Division 22 as set forth in

More information

SECTION HANGERS AND SUPPORTS PART 1 - GENERAL. A. Drawings and Division 1 Specification Sections, apply to this Section.

SECTION HANGERS AND SUPPORTS PART 1 - GENERAL. A. Drawings and Division 1 Specification Sections, apply to this Section. 1.01 RELATED DOCUMENTS SECTION 15060 HANGERS AND SUPPORTS PART 1 - GENERAL A. Drawings and Division 1 Specification Sections, apply to this Section. 1.02 SUMMARY A. This Section includes hangers and supports

More information

Corium Brick Rainscreen System Specifications

Corium Brick Rainscreen System Specifications CORIUM BRICK RAINSCREEN SYSTEM PART 1 - GENERAL 1.1 SUMMARY A. Work Included: The Work of this Section shall include but not be limited to the following: 1. Corium brick plates 2. Galvanized and coated

More information

SPECIFICATIONS FOR AluSystems Aluminum Composite Panels Series 20 Dry Joint 1.00 GENERAL 1.01 RANGE OF WORK Section includes: Laminated panels and attachment systems for use as exterior cladding. A. Provide

More information

A. Access doors and frames are part of an access door and frame allowance.

A. Access doors and frames are part of an access door and frame allowance. SECTION 08 31 13 ACCESS DOORS AND FRAMES PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck)

SECTION ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) SECTION 13125 ELEVATED BLEACHERS (Angle Frame Semi-Closed Deck) PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

SECTION METAL STAIRS

SECTION METAL STAIRS Tender SECTION 05510 METAL STAIRS PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes internal and external shop fabricated pre assembled steel stairs with integral handrails and ballustrades

More information

SECTION EXPANSION CONTROL

SECTION EXPANSION CONTROL SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Louis Armstrong New Orleans International Airport NOAB Project # North Terminal Development Program Phase 1

Louis Armstrong New Orleans International Airport NOAB Project # North Terminal Development Program Phase 1 Louis Armstrong New Orleans International Airport NOAB Project # 8910-01233 PART 1 - GENERAL SECTION 07 71 29 - MANUFACTURED ROOF EXPANSION JOINTS 1.1 RELATED DOCUMENTS A. Drawings and general provisions

More information

PRESTON HEALTH SERVICES ARCHITECT'S NO. 2700

PRESTON HEALTH SERVICES ARCHITECT'S NO. 2700 SECTION 09 5113 - ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

A. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein.

A. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein. SECTION 10530 - EXTRUDED ALUMINUM WALKWAY COVERS PART I - GENERAL.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General, Supplementary, and Special Conditions and Division

More information

SECTION EXPANSION CONTROL

SECTION EXPANSION CONTROL SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Your full service light gauge steel manufacturer

Your full service light gauge steel manufacturer Your full service light gauge steel manufacturer In addition to roof trusses, Superior Truss also supplies: q Light gauge steel floor trusses with metal decking and/or plywood sheathing q Light gauge steel

More information

***************************************************************************************************************

*************************************************************************************************************** 03410 STRUCTURAL PRECAST CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 41 00 ***************************************************************************************************************

More information

N-SERIES: NTH3500 SPECIFICATIONS Hollow Metal Sliding Door System

N-SERIES: NTH3500 SPECIFICATIONS Hollow Metal Sliding Door System Version 5.22.13 N-SERIES: NTH3500 SPECIFICATIONS Hollow Metal Sliding Door System OPTIONS ARE LISTED IN BOLD, PLEASE MODIFY THESE AREAS AS NEEDED BASED ON YOUR PROJECT CONSULT MANUFACTURER FOR ADDITONAL

More information

SECTION ACOUSTICAL PANEL CEILINGS

SECTION ACOUSTICAL PANEL CEILINGS SECTION 095113 ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION EXPANSION CONTROL

SECTION EXPANSION CONTROL SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

B. Shop Drawings: For metal lockers. Include plans, elevations, sections, details, and attachments to other work.

B. Shop Drawings: For metal lockers. Include plans, elevations, sections, details, and attachments to other work. SECTION 10 5113 - METAL LOCKERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

SECTION 716 SIGN MATERIALS SCOPE

SECTION 716 SIGN MATERIALS SCOPE 716 716.01.01 MATERIALS COVERED SECTION 716 SIGN MATERIALS SCOPE A. This specification covers the kind and quality of materials used in the construction and fabrication of traffic control devices used

More information

PROJECT LOCATION SECTION COPPER METAL PLATE WALL PANELS

PROJECT LOCATION SECTION COPPER METAL PLATE WALL PANELS SECTION 07 4213.25 PART 1- GENERAL 1.01 SECTION INCLUDES A. Copper metal plate wall panels. 1.02 RELATED REQUIREMENTS A. Section 05 4000 Cold-Formed Metal Framing: Wall panel substrates support framing.

More information

SECTION ORNAMENTAL ALUMINUM FENCING

SECTION ORNAMENTAL ALUMINUM FENCING SECTION 032300 ORNAMENTAL ALUMINUM FENCING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION STRUCTURAL RETROFIT ROOF SUB-FRAMING SYSTEM

SECTION STRUCTURAL RETROFIT ROOF SUB-FRAMING SYSTEM SECTION 13 34 21 - STRUCTURAL RETROFIT ROOF SUB-FRAMING SYSTEM PART 1 - GENERAL 1.1 DESCRIPTION A. The structural retrofit roof sub-framing system will provide support for a new metal roofing system constructed

More information

Interior Hangers. Application

Interior Hangers. Application Application Interior bridge deck hangers are typically fabricated using two heavy duty sheet metal end clips that have been electrically resistance welded to an appropriate sized wire or formed metal connecting

More information

SECTION A. ACSE 7 Minimum Loads for Buildings and other Structures.

SECTION A. ACSE 7 Minimum Loads for Buildings and other Structures. SECTION 06 12 00 STRUCTURAL INSULATED PANELS ------------------------------------------------------------------------------------------------------------ PART 1- GENERAL ----------------------------- 1.1

More information

SECTION STRUCTURAL PRECAST HOLLOW CORE SLABS

SECTION STRUCTURAL PRECAST HOLLOW CORE SLABS PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish all labor, materials, equipment and incidentals to provide a complete structural precast hollow core slab system as shown on the Contract

More information

Guideline Specifications

Guideline Specifications Page 1 of 7 PART 1 Guideline Specifications Exterior Aluminum/Composite Wall Panels GENERAL ARROWHEAD 508 SYSTEM Pressure Equalized Rainscreen SECTION 07410 1.01 SUMMARY A. Work of this section included

More information

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

B. Polyethylene samples shall be submitted for Owner approval of color and quality. Glass Rail ENGINEERED DASHERBOARD SPECIFICATIONS PART 1 - GENERAL 1.01 PROJECT SCOPE A. Contractor shall furnish and install one complete set of steel framed dasherboards as indicated on the drawings and

More information

ONE SCHOOL STREET SEPTEMBER 18, 2008 GOWANDA, NEW YORK ARCH PROJECT NO

ONE SCHOOL STREET SEPTEMBER 18, 2008 GOWANDA, NEW YORK ARCH PROJECT NO SECTION 09265 - GYPSUM BOARD SHAFT-WALL ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION MANUFACTURED ROOF EXPANSION JOINTS

SECTION MANUFACTURED ROOF EXPANSION JOINTS SECTION 07 71 29 - MANUFACTURED ROOF EXPANSION JOINTS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK

DIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK DIVISION 03 CONCRETE SPECIFICATION 031000: FORMS AND FORMWORK PART 1.0 GENERAL 1.1 DESCRIPTION The work of this specification includes furnishing of all labor, materials, equipment and incidentals to install,

More information

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

A. This Section includes automatic entrance door systems operating as follows: 1. Swinging operation.

A. This Section includes automatic entrance door systems operating as follows: 1. Swinging operation. SECTION 08462 - SWINGING AUTOMATIC ENTRANCE DOORS PART 1 - GENERAL.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General, Supplementary, and Special Conditions and Division

More information

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS PART 1 GENERAL 1.01 SUMMARY Section 15140 PIPE HANGERS, This Section includes the furnishing and subsequent installation of: A. Pipe and equipment hangers, supports, and associated anchors B. Equipment

More information

SECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING

SECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING 7160 Krick Rd., Walton Hills, OH 44146 800-321-3827 - Tel 440-439-8650 - Fax 440-439-6889 SECTION 12 48 16 ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING PART 1. GENERAL 1.01 SUMMARY: This section includes

More information

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL

CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9080 - Concrete Steps, Handrails, and Safety Rail CONCRETE STEPS, HANDRAILS, AND SAFETY RAIL PART - GENERAL.0 SECTION INCLUDES

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-05 40 00 (May 2015) ------------------------ Preparing Activity: NAVFAC Superseding UFGS-05 40 00 (May 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS References are in

More information

SECTION PIPE AND TUBE RAILINGS PART 1- GENERAL 1.1 RELATED DOCUMENTS 1.2 SUMMARY 1.3 PERFORMANCE REQUIREMENTS

SECTION PIPE AND TUBE RAILINGS PART 1- GENERAL 1.1 RELATED DOCUMENTS 1.2 SUMMARY 1.3 PERFORMANCE REQUIREMENTS SECTION 055213- PIPE AND TUBE RAILINGS PART 1- GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SECTION THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 075423 - THERMOPLASTIC POLYOLEFIN (TPO) ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including Division 00 Bidding Requirements and other Division

More information

SECTION Specification for Building Limes Specification For Building Sands from Natural Sources Methods of Tests for Paints.

SECTION Specification for Building Limes Specification For Building Sands from Natural Sources Methods of Tests for Paints. SECTION 09200 PART 1 - GENERAL 1.01 DESCRIPTION A. Extent of Work: The extent of lath and plaster work is shown on the drawings and in schedules and includes interior and exterior plaster work, and fibreglass

More information

SECTION ALUMINUM RAILINGS

SECTION ALUMINUM RAILINGS SECTION 05522 ALUMINUM RAILINGS PART 1 GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Aluminum pipe and tube railings. B. Related Sections include the following: 1. Division 5 Section "Ornamental

More information

1. Cast-in-place concrete is specified in Section

1. Cast-in-place concrete is specified in Section SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record

More information

SECTION BRICK MASONRY ASSEMBLIES

SECTION BRICK MASONRY ASSEMBLIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following: 1. Face brick. 2. Mortar and grout. 3. Ties and anchors. 4. Miscellaneous masonry accessories. 1.2 SUBMITTALS A. Product Data: For each type

More information

SECTION RESILIENT SHEET FLOORING

SECTION RESILIENT SHEET FLOORING SECTION 09 65 16 RESILIENT SHEET FLOORING SPEC WRITER NOTE: Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1.

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT Page 220529-1 SECTION 220529 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information