1 Int J Coal Sci Technol (2015) 2(2): DOI /s Key technologies and equipment for a fully mechanized top-coal caving operation with a large mining height at ultra-thick coal seams Jinhua Wang 1 Bin Yu 2 Hongpu Kang 1 Guofa Wang 1 Debing Mao 1 Yuntao Liang 3 Pengfei Jiang 1 Received: 20 February 2015 / Revised: 15 March 2015 / Accepted: 18 March 2015 / Published online: 21 July 2015 The Author(s) This article is published with open access at Springerlink.com Abstract Thick and ultra-thick coal seams are main coal seams for high production rate and high efficiency in Chinese coal mines, which accounts for 44 % of the total minable coal reserve. A fully mechanized top-coal caving mining method is a main underground coal extraction method for ultra-thick coal seams. The coal extraction technologies for coal seams less than 14 m thick were extensively used in China. However, for coal seams with thickness greater than 14 m, there have been no reported cases in the world for underground mechanical extraction with safe performance, high efficiency and high coal recovery ratio. To deal with this case, China Coal Technology & Engineering Group, Datong Coal Mine Group, and other 15 organizations in China launched a fundamental and big project to develop coal mining technologies and equipment for coal seams with thicknesses greater than 14 m. After the completion of the project, a coal extraction method was developed for top-coal caving with a large mining height, as well as a ground control theory for ultra-thick coal seams. In addition, the mining technology for top-coal caving with a large mining height, the ground support technology for roadway in coal seams with a large cross-section, and the prevention and control technology for gas and fire hazards were developed and applied. Furthermore, a hydraulic support with a mining height of 5.2 m, a shearer with high reliability, and auxiliary equipment were developed and manufactured. Practical implication on the technologies and equipment developed was successfully completed at the No coal face in the Tashan coal mine, Datong, China. The major achievements of the project are summarized as follows: 1. A top-coal caving method for ultra-thick coal seams is proposed with a cutting height of 5 m and a top-coal caving height of 15 m. A structural mechanical model of overlying strata called cantilever beam-articulated rock beam is established. Based on the model, the load resistance of the hydraulic support with a large mining height for top-coal caving method is determined. With the analysis, the movement characteristics of the top coal and above strata are evaluated during top-coal caving operation at the coal face with a large mining height. Furthermore, there is successful development of comprehensive technologies for preventing and controlling spalling of the coal wall, and the top-coal caving technology with high efficiency and high recovery at the top-coal caving face with a large mining height. This means that the technologies developed have overcome the difficulties in strata control, top-coal caving with high efficiency and high coal recovery, and enabled to achieve a production rate of more than 10 Mtpa at a single top-coal caving face with a large mining height in ultra-thick coal seams; 2. A hydraulic support with 5.2 m supporting height and & Hongpu Kang kanghp@163.com China Coal Technology & Engineering Group, Beijing , China Datong Coal Mine Group Co., Ltd., Datong , China CCTEG Shenyang Research Institute, Shenyang , China

2 98 J. Wang et al. anti-rockburst capacity, a shearer with high reliability, a scraper conveyor with a large power at the back of face, and a large load and long distance headgate belt conveyor have been successfully developed for a top-coal caving face with large mining height. The study has developed the key technologies for improving the reliability of equipment at the coal face and has overcome the challenges in equipping the top-coal caving face with a large mining height in ultra-thick coal seams; 3. The deformation characteristics of a large cross-section roadway in ultra-thick coal seams are discovered. Based on the findings above, a series of bolt materials with a high yielding strength of MPa and a high extension ratio, and cable bolt material with a structure, large tonnage and high extension ratio are developed. In addition, in order to achieve a safe roadway and a fast face advance, installation equipment for high pre-tension bolt is developed to solve the problems with the support of roadway in coal seams for top-coal caving operation with a large mining height; 4. The characteristics of gas distribution and uneven emission at top-coal caving face with large mining height in ultra-thick coal seams are evaluated. With the application of the technologies of gas drainage in the roof, the difficulties in gas control for high intensive top-coal caving mining operations, known as low gas content, high gas emission, are solved. In addition, large flow-rate underground mobile equipment for making nitrogen are developed to solve the problems with fire prevention and safe mining at a top-coal caving face with large mining height and production rate of more than 10 Mtpa. A case study to apply the developed technologies has been conducted at the No face, the Tashan coal mine in Datong, China. The case study demonstrates that the three units of equipment, i.e., the support, shearer and scraper conveyor, are rationally equipped. Average equipment usage at the coal face is 92.1 %. The coal recovery ratio at the coal face is up to 88.9 %. In 2011, the coal production at the No face reached Mtpa, exceeding the target of 10 Mtpa for a topcoal caving operation with large mining height performed by Chinese-made mining equipment. The technologies and equipment developed provide a way for extracting ultra-thick coal seams. Currently, the technologies and equipment are used in 13 mining areas in China including Datong, Pingshuo, Shendong and Xinjiang. With the exploitation of coal resources in Western China, there is great potential for the application of the technologies and equipment developed. Keywords Ultra-thick coal seams Top-coal caving mining Large mining height Mining method Mining equipment Roadway support Safety guarantee 1 Introduction In China, there is approximately 1341 Bt of proven coal resource, including Bt of basic coal resource for coal mine construction. Among them, coal resource in thick coal seams accounts for 44 % of the total available. The annual underground coal production from thick coal seams exceeds 45 % of total coal production. Since the Eighties in the last century, there have been many research projects focusing on mechanical coal extraction from thick coal seams. The mining technologies and systems for thick and ultra-thick coal seams have been gradually developed in China. Until recently, there have been three major mechanical mining methods for thick coal seams, i.e., a fully mechanized longwall top-coal caving mining method (thereafter LTCC mining method), a fully mechanized sub-level coal mining method, and a fully mechanized mining with a large mining height method. There are some limitations with the fully mechanized sub-level coal mining method, including the thickness variation of coal seams, spontaneous combustion, unit mining cost and efficiency. Due to the low production efficiency (Qian and Shi 2003; Wang 2005; 2006a; Mao and Yao 2010; Wang 2010a), the fully mechanized sub-level coal mining method is currently replaced by the other two mining methods. Compared with the fully mechanized sublevel coal mining method, the fully mechanized coal mining with a large mining height method can reduce the amount of roadway development, mitigate the tension between mining and development, and simplify the mining process. With the progress of mining technologies and equipment in China, the fully mechanized coal mining with a large mining height method has seen widely used (Yan and Yin 2008; Yan 2009; Yan et al. 2011), and has achieved significant mining profit and coal recovery. The method is only applicable to the coal seams of low dip, relative stable, and good roof conditions, and is also limited by the shearer s cutting height and coal wall spalling. For this reason, the mining height for one mining pass is 7.0 m (Wang et al. 2012), and cannot meet the requirement for safe and efficient mining in ultra-thick coal seams above 7 m. In terms of ultra-thick coal seams above 7 m, the top-coal caving mining method is the first choice. For coal seams with thicknesses ranging from 7 to 14 m, the top-coal caving mining method can be applied as the technologies and the equipment are well established and manufactured. In order to achieve safe and efficient coal extraction in ultra-thick coal seams with thicknesses ranging from 14 to 20 m, the authors propose a fully mechanized large mining height longwall top-coal caving mining method (thereafter LLTCC mining method), developed a full range of technologies and equipment for a LLTCC mining operation. The technologies and equipment developed have been successfully applied in the Tashan coal mine

3 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 99 in Datong, China, and has achieved a production of 10 Mtpa at a LLTCC mining operation in the ultra-thick coal seam. In the early twentieth century, the top-coal caving mining method was applied at steep seams in France, Spain and former Yugoslavia. Due to the low mechanical levels in mining, the method was actually an alternative of the high caving mining method, which was only used as a special mining method under complex geological conditions. At the end of forties and early fifties of the twentieth century, the top-coal caving mining method was used to extract the thick coal seams in the former Soviet Union, France and former Yugoslavia. With the progress of hydraulic support technology, the fully mechanized top-coal caving technology was improved and successfully applied in some countries. In the late eighties of the last century, the top-coal caving technology was not widely applied and its potential was not fully achieved due to the competition from other energy industries, the changes of social and political systems, and no solutions for the difficulties of its application in difficult geological conditions. Up to 1992, fully mechanized top-coal caving faces had been stopped in all countries, with the last site in Russia. By that time, China was the only country using the LTCC mining method to extract coal from thick coal seams (Wang 2009). Currently, China is a world leader in developing and conducting the LTCC mining technology, which results in several large, safe, high production rate and high efficiency mining areas including Luan, Yanzhou, Yangquan and Suozhou (Fan et al. 2003; Wang 2011). In recent years, with the development of the LTCC mining technology in China, the technology and equipment is starting to be introduced in some other countries, such as Australia, and is successfully used in underground coal mines. Although China was late to develop and apply top-coal caving mining technology, its development and applications are progressing very fast, showing significant economic potential and attracting attentions from other countries. In China, the top-coal caving mining method means the fully mechanized longwall top-coal caving mining method. A longwall panel is laid out at the bottom of the thick coal seam and extracted using a fully mechanized longwall mining method. At the same time, the remaining coal above the longwall face are fractured by ground stress and strain (manually fractured in some special cases), and caved through the sliding window at the support canopies into an additional scraper conveyor, and then transported out of the working face. There are approximately four stages for the development of LTCC technology in China. 1.1 Stage 1: Exploration stage ( ) Since 1982, the LTCC technology has been introduced and investigated in China. In 1984, the first industrial trial of the technology at a gentle inclined seam was conducted at Northern Area 3 in Puhe mine, Shenyang Province, China (Yan and Fu 2003). Due to the problems with support design and equipment, and lack of experience in production management, the trial was not successful. However, the subsequent trials at steep inclined coal seams in the No. 2 mine of Yaojie, Meihekou mine of Liaoyuan, and Liudaowan mine in Urumqi, China, were all successful. Up until 1990, although the trials on the technology at gentle inclined coal seams continued in Northeastern China and Pingdingshan, there were no breakthroughs. In the second half of 1990, the LTCC face 8603 at the No. 1 coal mine in Yangquan produced 140,000 t/m, doubling the production from a sub-level coal face and exceeded 80 % of coal recovery from the face. The dip of the LTCC face was 3 7, the thickness was 6 m and the face width was 120 m. The trial at Yangquan found a way to achieve high production, high efficiency at a LTCC face, demonstrated the potential with LTCC technology, and laid a solid foundation for the development of LTCC technology. The feasibility of high production capacity and high efficiency of the technology has been proven at this stage. 1.2 Stage 2: Gradual maturation ( ) The key achievement at this stage was that the LTCC face at Xinglongzhuang mine in Yanzhou, China, reached the high production of 3 Mtpa. In addition, there was a breakthrough for LTCC technology at three soft coal seams, large dip coal seams (approximately 30 ), and high gassy coal seams, which will enable a wide application of the technology in China. At this stage, the LTCC technology developed quickly and made some coal mining companies in China realize that the LTCC technology was a technological step-change for the coal mining industry. In addition, the research and studies were very active in the areas of ground control, support-strata relationship, cavability of top coal, and methods of top-coal caving, which provided various theories and practices. 1.3 Stage 3: Technical maturation and promotion ( ) Due to the huge technical advantages demonstrated, LTCC technology has attracted great attention from mining companies in China. Also with the removal of some technical difficulties in using LTCC technology, LTCC technology was widely and quickly applied in the coal mining industry in China. In 1995, LTCC technology was selected as one of five key technologies for further research and promotion during the period of the ninth five-year national economic plan by the Ministry of China Coal Industry. Several major technical issues associated with the

4 100 J. Wang et al. LTCC mining method were named as key topics for research. Furthermore, in 1997, China National Nature Science Foundation launched a research project of Basic study of whole seam coal extraction in thick coal seams. Various achievements were obtained at this stage. In some coal mines that meet appropriate geological conditions i.e., simple geological conditions, large coal reserves, fewer natural hazards, 6 9 m coal seams, and medium hard coals, the annual coal production and profit at LTCC faces increased substantially. For instance, in 1997, the coal production rate at the LTCC face in Dongtan mine in Yanzhou, China, achieved 4.1 Mtpa, and 208 t/manpower. In 1998, at the same face, the coal production rate reached 5.4 Mtpa, and the manpower efficiency was at 235 t/manpower, which was regarded as a world level in that time. In addition, at this stage, the LTCC technology was developed to extract some difficult coal seams, such as three soft, two hard, large dip, high gassy, spontaneous combustion-prone, and ultra-thin seams, etc. The various technologies were obtained from the above development. During the period of the tenth five-year national economic plan, a project called the research and experiment on LTCC technology and equipment with a production capacity of 6 Mtpa was completed in Yanzhou, China. The study enabled a higher than 6 Mtpa production rate of the LTCC face for six consequent years, which showed that LTCC technology in China had reached a new high level. 1.4 Stage 4: Improvement (2005 to present) In 2005, during the study of safe and high efficiency mining technologies for high gassy ultra-thick coal seams, the causes of problems that stagnated the production of high gassy LTCC faces were analyzed. In addition, the feasibility of further increasing the coal cutting height was investigated for coal extraction using LTCC technology at ultra-thick coal faces. In 2006, Li et al. (2006) presented some characteristics and potential of designing top-coal caving hydraulic support with large mining heights. In terms of equipment capacities, Lu et al. (2006) conducted a study on a complete set of mining equipment with a cutting height of 3.5 m. Currently, in order to overcome the difficulties in mining high gassy and ultra-thick coal seams, some mining companies in China, such as Tunliu mine and Wangzhuang mine of Luan Group, and Tashan mine of Datong Group, conducted various LTCC mining experiments with large mining heights and studies on the ground control at LTCC faces. Because LTCC mining technology with large mining height is a new coal mining method, however, there is still a lack of related theories and studies; for instance, the applicable conditions for a large mining height LTCC mining operation, the movement of the top coal and the roof strata, stress distribution around the face, and a complete set of equipment for a large mining height LTCC face. In terms of LTCC mining operations, the characteristics of ground pressure, the movement of the top coal and roof strata, and the relationship between the support and surrounding rock are the main topics. They are also the main criteria for the selection of face equipment, mining parameters and support parameters. The studies on ground pressure and the movement of the top coal and roof strata are limited in countries other than China. Limited literatures exist that describe top coal movement and top coal cavability (Hu 1995), while there is less description on roof structure, face pressure, and roof control, etc. Since the application of LTCC technology, there have been many studies on the movement characteristics of overlying strata, which has resulted in a large amount of achievements. Kang Lijun (Kang 1990; 1995; 1996; 1998; 1999; Kang and Qi 1998; Kang et al. 1998; 1999) divided the roof movement into two stages, the non-complete extraction stage and the complete extraction stage. At the non-complete extraction stage, the periodic pressure from the main roof is mainly caused by the combination impact or individual impact from the broken cantilever beam roof in the irregular caving zone, and the broken or overturned overlying beam roof fixed at the two ends. But at the complete extraction stage, the periodical pressure from the main roof is mainly caused by the periodical broken, overturn and unstable arch beam roof in the regular caving zone. The strength of periodic pressure at the non-complete extraction stage is higher than that at the complete extraction stage. A case study on the roof movement of a LTCC face at the No. 4 mine in Yangquan, China, further described the roof movement at the two stages (Kang et al. 1997). Based on the movement characteristics of overlying strata at the LTCC face, Yan (1996) introduced a mechanical theory of limited deformation and proposed a balance structure of macro continuous compressed arch beam of overlying strata at the upper location. Deng Guangzhe et al. from the Xi an Mining Institute (Deng 1994) investigated the characteristics of arch structure of overlying strata movement and ground control law based on the observation and measurement at LTCC face and the analysis of 3D analogue modelling. Using mechanical analysis of the shell structure, the arch structure of the overlying strata at LTCC face was preliminarily analyzed. The analysis concluded that the formation of the arch structure at overlying strata relies on some external conditions. When there are no stable skewbacks, the arch structure becomes unstable. The caving of the arch structure of strata shows an abruptness. Zhang (1999) believe that after the immediate roof caved, an

5 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 101 unstable arch similarly structure may be formed within times of mining height above the coal face, and its stability is random. On the other hand, after the caving of the immediate roof above the unstable range, a stable arch similarly structure may be formed due to limited space. This type of arch similarly structure may be formed and caved with the advance of the coal face, resulting in periodical ground pressure. Jiang Fuxing et al. proposed a concept of spatial structure of the overlying strata. Based on the different mining boundaries at different mining areas, the main roof and overlying strata may form four types of 3D structures after caving, including type h, O, S and C. The spatial structure type of overlying strata in mining regions or mines is initially determined by design, and then varies with the mining operation. It is determined by roof property, buried depth, coal pillars between the working face and the mining area, and fault protection pillars. In addition, it varies at different mining stages (Ma 2005; Jiang 1995; 2006; Wang 2006b; Hou et al. 2009; Liu 2010). In terms of the movement characteristics of overlying thick hard strata, Shi Hong (Shi 2005; Shi and Jiang 2004; 2005; Shi et al. 2005) regard the hard strata as a simple beam fixed at two ends structural model and analyzed the broken characteristics of thick hard strata before the initial fracture of the main roof. Using the stress distribution in the strata, Shi Hong, et al., proposed a mechanical criterion for three broken modes of thick hard rock, and predicted the initial fracture and the ground pressure interval of the main roof. Based on the elastic plate and articulated plate mechanical model, Jia Xirong of Taiyuan University of Technology et al. (Jia et al. 1998) extended the ground pressure calculation method in medium thick coal seams into the calculation of ground pressure at LTCC face roof. According to the structural properties of roof strata and mining conditions, the strata with no self-support capability after fracture (no self-support strata) are defined as immediate roof. The strata with support structure, but without sufficient self-support capability after fracture (transition strata) are defined as main roof. The strata with self-support capability after fracture (complete support strata) are defined as roof overlying strata. In addition, they presented the basic assessment criteria for complete support strata, transition strata and no self-support strata. Xie Guangxiang (Xie 2005; 2006; Xie and Luo 2005; Xie et al. 2006a, b; 2007a, b; 2009) believe that there is a stress shell composed of high stress beams in the surrounding rock space of mines. The maximum principal stress in the stress shell is greater than the principal stress in the strata inside and outside the stress shell. The stress shell bears and transfers the load and pressure from the overlying rock, and is a major support body while the main roof bears only partial load. Based on the findings on the stress shell and its mechanical properties, the 3D mechanical properties of the surrounding rock at LTCC faces were found, including the effect of mining height, the mechanism of pillar width and the response of advance rate. Furthermore, the mechanical properties of ground pressure abate and the mechanisms of dynamic hazard mitigation were obtained. Some researchers have completed various studies on the theory of ground control and the law of roof movement at LTCC face (Buddery and Oldroyd 1992; Zhang 1995; Wu 1998; Wang et al. 2001; Yasitli and Unver 2005; Ren 2005; Liu et al. 2006; Nan et al. 2008; Liu and Huang 2009; Xie and Zhao 2009a, b; Altounyan and Taljaard 2001; Alehossein and Poulsen 2010; Chen et al. 2010; Miao and Lai 2011; Yu et al. 2011; Zhang et al. 2011), including seismic monitoring (Liu 2008a, b; Kong et al. 2009; 2010a, b, c), analogous material (Kang et al. 2007a, b), numerical modelling (Wang et al. 2007; Zhu and Yan 2011), theoretical analysis (Meng 2007; Yang 2007; Fu 2008; Wu 2008; Zhang and Liu 2008; Zhou and Su 2008; Li and Xu 2009; Shi et al. 2009; Xing et al. 2009; Liu 2010; Meng et al. 2010; Wang 2010b) and site observations (Cheng 2008; Duan et al. 2008; Liu 2008a, b; Su2008; Song et al. 2010). The research results above are all based on the characteristics of ground pressure, and the models of beam, arch and shell. In addition, theoretical analysis and analogous (numerical) modelling were used to establish the model of overlying strata structure. Subsequently the models were validated on site. As a stable structure is formed in the strata at higher locations, its deformation and fracture will not affect or have little effect on the ground pressure at working face. Although there are some differences in studying methods and aspects, the ultimate purposes of the models derived are to explain the ground pressure during the LTCC operation and maintain a high efficient safe production. In recent years, however, the strong ground pressure at a large mining height LTCC face in ultra-thick coal seam cannot be explained by previous experiences and knowledge accumulated at a normal LTCC face. Therefore, based on the LTCC operation in ultra-thick coal seam of more than 14 m, this paper proposes a cantilever beam-articulated rock beam structural model. Based on the model proposed, the resistance force of support was calculated and the top coal and roof movement were monitored and analyzed. In the study on the relationship between support and surrounding rock, to overcome the difference between the actual measurement and the traditional theory, Qian Minggao (Liu 1996; Qian et al. 1996a, b; Liu et al. 2002) regarded the key blocks of the Voussoir beam as the top boundary condition of the immediate roof, and believed

6 102 J. Wang et al. that the support resistance force is mainly from the pressure of loose blocks and the deformation pressure of overturned blocks caused by the S R movement of the Voussoir beam. The deformation of immediate roof results in the overturned deformation load of the immediate roof inserted by the Voussoir beam absorbed by the fractured immediate roof (including top coal) and the nonexistence of double curve relationship in the P 4L relationship. Based on the mechanical properties and effect of various components in the support and surrounding rock system, the mechanical model of support and surrounding rock was established and provided a basis for further investigation on the relationship between the support and surrounding rock. With the development of LTCC technology, the comprehensive mechanical model for LTCC mining face has been greatly improved. Liu Changyou, et al. used site observation, finite element numerical calculation, and the analogous material modelling method to investigate the comprehensive mechanical properties of the immediate roof and their effect on the relationship between support and surrounding rock. By considering the immediate roof as a variable body, the characteristics of deformation and fracture of the immediate roof and the structural mechanical and stiffness properties of the immediate roof were studied. They proposed that the load of the immediate roof is regionalized, and provided a calculation method for the stiffness of the immediate roof. In addition, based on the stiffness characteristics of the immediate roof with a rectangle shape face, the immediate roof is divided into three categories as stiffness similar, zero stiffness and medium stiffness. When the immediate roof stiffness is zero, the support is in the status of a given load or a limited load. When the immediate roof is in a stiffness similar status, the support is in a given deformation status. When the immediate roof is in a medium stiffness status, the P 4L curve shows a typical double curve relationship. When the immediate roof is in a zero stiffness status, the rational resistance force of support is mainly determined by its effect on the stability of the face ends. The thickness variation of the immediate roof (including top coal) also affects the load bearing capacity of the immediate roof. Cao Changsheng et al. (Liu et al. 1997; 2002; Cao and Liu 1997; Cao et al. 1998; 1999; Cao et al. 1999) presented a concept on the critical thickness of the immediate roof and believed that the P 4L double curve flattens when the immediate roof thickness exceeds a critical thickness. In other words, the variations of support resistance and main roof overturn angles have little effect on the roof subsidence. Shi Yuanwei et al. (Kang et al. 1991; Shi and Chen 1993; Shi et al. 1993) presented and analyzed the critical thickness of the immediate roof and its effecting factors. They state that when critical thickness is greater than actual thickness, or when the immediate roof in front of the face enters a plastic zone, the immediate roof would lose its load bearing capacity after it enters the roof control zone. Therefore, the mechanical relationship of support and surrounding rock will show a variation. In contrast, the immediate roof will maintain a certain deformation capacity. Fang (2002) simulated the effect on the roof stability at face ends by support type using discrete element software and believes that under soft coals, the critical issue is to control the distance from the support tip to the coal wall, which must be controlled within the distance limit. Under the conditions of medium hard coals, the constraint distance from the support tip to coal wall is relatively large and thus there will be a rational arrangement for the tip to wall distance and support resistance force. For hard coals, the study focus should be on improving the top coal caving ability. In the study on the mechanical relationship of support and surrounding rock in a soft coal extraction, Huang (2002) found that the increase of support resistance can reduce the tensile stress range in the top coal between support tip and coal wall, increase the self-support capacity from the top coal between support tip and coal wall, and suppress the movement and fracture of top coals. Nevertheless, the increase of support resistance has a limited effect on the improvement of subsidence of unsupported zone between the support tip and coal wall. Jin et al. (2002) state that under the condition of hard roof and hard coal, the LTCC face shows the characteristics of hard roof, and demonstrates the characteristics of top coal cushion effect at LTCC face. The rational support resistance force should be based on the cantilever beam model with a modification by the coefficient of cushion effect. Wu Jian et al. (Wu and Yan 1995; Wu and Fu 1998; Wu and Zhang 2001) suggest that the traditional ground control theory could not explain the interaction relationship between the support and surrounding rock. The key support parameters in the support and surrounding rock relationship includes the vertical support force, the horizontal support force, the distance between the supporting point of resultant force and the coal wall, and the distance between the support tip and coal wall. There are obvious effects from these parameters, sometimes obvious only when they interact. Yang et al. (2009) state that the key to the interaction system of the support and surrounding rock is the interaction between the support and top coal. Under hard coal conditions, the overturn of the immediate roof is affected by the support and top coal system, and the turning angle of the lower strata is less than the turning angle of the main roof. Under the medium hard coals and soft coals, the

7 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 103 immediate roof can equally transfer the overturn deformation of the main roof to top coals and the support system. With the consideration of the immediate roof as the top boundary of support-top coal systems, the mechanical model for two-leg shield support and surrounding rock can be established. The studies on the relationship between roof support and surrounding rock provide theories for the design and selection of LTCC roof support, the improvement of support-surrounding rock status and effective roof control (including top coals). In this paper, based on the relationship between roof support and surrounding rock, the authors propose a 3D dynamic optimal design method with hydraulic support and surrounding rock coupling, and subsequently the determination of the working resistance of hydraulic support at the No coal face in Tashan mine in Datong, China, and test on site. In terms of the study on mining equipment for LTCC operation, the improvement of the production rate at a fully mechanized coal face mainly depends on the increase of longwall width and shear cutting depth, fast advance and the extension of applicable range. In particular, the application of electromechanical heavy equipment enables the increase of the production rate, including high powered electric traction shearer, large capacity conveyor, electrichydraulic controlled hydraulic support, non-stop selfmoving stage loader and conveyor end, and high voltage power supply for face equipment. Currently the mining equipment manufactured in China for the fully mechanized longwall face and the LTCC face can meet the requirements and demands for high production and high efficiency in the Chinese coal industry. In the early years, China imported a large amount of shearers including chain haulage type and hydraulic haulage type. Since the 1970s, China has started to manufacture shearers. In the eighties, the hydraulic haulage shearers met the requirements for extracting coal seams with heights from 1.5 to 4.5 m. In addition, the difficulties in integrating all mining equipment had been overcome. There were about 50 types of shearers. Up to the 1990s, large power hydraulic haulage shearer developed in China has gone into mass production. Furthermore, the high performance electric haulage shearer had been developed, and is currently at an advanced level in the world, with a cutting height of 5.5 m. In China, the application of large power electric haulage shearers enables the increase of coal production at a fully mechanized face from 1 Mtpa to 4 Mtpa or even 10 Mtpa. Currently, several series of electric haulage shearers are manufactured in China. In addition, the electric shearers are equipped with intelligent monitoring, control and protection systems, and applied with information processing and sensor technologies to achieve electro-mechanization. Top-coal caving hydraulic support is a key equipment for LTCC operations. During the last 20 years, top-coal caving hydraulic support was gradually developed from high position top-coal caving support, middle position topcoal caving support, to low position top-coal caving support. Currently, the low position top-coal caving support is widely used, which is a chock-shield hydraulic support with positive four-link bar, reverse four-link bar and single swing link bar. In terms of the scraper conveyor, there has been significant improvement every 10 years in China. In the 1980s, there were various types of scraper conveyors with two series of chute width of 730 mm and 764 mm. In 1994, the SGZ880/800 cross-side unloading scraper conveyor with an entirely cast-welded chute was developed by the Taiyuan Branch of China Coal Research Institute and Northwestern Mining Equipment Manufactory, which had a capacity of 7000 t/d. During the same period, Zhangjiakou Mining Equipment Manufactory introduced some casting and processing equipment and manufactured scraper conveyors with entirely cast-welding chutes. During the period of the ninth five-year national economic plan, with the cooperation of Zhangjiakou and Northwestern Coal Mining Equipment Manufactory, using CAD technology, the Taiyuan Branch of China Coal Research Institute developed the first scraper conveyors for LTCC face with retractable end chain adjusting device. They were the SGZ960/750 front scraper conveyor and the SGZ900/750 rear scraper conveyor, and also stage loader and crusher. The equipment developed met the requirements from Yankuang Group for a coal production of 10,000 13,000 t/d. During the period of the tenth five-year national economic plan, Yankuang Group, the Taiyuan Branch of China Coal Research Institute and Northwestern Benniu Group jointly developed the SGZ1000/1200 and the SGZ1200/1400 long distance high reliability front scraper conveyor and rear scraper conveyor. Currently, the SFZ1200/1400 long distance high reliable rear scraper conveyor is an ultra-heavy scraper conveyor for LTCC faces, which is characterized by its highest power level, widest chute and longest length. Furthermore, it integrated various advanced technologies, including automatic extension of the conveyor end, hydraulic motor chain tensioner, speed adjustment hydraulic coupler and compact chain. In the 1990s, its main specifications reached an advanced level accepted worldwide. The SGZ1000/1200 front scraper conveyor is currently the largest front scraper conveyor, and can be integrated with various powerful shearers and hydraulic supports. Its installed power is kw. The development of the SGZ1000/1200 and the SGZ1200/1400 scraper conveyors enables not only the technical advance in scraper conveyor technology, but also in LTCC technology.

8 104 J. Wang et al. In order to promote the development of large mining height LTCC technology and equipment for ultra-thick coal seams, and to achieve safe, high efficiency and high recovery mining of ultra-thick coal seams, in 2008, the Ministry of Science and Technology of China launched a significant R&D project called the study of large mining height LTCC technology and equipment The project was supported by the national science and technology plan. With m thick coal seams, the project has developed a large mining height LTCC mining method (LLTCC mining method), a complete set of mining equipment, roadway drivage and support technology and equipment, and mine safety warrant technology and equipment (Wang 2013a, b). In 2011, the technologies and equipment developed were tested at the No coal face of Tashan mine in Datong, China, with a production of Mtpa. The success of the project marked a new level for large mining height LTCC technology and equipment for ultrathick coal seams in China. In this paper, the major research achievements, case studies and technical economical results from this project are presented. 2 Geological and mining conditions at the Tashan coal mine 2.1 Brief description of the mine The Tashan coal mine is a large modern coal mine in Datong extracting the coals from Permo-Carboniferous system in the Datong coal field. The mine is located at the middle edge of Eastern Datong coal field in Shanxi Province, China, Fig. 1. The strike length of the mine is 24.3 km, the dip width is 11.7 km and the total area is km 2. The mine extracts five coal seams including seam 2, 3, 4, 5 and 8. The mine has 5070 Mt of geological coal reserve, 4760 Mt of industrial coal reserve and 3070 Mt of mineable coal reserve. In 2007, the mine had a nominal production capacity of 1.5 Mtpa, and a life of 140 years. 2.2 Geological conditions of the mine The main coal seams extracted at Tashan coal mine are coal seam 3 5; their buried depth ranges from 347 to 447 m; average seam thickness is 16.8 m and maximum is 20 m; and average seam dip is 4. The protodyakonov coefficient F of the coal seams ranges from 2.7 to There are 4 14 plies partings, and their lithologies consist of grey brown kaolinite, kaolinitic mudstone, grey and black carbonaceous mudstone, sandy mudstone, and locally dark grey siltstone. The top of coal seam 3 5 is a 0.33 m thick false roof of grey black carbonaceous mudstone. The top part of the immediate roof consists of brown grey kaolinitic mudstone, magmatic rock and the seam 2. The middle part of the immediate roof is composed of shed coal and silicified coal. The bottom part consists of grey black carbonaceous mudstone, kaolinite and magmatic rock. The thickness of the immediate roof ranges from 2.4 to 6.3 m. From top to bottom, the upper roof consists of seam 4, magmatic rock, silicified coal, siltstone, fine sandstone, kaolinitic mudstone and sandy mudstone. The thickness of the upper roof varies from to m. The immediate floor consists of grey brown kaolinitic mudstone and sandy mudstone. It is brittle, fragile and contains coal bits. The lower floor is dark grey siltstone with local fine sandstone. The length of the No LLTCC face is 207 m. The face is affected by igneous rock. Thus, there are some metamorphism and silicification in the seam 3-5. The seam structure is complex. The coal with metamorphism and silicification is hard, broken and with well-developed cleats. Mixed coal is lose and fragile. A lower coal seam is stable and hard, and forms a structure like a sandwich, shown in Fig. 2. Fig. 1 Locality of Tashan coal mine Fig. 2 The upper seam structure at No working face

9 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 105 Table 1 Geotechnical measurement of surrounding rock at Tashan coal mine Order number Measurement contents Measurement instrument Number of measurement points 1 Ground stress SYY-56 ground stress monitor with hydraulic fracture 3 holes 2 Rock strength WQCZ-56 measurement instrument of rock strength 8 holes 3 Rock structure KDVJ-400 borehole camera 13 holes Table 2 Test results of ground stress Order number Roadway name Buried depth (m) Vertical stress (MPa) Maximum horizontal principal stress (MPa) Minimum horizontal principal stress (MPa) Direction of maximum horizontal principal stress auxiliary transport N26.7 E roadway gate road N24.8 E gate road N19.0 E The relative gas emission at coal seam 3 5 in Tashan coal mine is 1.95 m 3 /t, which is classified as a low gas mine. However, the coal dust has the possibility of a dust explosion, with an explosion index of 37 %. The period of spontaneous combustion is 68 days. There is no high temperature heat hazard area. The geothermal gradient is 2.41 C/100 m. 2.3 Geotechnical measurement and analysis of coal and rock masses In order to fully understand the geotechnical properties of the surrounding rock, the measurement of geotechnical properties was systematically and comprehensively conducted, including the underground measurement of ground stress, rock strength test and rock structure observations. The measurement contents are listed in Table 1. Fig. 3 Test results of surrounding rock strength at roof of No roadway Measurement results of in situ stresses Using the hydraulic fracturing method, the in situ stress of rock in the roof of the seam 3 5 at Tashan coal mine was measured. The measurement results are shown in Table 2. These results show that the maximum horizontal principal stress is greater than the vertical principal stress. The type of stress field is the r H [ r V [ r h type. Therefore, the stress field tested is mainly a structural stress field, and maximum horizontal principal stress is the principal stress Test results of surrounding rock strength The surrounding rock strength was directly measured in the borehole underground using the WQCZ-56 instrument. There were eight boreholes at four test stations, including four roof holes and four wall holes. Figures 3 and 4 show Fig. 4 Test results of surrounding rock strength at wall of No roadway the test results in the No roadway that was the closest station to the No working face. The test station was located in the No roadway and 500 m away from the intersection of the No roadway and the No return airway. At this location, the roof holes and wall holes were all in coal seams and the coal strength was measured in detail. A 0.4 m fractured

10 106 J. Wang et al. Fig. 5 Typical photos inside boreholes at roof of roadway in Tashan coal mine zone at roof holes was ignored and thus the maximum strength of the coal was MPa, the minimum was 7.65 MPa, and the average was MPa. The average coal strength in wall holes was MPa Observations of the surrounding rock structure The development of cleavage and fracture of the surrounding rock was directly observed in the boreholes underground using a KDVJ-400 borehole camera. The observations of 13 boreholes demonstrated that the cleavage and fracture in the top coal and immediate roof at the Tashan coal mine were well developed. In addition, there were various degree of layer separation at shallow roof strata and there was a trend to extend the layer separation into the upper strata. Figure 5 shows the photos of cleavage and fracture in boreholes. 3 Mining method and ground control technology for LLTCC operation in ultra-thick coal seams 3.1 LLTCC in ultra-thick coal seams In a conventional fully mechanized top-coal caving longwall face, the coal cutting height is normally m. Based on the rule of cutting to caving ratio 1:3, the conventional top-coal caving height is m. In other words, the maximum thickness of coal extraction is m. In terms of ultra-thick coal seams with thicknesses greater than 14 m, if the cutting height remains as m, there will be many problems. For instance, the cutting to caving ratio will be too low (1:4.7 if cutting height is 3.5 m in a 20 m thick coal seam); it would be difficult to cave top coals, and the coal recovery will be Fig. 6 LLTCC mining method in ultra-thick coal seam low. At the same time, the increase of coal production will result in the increase of gas emission and the difficulties in removing gas due to limited cross-section area at the coal face. In order to overcome the problems mentioned above, the authors propose a LLTCC mining method, that is to increase the coal cutting height to 5 m, the top coal caving height to 15 m, and the total coal extraction height to 20 m, shown in Fig. 6. The LLTCC mining method involves a large coal cutting height, a large coal caving height and a large extraction space, that will result in some additional problems including coal wall spalling, difficulties in topcoal caving, and strong ground pressure. Those problems require comprehensive, in-depth and systematic research and testing D spatial structural model of the roof in LLTCC mining Because of the large thickness of the coal seam extracted through LLTCC mining in ultra-thick coal seams, the range of ground control should also be extended. After the completion of top coal caving operation, it is not possible for the roof rock to cave and fill in the goaf in a short time. Therefore, the immediate roof will form a cantilever beam, and the upper roof will form a stable articulated beam. In other words, a cantilever beam articulated beam will be formed in a LLTCC coal face. In a general case, the overlying strata does not simply follow the movement from lower layer to upper layer, and instead forms various combinations of structures and moves with some laws. Figures 7 and 8 show the structural model of the roof. Based on the study discussed above, a cantilever beam articulated beam structural model for overlying strata at a LLTCC face has been developed, shown in Fig. 9. The strata that need to be controlled are the strata

11 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 107 Fig. 7 Strike cross-section of a LLTCC face Fig. 10 Force analysis and calculation of the immediate roof Fig. 8 Dip cross-section of a LLTCC face Fig. 11 Force analysis of rock in main roof Fig. 9 Structural model of cantilever beam articulated beam that cannot be supported by caved rocks before they cave. They are in the form of a cantilever beam and defined as immediate roof. Above the immediate roof, the strata that are supported by caved rocks are called the upper roof with an articulated beam structure. The roof strata satisfying the D j - D m B 0 condition are defined as immediate roof while the roof strata satisfying the D j - D m [ 0 condition are defined as upper roof. D j is the ultimate subsidence. D j ¼ h ql2 ð1þ 2khr c where h is the strata thickness analyzed, k is a dimensionless coefficient (k = 0.1 h), q is the line load, l is fracture length of the strata analyzed, r c = ( )R c (R c is compression strength), D m is the possible subsidence (Yan 2009), D m ¼ ðh c þ h f Þð1 p 1 Þþð1 k P Þh m ð2þ where p 1 is the coal loss rate; h c is the coal-cutting height; h f is the coal caving height; k p is the expansion coefficient; h m is thickness of the immediate roof. 3.3 Determination of working resistance of the LLTCC hydraulic support The top coal body of the LLTCC face in ultra-thick coal seams can be regarded as a semi-rigid top coal body that can transfer the roof deformation. The deformation effect

12 108 J. Wang et al. of the part of the immediate roof enables the top coal body becoming semi-rigid top coal body. In terms of pressure on the support, this part of the strata can be called no deformation pressure strata. Through the semi-rigid top coal body, the pressure generated by the deformation of immediate roof and upper roof is transferred to hydraulic support. This part of the strata can be called deformation pressure strata (Yan 2009). The loads on the support are the combination of the weight of the top coal and the pressure generated by roof deformation. The force analysis of the immediate roof with deformation pressure is shown in Fig. 10. The force analysis of the upper roof is shown in Fig. 11. (1) Force analysis of the immediate roof with deformation pressure. According to P M oi ¼ 0(i = 1, 2, 3,, j), get: l 1 P 1 2 þ 1 2 h 1ctan a þ R 1 x 1 Qc ¼ 0 l 2 P 2 2 þ 1 2 h 2ctan a þ R 2 x 2 R 0 1ð x 1 h 1 ctan aþ ¼ 0 l 3 2 þ 1 2 h 3ctan a þ R 3 x 3 R 0 2ð x 2 h 2 ctan aþ ¼ 0 P l j P j 2 þ 1 2 h jctan a þ R j x j R 0 j 1 x j 1 h j 1 ctan a ¼ 0 The j formulas above are combined, and which will get: Qc ¼ 1 2 X j i¼1 P i ðl i þ h i ctan aþþ Xj 1 R i h i ctan a þ R j x j i¼1 ð3þ where Q is the deformation pressure on support, kn; c is the distance from resultant force of support to coal wall, m; P i is the rock weight of immediate roof of ith layer with deformation pressure, kn; h i, l i are the rock thickness and length of the immediate roof of ith layer with deformation pressure respectively, m; a is the rock fissure angle, ( ); R j is the additional force of upper strata, kn; x j is the distance from additional force of upper strata to caving point of jth layer immediate roof, m. During the analysis of the large roof structure, the roof with deformation pressure is regarded as an entire body, and the interaction of internal layers can be ignored. Therefore, the Eq. (3) can be simplified as follows: Qc ¼ 1 2 X j i¼1 P i ðl i þ h i ctan aþþr j x j ð4þ (2) Analysis of rock A in main roof with deformation pressure. During the analysis of rock A in main roof, assume that the broken distance of main roof A exceeding immediate roof P j is h j ctan a,thus, P M j?1 = 0toget: L R j x j ¼ Q A 2 þ 1 2 Hctan a TðH DÞ F AB ðl þ Hctan aþ ð5þ where Q A is the weight of rock A in main roof with deformation pressure, kn; T is the compression force between rocks, kn; H, L is the strata thickness and broken distance of main roof with deformation pressure respectively, m; D is the subsidence of rock A in main roof with deformation pressure, m; F AB is the friction force between rock A and B, kn. Substitute Eq. (2) into Eq. (3), to get: Qc ¼ 1 X j L P i ðl i þ h i ctan aþþq A 2 2 þ 1 2 Hctan a i¼1 TðH DÞ F AB ðl þ Hctan aþ Assume Q A = P i?1, L = l j?1, H = h j?1, the equation above is simplified as: X jþ1 Qc ¼ 1 P i ðl i þ h i ctan aþ Tðh jþ1 DÞ 2 i¼1 F AB l iþ1 þ h jþ1 ctan a (3) Analysis of rock B in main roof. Force balance in vertical direction: FAB 0 ¼ Ks Q B In Eq. (5), F 0 AB ¼ Tf, F0 AB ¼ F AB, therefore: ð6þ ð7þ T¼ Ks Q B ð8þ f where K is the rigidity of gangue in goaf, N/m; s is the compression of gangue in goaf, m, (s ¼ ðk 1 k 2 Þ Pj h i, k 1 is the expansion coefficient, i¼1 k 2 is the residual expansion coefficient); f is the friction coefficient among rocks; Q B is the weight of key block B in main roof (assume Q B = Q A ), kn. Substitute Eq. (8) into Eq. (6), to get:

13 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 109 Q ¼ f Pjþ1 i¼1 P i ðl i þ h i ctan a Þ 2ðKs Q B Þðh jþ1 þ fl iþ1 þ fh iþ1 ctan a DÞ 2cf ð9þ In summary, the calculation formula of hydraulic support for LLTCC mining is as follows: coal mine in Datong, China. The borehole analyzed was WEI 1403 at the No coal face in Tashan coal mine. P z ¼ K d BG ð d þ Q 2 Þ ¼ K d B6L d h d c m þ 4 f Pjþ1 i¼1 P i ðl i þ h i ctan a Þ 2ðKs Q B Þðh jþ1 þ fl iþ1 þ fh iþ1 ctan a DÞ 7 2cf 5 3 ð10þ where P z is the working resistance force of LLTCC support, kn; K d is the dynamic load coefficient; G d is the weight of top coal, kn; B is the distance between the centers of two supports, m; L d is the distance of roof control, m; h d is the thickness of top coal, m; c m is the bulk density of top coal, kn/m 3. The equation for calculating the support external load obtained from the theoretical study discussed above was tested and validated at the No coal face in Tashan Table 3 shows the structure of the strata in borehole, and Table 4 shows the physical and mechanical parameters. The determination on the working resistance force of hydraulic support for LLTCC mining in ultra-thick coal seams: (1) Based on criteria of immediate roof. D mi is the possible subsidence of ith layer, i = 1, 2,,12. Table 3 Structure of rock strata in WEI 1403 borehole Layer No. Layer thickness (m) Rock name Layer No. Layer thickness (m) Rock name Layer No. Layer thickness (m) Rock name C Mudstone C Siltstone C Coarse sandstone C Coal C Kaolinitic mudstone C Fine conglomerate C Sandy mudstone C Siltstone C Sandstone C Sandstone C Kaolinitic mudstone C Fine conglomerate C Sandy mudstone C Siltstone C Fine sandstone C Mudstone C Fine conglomerate C Siltstone C Coal C Coarse sandstone C Fine sandstone C Sandy mudstone C Siltstone C Fine conglomerate C Coarse sandstone C Sandy mudstone C Fine sandstone C Siltstone C Siltstone C Siltstone C Kaolinitic mudstone C Fine sandstone C Fine conglomerate C Siltstone C Sandy mudstone C Fine sandstone C Coarse sandstone C siltstone C siltstone C Siltstone C Fine sandstone C Fine sandstone C Kaolinitic mudstone C siltstone C Sandstone C Siltstone C Sandy mudstone C Siltstone C Coarse sandstone C Kaolinitic mudstone C Sandy mudstone C Siltstone C Coarse sandstone C Fine sandstone C Coarse sandstone C Siltstone C C Kaolinitic mudstone C Fine sandstone to C Fine sandstone C Sandy mudstone surface

14 110 J. Wang et al. Table 4 Lithological parameters of rock strata Rock strata D m1 ¼ 10:73 m D j1 ¼ h ql2 khr c ¼ 3:87 m\d m1 Thus rock strata C1 is in the immediate roof.... D m11 ¼ 1:89 m D j11 ¼ h ql2 khr c ¼ 0:56 m\d m11 Thus, rock strata C11 is in the immediate roof. D m12 ¼ 0:63 m D j12 ¼ h ql2 khr c ¼ 4:32 m [ D m12 Thus, rock strata C12 and strata above are in the upper roof. (2) Determination of rock strata without deformation pressure. P n D j i ¼ D d, D d is a total deformation of coal body i¼1 in roof control zone, D d ¼ gh d ð1 þ kþ (Yan 2009); g is the porosity of top coal, g ¼ ð1 c d =cþ 100 %, c d is the dried bulk density of coal seam, c is the bulk density of coal seam, k is the coefficient of horizontal pressure (measured value at Tashan coal mine is 1.13). D d ¼ gh d ð1 þ kþ ¼0:3 10:61 ð1þ1:13þ ¼ 6:78 m X4 ðd j Þ i ¼ 5:50 m \ D d ; X 5 i¼1 i¼1 Volume force (kn/m 3 ) Coal Mudstone Sandy mudstone Kaolinitic mudstone Siltstone Fine sandstone Sandstone Fine conglomerate Coarse sandstone D j i ¼ 12:48 m [ D d; Tensile strength (MPa) Rock strata C5 is divided into two parts, C5-1 = m, C5-2 = 5.50 m. X 5 1 i¼1 D j i ¼ D d Thus rock strata C1 C5-1 is rock strata without deformation pressure. (3) Determination of working resistance force. To maximize Eq. (10): 2 P z ¼ K d B6L d h d c þ 4 f Pjþ1 i¼1 P i ðl i þ h i cot a 2cf 3 Þ 7 5 ð11þ Analyze Table 3, refer to the mechanical property of each rock stratum, and take C12 C16 as a whole. Substitute the basic data of C5-2, C6, C7,,C16 into Eq. (11), get: 2 P z ¼ K d B6L d h d c þ 4 f Pjþ1 i¼1 P i ðl i þ h i cot a 2cf ¼ 1:6 1:75 ð923:07 þ 4378:11Þ ¼ 14843:3kN 3 Þ 7 5 Therefore, based on the geotechnical conditions of rock strata at the Tashan coal mine, the working resistance force of hydraulic support for the No LLTCC face at ultra-thick coal seam in Tashan coal mine was determined as 15,000 kn. The ZF15000/ 28/52 hydraulic support for LLTCC face was selected. 3.4 Analysis on the applicability of hydraulic support type The dynamic change characteristics of the ZF15000/28/52 fully mechanized high strength LLTCC hydraulic support in a shift is shown in Fig. 12. The figure shows that the variation of working resistance was not large, implying that the support had a very high reliability. Fig. 12 Periodical change of support working resistance at the middle of the face

15 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 111 Fig. 13 Distribution of ground pressure at the working face Fig. 14 Histogram of support working resistance Figure 13 shows the 3D support resistance variation at the end of the circle in the No face. The impact range of the initial caving and periodical caving of the upper roof was extensive and covered the whole working face. In a normal working period, the average working resistance is kn. Table 5 shows that there was almost no effect on supports, although the dynamic load coefficient is large during loading period, indicating that the impact resistance of support is high. When load is high, and the working resistance force exceeds nominal resistance force, the relief valve can be activated in a timely manner, showing the stability of the support is good. Fig. 15 Boreholes layout. a Top view of boreholes layout, b vertical cross-section diagram Fig. 16 Layout of deep base points Table 5 Statistics of dynamic loading coefficient of upper roof Support No Dynamic loading coefficient at initial loading Average dynamic loading coefficient at initial loading 1.56 Dynamic loading coefficient at Ith periodical loading Dynamic loading coefficient at IIth periodical loading Dynamic loading coefficient at IIIth periodical loading Dynamic loading coefficient at IVth periodical loading Dynamic loading coefficient at Vth periodical loading Average dynamic loading coefficient at periodical loading Total average dynamic loading coefficient at periodical loading 1.52

16 112 J. Wang et al. Fig. 17 Geometry of deep base point parameters The percentage of support resistance at different intervals was described as a histogram (Fig. 14). Figure 14 shows that the distribution of working resistance of hydraulic support was rational, and appeared as a distribution of sine wave. The support resistance was mostly within ,000 kn. In summary, the selection of support was reasonable and their utilization was high. The support selected was suitable for the roof conditions in the working face. 3.5 Analysis of the characteristics of top coal and roof movement in a LLTCC coal face In order to study the movement law of top coal and roof at a LLTCC coal face, some boreholes were drilled into the top coal and roof of the tailgate at the No LLTCC coal face in Tashan coal mine. Basic anchors were installed at different layers inside the boreholes. GUW300 tracking instruments were installed at the opening of the boreholes. The first monitoring station was setup at the location 300 m away from the box cut of the No face. The second monitoring station was 15 m away from the first station. At each station, four boreholes were drilled into the top coal and roof, two deep base points were installed inside each hole, eight deep base points in total were installed, and four GUW300 deep base point movement tracking instruments were installed. The intersection angle of borehole and tailgate was 45. The angles of from No. 1 to No. 4 boreholes with horizontal level were 40, 30, 20 and 10 respectively. The heights of borehole positions from No. 1 to No. 4 with floor were 2.4, 2.1, 1.8 and 1.5 m respectively. Figure 15 shows the layout of the boreholes. Figure 16 shows the layout of eight deep base points in each monitoring station with four points in the top coal and four points in the roof (Table 5). Figure 17 shows the basic parameter geometry of the boreholes layout. Tables 6 and 7 show the parameters of deep base points. Basic geometry is described as Eq. (12). qffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffi X ¼ ðl cos aþ 2 ðlsin bþ 2 ð12þ where L is the depth of base point, m; a is the angle of elevation, ( ); b is the angle between borehole and tailgate, ( ); X is the horizontal length from borehole opening to deep base point and parallel to tailgate, m; Y is the horizontal length from borehole opening to deep base point and perpendicular to tailgate, m; Z is the vertical height from floor to deep base point, m; H is the vertical height from floor to borehole opening, m. From Figs. 18, 19, 20 and 21 show the movement of top coal and roof from two monitoring stations at the No working face. As shown from Figs. 18, 19, 20 and 21, among the initial displacement positions of eight top coal deep base points at two monitoring stations, the distance ahead of the coal wall at the working face ranged from 34 to 48 m with an average of 38 m; among the initial displacement positions of roof deep base points, the maximum distance ahead of the coal wall at the working face ranged from 22 to 34 m, with an average of 28.6 m. The average measured displacement at the top coal base points in front of the coal wall was mm, accounting for 26.6 % of total displacement. The average measured displacement at the top coal base points behind coal wall was Table 6 Parameters from first monitoring station Hole No. Height from floor to hole opening (m) Base point No. Angle of elevation ( ) Height to floor (m) Height to hole opening (m) Depth to base point (m) Horizontal projection of base point (m) Distance of tailgate projection (m)

17 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 113 Table 7 Parameters from second monitoring station Hole No. Height from floor to hole opening (m) Base point No. Angle of elevation ( ) Height to floor (m) Height to hole opening (m) Depth to base point (m) Horizontal projection of base point (m) Distance of tailgate projection (m) Fig. 18 Top coal displacement at first monitoring station Fig. 21 Roof displacement at second monitoring station Fig. 19 Roof displacement at first monitoring station Fig. 20 Top coal displacement at second monitoring station mm, accounting for 73.4 % of total displacement. The total displacement was mm. Average measured displacement at the roof base points in front of the coal wall was 149 mm, accounting for 38.3 % of the total displacement. Average measured displacement at roof base points behind coal wall was mm, accounting for 61.7 % of total displacement. The total displacement was mm. Although from initial displacement position, the top coal base points were affected by abutment pressure in front of the face, that lasted a long period and affected a long distance, the accumulated displacement of the top coal and roof was relatively small due to the constraint from limited space before entering the roof control zone. After entering the roof control zone, the movement of the top coal and roof followed the movement law of vertical subsidence after caving. In front of the coal wall at the working face, the movement of the top coal and roof mainly showed a horizontal deformation under the abutment pressure due to the vertical constraints of the top coal and roof. At the rear of the coal wall which was under the repeated loading and unloading actions, the vertical constraints on the lower part of the top coal exhibited subsidential weakening with the advance of coal cutting resulting in a large space. Therefore, the movement of roof appeared as fracture subsidence and the movement of the top coal appeared as vertical

18 114 J. Wang et al. displacement caused by the roof fracture subsidence. There was a large difference in accumulated top coal and roof displacement in the front and in the rear of the coal wall. In addition, the difference of displacement per unit advance was relatively large. The displacement rate of the top coal in front of the coal wall was 2.63 and mm/m at rear of the coal wall. The displacement rate of the roof in front of the coal wall was 5.4 mm/m, and mm/m at rear of coal wall. It demonstrated that the horizontal deformation rate of the top coal and roof caused by abutment pressure in front of the coal wall was much less than the vertical subsidence rate of the top coal and roof at rear of coal wall. At eight base points in the top coal in two monitoring stations, from the coal wall to the gulf, the distance between the caving position to the coal wall ranged between 6 and 10 m, with an average of 7.8 m. Assume the average distance of the roof control was 6.5 m, the average caving position of the top coal was greater than the average distance of the roof control. In particular, the average caving position was 9 m in the middle or upper part of the top coal (h = 12.1 m, or h = 14.7 m), that indicated that there was a delay of the middle or upper part of top coal caving, the average distance of delay was 2.5 m, and the top coal was caved in a form of inverted step. From the point view of eight base points at two monitoring stations, the roof base points at h = 18.4 m, h = 22.5 m and h = 26.1 m caved in time with the top coal caving. The displacement of the roof started to increase at the roof base point of h = 32.1 m and 15 m at the rear of the coal wall. Therefore, the immediate roof was not completely caved or caved on time, and formed an immediate roof in the form of a cantilever beam above the coal seam. Based on the position of the top coal caving, the caving angle of the top coal can be approximately calculated, i.e., 64.3 for the first monitoring station, 70.1 for the second monitoring station, and 67.2 for an average caving angle. 3.6 Spalling of coal wall at a LLTCC coal face Factors of coal wall spalling at a LLTCC coal face At different stages of non-periodical ground pressure and periodical pressure, as the differences in mining height, advance speed and distance from the support tip to the coal wall, the spalling depth and spalling ratio were different at a LLTCC coal mining face (Yan 2008; Yin et al. 2008; Zhang et al. 2010). In order to better understand the spalling mechanism at a LLTCC coal mining face, the coal wall spalling were examined under different conditions including mining heights, advance rates, distances from the support tip to the coal wall, and ground pressure stages. Using the numerical simulation method, the horizontal displacements of the coal wall with mining heights of 3.5, Fig. 22 Horizontal displacements of rib with different mining heights Fig. 23 Structure of the second level wall guard plate installed on the extendable beam 4.5, 5.0 and 5.5 m were simulated and the results are shown in Fig. 22. Figure 22 showed that the peak horizontal displacement increased with the increase of mining height. Considering the normal mining height was m, the point of peak horizontal displacement to floor was approximately m. Therefore, the rational height of the wall guard plate of support was 1.5 m. Based on simulated results, the second level wall guard plate was installed on a high reliable extendable beam and articulated front beam to prevent the spalling of the coal wall. Its structure is shown in Fig. 23. The face advance speed also significantly affected wall spalling. The observations at the No coal face demonstrated that with the increase of face advance speed, there was a reduction of damage area around the coal wall, and a reduction of wall horizontal displacement. In other words, the spalling of coal wall was suppressed. It is therefore suggested that the face advance speed should be rationally increased to reduce the exposure time and spalling of coal wall. Nevertheless, the effectiveness of controlling coal wall spalling was limited through the increase of face advance speed. With a large amount of observations on site, the effect of increasing face advance speed on coal wall spalling was found. If the advance speed is too high, the coal spalling might increase. With the increase of the distance from support tip to coal wall, the peak abutment pressure in front of the face

19 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 115 decreased. Subsequently, the displacement at support tip increased significantly, and the damage zone in front of the face also increased, redulting in significant spalling. Undoubtedly, the distance from the support tip to the coal wall should be reduced appropriately. Coal cutting height, face advance speed and distance from support tip to coal wall were three factors that had substantial effects on coal wall spalling. Their weighted effects might be ordered as coal cutting height [ face advance speed [ distance from support tip to coal wall. The effect on coal wall spalling from the caving and displacement of the top coal and the roof had an obvious regular pattern. The coal wall spalling clearly appeared before ground pressure commenced, increasing to maximum with ground pressure, and decreased to a minimum after ground pressure disappeared. During periodical ground pressure, the average spalling ratio of the coal wall increased to %. With a low face advance speed, the effect on coal wall spalling would be obvious from periodical ground pressure. Therefore, the maintenance of the coal wall should be enhanced during the period of periodical pressure occurring. The seriousness of coal wall spalling is different at different positions. Coal wall spalling was found to be most serious at the middle part of the face, less serious at the lower part of the face and better at the upper part of the face. According to the observation at the No LLTCC face, the position of peak abutment pressure in front of the coal face was between 10 and 25 m, the relative stress concentration coefficient k was during the peak period, and the average was From the m zone in front of the coal face to the coal wall was the stress release zone, and the effected zone by abutment pressure was 80 m. With the analysis on the characteristics of coal wall spalling at the LLTCC face under different conditions, including mining height, face advance speed, distance from support tip to coal wall, ground pressure, and different positions at the coal face, the authors have developed a comprehensive spalling control technology of controlling the face advance speed, increasing initial support power, and improving the support capacity for wall protection. The technology developed has been tested and applied at the No coal face Observation plan of coal wall spalling at the No face The observation of coal wall spalling consisted of two aspects: (1) During the non-periodical pressure period, under different face advance speeds, the coal wall spalling ratio and depth are at different positions of the face. Fig. 24 Observation plan (2) During the periodical pressure period, under different face advance speeds, the coal wall spalling ratio and depth are at different positions of the face. The observation plan of coal wall spalling was as follows: the length of the No face was 207 m, and the number of supports was 121. The face was divided into three observation zones including upper part, middle part and lower part (upper part: No. 1 No. 30 supports, middle part: No. 31 No. 89 supports and lower part: No. 90 No. 121 supports). Figure 24 shows the observation zones Analysis of coal wall spalling during non-periodical pressure period (1) Coal wall spalling at the upper part of the face. Observation results of coal wall spalling at the upper part of the face (non-periodical pressure period) are shown in Table 8 and Fig. 25. In the non-periodical ground pressure period, the depth of coal wall spalling increased with the face advance speed at the upper part of the face, and eventually maintained at a certain depth range. When the face advance speed reached 3.05 m/d, the coal wall spalling length and depth reached their maximum values of 35 m and 0.6 m respectively, and the maximum spalling ratio was %. The relationship between spalling length, depth, ratio and the face advance speed displayed a significant range. But generally, the values tended to increase with the face advance speed. (2) Coal wall spalling in the middle part of the face. Observation results of coal wall spalling at the middle part of the face (non-periodical pressure period) are shown in Table 9 and Fig. 26. During the non-periodical pressure period, being similar to the coal wall spalling at the upper part of the face, the depth of coal wall spalling decreased with the increase of face advance speed in the middle

20 116 J. Wang et al. Table 8 Characteristics of coal wall spalling at the upper part of the face (non-periodical ground pressure period) Face advance speed (m/d) Average spalling depth (m) Spalling length (m) Spalling ratio (m) Maximum spalling depth (m) part of the face, the spalling ratio showed a trend of non-linear decrease with the increase of face advance speed. (3) Coal wall spalling at the lower part of the face. Observation results of coal wall spalling at the lower part of the face (non-periodical pressure period) are shown in Table 10 and Fig. 27. During the non-periodical pressure period, at the lower part of the face, the relationship between coal wall spalling and face advance speed showed a certain degree of randomness. When the face advance speed reached 2.4, 3.05, 5, 5.5 and 5.75 m/d, there was no spalling occurring. In general, the depth of coal wall spalling showed less variation with face advance speed at the lower part of the face, the average spalling depth concentrated Fig. 25 Relationship curves between coal wall spalling and face advance speed at the upper part of the face (non-periodical ground pressure). a Relationship between average rib spalling depth and face advance rate, b relationship between rib spalling length and face advance rate, c relationship between rib spalling ratio and face advance rate within m. With the increase of face advance speed, the spalling length and ratio showed a trend of decrease early, to increase at a later time. (4) Comparison of coal wall spalling at different face positions during non-periodical ground pressure period. Figure 28 shows the comparison of the depth of coal wall spalling at different face positions during nonperiodical ground pressure period. Table 11 lists the

21 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 117 Table 9 Characteristics of coal wall spalling in the middle part of the face (non-periodical ground pressure period) Face advance speed (m/d) Average spalling depth (m) Spalling length (m) Spalling ratio (%) Maximum spalling depth (m) statistical analysis results of coal wall spalling at different face positions during the non-periodical ground pressure period. Based on the analysis and comparison, the spalling depth was 0.2 m at the upper part of the face, 0.32 m in the middle part of the face and 0.26 m at the lower part of the face, suggesting that the spalling depth was deepest in the middle part of the face, less deep at the lower part and least deep at the upper part. Figure 29 shows the comparison of the spalling ratios at different face positions during the nonperiodical ground pressure period. The spalling ratio showed a trendency of reduction with the increase of face advance speed during the non-periodical ground pressure period. As shown in Table 12, the coal wall spalling ratio was % at the upper part of the face, % in the middle part of the face, and % at the lower part of the face, that indicated that the spalling ratio was largest in the middle of the Fig. 26 Relationship curves between coal wall spalling and face advance speed in the middle part of the face (non-periodical ground pressure). a Relationship between average rib spalling depth and face advance rate, b relationship between rib spalling length and face advance rate, c relationship between rib spalling ratio and face advance rate face, less at the upper part of the face, and the least at the lower part of the face Analysis of coal wall spalling during the periodical ground pressure period (1) Coal wall spalling at the upper part of the face. Observation results of coal wall spalling at the upper part of the face (during the periodical ground pressure period) are shown in Table 13 and Fig. 30. During the period of ground pressure, the spalling

22 118 J. Wang et al. Table 10 Characteristics of coal wall spalling at the lower part of the face (non-periodical ground pressure period) Face advance speed (m/d) Average spalling depth (m) Spalling length (m) Spalling ratio (%) Maximum spalling depth (m) depth, spalling length and spalling ratio at the upper part of the face had a similar variation trendency with the increase of face advance speed, i.e., increase early and decrease later. When the face advance speed reached 5.50 m/d, the spalling ratio was the largest at the upper part of the face at %. (2) Coal face spalling in the middle part of the face. Observation results of coal wall spalling at the middle part of the face (during the periodical ground pressure period) are shown in Table 14 and Fig. 31. During the period of periodical ground pressure, the spalling depth presented a trend of decrease early on, and increasing later with the increase of face advance speed. The spalling length and ratio presented a trend of gradual reduction with the face advance speed. In the middle part of the face, the spalling depth was 0.6 m, maximum spalling ratio Fig. 27 Relationship curves between coal wall spalling and face advance speed at the lower part of the face (non-periodical ground pressure). a Relationship between average rib spalling depth and face advance rate, b relationship between rib spalling length and face advance rate, c relationship between rib spalling ratio and face advance rate was % and maximum spalling length was %. (3) Coal wall spalling at the lower part of the face. Observation results of coal wall spalling at the lower part of the face (during the periodical ground pressure period) are shown in Table 15 and Fig. 32. During the period of periodical ground pressure, the average coal wall spalling depth at the lower part of the face decreased with the increase of the face advance speed. Before the face advance speed

23 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 119 Fig. 28 Comparison of average spalling depth at different face positions (non-periodical ground pressure period) Table 11 Statistical analysis results of spalling depth at the upper, middle and lower parts of the face (non-periodical ground pressure period) Face advance speed (m/d) Average spalling depth (upper) (m) Average spalling depth (middle) (m) Average spalling depth (lower) (m) Average Average spalling depth (m) reached 4.5 m/d, there was no distinct decrease of spalling depth, and the slope of the trend line was almost zero. When the face advance speed exceeded Fig. 29 Comparison of average spalling ratio at different face positions (non-periodical ground pressure period) 4.5 m/d, there was a distinct decrease of spalling depth, thus the slope of the trend line increased. As shown in Fig. 32b, c, during the periodical ground pressure period, the coal wall spalling ratio at the lower part of the face demonstrated a trend of increase early on, and decreasing later with the increase of face advance speed. (4) Comparison of coal wall spalling at different face positions during the periodical ground pressure As shown in Table 16, during the period of periodical ground pressure, the spalling depths at different face positions were almost identical, the average spalling depth was maintained at 0.29 m. The maximum spalling depth reached 0.7 m and the spalling depth exceeded 0.5 m, accounting for 30 %. During the period of periodical ground pressure, the spalling depth showed randomness, however, in general, presented a trend to decrease with the increase of face advance speed. As shown in Table 17, during the occurrence of periodical ground pressure, the spalling ratio at the upper part of the face was the largest, reaching %, less in the middle part at %, and least at the lower part, 20.1 %. The average spalling ratio was % Comparison of coal wall spalling at different ground pressure periods Figures 33 and 34 show spalling depth and spalling ratio at different ground pressure periods respectively (average 4.9 m/d). As shown in Fig. 33, the average difference of spalling depth with periodical ground pressure was 0.05 m (under the same face advance speed, the difference of spalling depth with periodical ground pressure or without periodical ground pressure).

24 120 J. Wang et al. Table 12 Statistical analysis results of spalling ratio at the upper, middle and lower parts of the face 8108 (non-periodical ground pressure period) Face advance speed (m/d) Average spalling ratio (upper) (%) Average spalling ratio (middle) (%) Average spalling ratio (lower) (%) Spalling ratio (%) Average As shown in Fig. 34, the periodical ground pressure has limited influence upon the coal wall spalling ratio at the No face. The difference of spalling ratio caused by the ground pressures was 4.64 % (at the same face advance Fig. 30 Relationship curves between coal wall spalling and face advance speed at the upper part of the face (periodical ground pressure period). a Relationship between average rib spalling depth and face advance rate, b relationship between rib spalling ratio and face advance rate, c relationship between rib spalling length and face advance rate speed, the difference between the spalling ratio during periodical ground pressure period and the spalling ratio during the non-periodical ground pressure period). Table 13 Characteristics of coal wall spalling at the upper part of No face during periodical ground pressure period Face advance speed (m/d) Average spalling depth (m) Spalling length (m) Spalling ratio (%) Maximum spalling depth (m)

25 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 121 Table 14 Characteristics of coal wall spalling in the middle part of No face during periodical ground pressure period Face advance speed (m/d) Average spalling depth (m) Spalling length (m) Spalling ratio (%) Maximum spalling depth (m) Conclusion of the observation on coal wall at No LLTCC face Fig. 31 Relationship curves between coal wall spalling and face advance speed in the middle part of the face (periodical ground pressure period). a Relationship between average rib spalling depth and face advance rate, b relationship between rib spalling length and face advance rate, c relationship between rib spalling ratio and face advance rate (1) During the non-periodical ground pressure period, the relationship between the coal wall spalling ratio and face advance speed presented randomness. However, in general, the spalling ratio reduced with the increase of face advance speed. There were some differences in the spalling ratio at different face positions. The statistical analysis of the spalling ratio showed: the spalling ratio in the middle part of the face [ the spalling ratio at the upper part of the face [ the spalling ratio at the lower part of the face. (2) During the periodical ground pressure period, the spalling depth and ratio showed a decreasing trend with the increase of the face advance speed. The spalling depth showed a difference at different face positions, i.e., upper part [ middle part [ lower part. (3) During the period of periodical ground pressure occurrence, the spalling ratio showed a trend of increase early and decreased later on with the increase of the face advance speed. The spalling ratios at different face positions were different. Through the comparison of coal wall spalling with the neighbouring No face, it was found that: during the period of non-periodical ground pressure occurring, the average coal wall spalling ratio was % and the spalling depth varied from 0.2 to 0.3 m at the No face; the average spalling ratio was % and the spalling depth varied from 0.18 to 0.25 m at the No face. During the period of periodical ground pressure, the spalling ratio was % at the No face, and % at the No face. Based on the statistical analysis, the spalling depth and length were the largest in the middle parts of the No and No faces. In comparison with the No face, the spalling ratio at the No face was 33.4 % less than that at the No. 8104

26 122 J. Wang et al. Table 15 Characteristics of coal wall spalling at the lower part of No face during periodical ground pressure period Face advance speed (m/d) Average spalling depth (m) Spalling length (m) Spalling ratio (%) Maximum spalling depth (m) face, and the spalling depth was also 50 mm less than that at the No face. Therefore, it can be concluded that the coal wall spalling was significantly reduced and the face achieved a fast advance speed due to the application of proposed comprehensive control technology at the No face in Tashan coal mine in Datong, China, including controlling face advance speed, increasing support initial abutment force and increasing the wall protection capacity of support. 3.7 High efficient top-coal caving technology at a LLTCC operation Study on rational top-coal drawing interval Fig. 32 Relationship curves between coal wall spalling and face advance speed at the lower part of the face (periodical ground pressure period). a Relationship between average rib spalling depth and face advance rate, b relationship between rib spalling length and face advance rate, c relationship between rib spalling ratio and face advance rate It is important to select a rational top-coal drawing interval to improve coal recovery and reduce the percentage of gangue. If the drawing interval is too large, the top coals might be caved into the goaf, resulting in a coal loss. On the other hand, if the drawing interval is too small, the gangue might be mixed with coals and cave into the discharge window, which may not only affect the coal quality, but also be mistaken for top coal exhaustion and result in coal loss. The factors for determining the drawing interval consists of the thickness of the top coal, the discharge window length of support, the center height of the discharge window and the shearer s cutting depth. The principal for determining the drawing interval is to fracture and loosen the top coal in the range of the discharged coal, increase top coal recovery and reduce the percentage of gangue. In addition, the rational drawing interval should match the coal mining process and form an integer-times relationship with the shearer s cutting depth. The drawing interval must be greater than the length of discharge window to avoid mixing the gangue with coal. The small drawing interval might result in the gangue in the goaf being mixed with caved top coals. The large drawing interval might result in top coal losses. A rational drawing interval will maintain the mixture of top coal with

27 Key technologies and equipment for a fully mechanized top-coal caving operation with a large Table 16 Statistical analysis results of spalling depth at the upper, middle and lower parts of No face (during periodical ground pressure period) Face advance speed (m/d) Average spalling depth (upper) (m) Average spalling depth (middle) (m) Average spalling depth (lower) (m) Average (m) Average Table 17 Statistical analysis results of spalling ratio at the upper, middle and lower parts of No face (during periodical ground pressure period) Face advance speed (m/d) Spalling ratio (upper) (%) Spalling ratio (middle) (%) Spalling ratio (lower) (%) Average (%) Average Fig. 33 Comparison of average spalling depth at different ground pressure periods under different face advance speeds Fig. 34 Comparison of spalling ratio at different ground pressure periods under different face advance speeds gangue and top coal losses in allowable limits. In a LLTCC face, the space for top coal fracturing becomes larger due to the increase in mining height, therefore, the effects of ground pressure on top coal fracture become greater. With the effects of ground pressure, the top coal will be fractured and broken thoroughly. The top coal fragment becomes smaller and has a better flowability. The drawing interval has a significant influence on the coal and gangue flow and thus is a key parameter for the LLTCC process. Figure 35 shows the coal and gangue flow at different drawing intervals. The boundary of coal and gangue before and after top coal discharge is regarded as the starting line for starting coal discharge and the finishing line for finishing coal discharge. In the experimental test, three drawing intervals were tested including one cutting and one coal caving, two cuttings and one coal caving, and three cuttings and one coal caving. In the process of support shift and coal caving, the boundary of coal and gangue was moved forward and maintained in the same shape. With the increase of the drawing interval, the distance between the starting line and the finishing line also increased. As shown in Fig. 35, with the increase in the top coal drawing interval, there were some variations in the boundary shape of coal and gangue before and after top coal caving. In other words, the initial caving point of top coal shifted forward, the distance between start line and finish line of top coal caving increased with the drawing

28 124 J. Wang et al. Fig. 35 Boundaries between coal and gangue with different top coal drawing intervals. a One cutting and one drawing, b two cuttings and one drawing, c three cuttings and one drawing interval. This indicated that the amount of coal discharged at each discharge circle increased with the increase of the drawing interval. There were three kinds of coal and gangue mixtures near the discharge window of support after top coal caving using different drawing intervals: (1) When the drawing interval is small, the gangue in the direction of the goaf reaches the discharge window earlier than the top coals do, and the discharged coals mix with gangue. Before coal discharge, the boundary between coal and gangue near the discharge window is beyond the lower boundary of the tail beam. Therefore, it results in the part of middle to top coals being unable to be discharged due to the enclosure of gangue and the tail beam. In this case, the gauge might enter the discharge window from the bottom of the window, and increase the percentage of gangue in the coals obtained. (2) With a rational top-coal drawing interval, at initial coal discharge, the gangue in the goaf and top coal will reach the discharge window of the support at the same time. Before the coal discharge, the boundary between coal and gangue is behind the lower boundary of the tail beam, thus the horizontal movement of gangue in the goaf is small. In the process of top-coal caving and discharge, the coals can smoothly reach the discharge window. With the caving of the lower and middle part of the coals, the gangue above the coal seam caves as well, then there will be some mixture of coal and gangue during the discharge of the upper layer of top coal. The mixture gangue is mainly from the roof above the seam that enters the discharge window with the discharge of top coals. (3) When the drawing interval is too large, at the beginning of coal discharge, top coals caved reach the discharge window earlier than gangue in the goaf. Before coal discharge, the boundary between coal and gangue is obviously behind the lower boundary of the tail beam, and the gangue in the goaf cannot reach the discharge window. With a LLTCC operation, the angle of the shield beam becomes larger, and the height of the discharge window becomes higher. During the process of coal discharge, the top coal above the discharge window can be discharged quickly and the gangue above the top coal also caves quickly. In this case, the coal and gangue in the goaf near the discharge window with natural angle of depose cannot flow toward the discharge window and be discharged, resulting in coal losses and low coal recovery. Figure 36 shows the shape of residual top coals with different drawing intervals. As shown in the figures, the one cutting and one drawing method (drawing interval is 0.8 m) can lead to a high top coal recovery Study on rational coal discharge method Top coal discharge method involves the combination of sequence of coal discharge, the times of coal discharge at each discharge window and the quantity of coal discharge, as well as the number of discharge window opened in the same time along the face. The sequence of coal discharge can be categorized as sequential coal discharge and alternated coal discharge. The times of coal discharge at each discharge window can be categorized as single, double and multiple coal discharges. The number of coal discharge window opened in the same time can be categorized as

29 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 125 the recovery of coal cutted and discharged was the lowest using single-time alternated multiple windows coal discharge, and highest using discharge in multi-round & multiple windows sequence alternately. In order to increase the recovery of top coal, the method of multipletime alternated multiple window coal discharge was selected in the LLTCC operation at the No face, Tashan coal mine in Datong, China. 4 Key equipment for the LLTCC coal mining operation Fig. 36 Shape of residual top coals with different drawing intervals. a One cutting and one drawing (drawing interval 0.8 m), b two cuttings and one drawing (drawing interval 1.6 m), c three cuttings and one drawing (drawing interval 2.4 m) single window discharge and multiple window discharge. The number of simultaneously opened discharge window can be categorized as single coal discharge and multiple coal discharge. The quantity of coal discharge can be categorized as equal quantity and non-equal quantity. Because it is difficult to manage equal or non-equal quantity coal discharge in operation, and single or multiple coal discharge can be managed in labor planning, however the determination of the coal discharge method is mainly based on the sequence of coal discharge and the times of coal discharge at each discharge window. There are four main alternative methods including single sequential coal discharge, single alternated coal discharge, multi-round sequential coal discharge and multi-round alternated coal discharge. The geological conditions for different coal seams are different, and their capabilities are also different, thus, different coal discharge methods must be used, and the recovery of top coal is also varied. A numerical analysis was conducted to simulate the topcoal caving and discharge by using the geological parameters of coal seams and the technical parameters of hydraulic supports at Tashan coal mine. In addition, the simulated loose thickness of the top coal was m, and the simulated cutting heights were 4, 4.5 and 5 m. The top-coal caving and discharge operation was simulated including single sequential coal discharge, single alternated coal discharge and multiple alternated coal discharge method. The numerical results showed that Key equipment for the LLTCC coal mining operation involves hydraulic support, shearer, front scraper conveyor, rear scraper conveyor, headgate belt conveyor and support hauler, etc. Prior to this project, there was no equipment for LLTCC coal mining operations in China or elsewhere in the world. Therefore, the various key equipment for LLTCC mining operation have been developed in this project. 4.1 Hydraulic support with large mining heights Hydraulic support is one of key equipment for a LLTCC coal mining operation. The requirements for hydraulic support consist of rational structure, sufficient support resistance force, stable and shock resistance, sustainability of high efficient coal discharge and high coal recovery Support and rock coupling 3D dynamic optimization design method In the design of hydraulic support, a support and rock coupling 3D dynamic optimization design method was used. The effects of surrounding rock on support structure, support intensity, and shift capability were fully considered. As the support and rock coupling based 3D dynamic parameter design commenced from roof movement, a simulation was conducted to simulate the transfer of fracture, subsidence, crash and the caving of roof into the pressure, torque, deformation and shift speed of the support. Using a series of conditions, support working resistance, support type and control parameters were dynamically determined to satisfy the requirements of roof movement and effective support on the roof. With the consideration of coal wall and floor characteristics, the forms and parameters of the auxiliary components for coal wall protection and bottom lift were determined. The advantages of the proposed method can be stated as: the dynamic characteristics of surrounding rock were fully considered through the dynamic interaction between

30 126 J. Wang et al. supports and surrounding rock, the variation of roof subsidence and fracture was transferred to the support in the forms of pressure, torque and constraints. Hydraulic support responded in terms of forms and characteristic parameters, and the response results fed back to rock in the forms of support resistance force and torque. Therefore, the roof caving and the distribution of stress and strain could be controlled. In terms of the technique for the support design, a 3D parametric dynamic design method from top to bottom was used. In the design process, the requirements of support from surrounding rock were gradually satisfied. The flowchart of support design is shown in Fig. 37. The method proposed achieves seamless integration between the optimization of structural parameters and the 3D modelling. Furthermore, the method improves the design efficiency, provides an integrated platform for structure optimization and parametric design, and improves the applicability of support Determination of support technical parameters Based on the geological conditions at the No coalface in Tashan coalmine, the composition of support working resistances during their calculation was analyzed. Using the numerical modelling method, the numerical model was built based on the occurrence conditions of coal seams. Subsequently, the model was used to simulate the support intensity of 0, 0.5, 0.9, 1.2, 1.3, 1.4, 1.5, and 1.6 MPa, respectively. The analysis on the vertical stress at the coalface showed that the increase of support intensity could not change the distribution of abutment stress in the front of the coalface. The front peak abutment stress was approximately 10 m from the coal wall. With the increase of support intensity, the area of peak abutment stress in the front of the coal face decreased and became closer to the coal wall. In order to obtain the relationship curve between support intensity and roof subsidence (P 4L curve) within the roof control range, the subsidence of the roof at a position 3 m Fig. 37 Flowchart of 3D parametric dynamic design of the hydraulic support from top to bottom

31 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 127 Fig. 38 Relationship curve between support intensity and roof subsidence (P 4L curve) away from the coal wall were measured, and simulated with the support intensity of 0.5, 0.9, 1.2, 1.3, 1.4, 1.5 and 1.6 MPa. The curve between support intensity and roof subsidence is shown in Fig. 38. As shown in the relationship curve between support intensity P and roof subsidence 4L, the subsidence of the roof gradually decreases with the increase of support intensity. When the increase of support intensity reaches a certain level, the increase of support intensity have little effect on the roof subsidence. Nevertheless, if the support intensity is below a given level, the reduction of support intensity will have substantial impact on roof subsidence. The given level of support intensity can be selected as rational support intensity. When the support intensity reaches MPa, the decrease of roof subsidence will not obvious with the increase of support intensity. As a result, the rational support intensity is determined as MPa. With comprehensive analysis on the mining and face conditions, the support intensity of the hydraulic support was determinedas1.4mpaintashancoalmine. Determination of support resistance. Nominal working resistance F can be calculated as Eq. (13): F PB cl ð13þ g where P is the nominal support intensity at the LLTCC face, 1.4 MPa; L is the center distance, 1.75 m; B c is the roof control distance, 5.5 m; g is the support efficiency, Substitute the parameters above into Eq. (13), get: 1:4 5:5 1:75 F ¼ kn 0:98 Considering the safety coefficient, the nominal support resistance was determined as kn, which is consistent with the calculation result from the cantilever beam-articulated beam structural mechanical model. The support and rock coupling mechanical model (Wang 2009) was used to analyses the main technical parameters of hydraulic support at Tashan coal mine. The support parameters were optimized based on the support and rock coupling mechanical model. The structural parameters, i.e. the beam length of the support, the center distance of the support, and maximum and minimum heights, were used as optimizing variables, and the surrounding distribution of roof stress and the floor pressure of the support front were used as the optimizing objective. The optimizing expression was: Objective functions: Dp ¼ p p j kðj ¼ 1; 2;...nÞ ð14þ min d where p j = f (l,h max,h min,a,b), d = k (l,h max,h min,a,b); 4p is the absolute difference between support intensity p j calculated iteratively based on support parameters and the result calculated based on surrounding rock parameters. When 4p is less than or equal to a given condition of convergence k, the support intensity is regarded as rational. The optimizing objective of floor pressure at the support front is to minimize the floor pressure. Function f and k are the mechanical status expression of the surrounding rock affected by support parameters obtained from the analysis of the interaction of support and surrounding rock, respectively. In the objective function, l is the length of top beam, h max and h min are maximum support height and minimum support height; a is the support center distance, being selected as 1.5, 1.75 and 2.05 m, b is the horizontal distance between the center of the top beam prop cup and the center of the base prop foot. Before optimization, the support type should be selected. The parameters of support are used as the variables of optimization function, after which the multiple-objective optimization function is established. After the calculation results converge to a group of stable values, the rational optimization results are obtained. In the Tashan coal mine, during the process of the LLTCC mining operation in m thick coal seams, the thickness of the top coal is large and the caving space is also large, therefore, the movement of roof increases, and the range of resultant force point of interaction between support and roof becomes large (Yu et al. 2012). According to the observation results of ground pressure at the No LLTCC face in Tashan coal mine, the resistance alternately increased at the rear prop or front prop during the roof periodical ground pressure period. As a consequence, the positive four-link bar type of support was selected to better suit the ground pressure. The average seam thickness at the No face in Tashan coal mine is approximately 20 m. Based on the requirement of not exceeding the cutting to caving ratio 1:3, the cutting height reached 5 m. Based on the requirements of cutting height and the parameter optimization of support-rock coupling, the main technical parameters of support were determined as follows: the maximum support height is 5200 mm, the minimum

32 128 J. Wang et al. must be solved for LLTCC hydraulic support, which provides the top coal control technology for a LLTCC hydraulic support. As a result, the following method can be used for the LLTCC hydraulic support: Fig. 39 LLTCC hydraulic support with a height of 5.2 m support height is 2800 mm, the top beam length is 5615 mm, the support center distance is 1750 mm, the horizontal distance between top beam prop cup center and support prop base center is 402 mm, and the support working resistance is 15,000 kn. Figure 39 shows the LLTCC hydraulic support as developed Development of shock resistance components for LLTCC hydraulic support In comparison to the fully mechanized longwall mining method and the fully mechanized LTCC mining method, the LLTCC mining method requires a higher standard for the shock resistance of hydraulic support. Thus, a large diameter double telescopic shock resistance prop was developed. Its main parameters are as follows: outer cylinder: cylinder diameter /360 mm, cylinder outer diameter /418 mm; middle cylinder: cylinder diameter / 260 mm, cylinder outer diameter /340 mm; small cylinder: cylinder diameter /235 mm, cylinder outer diameter /145 mm; working resistance (P 1 /P 2 = 43.2/82.3 MPa): 4400 kn. A 1000 min -1 large flow rate safety valve fast release device was developed to meet the requirement of a safety valve with a flow rate of 620 min -1 when prop was under shock force. With the development of key components above, the shock resistance capacity of the hydraulic support increased approximately 10 % High efficient coal discharge device for a LLTCC hydraulic support At a LLTCC coal mining face in a coal seam with thickness greater than 10 m, the caving height is high after the top coals cave, and the size of coal block is relatively large. Therefore, the top coals might form an arch balance structure during top coal caving. To break the arch balance structure and enable the top coals to be easily discharged into the rear scraper conveyor is a key technology. Therefore, the technical issues discussed above (1) The control of the size of the coal discharge window: The control of the discharge window is to control the coal discharge quantity at a single discharge window. Under the same flowability of caved top coals, the discharged quantity in a unit time is in proportion with the size of the discharge window. As a result, the centerline spacing of supports was modified from 1.5 m to 1.75 m to increase the size of discharge window along the inclined direction of the face (size in transverse direction). Simultaneously, the size of the discharge window in the longitudinal direction (along the strike direction of the face) was controlled. The size of the coal discharge window is controlled by a coal discharge device (coal discharge sliding plate and tail beam). The size of the discharge window is the function of the extension length of the sliding plate and the swing angle of the tail beam. When the coal discharge window is completely opened, the maximum size of the discharge window in the longitudinal direction is equal to the coalreception width of the rear scraper conveyor. In this case, the coal discharge rate of single support is determined by the chain speed of the rear scraper conveyor and the blockage coefficient of coal flow. The coal discharge rate of single support can be calculated using Eq. (15). V f ¼ 60 K f FcV s ð15þ where V f is the coal discharge rate of single support, t/min; K f is the blockage coefficient of discharged coal flow, K f = 0.6; F is the carrying cross-section of the rear scraper conveyor, m 2 ; c is the loose coal density, t/m 3 ; V s is the chain speed of scraper conveyor, m/s. (2) The time of multiple coal discharge and the control of coal discharge quantity: In respect of the LLTCC mining operation at Tashan coal mine, because the ply of the top coal is very thick and the top coal is very hard, after top coal caving, the upper top coals cannot fully break due to limited caving space. Some of top coals close to the roof cannot even cave. In this case, if the caved coals are discharged completely, there will be losses of large coal blocks and uncaved top coals. As a result, there should be multiple coal discharges, e.g., two or three times. The multiple coal discharges will provide time and

33 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 129 space for the fracturing and caving of top coals, and enable the boundary of caved top coals and immediate roof gangue to be evenly subsided. The purpose of multiple coal discharges is to provide time and space for the top coals and the immediate roof to fracture and cave. Therefore, the delay time of the second coal discharge cannot be too short. Generally, the second coal discharge should be more than 10 m away from the first coal discharge. It should be adjusted according to the movement of top coals and the roof. The discharged coal quantity in a round is determined by the awaited discharge of top coals. The awaited discharge quantity of top coals can be calculated theoretically, as shown in Eq. (16). Q d ¼ h 2 BScg d ð16þ where Q d is the awaited discharged quantity of top coals in a support, t; h 2 is the thickness of top coals, m; B is the width of support, m; S is the discharge interval, m; g d is the recovery of top coals, %. Because the discharged coal quantity in a unit of time at a discharge window cannot be calculated, the control of discharged coal quantity each time at a support is to control the time. After the start of a LLTCC operation, the coal discharge time at a discharge window should be calculated through several rounds of coal discharge operation. The time from the start of discharge until the gangue occurring in the discharge flow is the time of coal discharge in a round. When using two rounds of coal discharge, the time spent on one round of coal discharge should be half of the total coal discharge time, and 1/3 of the total coal discharge time for three rounds of coal discharge. (3) During the process of coal discharge, the size of caved coal is suitable at the initial stage and the discharged coal flow is smooth. With the discharge of top coals, the large-size coals increase and form a balanced arch above the discharge window to block the coal flow. In this case, the base of the balanced arch should be broken using a coal discharge device. In addition, the large coal blocks should be crushed to enable the continuity of coal discharge. Therefore, the tail beam should be continuously swung up and down during the process of coal discharge to disturb the awaited top coals. The upswing of the tail beam can crush large coal blocks and the down swing can loosen the coal flow. Caving and discharging the top coals and increasing coal recovery is the major objective of the present project. Based on the studies on the caveability of top coals and the laws of top coal caving, the support Fig. 40 Coal discharge device. 1 shield beam, 2 tail beam-sliding plate, 3 pump of sliding plate, 4 pump of tail beam, 5 rear link bar, 6 front link bar, 7 base structure and the method of top coal caving and discharge were optimized. A new highly efficient coal caving and discharge device was developed to increase top coal recovery. Figure 40 shows the design of the coal discharge device. Through the studies on previous coal discharge devices, the following problems were found: (1) In previous type LTCC supports, the front link bar was the double link bar, and the rear link bar was the single link bar. The rear bar was fixed in the middle of the support base, which resulted in blocking the operator s sight and difficulty in observing the effects of top coal caving and discharge. (2) There was no passage from the front to the rear of the support. Because the rear link bar was fixed in the middle of the support base, operators could not go through two supports from the front to the rear of the support. The only way was to go to the rear of the support via face ends, which resulted in difficulties in terms of safety and maintenance. (3) The coal discharge device of the tail beam-sliding plate was easily jammed and hard to slide. Because the sliding plate was not slid back, the sliding plate occasionally cut the chain of the rear scraper conveyor when the tail beam swung. In order to solve the above problems, a new type of coal discharge device was designed with a double rear link bar, middle passage and observation window for coal discharge through the optimization of support structure. In addition, the high efficient and high recovery coal discharge device had a strong disturbance capacity for releasing coals. (1) A new type of coal discharge device with double front and rear link bars, middle passage and observation window.

34 130 J. Wang et al. Fig. 41 Middle passage in support Fig. 42 High efficiency and high reliability electrical haulage shearer Through the optimization of the four-link bar on support, on the basis of meeting the requirements on support movement and limited positions, the internal components, i.e., shield beam and base, were redesigned. A new type of coal discharge device was developed with new double front and rear link bar, middle passage, and observation window, as shown in Fig. 41. Under the ground pressure, the top coal is fractured and caved. The size of coal is different depending on the coal hardness. During the process of top coal discharge, the increase in large coals causes a balanced arch above the support discharge window and blocks the coal flow. In this case, the base of the balanced arch should be fractured using the coal discharge device. In addition, the large coal blocks should be crushed to enable the continuity of coal discharge. Therefore, a high efficient and high recovery coal discharge device was developed with a strong disturbance capacity. Two jacks with a cylinder diameter of /180 mm were installed on the tail beam for operation. The force of a single jack was 1000 kn (P = 39 MPa) and 2000 kn with both. In order to increase the disturbance to top coals, the upswing of the tail beam can reach 19.5 to crush top coals, and the down swing can reach 41 to loosen coal flow. During the process of top coal discharge, the tail beam was swung continuously to disturb the awaited top coals and to achieve a high efficient and high recovery coal discharge. 4.2 High efficiency and high reliability electrical haulage shearer Assessment of the overall reliability of electrical haulage shearer The electrical haulage shearer is one of the key equipment in coal mining operations. High efficient continuous coal cutting is the shearer s main task, as the reliability and safety will affect coal production and operator safety. To Table 18 Common faults of electrical haulage shearer No. Fault No. Fault 1 Not reach correct position 20 Structure crash 2 Broken 21 Jam 3 Loosen 22 False open 4 Fall off 23 False close 5 Bending 24 Unusual wear 6 Twisting 25 Oil leakage 7 No input 26 Inappropriate gap 8 No output 27 Puncture 9 Circuit open 28 Plastic deformation 10 Short circuit 29 Poor contact 11 Unable to switch 30 Blockage 12 Unable to start 31 Poor sealing 13 False action 32 Peel off 14 Flow blockage 33 Burn out 15 False indicator 34 Worn 16 Unexpected operation 35 False connection 17 External leakage 36 Burn down 18 Internal leakage 37 Fractured 19 False action 38 Rusty meet the coal cutting requirements at the Tashan LLTCC coal mining operation, a new high efficiency, high reliability electrical haulage shearer had been developed. The shearer s specifications are as follows: cutting height m, total installed power 1945 kw, coal cutting power 750 kw, maximum haulage speed m/min, and maximum haulage power kn, as shown in Fig. 42. The reliability of the shearer is the key factor controlling normal mining operation. As a result, the assessment method for assessing shearer s reliability has been investigated. Table 18 lists 38 common faults of the electrical haulage shearer. A fault tree analysis method was used to analyses the reliability and design. Based on the theoretical analysis on component design, installation and the environment of usage, the main causes of component failure

35 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 131 were investigated to find the weakest link in reliability, and improve the reliability and utilization of the shearer. The fault tree method for assessing the faults in electrical haulage shearer was divided into two stages: (1) Establishment of fault tree for the electrical haulage shearer system. Collect and analyses the technical document of the electrical haulage shearer, including the drawings of the shearer, maintenance records, working environment and geological conditions, etc. ` Determine the contents and constraints of the electrical haulage shearer. Determine top events based on the electrical haulage shearer system. ˆ Analyze the causes and factors related with top events, the causes and factors related with each sub-system. Map the fault tree of the electrical haulage shearer system. Deductively analyses from top events, search for causes level by level until reaching the basic event, map the fault tree according to the their logical relationship. (2) Quantitative analysis of the electrical haulage shearer system. Simplify the fault tree, number the logical gates and basic events for further analysis. ` Calculate the failure rate of the basic event. Calculate the occurrence rate of the top event. ˆ Calculate the importance of parts of each basic event, including probability importance and criticality importance. Establish the main control measures on key components individually according to the importance of each sub-system and elements Shearer load database and faults database A remote data file submission scheme was developed to achieve a remote submission of shearer monitoring data by using the PHP language and B/S architecture. Through the automaton, the remote data was summarized and sent to database at headquarters to provide data for the simulation of shearer operation. Using a new Browser/Server architecture, under Browser/Server three-layered architecture, the presentation, Fig. 43 Relationship of monitoring objects, data and the graphic library business logic and data service were divided into three individual units: presentation: Web browser; business logic: Web server with extension function of application program; data service: database server. Monitoring objects are the monitored components in the shearer, which generate monitoring data. Monitoring data is the data converted from real-time signals generated by monitoring objects, which can be recognized by the computer. The graphic library in the monitoring system is composed of the instrument graphics of monitoring objects, which can be used by an application program. The relationship of three is shown in Fig. 43. The parameters of the monitoring system of the electrical haulage shearer were mainly used to define the environmental parameters of system operations, including the parameters displayed at the client terminal and the parameters of network transmissions, and the geological parameters, mining parameters, gateroad parameters, the parameters of the scraper conveyor, the parameters of the hydraulic support, and the parameters of the shearer and its accessories. Based on a whole configuration electric control system, the monitoring data of the shearer system is shown in Table 19. Four current transformers were used in the shearer s electric control system to monitor the single-phase current of each cutting motor. In this case, the loading status of the motor can be known. The DC0-10 V voltage signal output from the current transformer is sent to PLC for comparison to obtain the signals of the underload or overload. Pt100 thermal resistances are installed inside the motor windings of four cutting motors on the left and right, haulage motors on the left and right. The thermal resistances are directly connected with the RTD module of PLC. The data collected are stored in CF cards as.csv files for subsequent data analysis. The visualization system of monitoring data connects the.csv files to the application programs through the ADO, OLE, and ODBC methods. The application programs input the data into corresponding database tables to display the data in a graphic format. Based on the analysis on the requirement for the functions of monitoring the data visualization system, the

36 132 J. Wang et al. Table 19 Data structure of the parameters of shearer operation condition Parameters Variable type Variable name Note Left cutting motor power Float LCMP Left cutting motor power Right cutting motor power Float RCMP Right cutting motor power Left haulage motor power Float LHMP Left haulage motor power Right haulage motor power Float RHMP Right haulage motor power Oil pump motor power Float OBMP Oil pump motor power Water pump motor power Float WBMP Water pump motor power Left cutting motor temperature Float LCMT Left cutting motor temperature Right cutting motor temperature Float RCMT Right cutting motor temperature Left haulage motor temperature Float LHMT Left haulage motor temperature Right haulage motor temperature Float RHMT Right haulage motor temperature Oil pump motor temperature Float OBMT Oil pump motor temperature Water pump motor temperature Float WBMT Water pump motor temperature Haulage direction Bolean HD Haulage direction Haulage speed Float HS Haulage speed Shearer position Int SP Shearer position Fig. 45 3D model of shearer arm shell Development of 750 kw high reliable shearer ranging arm Fig. 44 System case model for shearer monitoring data system case model was established for the system, as shown in Fig. 44. The large amount of monitoring data generated during the shearer operation were compiled and transferred into the database. After being processed in the database, the relevant data was extracted to link with the graphic library. The visualization of data was achieved. The large amount of historical data was analyzed and mined to form a decision support system. Shearer s ranging arm shell (Fig. 45) is a power transmission part of drum rotary cutting and a supporting part of the curving movement of the drum. To enable the shearer s ranging arm maintaining its normal operation during the period of nominal coal cutting quantity (overhaul life maintenance), the arm shell should have excellent comprehensive mechanical properties, i.e., high tensile strength, high fatigue strength and hardness, and high impact toughness. As a result, a new material CrNiMo series of hardened and tempered steel was developed. The medium carbon CrNiMo series special cast steel material was selected because the alloy steel with Cr and Ni has a high strength, in addition to high plasticity and toughness. The addition of Mo can control the secondary temper brittleness, reduce overheating, increase temper stability and obtain high strength and toughness of steel after it is hardened and tempered. Because of the addition of Cr, Ni, Mo and other minor alloy elements in the alloy, the alloy

37 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 133 steel has a high hardenability. In addition, due to the solid solution strengthening of Ni and Mo elements, and the carbide precipitation strengthening of Cr and Mo elements, Mo and Cr elements hinder the growth of austenite grain, which will improve the strength, hardness and worn resistance of the alloy steel. The large power ranging arm shell is made of large heterotypic cast steel, thus, it is in an irregular shape with large internal space and a complex structure. Furthermore, the shell s thicknesses vary significantly. Therefore, if the cooling rate after high temperature austenite is too fast, the shell might have cracks. At the same time, the alloy steel of the arm shell has a high hardenability, and has a high hardness under air quenching (air cooling, normalizing) with modest cooling rate. Therefore, during the process of air quenching and high temperature tempering, the rate and method of increasing temperature and the temperature of air quenching need to be appropriately controlled to meet the mechanical property requirements from the arm shell body, and prevent the occurrence of cracks. The heat treatment of the shearer s ranging arm shell is high temperature tempering after air quenching (normalizing), which is completed before the machining of the shell. The process is: check before heat treatment air quenching intermediate check tempering final check. Figure 46 shows the normalized curve. The shell cast outline of the split-type ranging arm is 2948 mm mm mm, the minimum wall thickness is 45 mm, the maximum wall thickness is 119 mm, and the cast weight is 6380 kg. The position of water passage in the cast part needs to be tested in a hydrostatic test under eight standard atmospheric pressures, and the inner cavity is water leakage-proof. To make the castings with excellent mechanical properties, the density of the castings needs to be high and reaches GB II level in ultrasonic flaw detection. The geometry, allowance of machining, and dimensional deviation of the castings are consistent with the specifications of cast steel for engineering machinery JB/T Therefore, based on ranging arm shell cast material composition based casting characteristics and structure, size, and casting Fig. 46 Normalizing curve weight level, the foundry program was determined, including the sand casting method and casting process (pouring position, parting surface, sand box structure and size). After the casting process was determined, the designs were conducted including the design of casting parameters, sand core design, gating system design, riser design, chill design, and vent design. Ranging arm shell casting is a large heterotypic steel casting. A template sample manual molding was used. The molding sand is quartz sand with SiO 2 concentration greater than 96 %. The molding process used ester-hardened sodium silicate sand, core sand used mesh of quartz sand, and binder used phenolic resin. On the design of the outlet, sand core was used to make the exhaust channel, and the vent was reserved in sand mound. More vents were designed on the external mound upper box, in particular, on the sand mound upper box at the water jacket position of the ranging arm. In terms of the design of feeding system, the gating and rising, and chill were appropriately laid out based on the modulus of each structural element by using the modulus method. The top insulation riser and side insulation riser were set up in the local area, and the external chill was placed. In addition, a riser subsidy was set up at necessary parts to feed castings. With the computer numerical simulation of the process of shell mold filling and solidification, the casting process and parameters were optimized. Among them, the machining allowances were adjusted according to the JB/ T the specifications of cast steel for construction machinery, and the shrinkage was set based on the inner cavity and external shape. In addition, using the lofting small casting test, the rationality and stability of the shell casting process was determined. With the optimization of the casting process, the casting quality of the shell of the large power ranging arm was good in trial production. Through the process of heat treatment discussed above, the surface hardness test on the CrNiMo series casting steel of the ranging arm shell showed the hardness deviation in a reasonable arrange. The mechanical properties are as follows: Hardness HB , tensile strength C700 MPa, yield strength C600 MPa, percentage elongation C18 %, area contraction C40 %, and impact toughness C70 J. After using the technologies above, the performance of the shearer s ranging arm shells remained in good condition. The mechanical properties of the shell can meet the requirements of the high-power shearer. In addition, the heat balance of the shearer ranging arm was investigated and a special forced lubrication and cooling device was developed. The heat of the shearer ranging arm comes mainly from the gears, bearings and stirring oil by gears. There are four main ways of heat

38 134 J. Wang et al. Fig. 47 Built-in cooler dissipation for the shearer ranging arm: convective heat transfer between the ranging arm shell and air flow; heat removal by the cooling water of the ranging arms; heat absorption by the lube oil of the ranging arm; radial heat transfer between ranging arm and its connection devices. With the significant increase of ranging arm power, and the working requirements of equipment continuous transshipment by high production and high efficiency working face, it is difficult to solve the problem of heat caused by the loss of transmission efficiency through traditional methods. Thus, a dedicated heat balance system was set for the ranging arm. The design of the water jacket for the ranging arm shell was optimized. A cooling pipe was installed in the gear chamber. The built-in cooler is shown in Fig. 47. A hydraulic gear pump system was installed for forced lubrication and cooling. In addition, the temperature sensor was installed, when temperature exceeded the limit, the alarm was triggered. The design forms a unique, advanced and reliable ranging arm heat balance system. In order to increase the service life of gears and bearings inside the ranging arm, and increase the reliability of the shearer, the hydraulic system of the gear pump was installed for forced lubrication and cooling. The ranging arm gearbox was used as an oil tank for the automatic lubrication device. At the other side of shearer ranging arm I, screw pump 1 was mounted. In the gear oil tank, N320 middle load gear oil was injected. The gear on axial group I drives the gears on the gear pump, and the lubricating oil in the pump, under the action of centrifugal force, was pumped out through the oil tube to filter, which filters out impurities in the oil. After the cooling, the oil was transported by pipeline to the axial group III, axial group IV, axial group V, axial group VI and axial group VII. Each axial group and gear had special holes drilled, and the lubricating oil lubricated the mating surfaces through the hole as the gear turned. In order to clearly describe the effect of heat radiation on the shearer ranging arm temperature field after optimizing the cooler, the heat radiation without the cooler was theoretically and numerically analyzed when the ranging arm angle is 0 and ambient temperature is 0. The temperature rise curve of the ranging arm (Fig. 48) and the color cloud of stead temperature field (Fig. 49) were obtained. Fig. 48 Temperature rise curve with the effect of water-cooling Fig. 49 Temperature field of ranging arm without water-cooling at ambient temperature 0 Fig. 50 Locations of high speed and low speed seals on shearer ranging arm As shown in Fig. 48, the effect of the water cooler after optimization on the temperature rise of the ranging arm is significant. Without the water cooler, the acceleration speed of temperature increase is very large. Figure 49 shows the distribution of the ranging arm temperature field without the water cooler under working conditions. Without the water cooler, the temperature gradient generated between transmission shaft and box is very large. It indicates that the water cooler of ranging arm design has solved the overheating problem with the 750 kw ranging arm. In addition, it provides a reference for the study on the heat

39 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 135 Fig. 51 Major components of floating oil-seal test device. 1 Support, 2 2 V belt tension device, 3 electric control console, 4 moter, 5 oil tank, 6 shaft, 7 static ring fixer, 8 float oil seal, 9 moving ring fixer, 10 axial loading device Fig. 52 Floating oil-seal test device. a Electric control console, b mechanical parts of test device balance of large power ranging arms, and the optimization of cooler design. In order to further improve the reliability of the shearer ranging arm, the seal performance of the shearer ranging arm was evaluated. In reality, the seal problems mainly appeared in moving seals. There are two moving seals in the ranging arm, one is the seal between drum connection sets and the gland at the output shaft of the ranging arm (low-speed shaft), the other is the seal between the ranging arm shaft I (high-speed shaft) and motor cavity body, as shown in Fig. 50. Currently, a floating seal is used on the low-speed shaft seal of the ranging arm. The floating oil-seal is a sealing device combining dynamic and static sealing techniques. The floating oil-seal is composed of two identical metal rings (static floating seal ring and dynamic floating seal ring) and an O shape ring. In order to further understand the mechanism of the floating oil-sealing and optimize the assembly clearance, a test device of floating oil-seal was developed, as shown in Fig. 51. Figure 52 shows the photos of the test device. The working principal of the floating oil-seal test device is as follows: a axial force is imposed on floating oil-seal through the axial loading device; the speed of floating oilseal is adjusted through the electric control console, the oil temperature in floating oil-seal cavity and the test time of floating oil-seal are recorded; through the heater installed in the oil tank heat the oil in the tank, then the relationship between the axial force on floating oil-seal and assembly clearance can be measured; the floating oil-seal operation, and temperature increase and wear is monitored; and the oil leakage assembly clearance of floating oil-seal under static or dynamic status at a given temperature is detected. Main technical parameters of the test device are shown in Table 20. Based on the main factors that affect the performance of the floating oil-seal, and the working principal of the test device, the routine test items and methods were determined as follows: hardness test on O type ring; test on the relationship between pressure and shift; static oil leakage test; test on the elastic resilience of the static O type ring; test on dynamic temperature rise; test on the operation of the floating oil-seal; test on dynamic oil leakage; test on the wearing condition of the floating oil-seal; test on service life; and the comparison of performance of floating oil-seals from different manufacturers. The main problem for using the framework oil-seal of ranging arm s high-speed shaft is its premature failure, i.e., the failure before the service life of the framework oil-seal. The main causes of the premature failure for the framework oil-seal at the ranging arm shaft I are as follows: poor Table 20 Main technical parameters of test device of floating oil-seal Output (V) Motor power (kw) Variable frequency speed adjustment range (r/m) Maximum output torque (N m) Floating oil-seal size /293 /560

40 136 J. Wang et al. Table 21 Chemical composition of cladding materials (wt %) Sample C Si Ti V Cr Mn Ni Fe A Remains B Remains C Remains D Remains quality framework oil-seal, e.g., poor quality port, and defects; poor quality of self-tightening spring; the magnitude interference between port inner diameter and shaft I outer diameter is too small, which results in low radial pressure; and the material of framework oil-seal is not good, which results in wearing out at port. Design and machining: there are some misalignments at some positions, such as ranging arm, shaft I and bearing cup; there is a low degree of finish at shaft I that amounted with framework oil-seal; and inappropriate heat treatment, etc. Assembly: damage on the port of framework oil-seal, inclination of bearing cup, loose spring, different type of grease or different quantify of grease on oil-seal port and shaft surface. To overcome the problems associated with the framework oil-seal of ranging arm shaft I, and to increase the sealing reliability of high-speed shaft of ranging arm, the following measures were taken: select high quality framework oil-seals; maintain the machining precision of key components; checking and maintenance on oil leakage of the framework oil-seal High speed ultra-powerful pin and rail haulage system Based on the previous system, a high speed ultra-powerful chainless haulage system was developed. It has a rated traction of kn and a traction speed of up to 20 m/ min. The clearance matching of chainless haulage system with a pitch of 147 mm was studied. First of all, the variable range of meshing central distance of the shearer walk wheel and scraper conveyor pin rail was determined. Its determination principles are: under the correct meshing situation, the minimum meshing central distance can warrant the no interference and no gear jam between walk wheel and pin rail (two section pin row connection), and it is usually approximately 10 mm less than the pitch radius of the walk wheel; the maximum meshing central distance must satisfy the rational meshing, the simulation shows that the increase of the meshing central distance has little effect, based on analysis and experience, the value is taken as 15 mm larger than the corresponding pitch radius of the walk wheel; a further increase of meshing central distance would cause: imprecise rolling, impact on gears from every contact and alteration, the wear of wheel gear and rack gear, etc. The wear resistance of components in the chainless haulage system of maximum traction force kn was investigated. In the study, four types of cladding materials A, B, C and D were studied; the cladding of substrate steel can dramatically improve the surface hardness and abrasion resistance of the substrate. Based on the analysis, the C type is the hardest cladding layer among the four types of cladding material, up to HRC66.9, the A cladding layer is a less hard layer, the B cladding layer is the least hard layer, with its hardness reaching HRC51. The friction and wear test showed that the four types of cladding layers have the same wearing manner, e.g., abrasive and adhesive wears. Among the four types of cladding materials, the wear resistance of A is the best, followed by B, C and D that have the same wear resistance. Cladding material is Fe-based alloy powder; its chemical composition is shown in Table 21. The modified substrate steel after the cladding of Fe Cr- Mn Ti Fe-based alloy powder has an A cladding layer and a high hardness, excellent anti-wear properties, and a substrate with very good toughness, and is superior to any other alloy steel wear-resistant material. This modified substrate steel can be used as the shearer s guide sliding shoe material to meet the performance requirements of the shearer guide sliding shoe under complicated mining conditions Development of large-diameter, ultra-powerful and wear-resistance spiral drums with pick-shaped cutter and its components The shearer s pick holder and welding process were investigated. In earlier years, the pick holder of a small power shearer was cast with medium carbon steel. The common damage of pick holders were: weld cracking; overall cracking along pin hole due to high substrate hardness, poor plastic toughness; surface wear due mainly to poor surface organization, low hardness, poor wear resistance; inner hole wear due to poor surface organization, low hardness, and poor wear resistance. Comparison of different materials for the pick holders is shown in Table 22.

41 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 137 Table 22 Comparison of material properties Property ZG40Cr 35CrMnSi 15CrNi 3 MoA Material property Processing property Application property Not compact, many defects, low strength, low plasticity Poor hardnessability, high carbonequivalent, poor welding property Same surface hardness. In terms of the core, hardness is too high, poor plasticity, poor impact resistance; in terms of surface, hardness is too high, poor wear resistance High strength, good plasticity Good hardnessability, high carbonequivalent, poor welding property Same surface hardness. In terms of the core, hardness is too high, poor plasticity, poor impact resistance; in terms of surface, hardness is too high, poor wear resistance High strength, excellent plasticity Good hardnessability, low carbonequivalent, good wielding property After carburizing and quenching, the hardness at core is appropriate, good plasticity, high surface hardness, good wear resistance In order to better meet the working conditions of shearer s pick holders, a low carbon alloy steel 15CrNi3- MoA was used to make the pick holder which was subsequently treated by carburizing and quenching. Because the carbon content of the material is low, its carbon equivalent is also low and its welding property is good. The total alloy element content is low, therefore it is low cost, but its hardenability is high. After carburizing and quenching, the carburized layer is martensite plus carbide, its hardness exceeds 58 HRC, so the surface wear resistance is good, and substrate is a thin lath martensite. A material with a hardness of approximately 300 HB, a strong toughness, and strong impact resistance, would be a more appropriate for making pick holders. The wear process of the shearer drum helical vane was studied. In poor production conditions, the tail end of the shearer drum helical vane was often worn out. After a comparative study of several methods, the chrome SA1750CR wear-resistant composite plate was selected. The plate is made as follows: using the heap welding method, a layer of high chrome and carbide material are surfaced on a low alloy steel plate, and form a heap welding layer with high wear property, while the back of the plate has high toughness property; the large difference in the properties of front and back side of the composite plate results in the large improvement in the properties of bending, welding and mechanical processing of composite plate and original low carbon alloy steel plate Development of the prototype shearer and performance test Based on earlier studies in June 2009, the Shanghai Branch of Tiandi Science & Technology Co., Ltd commenced the manufacture of the prototype shearer and completed in February The key process of its main components is described as follows: As the MG750/1915-GWD shearer developed is a heavy-duty large power shearer, large casting shells, such as ranging arms and traction gearbox, are heavy in weight, and the cavity structure is complex and the thickness is uneven. Through software simulation, the parameters of the riser, such as number, size and position, were rationally designed to effectively avoid the casting defects, e.g. cracks and loose. To overcome the problem of blowholes in casting, in terms of process, a vent was made on the core and on the sand box. In addition, a well-shaped exhaust duct was made on the sand box. Large particles of synthetic quartz sand were used as the back sand. In these ways, the casting blowhole was effectively eliminated. In addition, the measures of a one-box multi-core combined tool and a core with multiple positioning were applied to ensure dimensional accuracy. In the machining process, the benchmark superposition method was used to achieve location accuracy. Before semi-finishing machining, a baseline was mapped properly, and the base surface was machined properly. Based on the correct baseline, the surface of each hole was machined in semi-finishing or finishing. To meet the requirements of geometric tolerances of some holes, a one clamping multichannel processing method was used to ensure the requirements of finishing size. A casting-air quenching and high temperature tempering-rough-finishing-stress removal tempering-finishing processing route was used to ensure the strength and dimensional stability of the castings. With the development of materials and the processing method, on the basis of solderability, the hardness of ranging arm shell reaches HB, and the tensile strength reaches r b - C 700 MPa, which greatly enhances the mechanical properties. Before forging the gear, the oxidized layer and surface defects were removed using a hand sand wheel to effectively avoid the cracking phenomenon of forging residue. In the forging process, the procedures must be strictly followed; the forging temperature must be strictly controlled with the temperature difference not exceeding 300 C. After forging, the forging part must be normalized under more than 950 C and tempered less than 600 C to eliminate forging stress and improve cutting performance. After a rough-machining of the gear blank, each part

42 138 J. Wang et al. underwent an ultrasonic defect check. A grinding undercut large radius hob was used for gear grinding to increase gear root fillet, and improve the impact resistance and bearing capacity of gears. In the carburizing and quenching heat treatment process, the carbon potential concentrations were strictly controlled at 0.8 % 1.0 %. A quenching? deep freezing? low temperature tempering process was used to ensure that the gear surface hardness reached HRC58-62, surface carbide reached Grade 1 3, the depth of effective hardened layer reached mm range (including grinding), core hardness reached HRC38 approximately, and retained austenite content was less than 9 %. All gears were ground in high precision grinding machine NILES, and some of the key components, such as planetary gear and sun gear, were under tip relief operation. At the same time, the accuracy of gear machining was one level higher than the specified level on the drawings to ensure a good meshing of the gears. The ground gears were treated by strengthened shot blast to eliminate the burns on the tooth surface and increase residual compressive stress, thereby enhancing the gear s contact fatigue strength and bending fatigue strength. The working conditions of the shearer walk gear are harsh, thus the shearer walk gear is one of the weakest parts in the shearer. In order to improve its work life, the electroslag remelted steel material 18Cr2Ni4WE was used to make the shearer walk gear. The electro-slag remelting greatly reduces the harmful content of non-metallic materials (these ingredients are the causes of quenching crack and fatigue crack), increases the purity of materials, and maximizes material performance. As the gear modulus was large and there was no standard hob, the gear tooth was machined twice, the first machining cut using NC wire cutting, leaving 2 3 mm allowance. The second machining was precisely machined to its place using a processing center. In particular, in the last processes, the amount of feed and cutting speed should be strictly controlled to avoid obvious cutting marks (machining marks are the stress concentration source of gear s tooth; currently fracturing of the shearer walk gear is often caused by these marks). To reduce the gear tooth s early failure due to stress concentration, it should be treated by shot-blast after heat treatment. High quality medium carbon alloy steel was used to cast the shearer s guiding sliding shoe. At rough machining, the shoe was hardened and tempered to improve its substrate mechanical properties. The high quality wear-resistance material was selected to heap weld the guiding surface, then, the surface was machined using a special machine to reduce the surface roughness and friction force. The trial production of other components also strictly followed the product standard and were checked to avoid Fig. 53 Cross-section of coal transportation at rear scraper conveyor installing non-confirming products in the prototype shearer, and can warrant the reliability of the shearer manufactured. 4.3 Rear scraper conveyor for LLTCC coal face In order to meet the requirements of coal production of 1000 Mtpa at the No face in Tashan coal mine, with the consideration of the effects of other uncertain factors, the calculation shows that the total transportation capacity of the front and rear scraper conveyors is 3500 t/h. Considering a cutting and caving ratio of 1:3, the individual transportation capacity of the front and rear scraper conveyors should be greater than 2625 t/h. Taking the uncertainty of caving quantity and some allowances in transportation capacity into consideration, the capacity of the rear scraper conveyor was determined as 3000 t/h. Because of the specific environment in the underground mine and the matching characteristics of the scraper conveyor, shearer and hydraulic support, there are many constraints on many structural parameters of the scraper conveyor including the width of the pan and other important structural parameters. Balancing between economic and technical contexts, the pan width of the rear scraper conveyor was determined as 1200 mm. Its coal transport section is shown in Fig. 53. Calculation of chain speed of scraper V: V ¼ n=2izp=60k ð17þ where n is the motor speed, 149 min -1 ; i is the reduce deceleration ratio, 28.43; Z is the tooth number of driving sprocket, 7; P is the chain pitch of , m; k is the slip ratio of coupler, Substitute the parameters into Eq. (17), get: V ¼ 1491=28: :152=60 0:95 1:77 m=s Calculate the hourly capacity of coal transportation Q: Q ¼ 3600 VAq ð18þ where V is 1.77 m/s; A is the cross-section of loads as to rear conveyor, because the top of the cross-section is open,

43 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 139 based on the coals rest angle of 30, the calculated coal transportation area A = 0.63 m 2 ; q is the loose coal density, t/m 3, select 0.9 t/m 3. Substitute the data into Eq. (18), get: Q = & 3613 t/h [ 3000 t/h,meet the requirements. Based on a conveying capacity of 3000 t/h and a chain speed of 1.77 m/s, and the installed power of 2000 kw, the theoretical power consumption utilization was analyzed under the conditions of face lengths of 300, 250 and 207 m respectively (the actual length at the No face in Tashan coal mine). The calculation results showed that: when the face length is 300 m, and face dip is 0, the power utilization reaches up to 94.3 %, power margin is small, which is only used in a flat or downhill face. When the face length is 250 m (or the actual face length at No face is 207 m), and the face dip is 0, the power utilization is 78.6 % and 65 %, respectively, showing a large margin. Therefore, a total power of kw can meet the requirement of transport capacity of 3000 t/h. In order to warrant the non-fracture of the scraper chain, the safety coefficient of the chain was calculated. When the total power is 2000 kw, scraper chain speed is 1.77 m/s and the broken load of scraper chain is 3290 kn, the safety coefficient of scraper chain should reach 1.72 to satisfy the requirements of safe coal transportation. Based on the analysis discussed, SGZ1200/ large load rear scraper conveyor was selected for the LLTCC face to extract the ultra-thick coal seam at Tashan coal mine. The installed power is kw, and transportation capacity exceeds 3000 t/h. The transportation distance meets the length requirement at the No face. In a LLTCC mining operation, the rear scraper conveyor should have reasonable technical parameters and structure; also, the key components should have high reliability. These key elements include a heavy-duty high-strength chain drive system, speed-adjustable soft start device, integrated monitoring transmission system of transmission device, heavy-loaded 1000 kw planetary retarder, high reliability long life high-strength coal transportation trough, high strength compact end discharge frame and automatic retractable tail with electro-hydraulic control, etc. With the development of compact highstrength round chain and link chain for the mine, as well as the high-strength forged scraper, the optimization of the meshing characteristics of the chain transmission system and the adaptability and chain tension, along with the development of along life drive sprocket and component, a heavy-duty high-strength chain transmission system was successfully developed. By studying the matching ability of controlled adjustable speed soft start device-valve-controlled hydraulic coupler and motor load characteristics, a rational coupler cavity has been designed and the fluid dynamics was optimized. In addition, an electro-hydraulic control technology for the coupler has been developed. A large power valve-controlled hydraulic coupler has been developed with intellectual property rights. A comprehensive monitoring integrated transmission system has been developed. It consists of central monitoring equipment (upper equipment) and site monitoring equipment (lower equipment), which achieves a state monitoring and control on the transmission device of the rear scraper conveyor, and enhances the operation monitoring capacity of the large power rear scraper conveyor. Through a combination method of theoretical analysis, three dimensional modelling, mechanical analysis and simulation, virtual prototyping, dynamic testing, bench testing, and industrial trial, a 1000 kw retarder for the mine has been developed. Through the study on the bending angle design of the middle pan, and the connection method of U-shaped port of middle pan, in addition to the large amount of research and testing on the choice of materials, welding processes and equipment, and machining technology, a high-reliability, long-life coal pan has been developed. Through the strength design on the end discharge head frame, the connection design of the head frame and joint parts, the connection design of the head frame and transition pan was improved. A high strength, compact end discharge head frame has been developed. With the analysis on the operating conditions of the scraper conveyor chain, and the calculation on the adjustment required by conveyor tail and the calculation of traction force of the extension mechanism, an automatic retractable conveyor tail electro-hydraulic control system and retractable extension tail frame has been developed. Furthermore, an electro-hydraulic automatic control retractable conveyor tail has been developed. Through the research and development of the key technologies and components above, the overall reliability of the rear scraper conveyor has been improved to warrant safe, efficient and stable operation. 4.4 Large-capacity and long distance gateroad belt conveyor In order to achieve the transportation of both the coals extracted by the shearer and the coals extracted by top coal caving from the LLTCC operations, the technologies on a large-capacity long-distance gateroad belt conveyor has been investigated. A CST soft drive system was used, in light loads or heave loads condition, the dynamic process of the loaded belt conveyor s soft start/soft stop can effectively be

44 140 J. Wang et al. controlled to achieve a balance of power among various drives. Based on the variation of tensile force during the start, stop and operation of belt conveyor, a tension technology and equipment of high accuracy and large tensioning stroke has been developed. It can quickly respond and automatically adjust tension and tensioning stroke with the tension variation of the belt conveyor. During normal operations, the tensile force is times of the rated tensile force, during start and stop, the tensile force is times of the rated tensile force, and during the shift of conveyor tail, the equipment can quickly respond and guarantee non-skid. The working principle is: based on the conveyor s start-up and loading, with the feedback of tension sensor signal, the PLC controller and fuel tank can automatically adjust the output of tensile force to avoid slipping between belts and drive pulley, lower the safety factor selected for the belt, and ensure the normal operation of the belt conveyor. Installed with an automatic moved conveyor tail, the automatic tensioning can be achieved when the conveyor tail is automatically moved, thus to a certain extent, the downtime rate of the belt conveyor and the downtime rate of the three face machine can be reduced. A new high-efficiency belt storage device was developed; the belt can be folded into six layers and stored with a length of 200 m. A belt storage system of multi-layer winding has been developed, which enables an automatic belt central alignment to overcome the deviation of conveyor belts in storage and the tensioning truck s off track. A low speed large torque hydraulic motor and electrohydraulic proportional control valves were used to develop a large-torque belt-speed controllable high efficiency hydraulic belt winding device, which significantly reduces the time on belt winding, is easy in operation, and reliable in working. A high-speed low-friction larger-diameter roller was developed. Using labyrinth seals with special structure and oxidation resistance, water-resistance grease sealing method, the service life of the high-speed large-diameter roller is significantly increased. Fig. 54 The large-capacity, long-distance belt conveyor Fig. 55 WC55Y shield hauler Using dynamic analysis software, the system was analyzed to determine a reasonable starting and braking curve. An advanced PLC programmable controller was developed. In addition, an advanced program-controlled automatic monitoring system was developed, which can conduct the operations of data collection, processing, storage, transmission, fault detection, reach and feed, etc. It can meet the requirements of the conveyor s controllable soft start and braking, power balance, automatic tensioning and self-movement of conveyor tail, as well as various functions, such as protection, communication and signal contact. In addition, it can monitor the various protection and safety devices, conveyor belt tension, the temperature of the driving drum and roller bearing, the measurement of throughput, etc. Through the studies presented, a large-capacity, longdistance belt conveyor has been developed, as shown in Fig. 54. Its main technical parameters are as follows: transportation distance: 2800 m; transportation capacity: 3500 t/h; lifting height: 35 m; belt width: 1400 mm; installed power: 1680 ( ) kw; belt speed: C4.5 m/ s; stored belt length: C120 m. 4.5 Large tonnage shield hauler The tonnage of hydraulic support for the working face in thick and ultra-thick coal seam is very large. In order to improve the efficiency of coal mining, it requires a fast relocation of coal face equipment. Therefore, a heavy-duty frame shield hauler WC55Y shield hauler was developed, as shown in Fig. 55. The vehicle is powered by diesel, the carrying capacity is 55 t, and is an efficient equipment for a quick relocation of coalface. If equipped with a hopper, it also can be used as a multifunctional underground transport vehicle. A V-type six-cylinder diesel engine explosion-proof equipment was used in the WC55Y shield hauler. Based on the requirements of explosion-proofing, the explosionproof device must be set up in engine intake and exhaust systems, which will increase the resistances of engine s

45 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 141 intake and exhaust, reducing engine efficiency, worsen the harmful emissions, and increase the pollution in underground. The difficulty in this project is how to optimize the inlet and outlet structures to minimize its effect on engine performance and reduce the emissions of harmful gases. In terms of the engine s explosion-proofing, the following four key technologies have been developed: (1) In the explosion-proof diesel engine, exhaust turbocharged water air cooling technology was used. Forced water circulation technology was used to solve the high temperature problem with the supercharger surface. Compared to natural air intake, the air intake increases 30 %, and lays a foundation for increasing efficiency and reducing emission. (2) Using theoretical analysis and test methods, the fuel injection control was optimized. The oil injection method of low-speed in the early stages, high-speed in the middle stages and reduced speed in later stages was used to effectively control the emission of NOx, PT, etc. (3) Intake resistance is an important factor affecting engine power. The intake spark arrestor is a key component of the air intake system in explosionproofing the diesel engine, which directly affects engine performance. Through the experiment, after the installation of the air inlet device on the diesel engine, the losses of power and torque is up to 14 %. To improve the flow characteristics of the diesel engine intake, the original structure had been optimized. With a comparative analysis of eddy current resistance loss at inlet/outlet section in different intake spark arrestors, an inclined windward surface end grid plate was designed to substantially reduce inlet resistance. (4) A constant pressure low resistance exhaust gas treatment device was designed. Using a water bath type cylindrical structure, the exhaust resistance was reduced by 5 %. For the WC55Y shield hauler, a moving speed brake was developed, which integrates a planetary speed retarder and a large torque wetted multi-disc safe brake. Traditional brake concentrates on the high-speed end of wheel-side retarder, and is small in dimension. However, under a larger braking torque and repeated braking, the system generates large amount of heat and consistently fails. The working condition of the shield hauler is harsh. In the aspect of driveless axle hydraulic-driven design, there have been no successful braking studies anywhere in the world. Fully enclosed, high torque and large brake power, small in size, and high efficiency heat dissipation are the difficulties in the study. Meanwhile, the road underground is potholed, thus during the movement of heavy-loaded vehicles, the wheel-side retarder will withstand a greater shock load, and therefore must have enough strength. Otherwise, it will cause failures in the retarder s bearing, such as broken parts. In response to these technical bottlenecks, a modular integrated technology was used to design a new planetary gear of wetted multiple-disc brake. Also, an integrated motor-cartridge wheel drive and brake retarder was invented. It is a wheel-side planetary retarder, and integrates all brake functions. The brake was designed as a fully closed wetted-type multi-disc brake with spring braking and hydraulic release. Through the spline, friction tablets and steel tablets are coupled with fixed parts and turned parts respectively. Through the motor input, retarder part input torque, delivered via a two level planetary deceleration device, the torque will be transmitted to the wheels. The brake cavity and retarder cavity are completely insulated by a pair of high reliable floating seals to avoid the interference of two different functions. The braking torque of the integrated brake-retarder is greater than 60,000 N m, thermal equilibrium temperature is less than 90 C under long term braking, and the average life of the friction disc is greater than 5000 h. Furthermore, it is safe, reliable, has good pollution resistance, and increases operational safety. The main performance indicators of the WC55Y shield hauler developed are: rated load 55 t, minimum ground clearance 300 mm, full load speed 0 12 km/h and climbing ability 12, engine rated power after explosion-proof 220 kw, turning radius 2800 mm (inside) and 7000 mm (outside). The WC55Y shield hauler was used in the relocation of the LLTCC coalface at m thick ultrathick coal seam in the Tashan coal mine to successfully solve the relocation problem of large-tonnage hydraulic support at a LLTCC coalface. 5 Bolt support technology of large cross-section roadway in ultra-thick coal seam 5.1 Deformation and failure characteristics of the surrounding rocks of coal roadway with a large cross-section in ultra-thick coal seam The roadways for a LLTCC coalface include headgate, tailgate, top return airway and open-off cut. These roadways are responsible for equipment installation, transportation, ventilation, gas exhaust, personnel passage, etc. A safe, efficient coalface depends on roadway stability and smooth flow. Roadway support is a key to the LLTCC mining operation. The roadway of a LLTCC coal face has following characteristics:

46 142 J. Wang et al. (1) The headgate, tailgate and open-off cut are developed along the coal seam. The roof is top coals with an average thickness of 12.9 m. Compared to rock, the coal seam is relatively soft, fractured, and thick. The top coal is easily subsided and even caved, which significantly increases the difficulty of roadway support. (2) Because the power of mining equipment is large, and face production is high, a very large cross-section of the roadway is required. The tailgate and the headgate have a same cross-section with a width of 5.5 m wide, a height of 3.9 m and a size of m 2. The open-off cut span is up to 10 m. The increase of roadway width can result in significant bending subsidence in the roof, and large height roadway can cause coal wall buckling and even spalling, which significantly affects the stability of the surrounding rock of the roadway, and brings great difficulties to roadway support. (3) The tailgate suffers the side-abutment pressure caused by the previous longwal gob and the and the front abutment pressure caused by the current longwall panel. In addition, due to the distinct characteristics of ground pressure at a LLTCC coalface, the mining effect on the tailgate is very strong, resulting in serious damage of the surrounding rocks. 5.2 Bolt support mechanism of large cross-section coal roadway Roadway support with bolt and cable has become one of the main methods at coal mines in China. In this project, bolts and cables were used to support the large cross-section coal roadway. However, the surrounding rock of the roadway in the coal seam is soft and fractured. Traditional bolt supporting failed to suppress the large deformation of the roadway due to the high mining-induced stresses. Bolt supporting mechanism for coal roadways should be investigated to provide a theoretical basis for support design. Many studies have been conducted to investigate the support mechanism of bolt and cable support on coal roadways (Jia and Huang 2005; Zhang et al. 2006; Ma and Zhang 2008; Zhang and Yang 2010) in China. In recent years, it has been recognized that the prestress of rock bolts plays an important role in bolt support (Kang et al. 2007a, b, 2008; Wang et al. 2008; Zhang et al. 2010), such as the binding effect it plays on the layer separation, slippage, and join crack opening of the surrounding rock surface layer, and maintaining the integrity of the surrounding rock. The studies improve the bolting effect, in particular, providing an effective theoretical guidance for complicated roadway support. Based on the deformation characteristics of large crosssection coal roadway in ultra-thick coal seam, a full coal roadway supporting mechanism is proposed. (1) The deformation of surrounding rock in a full coal roadway consists of two parts: one is the dilatancy deformation including the separation of coal and rock, sliding, fissures opening, and new cracks at their structural plane; the second is the elastic deformation of surrounding rock and the plastic deformation before its peak strength, and a full deformation of anchorage zone. A reasonable full coal seam roadway support should greatly improve the stiffness and strength of supporting system at initial support, effectively controlling the dilatancy deformation of the surrounding rock, and maintaining the integrity of top coals. At the same time, the supporting system should have sufficient elongation and allow a second deformation to release high stress. (2) The prestresses of bolts and anchors play a decisive role in roadway support. It is crucial for support design to determine reasonable prestresses according to coal roadway conditions, and enabling prestresses to effectively spread. (3) The anchor cable in a full coal seam roadway plays its role in two main aspects: one is to connect the bearing structure formed by bolting in top coal with deep surrounding rock in order to improve the stability of load bearing structures; the other is that the large prestresses of anchor cables and the compressive zone of bolts form a skeleton mesh structure to actively support surrounding rock. (4) In a full coal seam roadway, high prestress powerful bolt and anchor cables should be used to become the single necessary support during the service life of the roadway, avoiding second roadway support and roadway maintenance. 5.3 Material of high strength bolt and cable The yield strength of a traditional thread steel bolt is MPa, and the tensile strength is MPa, which is applicable to the roadway with normal conditions. For a roadway under complex geological and geotechnical conditions, a higher strength and sufficient elongation steel should be used for bolts and anchor cables in order to achieve high prestress, high strength and high elongation. In this project, with the cooperation of other steel mills, strong steel for bolts and cables has been developed. The key technology and difficulties in developing this type of

47 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 143 Table 23 High strength bolt steel Strength level (MPa) Yield (MPa) Tensile strength (MPa) Shock absorb energy (J) Elongation (%) Fig. 56 Anchor cable structure. a structure, b structure steel is to greatly improve the bolt strength, and simultaneously, maintain sufficient elongation and impact toughness of the bolt to prevent bolt fracture and breaking under impact loads, bending and shear loads. Starting from steelmaking, a special bolt steel formula was formulated, e.g., adding elements of V, Nb and Ti in the steel to alter the mechanical properties of steel. In addition, an appropriate rolling process was used to manufacture the bolt in accordance with its technical specifications. Table 23 lists two kinds of anchor bolt steel developed with high strength, high elongation, and high impact toughness. The yield strength of the two types of boltreaches 570 and 650 MPa respectively, and the tensile strength reaches 745 MPa and 805 MPa respectively. The elongation is 26 % and 22 % respectively, and their shock absorbing energy is more than 40 J. 5.4 Cable material with large tonnage and high elongation The anchor cable steel strand widely used in Chinese coal mines is composed of seven wires (Fig. 56a), with a diameter of 15.2 or 17.8 mm. Its application in underground coal mines showed the following disadvantages: the cable diameter is small and doesn t match borehole diameter, thus, significantly affects anchorage force, and is prone to the anchor end sliding. Due to its small breaking load, cable fractures often occur. Because of its low elongation, it cannot adapt to the large deformation of the surrounding rock. Due to its low prestress, it is poor in controlling the separation of rock layers. To solve the problems discussed above, a large diameter, high tonnage strong anchor cable series was developed with a diameter of mm, and a capacity of kn. The technological approaches used are as follows: (1) changing cable body structure. Using new type of 19 wires (Fig. 56b) to replace the original seven wires, the cable body structure is more reasonable, and the anchor cable elongation has been significantly improved; (2) increasing the diameter of anchor cable body. The cable diameter was increased from 15.2 to 18, 20 and 22 mm to improve the cable body s broken force, and match the cable diameter and drilling diameter. The anchor cable with a diameter of 22 mm has a breaking load of greater than 600 kn, and an elongation of 7 %. The comparison of different mechanical properties of anchor cable steel strand wires are shown in Table Equipment for applying high prestress on bolt As mentioned previously, the prestress of rock bolts is one of the key parameters for bolting, and plays a decisive role on the effect of anchor support. The previous studies show that the anchor prestress should reach a level of 30 % 50 % of anchor yield strength. According to the conversion relationship, the bolts tightening torque should be N m. To reach such a high prestress, the existing single bolting machines in China cannot meet such a requirement. It is necessary to develop a suitable bolt Table 24 Mechanical properties of different anchor cable strand wires Structure of steel strand wires Diameter (mm) Cross-section (mm 2 ) Tensile strength (MPa) Breaking load (kn) Elongation (%)

48 144 J. Wang et al. Table 25 Physical and mechanical parameters of coal and rock seams in a numerical model Lithology Density (kg/m 3 ) Volume modulus (GPa) Shear modulus (Pa) Cohesion (MPa) Friction angle ( ) Tensile strength (MPa) Sandstone Coal Sandy mudstone tightening tool to significantly increase the anchor cable s prestress. In terms of the equipment for bolting, there are two main methods for increasing bolt s prestress (Kang and Wang 2007): one is to increase the bolt-nut tightening torque; the second is to use a bolt tensioning device, which is similar to imposing large prestresses on anchor bolts. The methods for improving bolt-nut tightening torque include: (1) high torque jumbolter. With a high torque jumbolter, it can not only increase the bolt tightening torque, but also achieve an integration of bolt installation to improve installation speed. For instance, the torque of the jumbolter used with continuous miner can reach more than 300 N m. The rated torque of a single jumbolter in China is not greater than 150 N m, and unable to meet the requirement of high tightening torque of the bolt. (2) Torque multiplier. In order to improve the installation torque of the jumbolter, a torque multiplier can be used on the jumbolter to multiply the nut tightening torque when installing bolt. (3) Torque wrench. Using a large torque preload wrench to tighten the bolts and nuts is an effective way to improve the prestress of anchor bolts. Based on the jumbolter used in large cross-section coal roadway, and the operation conditions, torque multiplier was selected to improve the prestress of anchor bolts. The bolt torque multiplier developed has an input torque of N m and an output torque of N m. With a single jumbolter match, the maximum torque magnification is approximately six times, which meets the high prestressing requirement of the bolts. 5.6 Stress characteristics of the surrounding rock in a full seam roadway and numerical simulation of the combined support with bolt and cable In order to better understand the distribution characteristics of variation of surrounding rock in a large crosssection full coal roadway, as well as the support mechanism and main effect factors of anchor bolts and cables, a numerical analysis using FLAC 3D was performed based on the data from the No return airway of the No coalface at Tashan coal mine The stress characteristics of the surrounding rock in a large crosssection coal roadway with different top coal thicknesses, the influence of different roadway layout locations, different roadway width-height ratios, different ground stresses, and different pre-tight forces of anchor bolts and cables were evaluated Simulation approach The No return air roadway was developed along the seam floor, its cross-section is in a rectangular shape with a width of 5.5 m, a height of 3.9 m. Ground stress data measured are shown in Table 2, vertical stress is MPa, the maximum horizontal principal stress is MPa, and the minimum horizontal principal stress is 7.24 MPa. In the numerical simulation, the FLAC 3D built-in cable structure element was used to simulate the rock bolts and cables. The bolts have anelastic modulus of 200 GPa, a yield strength of 600 MPa, a tensile strength of 800 MPa. The rock bolts are 2.4 m long and 22 mm in diameter. The cables have an elastic modulus of 195 GPa a length of 8.3 m, a diameter of mm, and a capacity of 600 kn. The Mohr Coulomb constitutive model was used to describe the coal-rock body. Based on the results from the laboratory tests, the physical and mechanical parameters of coal and rock seams in the calculation are shown in Table 25. Combining the geological conditions at the No roadway in Tashan coal mine, based on the combined support of ancho bolts and anchor cables in coal roadway, multiple plans were compared in the simulations in this study: (1) When the horizontal principal stress is MPa, the vertical stress is MPa, and the roadway was developed along the seam floor, the effect of different top-coal thicknesses on the stress distribution of the surrounding rock. Top-coal thicknesses were 0, 5, 10, 15, 20, and 25 m respectively. (2) When the horizontal principal stress is MPa, the vertical stress is MPa, and the coal thickness is m, the effect of different positions of the roadway layout on the stress distribution of

49 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 145 Table 26 Different ground stress combinations in the numerical simulation Different ground stress combinations Horizontal stress (MPa) Vertical stress (MPa) Combination Combination Combination Lateral pressure coefficient surrounding rock. In a vertical direction, the roadway was laid out along the roof and along the floor. When the coal-pillar widths in the horizontal direction were 10, 20, 30, and 40 m, the effect after the extraction of two adjacent coalfaces on the stress distribution of surrounding rock of roadway. (3) When the horizontal principal stress is MPa, and the vertical stress is MPa, the effect of different width-height ratios on the stress distribution of the surrounding rock of the roadway. The heightwidth ratios in a full coal seam gateway are 1, 0.75 and 0.5. (4) When the coal thickness is 16.8 m, the roadway was developed along the seam floor, the effect of different ground stresses on the stress distribution of the surrounding rock of the roadway. Different combinations of stress are shown in Table 26. (5) The effect of different preloads of bolts and cables on the spread of stress in coal (regardless of in situ rock stress). Under the condition of the cable s prestress as 100, 150, and 200 kn, the bolt preloads are 60, 80 and 100 kn, respectively Effect of top-coal thickness on the stress distribution of surrounding rock of full coal roadway In Fig. 57a, because the roadway s roof and floor are rock, and the two walls are coal, the stress concentration zones after roadway development are located at the four corners of the roadway in the roof and floor rock strata, the maximum compressed stress reaches 22 MPa. As the rock strengths of roof and floor are relative high, it enables pressure to be uniformly transferred to the coal wall bodies of the roadway to reduce the compressed stress in the coal bodies of the roadway s two sides, and reduce roadway deformation. As shown from Fig. 57b f, with the increase of top coal thickness, the distribution zone of compressed stress in top-coal increases, and the stress in top-coal is less than that in the roadway floor. There is a distinct interface between top-coal and roof. Overall, during roadway excavation, when top-coal thickness is within 10 m, there is a strong correlation between the stress distribution of surrounding rock of roadway and the top-coal thickness. As the top-coal thickness increased, the stress concentration area in the top-coal expanded and the concentration coefficient reduced. With the continual increase of top-coal thickness, there is no appreciable variation in stress distribution of the surrounding rock. Fig. 57 Stress distribution of roadway surrounding rock at different top-coal thicknesses. a Rock roof b top coal 5 m c top coal 10 m d top coal 15 m e top coal 20 m f top coal 25 m

50 146 J. Wang et al. Fig. 59 Stress distribution of surrounding rock with different roadway positions. a Along floor layout b along roof layout Fig. 58 Stress distribution of roadway surrounding rock with different coal pillar widths. a Coal pillar width 10 m b coal pillar width 20 m c coal pillar width 30 m d coal pillar width 40 m Effect of roadway layout positions on the stress distribution of surrounding rock of full coal roadway The coalface with full coal roadways is usually a coalface with a large mining height. The increase of mining height will have a great impact on the stress distribution in the coal pillar, thus affecting the stress distribution of surrounding rock of the roadway. In Fig. 58a, b, the stress concentration zone generated at two side walls during roadway development overlapped with the stress concentration zone in coal pillar after coal extraction. The maximum stress in the coal pillar reaches 33 MPa. In Fig. 58c, the stress concentration zone in the surrounding rock of roadway during its development is isolated from the stress concentration zone in coal pillars caused by the extraction of two adjacent coalface. However, it still has some impact on the stress distribution of the surrounding rock of the roadway, the maximum compressive stress on the side coal pillar is approximately 30 MPa. In Fig. 58d, due to the further increase of coal pillar width, the effect of the stress of the adjacent mining face on roadway decreased significantly. The stress concentration zone formed in the surrounding rocks of the roadway during its development is basically separated with the stress concentration zone formed by coalface extraction. The maximum compressive stress of surrounding rocks of the roadway is 27 MPa. Overall, due to the large thickness of coal seams with the coal roadway, after roadway development and adjacent coalface extraction, the stress concentration zone formed in the coal pillar is different to that at thick or thin coal seams. The stress is no longer distributed as standard arch or hump distribution, but renders approximately triangular distribution. A full coal seam roadway has two kinds of vertical arrangements, one is arranged along the floor, the other is arranged along the roof, their stress distributions have a large difference (Fig. 59). When the roadway is arranged along the floor, the stress concentration area is mainly distributed in the two corners of the roadway floor, the maximum stress reaches 22 MPa, and the maximum stress in the top coal of roadway is about 18 MPa. When the roadway is arranged along the roof, the stress state of surrounding rock of the roadway is opposite to that of roadway arranged along the floor, the stress concentration area is mainly distributed on the two corners of the roof, maximum stress is 22 MPa, and the maximum stress of the coal body at the floor is about 18 MPa. Because the stress field distributions of two kinds of arrangements are different, different measures should be taken during the roadway support. When the roadway is arranged along the floor, in addition to the top-coal support, the side walls support should be enhanced or the anchor bolt should be installed at the floor corners to prevent the occurrence of floor heave. When roadway is arranged along the roof, the support on the two corners of the roof should be strengthened, and some measures should be taken to prevent or reduce the occurrence of floor heave Effect of roadway height-width ratio on stress distribution of a full coal roadway The stress distributions of the surrounding rock of the roadway under different roadway height-width ratios are shown in Fig. 60. With the same roadway height, the wider the roadway tunnel is, the higher the level of stress concentration in the top-coal; the greater the stress concentration area in top-coal, the higher the stress concentration factor. When the roadway s height-width ratio is equal to one, the maximum compressive stress in top-coal is

51 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 147 Fig. 60 Stress distribution with different roadway s height-width ratios. a Height-width ratio 1 b height-width ratio 0.75 c height-width ratio 0.5 Fig. 61 Stress distribution of surrounding rock with different ground stress. a Combination 1 b combination 2 c combination 3 12 MPa. When roadway s height-width ratio is 0.75, the maximum compressive stress in top-coal is 16 MPa. When roadway s height-width ratio is 0.75, the maximum compressive stress in top-coal is 16 MPa, but the compressive stress concentration area increases significantly. When the roadway s height-width ratios are different, the stress distributions formed in the floor during roadway development are significantly different. When the height-width ratio is equal to one, the stress concentration zone in the floor shows an inverted arch distribution. When the heightwidth ratio is 0.75, the stress distribution zone shows an inverted hump shape distribution. When the heightwidth ratio is 0.5, an irregular stress distribution in the floor occurs, but the range increases significantly. Based on the maximum stress values in the floor, with the increase in roadway s width, the maximum stress values follow a downward trend Effect of ground stress on stress distribution of surrounding rock of a full coal roadway The stress field distributions of surrounding rock of a full coal roadway under different ground stress conditions are shown in Fig. 61. The stress distribution of the surrounding rock of the roadway after roadway development is correlated to rock strength. When the horizontal and vertical stresses are the same, the stresses in the top-coal and side coal walls are basically the same, their values are relatively low, about 15 MPa. High stress areas are mainly in the floor with high rock strength, the maximum stress is about 21 MPa. When the horizontal stress is twice of vertical stress, the stress concentration areas are mainly in the top coal and the floor rock. In particular, due to the high rock strength in the floor, its stress and stress concentration area are significantly larger than that in top coal, the maximum stress value is up to 33 MPa. When the vertical stress is twice of horizontal stress, the maximum compressive stress of surrounding rock of roadway is approximately 30 MPa, and the stress concentration area shows an arc-shaped symmetrical distribution at two side walls of the roadway Effect of different bolt prestress on the stress distribution of surrounding rock of a full coal roadway The increase of compressive stress in the anchorage zone and the range extension of compressive stress are the keys to improving the supporting effect. As shown in Fig. 62a, in the anchor bolt and anchor cable joint support, when anchor bolt pre-tight torque is 200 N m, a prestress overlap zone can be formed in the anchor bolt anchorage zone, but cannot cover the area between roof and anchor bolt at two side coal walls. The maximum compressive stress near anchor bolt in the coal body is about for 0.55 MPa, the compressive stress between anchor bolts is approximately 0.25 MPa. When the anchor bolt s pre-tight torque is

52 148 J. Wang et al. Fig. 62 Stress distribution of surrounding rock with different combinations of bolt and cable. a Cable prestress 100 kn b cable prestress 150 kn c cable prestress 200 kn 300 N m, with the increase of anchor bolt s pre-tight force, the anchor bolt s prestress spread range increases at roadway roof and two side coal walls, and in roadway s top coal, the spread zones can basically join and form one large zone. However, the anchor bolt s prestress spread zone is still small, and cannot cover the whole coal wall. The compressive stress between top coal and the roadway walls anchor bolt increases to around 0.4 MPa. When bolt s tightening torque increases up to 400 N m, the effect of the bolt s prestress spread within bolting range between the roof and two walls of the roadway is good. It covers the entire range of anchor zone, and the compressive stress value between bolts in the coal increases to about 0.5 MPa. Because of the lower prestress of the anchorage cable, the cable s prestress cannot spread to its anchoring range, thus, the overlapping effect of the bolt s prestress and cable s prestress is not obvious. Compared to Fig. 62a, b shows that with the increase of the cable s prestress, there is a significant increase of prestress spread in the area along the cable length in the roadway s top coal and perpendicular to the direction of cable length. Nevertheless, in terms of the compressive stress in coal body formed by the bolt and cable s prestress, under the impact of the increase of cable s prestress and the superposition effect of the bolt s prestress, the maximum compressive stress close to the cable in the coal body reaches 0.88 MPa. When the bolt s tightening torque is 200, and 300 N m, the distribution of compressive stress

53 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 149 Fig. 63 Stress distribution on the surface of top coal with the bolt and cable combined support formed in the coal body by cables and bolts is not uniform, the compressible stress between two bolts farther away from cables is 0.48 MPa. When the bolt s tightening torque is 400 N m, the effect of prestress spread formed in top coal by cables and bolts is improved to some extent. The compressible stress between two bolts farther away from cables is approximately 0.64 MPa. As shown in Fig. 62c, when the cable s pre-tight force increases to 200 kn, the cable plays a major role in prestress spread in the coal body, the range of prestress spread basically covers the entire cable anchoring zone, and the maximum compressive stress formed in coal body is 1.1 MPa. The bolt s pre-tight force mainly affects the compressive stress distribution in the coal body, as the increase of bolt tightening torque, there is a distinct increase of compressive stress spread formed in the coal body and the stress values. Figure 63 shows the compressive stress distribution on the surface of the roadway under the support of the combination of rock bolts and cables with a pre-tightening force of 400 and 150 kn, respectively. The compressive stress zones on the roadway surface formed by bolts and cables combined support are interconnected and superimposed. The compressive stress of top coal at the bolt tray reached 2.8 MPa, at cable tray reached 7.7 MPa, the bolt s prestress and cable s prestress basically spread to the entire surface of top coal to form an effective stress arch, and improve the stress state of the surrounding rock of the roadway. 5.7 Support design of a large cross-section full coal roadway Based on the numerical simulation results and lessons learned, a high strength bolt and cable combined support system was determined for the No roadway at the No coalface in Tashan coal mine. A BHRB600 bolt was selected with a diameter of 22 mm and length of 2.4 m left-lateral no longitudinal reinforcement steel rebar, extended with resin, and the bolt s tightening torque is not less than 400 N m. A 4 mm thick W steel belt and Fig. 64 Layout of roadway support diamond-shaped metal mesh were used to protect the roof and side walls of the roadway. The roof bolt spacing was 800 mm, and the row spacing was 800 mm. Roof cable s diameter was /22 mm with strands high strength low relaxation prestressed steel wires, and its length is 8300 mm. Using one K2335 and two Z2360 low viscosity resin cartridge, the cable was anchored, the anchorage length is 1500 mm. With every two rows of bolts, three cable anchors were installed, the row spacing is 1600 mm, and cable spacing is 2000 mm, and all cables were vertically installed into the roof. The cable anchor s pre-tightening force was kn. Figure 64 shows the layout of roadway support. 6 Safety technologies for the LLTCC coal mining operation 6.1 Gas control technologies for the LLTCC coalface Characteristics of gas distribution at the LLTCC coalface At the coal seam 3 5 in Tashan coal mine, the original gas pressure varies MPa, the gas content in the coal seam varies m 3 /t and the average is 1.78 m 3 /t. The coal seam permeability coefficient varies m 2 /(MPa 2 d), and the gas flow per hundred meters in the borehole varies (m 3 /min hm); the gas discharge attenuation coefficient in the borehole varies between and d -1. The residual coal gas amount at the coal seam 3 5 is 1.17 m 3 /t. The coal seams

54 150 J. Wang et al. are spontaneous combustion-prone coal seams, and the shortest period of the occurrence of spontaneous combustion is 60 days; the coal seams have a tendency for coal dust explosion hazards and the explosion index is 37 %. With the analysis of field tests, the gas emission and distribution in a LLTCC coalface have four characteristics: (1) Low gas storage, high gas emission. Under the influence of large thickness of coal seam and high mining intensity, the LLTCC mining operation in ultra-thick coal seam shows a low gas storage, high absolute gas emission feature. At the coal seam 3-5, the original gas pressure was only MPa, gas content in the coal seam was m 3 /t, and an average was only 1.78 m 3 /t, however, the absolute gas emissions in the working face exceeded 40 m 3 /min, and the highest absolute gas emission was up to 65 m 3 /min. (2) Unbalanced gas emission. The gas emission sources at the LLTCC coalface in Tashan mine can be divided into three parts, one is the gas at the top position of the goaf including the gas in the upper adjacent layer; the second is the gas in the deep part of the goaf including the gas of the lower adjacent layer; the third is the gas from coal extraction and caving operation carried by the airflow leakage in the working face. The gas emission in the three sources discussed above will be affected by face pressure, upper roof caving and top coal caving, and present the characteristics of imbalance, and the uneven emission coefficient might reach 1.8. (3) Large gas emission in goaf. Local gas emission in goaf showed that the gas emission often exceeded the gas limit at the zone between the 110th support and upper corner of the coalface; at the window of top coal caving and the gap between supports, the measured gas concentration reached 2 % 3 %, sometimes even higher. At U-type ventilation coalface, the gas concentration seriously exceeded the gas limit in the upper corner of the working face. Without taking any measures in the upper corner, the gas emission concentration often exceeded 5 %. In the 10 % tail region of the coalface, the gas emission accounted for 90 % of the gas emission. (4) The gas concentration distribution in the coalface showed a nonlinear relationship with the distance from the monitoring station. Figure 65 shows the gas concentration distribution along the vertical direction and face advance direction at the LLTCC coalface. The gas concentration distribution on the vertical face in the goaf showed an increase trend from bottom to top, increasing 2.3 % every 5 m; Fig. 65 Gas concentration distribution along the directions of vertical height in the goaf and face advance. a Along the direction of roof height b along the direction of face advance Fig. 66 Gas drainage at the No working face From the tailgate to internal displacement 32 m, the gas distribution showed an increasing trendency within the same elevation. From the support at the working face to the deep goaf, and within a 200 m range, the gas concentration distribution showed a ladder-type distribution. Within a 0 60 m range from the support to the goaf, the gas concentration increased from 1.5 % to 2.8 %; within a m range in the goaf, the gas concentration increased from 3.6 % to 4.6 %; within a m range in the goaf, the gas concentration increased from 5.7 % to 6.1 %, and basically coincided with the spontaneous combustion three-zone.

55 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 151 Fig. 67 Nitrogen generator in making developed: the first step was to use seals to block the gas at the upper and lower corners, and wind curtains to induce and dilute the gas for controlling the gas limit at the upper corner of the coalface at the early mining stage; the second step was to establish a large flow gas drainage system, including high-position pre-buried vertical tube, upper corner drainage tube and coalface ventilation system optimization; the third step was to developed a high drainage roadway in the roof, and use the closed roof high drainage roadway to drain the gas in the goaf. The gas drainage and mining at the No coalface in Tashan coal mine is shown in Fig Fire prevention technologies for LLTCC coalface Large flow mobile nitrogen generator mounted on rubber tire vehicle underground Fig. 68 Nitrogen generator in assembling Fig. 69 Nitrogen generator after assembly Fig. 70 Nitrogen generator at site test Gas control technologies at the LLTCC coalface Based on the characteristics of gas occurrence, a mainly in strengthening gas drainage in goaf, complemented with the optimization of ventilation system in the working face approach was used to develop a gas drainage roadway in roof-based comprehensive control technology for the LLTCC coalface. A three-step integrated program was The nitrogen injection method was used to prevent fire at LLTCC coalface in ultra-thick coal seams. Therefore, a large flow mobile nitrogen generator mounted on rubber tire vehicle in the underground was developed. Figures 67, 68 and 69 show the units of large flow pressure swing adsorption nitrogen generator in the manufacturing process. Figure 70 shows the nitrogen plant in a field test. The large flow mobile nitrogen generator mounted on rubber tire vehicle has following technical characteristics: (1) Comparing and taking from the coarse and fine particle combined adsorption tower filling method in the US, the same method in Europe, the blizzard type adsorption tower absorption method, and the vibration desktop type filling method were used to develop a carbon molecular sieve filling method with the combination of vibration desktop type filling and coarse and fine grain filling, which greatly improved the service life of the molecular sieve; (2) The recirculation calculation formula of minimum industrial pressure swing adsorption tower x 2 (minimum) & 1.15x 0 (t a /t p )(p 3 /P 0 ) was used to replace the calculation formula of the minimum regeneration cleaning amount required by the continuous adsorption process x 2 (minimum) & x 0 (t a /t p )(p j0 /P j3 )(- p j3 - P j3 )/p 0 (x 2 is the Minimum cleaning quality flow rate of regeneration, kg/s; x 0 is the initial gas mass flow rate, kg/s; t a is the limiting adsorption time, s; t p is the holding regeneration time, s; p 3 is the export airflow pressure, Pa; p 0 is the initial pressure entrance airflow, Pa), thus, the minimum amount of regeneration recirculation was determined. Combined with the control recirculation valve of the PLC controller, by reverse blowing

56 152 J. Wang et al. with the inlet direction, the fast and high efficient generation of nitrogen with the carbon molecular sieve device was achieved to increase the nitrogen amount generated by the nitrogen generator, as well as the nitrogen purity. In addition, it was possible to reduce the size of the nitrogen generator, and make the nitrogen generator more in line with the underground environment; (3) The activated carbon filtering method was used with the combination of C, T and A three-stage fine filtrations. The activated carbon was used to remove large particles of water and oil in the compressed air, to prevent the absorption and break by the carbon molecular sieve. Using C, T, and A three-stage fine filtrations, the particles of water, oil and dust greater than 0.1 lm in compressed air will be removed to avoid large particle impurities not deposing to adsorption bed, reduce the adsorption bed resistance except maintaining the service life of the adsorbent. Furthermore, the nitrogen generator can work in a high nitrogen purity situation for a long time, ensuring that the molecular sieve service life can be extended and the efficiency of carbon molecular sieve can be improved; (4) A dual PLC control automatic control system was developed. With the control of a dual control system, the unstable system problem caused by the interference of variable-pressure absorption in the same of twin towers was avoided during the operation of the four adsorption towers Study on the process and properties of large flow nitrogen generator With a full consideration of the speed effect of the pressure swing adsorption tower, the size effect of adsorption bed and the adsorption equilibrium of carbon molecular sieve, the pressure swing adsorption tower was designed and the tower was filled with the vibration bench filling method and the coarse fine combination filling method. Selecting the suitable pressure swing adsorption process, through a control system, the pressure swing adsorption nitrogenmaking process was controlled, to ensure the time of pressure swing adsorption, and the time of adsorbent regeneration. Using product gas reverse blowing regeneration technologies, the nitrogen generation capacity of pressure swing adsorption and nitrogen purity were improved, and the nitrogen purity reached the requirement of C98 %. With the methods of activated carbon filters, and C, T and A three-stage fine filtration, the particles of water, oil and dust greater than 0.1 lm in compressed air was removed to ensure the service life of the adsorbent while reducing the adsorption bed resistance, and maintain the generation of high purity nitrogen. Based on research and the comparison on the method of other existing models of pressure swing absorption molecular sieve nitrogen generator, through a small scale laboratory test, a comparison on the different processes, different adsorption media was conducted to determine the best process. The process is as follows: air compression air buffer (and preliminary water removal) activated carbon filter (removal of most of the water, and oil in compressed air) fine filter (removal of the particles of water, and oil and dust greater than 0.1 lm in compressed air in) pressurized adsorption (nitrogen generation) pressure release even pressure regeneration (reverse blowing process) product nitrogen. In the compressed air system, two 250 kw screw-type air compressors were used to compress air, and the two sets of PLC controllers were used to control the pressure swing adsorption process. They ensure the smooth completion of adsorption and desorption process of the pressure swing adsorption nitrogen generating apparatus. After a 24 h continuous operation test, with the condition of nitrogen purity was greater than 98 %, the nitrogen flow rate was greater than 2000 m 3 /h Development of fast curing stackable sealing material The sealing on the upper corner of the coalface is an effective method for reducing the risk of spontaneous combustion in the goaf. However, in Tashan mine, the cross-section of intake and air return roadways are all up to 20 m 2. The use of traditional means, i.e. fly ash and yellow mud, would result in heavy workloads and high cost, which affects the normal transportation in the mine. Therefore, a fast curing stackable sealing material was developed. Fast curing stackable sealing material is a polymer composite with multi-component, multi-usage, and solid gel combination, and is composed of a polymer compound, foaming agents, catalysts, flame retardants and other components. The feeding sequence for making the sealing material is: A material? B material? water-cementsand mixture? curing agent. At the same time, the sealing material was quickly mixed to a uniform status, then pressurized and sprayed. The volume of the sealing material would instantly expand to (10 30) times of its original volume to achieve fast sealing. This material does not contain formaldehyde, is nontoxic, odorless, and non-corrosive. During the reaction expansion process, the sealing material can fill the space and cracks in coal and rock, and has a strong bonding property. It can bond coal (rock) body, concrete, and other materials to form one solid body. It has a certain level of pressure resistance and shear

57 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 153 Table 27 Equipment for the coalface No. Equipment name Main parameters of equipment Reference type 1 Hydraulic support Height: mm; center distance: 1750 mm; support intensity: [1.35 MPa ZF15000/28/52 2 Shearer Cutting power: kw; cutting height: m; cutting depth: 800 mm; AC electric MG750/1915-GWD traction; voltage: 3300 V 3 Front scraper Length: 220 m; power: kw; voltage: 3300 V; transportation capacity: 2500 t/h SGZ1000/ conveyor 4 Rear scraper Length:220 m; power: kw; voltage: 3300 V; transportation capacity: 3000 t/h SGZ1200/ conveyor 4 Stage loader Transportation capacity: 3500 t/h; power: 450 kw; voltage: 3300 V PF6/ Crasher Crashing capacity: 4250 t/h; power: 400 kw;voltage: 3300 V SK Emulsion pump Working pressure: 31.5 MPa, Rated flow rate: 400 L/min; motor power: 250 kw, BRW400/31.5 voltage: 3300 V, fluid box: 2, volume: 2500 L 7 Spray pump Working pressure: 12.5 MPa, Rated flow rate: 500 L/min,motor power: 132 kw, voltage: 3300 V, fluid box: 1,volume: 3000 L BPW500/ Test in underground coal mine and result analysis 7.1 Parameters of working face and equipment Fig. 71 Combined trial operation on the surface of complete equipment for the working face resistance strength. It has good flexibility, is shockproof and pressure resistant, has strong elastic resilience after compression, with no cracking after curing, and no shedding. It has insulation properties, including heat insulation and flame retardant properties, suitable for filling at different locations in an underground coal mine. The response time of rapid curing stackable material is 5 60 s adjustable at (23 ± 2) C. The foam index is times adjustable. The flame retardant: oxygen index is not less than 32, vertical and horizontal combustion level is V0. The content of heavy metals (Pb) is less than 0.90 mg/ kg (assessment value 90 mg/kg). At the No LLTCC coalface in Tashan coal mine, the face length is 207 m, the maximum cutting height is 5.0 m, and the cutting depth is 0.8 m. The installed capacity for the working face is 10 Mtpa. Based on the technical parameters and performance of fully mechanized coal mining equipment in China, the main technical parameters of the fully mechanized coalface equipment are determined as shown in Table 27. In April 2010, the combined trial operation on surface of the complete equipment developed was conducted at Tashan coalmine (Fig. 71). From October to December in the same year, an underground industrial trial was completed. 7.2 Operation of trial equipment and production During the period of the industrial trial at the No face from October to December 2010, the statistics of production downtime caused by major equipment accidents are shown in Table 28. From October to December 2010, the Table 28 Statistics of production downtime caused by major equipment failure during the industrial trial period from October to December 2010 Time Shearer Hydraulic support Scraper conveyor Belt conveyor Power supply system October h 35 min h 30 min 2 h 35 min November h 0 15 h 50 min 5 h 10 min 4 h December h 30 min 0 1 h 25 min 15 min 0 Total 31 h 5 min 0 17 h 15 min 13 h 55 min 6 h 35 min

58 154 J. Wang et al. Table 29 Production statistics at No coalface during the industrial test period from October to December 2010 Equipment usage (%) Coal recovery (%) Average manpower efficiency (t/worker) Average daily production (t) Production (t) Average/maximum monthly production (t) Face advance (m) Cutting height average/ maximum (m) Time Number of working days October / , / November , December , Total / ,722, / Fig. 72 Displacement curve of the roadway surface. a During roadway development b during coalface operation production downtime caused by shearer accidents was 31 h and 5 min, the shearer usage rate was %, and its performance was stable. The production downtime caused by hydraulic support failure was zero, its working resistance varied within a ,000 kn range, and overall the support was in good condition. The production downtime caused by scraper conveyor failure was 17 h and 15 min with an usage rate of %. The production downtime caused by belt conveyor accidents was 13 h and 55 min, with an usage rate of %. The production downtime caused by power system accident was 6 h and 35 min, failure-free rate was %. In October 2010, the production downtime caused by cumulative electrical accidents during the production period was about 57 h and 40 min. Based on four shifts with six hours each shift in the working face, the usage rate was 89.3 %. In November 2010, the production downtime caused by cumulative electrical accidents during the production period was about 53 h and 50 min, the usage rate was 91.3 %. In December 2010, the production downtime caused by cumulative electrical accidents during the production period was about 7 h and 10 min, the usage rate was 95.7 %. In the industrial test period from October 2010 to December 2011, average usage rate of equipment in use was 92.1 %. During the industrial test period from October to December 2010 at No coalface, the cumulative face advance was m, average daily advance was 5 m,

59 Key technologies and equipment for a fully mechanized top-coal caving operation with a large 155 Fig. 73 Roadway support at the No roadway maximum daily advance was 8 m; the cumulative coal production was Mt, the average daily production was 30,300 t, maximum daily production was 38,000 t; average manpower efficiency was t/worker. In three consecutive months during the industrial test, average monthly production reached more than 900,000 t, coal recovery rate at the working face reached 89.9 %. In 2011, the average monthly coal production was 904,000 t, the cumulative coal production for the year was mt, achieving the goal of producing 10 Mtpa. The production statistics for the industrial test at the No coalface from October to December 2010 is listed in Table 29. Fig. 74 Monitoring curve of absolute gas emission volume 7.3 Analysis of roadway support During the excavation and support in the No roadway, the deformation of the surrounding rock of the roadway was monitored, see Fig. 72a. The wall-to-wall convergence and the roof-to-floor convergence during the roadway excavation period was 25 mm and 16.6 mm, respectively. The support effect during the excavation period is shown in Fig. 73. In general, the deformation was small during roadway excavation period, and the effect of roadway support was good. After the coal extraction at the No coalface, under the influence of coal extraction, there were some variations in stress distribution of the surrounding rock in the roadway. The stress concentration occurred in coal and rock body in front of the coalface and in the surrounding rock of the roadway, resulting in the deformation of surrounding rocks in the roadway. The roadway surface displacement was monitored in the No roadway within a 100 m range in front of the No coalface, the monitoring results are shown in Fig. 72b. As can be seen from the figure, there was no change for the roadway surface displacement exceeding 78 m from the coalface, the roadway deformation affected by the coalface abutment pressure appeared from a location 78 m in front of the coalface. Within m range in front of the coalface, large deformations occurred at the same time in the roof and two Fig. 75 Variation curves of gas concentration at the upper corner of coalface, coalface and in return air after coal extraction walls. Subsequently, the deformation increased as the coalface advanced slowly. Within 36 m range from coalface, with the advance of the coalface, the deformation began to dramatically increase. In the location of the monitoring station 5 m away from the coalface, the two side walls of the roadway moved closer by 280 mm, the roof and floor closer by 210 mm. However, in general there was no obvious damage to the surrounding rock of the roadway during the coal extraction period, the amount of deformation was small, and the transportation and ventilation requirements was fully able to be met. 7.4 Analysis on gas control On the 9th of November 2010, the No coalface and roof drainage roadway were connected. After the connection, a 2BEC80 gas drainage pump was used to drain the gas, the gas concentrations were maintained between 1.5 %

State Key Laboratory of Coal Resources and Safe Mining, China University of Mining and Technology, Beijing , China.

State Key Laboratory of Coal Resources and Safe Mining, China University of Mining and Technology, Beijing , China. 2nd International Conference on Economics, Management Engineering and Education Technology (ICEMEET 2016) Coal Mining with Three-dimensional Stagger Arrangement Roadway Layout Method: a case study Zimo

More information

The Safety Guarantee Technology of Extra-thick Coal Seam Mining in Tashan Coal Mine

The Safety Guarantee Technology of Extra-thick Coal Seam Mining in Tashan Coal Mine Available online at www.sciencedirect.com Procedia Engineering 26 (2011) 1263 1269 First International Symposium on Mine Safety Science and Engineering The Safety Guarantee Technology of Extra-thick Coal

More information

Study on Rib Spalling Mechanism and Spalling Depth in Large Mining Height Fully-Mechanized Face

Study on Rib Spalling Mechanism and Spalling Depth in Large Mining Height Fully-Mechanized Face University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2016 Study on Rib Spalling Mechanism and Spalling Depth in Large Mining Height Fully-Mechanized

More information

AN EXPERIMENTAL STUDY OF DEEP BOREHOLE PRE-CRACKING BLASTING FOR GAS PRE-DRAINAGE ON A MINE HEADING ROADWAY IN A LOW PERMEABILITY SEAM**

AN EXPERIMENTAL STUDY OF DEEP BOREHOLE PRE-CRACKING BLASTING FOR GAS PRE-DRAINAGE ON A MINE HEADING ROADWAY IN A LOW PERMEABILITY SEAM** AGH Journal of Mining and Geoengineering vol. 36 No. 3 2012 Jian Liu*, Zegong Liu*, Kui Gao* AN EXPERIMENTAL STUDY OF DEEP BOREHOLE PRE-CRACKING BLASTING FOR GAS PRE-DRAINAGE ON A MINE HEADING ROADWAY

More information

Journal of Engineering Science and Technology Review 7 (4) (2014) Experimental Study on Shear Performance of Bolt in Roadway Supporting

Journal of Engineering Science and Technology Review 7 (4) (2014) Experimental Study on Shear Performance of Bolt in Roadway Supporting Jestr Journal of Engineering Science and Technology Review 7 (4) (2014) 79-83 JOURNAL OF Engineering Science and Technology Review www.jestr.org Experimental Study on Shear Performance of Bolt in Roadway

More information

Ground pressure behavior law at fully-mechanized face in Fenxi-ShuGuang coal mine

Ground pressure behavior law at fully-mechanized face in Fenxi-ShuGuang coal mine Procedia Earth and Planetary Science 1 (29) 275 28 Procedia Earth and Planetary Science www.elsevier.com/locate/procedia The 6 th International Conference on Mining Science & Technology Ground pressure

More information

AN ASYMMETRICAL BOLT SUPPORTING DESIGN OF RETREATING COAL ROADWAY BASED ON PHYSICAL SIMULATION IN LARGE DIP COAL SEAM*** 1.

AN ASYMMETRICAL BOLT SUPPORTING DESIGN OF RETREATING COAL ROADWAY BASED ON PHYSICAL SIMULATION IN LARGE DIP COAL SEAM*** 1. AGH Journal of Mining and Geoengineering vol. 36 No. 3 2012 Ke Yang*, Guangxiang Xie** AN ASYMMETRICAL BOLT SUPPORTING DESIGN OF RETREATING COAL ROADWAY BASED ON PHYSICAL SIMULATION IN LARGE DIP COAL SEAM***

More information

Theories and techniques of coal bed methane control in China

Theories and techniques of coal bed methane control in China Journal of Rock Mechanics and Geotechnical Engineering. 2011, 3 (4): 343 351 Theories and techniques of coal bed methane control in China Liang Yuan National Engineering and Research Center for Coal Gas

More information

Study on the Movement Law of Overburden Strata During Mining Strip Pillar with Paste

Study on the Movement Law of Overburden Strata During Mining Strip Pillar with Paste Study on the Movement Law of Overburden Strata During Mining Strip Pillar with Paste Guo Weijia,Li Yangyang,Zhang Baoliang,Wang hailong,sun xizhen State Key Laboratory of Mining Disaster Prevention and

More information

The Application of Flac3d Numerical Simulation Software to Determine the Reasonable Width of the Section Coal Pillar

The Application of Flac3d Numerical Simulation Software to Determine the Reasonable Width of the Section Coal Pillar 2012 International Conference on Education Technology and Computer (ICETC2012) IPCSIT vol.43 (2012) (2012) IACSIT Press, Singapore The Application of Flac3d Numerical Simulation Software to Determine the

More information

Journal of Chemical and Pharmaceutical Research, 2014, 6(10): Research Article

Journal of Chemical and Pharmaceutical Research, 2014, 6(10): Research Article Available online www.jocpr.com Journal of Chemical and Pharmaceutical Research, 2014, 6(10):391-398 Research Article ISSN : 0975-7384 CODEN(USA) : JCPRC5 The anchor craning beam support technology of the

More information

Aquifer water abundance evaluation using a fuzzy- comprehensive weighting method

Aquifer water abundance evaluation using a fuzzy- comprehensive weighting method IOP Conference Series: Earth and Environmental Science PAPER OPEN ACCESS water abundance evaluation using a fuzzy- comprehensive weighting method To cite this article: Z Wei 016 IOP Conf. Ser.: Earth Environ.

More information

Procedia Earth and Planetary Science

Procedia Earth and Planetary Science Procedia Earth and Planetary Science 1 (2009) 524 529 Procedia Earth and Planetary Science www.elsevier.com/locate/procedia The 6 th International Conference on Mining Science & Technology Design method

More information

THE EXPERIMENTAL STUDY ON INNER SHIFT LINING STRUCTURE OF FREEZING SHAFT IN DEEP THICK AQUIFEROUS SOFT ROCK**

THE EXPERIMENTAL STUDY ON INNER SHIFT LINING STRUCTURE OF FREEZING SHAFT IN DEEP THICK AQUIFEROUS SOFT ROCK** AGH Journal of Mining and Geoengineering vol. 36 No. 3 2012 Zhishu Yao*, Haiqing Song*, Hua Cheng*, Chuanxin Rong* THE EXPERIMENTAL STUDY ON INNER SHIFT LINING STRUCTURE OF FREEZING SHAFT IN DEEP THICK

More information

STUDY ON INDICATOR GAS OF SPONTANEOUS COMBUSTION AND PREVENTION MEASURES

STUDY ON INDICATOR GAS OF SPONTANEOUS COMBUSTION AND PREVENTION MEASURES International Journal of Science, Environment and Technology, Vol. 6, No 6, 2017, 3225 3232 ISSN 2278-3687 (O) 2277-663X (P) STUDY ON INDICATOR GAS OF SPONTANEOUS COMBUSTION AND PREVENTION MEASURES Fu

More information

Production prediction model of coalbed methane wells at stable production stage

Production prediction model of coalbed methane wells at stable production stage Acta Technica 62 No. 2B/2017, 141 150 c 2017 Institute of Thermomechanics CAS, v.v.i. Production prediction model of coalbed methane wells at stable production stage Jia Liu 1, Yinghong Liu 1, Ruyong Feng

More information

Three-dimensional computer simulation of soil nailing support in deep foundation pit

Three-dimensional computer simulation of soil nailing support in deep foundation pit Three-dimensional computer simulation of soil nailing support in deep foundation pit Abstract Chang Zhi Zhu 1,2*, Quan Chen Gao 1 1 School of Mechanics & Civil Engineering, China University of Mining &

More information

Study on Shear Lag Effect of Composite Box Girder Bridge with Corrugated Steel Webs

Study on Shear Lag Effect of Composite Box Girder Bridge with Corrugated Steel Webs 979 A publication of CHEMICAL ENGINEERING TRANSACTIONS VOL. 6, 017 Guest Editors: Fei Song, Haibo Wang, Fang He Copyright 017, AIDIC Servizi S.r.l. ISBN 978-88-95608-60-0; ISSN 8-916 The Italian Association

More information

Research on Seismic Behavior of honeycomb composite beamcolumn

Research on Seismic Behavior of honeycomb composite beamcolumn Research on Seismic Behavior of honeycomb composite beamcolumn joints * Lianguang Jia 2), Xianchao Li 1) and Lu Jin 3) 1),2),3) School of Civil Engineering, Shenyang Jianzhu University, Liaoning Shenyang110168,

More information

Current Status and Future Prospects of Mining Subsidence and Ground Control Technology in China

Current Status and Future Prospects of Mining Subsidence and Ground Control Technology in China University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2009 Current Status and Future Prospects of Mining Subsidence and Ground Control Technology

More information

Rong He School of Civil Engineering and Communication, North China University of Water Resources and Electric Power, Zhengzhou, , China

Rong He School of Civil Engineering and Communication, North China University of Water Resources and Electric Power, Zhengzhou, , China doi:10.21311/002.31.12.08 Dynamic Characteristics Analysis of Wide Well Ditch Aqueduct Wei He * School of Civil Engineering and Communication, North China University of Water Resources and Electric Power,

More information

Anti-fatigue Performance Analysis on Steel Crane Beam

Anti-fatigue Performance Analysis on Steel Crane Beam Sensors & Transducers 2013 by IFSA http://www.sensorsportal.com Anti-fatigue Performance Analysis on Steel Crane Beam Yuanmin Xie College of Machinery and Automation, Wuhan University of Science and Technology,

More information

Flexural Behavior of Casing Joint of Square Steel Tube

Flexural Behavior of Casing Joint of Square Steel Tube 8 The Open Construction and Building Technology Journal, 2011, 5, 8-13 Open Access Flexural Behavior of Casing Joint of Square Steel Tube Jinsan Ju 1, Zhenhua Hou 1, Xiugen Jiang 1, Yuzhi He 1, Guangkui

More information

Surrounding rock control theory and longwall mining technology innovation

Surrounding rock control theory and longwall mining technology innovation Int J Coal Sci Technol (2017) 4(4):301 309 https://doi.org/10.1007/s40789-017-0188-8 Surrounding rock control theory and longwall mining technology innovation Guofa Wang 1 Yihui Pang 1 Received: 1 November

More information

THE EFFECT OF AXIAL COMPRESSION RATIO ON SEISMIC BEHAVIOR OF INFILLED REINFORCED CONCRETE FRAMES WITH PROFILED STEEL SHEET BRACING

THE EFFECT OF AXIAL COMPRESSION RATIO ON SEISMIC BEHAVIOR OF INFILLED REINFORCED CONCRETE FRAMES WITH PROFILED STEEL SHEET BRACING THE EFFECT OF AXIAL COMPRESSION RATIO ON SEISMIC BEHAVIOR OF INFILLED REINFORCED CONCRETE FRAMES WITH PROFILED STEEL SHEET BRACING FENG Ningning 1, WU Changsheng 2, MA Junyue 1, MAO Xiaotian 1 1. Changzhou

More information

Numerical Analysis of the Durability of Retaining Wall with Anchor

Numerical Analysis of the Durability of Retaining Wall with Anchor Numerical Analysis of the Durability of Retaining Wall with Anchor Qingyu Meng 1, 2, Chao Li 1, 2, Hongbo Zhang 1, 2, Xin Li 1, 2 1. School of Civil Engineering, Shandong University, Jinan, 250061, China

More information

Micro- and macroscopic study of crack propagation in coal: theoretical and experimental results and engineering practice

Micro- and macroscopic study of crack propagation in coal: theoretical and experimental results and engineering practice Journal of Geophysics and Engineering J. Geophys. Eng. 15 (2018) 1706 1718 (13pp) https://doi.org/10.1088/1742-2140/aabb34 Micro- and macroscopic study of crack propagation in coal: theoretical and experimental

More information

Land subsidence risk assessment and protection in mined-out regions

Land subsidence risk assessment and protection in mined-out regions Proc. IAHS, 372, 145 150, 2015 doi:10.5194/piahs-372-145-2015 Author(s) 2015. CC Attribution 3.0 License. Land subsidence risk assessment and protection in mined-out regions A. Zhao 1,2 and A. Tang 2,1

More information

Application of Longwall Top Coal Caving in Challenging Geological Conditions

Application of Longwall Top Coal Caving in Challenging Geological Conditions Proceedings of the World Congress on Mechanical, Chemical, and Material Engineering (MCM 2015) Barcelona, Spain July 20-21, 2015 Paper No. 354 Application of Longwall Top Coal Caving in Challenging Geological

More information

Characteristics and control mechanisms of coalbed permeability change in various gas production stages

Characteristics and control mechanisms of coalbed permeability change in various gas production stages Pet. Sci. (215) 12:684 691 DOI 1.17/s12182-15-54-5 ORIGINAL PAPER Characteristics and control mechanisms of coalbed permeability change in various gas production stages Da-Zhen Tang 1,2 Chun-Miao Deng

More information

Analysis of seismic mitigation elastic-plastic passive control for. continuous beam bridge *

Analysis of seismic mitigation elastic-plastic passive control for. continuous beam bridge * Analysis of seismic mitigation elastic-plastic passive control for continuous beam bridge * QI Xing-jun 1, LI Xiao-jun 2 ( 1 Associate Professor, School of Civil Engineering, Shandong Jianzhu University,

More information

Journal of Chemical and Pharmaceutical Research, 2013, 5(9): Research Article. Stability analysis of cantilever retaining wall with FEM

Journal of Chemical and Pharmaceutical Research, 2013, 5(9): Research Article. Stability analysis of cantilever retaining wall with FEM Available online www.jocpr.com Journal of Chemical and Pharmaceutical Research, 2013, 5(9):362-371 Research Article ISSN : 0975-7384 CODEN(USA) : JCPRC5 Stability analysis of cantilever retaining wall

More information

Application of green bio-mining technology for coal under villages in environmental protection

Application of green bio-mining technology for coal under villages in environmental protection Available online www.jocpr.com Journal of Chemical and Pharmaceutical Research, 2014, 6(6):2120-2124 Research Article ISSN : 0975-7384 CODEN(USA) : JCPRC5 Application of green bio-mining technology for

More information

Experimental study on shear lag of curved box girder under earthquake excitation

Experimental study on shear lag of curved box girder under earthquake excitation Experimental study on shear lag of curved box girder under earthquake excitation Hailin Lu 1, Tengfei Peng 2, Minshui Huang 3, Xiaolong Zhou 4, Songbo Zhu 5 School of Resource and Civil Engineering, Wuhan

More information

Analysis of the Sensitivity of Influencing Factors on Tunnel Secondary Lining Structure *

Analysis of the Sensitivity of Influencing Factors on Tunnel Secondary Lining Structure * Analysis of the Sensitivity of Influencing Factors on Tunnel Secondary Lining Structure * Kezhi Song School of Civil Engineering Ludong University Yantai, China ytytskz@126.com Liangji Kong Yantai No.1

More information

Top coal caving. Tuesday 23rd October 2012: 11.45am. Chief Executive Officer. M GPO Box 358 Brisbane Qld 4001

Top coal caving. Tuesday 23rd October 2012: 11.45am. Chief Executive Officer. M GPO Box 358 Brisbane Qld 4001 Conference Presentation Top coal caving Tuesday 23rd October 2012: 11.45am Allison Golsby MAusIMM(CP), RPEQ, MEn Chief Executive Officer ngsc(min Man), MMinEng(Geomech), GDipMVent GPO Box 358 Brisbane

More information

Ecological Study of Moisture Content of Clay Soil Affecting Compressive Failure of the CEP Pile

Ecological Study of Moisture Content of Clay Soil Affecting Compressive Failure of the CEP Pile Ekoloji 27(106): 905-911 (2018) Ecological Study of Moisture Content of Clay Soil Affecting Compressive Failure of the CEP Pile Yongmei Qian 1*, Xue Feng 1, Wei Tian 1, Ruozhu Wang 1 1 Jilin Jianzhu University,

More information

Earthquake Response Analysis of Spherical Tanks with Seismic Isolation

Earthquake Response Analysis of Spherical Tanks with Seismic Isolation Available online at www.sciencedirect.com Procedia Engineering 14 (2011) 1879 1886 The Twelfth East Asia-Pacific Conference on Structural Engineering and Construction Earthquake Response Analysis of Spherical

More information

Research Article Effect of Construction Method on Shear Lag in Prestressed Concrete Box Girders

Research Article Effect of Construction Method on Shear Lag in Prestressed Concrete Box Girders Mathematical Problems in Engineering Volume 22, Article ID 273295, 7 pages doi:.55/22/273295 Research Article Effect of Construction Method on Shear Lag in Prestressed Concrete Box Girders Shi-Jun Zhou,

More information

Research Article Effect of Construction Method on Shear Lag in Prestressed Concrete Box Girders

Research Article Effect of Construction Method on Shear Lag in Prestressed Concrete Box Girders Mathematical Problems in Engineering Volume 22, Article ID 273295, 7 pages doi:.55/22/273295 Research Article Effect of Construction Method on Shear Lag in Prestressed Concrete Box Girders Shi-Jun Zhou,

More information

Shaft-lining Non-mining Fracture Multi-factor Forecasting Evaluation System Research

Shaft-lining Non-mining Fracture Multi-factor Forecasting Evaluation System Research An Interdisciplinary Response to Mine Water Challenges - Sui, Sun & Wang (eds) 014 China University of Mining and Technology Press, Xuzhou, ISBN 978-7-5646-437-8 Shaft-lining Non-mining Fracture Multi-factor

More information

EXPERIMENTAL STUDY ON SEISMIC BEHAVIOR OF REINFORCED CONCRETE CORE WALL

EXPERIMENTAL STUDY ON SEISMIC BEHAVIOR OF REINFORCED CONCRETE CORE WALL EXPERIMENTAL STUDY ON SEISMIC BEHAVIOR OF REINFORCED CONCRETE CORE WALL DU Xiu-li 1, JIA Peng 2 And ZHAO Jun 3 1 Professor, College of Architecture and Civil Engineering, Beijing University of Technology,

More information

Advances in Engineering Research (AER), volume Global Conference on Mechanics and Civil Engineering (GCMCE 2017)

Advances in Engineering Research (AER), volume Global Conference on Mechanics and Civil Engineering (GCMCE 2017) 217 Global Conference on Mechanics and Civil Engineering (GCMCE 217) Active Limit State Analysis of Soil Considering Displacement Effect of the Retaining Wall Bin Peng1,a, Zhijun Li1, He Huang1, Hanyang

More information

ISMS Paper No. 89

ISMS Paper No. 89 Paper No. 89 ISMS 2016 Numerical modelling and rescaled range analysis on spontaneous combustion under surface methane drainage in a Chinese coal mine Xincheng Hu a,b,c, Shengqiang Yang a,b, *, Wei Victor

More information

Researching on Buckling Performance of Corrugated Steel Web

Researching on Buckling Performance of Corrugated Steel Web American Journal of Civil Engineering 2018; 6(1): 5-10 http://www.sciencepublishinggroup.com/j/ajce doi: 10.11648/j.ajce.20180601.12 ISSN: 2330-8729 (Print); ISSN: 2330-8737 (Online) Researching on Buckling

More information

Cyclic Loading Tests Of Steel Dampers Utilizing Flexure-Analogy of Deformation

Cyclic Loading Tests Of Steel Dampers Utilizing Flexure-Analogy of Deformation Cyclic Loading Tests Of Steel Dampers Utilizing Flexure-Analogy of Deformation J.-H. Park & K.-H. Lee University of Incheon, Korea SUMMARY Steel dampers utilizing flexure analogy of deformation are proposed

More information

Study of rigid Bolt Joint in Beam-column connection of Gabled Portal Frames Xuan Guo 1, a, Xiaoxin Zhang2, b

Study of rigid Bolt Joint in Beam-column connection of Gabled Portal Frames Xuan Guo 1, a, Xiaoxin Zhang2, b 6th International Conference on Machinery, Materials, Environment, Biotechnology and Computer (MMEBC 2016) Study of rigid Bolt Joint in Beam-column connection of Gabled Portal Frames Xuan Guo 1, a, Xiaoxin

More information

The Effect of Groundwater Seepage on Stability of Tunnel by Using Strength Reduction Method Considering Fluid Solid Coupling

The Effect of Groundwater Seepage on Stability of Tunnel by Using Strength Reduction Method Considering Fluid Solid Coupling International Journal of Transportation Engineering and Technology 2018; 4(4): 75-82 http://www.sciencepublishinggroup.com/j/ijtet doi: 10.11648/j.ijtet.20180404.12 ISSN: 2575-1743 (Print); ISSN: 2575-1751

More information

Council on Tall Buildings. and Urban Habitat BACKGROUND SECTION STEEL REINFORCED CONCRETE SHEAR WALL STEEL PLATE COMPOSITE SHEAR WALL

Council on Tall Buildings. and Urban Habitat BACKGROUND SECTION STEEL REINFORCED CONCRETE SHEAR WALL STEEL PLATE COMPOSITE SHEAR WALL BACKGROUND CATALOG SECTION STEEL REINFORCED CONCRETE SHEAR WALL STEEL PLATE COMPOSITE SHEAR WALL STEEL PLATE SHEAR WALL CONCLUSION BACKGROUND With the rapid development of our economy and advancement of

More information

Ventilation and Gas Extraction Techniques of High Gas Seams in Kazakhstan

Ventilation and Gas Extraction Techniques of High Gas Seams in Kazakhstan University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2009 Ventilation and Gas Extraction Techniques of High Gas Seams in Kazakhstan D. Mukhamedzhanov

More information

Experimental Study on Seismic Behavior of Double Steel Plates Shear Wall with Concrete-filled Steel Tubular Frames and Seams

Experimental Study on Seismic Behavior of Double Steel Plates Shear Wall with Concrete-filled Steel Tubular Frames and Seams Experimental Study on Seismic Behavior of Double Steel Plates Shear Wall with Concrete-filled Steel Tubular Frames and Seams Yaohong Wang, Chaobo Han, Qing Han* Institute of Civil Engineering, Inner Mongolia

More information

Pressure relief and structure stability mechanism of hard roof for gob-side entry retaining

Pressure relief and structure stability mechanism of hard roof for gob-side entry retaining DOI: 10.1007/s11771-015-2992-x Pressure relief and structure stability mechanism of hard roof for gob-side entry retaining HAN Chang-liang( 韩昌良 ) 1, ZHANG Nong( 张农 ) 1, 2, LI Bao-yu( 李宝玉 ) 1, SI Guang-yao(

More information

PRECISION CONTROL METHOD FOR PRE-STRESSING CONSTRUCTION OF SUSPEN-DOME STRUCTURES

PRECISION CONTROL METHOD FOR PRE-STRESSING CONSTRUCTION OF SUSPEN-DOME STRUCTURES Advanced Steel Construction Vol. 10, No. 4, pp. 404-425 (2014) 404 PRECISION CONTROL METHOD FOR PRE-STRESSING CONSTRUCTION OF SUSPEN-DOME STRUCTURES Hongbo Liu 1,2, Qinghua Han 2, Zhihua Chen 1,2, Xiaodun

More information

Seepage-Stress Coupled Analysis on Shield Tunnel Face Stability in Layered Soil

Seepage-Stress Coupled Analysis on Shield Tunnel Face Stability in Layered Soil 3rd International Conference on Mechatronics, Robotics and Automation (ICMRA 2015) Seepage-Stress Coupled Analysis on Shield Tunnel Face Stability in Layered Soil Yongli Fan 1, a, Zemin Ren 2,b, Kun Liu

More information

Experiment of Reinforce Concrete Beams at Different Loading Rates

Experiment of Reinforce Concrete Beams at Different Loading Rates Experiment of Reinforce Concrete Beams at Different Loading Rates Shiyun Xiao, Wenbo Cao & Haohao Pan Dalian University of Technology, Dalian 116024, China SUMMARY: (10 pt) Dynamic experiment of reinforced

More information

ISMS Paper No Key technologies for extinguishing large-area goaf fires in closely spaced shallow coal seams

ISMS Paper No Key technologies for extinguishing large-area goaf fires in closely spaced shallow coal seams Paper No. 110 ISMS 2016 Key technologies for extinguishing large-area goaf fires in closely spaced shallow coal seams Botao Qin a, *, Quanlin Shi a, Junzhe Yang a, Hetang Wang a, Lihui Zhang b a Faculty

More information

Study of CBM Wireline Logs Normalization in B Block

Study of CBM Wireline Logs Normalization in B Block International Journal of Oil, Gas and Coal Engineering 2016; 4(6): 70-80 http://www.sciencepublishinggroup.com/j/ogce doi: 10.11648/j.ogce.20160406.14 ISSN: 2376-7669(Print); ISSN: 2376-7677(Online) Study

More information

Investigation on temperature change of cold magnesium alloy strips rolling process with heated roll

Investigation on temperature change of cold magnesium alloy strips rolling process with heated roll University of Wollongong Research Online Faculty of Engineering - Papers (Archive) Faculty of Engineering and Information Sciences 12 Investigation on temperature change of cold magnesium alloy strips

More information

POSTER PAPER PROCEEDINGS

POSTER PAPER PROCEEDINGS ITA - AITES WORLD TUNNEL CONGRESS 21-26 April 2018 Dubai International Convention & Exhibition Centre, UAE POSTER PAPER PROCEEDINGS Study on quick excavation and support method of Expressway Tunnel with

More information

3-D finite element analysis on shear lag effect of curved box girder under multi-dimensional seismic excitation

3-D finite element analysis on shear lag effect of curved box girder under multi-dimensional seismic excitation 3-D finite element analysis on shear lag effect of curved box girder under multi-dimensional seismic excitation Heng Cai 1, Hailin Lu 2, Zheng Tang 3 School of Resource and Civil Engineering, Wuhan Institute

More information

Analysis of Seismic Performance of Steel Moment Connection with Welded Haunch and Cover Plate

Analysis of Seismic Performance of Steel Moment Connection with Welded Haunch and Cover Plate Research Journal of Applied Sciences, Engineering and Technology 4(14): 2199-224, 212 ISSN: 24-7467 Maxwell Scientific Organization, 212 Submitted: March 1, 212 Accepted: April 4, 212 Published: July 15,

More information

Non-welded Concrete Filled -Bilateral Steel Plate Composite Shear Walls Using Bolt Connection: Theoretical Analysis of Deformation

Non-welded Concrete Filled -Bilateral Steel Plate Composite Shear Walls Using Bolt Connection: Theoretical Analysis of Deformation Non-welded Concrete Filled -Bilateral Steel Plate Composite Shear Walls Using Bolt Connection: Theoretical Analysis of Deformation *Li-meng Zhu 1), Chunwei Zhang 2) and Hongmei Xiao 3) 1), 2) School of

More information

Research on Sustainable Utilization of Shallow Geothermal Resources in Beijing, China

Research on Sustainable Utilization of Shallow Geothermal Resources in Beijing, China Proceedings World Geothermal Congress 2015 Yu Yuan, China, 19-25 April 2015 Research on Sustainable Utilization of Shallow Geothermal Resources in Beijing, China Yu Yuan, Zheng Jia and Zou Yuanlin China

More information

Comprehensive experimental study on prevention of land subsidence caused by dewatering in deep foundation pit with hanging waterproof curtain

Comprehensive experimental study on prevention of land subsidence caused by dewatering in deep foundation pit with hanging waterproof curtain Proc. IAHS, 372, 1 5, 2015 doi:10.5194/piahs-372-1-2015 Author(s) 2015. CC Attribution 3.0 License. Comprehensive experimental study on prevention of land subsidence caused by dewatering in deep foundation

More information

Sensors & Transducers, Vol. 167, Issue 3, March 2014, pp

Sensors & Transducers, Vol. 167, Issue 3, March 2014, pp Sensors & Transducers 2014 by IFSA Publishing, S. L. http://www.sensorsportal.com Experimental Study on the Rupture Process and Hydraulic Pressure Critical Condition about Two Kinds of Typical Raw Coal

More information

The lifting and separating system for ground maneuvering rescue equipment

The lifting and separating system for ground maneuvering rescue equipment Paper No. 102 ISMS 2016 The lifting and separating system for ground maneuvering rescue equipment GAO Yukun, GONG Xuejiao, HUANG Zhian*, ZHANG Yinghua State Key Laboratory of High-Efficient Mining and

More information

Experimental study on seismic behavior of composite concrete and

Experimental study on seismic behavior of composite concrete and 6 th International Conference on Advances in Experimental Structural Engineering 11 th International Workshop on Advanced Smart Materials and Smart Structures Technology August 1-2, 215, University of

More information

Application of Sequence Control Injection in Modified Design of Car Front Bumper

Application of Sequence Control Injection in Modified Design of Car Front Bumper IOP Conference Series: Materials Science and Engineering OPEN ACCESS Application of Sequence Control Injection in Modified Design of Car Front Bumper To cite this article: Wang Feng et al 2014 IOP Conf.

More information

Long-term Stress of Simply Supported Steel-concrete Composite Beams

Long-term Stress of Simply Supported Steel-concrete Composite Beams The Open Construction and Building Technology Journal, 2011, 5, 1-7 1 Open Access Long-term Stress of Simply Supported Steel-concrete Composite Beams Min Ding 1,2, Xiugen Jiang 1, Zichen Lin 3 and Jinsan

More information

Introduction to Longwall Mining and Subsidence

Introduction to Longwall Mining and Subsidence Introduction to Longwall Mining and Subsidence Prepared by Mine Subsidence Engineering Consultants Level 1 / 228 Victoria Avenue Chatswood NSW 2067 PO Box 3047 Willoughby North NSW 2068 Tel. (02) 9413

More information

The construction technology of Chongqing Chaotianmen Bridge

The construction technology of Chongqing Chaotianmen Bridge The construction technology of Chongqing Chaotianmen Bridge Zhongfu Xiang School of Civil Engineering & Architectures, Chongqing Jiaotong University, Chongqing, China Wei Xu China zhongtie major bridge

More information

Analysis of Shear Wall Transfer Beam Structure LEI KA HOU

Analysis of Shear Wall Transfer Beam Structure LEI KA HOU Analysis of Shear Wall Transfer Beam Structure by LEI KA HOU Final Year Project report submitted in partial fulfillment of the requirement of the Degree of Bachelor of Science in Civil Engineering 2013-2014

More information

Bruce Hebblewhite (BBUGS 12 September, 2013)

Bruce Hebblewhite (BBUGS 12 September, 2013) A review of current international thick seam mining practices and geotechnical challenges (An expanded presentation on thick seam mining, based on the Morgantown 2013 conference presentation) Bruce Hebblewhite

More information

The New Incremental Launching Construction Technology of Jiubao Bridge Long-span Hybrid Arch-girder Structure

The New Incremental Launching Construction Technology of Jiubao Bridge Long-span Hybrid Arch-girder Structure The New Incremental Launching Construction Technology of Jiubao Bridge Long-span Hybrid Arch-girder Structure C.Y. Shao Shanghai Municipal Engineering Design & Research General Institute (Group) Co. Ltd.,

More information

Managing the geotechnical aspects of longwall face recovery

Managing the geotechnical aspects of longwall face recovery University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2010 Managing the geotechnical aspects of longwall face recovery David Hill Strata Engineering

More information

EXPERIMENTAL RESEARCH ON THE MECHANICAL PROPERTIES OF SHEAR CONNECTORS FOR COMPOSITE BEAM BRIDGE

EXPERIMENTAL RESEARCH ON THE MECHANICAL PROPERTIES OF SHEAR CONNECTORS FOR COMPOSITE BEAM BRIDGE Blucher Mechanical Engineering Proceedings May 2014, vol. 1, num. 1 www.proceedings.blucher.com.br/evento/10wccm EXPERIMENTAL RESEARCH ON THE MECHANICAL PROPERTIES OF SHEAR CONNECTORS FOR COMPOSITE BEAM

More information

Finite Element Simulation on the Roller Pressure during the Rolling of Glass

Finite Element Simulation on the Roller Pressure during the Rolling of Glass Journal of Materials Science and Chemical Engineering, 2017, 5, 168-174 http://www.scirp.org/journal/msce ISSN Online: 2327-6053 ISSN Print: 2327-6045 Finite Element Simulation on the Roller Pressure during

More information

Deformation Modes of the Graded Closed-Cell Foam under Impact Loading Jiang-long WANG, Xin LI and Gen-wei WANG*

Deformation Modes of the Graded Closed-Cell Foam under Impact Loading Jiang-long WANG, Xin LI and Gen-wei WANG* 2016 International Conference on Applied Mechanics, Electronics and Mechatronics Engineering (AMEME 2016) ISBN: 978-1-60595-357-1 Deformation Modes of the Graded Closed-Cell Foam under Impact Loading Jiang-long

More information

RESEARCH ON LOAD SPECTRUM OF AERO HYDRAULIC PUMP BASED ON ACCELERATED DEGRADATION TESTING

RESEARCH ON LOAD SPECTRUM OF AERO HYDRAULIC PUMP BASED ON ACCELERATED DEGRADATION TESTING RESEARCH ON LOAD SPECTRUM OF AERO HYDRAULIC PUMP BASED ON ACCELERATED DEGRADATION TESTING Chen Juan*, Zhang Jian*, Li Jia** *School of Mechanical Engineering and Automation, Beihang University, Beijing

More information

The Failure Behavior of Composite Honeycomb Sandwich Structure with. Stringer Reinforcement and Interfacial Debonding

The Failure Behavior of Composite Honeycomb Sandwich Structure with. Stringer Reinforcement and Interfacial Debonding ICCM015, 14-17 th July, Auckland, NZ The Failure Behavior of Composite Honeycomb Sandwich Structure with Stringer Reinforcement and Interfacial Debonding *Ruixiang Bai 1, S.H. Bao ¹, X.Y. Liu, and X.H.

More information

Study on the Determination Method of the Inclination of the Large Height Chute

Study on the Determination Method of the Inclination of the Large Height Chute American Journal of Chemical Engineering 2018; 6(1): 7-11 http://www.sciencepublishinggroup.com/j/ajche doi: 10.11648/j.ajche.20180601.12 ISSN: 2330-8605 (Print); ISSN: 2330-8613 (Online) Conference Paper

More information

Research on the mechanism of weld-line movement of. U-shape TWB parts

Research on the mechanism of weld-line movement of. U-shape TWB parts 5th International Conference on Advanced Engineering Materials and Technology (AEMT 2015) Research on the mechanism of weld-line movement of U-shape TWB parts Yong Gan 1, a, Xi Qin 1, b*, Hanchao Wang

More information

On Mechanical Characteristics of Stiffening Suspension Cable Reinforced Steel Truss Bridge X.B. SU, S.H. GONG & J.N. SU

On Mechanical Characteristics of Stiffening Suspension Cable Reinforced Steel Truss Bridge X.B. SU, S.H. GONG & J.N. SU 5th International Conference on Civil, Architectural and Hydraulic Engineering (ICCAHE 216) On Mechanical Characteristics of Stiffening Suspension Cable Reinforced Steel Truss Bridge X.B. SU, S.H. GONG

More information

Numerical Simulation of Liquefaction Deformation of Sand Layer around Bucket Foundations under Dynamic Loadings

Numerical Simulation of Liquefaction Deformation of Sand Layer around Bucket Foundations under Dynamic Loadings The Open Ocean Engineering Journal, 2010, 3, 75-81 75 Open Access Numerical Simulation of Liquefaction Deformation of Sand Layer around Bucket Foundations under Dynamic Loadings Chi Li 1,*, Xiaobing Lu

More information

Load Transferring Mechanism and Design Method of Effective Detailings for Steel Tube-Core Concrete Interaction in CFT Columns with Large-Section

Load Transferring Mechanism and Design Method of Effective Detailings for Steel Tube-Core Concrete Interaction in CFT Columns with Large-Section International Journal of High-Rise Buildings September 2018, Vol 7, No 3, 223-232 https://doi.org/10.21022/ijhrb.2018.7.3.223 International Journal of High-Rise Buildings www.ctbuh-korea.org/ijhrb/index.php

More information

Research on the mechanical properties of the castellated lightweight steel portal frame

Research on the mechanical properties of the castellated lightweight steel portal frame Advanced Materials Research Online: 2011-05-17 ISSN: 1662-8985, Vols. 243-249, pp 1267-1271 doi:10.4028/www.scientific.net/amr.243-249.1267 2011 Trans Tech Publications, Switzerland Research on the mechanical

More information

Bucyrus International, Inc.

Bucyrus International, Inc. Bucyrus International, Inc. Seminar on EU environmental legislation for the extractive industry and on exploration in the EU 18-19 November 2008 Belgrade, Serbia Underground coal mining in international

More information

Large Storage Tanks Foundation Settlement Structural Mechanics Characteristics Analysis

Large Storage Tanks Foundation Settlement Structural Mechanics Characteristics Analysis 2017 Joint International Conference on Materials Science and Engineering Application (ICMSEA 2017) and International Conference on Mechanics, Civil Engineering and Building Materials (MCEBM 2017) ISBN:

More information

EXPRIMENTAL STUDY ON COMPRESSIVE STRENGTH OF RECYCLED CONCRETE HOLLOW BLOCK MASONRY

EXPRIMENTAL STUDY ON COMPRESSIVE STRENGTH OF RECYCLED CONCRETE HOLLOW BLOCK MASONRY EXPRIMENTAL STUDY ON COMPRESSIVE STRENGTH OF RECYCLED CONCRETE HOLLOW BLOCK MASONRY Fengjian ZHANG (1) (3), Guoliang BAI (1), Yuyi AN (1), Hui XIAO (2), and Zonggang QUAN (2) (1) Xi an University of Architecture

More information

Underground CMM Capture and Emission Reduction - a case study

Underground CMM Capture and Emission Reduction - a case study Underground CMM Capture and Emission Reduction - a case study Dr Hua Guo, GMI Coal Mines Subcommittee Best Practices Workshop 30 March 2016 COMMONWEALTH SCIENTIFIC AND INDUSTRIAL RESEARCH ORGANISATION,

More information

Study of Thickness Effect on Fracture Toughness of High Grade Pipeline Steel

Study of Thickness Effect on Fracture Toughness of High Grade Pipeline Steel Study of Thickness Effect on Fracture Toughness of High Grade Pipeline Steel Hua ZHANG 1,,a,*, Hong ZHANG 1,b, Xinwei ZHAO,c,Yalong WANG,d and Na LI.e 1 China University of Petroleum-Beijing, Beijing 1049,China

More information

Research on vibration and sound radiation characteristics of ship stiffened composite plate structure

Research on vibration and sound radiation characteristics of ship stiffened composite plate structure Research on vibration and sound radiation characteristics of ship stiffened composite plate structure Fu-zhen PANG 1 ; Hong-bao SONG ; Xu-hong MIAO 1 College of Shipbuilding Engineering, Harbin Engineering

More information

Optimization and Stress Analysis of Underground Oil Pipelines in High and Steep Slope Areas

Optimization and Stress Analysis of Underground Oil Pipelines in High and Steep Slope Areas Send Orders for Reprints to reprints@benthamscience.ae The Open Civil Engineering Journal, 215, 9, 477-483 477 Open Access Optimization and Stress Analysis of Underground Oil Pipelines in High and Steep

More information

Council on Tall Buildings

Council on Tall Buildings Structure Design of Sino Steel (Tianjin) International Plaza Xueyi Fu, Group Chief Engineer, China Construction Design International 1 1 Brief of Project 2 Location: Tianjin Xiangluowan Business District

More information

An Extrusion Die with Twin Cavities for Semi-hollow Al-Profiles

An Extrusion Die with Twin Cavities for Semi-hollow Al-Profiles An Extrusion Die with Twin Cavities for Semi-hollow Al-Profiles Xuemei Huang 1,a, Rurong Deng 2,b * 1,2 Guangzhou Vocational College of Science and Technology, Guangzhou, 510550, China a Email: 41784402@qq.com,

More information

Relationship between twin tunnels distance and surface subsidence in soft ground of Tabriz Metro - Iran

Relationship between twin tunnels distance and surface subsidence in soft ground of Tabriz Metro - Iran University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2012 Relationship between twin tunnels distance and surface subsidence in soft ground

More information

Design and Finite Element Analysis of A Spatial Tubular Truss and Its Pin Support

Design and Finite Element Analysis of A Spatial Tubular Truss and Its Pin Support 28 September 2 October 2009, Universidad Politecnica de Valencia, Spain Alberto DOMINGO and Carlos LAZARO (eds.) Design and Finite Element Analysis of A Spatial Tubular Truss and Its Pin Support Wen YANG*,

More information

Analysis and Research on Control Technology of Large Mining Height Fully Mechanized Face and Roadway Surrounding Rock

Analysis and Research on Control Technology of Large Mining Height Fully Mechanized Face and Roadway Surrounding Rock Journal of Geography and Cartography (2018) doi: - Original Research Article Analysis and Research on Control Technology of Large Mining Height Fully Mechanized Face and Roadway Surrounding Rock Shuya

More information

Zoning Supporting Design of Deep Foundation Pit Based on Controlling Deformation of Surrounding Buildings

Zoning Supporting Design of Deep Foundation Pit Based on Controlling Deformation of Surrounding Buildings International Journal of Architecture, Arts and Applications 2017; 3(5): 73-78 http://www.sciencepublishinggroup.com/j/ijaaa doi: 10.11648/j.ijaaa.20170305.12 ISSN: 2472-1107 (Print); ISSN: 2472-1131 (Online)

More information

Numerical Simulation of Flexural-tensile Properties of Reinforced Concrete Beam

Numerical Simulation of Flexural-tensile Properties of Reinforced Concrete Beam American Journal of Engineering and Applied Sciences Original Research Paper Numerical Simulation of Flexural-tensile Properties of Reinforced Concrete Beam 1,2 Shi Di, 2 Wang Juan and 1 Liu Jianjun 1

More information