1 CLEVELAND REGIONAL JETPORT PART 1 - GENERAL SECTION STRUCTURAL STEEL 1.1 RELATED SPECIFICATION SECTIONS: A. Bolting of wood to steel, steel anchors for work of other trades, concrete reinforcing steel, steel joists, metal deck, miscellaneous metals (loose lintels, etc.), and installation of loose lintels, embedded steel, etc. 1.2 QUALIFICATIONS: A. Fabricator shall have not less than 5 years experience in fabrication of structural steel for projects of similar scope. B. Steel Erector shall have not less than 5 years experience in the erection of structural steel structures of magnitude similar to the proposed structure. 1.3 QUALITY ASSURANCE: A. The latest edition of the following regulations, standards, etc. are hereby included in and made a part of these specifications: 1. American Institute of Steel Construction: a. AISC Specification for the Design, Fabrication and Erection of Structural Steel for Buildings. b. AISC Code of Standard Practice. c. Structural Joints Using ASTM A325 or A490 Bolts, by the Research Council on Riveted and Bolted Structural Joints. d. AISC Quality Criteria and Inspection Standards. 2. American Welding Society a. AWS Structural Welding Code. b. AWS Welding Symbols. c. AWS Gas Metal-Arc Welding with CO2 Shielding. d. AWS Non-Destructive Testing Symbols. 3. American Society for Testing and Materials (ASTM): a. A6, General Requirements for Delivery. b. A325, H. S. Bolts. 1.4 ERECTION TOLERANCES: A. Plumb, level and align individual pieces in accordance with the requirements of the Code of Standard Practice of the AISC. 1.5 SUBMITTALS: Submit shop drawings detailing fabrication and erection of structural steel components. A. Include details of cuts, connections, splices, camber, holes and other pertinent data.

2 CLEVELAND REGIONAL JETPORT B. Indicate welds by standard AWS symbols, distinguishing between shop and field welds and show size, length and type of each weld. C. Indicate type, size and length of bolts, distinguishing between shop and field bolts. Identify high-strength bolted slip critical, direct tension or tensioned shear/bearing connections. D. Submit copies of Welder s qualification certifications. 1.6 DELIVERY, STORAGE AND HANDLING: A. Deliver structural steel to Project site in such quantities and at such times to ensure continuity of installation. B. Store materials to permit easy access for inspection and identification. Keep steel members off ground by using pallets, platforms or other supports. Protect steel members and packaged materials from erosion and deterioration. 1. Do not store materials on structure in a manner that might cause distortion or damage to members or supporting structures. Repair or replace damaged materials or structures as directed. 1.7 SEQUENCING, SCHEDULING AND PROCEDURES: A. The Contractor shall review the structural capabilities of areas to be used for lifting devices, material delivery and storage and shall not exceed design loads without taking appropriate steps to compensate for the anticipated loads exceeding design loads. B. Any modifications, temporary or permanent, to the buildings structural frame required to support erection equipment (including trucks, cranes and other devices) and its load shall be made by the Contractor at his own expense and as subject to review and directives of the Architect/Engineer. C. Any redesign by the Contractor for his own convenience requires approval of the Architect/Engineer and is to be paid for by the Contractor. D. Place Contractor s lifting equipment in location approved by the Architect/Engineer. E. The Contractor shall furnish and place any temporary guys, braces or false-work required to stabilize the structural steel during erection and it shall not be removed until the structure is fully erected, including bracing elements provided by other trades such as masonry, and bolted or welded. F. The Contractor shall cooperate fully with authorized personnel making inspections of both shop and field operations. The Contractor will provide access to scaffolds and work platforms and any necessary manpower to assist in the inspection of welding and bolting.

3 CLEVELAND REGIONAL JETPORT TESTING AND INSPECTION: A. Owner shall provide an independent testing laboratory to check structural steel erection for compliance with AISC Specifications including Part 6 of Structural Joints Using ASTM A325 or A490 Bolts. Contractor shall coordinate erection and testing to facilitate construction. B. Inspection will be required of a random selection of 10% of all high strength shop and field bolting. To be acceptable, 95% of all bolts tested shall meet design tension, and no bolt shall test to less than 85% of design tension. If the bolting fails to meet this requirement, bolts shall be rewoked by the Contractor and additional tests of 50% of all bolts shall be made until the above requirements are met. All bolted connections of members and supports of trusses shall be inspected. C. Where field welding has been used for structural connections, testing laboratory will perform visual inspections of a minimum of 50% of welds. Should any welds fail, then 100% of welds shall be inspected. All welded connections of trusses shall be inspected. PART 2 - PRODUCTS 2.1 MATERIALS: A. : W shape: ASTM A-992, Others: ASTM A-36. B. High-Strength Bolts: ASTM A325 or ASTM A490. C. Unfinished Bolts: ASTM A307. D. Structural Tubes: ASTM A500, Grade C. E. Pipe: ASTM A501. F. Filler Metal: E70 electrodes or equivalent. Electrodes shall be as recommended by their manufacturers for the position and other conditions of actual use. G. Shop Paint: SSPC-Paint 15, Type I, red oxide. Where steel is exposed (not concealed by ceilings, etc.) the finish shall be compatible with receiving final field painting. Touch-up paint used in the field shall be the same material used for the shop coat. Paint delivered to the job shall be the same material used for the shop coat. Paint shall be delivered to the job in sealed containers clearly marked with manufacturer's name and brand. 2.2 GROUT: A. Non-Metallic, Shrinkage-Resistant Grout: Premixed, factory packaged, ferrous aggregate grout, complying with ASTM C 1107, of consistency suitable for application and a 30-minute working time. 2.3 FABRICATION:

4 CLEVELAND REGIONAL JETPORT A. Fabricate structural steel in accordance with minimum requirements of AISC, except as modified or noted in these specifications. B. All members to be free from twists, buckles or open joints. Parts assembled with bolts to be in close contact, except where separators are required. All parts to be accurately made and spaced so when assembled, the parts come together and bolts enter without distortion. C. Standard AISC, latest edition, specifications to be used in determining the connections, unless otherwise shown on drawings, including number of bolts and spacing required. All connections to be bolted or welded and not interfere with architectural clearances. The best shop practices shall be followed for shearing, punching, diameter of bolt holes, spacing, machine riveting, welding, etc. D. Bearing surfaces shall be planed to true beds. Abutting surfaces shall be closely fitted. Tubular sections shall be completely seal-welded at all joints, seams and splices. E. Structural steel shall be provided with all holes for attaching wood, masonry and furring, sash angle clips and other parts. F. Fascia beams and other steel requiring accurate alignment shall be provided with slotted holes and/or washers for aligning the steel accurately. No erection bolts or other fastening parts, joints or rolled stamping names shall show on finished surfaces of exposed steel, exterior or interior. G. Welding to be done by operators qualified by AWS Standards, Welding techniques, appearances and quality shall conform to AWS Standards. Continuous jet welding may be employed at all exposed connections to furnish a smooth weld in lieu of conventional welds that require grinding. H. Loose lintels shall be of a length to provide 8-inch minimum bearing each side of opening, unless otherwise noted on drawings. I. All steel, except that which is to be encased in concrete and that which will be concealed by interior building finishes, shall receive one coat of shop paint. Steel shall be completely covered, except surfaces that are to be field welded. Paint shall be applied to thoroughly cleaned surfaces free of loose mill scale, rust, slag or flux deposits, oil, dirt, etc. Cleaning and painting shall be applied evenly to dry surfaces and shall not have runs, etc. J. Drill or punch holes at right angles to the surface of the metal. Do not make or enlarge holes by burning. Remove burrs resulting from drilling operations. K. Apply one (1) shop coat of paint after cleaning of all rust, scale, and foreign matter. Surfaces shall be dry and clean at time of paint application. 2.4 CONNECTIONS:

5 CLEVELAND REGIONAL JETPORT A. All connections shall conform to those shown on the structural drawings or as approved by Architect/Engineer. 2.5 BOLTING: A. Use high strength bolts. B. Size bolts allowing full thread engagement. C. Enter bolts into holes without damaging the thread. D. Oversize and short-slotted holes are subject to approval by Architect/Engineer. If approved for use, standard hardened washers are required to provide adequate bearing area. Place washers on the exposed face of the oversized or short-slotted hole. E. Long-slotted holes are subject to approval by the Architect/Engineer. F. Bolted connections for members with tension or compression loads shown on the drawings are slip-critical. 2.6 WELDING: A. Prior to commencing welding, joint elements are to be bolted or tacked in intimate contact and adjusted to dimensions shown on drawings with allowance for any weld shrinkage. B. Shop splices not shown on drawings will not be permitted. C. Welding shall be performed by welders currently qualified under AWS Standard Qulaification procedures to perform the type of work required. PART 3 - EXECUTION 3.1 ERECTION, INSTALLATION AND APPLICATION: A. Erection shall include setting of all column/bases and erection of all structural steel. Frame shall be erected true and plumb. Temporary bracing to be used wherever necessary to take care of all loads to which structure may be subjected, including erection equipment and operation of same. Such bracing shall remain in place as long as required for safety. As erection progresses, the work shall be securely bolted up to take care of all dead load, wind and erection stresses. Steel shall be erected level or plumb within a tolerance as recommended by AISC Code of Standard Practice. B. Check alignment, elevations, and locations of all anchor bolts. Report to Architect/Engineer all errors and proposed correcting methods prior to proceeding with corrections and base plate setting.

6 CLEVELAND REGIONAL JETPORT C. Field correction of fabrication by flame cutting will only be permitted by written prior approval of the Architect/Engineer. D. Base and Bearing Plates: Clean concrete and masonry bearing surfaces of bond reducing materials and roughen surfaces prior to setting base and bearing plates. Clean bottom surface of base and bearing plates. 1. Set base and bearing plates for structural members on wedges, shims or setting nuts as required. 2. Tighten anchor bolts after supported members have been positioned and plumbed. Do not remove wedges or shims, but if protruding, cut off flush with edge of base or bearing plate prior to packing with grout. 3. Pack grout solidly between bearing surfaces and plates so no voids remain. Finish exposed surfaces, protect installed materials and allow to cure. Grout shall be in place before any concrete is cast on the structure the base plate supports. E. No final bolting or welding shall be done until each portion of the structure has been properly aligned. Bolting shall be done with high strength friction type bolts and hardened washers, using properly calibrated and inspected torque tension wrenches. Install and tighten bolts according to RCSC's Specifications for Structural Joints using ASTM A325 or A 490 Bolts. Bolts shall be marked after tightening. Bolts shall be drawn-up tight and threads set so that nuts can not become loose. Holes for turned bolts to be inserted in the field shall be reamed in the field. Erection bolts are not to be used on exposed surfaces. Erection bolts or other surfaces and stiffeners shall not interfere with architectural clearances. Splice members only where indicated. F. Protect all adjacent finished surfaces during the progress of welding. Damaged surfaces shall be replaced at the cost of the erection contractor. G. After erection is completed, all field bolts, field welds, abrasion, etc., shall be cleaned and spot painted. Paint shall be same material used for the shop coat and shall be applied evenly with no runs, etc. H. Splices will be permitted only where indicated. I. Remove all temporary erection material (lifting hitches, column erection lugs, temporary gussets for bracing or guy cables, and related items). 3.2 CONNECTIONS: A. Connections shall comply with requirements specified in PART 2 PRODUCTS. B. Remove run-off tabs and grind surfaces smooth where the tabs interfere with fireproofing and architectural treatment. C. Do not use powder actuated fasteners for connection onto structural steel unless written permission is granted by the Architect.

7 CLEVELAND REGIONAL JETPORT PAINTING: A. Immediately after erection, spot stain field connections and abraded places with the same paint used for shop coat. B. Surfaces shall be clean and dry before painting. Apply no paint in freezing weather. C. All touch-up painting to be done by steel erector. See PAINTING for finish painting and additional requirements for steel finish and surface preparation. 3.4 FIELD QUALITY CONTROL: A. Owner shall provide the services of a testing laboratory as approved and accepted by local authorities and Architect/Engineer to provide qualified inspectors for the following inspections: 1. All shop and field connections. 2. Qualifications of welders. 3. Daily calibration of impact wrenches used for high strength bolting. 4. Visual inspections of all work after erection. B. Costs of all inspections shall be paid for by the Contractor. Testing laboratory shall send three (3) reports of all inspections directly to the Engineer and Owner and elsewhere as directed. C. Field errors shall not be corrected by burning, except with the permission of the Engineer. D. Bolted connections shall be tested for minimum fastener tension for bolt size and grade specified in conformance with the AISC. END OF SECTION

SECTION STRUCTURAL METAL FRAMING

SECTION STRUCTURAL METAL FRAMING SECTION 05100 STRUCTURAL METAL FRAMING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Structural steel framing including lintels, shelf angles, bearing plates, anchor bolts and other items as shown on

More information

SECTION STRUCTURAL STEEL

SECTION STRUCTURAL STEEL SECTION 05120 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this

More information

Mezzanines By Design Page 1

Mezzanines By Design Page 1 SECTION 05120 STRUCTURAL STEEL PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions and Division 1 apply to this Section. 1.2 SUMMARY

More information

STRUCTURAL STEEL FRAMING

STRUCTURAL STEEL FRAMING SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Section includes 1. Structural steel framing 2. Structural steel framing required for support and framing of rooftop mechanical

More information

STRUCTURAL STEEL FRAMING Section

STRUCTURAL STEEL FRAMING Section PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Structural steel. 2. Grout. 1.2 DEFINITIONS A. Structural Steel: Elements of the structural frame indicated on Drawings and as described in AISC 303,

More information

SUNY GENESEO RED JACKET DINING HALL RENOVATION SECTION STRUCTURAL STEEL FRAMING

SUNY GENESEO RED JACKET DINING HALL RENOVATION SECTION STRUCTURAL STEEL FRAMING SUNY GENESEO 051200-1 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns. PAGE 051200-1 SECTION 051200 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

A. Structural Steel: Elements of structural-steel frame, as classified by AISC 303, "Code of Standard Practice for Steel Buildings and Bridges.

A. Structural Steel: Elements of structural-steel frame, as classified by AISC 303, Code of Standard Practice for Steel Buildings and Bridges. SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

DIVISION 5 METALS SECTION STRUCTURAL STEEL

DIVISION 5 METALS SECTION STRUCTURAL STEEL DIVISION 5 METALS SECTION 05 12 00 PART 1 GENERAL 1.01 SUMMARY A. Section Includes: All labor and materials required to furnish and install the structural steel shown on the Drawings and required by these

More information

C. Miscellaneous Metal Fabricators are specified elsewhere in Division 5.

C. Miscellaneous Metal Fabricators are specified elsewhere in Division 5. SECTION 05 1200 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.01 SUMMARY A. Extent of structural steel work is shown on drawings, including schedules, notes and details to show size and location of members,

More information

Commission No Section

Commission No Section Commission No. 1511 Section 05120-1 PART ONE - GENERAL 1.1 DESCRIPTION A. Work Included: Structural steel and grout. Furnish, fabricate, mark for erection identification, pack, crate, or otherwise properly

More information

SECTION STRUCTURAL STEEL FRAMING

SECTION STRUCTURAL STEEL FRAMING SECTION 05 1200 STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Tnemec 394 Proprietary Long Form Coatings Schedule

Tnemec 394 Proprietary Long Form Coatings Schedule 1.1 PRIMER Tnemec 394 Proprietary Long Form Coatings Schedule A. Primer: Tnemec Series 394 PerimePrime Aromatic Polyurethane Mio/Zinc filled Primer applied @ 2.5-3.5 mils DFT and conforming to the following

More information

SECTION STRUCTURAL STEEL

SECTION STRUCTURAL STEEL SECTION 05120 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work under this Section shall include all materials and installation necessary to provide Structural Steel as shown and detailed on the Drawings

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 051200 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK DIVISION 5 - STRUCTURAL STEEL AND IRON WORK SECTION 05100 STRUCTURAL METAL FRAMING PART 1.00 GENERAL 1.01 SCOPE OF WORK A. Work Included: 1. 2. Structural steel complete in place. Steel joists complete

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 051200 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. The provisions of the Contract and of the Contract documents apply to this Section. 1.2 PERFORMANCE REQUIREMENTS A. Structural

More information

SECTION CASTELLATED or CELLULAR STRUCTURAL STEEL BEAMS

SECTION CASTELLATED or CELLULAR STRUCTURAL STEEL BEAMS GUIDE SPECIFICATION Manufacturer: ( Division of SteelFab, Inc. ) 8623 Old Dowd Road Charlotte, North Carolina 28214 Phone: 704.970-1027 Facsimile: 704.392-4503 SECTION 05120 CASTELLATED or CELLULAR STRUCTURAL

More information

SECTION STRUCTURAL STEEL FRAMING

SECTION STRUCTURAL STEEL FRAMING SECTION 05 12 00 STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Section includes steel elements indicated on the structural drawings. 1.2 SUBMITTALS A. Product Data: Submit copies of producer's

More information

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces.

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces. SECTION 05500- METAL FABRICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Tnemec 394 Public Bid Long Form Specification

Tnemec 394 Public Bid Long Form Specification Tnemec 394 Public Bid Long Form Specification PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011. DIVISION 05 METALS 05 12 00 STRUCTURAL STEEL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Structural steel framing members, support members. 1.2 RELATED REQUIREMENTS A. Section 05 50 00 - Metal Fabrications:

More information

SECTION METAL FLOOR PLATE STAIRS

SECTION METAL FLOOR PLATE STAIRS SECTION 05513 - METAL FLOOR PLATE STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION STRUCTURAL STEEL

SECTION STRUCTURAL STEEL SECTION 05 12 00 STRUCTURAL STEEL PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Divisions 1 Specification

More information

METALS Commissioning of Metals Structural Steel Framing Steel Studs... 2

METALS Commissioning of Metals Structural Steel Framing Steel Studs... 2 ~ 05-1 ~ 05 00 00 Metals 05 00 00 METALS... 2 05 08 00 Commissioning of Metals... 2 05 12 00 Structural Steel Framing... 2 05 12 30 Steel Studs... 2 05 45 00 METAL SUPPORT ASSEMBLIES... 2 05 50 00 METAL

More information

B. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.

B. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work. SECTION 055116 - METAL FLOOR PLATE STAIRS PART 1- GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 052100 - STEEL JOISTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections

More information

SECTION COLD-FORMED METAL TRUSSES

SECTION COLD-FORMED METAL TRUSSES SECTION 054400 COLD-FORMED METAL TRUSSES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION FABRICATED ENGINEERED STRUCTURES. A. Pre-engineered, shop-fabricated structural steel building with formed purlin framing.

SECTION FABRICATED ENGINEERED STRUCTURES. A. Pre-engineered, shop-fabricated structural steel building with formed purlin framing. PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 13 34 00 FABRICATED ENGINEERED STRUCTURES A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1

More information

SECTION STRUCTURAL STEEL FRAMING

SECTION STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 05 12 00 SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // ---// if not applicable to project. Also delete any other item or paragraph

More information

B. Shop Drawings: Include plans, elevations, sections, details, and attachments.

B. Shop Drawings: Include plans, elevations, sections, details, and attachments. SECTION 055119 - METAL GRATING STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

.2 Section Waste Management and Disposal.

.2 Section Waste Management and Disposal. Issued 2006/08/01 Section 05121 Structural Steel for Buildings Page 1 of 5 PART 1 GENERAL 1.1 RELATED SECTIONS.1 Section 01330 Submittal Procedures..2 Section 01355 Waste Management and Disposal..3 Section

More information

B. Maintain a direct channel of communication with the Engineer, and keep the General Contractor informed of the subject of such communication.

B. Maintain a direct channel of communication with the Engineer, and keep the General Contractor informed of the subject of such communication. SECTION 051000 - STRUCTURAL STEEL PART 1 GENERAL 1.01 RELATED DOCUMENTS 1.02 SCOPE A. Drawings and general provisions of the Contract, including General and Special Conditions and Division 01 Specification

More information

SECTION STRUCTURAL STEEL

SECTION STRUCTURAL STEEL PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish and install all materials, labor, equipment and incidentals required to provide structural steel shown on the Contract Drawings and as

More information

LAGUARDIA COMMUNITY COLLEGE - CUNY August 3, 2009

LAGUARDIA COMMUNITY COLLEGE - CUNY August 3, 2009 SECTION 051200 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.01 SUMMARY A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

Insulating Cellular Concrete Steel Joists Painting. A. America Society for Testing and Materials (ASTM):

Insulating Cellular Concrete Steel Joists Painting. A. America Society for Testing and Materials (ASTM): SECTION 05120 STRUCTURAL STEEL PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03342 - Insulating Cellular Concrete. 2. 05210 - Steel Joists. 3. 09900 - Painting. 1.02 REFERENCES A. America Society

More information

DOUGLAS ELEMENTARY SCHOOL STRUCTURAL STEEL FRAMING

DOUGLAS ELEMENTARY SCHOOL STRUCTURAL STEEL FRAMING SECTION 051200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

.1 American Institute of Steel Construction (AISC) Specifications for Steel Buildings AISC

.1 American Institute of Steel Construction (AISC) Specifications for Steel Buildings AISC 05 12 00 STRUCTURAL STEEL FRAMING Page 1 of 3 1 General 1.1 SECTION INCLUDES.1 Structural steel framing and support members 1.2 RELATED SECTIONS.1 Section 05 50 00 Metal Fabrications 1.3 REFERENCES.1 American

More information

PRESTON HEALTH SERVICES ARCHITECT'S NO MITCHELL-HOLLINGSWORTH NURSING & REHAB ADPH #B

PRESTON HEALTH SERVICES ARCHITECT'S NO MITCHELL-HOLLINGSWORTH NURSING & REHAB ADPH #B SECTION 05 5213 - PIPE RAILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Facility Repairs - MCAS Cherry Point - Tank Farm A SECTION STRUCTURAL STEEL 05/14

Facility Repairs - MCAS Cherry Point - Tank Farm A SECTION STRUCTURAL STEEL 05/14 SECTION 05 12 00 STRUCTURAL STEEL 05/14 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the

More information

SECTION STRUCTURAL STEEL

SECTION STRUCTURAL STEEL SECTION 051200 STRUCTURAL STEEL PART 1 GENERAL 1.1 WORK INCLUDED A. The extent of structural steel work is shown on the drawings, including schedules, notes and details to show size and location of members,

More information

CONSTRUCTION SPECIFICATION FOR STRUCTURAL STEEL

CONSTRUCTION SPECIFICATION FOR STRUCTURAL STEEL ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 906 FEBRUARY 1993 CONSTRUCTION SPECIFICATION FOR STRUCTURAL STEEL 906.01 SCOPE 906.02 REFERENCES 906.03 DEFINITIONS TABLE OF CONTENTS 906.04 SUBMISSION

More information

SECTION METAL FABRICATIONS FOR STEAM UTILITY DISTRIBUTION

SECTION METAL FABRICATIONS FOR STEAM UTILITY DISTRIBUTION PAGE 055015-1 SECTION 055015 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

SECTION STEEL JOIST FRAMING

SECTION STEEL JOIST FRAMING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 05 21 00 1. Use this section only for NCA projects. 2. Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable

More information

SECTION STRUCTURAL STEEL

SECTION STRUCTURAL STEEL SECTION 051200 STRUCTURAL STEEL PART 1 GENERAL 1.01 SECTION INCLUDES A. Structural steel framing members and support members. B. Base plates, shear stud connectors. C. Grouting under base plates. 1.02

More information

SECTION STRUCTURAL STEEL

SECTION STRUCTURAL STEEL HWY 99 & 196 TH STREET SW SECTION 05120 STRUCTURAL STEEL PART 1 GENERAL 1.1 SUMMARY A. This Section specifies the construction of all structural metal framing, including columns, beams, lintels attached

More information

SECTION Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces.

SECTION Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces. PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following: 1. Handrails and guardrails. 1.2 PERFORMANCE REQUIREMENTS A. General: In engineering railings to withstand structural loads indicated, determine

More information

Report of Special Inspections

Report of Special Inspections Project: Project Location: Report of Special Inspections Central Carolina Technical College Advanced Manufacturing Technology Training Center Sumter, South Carolina Permit Number: Owner/Address: 853 Broad

More information

DIVISION 5 METALS SECTION METAL DECKING

DIVISION 5 METALS SECTION METAL DECKING DIVISION 5 METALS SECTION 05 30 00 PART 1 GENERAL 1.01 SUMMARY A. Section Includes: All labor and materials required to furnish and install metal decking and accessories including shear connectors, closures,

More information

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR October 19, 2018 Construction Documents

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR October 19, 2018 Construction Documents SECTION 050520 - POST INSTALLED STRUCTURAL ANCHORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION MISCELLANEOUS METAL FABRICATIONS

SECTION MISCELLANEOUS METAL FABRICATIONS SECTION 05500 PART I - GENERAL 1.01 DESCRIPTION: A. Scope: Work under this Section shall include all material and installation necessary to provide Miscellaneous Metal Fabrications, as shown and detailed

More information

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2) Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction

More information

SECTION METAL STAIRS

SECTION METAL STAIRS SECTION 05 51 00 METAL STAIRS PART 1 GENERAL 1.1 SUMMARY A. Section includes steel stair frame of structural sections, with closed risers; pan to receive concrete fill stair treads and landings; integral

More information

Preassembled steel stairs with concrete-filled treads.

Preassembled steel stairs with concrete-filled treads. SECTION 055113 - PART 1 - GENERAL 1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this

More information

SECTION MISCELLANEOUS METALS

SECTION MISCELLANEOUS METALS PART 1 GENERAL 1.1 WORK OF THIS SECTION A. Contractor shall provide all labor, materials, equipment and incidentals as shown, specified and required to furnish and install all miscellaneous metal fabrications

More information

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017 SECTION 055213 - PIPE AND TUBE RAILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION WELDED STEEL PICKET FENCE. 1. Fusion welded and rackable ornamental steel picket fence system.

SECTION WELDED STEEL PICKET FENCE. 1. Fusion welded and rackable ornamental steel picket fence system. PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Fusion welded and rackable ornamental steel picket fence system. B. Related sections: 1. Section 03310 Concrete Work for post support. 2. Section 09960

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING SECTION 05400 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work of this Section shall include all materials and installation necessary to provide all cold formed metal framing. B. This Section includes:

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 055113 - METAL PAN STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

2012 VIRGINIA TECH SCHEDULE OF SPECIAL INSPECTIONS

2012 VIRGINIA TECH SCHEDULE OF SPECIAL INSPECTIONS 2012 VIRGINIA TECH SCHEDULE OF SPECIAL INSPECTIONS HECO-6 GENERAL Pre-construction conference Preconstruction meeting Scheduled by SI with the Contractor, UBO, A/E, and relevant subs prior to commencement

More information

SECTION 2 DIVISION 05 METALS

SECTION 2 DIVISION 05 METALS SECTION 2 DIVISION 05 METALS DIVISION 5 - METALS Note: This is a guide for Designers only. Contents shall not be used in lieu of specifications as part of the Designer s Contract Documents. GENERAL DESIGN:

More information

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014 STATE STRUCTION FUND DIRECTIVE 5-1 Issue date: October 2014 STRUCTURAL STEEL 1. General: It is the Fund's policy that the design of the structural steel is the prime responsibility of the project's Structural

More information

DIVISION 5 METALS BUSHEY FEIGHT MORIN ARCHITECTS INC. 473 NORTH POTOMAC STREET HAGERSTOWN, MARYLAND FAX:

DIVISION 5 METALS BUSHEY FEIGHT MORIN ARCHITECTS INC. 473 NORTH POTOMAC STREET HAGERSTOWN, MARYLAND FAX: DIVISION 5 METALS BUSHEY FEIGHT MORIN ARCHITECTS INC. 473 NORTH POTOMAC STREET HAGERSTOWN, MARYLAND 21740 301-733-5600 FAX: 301-733-5612 SECTION 05400 - COLD FORMED METAL FRAMING PART 1 GENERAL 1.1 SECTION

More information

SECTION METAL STAIRS

SECTION METAL STAIRS SECTION 05510 METAL STAIRS PART 1 GENERAL 1.01 SECTION INCLUDES A. Stairs with concrete treads. B. Stairs with metal treads. C. Structural steel stair framing and supports. D. Handrails and guards. 1.02

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING The Collective Voice of America s Steel Framing Industry The Steel Framing Industry Association (SFIA) is dedicated to expanding the market for cold-formed steel in construction through programs and initiatives

More information

HOTEL SPECIFICATION SECTION 08100

HOTEL SPECIFICATION SECTION 08100 Part 1 General HOTEL SPECIFICATION SECTION 08100 1.01 Work Included A. The work under this section shall include the furnishing of all items shown on the drawings and as specified including, but not limited

More information

SECTION PIPE AND TUBE RAILINGS

SECTION PIPE AND TUBE RAILINGS SECTION 055213- PIPE AND TUBE RAILINGS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SPECIAL INSPECTION AGREEMENT

SPECIAL INSPECTION AGREEMENT PART 1 STATEMENT OF SPECIAL INSPECTIONS When special inspection is required to be performed in accordance with International Building Code Chapter 17, a building permit cannot be issued until a statement

More information

PIPE AND TUBE RAILINGS. Evansville Christian High School RELATED DOCUMENTS 1.1

PIPE AND TUBE RAILINGS. Evansville Christian High School RELATED DOCUMENTS 1.1 SECTION 055213 - PART 1 - GENERAL 1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this

More information

D I V I S I O N 05: M E T A L S

D I V I S I O N 05: M E T A L S 05 0500 C O M M O N W O R K R E S U L T S O F M E T A L S D I V I S I O N 05: M E T A L S 05 0503 SHOP-APPLIED METAL COATINGS 05 0523 METAL FASTENINGS 05 1000 S T R U C T U R A L M E T A L F R A M I N

More information

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. SECTION 260529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. 1.2

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING SECTION 05 40 00 COLD-FORMED METAL FRAMING SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the

More information

SECTION ARCHITECTURAL PRECAST CONCRETE. A. American Society for Testing and Materials (ASTM):

SECTION ARCHITECTURAL PRECAST CONCRETE. A. American Society for Testing and Materials (ASTM): SECTION 03450 ARCHITECTURAL PRECAST CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03100 - Concrete Formwork 2. 03200 - Concrete Reinforcement 3. 03300 - Cast-in-Place Concrete 4. 03600 -

More information

Statement of Special Inspections Michigan Building Code 2012 (MBC 2012)

Statement of Special Inspections Michigan Building Code 2012 (MBC 2012) Gaines Charter Township 8555 Kalamazoo Ave SE Caledonia MI 49316 PH: 616 698-6640 Fax: 616 698-2490 www.gainestownship.org Building Department Statement of Special Inspections Michigan Building Code 2012

More information

SECTION VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT

SECTION VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT SECTION 230548 - VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 22 0548 - PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION (10705) EXTERIOR SUN CONTROL DEVICES

SECTION (10705) EXTERIOR SUN CONTROL DEVICES 10 71 13 SECTION (10705) EXTERIOR SUN CONTROL DEVICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 Part 1 General 1.01 Work Included A. The work under this section shall include the furnishing of all items shown on the drawings and as specified,

More information

SECTION ALUMINUM RAILINGS

SECTION ALUMINUM RAILINGS SECTION 05522 ALUMINUM RAILINGS PART 1 GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Aluminum pipe and tube railings. B. Related Sections include the following: 1. Division 5 Section "Ornamental

More information

E.M. Crouthamel Elementary School Souderton, PA. Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA

E.M. Crouthamel Elementary School Souderton, PA. Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA Copyright 2007 by The American Institute of Architects (AIA) Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA SECTION 05 12 00 - STRUCTURAL STEEL FRAMING

More information

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS SECTION 260548 - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Isolation pads. 2. Spring isolators. 3. Restrained spring isolators. 4. Channel

More information

East Central College HANSEN HALL LEVEL 300/400 RENOVATIONS CONSTRUCTION PACKAGE

East Central College HANSEN HALL LEVEL 300/400 RENOVATIONS CONSTRUCTION PACKAGE SECTION 220529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION TIMBER FLOATS

SECTION TIMBER FLOATS SECTION 06210 PART 1 - GENERAL 1.01 SUMMARY A. This section covers furnishing and installing the timber float framing for the pile guide area, and all other components not specifically mentioned, necessary

More information

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.

The Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers. SECTION 05 31 13 STEEL FLOOR DECKING PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 - Specification

More information

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION Page 210500-1 SECTION 210500 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate.

SECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate. SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Welded stainless steel railing systems. 1.2 RELATED SECTIONS A. Section 03300 - Cast-In-Place Concrete; coordination with substrate.

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The General Conditions, Special Conditions and Division 1 through Division 22 as set forth in

More information

***************************************************************************************************************

*************************************************************************************************************** 03450 ARCHITECTURAL PRECAST CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 45 13 ***************************************************************************************************************

More information

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 13686.00 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 230529-1 SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 1.1 SUMMARY A. Section Includes: 1. Metal pipe hangers and supports.

More information

SECTION STRUCTURAL PRECAST HOLLOW CORE SLABS

SECTION STRUCTURAL PRECAST HOLLOW CORE SLABS PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish all labor, materials, equipment and incidentals to provide a complete structural precast hollow core slab system as shown on the Contract

More information

SECTION STRUCTURAL STEEL

SECTION STRUCTURAL STEEL A NEW ADMINISTRATIVE OFFICE & STATIONHOUSE FOR FIRE & RESCUE PART 1 GENERAL 1.1 SUMMARY: A. Section Includes: SECTION 05 1200 STRUCTURAL STEEL 1. Structural steel work including schedules, notes and details

More information

SECTION METAL DECKING. A. Extent of metal decking is indicated on Plans, including basic layout for the following type of deck required:

SECTION METAL DECKING. A. Extent of metal decking is indicated on Plans, including basic layout for the following type of deck required: PART 1 GENERAL 1.1 WORK INCLUDED A. Extent of metal decking is indicated on Plans, including basic layout for the following type of deck required: 1.2 RELATED WORK 1. Metal Roof Deck. A. Structural Steel:

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB #

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # SECTION 26 0529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

BRYAN COUNTY SCHOOLS DECEMBER 2013 McALLISTER ELEMENTARY SCHOOL - RICHMOND HILL NORTH BRYAN COUNTY 3-5 SCHOOL PEMBROKE 100% GMP DOCUMENTS (1/14/2014)

BRYAN COUNTY SCHOOLS DECEMBER 2013 McALLISTER ELEMENTARY SCHOOL - RICHMOND HILL NORTH BRYAN COUNTY 3-5 SCHOOL PEMBROKE 100% GMP DOCUMENTS (1/14/2014) SECTION 13 34 19 - METAL BUILDING SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

East Central College

East Central College SECTION 230529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 WORK INCLUDES A. Base Bid and Alternate Bids: 1. Contractor provide the following hangers and supports for HVAC system

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING SECTION 05.40.00 COLD-FORMED METAL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Cold-formed metal framing for: B. Exterior load-bearing steel stud walls. 1. Interior load-bearing steel stud walls. 2.

More information

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410

GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 Note to user: These guide specifications are provided by Mid- States Concrete Products as a service to you; they are NOT specific

More information

Daytona Beach Pier Building Renovation Jun 2010

Daytona Beach Pier Building Renovation Jun 2010 SECTION 15060 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information