1 sonitec The most effective solution for integrity checking of concrete piles and deep foundations

2 Dextra sonitec WHAT IS CROSS SONIC LOGGING? Definition Crosshole Sonic Logging (CSL) is an accurate method to determine the structural integrity and homogeneity of concrete within diaphragm walls, bored piles, drilled shafts, barretes, concrete piles or augercast piles. This method is: Widely used for more than 30 years. Practical and economical for deep foundation integrity testing. Method The speed of sound wave propagation in concrete is dependent on the concrete material properties. Thus, the CSL measures the propagation time and relative energy of an ultrasonic pulse between an ultrasonic transmitter and receiver in two parallel waterfilled tubes installed at a specific spacing within the deep foundation element during Steel rebar CSL tubes Ultrasonic pulse Typical tube configuration for a pile (diameter 1000 to 1400 mm) construction. The transmitter and receiver ultrasonic probes are lowered and lifted in unison in their respective water-filled tubes to test the full shaft length from top to bottom. Typical ultrasonic profile (response time and energy on damaged pile)

3 Dextra sonitec ABOUT sonitec The most effective solution for drilled shafts integrity check Product Features Sonitec are thin black steel tubes available in different diameters with an enlarged end in a bell mouth shape. This makes the connection between 2 tubes an easy process and minimises labour cost. The bell mouth and rubber gasket ensure a concrete-tight joint that will maintain the tube integrity and prevent the entry of foreign material. Fixing ears Product Benefits Easy assembly with PUSH-FIT concept. Fast and easy handling by operatives. Push-fit No preparation time. No power / welding / threading required. No equipment required. Easy visual inspection at site with the PUSH-FIT mark. Bell mouth with rubber gasket Additional Applications Length control Verification of the depth of the foundation. Coring Fixing ears Control that drilled shafts are socketed into bedrock. One tube is replaced by a larger diameter onr for coring (see left page). Post-grouting Injection of high pressure grout Push-fit mark to validate full engagement beneath the tip of the shaft. Additional Sonitec Toe-grouting accessory ASTEC GFRP Pipes are also available for soft-eye location. GFRP cuttable nature prevents any damage to occur on the TBM head during breakthrough. Rubber cap reinforced with steel cap

4 Assembly Instructions Install the bottom cap onto the end of the first tube. Install the first tube in the rebar cage and fix it to the reinforcement by tying steel wire around the tube and through the fixing ears Proceed with first cage installation. Simply push the upper tube section into the first tube. Prepare the next section of the tube in the upper cage and fix it similarly as described in step 2. Validate the assembly by aligning the yellow mark with the rubber gasket. Lift and approach the second cage. Connect reinforcement Secure the assembly by connecting tightly the ears of both tubes with steel wires. Repeat the process for all other tubes and cage segments. Installation sequence video dextragroup.com/sonitec

5 Foundation Type Bored piles (Ø < 1,000 mm) Bored piles (Ø > 1,000 mm) Diaphragm wall & barrettes Product Specifications & Performance Product Name ST 50* ST50-2mm* ST 75 ST 100 ST 110 ST 150 Nominal Diameter 50 mm (2 ) 50 mm (2 ) 88 mm (3 ) 102 mm (4 ) 112 mm (4 ) mm (6 ) Wall Thickness 1.00 mm 2.00 mm 1.20 mm 1.50 mm 1.50 mm 1.50 mm Standard Length 5.80 m 5.80 m 5.80 m 5.80 m 5.80 m 5.80 m Weight 7 kg 14 kg 15 kg 22 kg 24 kg 35 kg Waterproofness Up to 200 m Up to 200 m Up to 100 m Up to 100 m Up to 100 m Up to 100 m Bell mouth pull out strength Fixing ear loading capacity 40 kg 40 kg 50 kg 50 kg 50 kg 65 kg 150 kg 150 kg 150 kg 150 kg 150 kg 150 kg * Gaskets are made with high performance synthetic rubber, improving durability and UV resistance. Welded steel cap available on request. Other wall thicknesses and lengths availabe upon request. Quality Control Manufactured under Quality Management System - ISO Tested under supervision of Bureau Veritas & SGS. Compliant with ASTM D6760 Standard Test Method for Integrity testing by ultrasonic crosshole testing. 100% verified in factory: each Sonitec is tested for leakage. Recommendation for Storage As Sonitec tubes are made of black steel, if subjested to normal weather conditions discoloration may occur. To avoid this issue, please note the following instructions: Cover the steel tubes with tarpaulin or keep the steel tubes in a covered area or closed container. Avoid exposing them to environmental conditions (humidity, rain, heat...). For better storage conditions and easy tube management on site, storage containers are available upon request.

6 Some Major References sonitec Causeway Bridge, Kuwait Bangkok MRT, Thailand Commercial presence in more than 55 countries. HEADQUARTERS THAILAND Dextra Manufacturing Co., Ltd. Tel: (66) Fax: (66) thailand@dextragroup.com EUROPE Dextra Europe SARL. Tel: (33) Fax: (33) europe@dextragroup.com NORTH AMERICA Dextra America Inc. Tel: (1) / america@dextragroup.com Manufactured in CHINA Dextra Building Products (Guangdong) Co., Ltd. Tel: (86) Fax: (86) china@dextragroup.com MIDDLE EAST Dextra Middle-East FZE Tel: (971) Fax: (971) middleeast@dextragroup.com LATIN AMERICA Dextra Latam Tel: (507) / latam@dextragroup.com HONG KONG Dextra Pacific Ltd. Tel: (852) / Fax: (852) / dplbuilding@dextragroup.com INDIA Dextra India Pvt. Ltd. Tel: (91) / Fax: (91) india@dextragroup.com SOUTH AMERICA Dextra do Brasil Tel: (55) / brasil@dextragroup.com Sonitec Brochure - August PS+JD

Post-Tensioning Bars

Post-Tensioning Bars Post-Tensioning Bars www.dextragroup.com Post-Tensioning Bars Jahra road, Kuwait About our range Post-Tensioning bars are used for permanent works such as connecting various segments of bridge structures,

More information

Soft-Eye. Turnkey solution for efficient boring of reinforced concrete structures.

Soft-Eye. Turnkey solution for efficient boring of reinforced concrete structures. Soft-Eye Turnkey solution for efficient boring of reinforced concrete structures www.dextragroup.com 2 Dextra Soft-Eye Typical Soft-Eye locations 1 Soft-Eye at lauching shaft 2 Soft-Eye at station break-in

More information

GROUND ENGINEERING. Soil Retention & Stabilization Tunneling & Mining Deep Foundation.

GROUND ENGINEERING. Soil Retention & Stabilization Tunneling & Mining Deep Foundation. GROUND ENGINEERING Soil Retention & Stabilization Tunneling & Mining Deep Foundation www.dextragroup.com Vision To be a global leader in engineering, manufacturing and delivery of high value added quality

More information

Lesson 7 REINFORCING CAGE. Version 1-1/

Lesson 7 REINFORCING CAGE. Version 1-1/ Lesson 7 REINFORCING CAGE 7-1 Version 1-1/15 7-1 Learning Outcomes Describe cage construction Determine the circumference of a shaft and rebar cage and calculate the required number of side spacers. Explain

More information

Deep Foundation Testing, Analysis and Consulting Services

Deep Foundation Testing, Analysis and Consulting Services Deep Foundation Testing, Analysis and Consulting Services PDA Testing and Monitoring Dynamic Load Testing- APPLE Thermal Integrity Testing Crosshole Sonic Logging SPT Energy Calibration Low Strain Integrity

More information

SAMPLE SPECIFICATION for CROSSHOLE SONIC LOGGING (CSL) September 2015

SAMPLE SPECIFICATION for CROSSHOLE SONIC LOGGING (CSL) September 2015 SAMPLE SPECIFICATION for CROSSHOLE SONIC LOGGING (CSL) September 2015 Note: This sample specification contains recommended or typical quantities in parenthesis, in the format (quantity); the specifying

More information

Integrity evaluation of concrete by cross-hole sonic logging in Bangladesh

Integrity evaluation of concrete by cross-hole sonic logging in Bangladesh IABSE-JSCE Joint Conference on Advances in Bridge Engineering-III, August 2-22, 25, Dhaka, Bangladesh. ISBN: 978-984-33-933-5 Amin, Okui, Bhuiyan, Ueda (eds.) www.iabse-bd.org Integrity evaluation of concrete

More information

Deep Water Drilled Shafts for the Herrington Lake Bridge Replacement Project

Deep Water Drilled Shafts for the Herrington Lake Bridge Replacement Project Deep Water Drilled Shafts for the Herrington Lake Bridge Replacement Project Darrin Beckett, P.E. Kentucky Transportation Cabinet 49 th Southeastern Transportation Geotechnical Engineering Conference October

More information

Civil Engineering Construction I (CBE5031)

Civil Engineering Construction I (CBE5031) Civil Engineering Construction I (CBE5031) Pile Test 1 Ch. 2B Quality Control of Piles As the design and construction of buildings become more complex, it is necessary to exercise closer supervision during

More information

Sample Specifications for Testing Foundations with the Thermal Integrity Profiler (TIP)

Sample Specifications for Testing Foundations with the Thermal Integrity Profiler (TIP) September 2016 Sample Specifications for Testing Foundations with the Thermal Integrity Profiler (TIP) Note: This sample specification contains recommended or typical quantities in parenthesis, in the

More information

Using Thermal Integrity Profiling to Confirm the Structural Integrity of foundation applications

Using Thermal Integrity Profiling to Confirm the Structural Integrity of foundation applications Using Thermal Integrity Profiling to Confirm the Structural Integrity of foundation applications Authors: 1. George Piscsalko, PE, Pile Dynamics, Inc., 30725 Aurora Road, Solon, Ohio, USA, gpiscsalko@pile.com;

More information

WE ARE YOUR SOLUTION TO REBAR CAGE ALIGNMENT!

WE ARE YOUR SOLUTION TO REBAR CAGE ALIGNMENT! MANUFACTURER OF QUALITY CONCRETE ACCESSORIES PRODUCT CATALOG WE ARE YOUR SOLUTION TO REBAR CAGE ALIGNMENT! www.pieresearch.com 800. 342.2409 sales@pieresearch.com DON T LEAVE YOUR REBAR CAGE ALIGNMENT

More information

The Technical and Contractual Matters of Bored Piling Works. By Wallace Yeung Vibro (H.K.) Ltd.

The Technical and Contractual Matters of Bored Piling Works. By Wallace Yeung Vibro (H.K.) Ltd. The Technical and Contractual Matters of Bored Piling Works By Wallace Yeung Vibro (H.K.) Ltd. What is large diameter bored pile? How to construct a large diameter bored pile? Its advantages and limitation

More information

Non-Destructive Testing of Drilled Shafts Current Practice and New Method

Non-Destructive Testing of Drilled Shafts Current Practice and New Method Non-Destructive Testing of Drilled Shafts Current Practice and New Method George Piscsalko PE, Pile Dynamics, Inc., Cleveland, Ohio, USA Garland Likins PE, Pile Dynamics, Inc., Cleveland, Ohio, USA Benjamin

More information

Quality Control of Drilled Piles

Quality Control of Drilled Piles Quality Control of Drilled Piles (Drilled Shafts, Bored Piles, Augercast piles) Garland Likins, P.E. Pile Dynamics, Inc. August 2015 2015, Pile Dynamics, Inc. For a pile to successfully carry the required

More information

NDT in Grouted PT Inspection for Bridges

NDT in Grouted PT Inspection for Bridges NDT in Grouted PT Inspection for Bridges PTI Technical Conference & Exhibition Miami, FL May 8, 2007 Hong-gang gang Cao CTLGroup (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 1 of 37

More information

Capstone C O N S U L T A N T S

Capstone C O N S U L T A N T S Ultrasonic Pulse Velocity Tests These tests are primarily done to establish: the homogeneity of concrete presence of cracks, voids and other imperfections changes in quality of concrete over time this

More information

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures Preferred QC/QA Procedures The Federal Highway Administration (FHWA) has provided QC/QA guidance for this technology as noted below. The reference document also contains information about construction

More information

EVALUATION OF DEFECTS AND TOMOGRAPHY FOR CSL

EVALUATION OF DEFECTS AND TOMOGRAPHY FOR CSL EVALUATION OF DEFECTS AND TOMOGRAPHY FOR CSL Garland Likins 1, Scott Webster 2 and Mario Saavedra 3 ABSTRACT Cross-hole Sonic Logging (CSL) transmits ultrasonic pulse waves between probes in parallel tubes

More information

703 - DRILLED SHAFTS SECTION 703 DRILLED SHAFTS

703 - DRILLED SHAFTS SECTION 703 DRILLED SHAFTS SECTION 703 DRILLED SHAFTS 703.1 DESCRIPTION Construct drilled shafts by the cased or uncased method depending upon site conditions and Contract Document requirements. BID ITEMS Drilled Shaft (*) (**)

More information

Thermal Integrity Testing of Foundations. Juan F. Castellanos, P.E., FDOT State Construction Geotechnical Engineer

Thermal Integrity Testing of Foundations. Juan F. Castellanos, P.E., FDOT State Construction Geotechnical Engineer Thermal Integrity Testing of Foundations Juan F. Castellanos, P.E., FDOT State Construction Geotechnical Engineer Cross Sonic Logging (CSL) testing CSL testing Information inside tubes perimeter only.

More information

Rapid Axial Load Testing of Drilled Shafts

Rapid Axial Load Testing of Drilled Shafts Supplemental Technical Specification for Rapid Axial Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 4, 2015 1.0 GENERAL This work shall consist of performing a rapid axial

More information

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 2, 2015 1.0 GENERAL This work shall consist of furnishing all

More information

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (01/18) 1.0 GENERAL This work shall consist of furnishing all materials, equipment,

More information

Drilled Shaft. Inspection. HQ Construction Office HQ Geotechnical Division

Drilled Shaft. Inspection. HQ Construction Office HQ Geotechnical Division Drilled Shaft Inspection HQ Construction Office HQ Geotechnical Division Drilled Shafts: What are Drilled Shafts Drilled Shaft Construction Challenges of Drilled Shaft Construction The WSDOT SHAFT Special

More information

Composite Rebar for Concrete Structures. Revolution in Concrete Construction

Composite Rebar for Concrete Structures. Revolution in Concrete Construction Composite Rebar for Concrete Structures Revolution in Concrete Construction Corrosion Resistance Transportation Tunnels Mining Strength Durability Easy Site Handling & Easy Cutting Electromagnetic Neutrality

More information

VE-53-DH Downhole Seismometer Installation Instructions

VE-53-DH Downhole Seismometer Installation Instructions VE-53-DH Downhole Seismometer Installation Instructions GeoSIG Ltd, Ahronweg 5A, 5504 Othmarsingen, Switzerland Phone: + 41 44 810 2150, Fax: + 41 44 810 2350 info@geosig.com, www.geosig.com ii GS_VE-xx-DH_Installation_Instructions_V03.doc

More information

Geoprobe SDT45 Sonic Dual Tube Sampling System

Geoprobe SDT45 Sonic Dual Tube Sampling System Geoprobe SDT45 Sonic Dual Tube Sampling System Standard Operating Procedure Technical Bulletin No. MK3189 PREPARED: January, 2012 A. B. C. D. E. A. Assembled outer casing with sample sheath and liner advanced

More information

SECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate.

SECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate. SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Welded stainless steel railing systems. 1.2 RELATED SECTIONS A. Section 03300 - Cast-In-Place Concrete; coordination with substrate.

More information

Raci spacer type L ST 503I 2/7

Raci spacer type L ST 503I 2/7 RACI SPACER TYPE L Mar./10 Rev. 1.0 - General revision Editing L.Manoni Approval G.Borta 1/7 D es c ri pti o n Raci s.r.l. - via Adriano, 101 20128 Milano Italy - www.raci.it tel. +3902262351 fax +390226235215

More information

CHANGES IN 2006 SPECIFICATIONS SECTION 804 DRIVEN PILES SECTION 814 DRILLED SHAFTS

CHANGES IN 2006 SPECIFICATIONS SECTION 804 DRIVEN PILES SECTION 814 DRILLED SHAFTS CHANGES IN 2006 SPECIFICATIONS SECTION 804 DRIVEN PILES SECTION 814 DRILLED SHAFTS 2006 LADOTD ENGINEERING CONFERENCE Kim Martindale Garlington, P.E. Pavement & Geotechnical Services February 13, 2007

More information

SUPPLEMENTAL TECHNICAL SPECIFICATION

SUPPLEMENTAL TECHNICAL SPECIFICATION July 14, 2015 HIGH STRAIN DYNAMIC LOAD TESTING OF DRILLED SHAFTS 1.0 GENERAL This work shall consist of performing high-strain dynamic testing using a drop weight loading system on a test drilled shaft

More information

CEILING MOUNTED ARTICULATING JIB CRANE

CEILING MOUNTED ARTICULATING JIB CRANE SECTION 14657 CEILING MOUNTED ARTICULATING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station

More information

South-to-North Water Diversion( middle route ) China Institute of Water Resources and Hydropower Research(IWHR)

South-to-North Water Diversion( middle route ) China Institute of Water Resources and Hydropower Research(IWHR) South-to-North Water Diversion( middle route ) China Institute of Water Resources and Hydropower Research(IWHR) Contents 1 Canal 2 PCCP pipe 3 Tunnel 1 Canal The middle route runs from Danjiangkou Reservoir

More information

Large-diameter bored piles and Large-hole drillings Applications

Large-diameter bored piles and Large-hole drillings Applications Large-diameter bored piles and Large-hole drillings Applications Implenia Spezialtiefbau GmbH Robert Bosch Straße 25 D-63225 Langen Phone: +49 6103 988 345 Fax: +49 6103 988 277 Email: info.spezialtiefbau@implenia.com

More information

SEMINAR. Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013. Facilitator: Martin Larisch

SEMINAR. Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013. Facilitator: Martin Larisch SEMINAR Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013 Facilitator: Martin Larisch 1 Brief History of Piling Contractors, its capabilities and market Introduction to CFA piling

More information

SECTION HANDRAILS AND RAILINGS. A. Section Metal Fabrications: Associated metal supports.

SECTION HANDRAILS AND RAILINGS. A. Section Metal Fabrications: Associated metal supports. SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Handrails and guardrails B. Guardrails for hatches and openings. C. Safety barriers. D. Roof edge protection. 1.2 RELATED SECTIONS

More information

SPECIAL SPECIFICATION Thermal Integrity Profiler (TIP) Wire Cable Testing of Drilled Shafts

SPECIAL SPECIFICATION Thermal Integrity Profiler (TIP) Wire Cable Testing of Drilled Shafts SAMPLE SPECIFICATION FOR TESTING FOUNDATIONS With the Thermal Integrity Profiling Wire Cable System Note: This sample specification contains recommended or typical quantities in parenthesis, in the format

More information

STATE-OF-THE-ART TECHNOLOGY OF Y-JACK IN BI-DIRECTIONAL PILE TEST

STATE-OF-THE-ART TECHNOLOGY OF Y-JACK IN BI-DIRECTIONAL PILE TEST STATE-OF-THE-ART TECHNOLOGY OF Y-JACK IN BI-DIRECTIONAL PILE TEST SL, Yu 1 and Yekong, Wai 2 ABSTRACT: The innovative pile testing that is categorized as a bi-directional test method (BD) obtained worldwide

More information

THERMAL INTEGRITY PROFILING AS A DRILLED SHAFT QUALITY ASSURANCE TOOL

THERMAL INTEGRITY PROFILING AS A DRILLED SHAFT QUALITY ASSURANCE TOOL THERMAL INTEGRITY PROFILING AS A DRILLED SHAFT QUALITY ASSURANCE TOOL Mark Gaines, PE State Bridge Construction Engineer Washington State Department of Transportation September 10th, 2015 PRESENTATION

More information

SECTION ROOF EDGE SAFETY RAILING SYSTEM

SECTION ROOF EDGE SAFETY RAILING SYSTEM SECTION 07720 ROOF EDGE SAFETY RAILING SYSTEM PART 1 GENERAL 1.1 SECTION INCLUDES A. Provide and install freestanding KeeGuard Roof Edge Protection System, including pipe railings, uprights, bases, counterweights,

More information

FURTHER TECHNICAL INFORMATION IN RELATION TO THE OPERATIONS OF OUR GROUP

FURTHER TECHNICAL INFORMATION IN RELATION TO THE OPERATIONS OF OUR GROUP A. TECHNICAL INFORMATION OF OUR FOUNDATION WORKS The major types of our foundation works (with illustrative diagram, where applicable) are set out below: 1. Bored piles 0.80m 3.5m pile shaft By Grabbing

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2015

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2015 Sheet 1 of 9 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2015 Delete SECTION 703 and replace with the following: SECTION 703 DRILLED SHAFTS 703.1 DESCRIPTION

More information

SECANT PILE. Introduction:

SECANT PILE. Introduction: SECANT PILE Introduction: Over the last few decades construction of retaining walls in urban areas has grown significantly, as a result of territorial and economical development of the cities. In most

More information

DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS

DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS Implenia Spezialtiefbau GmbH Robert Bosch Straße 25 D-63225 Langen Phone: +49 6103 988 345 Fax: +49 6103 988 277 Email: info.spezialtiefbau@implenia.com

More information

Sept 30, 2004 Page 1 PRODUCT DESCRIPTION PRODUCT FEATURES

Sept 30, 2004 Page 1 PRODUCT DESCRIPTION PRODUCT FEATURES Sept 30, 2004 Page 1 PRODUCT FEATURES BASIC USES / RELATED USES LOGIX Insulated Concrete Forms are stackable, interlocking expanded polystyrene (EPS) blocks that serve as permanent formwork to create solid

More information

TETTO COLOUR. unnati me sajhedaari! Om Shree Ganesh India (P) Ltd

TETTO COLOUR. unnati me sajhedaari! Om Shree Ganesh India (P) Ltd Om Shree Ganesh India (P) Ltd COMPANY PROFILE Om Shree Ganesh India Pvt. Ltd. is a professional enterprise, is engaged in the manufacturing of the latest technology based three layers PVC colour coated

More information

Smarter. Safer. Leaner.

Smarter. Safer. Leaner. Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter

More information

PFEIFER Lifting Anchors: The original as standard for quality and a maximum of safety.

PFEIFER Lifting Anchors: The original as standard for quality and a maximum of safety. PFEIFER Lifting Anchors: The original as standard for quality and a maximum of safety. 16 PFEIFER Round Thread Exceptionally robust thread even no chance for hammer blows Not sensitive against dirt enables

More information

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011. DIVISION 05 METALS 05 12 00 STRUCTURAL STEEL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Structural steel framing members, support members. 1.2 RELATED REQUIREMENTS A. Section 05 50 00 - Metal Fabrications:

More information

WALL MOUNTED ARTICULATING JIB CRANE

WALL MOUNTED ARTICULATING JIB CRANE SECTION 14656 WALL MOUNTED ARTICULATING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and

More information

Contact our office if you would like assistance. Ex: letter of invitation for a US visa, lodging, etc.

Contact our office if you would like assistance. Ex: letter of invitation for a US visa, lodging, etc. NONDESTRUCTIVE EVALUATION (NDE) USERS SEMINAR COURSE OUTLINE October 2nd - October 4th, 2012, 8:30 am - 5:00 pm Wheat Ridge, CO USA Office > Structures/Pavements: October 2 (Tues) > Foundations: October

More information

Technical Bulletin No. MK3176. PREPARED: July, 2010

Technical Bulletin No. MK3176. PREPARED: July, 2010 Geoprobe DT45 Dual Tube Sampling System Standard Operating Procedure Technical Bulletin No. MK3176 PREPARED: July, 2010 A. B. C. D. E. A. Assembled outer casing with sample sheath and liner driven to collect

More information

CARES Technical Approval Report TA1-B 5064

CARES Technical Approval Report TA1-B 5064 CARES Technical Approval Report TA1-B 5064 Issue 1 BARUS SimGrip Standard and Positional Parallel Threaded Couplers Assessment of the BARUS SimGrip Standard and Positional Parallel Thread Coupler Product

More information

PRE-CAST YARDS / LIGHTWEIGHT PANEL / HOLLOW CORE / TELECOM MANHOLE / MRTC [SUB-WAY] / PLASTIC SHIMS

PRE-CAST YARDS / LIGHTWEIGHT PANEL / HOLLOW CORE / TELECOM MANHOLE / MRTC [SUB-WAY] / PLASTIC SHIMS PRE-CAST YARDS / LIGHTWEIGHT PANEL / HOLLOW CORE / TELECOM MANHOLE / MRTC [SUB-WAY] / PLASTIC SHIMS LONG PUN ENTERPRISE PTE LTD SPACER SPECIALIST SDN BHD FORMWORK PRODUCT CATALOGUE PRE-CAST YARDS CATERPILLAR

More information

Deep Foundation. Deep Foundation Applications

Deep Foundation. Deep Foundation Applications Deep Foundation Deep Foundation Applications 1. Soils with: High compression Low shear strength Swelling/shrinkage 2. Resist lateral loads 3. Surface erosion 4. Resist tension (anchors) 1 Typical Applications

More information

Lattice Plate Flooring

Lattice Plate Flooring Lattice Plate Flooring Introduction Pekso Precast manufacturers and supplies a range of precast concrete structural building products ranging from foundations and flooring systems that includes Lattice

More information

Implementation of this Special Provision requires a complete understanding of the following documents:

Implementation of this Special Provision requires a complete understanding of the following documents: VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR Quality Assurance/Quality Control (QA/QC) for the Construction of Deep Foundation Systems for Design-Build and PPTA Contracts November 10, 2009

More information

Guideline No.: P-08(201510) P-08 FLEXIBLE HOSE. Issued date: October 20,2015. China Classification Society

Guideline No.: P-08(201510) P-08 FLEXIBLE HOSE. Issued date: October 20,2015. China Classification Society Guideline No.: P-08(201510) P-08 FLEXIBLE HOSE Issued date: October 20,2015 China Classification Society Foreword: This Guide is a part of CCS Rules, which contains technical requirements, inspection and

More information

HA Flex LV AF /Flex SLV AF

HA Flex LV AF /Flex SLV AF HA Flex LV AF /Flex SLV AF Next generation, phthalate free, closed cell, 1-component high performance hydrophobic, hydroactive, flexible polyurethane injection grouts for waterproofing leaking joints and

More information

Lifting Sockets. Flat Lifting Sockets

Lifting Sockets. Flat Lifting Sockets Lifting sockets are widely used in the application of precast concrete construction, such as lifting beams, wall and floor slabs etc.. A reinforcement bar is to be inserted through the cross hole to transfer

More information

INDUSTRIAL PIPE FITTINGS, LLC

INDUSTRIAL PIPE FITTINGS, LLC Page 1 of 9 SPIROLITE MUNICIPAL AND INDUSTRIAL ODOR CONTROL PIPING Municipal wastewater treatment plants, industrial processes and composting facilities can be assured of trouble free transport of foul

More information

Contact our office if you would like assistance. Ex: letter of invitation for a US visa, lodging, etc.

Contact our office if you would like assistance. Ex: letter of invitation for a US visa, lodging, etc. NONDESTRUCTIVE EVALUATION (NDE) USERS SEMINAR COURSE OUTLINE October 3 - October 5, 2017, 8:30 am - 5:00 pm Wheat Ridge, CO USA Office > Structures: October 3 (Tues) > Foundations/Pavements: October 4

More information

Dr. Shiwei William Guan, Bredero Shaw a ShawCor Company, Canada, discusses the mitigation of pipe end coating disbondment due to long-term storage.

Dr. Shiwei William Guan, Bredero Shaw a ShawCor Company, Canada, discusses the mitigation of pipe end coating disbondment due to long-term storage. Dr. Shiwei William Guan, Bredero Shaw a ShawCor Company, Canada, discusses the mitigation of pipe end coating disbondment due to long-term storage. Figure 1. Concrete weight coating/mlpp pipes preserved

More information

Delta Level 1000 Hinged Lip Pit Mounted & Suspended Frame Dock Leveller

Delta Level 1000 Hinged Lip Pit Mounted & Suspended Frame Dock Leveller Delta Level 1000 Hinged Lip Pit Mounted & Suspended Frame Dock Leveller Product Description The Delta Level 1000 is one of our ranges of hinged lip dock levellers. Dock levellers are indispensable for

More information

Post-Grouting of Drilled Shaft Tips on the Sutong Bridge: A Case History

Post-Grouting of Drilled Shaft Tips on the Sutong Bridge: A Case History Post-Grouting of Drilled Shaft Tips on the Sutong Bridge: A Case History Dr. Osama Safaqah 1, P.E., Robert Bittner 2, P.E. & Xigang Zhang 3 1 Project Manager, Ben C. Gerwick, Inc., 20 California Street,

More information

Risk Management of the Restoration of Shanghai Metro Line 4

Risk Management of the Restoration of Shanghai Metro Line 4 ISGSR2007 First International Symposium on Geotechnical Safety & Risk Oct. 18~19, 2007 Shanghai Tongji University, China Risk Management of the Restoration of Shanghai Metro Line 4 X. P. Yu, W. J. Zhu

More information

MK III. James Bond Test TM MK III

MK III. James Bond Test TM MK III Promat (HK) Limited Tel: 2661 2392 Fax: 2661 2086 Website: http://www.promat.hk James Bond Test TM MK III The James Bond Tester MK III or pull off adhesion test measures the bond strength or tensile strength

More information

ITEM NN17 - DRILLED SHAFTS ITEM NN17 - DRILLED SHAFTS (LOW OVERHEAD CLEARANCE) ITEM TRIAL SHAFTS

ITEM NN17 - DRILLED SHAFTS ITEM NN17 - DRILLED SHAFTS (LOW OVERHEAD CLEARANCE) ITEM TRIAL SHAFTS DESCRIPTION A. General. This work shall consist of furnishing the materials and installing drilled shafts at the locations, dimensions, and batters shown on the contract plans or where ordered by the Engineer

More information

Developed countries require a modern infrastructure Roads Railways Power Communications Water Wastewater

Developed countries require a modern infrastructure Roads Railways Power Communications Water Wastewater Introduction to Soft Ground Tunnelling in Urban Environment Dr. Noppadol Phienwej Geotechnical and Geo-environmental environmental Engineering School of Engineering and Technology Asian Institute of Technology

More information

2012 VIRGINIA TECH SCHEDULE OF SPECIAL INSPECTIONS

2012 VIRGINIA TECH SCHEDULE OF SPECIAL INSPECTIONS 2012 VIRGINIA TECH SCHEDULE OF SPECIAL INSPECTIONS HECO-6 GENERAL Pre-construction conference Preconstruction meeting Scheduled by SI with the Contractor, UBO, A/E, and relevant subs prior to commencement

More information

Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways

Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways Hong Kong Section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link Supplementary Information In the meeting of the

More information

DSH HIGH EFFICIENCY DROPLET SEPARATOR DROPLET SEPARATOR DSH. For demanding applications

DSH HIGH EFFICIENCY DROPLET SEPARATOR DROPLET SEPARATOR DSH. For demanding applications DSH MATERIALS HIGH EFFICIENCY DROPLET SEPARATOR For demanding applications PART MATERIAL FINISHING Droplet separator Aluminium EN AW Droplet separator Mask louvre Mask louvre Stainless steel EN 1.44 (AISI16L)

More information

SECTION DECORATIVE METAL RAILINGS

SECTION DECORATIVE METAL RAILINGS SECTION 05 73 00 DECORATIVE METAL RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Vertical Stainless Steel Cable Railing System. B. Horizontal Stainless Steel Cable Railing System. 1.2 RELATED SECTIONS

More information

METHOD STATEMENT for INSTALLATION OF MICROPILE

METHOD STATEMENT for INSTALLATION OF MICROPILE METHOD STATEMENT for INSTALLATION OF MICROPILE A. MATERIAL TO BE USED 1. Grout Grout shall be mixed from Ordinary Portland Cement and clean water free from harmful substances. Usage of other cement which

More information

An Introduction to. By Michael L. Schumaker, P.E. An Introduction to Shaner Industries Metal Foundation System

An Introduction to. By Michael L. Schumaker, P.E. An Introduction to Shaner Industries Metal Foundation System An Introduction to Metal Foundation System By Michael L. Schumaker, P.E. Introduction Various types of deep foundations are routinely used to support structures. Selection of the appropriate type of deep

More information

State of Practice and Advances in Quality Control Methods for Drilled Shafts

State of Practice and Advances in Quality Control Methods for Drilled Shafts State of Practice and Advances in Quality Control Methods for Drilled Shafts George Piscsalko, P.E., 1 and Patrick Hannigan, P.E. 2 1. Pile Dynamics, Inc., 30725 Aurora Road, Solon, Ohio 44139; e-mail:

More information

Diaphragm wall Construction

Diaphragm wall Construction Diaphragm wall Construction Diaphragm wall is a continuous wall constructed in ground in to facilitate certain construction activities, such as: a) As a retaining wall b) As a cut-off provision to support

More information

SHORING & UNDERPINNING 02250

SHORING & UNDERPINNING 02250 Subsidiary of Hubbell Power Systems 210 North Allen St. Centralia, MO 65240 Phone: (573) 682-8414 Fax: (573) 682-8660 E-mail: hpscontact@hps.hubbell.com www.abchance.com This MANU-SPEC utilizes the Construction

More information

Bridge Drainage Systems

Bridge Drainage Systems Bridge Drainage Systems 2 Bridge drains made of cast iron, durable and reliable in use 3 One of the most important preconditions for the perfect functioning of bridge structures is the fast drainage of

More information

GeoEng2000 An International Conference on Geotechnical & Geological Engineering

GeoEng2000 An International Conference on Geotechnical & Geological Engineering GeoEng2000 An International Conference on Geotechnical & Geological Engineering 19-24 November 2000 Melbourne Exhibition and Convention Centre Melbourne, Australia Barrettes : A versatile foundation for

More information

Atlaspile. Full soil displacement bored pile, vibration free - low noise economical

Atlaspile. Full soil displacement bored pile, vibration free - low noise economical Atlaspile Full soil displacement bored pile, vibration free - low noise economical Atlaspile Possible applications The Atlaspile is used where more economical driven piles are not practicable for environmental

More information

Tunnelling steel pipe systems. Cost-efficient, flexible, reliable.

Tunnelling steel pipe systems. Cost-efficient, flexible, reliable. Tunnelling steel pipe systems. Cost-efficient, flexible, reliable. EN 2 You tunnel. We supply the flexible pipe systems. Tough environment, tough conditions, maximum operating reliability and simple installation.

More information

Project Address: Name of Person Completing Form:

Project Address: Name of Person Completing Form: Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties

More information

RAPID Column Formwork For the highest requirements on concrete surfaces and edge formation. Product Brochure Issue 10/2017

RAPID Column Formwork For the highest requirements on concrete surfaces and edge formation. Product Brochure Issue 10/2017 For the highest requirements on concrete surfaces and edge formation Product Brochure Issue 10/2017 Content System advantages 5 For the highest requirements on concrete surfaces and edge formation 8 For

More information

Contact our office if you would like assistance. Ex: letter of invitation for a US visa, lodging, etc.

Contact our office if you would like assistance. Ex: letter of invitation for a US visa, lodging, etc. NONDESTRUCTIVE EVALUATION (NDE) AND GEOPHYSICS USERS SEMINAR COURSE OUTLINE October 2 - October 4, 2018, 8:30 am - 5:00 pm Wheat Ridge, CO USA Office > Structures: October 2 (Tues) > Foundations/Pavements:

More information

CPM Concrete Drainage Systems

CPM Concrete Drainage Systems CPM Group Ltd offer a complete range of precast concrete manhole units from DN 900 to DN 4000 in varying depths with tongue and groove joints. A djusting units Ductile iron cover & frame Cover slab DN1200

More information

Presented by: Frank Guyamier

Presented by: Frank Guyamier FTBA Orlando Tuesday, March 20, 2012 Presented by: Frank Guyamier Project Engineer P3 PROJECT PARTNERS Public Sponsors 90% Equity Partner Design/Build Contractor 10% Equity Partner VMS Operator Federal

More information

HEBEI QIANLI RUBBER PRODUCTS CO., LTD. DRILLIN HOSE. Quality Assurance. Safety Of Mechanical Parts

HEBEI QIANLI RUBBER PRODUCTS CO., LTD. DRILLIN HOSE. Quality Assurance. Safety Of Mechanical Parts HEBEI QIANLI RUBBER PRODUCTS CO., LTD. DRILLIN HOSE T E C H N I C A L D A T A Quality Assurance Safety Of Mechanical Parts ABOUT OUR COMPANY Owing to over twenty years market experiences in supplying high-

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BUY AMERICA

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BUY AMERICA 106-5(a-f) 09 OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BUY AMERICA These Special Provisions amend, revise, and where in conflict, supersede applicable sections of the 2009 Standard

More information

National Standard of the People's Republic of China. Specification for minimum thickness of the shell of valves

National Standard of the People's Republic of China. Specification for minimum thickness of the shell of valves ICS 23.060.01 J16 National Standard of the People's Republic of China GBxxxx-xxxx Specification for minimum thickness of the shell of valves (Draft for approval) Issue Date: XXXX XX XX Implementation Date:

More information

Specifications for SWC #110: Pipe, Pipe Liner, & Liner Installation

Specifications for SWC #110: Pipe, Pipe Liner, & Liner Installation 1. Drainage Pipe Specifications Specifications for SWC #110: Pipe, Pipe Liner, & Liner Installation 1.1 Corrugated Metal, Aluminized, and Culvert Pipe (Round) Please see TDOT standard drawing D-PB-2 and

More information

SUPPLEMENTARY SECTION: STANDARD SPECIFICATIONS PAGE 1 STORMWATER MAINS & CULVERTS MAY 2018

SUPPLEMENTARY SECTION: STANDARD SPECIFICATIONS PAGE 1 STORMWATER MAINS & CULVERTS MAY 2018 STANDARD SPECIFICATIONS PAGE 1 STORMWATER MAINS & CULVERTS MAY 2018 PART 1 - GENERAL... 2 1.1 Work Included... 2 1.2 Related Sections... 2 1.3 Reference Standards... 2 1.4 Shop Drawings... 3 1.5 Certificates...

More information

PROTECT BOLLARD PROTECT FOUNDATIONS RE-USE BOLLARD

PROTECT BOLLARD PROTECT FOUNDATIONS RE-USE BOLLARD \\ PROTECT FOUNDATIONS Impact Recovery System protects foundations from damage when bollards are impacted or need replacing. Lifetime warranty! RE-USE If badly impacted bollard is removed and reinstated

More information

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)

Structural Tests and Special Inspections Form. Inspection of Fabricators (1704.2) Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction

More information

Key Technology for Grouting behind Wall of Single-formation Shaft Wall in the Surface Soil Segment of Waste Shaft

Key Technology for Grouting behind Wall of Single-formation Shaft Wall in the Surface Soil Segment of Waste Shaft An Interdisciplinary Response to Mine Water Challenges - Sui, Sun & Wang (eds) 2014 China University of Mining and Technology Press, Xuzhou, ISBN 978-7-5646-2437-8 Key Technology for Grouting behind Wall

More information

DUCTILE IRON PIPES AND FITTINGS DETAILED PRODUCTS SPECIFICATIONS

DUCTILE IRON PIPES AND FITTINGS DETAILED PRODUCTS SPECIFICATIONS DUCTILE IRON PIPES AND FITTINGS DETAILED PRODUCTS SPECIFICATIONS General All Materials shall be EN, ISO or equivalent standard and shall be supplied from approved manufacturers. According to the International

More information

Method for Installation of PEHD Manholes - a technical report with 29 self-explanatory Figures -

Method for Installation of PEHD Manholes - a technical report with 29 self-explanatory Figures - Method for Installation of PEHD Manholes - a technical report with 29 self-explanatory Figures - 1. HDPE Manhole & Chamber Design PEHD Manhole and Chamber design stipulates various manufacturing configurations

More information