sonitec The most effective solution for integrity checking of concrete piles and deep foundations
|
|
- Karen Bennett
- 5 years ago
- Views:
Transcription
1 sonitec The most effective solution for integrity checking of concrete piles and deep foundations
2 Dextra sonitec WHAT IS CROSS SONIC LOGGING? Definition Crosshole Sonic Logging (CSL) is an accurate method to determine the structural integrity and homogeneity of concrete within diaphragm walls, bored piles, drilled shafts, barretes, concrete piles or augercast piles. This method is: Widely used for more than 30 years. Practical and economical for deep foundation integrity testing. Method The speed of sound wave propagation in concrete is dependent on the concrete material properties. Thus, the CSL measures the propagation time and relative energy of an ultrasonic pulse between an ultrasonic transmitter and receiver in two parallel waterfilled tubes installed at a specific spacing within the deep foundation element during Steel rebar CSL tubes Ultrasonic pulse Typical tube configuration for a pile (diameter 1000 to 1400 mm) construction. The transmitter and receiver ultrasonic probes are lowered and lifted in unison in their respective water-filled tubes to test the full shaft length from top to bottom. Typical ultrasonic profile (response time and energy on damaged pile)
3 Dextra sonitec ABOUT sonitec The most effective solution for drilled shafts integrity check Product Features Sonitec are thin black steel tubes available in different diameters with an enlarged end in a bell mouth shape. This makes the connection between 2 tubes an easy process and minimises labour cost. The bell mouth and rubber gasket ensure a concrete-tight joint that will maintain the tube integrity and prevent the entry of foreign material. Fixing ears Product Benefits Easy assembly with PUSH-FIT concept. Fast and easy handling by operatives. Push-fit No preparation time. No power / welding / threading required. No equipment required. Easy visual inspection at site with the PUSH-FIT mark. Bell mouth with rubber gasket Additional Applications Length control Verification of the depth of the foundation. Coring Fixing ears Control that drilled shafts are socketed into bedrock. One tube is replaced by a larger diameter onr for coring (see left page). Post-grouting Injection of high pressure grout Push-fit mark to validate full engagement beneath the tip of the shaft. Additional Sonitec Toe-grouting accessory ASTEC GFRP Pipes are also available for soft-eye location. GFRP cuttable nature prevents any damage to occur on the TBM head during breakthrough. Rubber cap reinforced with steel cap
4 Assembly Instructions Install the bottom cap onto the end of the first tube. Install the first tube in the rebar cage and fix it to the reinforcement by tying steel wire around the tube and through the fixing ears Proceed with first cage installation. Simply push the upper tube section into the first tube. Prepare the next section of the tube in the upper cage and fix it similarly as described in step 2. Validate the assembly by aligning the yellow mark with the rubber gasket. Lift and approach the second cage. Connect reinforcement Secure the assembly by connecting tightly the ears of both tubes with steel wires. Repeat the process for all other tubes and cage segments. Installation sequence video dextragroup.com/sonitec
5 Foundation Type Bored piles (Ø < 1,000 mm) Bored piles (Ø > 1,000 mm) Diaphragm wall & barrettes Product Specifications & Performance Product Name ST 50* ST50-2mm* ST 75 ST 100 ST 110 ST 150 Nominal Diameter 50 mm (2 ) 50 mm (2 ) 88 mm (3 ) 102 mm (4 ) 112 mm (4 ) mm (6 ) Wall Thickness 1.00 mm 2.00 mm 1.20 mm 1.50 mm 1.50 mm 1.50 mm Standard Length 5.80 m 5.80 m 5.80 m 5.80 m 5.80 m 5.80 m Weight 7 kg 14 kg 15 kg 22 kg 24 kg 35 kg Waterproofness Up to 200 m Up to 200 m Up to 100 m Up to 100 m Up to 100 m Up to 100 m Bell mouth pull out strength Fixing ear loading capacity 40 kg 40 kg 50 kg 50 kg 50 kg 65 kg 150 kg 150 kg 150 kg 150 kg 150 kg 150 kg * Gaskets are made with high performance synthetic rubber, improving durability and UV resistance. Welded steel cap available on request. Other wall thicknesses and lengths availabe upon request. Quality Control Manufactured under Quality Management System - ISO Tested under supervision of Bureau Veritas & SGS. Compliant with ASTM D6760 Standard Test Method for Integrity testing by ultrasonic crosshole testing. 100% verified in factory: each Sonitec is tested for leakage. Recommendation for Storage As Sonitec tubes are made of black steel, if subjested to normal weather conditions discoloration may occur. To avoid this issue, please note the following instructions: Cover the steel tubes with tarpaulin or keep the steel tubes in a covered area or closed container. Avoid exposing them to environmental conditions (humidity, rain, heat...). For better storage conditions and easy tube management on site, storage containers are available upon request.
6 Some Major References sonitec Causeway Bridge, Kuwait Bangkok MRT, Thailand Commercial presence in more than 55 countries. HEADQUARTERS THAILAND Dextra Manufacturing Co., Ltd. Tel: (66) Fax: (66) thailand@dextragroup.com EUROPE Dextra Europe SARL. Tel: (33) Fax: (33) europe@dextragroup.com NORTH AMERICA Dextra America Inc. Tel: (1) / america@dextragroup.com Manufactured in CHINA Dextra Building Products (Guangdong) Co., Ltd. Tel: (86) Fax: (86) china@dextragroup.com MIDDLE EAST Dextra Middle-East FZE Tel: (971) Fax: (971) middleeast@dextragroup.com LATIN AMERICA Dextra Latam Tel: (507) / latam@dextragroup.com HONG KONG Dextra Pacific Ltd. Tel: (852) / Fax: (852) / dplbuilding@dextragroup.com INDIA Dextra India Pvt. Ltd. Tel: (91) / Fax: (91) india@dextragroup.com SOUTH AMERICA Dextra do Brasil Tel: (55) / brasil@dextragroup.com Sonitec Brochure - August PS+JD
Post-Tensioning Bars
Post-Tensioning Bars www.dextragroup.com Post-Tensioning Bars Jahra road, Kuwait About our range Post-Tensioning bars are used for permanent works such as connecting various segments of bridge structures,
More informationSoft-Eye. Turnkey solution for efficient boring of reinforced concrete structures.
Soft-Eye Turnkey solution for efficient boring of reinforced concrete structures www.dextragroup.com 2 Dextra Soft-Eye Typical Soft-Eye locations 1 Soft-Eye at lauching shaft 2 Soft-Eye at station break-in
More informationGROUND ENGINEERING. Soil Retention & Stabilization Tunneling & Mining Deep Foundation.
GROUND ENGINEERING Soil Retention & Stabilization Tunneling & Mining Deep Foundation www.dextragroup.com Vision To be a global leader in engineering, manufacturing and delivery of high value added quality
More informationLesson 7 REINFORCING CAGE. Version 1-1/
Lesson 7 REINFORCING CAGE 7-1 Version 1-1/15 7-1 Learning Outcomes Describe cage construction Determine the circumference of a shaft and rebar cage and calculate the required number of side spacers. Explain
More informationDeep Foundation Testing, Analysis and Consulting Services
Deep Foundation Testing, Analysis and Consulting Services PDA Testing and Monitoring Dynamic Load Testing- APPLE Thermal Integrity Testing Crosshole Sonic Logging SPT Energy Calibration Low Strain Integrity
More informationSAMPLE SPECIFICATION for CROSSHOLE SONIC LOGGING (CSL) September 2015
SAMPLE SPECIFICATION for CROSSHOLE SONIC LOGGING (CSL) September 2015 Note: This sample specification contains recommended or typical quantities in parenthesis, in the format (quantity); the specifying
More informationIntegrity evaluation of concrete by cross-hole sonic logging in Bangladesh
IABSE-JSCE Joint Conference on Advances in Bridge Engineering-III, August 2-22, 25, Dhaka, Bangladesh. ISBN: 978-984-33-933-5 Amin, Okui, Bhuiyan, Ueda (eds.) www.iabse-bd.org Integrity evaluation of concrete
More informationDeep Water Drilled Shafts for the Herrington Lake Bridge Replacement Project
Deep Water Drilled Shafts for the Herrington Lake Bridge Replacement Project Darrin Beckett, P.E. Kentucky Transportation Cabinet 49 th Southeastern Transportation Geotechnical Engineering Conference October
More informationCivil Engineering Construction I (CBE5031)
Civil Engineering Construction I (CBE5031) Pile Test 1 Ch. 2B Quality Control of Piles As the design and construction of buildings become more complex, it is necessary to exercise closer supervision during
More informationSample Specifications for Testing Foundations with the Thermal Integrity Profiler (TIP)
September 2016 Sample Specifications for Testing Foundations with the Thermal Integrity Profiler (TIP) Note: This sample specification contains recommended or typical quantities in parenthesis, in the
More informationUsing Thermal Integrity Profiling to Confirm the Structural Integrity of foundation applications
Using Thermal Integrity Profiling to Confirm the Structural Integrity of foundation applications Authors: 1. George Piscsalko, PE, Pile Dynamics, Inc., 30725 Aurora Road, Solon, Ohio, USA, gpiscsalko@pile.com;
More informationWE ARE YOUR SOLUTION TO REBAR CAGE ALIGNMENT!
MANUFACTURER OF QUALITY CONCRETE ACCESSORIES PRODUCT CATALOG WE ARE YOUR SOLUTION TO REBAR CAGE ALIGNMENT! www.pieresearch.com 800. 342.2409 sales@pieresearch.com DON T LEAVE YOUR REBAR CAGE ALIGNMENT
More informationThe Technical and Contractual Matters of Bored Piling Works. By Wallace Yeung Vibro (H.K.) Ltd.
The Technical and Contractual Matters of Bored Piling Works By Wallace Yeung Vibro (H.K.) Ltd. What is large diameter bored pile? How to construct a large diameter bored pile? Its advantages and limitation
More informationNon-Destructive Testing of Drilled Shafts Current Practice and New Method
Non-Destructive Testing of Drilled Shafts Current Practice and New Method George Piscsalko PE, Pile Dynamics, Inc., Cleveland, Ohio, USA Garland Likins PE, Pile Dynamics, Inc., Cleveland, Ohio, USA Benjamin
More informationQuality Control of Drilled Piles
Quality Control of Drilled Piles (Drilled Shafts, Bored Piles, Augercast piles) Garland Likins, P.E. Pile Dynamics, Inc. August 2015 2015, Pile Dynamics, Inc. For a pile to successfully carry the required
More informationNDT in Grouted PT Inspection for Bridges
NDT in Grouted PT Inspection for Bridges PTI Technical Conference & Exhibition Miami, FL May 8, 2007 Hong-gang gang Cao CTLGroup (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 1 of 37
More informationCapstone C O N S U L T A N T S
Ultrasonic Pulse Velocity Tests These tests are primarily done to establish: the homogeneity of concrete presence of cracks, voids and other imperfections changes in quality of concrete over time this
More informationCONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures
Preferred QC/QA Procedures The Federal Highway Administration (FHWA) has provided QC/QA guidance for this technology as noted below. The reference document also contains information about construction
More informationEVALUATION OF DEFECTS AND TOMOGRAPHY FOR CSL
EVALUATION OF DEFECTS AND TOMOGRAPHY FOR CSL Garland Likins 1, Scott Webster 2 and Mario Saavedra 3 ABSTRACT Cross-hole Sonic Logging (CSL) transmits ultrasonic pulse waves between probes in parallel tubes
More information703 - DRILLED SHAFTS SECTION 703 DRILLED SHAFTS
SECTION 703 DRILLED SHAFTS 703.1 DESCRIPTION Construct drilled shafts by the cased or uncased method depending upon site conditions and Contract Document requirements. BID ITEMS Drilled Shaft (*) (**)
More informationThermal Integrity Testing of Foundations. Juan F. Castellanos, P.E., FDOT State Construction Geotechnical Engineer
Thermal Integrity Testing of Foundations Juan F. Castellanos, P.E., FDOT State Construction Geotechnical Engineer Cross Sonic Logging (CSL) testing CSL testing Information inside tubes perimeter only.
More informationRapid Axial Load Testing of Drilled Shafts
Supplemental Technical Specification for Rapid Axial Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 4, 2015 1.0 GENERAL This work shall consist of performing a rapid axial
More informationBi-Directional Static Load Testing of Drilled Shafts
Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 2, 2015 1.0 GENERAL This work shall consist of furnishing all
More informationBi-Directional Static Load Testing of Drilled Shafts
Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (01/18) 1.0 GENERAL This work shall consist of furnishing all materials, equipment,
More informationDrilled Shaft. Inspection. HQ Construction Office HQ Geotechnical Division
Drilled Shaft Inspection HQ Construction Office HQ Geotechnical Division Drilled Shafts: What are Drilled Shafts Drilled Shaft Construction Challenges of Drilled Shaft Construction The WSDOT SHAFT Special
More informationComposite Rebar for Concrete Structures. Revolution in Concrete Construction
Composite Rebar for Concrete Structures Revolution in Concrete Construction Corrosion Resistance Transportation Tunnels Mining Strength Durability Easy Site Handling & Easy Cutting Electromagnetic Neutrality
More informationVE-53-DH Downhole Seismometer Installation Instructions
VE-53-DH Downhole Seismometer Installation Instructions GeoSIG Ltd, Ahronweg 5A, 5504 Othmarsingen, Switzerland Phone: + 41 44 810 2150, Fax: + 41 44 810 2350 info@geosig.com, www.geosig.com ii GS_VE-xx-DH_Installation_Instructions_V03.doc
More informationGeoprobe SDT45 Sonic Dual Tube Sampling System
Geoprobe SDT45 Sonic Dual Tube Sampling System Standard Operating Procedure Technical Bulletin No. MK3189 PREPARED: January, 2012 A. B. C. D. E. A. Assembled outer casing with sample sheath and liner advanced
More informationSECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate.
SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Welded stainless steel railing systems. 1.2 RELATED SECTIONS A. Section 03300 - Cast-In-Place Concrete; coordination with substrate.
More informationRaci spacer type L ST 503I 2/7
RACI SPACER TYPE L Mar./10 Rev. 1.0 - General revision Editing L.Manoni Approval G.Borta 1/7 D es c ri pti o n Raci s.r.l. - via Adriano, 101 20128 Milano Italy - www.raci.it tel. +3902262351 fax +390226235215
More informationCHANGES IN 2006 SPECIFICATIONS SECTION 804 DRIVEN PILES SECTION 814 DRILLED SHAFTS
CHANGES IN 2006 SPECIFICATIONS SECTION 804 DRIVEN PILES SECTION 814 DRILLED SHAFTS 2006 LADOTD ENGINEERING CONFERENCE Kim Martindale Garlington, P.E. Pavement & Geotechnical Services February 13, 2007
More informationSUPPLEMENTAL TECHNICAL SPECIFICATION
July 14, 2015 HIGH STRAIN DYNAMIC LOAD TESTING OF DRILLED SHAFTS 1.0 GENERAL This work shall consist of performing high-strain dynamic testing using a drop weight loading system on a test drilled shaft
More informationCEILING MOUNTED ARTICULATING JIB CRANE
SECTION 14657 CEILING MOUNTED ARTICULATING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station
More informationSouth-to-North Water Diversion( middle route ) China Institute of Water Resources and Hydropower Research(IWHR)
South-to-North Water Diversion( middle route ) China Institute of Water Resources and Hydropower Research(IWHR) Contents 1 Canal 2 PCCP pipe 3 Tunnel 1 Canal The middle route runs from Danjiangkou Reservoir
More informationLarge-diameter bored piles and Large-hole drillings Applications
Large-diameter bored piles and Large-hole drillings Applications Implenia Spezialtiefbau GmbH Robert Bosch Straße 25 D-63225 Langen Phone: +49 6103 988 345 Fax: +49 6103 988 277 Email: info.spezialtiefbau@implenia.com
More informationSEMINAR. Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013. Facilitator: Martin Larisch
SEMINAR Introduction to Continuous Flight Auger (CFA) piling Thursday 21/8/2013 Facilitator: Martin Larisch 1 Brief History of Piling Contractors, its capabilities and market Introduction to CFA piling
More informationSECTION HANDRAILS AND RAILINGS. A. Section Metal Fabrications: Associated metal supports.
SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Handrails and guardrails B. Guardrails for hatches and openings. C. Safety barriers. D. Roof edge protection. 1.2 RELATED SECTIONS
More informationSPECIAL SPECIFICATION Thermal Integrity Profiler (TIP) Wire Cable Testing of Drilled Shafts
SAMPLE SPECIFICATION FOR TESTING FOUNDATIONS With the Thermal Integrity Profiling Wire Cable System Note: This sample specification contains recommended or typical quantities in parenthesis, in the format
More informationSTATE-OF-THE-ART TECHNOLOGY OF Y-JACK IN BI-DIRECTIONAL PILE TEST
STATE-OF-THE-ART TECHNOLOGY OF Y-JACK IN BI-DIRECTIONAL PILE TEST SL, Yu 1 and Yekong, Wai 2 ABSTRACT: The innovative pile testing that is categorized as a bi-directional test method (BD) obtained worldwide
More informationTHERMAL INTEGRITY PROFILING AS A DRILLED SHAFT QUALITY ASSURANCE TOOL
THERMAL INTEGRITY PROFILING AS A DRILLED SHAFT QUALITY ASSURANCE TOOL Mark Gaines, PE State Bridge Construction Engineer Washington State Department of Transportation September 10th, 2015 PRESENTATION
More informationSECTION ROOF EDGE SAFETY RAILING SYSTEM
SECTION 07720 ROOF EDGE SAFETY RAILING SYSTEM PART 1 GENERAL 1.1 SECTION INCLUDES A. Provide and install freestanding KeeGuard Roof Edge Protection System, including pipe railings, uprights, bases, counterweights,
More informationFURTHER TECHNICAL INFORMATION IN RELATION TO THE OPERATIONS OF OUR GROUP
A. TECHNICAL INFORMATION OF OUR FOUNDATION WORKS The major types of our foundation works (with illustrative diagram, where applicable) are set out below: 1. Bored piles 0.80m 3.5m pile shaft By Grabbing
More informationKANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2015
Sheet 1 of 9 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2015 Delete SECTION 703 and replace with the following: SECTION 703 DRILLED SHAFTS 703.1 DESCRIPTION
More informationSECANT PILE. Introduction:
SECANT PILE Introduction: Over the last few decades construction of retaining walls in urban areas has grown significantly, as a result of territorial and economical development of the cities. In most
More informationDIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS
DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS Implenia Spezialtiefbau GmbH Robert Bosch Straße 25 D-63225 Langen Phone: +49 6103 988 345 Fax: +49 6103 988 277 Email: info.spezialtiefbau@implenia.com
More informationSept 30, 2004 Page 1 PRODUCT DESCRIPTION PRODUCT FEATURES
Sept 30, 2004 Page 1 PRODUCT FEATURES BASIC USES / RELATED USES LOGIX Insulated Concrete Forms are stackable, interlocking expanded polystyrene (EPS) blocks that serve as permanent formwork to create solid
More informationTETTO COLOUR. unnati me sajhedaari! Om Shree Ganesh India (P) Ltd
Om Shree Ganesh India (P) Ltd COMPANY PROFILE Om Shree Ganesh India Pvt. Ltd. is a professional enterprise, is engaged in the manufacturing of the latest technology based three layers PVC colour coated
More informationSmarter. Safer. Leaner.
Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter
More informationPFEIFER Lifting Anchors: The original as standard for quality and a maximum of safety.
PFEIFER Lifting Anchors: The original as standard for quality and a maximum of safety. 16 PFEIFER Round Thread Exceptionally robust thread even no chance for hammer blows Not sensitive against dirt enables
More informationK. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.
DIVISION 05 METALS 05 12 00 STRUCTURAL STEEL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Structural steel framing members, support members. 1.2 RELATED REQUIREMENTS A. Section 05 50 00 - Metal Fabrications:
More informationWALL MOUNTED ARTICULATING JIB CRANE
SECTION 14656 WALL MOUNTED ARTICULATING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and
More informationContact our office if you would like assistance. Ex: letter of invitation for a US visa, lodging, etc.
NONDESTRUCTIVE EVALUATION (NDE) USERS SEMINAR COURSE OUTLINE October 2nd - October 4th, 2012, 8:30 am - 5:00 pm Wheat Ridge, CO USA Office > Structures/Pavements: October 2 (Tues) > Foundations: October
More informationTechnical Bulletin No. MK3176. PREPARED: July, 2010
Geoprobe DT45 Dual Tube Sampling System Standard Operating Procedure Technical Bulletin No. MK3176 PREPARED: July, 2010 A. B. C. D. E. A. Assembled outer casing with sample sheath and liner driven to collect
More informationCARES Technical Approval Report TA1-B 5064
CARES Technical Approval Report TA1-B 5064 Issue 1 BARUS SimGrip Standard and Positional Parallel Threaded Couplers Assessment of the BARUS SimGrip Standard and Positional Parallel Thread Coupler Product
More informationPRE-CAST YARDS / LIGHTWEIGHT PANEL / HOLLOW CORE / TELECOM MANHOLE / MRTC [SUB-WAY] / PLASTIC SHIMS
PRE-CAST YARDS / LIGHTWEIGHT PANEL / HOLLOW CORE / TELECOM MANHOLE / MRTC [SUB-WAY] / PLASTIC SHIMS LONG PUN ENTERPRISE PTE LTD SPACER SPECIALIST SDN BHD FORMWORK PRODUCT CATALOGUE PRE-CAST YARDS CATERPILLAR
More informationDeep Foundation. Deep Foundation Applications
Deep Foundation Deep Foundation Applications 1. Soils with: High compression Low shear strength Swelling/shrinkage 2. Resist lateral loads 3. Surface erosion 4. Resist tension (anchors) 1 Typical Applications
More informationLattice Plate Flooring
Lattice Plate Flooring Introduction Pekso Precast manufacturers and supplies a range of precast concrete structural building products ranging from foundations and flooring systems that includes Lattice
More informationImplementation of this Special Provision requires a complete understanding of the following documents:
VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR Quality Assurance/Quality Control (QA/QC) for the Construction of Deep Foundation Systems for Design-Build and PPTA Contracts November 10, 2009
More informationGuideline No.: P-08(201510) P-08 FLEXIBLE HOSE. Issued date: October 20,2015. China Classification Society
Guideline No.: P-08(201510) P-08 FLEXIBLE HOSE Issued date: October 20,2015 China Classification Society Foreword: This Guide is a part of CCS Rules, which contains technical requirements, inspection and
More informationHA Flex LV AF /Flex SLV AF
HA Flex LV AF /Flex SLV AF Next generation, phthalate free, closed cell, 1-component high performance hydrophobic, hydroactive, flexible polyurethane injection grouts for waterproofing leaking joints and
More informationLifting Sockets. Flat Lifting Sockets
Lifting sockets are widely used in the application of precast concrete construction, such as lifting beams, wall and floor slabs etc.. A reinforcement bar is to be inserted through the cross hole to transfer
More informationINDUSTRIAL PIPE FITTINGS, LLC
Page 1 of 9 SPIROLITE MUNICIPAL AND INDUSTRIAL ODOR CONTROL PIPING Municipal wastewater treatment plants, industrial processes and composting facilities can be assured of trouble free transport of foul
More informationContact our office if you would like assistance. Ex: letter of invitation for a US visa, lodging, etc.
NONDESTRUCTIVE EVALUATION (NDE) USERS SEMINAR COURSE OUTLINE October 3 - October 5, 2017, 8:30 am - 5:00 pm Wheat Ridge, CO USA Office > Structures: October 3 (Tues) > Foundations/Pavements: October 4
More informationDr. Shiwei William Guan, Bredero Shaw a ShawCor Company, Canada, discusses the mitigation of pipe end coating disbondment due to long-term storage.
Dr. Shiwei William Guan, Bredero Shaw a ShawCor Company, Canada, discusses the mitigation of pipe end coating disbondment due to long-term storage. Figure 1. Concrete weight coating/mlpp pipes preserved
More informationDelta Level 1000 Hinged Lip Pit Mounted & Suspended Frame Dock Leveller
Delta Level 1000 Hinged Lip Pit Mounted & Suspended Frame Dock Leveller Product Description The Delta Level 1000 is one of our ranges of hinged lip dock levellers. Dock levellers are indispensable for
More informationPost-Grouting of Drilled Shaft Tips on the Sutong Bridge: A Case History
Post-Grouting of Drilled Shaft Tips on the Sutong Bridge: A Case History Dr. Osama Safaqah 1, P.E., Robert Bittner 2, P.E. & Xigang Zhang 3 1 Project Manager, Ben C. Gerwick, Inc., 20 California Street,
More informationRisk Management of the Restoration of Shanghai Metro Line 4
ISGSR2007 First International Symposium on Geotechnical Safety & Risk Oct. 18~19, 2007 Shanghai Tongji University, China Risk Management of the Restoration of Shanghai Metro Line 4 X. P. Yu, W. J. Zhu
More informationMK III. James Bond Test TM MK III
Promat (HK) Limited Tel: 2661 2392 Fax: 2661 2086 Website: http://www.promat.hk James Bond Test TM MK III The James Bond Tester MK III or pull off adhesion test measures the bond strength or tensile strength
More informationITEM NN17 - DRILLED SHAFTS ITEM NN17 - DRILLED SHAFTS (LOW OVERHEAD CLEARANCE) ITEM TRIAL SHAFTS
DESCRIPTION A. General. This work shall consist of furnishing the materials and installing drilled shafts at the locations, dimensions, and batters shown on the contract plans or where ordered by the Engineer
More informationDeveloped countries require a modern infrastructure Roads Railways Power Communications Water Wastewater
Introduction to Soft Ground Tunnelling in Urban Environment Dr. Noppadol Phienwej Geotechnical and Geo-environmental environmental Engineering School of Engineering and Technology Asian Institute of Technology
More information2012 VIRGINIA TECH SCHEDULE OF SPECIAL INSPECTIONS
2012 VIRGINIA TECH SCHEDULE OF SPECIAL INSPECTIONS HECO-6 GENERAL Pre-construction conference Preconstruction meeting Scheduled by SI with the Contractor, UBO, A/E, and relevant subs prior to commencement
More informationLegislative Council Panel on Transport Subcommittee on Matters Relating to Railways
Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways Hong Kong Section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link Supplementary Information In the meeting of the
More informationDSH HIGH EFFICIENCY DROPLET SEPARATOR DROPLET SEPARATOR DSH. For demanding applications
DSH MATERIALS HIGH EFFICIENCY DROPLET SEPARATOR For demanding applications PART MATERIAL FINISHING Droplet separator Aluminium EN AW Droplet separator Mask louvre Mask louvre Stainless steel EN 1.44 (AISI16L)
More informationSECTION DECORATIVE METAL RAILINGS
SECTION 05 73 00 DECORATIVE METAL RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Vertical Stainless Steel Cable Railing System. B. Horizontal Stainless Steel Cable Railing System. 1.2 RELATED SECTIONS
More informationMETHOD STATEMENT for INSTALLATION OF MICROPILE
METHOD STATEMENT for INSTALLATION OF MICROPILE A. MATERIAL TO BE USED 1. Grout Grout shall be mixed from Ordinary Portland Cement and clean water free from harmful substances. Usage of other cement which
More informationAn Introduction to. By Michael L. Schumaker, P.E. An Introduction to Shaner Industries Metal Foundation System
An Introduction to Metal Foundation System By Michael L. Schumaker, P.E. Introduction Various types of deep foundations are routinely used to support structures. Selection of the appropriate type of deep
More informationState of Practice and Advances in Quality Control Methods for Drilled Shafts
State of Practice and Advances in Quality Control Methods for Drilled Shafts George Piscsalko, P.E., 1 and Patrick Hannigan, P.E. 2 1. Pile Dynamics, Inc., 30725 Aurora Road, Solon, Ohio 44139; e-mail:
More informationDiaphragm wall Construction
Diaphragm wall Construction Diaphragm wall is a continuous wall constructed in ground in to facilitate certain construction activities, such as: a) As a retaining wall b) As a cut-off provision to support
More informationSHORING & UNDERPINNING 02250
Subsidiary of Hubbell Power Systems 210 North Allen St. Centralia, MO 65240 Phone: (573) 682-8414 Fax: (573) 682-8660 E-mail: hpscontact@hps.hubbell.com www.abchance.com This MANU-SPEC utilizes the Construction
More informationBridge Drainage Systems
Bridge Drainage Systems 2 Bridge drains made of cast iron, durable and reliable in use 3 One of the most important preconditions for the perfect functioning of bridge structures is the fast drainage of
More informationGeoEng2000 An International Conference on Geotechnical & Geological Engineering
GeoEng2000 An International Conference on Geotechnical & Geological Engineering 19-24 November 2000 Melbourne Exhibition and Convention Centre Melbourne, Australia Barrettes : A versatile foundation for
More informationAtlaspile. Full soil displacement bored pile, vibration free - low noise economical
Atlaspile Full soil displacement bored pile, vibration free - low noise economical Atlaspile Possible applications The Atlaspile is used where more economical driven piles are not practicable for environmental
More informationTunnelling steel pipe systems. Cost-efficient, flexible, reliable.
Tunnelling steel pipe systems. Cost-efficient, flexible, reliable. EN 2 You tunnel. We supply the flexible pipe systems. Tough environment, tough conditions, maximum operating reliability and simple installation.
More informationProject Address: Name of Person Completing Form:
Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties
More informationRAPID Column Formwork For the highest requirements on concrete surfaces and edge formation. Product Brochure Issue 10/2017
For the highest requirements on concrete surfaces and edge formation Product Brochure Issue 10/2017 Content System advantages 5 For the highest requirements on concrete surfaces and edge formation 8 For
More informationContact our office if you would like assistance. Ex: letter of invitation for a US visa, lodging, etc.
NONDESTRUCTIVE EVALUATION (NDE) AND GEOPHYSICS USERS SEMINAR COURSE OUTLINE October 2 - October 4, 2018, 8:30 am - 5:00 pm Wheat Ridge, CO USA Office > Structures: October 2 (Tues) > Foundations/Pavements:
More informationCPM Concrete Drainage Systems
CPM Group Ltd offer a complete range of precast concrete manhole units from DN 900 to DN 4000 in varying depths with tongue and groove joints. A djusting units Ductile iron cover & frame Cover slab DN1200
More informationPresented by: Frank Guyamier
FTBA Orlando Tuesday, March 20, 2012 Presented by: Frank Guyamier Project Engineer P3 PROJECT PARTNERS Public Sponsors 90% Equity Partner Design/Build Contractor 10% Equity Partner VMS Operator Federal
More informationHEBEI QIANLI RUBBER PRODUCTS CO., LTD. DRILLIN HOSE. Quality Assurance. Safety Of Mechanical Parts
HEBEI QIANLI RUBBER PRODUCTS CO., LTD. DRILLIN HOSE T E C H N I C A L D A T A Quality Assurance Safety Of Mechanical Parts ABOUT OUR COMPANY Owing to over twenty years market experiences in supplying high-
More informationOKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BUY AMERICA
106-5(a-f) 09 OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISIONS FOR BUY AMERICA These Special Provisions amend, revise, and where in conflict, supersede applicable sections of the 2009 Standard
More informationNational Standard of the People's Republic of China. Specification for minimum thickness of the shell of valves
ICS 23.060.01 J16 National Standard of the People's Republic of China GBxxxx-xxxx Specification for minimum thickness of the shell of valves (Draft for approval) Issue Date: XXXX XX XX Implementation Date:
More informationSpecifications for SWC #110: Pipe, Pipe Liner, & Liner Installation
1. Drainage Pipe Specifications Specifications for SWC #110: Pipe, Pipe Liner, & Liner Installation 1.1 Corrugated Metal, Aluminized, and Culvert Pipe (Round) Please see TDOT standard drawing D-PB-2 and
More informationSUPPLEMENTARY SECTION: STANDARD SPECIFICATIONS PAGE 1 STORMWATER MAINS & CULVERTS MAY 2018
STANDARD SPECIFICATIONS PAGE 1 STORMWATER MAINS & CULVERTS MAY 2018 PART 1 - GENERAL... 2 1.1 Work Included... 2 1.2 Related Sections... 2 1.3 Reference Standards... 2 1.4 Shop Drawings... 3 1.5 Certificates...
More informationPROTECT BOLLARD PROTECT FOUNDATIONS RE-USE BOLLARD
\\ PROTECT FOUNDATIONS Impact Recovery System protects foundations from damage when bollards are impacted or need replacing. Lifetime warranty! RE-USE If badly impacted bollard is removed and reinstated
More informationStructural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)
Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction
More informationKey Technology for Grouting behind Wall of Single-formation Shaft Wall in the Surface Soil Segment of Waste Shaft
An Interdisciplinary Response to Mine Water Challenges - Sui, Sun & Wang (eds) 2014 China University of Mining and Technology Press, Xuzhou, ISBN 978-7-5646-2437-8 Key Technology for Grouting behind Wall
More informationDUCTILE IRON PIPES AND FITTINGS DETAILED PRODUCTS SPECIFICATIONS
DUCTILE IRON PIPES AND FITTINGS DETAILED PRODUCTS SPECIFICATIONS General All Materials shall be EN, ISO or equivalent standard and shall be supplied from approved manufacturers. According to the International
More informationMethod for Installation of PEHD Manholes - a technical report with 29 self-explanatory Figures -
Method for Installation of PEHD Manholes - a technical report with 29 self-explanatory Figures - 1. HDPE Manhole & Chamber Design PEHD Manhole and Chamber design stipulates various manufacturing configurations
More information