1 MANUAL for the TOWNSHIP OF ADJALA-TOSORONTIO JANUARY 2006 PREPARED BY: R. J. BURNSIDE & ASSOCIATES LIMITED

2 TABLE OF CONTENTS SECTION PAGE NO. SECTION A - GENERAL INFORMATION A1.00 INTRODUCTION A-1 A2.00 SUBMISSIONS A-4 A3.00 ENGINEERING DRAWING REQUIREMENTS A-8 A4.00 GENERAL PLAN OF SERVICES A-9 A5.00 PLAN AND PROFILE DRAWINGS A-11 A6.00 OTHER DRAWINGS A-13 A7.00 CERTIFICATE OF COMPLETION AND FINAL ACCEPTANCE A-14 A8.00 AS-CONSTRUCTED DRAWINGS A-15 SECTION B - ROADWAYS B1.00 CLASSIFICATIONS B-1 B2.00 GEOMETRIC DESIGN ELEMENTS B-2 B3.00 DESIGN ELEMENTS B-3 B4.00 PAVEMENT DESIGN B-6 B5.00 CONSTRUCTION REQUIREMENTS B-7 B6.00 CONCRETE CURB AND GUTTER B-9 B7.00 SIDEWALKS B-10 B8.00 DRIVEWAY APPROACHES B-11 B9.00 BOULEVARDS B-12 B10.00 EASEMENT REQUIREMENTS B-13

3 SECTION PAGE NO. SECTION C - STORM DRAINAGE AND STORM WATER MANAGEMENT C1.00 DRAINAGE POLICIES C-1 C2.00 ATTAINMENT OF DRAINAGE OBJECTIVES C-2 C3.00 MAJOR SYSTEM C-3 C4.00 MINOR SYSTEM C-4 C5.00 HYDRAULIC DESIGN C-5 C6.00 STORM SEWER DESIGN C-6 C7.00 MANHOLES C-10 C8.00 CATCHBASINS C-12 C9.00 INLETS, OUTFALLS AND SPECIAL STRUCTURES C-13 C10.00 MISCELLANEOUS MATERIALS C-14 C11.00 TESTING C-15 SECTION D - RESERVED SECTION E - WATERMAINS AND APPURTENANCES E1.00 HYDRAULIC DESIGN E-1 E2.00 WATERMAIN DESIGN E-3 E3.00 VALVING REQUIREMENTS E-5 E4.00 FIRE HYDRANT REQUIREMENTS E-6 E5.00 SERVICE CONNECTIONS E-7 E6.00 PIPE MATERIALS E-8 E7.00 TESTING REQUIREMENTS E-9 E8.00 CORROSION PROTECTION E-11

4 SECTION PAGE NO. SECTION F - SANITARY SEWERS AND APPURTENANCES F1.00 HYDRAULIC DESIGN F-1 F2.00 SANITARY SEWER DESIGN F-3 F3.00 MANHOLES F-6 F4.00 SANITARY SERVICE CONNECTION F-8 F5.00 PIPE MATERIALS F-10 F6.00 TESTING F-11 SECTION G - LOT GRADING G1.00 GENERAL G-1 G2.00 LOT GRADING DESIGN G-2 G3.00 INDIVIDUAL LOT GRADING G-3 G4.00 AREA ROUGH GRADING G-5 SECTION H - SIGNS H1.00 GENERAL H-1 H2.00 STREET NAME SIGNS H-1 H3.00 TRAFFIC CONTROL AND ADVISORY SIGNS H-1 SECTION I - STREET TREE PLANTING I1.00 RESPONSIBILITY I-1 SECTION J - PARKLANDS J1.00 PLAN J-1 STREET K - STREET LIGHTING AND UTILITIES K1.00 GENERAL K-1

5 SECTION PAGE NO. SECTION L - STANDARD DRAWINGS L1.00 LIST OF DRAWINGS L-1 (STANDARD DRAWINGS FOLLOW) APPENDIX A MOE CONCEPTUAL STORMWATER MANAGEMENT PLAN APPENDIX B NVCA STORMWATER MANAGEMENT TECHNICAL STANDARDS APPENDIX C TEMPORARY CONNECTION, TESTING AND DISINFECTION OF WATERMAINS

6 SECTION A - GENERAL INFORMATION A1.00 INTRODUCTION The design of all municipal services in the municipality is to be based upon the specifications and standards in effect at the time of approval. All plans are to be approved before they are to be used for the construction of services. Such approval shall in no way relieve the Consulting Engineer from providing an adequate and safe design. A1.01 FAMILIARIZATION Prior to the commencement of the Engineering Design, the Consultant shall obtain copies of the municipality s Design Criteria Manual and Standard Detailed Drawings to familiarize himself/herself with the requirements of subdivision design in the municipality. Meetings shall be held with the Township Engineer and Director of Public Works and the Township Planning Department to discuss areas of preliminary concern and other data prior to commencement of the engineering design. A1.02 ENGINEERING REQUIREMENTS FOR DRAFT PLAN APPROVAL A preliminary Functional Servicing Report must be submitted to the Township Engineer for review and acceptance. This report must be presented in a readable, comprehensive and professional manner. The Report must be signed and sealed by a Professional Engineer. This Functional Servicing Report (FSR) shall contain the following information as a minimum and be submitted in duplicate. (a) The Draft Plan The Draft Plan must be in a form acceptable to the Planning Department of the Township of Adjala-Tosorontio and the County of Simcoe. A reduced size (8½x11) copy of the draft plan shall be included in the FSR. (b) Contour/Drainage Plan This plan must be at a scale of no larger than 1:1250 giving contour lines at sufficient intervals to permit assessment of existing surface drainage patterns. This plan is to extend to the limits of the drainage area to be served by proposed sanitary and storm sewer systems, including lands beyond the boundaries of the subdivision. For large external areas Contour plans at a larger scale may be provided. All elevations are to refer to Geodetic Datum. Contours established from air photo interpretation will not be permitted. A-1

7 A1.02 ENGINEERING REQUIREMENTS FOR DRAFT PLAN APPROVAL (cont d) (c) General Plan of Services This will be a plan based on the Draft Plan and must schematically show the proposed storm and sanitary sewer systems and their connection to existing systems. This plan is to be accompanied by preliminary engineering calculations indicating the quantity of flows at the connection to existing systems and/or at proposed outfalls. Consideration must be given to the whole catchment area to ultimately be developed. Blocks and easements for drainage systems shall also be shown. Preliminary road profiles must also be identified in the FSR. The method of treatment and disposal of sewage shall be provided and an outline of the actual design shall be presented, including calculations and relative size of the treatment facilities. (d) Drainage/Stormwater Plan When a natural drainage channel passes through and is affected by the subdivision, drawings must be submitted to indicate the location and typical cross-sections of the existing channel of any proposed changes. A preliminary stormwater management plan and report will be required by the Township of Adjala-Tosorontio in accordance with Section C 2.05 of the document. An erosion-sediment control plan will be required. The Consulting Engineer must submit an outline of the erosion-sediment control plan in accordance with Section C All proposed stormwater controls shall be in accordance with the Nottawasaga Valley Conservation Authority requirements and their preliminary assessment and approval of the design is required. (e) Water Systems The FSR shall outline the proposed source of water and the method of distribution. For individual well applications, a hydrogeological report shall be provided which clearly indicates the availability of water, in compliance with Provincial guidelines and regulations. For larger systems, the FSR shall provide an overview of the existing water system, its capacities and characteristics, and the needs generated by the new development. Actual water modeling of the distribution system will be competed by the Township Engineer. A-2

8 A1.02 ENGINEERING REQUIREMENTS FOR DRAFT PLAN APPROVAL (cont d) (f) Soils Report A preliminary soils investigation and report from an independent Soils Consultant will be required by the Township Engineer. This report shall provide input and comments on the existing soils and the applicable discussions relating to roads, services, sewage disposal, etc. (g) Additional Reports In addition to the Preliminary Engineering Report, the Township will require a study and report which evaluates the geographical and hydrogeological characteristics of an area. This study shall identify the suitability of the development area and its component sub-areas to safely accommodate water supply and sewage disposal systems. The study shall further evaluate any potential impacts on existing adjacent developments. The Developer s Consulting Engineer is responsible to identify any and all approvals and reports required by Ontario Provincial regulations, as well as the policies of the Township, County, and Conservation Authority. A1.03 FUNCTIONAL DESIGN REPORT A functional design is required prior to commencement of the final design. Prior to the commencement of the functional design, the Developer s Consulting Engineer shall meet with the Township Engineer and Director of Public Works to discuss the Township s requirements. The functional design shall provide all details, calculations, alternatives and recommendations necessary to evaluate the servicing of the proposed development. In cases where the subdivision development under consideration forms part of a larger area set aside for future development, the functional report shall confirm that the servicing design does not limit the future development. The functional design shall be a definite requirement, when a subdivision is being phased and the engineering design is being undertaken for each phase separately. A-3

9 A2.00 SUBMISSIONS Engineering Drawings shall be submitted simultaneously to the Township Engineer and to the Township Director of Public Works. The Consulting Engineer is required to review the design criteria to determine the requirements for submission of Engineering Drawings. A2.01 FIRST SUBMISSION The initial submission of engineering drawings to the Township shall contain the following information: (a) (b) (c) (d) (e) (f) (g) one copy of the approved Draft Plan; two copies of the proposed plan for registration showing all block and lot numbers; a declaration from the Consulting Engineer showing that he/she has been retained to design and supervise the construction of the works of the proposed subdivision according to the terms of the Subdivision Agreement; two copies to the Township Engineer and one copy to the Township of the following plans: i) General Plan of Services; ii) Lot Grading Plan; iii) Area Rough Grading Plan; iv) Sanitary Drainage Plan; v) Storm Drainage Plan; vi) plan and profile drawings; vii) detail drawings other than Township of Adjala-Tosorontio Standard Drawings; viii) any other drawing pertinent to the design; and two copies of the storm sewer design sheets, computer printouts, and detail calculations for pipe strength and bedding; two copies of a Stormwater Management report addressing issues of water run-off quantity and quality; one copy of a soils report for confirmation of the pavement design, prepared by a qualified Soils Consulting Engineer. (See Sections A3.0, A4.0, A5.0 for details on plan preparation) A2.02 SUBSEQUENT SUBMISSIONS Subsequent submissions of engineering drawings shall be made until the Engineering Drawings and design is acceptable to the Township of Adjala- Tosorontio Engineer. The design of Bell Telephone System, Cable T.V. and gas systems shall be completed by the respective authority. The electrical distribution shall be approved by Ontario Hydro. A-4

10 A composite utility plan shall be submitted as part of the drawings listed in A2.01 and shall detail all street lighting components. A2.03 MINISTRY OF ENVIRONMENTAL APPLICATIONS After the engineering design and drawings are approved by the Township of Adjala-Tosorontio, three copies of the Ministry of Environment application forms for storm and sanitary sewer and watermains and one complete set of engineering drawings shall be submitted to the Township Engineer. These copies will be signed by the Township Clerk and the Township Engineer and then returned to the Consulting Engineer. The Consulting Engineer will then make application to the Ministry of the Environment for approval under the Ontario Water Resources Act. A2.04 OTHER APPROVALS The Consulting Engineer is required to make all submissions and representations necessary to obtain approvals from all other authorities affected (Ministry of Natural Resources, Ministry of Transportation, Conservation Authorities, Canada Post Corporation, Fire Marshall, Medical Officer of Health, etc.). The Township of Adjala-Tosorontio shall be kept informed of the progress of these submissions by copies of all correspondence. A2.05 ORIGINAL TRACINGS After all approvals have been received from all parties affected, the original drawings shall be submitted to the Township Engineer. These tracings shall be signed and dated by the Township Engineer and returned to the Consulting Engineer. A copy of the approved drawings shall be provided to the Township in electronic format - AutoCAD Version 14 or latest version required by the Township. Any subsequent changes must be formally submitted to the Township Engineer for approval. If after one year the date of the signing of the drawings by the Township Engineer, the Developer fails to enter into a Subdivision Agreement with the Township, the Township Engineer reserves the right to revoke any or all approvals related to the engineering drawings. A2.06 PREPARATION OF SUBDIVISION AGREEMENT The draft of the Subdivision Agreement will be prepared by the Township s Engineer and Solicitor. The Developer s Engineer shall prepare the draft schedules for the agreement where appropriate (i.e. - list of drawings, cost estimate, legal descriptions, etc.). A-5

11 A2.06 PREPARATION OF SUBDIVISION AGREEMENT (cont d) The Township Clerk must be in a position to clear all conditions of the Draft Plan Approval prior to the preparation of the draft Subdivision Agreement Schedules. The following information must be provided by the Developer s Consulting Engineer to the Township Engineer prior to the preparation of the Subdivision Agreement. (a) (b) (c) (d) (e) (f) Ministry of Environment certificates of approval for all the services to be constructed. The name of the person and/or company and Mortgagees with whom the Subdivision Agreement will be executed. Four copies of the Reference Plan. Four copies of the Legal Description based on the Reference Plan. Four copies of the reference (51R-) Plans for any easements to be granted to the Township. Four copies of the approved engineering drawings. (g) A detailed cost estimate of all services to be constructed. This estimate shall include: (i) (ii) detailed cost of services; cost of underground electrical distribution system and street lighting; (iii) all miscellaneous expenditures; (iv) allowances for contingencies and engineering. This estimate will be used as a basis for calculation of the security to be posted for the development. (h) (i) (j) Proposed timetable for construction of services. Proposed landscaping plans where necessary or required Proposed staging plans. A-6

12 A2.07 REQUIREMENTS PRIOR TO COMMENCEMENT OF CONSTRUCTION Prior to the commencement of construction, the Developer s Consulting Engineer shall submit the following information to the Township Engineer for approval (allow two weeks for approval): two sets of construction specifications the proposed contractor and subcontractors the contractor s list of suppliers a copy of the signed contract tender complete with prices all recommendations of the Erosion Control plan must be implemented the required Letter of Credit must be posted with the Township any other information as required by the Township Engineer or as specified in the Subdivision Agreement. A-7

13 A3.00 ENGINEERING DRAWING REQUIREMENTS A3.01 All drawings to be prepared in a neat and legible fashion. The design information presented shall be completed in ink. A3.02 All drawings shall be prepared using AutoCadd 14 (or latest version) with plans plotted on drafting grade vellum or 3 mil mylar. A3.03 All plans shall be prepared on standard A1 sheets. A3.04 All elevations shown on the drawings are to be of geodetic origin. A3.05 Plan and profile drawings are to be prepared so that each street can be filed separately. The street names are to be identified on the plan portion of the drawings. A3.06 When streets are of a length that requires more than one drawing, match lines are to be used with no overlapping of information. A3.07 The reference drawing numbers for all intersecting streets and match lines shall be shown on all plan and profile drawings. A3.08 A north arrow shall be referenced on all drawings. A3.09 A key plan drawn to 1: scale shall be shown on all plan and profile drawings as well as the General Plan of Services. The area covered by the drawing shall be clearly identified. A3.10 A standard Title Block shall be used for all drawings. A title sheet is required for the drawings. A3.11 All engineering drawings shall be stamped by a Professional Engineer. The Engineer s stamp must be signed and dated, prior to the issuance of drawings for tendering and signing by the Township Engineer. A-8

14 A4.00 GENERAL PLAN OF SERVICES A4.01 A General Plan of Services drawing shall be prepared for all developments at a maximum scale of 1:1000. A4.02 When more than one General Plan of Services drawing is required for any development then the division of drawings shall reflect the limits of the Registered Plans as closely as possible. Where more than one plan is prepared, a supplementary General Plan of Services at a smaller scale shall be prepared to show the entire plan of subdivision on one drawing. A4.03 The reference Geodetic Benchmark and the Site Benchmarks to be used for construction shall be identified on the General Plan of Services. A4.04 A drawing index shall be shown on all General Plans of Services to identify the Plan and Profile Drawing number for each street or easement shown. A4.05 All road allowances, lots, blocks, easements and reserves are to be shown and are to be identified in the same manner as shown on the Registered Plan. A4.06 All existing services, utilities and abutting properties are to be shown in dotted lines. A4.07 All services to be constructed are to be shown on the General Plan of Services in solid lines. A4.08 All storm and sanitary sewer are to be shown including sizing, direction of flow and type of the sewer. A4.09 All manholes will be shown and are to be numbered in accordance with the design drawings. A4.10 All catchbasins are to be shown. A4.11 All watermains, valves and hydrants are to be shown. Watermains to be identified only by sizing. A4.12 All curbs and sidewalks are to be shown. A4.13 All fencing is to be indicated by height and type. A4.14 All street lighting location and hydro transformers are to be shown. A-9

15 A4.00 GENERAL PLAN OF SERVICES (cont d) A4.15 All sites for parks, schools, churches, commercial and industrial development must be shown. A4.16 If a subdivision encroaches on an existing floodplain, the approved fill and flood line restrictions must be shown, as specified by the local Conservation Authority. A4.17 Proposed locations of Community Mail Boxes and the associated number of units shall be shown on the General Plan of Services. A4.18 The location of all traffic control and information signs is to be clearly shown. A-10

16 A5.00 PLAN AND PROFILE DRAWINGS A5.01 All plan and profile drawings shall be prepared at a scale of 1:500 horizontally and 1:50 vertically. A complete legend shall be provided on each drawing. A5.02 Plan and profile drawings are required for all roads, blocks and easements where services are proposed, for all outfalls and for all boundary roadways abutting the development. A5.03 All existing or future services, utilities and abutting properties shall be shown in dotted or shaded lines. A5.04 All services to be constructed to be shown in solid lines. A5.05 All road allowances, lots, blocks, easements and reserves are to be identified. Lot and block frontages are to be shown. A5.06 All curb and gutter and sidewalks are to be shown and dimensioned on the plan portion of the drawings. A5.07 All sewers and culverts shall be shown and dimensioned on the plan and shall also be plotted on the profile of the drawings to true scale size. Sewers and culverts shall be described only by size, type and direction of flow on the plan portion. The length, size, grade, material, class of pipe, usage and type of bedding shall be described in detail on the profile portion. A5.08 All manholes shall be shown on the plan portion and the profile portion of the drawings. The manholes shall be identified by number on the plan portion and by number, chainage, offset, size, invert elevations and applicable Township of Adjala-Tosorontio Standard Drawing or Ontario Provincial Standard Drawing on the profile portion of the drawing. Manholes that have safety platforms or drop connections shall be noted and referred to an O.P.S. drawing. A5.09 All catchbasins and catchbasin connections shall be shown. A5.10 All rim and invert elevations for rear lot catchbasins are to be shown. A5.11 Left and right ditch profiles and grades shall also be shown. A5.12 All watermains, hydrants, valves, etc., shall be described and dimensioned on the plan portion of the drawings. The watermain is to be plotted to true scale size on the profile portion of the drawing and shall be described. A-11

17 A5.00 PLAN AND PROFILE DRAWINGS (cont d) A5.13 The location of all storm, water and sanitary service connections shall be shown and dimensioned on the plan portion of the drawing. A5.14 The centreline of construction with 20 metre stations shall be noted with a small cross on the plan portion of the drawings. A5.15 The original ground at centreline and the proposed centreline road grade shall be plotted on the profile. The proposed profile shall be fully described (length, grade, V.P.I. elevations, vertical curve data, etc.) with all elevations shown to three decimal places. Chainage for the centreline of construction as well as the chainages for V.P.I., B.V.C., E.V.C. shall be noted on the profile portion of the drawing. A5.16 Details of the gutter grades for cul-de-sacs and crescents shall be provided on the plan portion as a separate detail at a scale of 1:200. A5.17 Chainage for the centreline of construction, including chainages for P.I., B.C., E.C. and horizontal curve data shall be shown on the plan portion. A5.18 The proposed pavement structure design and dimensions shall be noted on the plan portion. A5.19 All existing utilities and services shall be shown on the plan portion. It may be necessary to dig test holes to determine the actual elevations of these services to avoid conflicts with new construction. These elevations shall be shown on the profile portion. A5.20 Profiles of roadways shall be produced sufficiently beyond the limits of the proposed roads to confirm the feasibility of future extensions. A5.21 In addition to the above, the following detail shall be shown on the plan portion of the drawings: the curb radii at all intersections; the location of all luminaire poles and transformers; the location and type of all street name and traffic control signs; and any special notes necessary to construction procedures or requirements. A5.22 Existing and proposed centreline elevations shall be shown at 20 m intervals along with the bottom of the profile. A-12

18 A6.00 OTHER DRAWINGS A6.01 LOT GRADING PLANS All lot grading plans shall be prepared in accordance with the criteria in Section G of this document. A6.02 STORM DRAINAGE PLANS All drainage plans for the storm sewer design shall be prepared in accordance with the criteria in Section C of this document. A6.03 DETAIL DRAWINGS The Township of Adjala-Tosorontio Standard Drawings shall be used whenever applicable. In the absence of a Standard Drawing the latest revision of the Ontario Provincial Standard Drawings shall be used. Individual details shall be provided by the Consulting Engineer for all special features not covered by any of the above. All details shall be reproduced or drawn on standard size sheets and shall be included as part of the Engineering Drawings. A-13

19 A7.00 CERTIFICATE OF COMPLETION AND FINAL ACCEPTANCE The term Certificate of Completion shall be used to describe the date when the services are complete and acceptable to the Township of Adjala- Tosorontio subject to the maintenance requirements pursuant to the terms and conditions of the Subdivision Agreement. Final Acceptance shall be the terminology used to describe the date when the Developer s maintenance requirements have been fulfilled and the services are acceptable to the Township of Adjala-Tosorontio. Formal Acceptance of the subdivision shall be the date on which the Township of Adjala-Tosorontio agrees by By-law that all conditions of the Subdivision Agreement have been fulfilled and all maintenance requirements have been completed. The Certificate of Completion and Final Acceptance must be requested by the Developer in writing. The dates for all certificates shall be established by the Township of Adjala-Tosorontio. When the services are completed and cleaned to the satisfaction of the Consulting Engineer, he/she shall advise the Township and the Township Engineer, in writing, that the work is completed and shall request an inspection by the Township of Adjala-Tosorontio. The Township of Adjala- Tosorontio shall carry out their inspections and shall advise the Consulting Engineer of any items that require further rectifications. When all deficiencies have been corrected to the satisfaction of the Township Engineer, a report shall be forwarded to Council ( Certificate of Completion ) recommending a date for the commencement of the maintenance period. Near the end of the maintenance period the services shall be reinspected by the Consulting Engineer and all deficiencies found shall be corrected. When the Consulting Engineer is satisfied that the work is complete and acceptable, he/she shall advise the Township, in writing, and request a final inspection by the Township Engineer. When all work is completed to the satisfaction of the Township Engineer, a report shall be forwarded to the Council recommending Final Acceptance of the works. A-14

20 A8.00 AS-CONSTRUCTED DRAWINGS A8.01 GENERAL The as-constructed drawings constitute the original engineering drawings which were approved by the Township Engineer and which have been amended to incorporate the construction changes and variances in order to provide accurate information on the works as installed in the development. These drawings shall be submitted during the maintenance period, prior to issuance of Final Acceptance. A8.02 AS-CONSTRUCTED FIELD SURVEY The as-constructed revisions shall be based on a final survey of all the subdivision services and the Consulting Engineer s construction records. The final survey shall include a final check of the following items: location of all manholes, including invert and top of cover elevations distances and pipe slopes between all manholes location of all roadway catchbasins location, rim and invert elevations for all rear yard and lot catchbasins location and ties to all valve boxes, chambers, hydrants and other watermain appurtenance road centreline elevations site benchmarks location of all service connections to all lots and blocks CCTV inspection of all sewer lines including video record and printed report. A8.03 DRAWING REVISIONS The original drawings shall be revised to incorporate all changes and variances found during the field survey and to provide ties and additional information to readily locate all underground services. All utility and street hardware is to be shown on the plans. All sewer and road grades are to be recalculated to two decimal places. All street names, lot numbering and block identification shall be checked against the Registered Plan and corrected if necessary. All municipal address numbers are to be added to the general plans. A-15

21 A8.03 DRAWING REVISIONS (cont d) The as-constructed revision note shall be placed on all drawings in the revision block and dated based on the date of the surveys. The information on the as-constructed drawings may be checked by the Township of Adjala-Tosorontio at any time up to two years after final acceptance of the subdivision. If any discrepancies are found, then the drawings shall be returned to the Consultant for rechecking and further revision. The Consultant shall be required to explain in writing any major difference between the design and the as-constructed data and to provide verification that the alteration does not adversely affect the function of the subdivision services. A8.04 SUBMISSIONS Upon completion of all construction work and the as-constructed revisions, the original drawings shall be submitted to the Township of Adjala-Tosorontio for their permanent records. The submission of the as-constructed drawings in paper and electronic format to the Township must be completed before Final Acceptance of the subdivision will be given. A-16

22 SECTION B - ROADWAYS B1.00 CLASSIFICATIONS All roadways in new developments shall be classified according to the traffic volume expected and the intended use of the roadway. For predominantly residential areas, three classifications shall be noted as follows: Local - Estate Residential Local - Urban and Hamlets Collector (Arterial roads are typically under the control of the County of Simcoe.) The proposed classification of all streets shall be confirmed with the Township of Adjala-Tosorontio as part of the pre-consultation process, prior to the approval of the Draft Plan. The roads in industrial and commercial areas shall be classified Local or Collector dependent upon the length of street, traffic volume expected, and amount of truck traffic. Generally, all roads in settlement areas (or Hamlet Residential Zones) shall be constructed with an urban road standard. Those roads located in rural or estate lot settings will be constructed to a rural (ditched) standard.. B-1

23 B2.00 GEOMETRIC DESIGN ELEMENTS Local Collector Geometric Detail Estate Urban Minor Major Min. R.O.W. (metres) Design Speed (km/hr) Min. Safe Stopping Distance (metres) Min. Visibility Curves in Sag (K Values) Min. Visibility Curves on Crests (K Values) Min. Horizontal Radius (metres) Pavement Width (metres) Pavement Crossfall (%) Minimum Grade (%) Maximum Grade (%) Maximum Grade for Through Roads at Intersections (%) Maximum Grades at Stop Roads at Intersections (%) Intersection Angle (degrees) Minimum Tangent Length Between Reverse Curves (metres) B-2

24 B3.00 DESIGN ELEMENTS B3.01 HORIZONTAL CURVES Horizontal alignment is to conform to the requirements as outlined in Section B2.00. In general, right angle bends will not be permitted on local streets except in the case of Courts or Crescents servicing no more than 50 residential lots. Where permitted, these bends must not have a deflection angle greater than 90 o. B3.02 VERTICAL CURVES All points of grade change in excess of one percent shall be designed with vertical curves as outlined in the current Ministry of Transportation of Ontario publications. The minimum visibility curves to be used are outlined in the geometric details for each roadway classification. The minimum tangent length of any road grade shall be 9 metres. B3.03 BACKFALL AT INTERSECTING STREETS At all street intersections the normal crossfall of the major street shall not be interrupted by the crown line of the minor street. A one or two percent backfall shall be provided on the minor street at all street intersections. This backfall shall continue to the end of the curb return radii to facilitate proper drainage of the intersection. Overland flow routing of storm drainage through the intersection must be maintained. B3.04 CURB RETURN RADII AT INTERSECTIONS The curb return radii at street intersections shall conform to the following dimensions: Pavement Width Pavement Width Curb Return Street A Street B Radii 6.7 m 6.7 m 10.0 m 8.5 m 10.0 m 10.0 m 8.5 m 12.8 m 10.0 m 8.5 m 14.0 m 10.0 m 10.0 m 10.0 m 12.0 m 10.0 m 12.8 m 12.0 m 10.0 m 14.0 m 15.0 m 12.8 m 12.8 m 12.0 m B-3

25 B3.05 DAYLIGHTING REQUIREMENTS AT INTERSECTIONS Daylighting at all intersection quadrants shall be included in the road allowances to provide for uniform boulevard widths. Such daylighting shall be included on the proposed plan for registration (M Plan) and on all engineering drawings. B3.06 CUL-DE-SAC AND BULBS Permanent cul-de-sacs are generally not permitted. Where approved, they shall be constructed in accordance with the details provided on Standard Drawing No Minimum gutter grades of 0.5 percent shall be maintained along the flow line of the gutters around the cul-de-sac. B3.07 TEMPORARY TURNING CIRCLES Temporary turning circles will be considered whenever a road is to be continued in the future in a phased Plan of Subdivision. The minimum radius for temporary turning circles shall be 13 m. B3.08 LOCATION OF UTILITIES The location of utilities within the road allowance shall be as detailed on the Township of Adjala-Tosorontio Standard Drawings. Composite utility drawings shall be submitted to the Township Engineer for approval of the proposed utility locations. All utility wiring is to be housed underground or direct buried. Hydro transformers are to be housed in suitable enclosures and mounted on transformer pads installed at the final elevation of the adjacent ground. The location of transformer pads shall be as detailed on the Township of Adjala- Tosorontio Standard Drawings. Bell Telephone and Cable T.V. junction boxes may be mounted at the surface in approved standard enclosures. B-4

26 B3.09 COMMUNITY MAIL BOX REQUIREMENTS In general, community mail centres and/or site individual super mail boxes shall be placed in locations approved by the Township of Adjala-Tosorontio. Community mail centres shall be constructed in mini-parks, centrally and suitably located in consultation with Canada Post Corporation. The design of the community mail centre must incorporate such criteria as pedestrian safety, traffic flow and aesthetics. The Township of Adjala-Tosorontio may require the developer to furnish the following amenities within the community mail centre: park benches fencing litter containers landscaping pedestrian lighting concrete pad or interlocking stone surface architectural controlled kiosks adjacent car bays parallel to the travelled portion of the roadway. All details associated with the community mail centres or super mail boxes shall be identified on the Engineering Drawings and will be subject to the approval of the Township Engineer. The Developer shall be responsible for constructing community mail centres within residential subdivisions, prior to the issuance of the first building permit. The approval of Canada Post Corporation with respect to location of community mail centres and/or site individual super mail boxes will be required prior to the approval of the Engineering Drawings by the Township Engineer. B-5

27 B4.00 PAVEMENT DESIGN The minimum pavement design for all streets in new subdivision shall be as follows: Local Road Collector Road 40 mm HL3 40 mm HL3 50 mm HL8 80 mm HL8 150 mm Granular A 150 mm Granular A 300 mm Granular B 450 mm Granular B To confirm the minimum pavement design, a qualified soils consultant shall be engaged by the Consultant to sample, test and design a suitable pavement section. Soil sampling shall be carried out in the presence of the Township Engineer. Copies of all test results and proposed road designs shall be submitted with the Engineering Drawings. In no case will a pavement design less than the minimum Township of Adjala-Tosorontio Standard as shown on the standard drawing for the particular road classification be considered acceptable. Testing and approval of all granular materials at the designated pits prior to placement and subsequent in-situ verification tests shall also be performed by the Developer s Geotechnical Consultants Prior to the placement of asphalt pavement, the Consulting Engineer must submit to the Township Engineer for approval, the asphalt pavement mix designs. B-6

28 B5.00 CONSTRUCTION REQUIREMENTS B5.01 CLEARING AND GRUBBING AND AREA ROUGH GRADING The road allowance shall be cleared of all trees and shrubs which are not included in final landscaping, and of all other obstructions for such widths as are required for the proper installation of roads, services and other works. Rough grading shall be done to bring the travelled portion of the road to the necessary grade and in conformity with the cross-section shown on the drawings. Rough grading of all lots and easements must be properly shaped and compacted to 95 percent Standard Proctor Density, prior to any application of granular base course materials. In all cases, topsoil shall be stripped for the complete width of the road allowance and stockpiled at locations approved by the Township Engineer. B5.02 ROAD SUB-DRAINS In general, 100 mm diameter perforated, filter cloth wrapped plastic corrugated subdrains will be required to run continuous along both sides of all roads with curb and gutter. It will be the responsibility of the Developer to justify deviation from this standard by submitting a Soil Drainage Report from a recognized independent Soils Consultant. Sub-drains may be omitted if it can be shown that the subgrade is sufficiently permeable to ensure adequate drainage of the road base. The Township reserves the right to require video inspection of subdrains. B5.03 SNOW CLEARING Snow clearing operations prior to Final Acceptance may be carried out by the Township if so requested in writing by the Developer and the associated costs may be charged back to the Developer. B5.04 PLACING OF FINAL SURFACE COURSE ASPHALT The placement of surface course asphalt shall not commence in any area until all of the following conditions are met: (a) (b) a minimum period of one year has expired from the completion date for the placement of the base course asphalt; 85 percent of the dwellings have received Final Occupancy Permits; B-7

29 B5.04 PLACING OF FINAL SURFACE COURSE ASPHALT (cont d) (c) (d) (e) (f) (g) all undeveloped lots are rough graded in accordance with the approved lot grading plans; all service connections for multiple family commercial, institutional or other blocks are installed; the approval of the Township Engineer is obtained in writing; all deficiencies and settlements have been repaired; and favourable weather conditions are present. B5.05 OTHER REQUIREMENTS Whenever it is necessary to cut through an existing Township road external to the development, the Developer s Contractor will be responsible to obtain a permit from the Director of Public Works. The placement and compaction of the backfill material and the restoration of the surface pavement shall be done in accordance with the standards and specifications of the Township. All road crossings shall be completed by urgering or use of a torpedo unless explicitly approved otherwise. Any open road cut shall be backfilled with nonshrink concrete material. Before making detours, permission is required from the Township Public Works Department. Where the road is not part of the Township road system, approval from the appropriate road authority will also be necessary. In all cases, the Fire, Police Departments, School Bus Companies and Ambulance Service must be notified by the Developer or his Contractor. All work will be done in accordance with ordinances and By-laws of the Township of Adjala-Tosorontio. B-8

30 B6.00 CONCRETE CURB AND GUTTER Concrete curb and gutter conforming to OPSD or OPSD shall be used on all new urban subdivision roads, at the discretion of the Town Engineer. Driveway depressions shall be formed in the curb according to the detail and location as per OPSD If driveway locations cannot be determined at the time of pouring, a full section of curb and gutter shall be poured continuously. When the driveway location is determined, a driveway depression can be formed by cutting the back of the curb with a curb cutting machine providing the section to be cut is free from cracks and other defects. All curb and gutter is to be protected from damage from heavy equipment and vehicles. B-9

31 B7.00 SIDEWALKS The location requirements for sidewalks in new subdivisions shall be confirmed with the Township Engineer prior to commencing the detailed design. In general, sidewalks are required on both sides of all arterial and collector roadway and at least one side of all local streets. The sidewalk shall conform in details and dimensions to the current Township of Adjala-Tosorontio Standard Detail Drawings and shall be installed at locations as shown on the typical road cross sections. The width of sidewalks for streets is 1.2 metres on 20 m R.O.W. s and 1.5 m on 26 m R.O.W. s. The sidewalks shall be increased in thickness from 125 mm to 150 mm at all driveway locations as shown on the standard drawings. At street intersections the curb and the sidewalk shall be depressed to meet the roadway elevations as shown on the standard drawings. The Township of Adjala-Tosorontio requires that all concrete sidewalks be constructed as indicated on the approved Engineering Drawings, prior to preliminary acceptance. B-10

32 B8.00 DRIVEWAY APPROACHES The developer is responsible for the grading, graveling and the paving of all driveways from the curb to the property line. B8.01 MINIMUM DRIVEWAY DESIGN The minimum consolidated depth requirements for the granular base and asphalt in driveway shall be as follows: (a) (b) (c) Single Family Residential - Asphalt 50 mm of HL3A asphalt - Granular 200 mm Granular A Commercial, Light Industrial and Apartments - Asphalt 50 mm HL8 base course plus 40 mm HL3 surface course - Granular 225 mm Granular B plus 150 mm Granular A Heavy Industrial Driveways - Asphalt 75 mm HL8 base course plus 40 mm HL3 surface course - Granular 300 mm Granular B plus 150 mm Granular A B8.02 DRIVEWAY GRADES The maximum permissible design grade for any driveway on private lands shall be 8.0 percent. The minimum grade for driveways shall be 1.0 percent. B8.03 DRIVEWAY DEPRESSIONS The width and location of driveway depressions in the curb for single family dwellings shall be detailed in OPS drawing The width and location of driveway depressions for commercial industrial and apartment driveways shall be detailed in OPSD , however, the maximum width shall be 12 metres. B-11

33 B9.00 BOULEVARDS All boulevard areas are to be graded according to the details shown on the Township of Adjala-Tosorontio Standard Drawing and to the satisfaction of the Township Engineer. The grade of the boulevard is to be constant from the back of the curb to the property line and in no case will terracing be permitted. The final grade of the sod shall match and not exceed the finished grade of the top of the concrete curb and sidewalk. All debris and construction materials shall be removed from the boulevard area upon completion of the base course asphalt and shall be maintained in a clean state until the roadway section is completed. Clean, weed free topsoil shall be placed on all boulevard areas to a depth of 100 mm. No. 1 Nursery Sod shall be placed on all boulevard areas. B9.01 OPEN DITCHES Where permitted, open ditches shall be graded to the lines and grades as shown on the plan and profile drawings. Ditch slopes shall not exceed 3:1 (4:1 preferred) with a maximum depth of 1.2 metres unless otherwise approved by the Township Engineer. The minimum depth of ditches shall be 150 mm below the subgrade of the road. Minimum culvert size for road crossings shall be 450 mm (2.0 mm thick) with minimum 0.5 m cover. Ditches are to be topsoiled with clean, weed free topsoil to a minimum depth of 100 mm. The ditch invert is to be sodded to a minimum of 2.0 metres wide and the balance to be seeded and mulched. When the ditch grade exceeds 6.0 percent, approved erosion protection shall be used. The minimum ditch grade shall be 1.0 percent. Driveway culverts shall be corrugated steel pipes, be a minimum size of 400 mm in diameter and shall be of a length to suit the driveway width. The minimum cover over driveway culverts shall be 450 mm and 600 mm for road crossing culverts. Culverts and driveways are to be installed prior to excavation for houses and shall be constructed with manufactured endsections or approved equivalent treatment. The minimum culvert size for road culverts shall be 450 mm diameter (2.0 mm thick) with a minimum cover of 600 mm for all road crossing culverts. All culverts shall be installed in accordance with OPS specifications. B-12

34 B10.00 EASEMENT REQUIREMENTS B10.01 GENERAL Where underground services are placed outside road allowances or blocks of land under the ownership of the Township, permanent easements are required. Utility easements shall be located on one side of the common lot line between adjacent lots. Pipes shall be centred on the easement. Where two pipes are located in one easement, the minimum width of the easement shall be the width required for the larger pipe plus ½ the width required for the small pipe. B10.02 STORM AND SANITARY SEWER EASEMENTS The minimum width of easements for storm and sanitary sewers shall be in accordance with the following: Minimum Side of Pipe Depth of Invert Width of Easement Up to 675 mm 3.5 m maximum 3.0 m 750 to 1500 mm 3.5 m maximum 4.0 m 1650 mm and up 4.0 m maximum 4.0 m plus 3 times Outside Dia. of pipe B STORM CONNECTIONS FOR REAR YARD CATCHBASINS The minimum width of permanent easements for leads to rear yard catchbasins shall be 3.0 metres for pipe sizes ranging from 250 mm to 450 mm in diameter. For pipe sizes greater than 450 mm, criteria under Section shall apply. The lead shall be centred on the easement. B-13

35 B10.04 WATERMAINS The minimum width of easements for watermains shall be in accordance with the following: Minimum Size of Pipe Depth of Invert Width of Easement B10.05 OPEN CHANNELS Up to 600 mm 3.7 m maximum 5.0 m The minimum width of blocks of land for open channels shall be the width of the top of the channel plus 6.0 metres for maintenance requirements. B-14

36 SECTION C - STORM DRAINAGE AND STORMWATER MANAGEMENT C1.00 DRAINAGE POLICIES C1.01 DRAINAGE OBJECTIVES The Township of Adjala-Tosorontio has set the following objectives for drainage management within its boundaries: That post-development runoff not exceed the pre-development runoff. Reduce to acceptable levels, the potential risk of health hazards, loss of life and property damage from flooding. Reduce to acceptable levels, the incidence of inconvenience caused by surface ponding and flooding. Ensure that any development or redevelopment minimizes the impact of change to the groundwater regime, increased pollution, increased erosion or increased transport, especially during construction. Maintain the natural stream channel geometry, insofar as it is feasible with achieving the above objectives. Encourage groundwater replenishment by infiltration where possible and practical. C-1

37 C2.00 ATTAINMENT OF DRAINAGE OBJECTIVES C2.01 GENERAL The Township of Adjala-Tosorontio standards are to be part of an overall storm water plan involving MOE requirements - Appendix A and the N.V.C.A. Storm Water Management Guidelines - Appendix B. C2.02 MAJOR AND MINOR SYSTEMS In general, the Township of Adjala-Tosorontio supports the concept of drainage having two separate and distinct components - the minor drainage system and the major drainage system. The minor system comprises swales, street gutters, ditches, catchbasins and storm sewers. The major system comprises the natural streams and valleys and the manmade channels and ponds. C2.03 RUN-OFF QUALITY CONTROL The Township requires developers, contractors and builders to plan and execute their operations so as to minimize sediment and debris pickup and transport to water bodies. The degree of control and methods used must meet the regulations and guidelines of the MOE, MNR, MTO and local Conservation Authorities. On site inspection of the facilities and will expect all erosion control works are to be properly maintained throughout the duration of the project to the satisfaction of regulatory agencies. C2.04 MASTER DRAINAGE PLANS The Township requires a Master Drainage Plan for all proposed urban developments. The primary purpose of the Master Drainage Plan is to define the effects of urban development and to determine the solution that is compatible with the objectives for the watershed. C-2

38 C3.00 MAJOR SYSTEM C3.01 HAZARD LANDS AND FLOODLINES The Township of Adjala-Tosorontio requires that Hazard Lands be clearly defined on all watersheds and that no development, other than necessary access or services, be located therein. The Township also requires that the floodplains that would result from the 1:100 and Regional storms be defined for predevelopment and post development conditions. C3.02 DETENTION PONDS Detention Ponds shall be designed so as to minimize any adverse effects to the environment as well as ensuring the safety of local residents. Ponds that exceed 3.0 metres in depth shall have terraced slopes to facilitate maintenance of the facility. The minimum slope of the bottom of the pond shall not be less than 1.0 percent. Under no circumstances should the contours of the land in such detention ponds be altered after construction without notifying the Township of Adjala- Tosorontio and the appropriate Conservation Authority. It must be agreed by all concerned that such modification will have no detrimental effect on the stormwater management. C3.03 OUTLET STRUCTURES FROM PONDS Where a detention pond is proposed for quality control on a watercourse, the outlet structures must be designed as much for ease of operation as for hydraulic efficiency. The designer should always consider the possibility of a plugged outlet and should design a maintenance feature for drainage. The inlets and outlets must be protected to prevent child and major debris access. The area at the downstream end must be protected against erosion by channel lining and/or energy dissipater. The Township of Adjala-Tosorontio requires that the Consulting Engineer submit an outline of his proposed erosion sediment control plan with the first submission of Engineering Drawings. This may contain any or all of the following measures: sediment traps or temporary detention ponds seeding of topsoil stockpiles isolated stripping of development lands vegetation screens erosion control (silt) fence. C-3

39 C4.00 MINOR SYSTEM C4.01 WATERSHED AREA The contributing watershed area shall be determined from the contour plans and shall include all areas that naturally drain into the system and any fringe areas not accommodated in adjacent drainage systems, as well as other areas which may become tributary by reason of regrading. C4.02 STORM DRAINAGE PLANS EXTERNAL AREAS A plan shall be prepared to a scale dependent on the size of the watershed area, to show the nature and extent of the drainage of the lands surrounding the development site. The area to be developed and all existing contours used to justify the design shall be clearly shown. This plan shall be prepared and submitted to the Township Engineer at the functional report stage. INTERNAL DRAINAGE PLAN All internal storm drainage plans shall be prepared to a scale of 1:1000 and shall include all streets, blocks, lots and easements. The proposed storm sewer system shall be shown on this plan with all manholes numbered consecutively from the outlet. The manholes shall be the tributary points in the design and the area contributing to each manhole shall be clearly outlined on the plan. The area in hectares and the runoff coefficient shall be shown in a circle within the contributing area. In determining the contributing area to each manhole, the proposed lot grading must be considered to maintain consistency in the design. The length, size and grade of each section of storm sewer shall also be shown on the storm drainage plan. Large arrows should depict the overland flow route. C4.03 RAINWATER LEADERS Rainwater leaders on all single family and semi-detached residential units shall be discharged onto splash pads and shall be constructed in a manner so as to not interfere with adjacent properties. The only exception shall be where discharge to soak-away pits or trenches forms part of an overall stormwater management scheme. C-4

TOWN OF AJAX DESIGN CRITERIA SECTION B ROADWAYS

TOWN OF AJAX DESIGN CRITERIA SECTION B ROADWAYS TOWN OF AJAX DESIGN CRITERIA SECTION B ROADWAYS B1 B 1.00 B 1.01 CLASSIFICATIONS STREET CLASSIFICATION All roadways in new developments shall be classified according to the traffic volume expected and

More information

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects 2.0 ROADWAYS 2.1 Road Classification 2.1.1 Standard Drawing Classification All Road Widths and Road Allowances shall be designed in accordance with the most recent Town of New Tecumseth Standards: TNT.SD

More information

ENGINEERING DESIGN GUIDELINES THE CORPORATION MUNICIPALITY OF BRIGHTON

ENGINEERING DESIGN GUIDELINES THE CORPORATION MUNICIPALITY OF BRIGHTON ENGINEERING DESIGN GUIDELINES for THE CORPORATION of the MUNICIPALITY OF BRIGHTON Date: May 29, 2018 Latest Revision Date: TABLE OF CONTENTS SECTION A GENERAL INFORMATION... 1 A 1.00 THE CORPORATION OF

More information

TOWNSHIP OF KING. Regional Municipality of York DESIGN CRITERIA AND STANDARD DETAIL DRAWINGS

TOWNSHIP OF KING. Regional Municipality of York DESIGN CRITERIA AND STANDARD DETAIL DRAWINGS TOWNSHIP OF KING Regional Municipality of York DESIGN CRITERIA AND STANDARD DETAIL DRAWINGS March 2018 Record of Revisions Revision Date Description 1 April 2015 General Update 2 June 8, 2015 Council Approval

More information

Chapter 3: Permit Procedures and Requirements

Chapter 3: Permit Procedures and Requirements Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8

More information

Section H - Site Plan Guidelines

Section H - Site Plan Guidelines H1 GENERAL REQUIREMENTS The following is an outline of procedures and requirements for preparation and submission of Grading Plans, Site Alteration Plans (Erosion and Sediment Control Plans), Site Servicing

More information

TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST

TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST Project Name: Project Location: Date Submitted: TOWN of LAKESHORE SUBDIVISION DEVELOPMENT PLAN CHECKLIST Last Revised January 31, 2014 Name Phone Number E-mail Address Owner: Contractor/ Engineer: ( )

More information

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements

TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements This checklist is to be completed and submitted with all Subdivision Applications. The Town reserves

More information

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards

More information

GENERAL PLAN OF SERVICING

GENERAL PLAN OF SERVICING No. REVISIONS By 400 333 Preston Street GENERAL PLAN OF SERVICING 38158 100 T UTILITY LEGEND TRANSFORMER SERVICING LEGEND SANITARY MANHOLE C/W IDENTIFICATION TRANSFORMER C/W CONCRETE WINGS SANITARY SEWER

More information

Appendix 3. POLICY & PROCEDURE No

Appendix 3. POLICY & PROCEDURE No DEPARTMENT OF PUBLIC WORKS DIVISION: ENGINEERING SERVICES SECTION: ADMINISTRATIVE PAGE NO: 1 OF 10 REVISION NO: 3 DATE: 1995 05 01 ESTABLISHED: 1986 03 03 Appendix 3 POLICY & PROCEDURE No. 2.3.1-020 TITLE:

More information

TOWNSHIP OF TINY LOT GRADING/DRAINAGE PLAN PROCEDURE

TOWNSHIP OF TINY LOT GRADING/DRAINAGE PLAN PROCEDURE TOWNSHIP OF TINY LOT GRADING/DRAINAGE PLAN PROCEDURE Approved: December 2015 Revised: April 2017 TABLE OF CONTENTS Section 1.0 Introduction... 2 Section 2.0 Policy... 2 Section 3.0 Preparation of the Lot

More information

Design Specifications & Requirements Manual

Design Specifications & Requirements Manual 9 GRADING 9.1 GRADING REQUIREMENTS FOR VARIOUS SITUATIONS... 1 9.1.1 Subdivisions... 1 9.1.2 Site Plans... 1 9.1.3. Severances, Lifting of Part Lot Control & Infill Lots... 1 9.1.4 Blocks... 1 9.1.5 Capital

More information

Infrastructure Standards and Specifications

Infrastructure Standards and Specifications Infrastructure Standards and Specifications These specifications and drawings will be revised from time to time as considered necessary by the City. It is the responsibility of the owner and the professional

More information

DEVELOPMENT ENGINEERING MANUAL VERSION 1.0 NOVEMBER City of Guelph Engineering and Capital Infrastructure Services

DEVELOPMENT ENGINEERING MANUAL VERSION 1.0 NOVEMBER City of Guelph Engineering and Capital Infrastructure Services DEVELOPMENT ENGINEERING MANUAL VERSION 1.0 NOVEMBER 2016 City of Guelph Engineering and Capital Infrastructure Services TABLE OF CONTENTS 1.0 INTRODUCTION... 5 1.1 Purpose and Background... 5 1.2 Intent

More information

Design Specifications & Requirements Manual

Design Specifications & Requirements Manual 9 GRADING 9.1 GRADING REQUIREMENTS FOR VARIOUS SITUATIONS... 1 9.1.1 Subdivisions... 1 9.1.2 Site Plans... 1 9.1.3. Severances, Lifting of Part Lot Control & Infill Lots... 1 9.1.4 Blocks... 1 9.1.5 Capital

More information

7.00 INTRODUCTION... 1

7.00 INTRODUCTION... 1 SITE PLANS, REZONING, LAND DIVISION AND CONDOMINIUM SECTION 7 GENERAL REQUIREMENTS INDEX Page 7.00 INTRODUCTION... 1 7.01 SITE GRADING AND MECHANICAL PLANS... 2 7.01.01 Submission Procedures... 2 7.01.02

More information

CONSTRUCTION PLAN CHECKLIST

CONSTRUCTION PLAN CHECKLIST CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted

More information

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements SECTION 3 DRAINAGE 3-1 General All Drainage plans for proposed development shall be prepared by a Professional Engineer registered in Virginia, except as noted below. Further, their seal and signature

More information

City of St. Catharines Standard Drawings JULY Revised July 21, 2017 TES-ENG (SH)

City of St. Catharines Standard Drawings JULY Revised July 21, 2017 TES-ENG (SH) City of St. Catharines Standard Drawings JULY 2017 Revised July 21, 2017 TES-ENG (SH) Roads Dwg No. Revision Standard Sidewalk Detail 110-2001 1 Monolithic Curb-Faced Sidewalk for Concrete Road 110-2002

More information

Design Specifications & Requirements Manual

Design Specifications & Requirements Manual 18 DRAFTING AND DESIGN REQUIREMENTS FOR NEW SUBDIVISIONS 18.1 DRAWING REQUIREMENTS FOR NEW SUBDIVISIONS... 1 18.1.1 Basic Drawing Requirements... 1 18.1.2 Transportation Drawing Requirements... 1 a) Road

More information

PLANNING AND ZONING COMMISSION APPLICATION FOR IMPROVEMENT PLAT APPROVAL

PLANNING AND ZONING COMMISSION APPLICATION FOR IMPROVEMENT PLAT APPROVAL PLANNING AND ZONING COMMISSION APPLICATION FOR IMPROVEMENT PLAT APPROVAL Date Submitted: Project Number: CITY OF ALEXANDRIA 8236 WEST MAIN STREET ALEXANDRIA, KY 41001 (859) 635-4125 FAX (859) 635-4127

More information

THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION

THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION THE REGIONAL MUNICIPALITY OF PEEL STANDARD SPECIFICATIONS FOR RESTORATION Standard Specifications for Restoration INDEX PAGE R.1 GENERAL...1 R.2 SCOPE...1 R.3 MATERIALS...1 R.4 CONSTRUCTION...2 R.4.1 General...2

More information

SITE GRADING (LOT GRADING) - CITY OF TORONTO In Compliance with Sentence B of the Ontario Building Code, every site is to be graded so that w

SITE GRADING (LOT GRADING) - CITY OF TORONTO In Compliance with Sentence B of the Ontario Building Code, every site is to be graded so that w SITE GRADING (LOT GRADING) - CITY OF TORONTO In Compliance with Sentence B-9.14.6.1 of the Ontario Building Code, every site is to be graded so that water will not accumulate at or near the building under

More information

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER TOWNSHIP SUBDIVISION STREET DESIGN STANDARDS AND IMPROVEMENT PLAN REQUIREMENTS

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER TOWNSHIP SUBDIVISION STREET DESIGN STANDARDS AND IMPROVEMENT PLAN REQUIREMENTS CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER TOWNSHIP SUBDIVISION STREET DESIGN STANDARDS AND IMPROVEMENT PLAN REQUIREMENTS November 25, 2013 Table of Contents Cuyahoga County Engineer's

More information

SUBDIVISION AND OFF-SITE SERVICING CERTIFICATION REQUIREMENTS Rev 5 May 25, 2017

SUBDIVISION AND OFF-SITE SERVICING CERTIFICATION REQUIREMENTS Rev 5 May 25, 2017 SUBDIVISION AND OFF-SITE SERVICING CERTIFICATION REQUIREMENTS Rev 5 May 25, 2017 I. CONSTRUCTION PREREQUISITES 1.0 Pre-construction Survey A pre-construction survey of all existing infrastructure within

More information

T a b l e o f C o n t e n t s

T a b l e o f C o n t e n t s C i t y o f G l a d s t o n e P u b l i c W o r k s D e s i g n S t a n d a r d s T a b l e o f C o n t e n t s SECTION THREE SANITARY SEWER REQUIREMENTS... 1 3.0000 SANITARY SEWERS... 1 3.0010 General

More information

TOWN OF MIDLAND ENGINEERING DEVELOPMENT DESIGN STANDARDS

TOWN OF MIDLAND ENGINEERING DEVELOPMENT DESIGN STANDARDS Revised December 2012 1 TABLE OF CONTENTS 1.0 DESIGN SUBMISSIONS 9 1.1 General...9 1.2 Definitions... 9 1.3 Submissions to Government Agencies... 10 1.4 Pre-Servicing for Subdivision Development... 10

More information

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 492 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES TABLE OF

More information

INSPECTION AND ACCEPTANCE FOR MAINTENANCE

INSPECTION AND ACCEPTANCE FOR MAINTENANCE Inspection and Acceptance For Maintenance Page 1 (Last revised 6/29/10) INSPECTION AND ACCEPTANCE FOR MAINTENANCE SELECTED LINKS TO SECTIONS WITHIN THIS SPECIFICATION Acceptance Sewer As Built Drwg Example

More information

Ordinance No Lot Surface Drainage

Ordinance No Lot Surface Drainage Ordinance No. 35-2008 - Lot Surface Drainage The Township has adopted a new Lot Surface Drainage Ordinance which amends Chapter 170, Article IX, Subdivision and Site Plan Review by adding a new Section

More information

CORPORATION OF THE TOWN OF WHITBY

CORPORATION OF THE TOWN OF WHITBY CORPORATION OF THE TOWN OF WHITBY PUBLIC WORKS DEPARTMENT ENGINEERING SECTION The Town of Whitby has adopted the Ontario Provincial Standards. They consist of the following: Ontario Provincial Standard

More information

City of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH)

City of St. Catharines Standard Drawings SEPTEMBER Revised September 6, 2018 TES-ENG (SH) City of St. Catharines Standard Drawings SEPTEMBER 2018 Revised September 6, 2018 TES-ENG (SH) Roads Dwg No. Revision Standard Sidewalk Detail 110-2001 2 Monolithic Curb-Faced Sidewalk 110-2002 3 Sidewalk

More information

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Regional Roads and Traffic REVISED February 2010 PUBLIC WORKS REGIONAL ROADS AND TRAFFIC DESIGN CRITERIA TABLE

More information

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS 12.1 The subdivider shall construct and install the improvements in accordance with the County's Standards for Construction Plans and Specifications

More information

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES DIVISION OF ENGINEERING & CONSTRUCTION MANAGEMENT PLAN REVIEW DEPARTMENT WASHINGTON COUNTY SOIL CONSERVATION DISTRICT 1260 Maryland Avenue, Suite 101 Hagerstown, MD 21740 Telephone: (301) 797-6821, Ext.

More information

SCHEDULE F REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN AND INSTALLATION OF DRAINAGE SYSTEMS

SCHEDULE F REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN AND INSTALLATION OF DRAINAGE SYSTEMS SCHEDULE F REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE DESIGN AND INSTALLATION OF DRAINAGE SYSTEMS This is Schedule F of the City of Vernon Subdivision and Development Servicing Bylaw No. 3843, 1992

More information

Index. Composition and Order of Plan Set. Utility Plan... 5

Index. Composition and Order of Plan Set. Utility Plan... 5 City of Des Plaines Public Works and Engineering Department Revised-October 5, 2012 Index Composition and Order of Plan Set Title Page Number Cover Sheet... 1 Requirements for Site Development... 2 Grading

More information

CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2

CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2 CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2 7.1. GENERAL.... 2 7.1.1. Inspection Restriction Dates.... 2 7.1.2. Complete Improvements.... 2 7.1.3. Public Improvements.... 2 7.1.4. Warranty

More information

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH JULY 2013 DOCUMENT CONTROL Client: Project Name: Report Title: IBI Reference: 25528 Cityview Drive Version: JULY 2013 Digital Master: Originator: Reviewer: Authorization: [File Location] Scott MacDonald,

More information

COUNTY OF YUBA DEPARTMENT OF PUBLIC WORKS IMPROVEMENT STANDARDS

COUNTY OF YUBA DEPARTMENT OF PUBLIC WORKS IMPROVEMENT STANDARDS COUNTY OF YUBA DEPARTMENT OF PUBLIC WORKS IMPROVEMENT STANDARDS TABLE OF CONTENTS SECTION 1 PURPOSE AND DEFINITIONS 1.1 PURPOSE:... 1 1.2 DEFINITIONS:... 1 SECTION 2 GENERAL REQUIREMENTS 2.1 PLANS BY AN

More information

SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004

SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004 SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004 General: Sections of the Minnesota Department of Transportation (Mn/DOT), Standard Specification for Construction, 2000 or Current

More information

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS 1500.01 GENERAL REQUIREMENTS 1500.02 NATURE OF STORM WATER FACILITIES 1500.03 DRAINAGE EASEMENTS 1500.04 STORM WATER MANAGEMENT

More information

Construction Specification for General Excavation

Construction Specification for General Excavation Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03

More information

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision Plat Name: Location Description/ Nearest Intersection: Acreage:

More information

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING

CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 401 NOVEMBER 2015 (Formerly OPSS 401, November 2013) CONSTRUCTION SPECIFICATION FOR TRENCHING, BACKFILLING, AND COMPACTING TABLE OF CONTENTS 401.01

More information

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY 31 25 00 EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY A. Erosion and sedimentation control shall be provided by the Contractor for all areas of the site denuded or otherwise disturbed

More information

ENGINEERING REVIEW CHECKLIST City of Mount Clemens

ENGINEERING REVIEW CHECKLIST City of Mount Clemens (To be completed by the Developer s & Submitted with ing Plans) DATE: PROJECT NAME: Site Plan Approved: Date DESIGN ENGINEERING COMPANY: ing Company Contact Information: Name: Phone: Email: Owner Contact

More information

SUBDIVISION CHECKLIST. Subdivision Name. Prior To Review. Preliminary plan approved by Planning Commission / Council as required.

SUBDIVISION CHECKLIST. Subdivision Name. Prior To Review. Preliminary plan approved by Planning Commission / Council as required. SUBDIVISION CHECKLIST Subdivision Name Account Number Review Engineer Prior To Review Preliminary plan approved by Planning Commission / Council as required. Review fee paid. Statement of Responsibility

More information

SUPPLEMENTAL DRAWINGS

SUPPLEMENTAL DRAWINGS CITY OF GREATER SUDBURY SUPPLEMENTAL DRAWINGS TO THE ONTARIO PROVINCIAL STANDARD DRAWINGS Rev: February 2012 CITY OF GREATER SUDBURY STANDARD DRAWINGS TABLE OF CONTENTS Greater Sudbury Standard Drawings

More information

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS DESIGN STANDARDS SECTION 2 INDEX ITEM DESCRIPTION 2.00 GENERAL STATEMENT 2.01 WATER DISTRIBUTION

More information

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw 6410 2006 The Erosion and Sediment Control plan should seek (i) to protect the soil surface from erosion where possible and (ii) capture

More information

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW Chapter 8 Building and Building Regulations, Article XIII Grading and Drainage and Article XV Soil Erosion and Sedimentation

More information

CONSTRUCTION PLAN REVIEW CHECKLIST FOR PRIVATE DEVELOPMENT

CONSTRUCTION PLAN REVIEW CHECKLIST FOR PRIVATE DEVELOPMENT ADDITION NAME: City of Grapevine, Texas CONSTRUCTION PLAN REVIEW CHECKLIST FOR PRIVATE DEVELOPMENT Updated April 16, 2018 Public Works Department Engineering Division 200 South Main Street Grapevine, Texas

More information

TERMS OF REFERENCE PROJECT EDINBURGH ROAD FROM SPEEDVALE AVENUE TO LONDON ROAD

TERMS OF REFERENCE PROJECT EDINBURGH ROAD FROM SPEEDVALE AVENUE TO LONDON ROAD TERMS OF REFERENCE PROJECT EDINBURGH ROAD FROM SPEEDVALE AVENUE TO LONDON ROAD OBJECTIVES/PURPOSE The City of Guelph intends to upgrade the underground services to current standards and carry out complete

More information

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Allen County Stormwater Plan Submittal Checklist The following items must be provided when applying for an Allen County Stormwater

More information

DISTRICT OF HOPE SUPPLEMENTARY SPECIFICATIONS

DISTRICT OF HOPE SUPPLEMENTARY SPECIFICATIONS DISTRICT OF HOPE SUPPLEMENTARY SPECIFICATIONS SUPPLEMENTARY CONSTRUCTION SPECIFICATIONS The District of Hope has adopted the Master Municipal Construction Document and Standard Detail Drawings, printed

More information

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY 405 TWEEDSMUIR AVENUE

FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY 405 TWEEDSMUIR AVENUE FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY FOR CITY OF OTTAWA PROJECT NO.: 11-532 FOR TABLE OF CONTENTS 1.0 INTRODUCTION... 1 1.1 Existing Conditions... 2 1.2 Required Permits / Approvals...

More information

6 STORMWATER IMPROVEMENTS

6 STORMWATER IMPROVEMENTS 6 STORMWATER IMPROVEMENTS 6.01 General Requirements a. In addition to the standards contained in this, the design of stormwater systems is also governed by several ordinances and regulations. (1) Projects

More information

The Regional Municipality of Peel Basis of Payment

The Regional Municipality of Peel Basis of Payment Page PS-1 THE REGIONAL MUNICIPALITY OF PEEL BASIS OF PAYMENT FOR SANITARY SEWER CONSTRUCTION Page PS-2 INDEX Page No. PS.1. EXCAVATION...4 1.1. Trench Excavation...4 1.2. Asphalt/Concrete Removal...5 PS.2.

More information

STREET IMPROVEMENTS (Refer to Title 18, chapter entitled "STREETS" of the Layton Municipal Code.)

STREET IMPROVEMENTS (Refer to Title 18, chapter entitled STREETS of the Layton Municipal Code.) STREET IMPROVEMENTS (Refer to Title 18, chapter 18.24 entitled "STREETS" of the Layton Municipal Code.) I. Street widths STREET TYPE (ALL MEASUREMENTS IN FEET) ROW WIDTH LAYTON CITY STANDARD STREET SECTIONS

More information

TOWNSHIP OF SPRINGWATER. Engineering Design Standard Specifications And Engineering Design Standard Drawings

TOWNSHIP OF SPRINGWATER. Engineering Design Standard Specifications And Engineering Design Standard Drawings TOWNSHIP OF SPRINGWATER Engineering Design Standard Specifications And Engineering Design Standard Drawings TOWNSHIP OF SPRINGWATER ENGINEERING DESIGN STANDARD SPECIFICATIONS Revised: May, 2008 INTRODUCTION

More information

POLICY & PROCEDURE MANUAL

POLICY & PROCEDURE MANUAL POLICY & PROCEDURE MANUAL SECTION TRANSPORTATION SERVICES POLICY SUB-SECTION ADMINISTRATION EFFECTIVE DATE June 14, 2012 SUBJECT Entrance Policy AUTHORITY Public Works Committee May 23, 2012 Council June

More information

ROADWAY DESIGN AND CONSTRUCTION STANDARDS

ROADWAY DESIGN AND CONSTRUCTION STANDARDS ROADWAY DESIGN AND CONSTRUCTION STANDARDS Adopted: 1990 Amended: 1994 2003 2011 2013 ROADWAY DESIGN AND CONSTRUCTION STANDARDS ORIGINALLY ADOPTED IN 1990 Resolution No. R-990-046 OFFICIALLY AMENDED IN

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 2-1 Issue date: September 2012 1. General SITEWORK OVERVIEW This Directive outlines the Fund s requirements for the Consultant relative to the development, design and presentation of documents

More information

APPENDIX A. 2. That the road allowances included in this draft plan shall be shown and dedicated as public highways.

APPENDIX A. 2. That the road allowances included in this draft plan shall be shown and dedicated as public highways. APPENDIX A FILE NO: 04-T-2008-01 The City of Cornwall s conditions and amendments to final plan approval for registration of subdivision File No. 04-T-2008-01 are as follows: NO. CONDITIONS 1. That this

More information

DESIGN CRITERIA & CONSTRUCTION REGULATIONS

DESIGN CRITERIA & CONSTRUCTION REGULATIONS DESIGN CRITERIA & CONSTRUCTION REGULATIONS APRIL 2004 BY: TST, INC. CONSULTING ENGINEERS FORWARD PURPOSE OF THIS MANUAL The Town of Johnstown has prepared this manual to provide guidance to engineers and

More information

Plan Name Plan No. Submitting Firm Contact Engineer. Review Date ESI Team ENGINEERS AND SURVEYORS INSTITUTE PEER REVIEW CHECKLIST CITY OF ALEXANDRIA

Plan Name Plan No. Submitting Firm Contact Engineer. Review Date ESI Team ENGINEERS AND SURVEYORS INSTITUTE PEER REVIEW CHECKLIST CITY OF ALEXANDRIA EROSION AND SEDIMENT CONTROL CHECKLIST (E&S) VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (1 of 2) Item # Description OK NO N/A 1 Limits of clearing and grading match on all appropriate sheets 2 Construction

More information

STORM DRAINAGE DESIGN MANUAL

STORM DRAINAGE DESIGN MANUAL Appendix I STORM DRAINAGE DESIGN MANUAL by: SUNGATE DESIGN GROUP, P.A. GEN ERAL DESIGN STAN DARDS AN D POLICIES 1. STREET AND LOCAL DRAINAGE Discharge estimates for specified design storms shall be calculated

More information

6 STORMWATER IMPROVEMENTS

6 STORMWATER IMPROVEMENTS 6 STORMWATER IMPROVEMENTS 6.01 General Requirements a. In addition to the standards contained in this, the design of stormwater systems is also governed by several ordinances and regulations. (1) Projects

More information

Municipal Inspection and Construction Guidelines Section I Roadworks SECTION I ROADWORKS I-1 GENERAL

Municipal Inspection and Construction Guidelines Section I Roadworks SECTION I ROADWORKS I-1 GENERAL I-1 GENERAL SECTION I ROADWORKS The Consultant Engineer is to monitor all specified asphalt, granular materials and sub-grade preparation to ensure all road and curb construction is undertaken as outlined

More information

PART II. - SPECIFICATIONS AND DESIGN STANDARDS TO CITY OF HEWITT, TEXAS SUBDIVISION ORDINANCE FOR PUBLIC WORKS CONSTRUCTION [TEXT]

PART II. - SPECIFICATIONS AND DESIGN STANDARDS TO CITY OF HEWITT, TEXAS SUBDIVISION ORDINANCE FOR PUBLIC WORKS CONSTRUCTION [TEXT] PART II. - SPECIFICATIONS AND DESIGN STANDARDS TO CITY OF HEWITT, TEXAS SUBDIVISION ORDINANCE FOR PUBLIC WORKS CONSTRUCTION [TEXT] A. - General. B. - Streets. C. - Stormwater drainage system. D. - Water

More information

CITY OF HILSHIRE VILLAGE SWIMMING POOL PLAN SUBMITTAL CHECK LIST ADDRESS: DATE:

CITY OF HILSHIRE VILLAGE SWIMMING POOL PLAN SUBMITTAL CHECK LIST ADDRESS: DATE: CITY OF HILSHIRE VILLAGE SWIMMING POOL PLAN SUBMITTAL CHECK LIST "THE FOLLOWING CHECKLIST IS ONLY A SUMMARY THAT IS PROVIDED FOR THE APPLICANT'S BENEFIT; HOWEVER, FULFILLING THE REQUIREMENTS OF THIS SUMMARY

More information

CHAPTER 3. Grading Standards

CHAPTER 3. Grading Standards CHAPTER 3 Grading Standards A. Introduction A grading plan is an important element in preventing property damage, flooding, standing water, and erosion of embankment areas. The design engineer must consider

More information

LOT GRADING GUIDELINES FOR LOW DENSITY RESIDENTIAL PROPERTIES

LOT GRADING GUIDELINES FOR LOW DENSITY RESIDENTIAL PROPERTIES LOT GRADING GUIDELINES FOR LOW DENSITY RESIDENTIAL PROPERTIES Contents LOT GRADING GUIDELINES... 3 LOW DENSITY RESIDENTIAL PROPERTIES... 3 Introduction... 3 Definitions:... 3 Purpose... 3 LOT GRADING APPROVAL

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

CITY OF MILTON CONSTRUCTION NOTES

CITY OF MILTON CONSTRUCTION NOTES CITY OF MILTON CONSTRUCTION NOTES 1. Driveways shall be constructed of concrete and sloped per Georgia Highway standard 9031-J. Curb shall not be broken from gutter. Curb and gutter to be removed to existing

More information

ENGINEERING STANDARDS TOWN OF GRAND VALLEY

ENGINEERING STANDARDS TOWN OF GRAND VALLEY ENGINEERING STANDARDS TOWN OF GRAND VALLEY Date: November 2013 Consolidated May 2016 AMENDMENTS May 2015 Resolution #2015-05-09 Appendix A-3, Storm Sewer connections May 2016 Resolution #2016-05-14 Amends

More information

City of Elgin SUBDIVISION FINAL ENGINEERING Engineering Submittal Checklist

City of Elgin SUBDIVISION FINAL ENGINEERING Engineering Submittal Checklist If this is a re-submittal, please provide a point-by-point response to previous review comments, identifying how each comment has been addressed, location in the plan set of the changes made to address

More information

GENERAL NOTES ROADWAY CONSTRUCTION RD0001-1A ISSUED:2017 REVISED: --

GENERAL NOTES ROADWAY CONSTRUCTION RD0001-1A ISSUED:2017 REVISED: -- ROADWAY CONSTRUCTION NOTES 1. ALL RIGHT-OF-WAY OTHER THAN ROADWAY AREAS SHALL BE SODDED. ALL SLOPE STEEPER THAN 6:1 SHALL REQUIRE SODDING. THE CITY RESERVES THE RIGHT TO REQUIRE SODDING IN SPECIAL AREAS

More information

A Stormwater Management Plan and Sediment Control Plan are required for all proposed developments within the City of Richmond.

A Stormwater Management Plan and Sediment Control Plan are required for all proposed developments within the City of Richmond. Engineering Page 3-1 3.0 STORM DRAINAGE 3.1 GENERAL Good drainage is vital to flat urban areas such as Lulu Island. It is essential that every storm sewer must be designed accurately minimizing conflicts

More information

SECTION GENERAL EXCAVATION

SECTION GENERAL EXCAVATION 02210-1 of 11 SECTION 02210 GENERAL EXCAVATION 02210.01 GENERAL A. Description 1. General excavation shall include but not necessarily be limited to, excavation and grading for general site work, roadways,

More information

Table Related Arlington County Standards, Specification and Policies

Table Related Arlington County Standards, Specification and Policies 2.1 GENERAL 2.1.1 DESCRIPTION SITE WORK V02000 2.1 GENERAL 2.1.1 Description This standard identifies minimum requirements that shall be met for all site work in the design and construction of elements

More information

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related

More information

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1 CITY OF THORNTON Standards and Specifications Revised: October 2012 SECTION 400 - STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 401 GENERAL PROVISIONS 400-1

More information

DESIGN GRADING AND EROSION CONTROL A. Slope Criteria

DESIGN GRADING AND EROSION CONTROL A. Slope Criteria Section 5. DESIGN GRADING AND EROSION CONTROL A. Slope Criteria Earthen slopes shall conform to the following: Maximum slope should not be steeper than 6:1 (horizontal to vertical) unless protected from

More information

A bylaw to regulate standards and specifications for the design and installation of drainage systems.

A bylaw to regulate standards and specifications for the design and installation of drainage systems. TOWN OF CRESTON Consolidated to February 23, 2016 BYLAW NO. 1417 A bylaw to regulate standards and specifications for the design and installation of drainage systems. WHEREAS the Municipal Act allows Council,

More information

DEVELOPMENT ENGINEERING REVIEW MANUAL (Regional Services)

DEVELOPMENT ENGINEERING REVIEW MANUAL (Regional Services) DEVELOPMENT ENGINEERING REVIEW MANUAL (Regional Services) FEBRUARY, 2005 PLANNING AND TRANSPORTATION SERVICES PLANNING AND PUBLIC WORKS DEPARTMENT TABLE OF CONTENTS Introduction 1 Application Review 1.1

More information

The Blue Mountains Engineering Standards Revised April 2009 AODA Update July 2018

The Blue Mountains Engineering Standards Revised April 2009 AODA Update July 2018 The Blue Mountains Engineering Standards Revised April 2009 AODA Update July 2018 April 2009 (AODA) 1 Intentionally left blank April 2009 (AODA) 2 The Blue Mountains Engineering Standards Contents 1 GENERAL

More information

CITY OF WALLED LAKE 1499 E. WEST MAPLE WALLED LAKE, MI 48390

CITY OF WALLED LAKE 1499 E. WEST MAPLE WALLED LAKE, MI 48390 CITY OF WALLED LAKE 1499 E. WEST MAPLE WALLED LAKE, MI 48390 ENGINEERING DESIGN STANDARDS Prepared by: Boss Engineering Howell, Michigan October 5, 2016 TABLE OF CONTENTS PART I. INTRODUCTION SECTION 1.0

More information

SECTION 4 STORM DRAINAGE

SECTION 4 STORM DRAINAGE 4.01 GENERAL SECTION 4 STORM DRAINAGE These standards shall provide minimum requirements for the design of Storm Drainage and related appurtenances within the City of West Sacramento rights of way and

More information

Appendix K: Soil Erosion and Sedimentation Control Plan Check List

Appendix K: Soil Erosion and Sedimentation Control Plan Check List Appendix K: Soil Erosion and Sedimentation Control Plan Check List Drain Commissioner 46 February 2005 SOIL EROSION AND SEDIMENTATION CONTROL PLAN CHECK LIST Items listed below must be clearly depicted

More information

1. INTRODUCTION 1.1 Contents of Engineering Specifications The Engineering Specifications contains the following sections:

1. INTRODUCTION 1.1 Contents of Engineering Specifications The Engineering Specifications contains the following sections: Schedule H to Bylaw 7452, Subdivision Bylaw Page 1 1. INTRODUCTION 1.1 Contents of Engineering Specifications 1.1.1 The Engineering Specifications contains the following sections: 1. Introduction 2. General

More information

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1

CHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1 CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3 CITY OF TORONTO TS 3.70 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS 3.70.01 SCOPE...3 TS

More information

STREET STANDARDS FOR PRIVATE ROAD/STREET. Number of Travel Lanes Width of Travel Lanes Width of Right-of-Way. Subbase - Bank Run Gravel (6" minus)

STREET STANDARDS FOR PRIVATE ROAD/STREET. Number of Travel Lanes Width of Travel Lanes Width of Right-of-Way. Subbase - Bank Run Gravel (6 minus) L. Road Construction All roads shall be a minimum of 200' in length and shall comply with all applicable provisions of this ordinance. No building permit shall be issued for a property until the road constituting

More information

Nottawasaga Valley Conservation Authority

Nottawasaga Valley Conservation Authority Nottawasaga Valley Conservation Authority PROCEDURAL GUIDELINE FOR THE PLACEMENT OF LARGE QUANTITIES OF FILL Effective: October 28, 2011 Nottawasaga Valley Conservation Authority 8195 8th Line, Utopia,

More information

SITE SPECIFIC GRADING PLAN FOR CONTIGUOUS SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION WITH PREVIOUSLY APPROVED PRELIMINARY PLAT (FORM 2)

SITE SPECIFIC GRADING PLAN FOR CONTIGUOUS SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION WITH PREVIOUSLY APPROVED PRELIMINARY PLAT (FORM 2) WASHINGTON COUNTY DIVISION OF PLAN REVIEW AND PERMITTING 80 West Baltimore Street Hagerstown, Maryland 21740-6003 Telephone: (240) 313-2460 FAX: (240) 313-2461 Hearing Impaired call 7-1-1 for Maryland

More information

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES 4.1 GENERAL REQUIREMENTS 4.1.1 Water and fire protection distribution facilities are to be provided solely for the purpose of supplying potable

More information