1 Environmental Monitoring Report Semestral Report January to June 2014 VIE: Power Transmission Investment Program, Tranche 2 Prepared by the Central Vietnam Power Project Management Board (CPPMB) for the National Power Transmission Corporation and the Asian Development Bank.

2 NATIONAL POWER TRANSMISSION CORPORATION CENTRAL VIETNAM POWER PROJECTS MANAGEMENT BOARD SEMIANNUAL ENVIRONMENTAL MONITORING REPORT 2014 PROJECT 500KV PLEIKU-MY PHUOC-CAU BONG TRANSMISSION LINE (POWER TRANSMISSION INVESTMENT PROGRAM - TRANCHE 2) (LOAN 2959-VIE) Da Nang, August 2014

3 ACRONYMS ADB : Asian Development Bank AFD : Agence Française de Développement CPMB : Central Viet Nam Power Projects Management Board CPC : Commune People s Committee CSCC : Compensation and Site Clearance Committee DPC : District People s Committee EVN : Viet Nam Electricity EMP : Environmental Management Plan F/S : Feasibility study GOV : Government of the Socialist Republic of Vietnam HH(s) : Household(s) HPP : Hydropower Plant HW(s) : Highway(s) MONRE : Ministry of Natural Resources and Environment NPT : National Power Transmission Corporation PAP(s) : Project Affected Person(s) PAH(s) : Project Affected Household(s) PPC : Provincial People s Committee PECC4 : Power Engineering Consulting J.S Company 4 PECC2 : Power Engineering Consulting J.S Company 2 PO : Project Owner Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 1/37

4 RP : Compensation, Allowances and Resettlement Plan ROW : Right-of-Way SMIC : Safeguard Monitoring Independent Consultancy T/L(s) : Transmission Line(s) VND : Vietnam Dong Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 2/37

5 1. INTRODUCTION 1.1 Introduction of the project Project background - To implement the policy of industrialization and modernization of the country, the Government of Vietnam has applied to ADB/AFD a loan to support the construction of 500kV Pleiku - My Phuoc - Cau Bong transmission line, with total length of 436, 673 km (437 km); construct 02 new optical repeaters synchronized with the optical cable of 500kV Pleiku-My Phuoc-Cau Bong transmission line on the territory of 05 provinces and one city, which are Gia Lai, Dak-Lak, Dak Nong, Binh Phuoc - Binh Duong and Ho Chi Minh City. The project was prepared under the technical assistance (PPTA) of 7742-VIE and is one part of the transmission investment program (MFF). National Power Transmission Corporation (EVNNPT) is the investor and Central Vietnam Power Project Management Board is responsible for management and implementation of project. - The benefits of the project are: Increasing the supply of reliable power for the South of Vietnam, where the economic development is taking place rapidly, especially the industrial zones and this is also a place accounting for 10% of the whole country s population Objective of the Project - The 500kV Pleiku My Phuoc Cau Bong Transmission Line Project is a part of the National Electricity Network, maintains the supply of electricity to the development need of the South of Vietnam in the period of Moreover, the Project also ensures the connectivity of the transmission networks within Vietnam, Laos and Cambodia to The Project helps to increase the reliability of power supply, reducing the risk of electrical losses. It will also optimize capacity of power plants in order to provide electricity continuously and safely to the sub-loading lines of the South in particular and the whole country in general. Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 3/37

6 Scale and scope of the Project - The 500kV Pleiku- My Phuoc- Cau Bong Transmission Line (TL) takes place within the boundaries of 06 provinces and one city, namely: Gia Lai, Dak Lak, Dak Nong, Binh Phuoc, Binh Duong and Ho Chi Minh City. In particular: + In Gia Lai Province, the TL is km long and passes through 18 communes which belong to 05 districts: Chu Pah, Ia Grai, Pleiku City, Chu Prong, Chu Puh; + In Dak Lak Province, the TL passes through 09 communes in the districts of Ea Sup, Cu M Gar and Buon Don with the total length of km; + In Dak Nong Province, there are 20 communes which the TL has gone through. These communes belong to districts of Cu Jut, Dak Mil, Krong No, Dak Song, Tuy Duc and Dak R Lap. The TL in Dak Nong is km long; + Binh Phuoc Province has km of TL. The line passes through 15 communes in the following districts: Bu Dang, Bu Gia Map, Dong Phu and Chon Thanh; + In Binh Duong Province, the TL passes through 10 communes in Ben Cat Districts and Phu Giao Districts with the total length of km; + In the Cu Chi Districts of Ho Chi Minh City, the TL locates in the area of 04 communes and is km long. 500 kv Pleiku - My Phuoc - Cau Bong Transmission Line subproject has a total length of km. It starts from the existing Pleiku 500kV substation at Chu Pah District in Gia Lai Province and terminate in Cau Bong substation, which is planned to be constructed in Cu Chi District, Ho Chi Minh City. The components of the Project include in Table 1 and the main project features are presented in Table 2. Routes of Transmission Line are displayed in the Figures 1 and 2. Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 4/37

7 Table 1: Components of the Transmission Line Transmission Line Length Starting point Ending Number Components (km) point of Towers Gia Lai Province At 500 kv G Transmission Line busbar at Pleiku 403m Component 500 kv substation Dak Lak Province G13 (Picket G Transmission Line ) (Picket Component ) Dak Nong Province G25-G26 G50-G Transmission Line (Picket (Picket Component ) ) Binh Phuoc Province G51 (Picket G69-G Transmission Line ) (Picket Component ) Binh Duong G70 (Picket G81-G82 99 Province ) (Picket Transmission Line ) Component HCMC G81-G82 At 500 kv 54 Transmission Line (Picket busbar at Component ) Cau Bong 500kV substation Total length of TL Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 5/37

8 Table 2: Summary of main features of 500 kv Pleiku- My Phuoc- Cau Bong Transmission Line Item Length (km) Technical data km - Starting point At 500 kv busbar at Pleiku 500 kv substation - End-point At 500 kv busbar at Cau Bong 500kV substation Right of Way width Earth grounding width Voltage 16m from either side of the centre line From 16m to within 72m from the centre line 500 kv Number of circuits 2 Conductor Earth wire Optical repeater cable Suspension towers (number) 4xACSR-330/43 OPGW-90 & PHLOX fibres Height Average 65m with the highest is 79m -Area requirement/tower m² Tension towers (number) Height Average 60m with the highest is 72m - Area requirement/tower m² Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 6/37

9 Figure 1: Location of the Pleiku - My Phuoc - Cau Bong 500 kv transmission line and surrounding areas Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 7/37

10 National Parks National Reserves Cultural-Historic Water flooded land 500kv Pleiku-My Phuoc-Cau Bong Figure 2: Transmission line and other closed places Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 8/37

11 1.1.4 Project Construction Progress The project started from October 23, 2011 and was finished and put into operation on May 05, 2014 with the warranty period of 24 months. The construction progress updated until May 21, 2014 is as follows: - Foundation digging: 926/926 position - Foundation casting: 926/926 position - Tower erection: 926/926 - Stringing conductors: km / km The construction packages and implementation progress are presented in Table 3 Table 3: The Project s construction packages implementation progress Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 9/37

12 Packages Constructors Length (km) Position No. Foundation casting Tower erections String conductors % of String conductors ĐĐ-G6 and OHL feeder Power Construction Company % Ltd No.4 500kV Pleiku OHL feeder Acceptanced and energized on April 21, 2014 Pac. 02 (G6-G13) Vietnam Electricity Construction Company Pac. 03 (G13-G17) Vietnam Electricity Construction Company Pac. 04 (G17-G21) Joint Venture of Power Construction Company Ltd No.4 and Viet Trung Joint Stock Company Joint Venture of Viet A Investment Commercial Pac. 05 (G21-G24) Industrial Company and Dien Dia Phuong Ltd Co. Buon Đon optical repeater station % % % Completed Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 11/37

13 Pac. 06 (G24-G30) INCO Company % Pac. 07 (G30-G36) Joint venture of Installation of Machines and Electricity Joint Stock Company and Electricity and Construction Joint Stock Company. Pac. 08 (G36-G45C) Joint Venture of Power Construction Company Ltd No.4, Alphanam Joint Stock Company and Song Da 12 Joint Stock Company Pac. 09 (G45C-G49) Song Da 11 Joint Stock Company Pac. 10 (G49-G52) Song Da 11 Joint Stock Company Song Da 11-Thang Long Joint Pac. 11 (G52-G60) stock Company Bu Dang optical repeater station % % % % % Completed Pac. 12 (G60-G64) Song Da 11-Thang Long Joint stock Company % Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 12/37

14 Pac. 13 (G64-G71) Power Construction Joint Stock Company No % Pac. 14 (G71-G79) Joint Venture of Power Construction Joint Stock Company No.1 and Thang Long Joint Stock Company % Pac.15 (G79-G85) Power Construction Company Ltd No % - Section of 110kV Pac. 16 (G85-ĐC and OHL feeder) Power Construction Company % Cau Bong OHL Ltd No.2 feeder Completed Total: % Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 13/37

15 1.2 Purpose of the report: In order to comply with AFD/ADB s requirements on environment safeguards, EVNNPT- CPMB is requested to prepare the semiannual environmental monitoring reports. These reports are considered as an important and necessary part to evaluate the AFD/ADB s safeguard compliance of EVNNPT-CPMB. This report presents environmental compliance, the need and method to environmental inspection and management, environment aspects to be monitored of the 500kV Pleiku-My Phuoc-Cau Bong transmission line subproject during the period from January 2014 to July INCORPORATION OF ENVIRONMENTAL REQUIREMENTS INTO PROJECT CONTRACTUAL ARRANGEMENTS The civil works contracts have included the environment management work which must be performed by contractors as per EVNNPT requirements. In order to ensure that the IEE approved by ADB shall be fully and strictly complied by the contractors, CPMB has sent the EMP and draft of CEMP (both Vietnamese and English versions) to contractors. In addition, to monitor environmental compliance of contractors, CPMB has also sent official letters to contractors requesting for implementation of the EMP, CEMP and other related works. On that basis, the contractors have prepared CEMP for their units and strictly follow the requirements of CPMB to meet the requirements in accordance with ADB's guidelines on Environmental Management Plan (EMP). The implemementation of EMP of contractors shall be supervised and monitored as an intergral part of civil works contracts. Besides, the EMP has also been sent to supervising units such as PTC3 (Power Transmission Company No.3) and PTC4 (Power Transmission Company No.4) and related departments of EVNNPT-CPMB to supervise the implementation of contractors. 3. SUMMARY OF ENVIRONMENTAL MITIGATIONS MEASURES REQUESTED IN EMP. Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 14/37

16 Table 4: Summary on the impacts and mitigation measures listed in the EMP Impacts Proposed mitigation measures CONSTRUCTION PHASE Noise and vibration Dust management i. If particularly noisy activities are required work may need to be limited to daylight hours. When dust is carried towards residential areas or becomes problematic on-site, the contractor is to apply dust control measures such as: Materials have to be fully covered to prevent emissions to the atmosphere. Spraying water on the area where there is dust. Watering the road of transportation when the weather is dry. Prevention of soil erosion on construction site. i. Apply soil conservation and erosion protection technologies. ii. Avoid operating machinery in adverse ground conditions. iii. Protect and revegetate newly excavated areas as soon as possible Storage and handling of: fuel and lubricants i. Storage areas to be prepared to avoid deterioration of materials. ii. All fuel storage areas to be security fenced and provided with oil and water separators. Fuel hoses Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 15/37

17 Impacts and shut off valve to be locked. Proposed mitigation measures iii. All refueling to be done at least 20 m away from waterways by trained personnel. iv. All waste oil and oil filters to be collected and if possible recycled, otherwise to be disposed of to landfills. v. The contractor is to train refueling personnel in these procedures. vi. The contractor is to have developed an accidental spill handling action plan. Public access to site i. Erect warning signs and barriers around work areas. ii. Site can only be accessed with permission of contractor. iii. Visitors to be inducted to site with an explanation of the site hazards that may be experienced. Community Safety from increased vehicle movements i. All vehicles to be properly maintained and operated in accordance with road laws. ii. All loads to be properly secured and fugitive loads to be covered. iii. Drivers to be fired if ignore safety requirements. i. Use of hazardous materials and ii. Prohibited activities i. Contractor to provide list of all HAZCHEM products to be used on site ii. List verified against HAZCHEM. Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 16/37

18 Impacts Proposed mitigation measures Workplace health and safety Contractor to abide by: Vietnamese Labour Code as amended Workers to be provided with safe working environment including: i. Erect warning signs and barriers around work areas ii. No drugs or alcohol allowed on-site iii. Noise and dust to be controlled. iv. All workers provided with safety equipment appropriate for the task in which they are employed. v. To be supplied on-site for workers: Potable water, chemical toilet, changing place with clothes storage, and washing and showering facilities. vi. Work Statements prepared for each activity vii. Prior to entering site for first time workers to be inducted to site and site hazards explained together with explanation of work site safety procedures. ix. Medical and first aid facilities provided together with a person qualified in first aid. Worker issues (i): Hiring of Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 17/37

19 Impacts workers and HIV/AIDS issues. Proposed mitigation measures Contractor to implement HIV/AIDS awareness program. Worker issues (ii): Location of camps and employment of local labour i. Local communities to be preferentially offered employment for unskilled work. ii. Camps to be sited to avoid social conflicts. iii. Each camp should have a solid waste disposal site and a soakage pit to pre-treat camp wastewater Worker issues (iii): Provision of adequate living conditions within campsite. Camp conditions to meet Labour Law requirements. Provide: i. adequate shelter ii. potable water iii. Sanitation and washing facilities iv. Kitchen with adequate cooking facilities v. Nutritionally adequate food rations Worker issues (iv): Camp water heating and cooking. Use of fuel wood. PREFERENTIALLY i. the contractor will provide gas and kerosene for water heating and cooking. ii. Locate camp away from significant forest areas, and: limit collection and use of fuel-wood. Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 18/37

20 Impacts Worker issues (v): Hunting and sale of wildlife by workers Disposal of site waste Chance discovery of archaeological and cultural sites Proposed mitigation measures i. Labour employment agreement enforced by contractor that bans hunting and trading in wildlife by workers. ii. Labour who disregards this requirement are handed over to Forest Protection Department for prosecution and immediately dismissed. Contractor is to provide nutritionally adequate camp rations. All waste materials to be collected and sorted; (i) those that can be recycled and (ii) those that need to go to an approved landfill site for disposal. No known sites. Chance discoveries are to be notified to the SE who will advise the EO. EO to advice on procedure for dealing with chance discoveries. Clearance and rehabilitation of construction sites and removal of contractor s facilities. i. All solid waste to be removed from sites and disposed in approved landfills. ii. All contaminated soil to be removed. iii. All sites to be rehabilitated and restored to original condition. iv. Drainage to be re-established. v. To be included as part of Final Inspection before payment made. Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 19/37

21 Impacts Proposed mitigation measures OPERATION PHASE Unsafe operation of transmission line. i. Unsafe habitation within RoW ii. Unsafe operation of transmission line. i. Vegetation cut and controlled to safe operating limits. ii. Use hand labour i. All buildings kept out of 32 m RoW ii. All buildings outside 16m RoW width from centreline to 72 m earthed. Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 20/37

22 4. ENVIRONMENT COMPLIANCE INSPECTION AND MANAGEMENT. 4.1 Environment compliance inspection EMP implementation inspection of CPMB and related parties: - Monitoring and compliance with the environmental management plan of CPMB and the related parties are implemented according to the organization structure and method of environmental management system shown in Figure 3. The information on labor safety and environmental sanitation has been quickly reflected to PMU, concurrently the duties of parties: PMU construction monitoring unit contractors local authorities have been determined clearly and closely. PMU (CPMB) Construction monitoring units (PTC3 & PTC4) Contractors Local authorities Construction monitoring engineers contractors of Figure 3: Organization structure of environmental management system - In order to effectively implement the tasks of environmental management, CPMB and other units involved in environmental monitoring system Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 21/37

23 (contractors, local authorities, construction monitoring units: PTC3, PTC4...) have to conduct their specific environmental management tasks; to monitor the environmental impacts caused by project construction activities and other related activities and ensured that the EMP has been followed during construction of the project. - Almost all of mitigation measures presented in the Contractor Environmental Management Plan (CEMP) were performed relatively well under the supervision of the power transmission companies (PTC3, 4) as well as the staffs in charge of CPMB. - The semiannual environment monitoring reports were prepared by CPMB and submitted to ADB/AFD for review in August 2013, February 2014 and August On August 27-29, 2013, CPMB and ADB consultants conducted site visit in the area of Cu Chi and Binh Duong to check the compliance with the projects s environmental management plan. - On the basis of submitted reports and the situation found in the site visit, ADB had no objection letter dated September 03, 2013, which recognized the compliance of the project on ADB s environment, resettlement and ethnic minority safeguards. - From December 05-07, 2013, CPMB and ADB/AFD have conducted site visits at some places of the project as Tan Thanh Dong commune, Cu Chi district, Ho Chi Minh City; Lai Hung commune, Ben Cat district and Tan Long commune, Phu Giao district of Binh Duong province. - From April 01-04, 2014, CPMB and ADB have conducted site visit at some places of the project belonging to Gia Lai and Dak Lak provinces (such as Nghia Hoa commune of Chu Pah district, Gia Lai province; Tan Hoa commune of Buon Don district, Dak Lak province; Tan Thanh Dong commune of Cu Chi district, Ho Chi Minh city) to check the compliance with the EMP, social safeguards and the issues of reforestation for the project. Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 22/37

24 - CPMB evaluates the effectiveness of the implementation of mitigation measures conducted by contractors during the construction period, based on environmental compliance reports and the Minutes of environmental compliance monitoring of contractors, and actual situation of environmental management under the supervision of Power Transmission Companies, the engineers who have supervised project construction of CPMB as well as local authorities in the project area. - CPMB has always monitored, supervised and urge prompted the contractors to strictly implement of environmental management in accordance with regulations Environment compliance inspection for Contractors: - On the basis of CEMP and civil work contracts, the contractors have strictly performed environmental management plan in accordance with the ADB's guidelines and requirements of EVNNPT/CPMB. - The contractors cooperate with CPMB and local authorities to disclose information about the project construction activities to the local people and deal with the local authorities, local people to work together to implement CEMP well. - Contractors assign environment experts to address the environment information to workers and implement the mitigation measures during the project duration. - The contractors are willing to solve shortcomings arising during construction after each inspection of the CPMB staff who are in charge of compliance with the environmental management plan of the contractors. - Contractors attended the meetings and give out solutions to shortcomings as per CPMB s request. Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 23/37

25 - Contractors have set up criteria to implement the mitigation actions, which are stated in the CEMP and report the compliance in the format guided by ADB enclosed with Certified Minutes under the monitoring of CPMB. - The contractors integrate, complete and submit reports to the CPMB before the 25th date of each month. The report and the written certification complied with ADB guidelines form and the content of the approved EMP. The reports focus on the impacts incurred during the construction process and the mitigation measures implemented by contractors that are summaried in table 5 below. Table 5. Summary of the project environmental impacts and mitigation measures conducted by contractors. Impacts Mitigation measures taken by contractors Note Dust and waste Noise and vibration There has been a person who regularly checked the transportation vehicles, equipment to handle the problem of air pollution. Materials have been fully covered to prevent emissions to the atmosphere. The trucks moving materials have been fully covered to ensure no pollution to the air environment. Reduced of vehicle traffic on roads Sprayed water on the area where there is dust. Watering the road of transportation when the weather is dry. The construction activities have took place during the day. Used equipment with small capacity and not so regularly, therefore the noise did not affect the residential area and could be acceptable. The equipment, tools, machinery met registered standards. Complied with national technical regulation on noise. Certified by Minutes * Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 24/37

26 Impacts Mitigation measures taken by contractors Note Water waste of construction Collected and transported waste to the place in accordance with local regulations. Cement bags were collected and reused. Excavated soil was used to backfill the pit after construction. Water waste was not discharged directly into rivers, lakes around. Arranged ditch surrounding the foundation to collect water to a hole to reduce turbidity before water is discharged into the pit around. Minimized the oil spillage of construction machinery outside the site. Soil erosion on construction site. Restricted excavation expand, reduced soil erosion potential. Applied the land protection method at the area where there is erosion. Avoided using machinery to dig up the soil in the humid conditions. Excavation area was leveled soon after completion of the work. Protected new foundation immediately after completion. Grassed and embankment at the place where it is easily eroded. Solid waste All construction waste materials including steel and wood trim, sand, gravel, cement bags etc.... were collected and classified for reuse if possible, or treated at a regulated place. Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 25/37

27 Impacts Mitigation measures taken by contractors Note Storage and handling of construction materials Community Safety from increased vehicle movements Workplace health and safety Storage areas have been prepared and protected by security fences, locked protection. Fuel were stored in properly sealed containers; regularly checked so that the fuel does not flow into the environment. All the filling of fuels were done at least a distance of 20 m from the river, streams, ponds and lakes and it was carried out by trained personnel. Oil waste was collected and treated as per regulations. Developed training for the troubleshooting process and explosives for employees to handle problems related to fire and explosion. All vehicles were properly maintained and operated in accordance with road laws. Used the transportation vehicles suitable with the road Drivers to be fined if ignore safety requirements. Erected warning signs at the dangerous places or at the crossing place with the traffic road. Erected warning signs and barriers around work areas There is no drug or wine at the site. Dust and noise were controlled. All the workers were provided with protection equipment which is suitable for their work. All workers were provided with: clean water, toilets, protection clothes and area for bathing. Before accessing the site for the first time, Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 26/37

28 Impacts Mitigation measures taken by contractors workers were introduced about the dangerous places and were guided with safety procedures at workplace. Note There has been medicine cubicle at the site for first aid. Clearance and rehabilitation of construction sites and removal of contractor s facilities. All solid waste was removed from sites and disposed in approved landfills. All contaminated soil was removed. Sites have been rehabilitated and restored to original condition. There is the witness of local authorities when returning of site. Drainage were re-established as the original condition Public access to site Erected warning signs and barriers around work areas. Worker s health and community Site could only be accessed with permission of contractors. Visitors to site were explained site hazards that may be experienced. Enhanced awareness of workers about the social evils. Implemented the preventive measures against HIV / AIDS. Provided adequate living conditions in the camp area, to ensure hygiene for drinking water and cooking. Regional camps are located in high places, dry, non-humid Provided protective equipment for workers and required workers to use while working. Provided first aid facilities, medicines for workers. Cleaned the worker camps. Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 27/37

29 Impacts Mitigation measures taken by contractors Note Strictly prohibited hunting and trading of wild animals ev * Certified Minutes: Environmental Compliance Monitoring Minutes of were certified by the construction monitoring engineers of CPMB or PTC3, 4. The mitigations implemented by the contractors have supervised and stated results in the Minutes. Most of mitigations were evaluated according to effectiveness rating criteria to be good. In order to effectively implement the tasks of environmental management, the CPMB and other units involved in environmental monitoring system (construction monitoring engineers; local government, PTC3, PTC4...) have supervised the above mentioned activities of the contractors as well as other related activities of the project to ensure that the EMP are followed during the construction and operation of the project. 4.2 Environment Management: Environment Management performed by CPMB 1. Environment management is well performed by CPMB before and during the project implementation. 2. All the conditions and requirements on the environment management which must be performed by parties are strictly set forth by CPMB. 3. The implementation of the monitoring of environmental management in accordance with EVNNPT s requirement as well as the requirements of security, public order and safety, fire prevention, environmental sanitation in particular has been incorporated in the civil works contracts of the project and CPMB follow up the implementation of the contractors. 4. To operate better environmental management system for the project, CPMB dispatched officials who are responsible for environment to receive monthly information, as a bridge between the CPMB and the unit related to timely resolve issues of environmental safety. Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 28/37

30 5. CPMB has prepared the monitoring criteria in Enviromental compliance Report and Enviromental compliance monitoring Minutes, which were sent to the contractors for implementation. 6. There is always technical expert of CPMB who is at site and urge the contractors to comply the mitigation measures set forth in EMP during the construction. 7. The meeting attended by the Contractor, Consultant and representative of CPMB is maintained weekly under the chairmanship of the CPMB. Besides meeting unexpected mechanism addressing the urgent issues is also proposed depending of the actual conditions of the site. 8. Ready and full-participation meetings, training, seminars... on the environment management organized by ADB, absorb and overcome the deficiencies and shortcomings Environment Management performed by constrution monitoring companies Apart from monitoring the construction, monitoring companies (PTC3, PTC4) are frequently at site and requesting contractors to fully prepared legal formalities on the environment safety Environment Management performed by contractors Contractors assign their experts to the site and monitor all the environment issues, including: Supervision of contractors (CSE), Environmental Officer and health safety (EHS), Community Expert Consultation (CLO). These staffs are responsible for implementing and monitoring the implementation of CEMP, responsible for monitoring compliance with the EMP, the health and safety issues as a liaison between the local community and the contractors. Based on approved EMP, the contractors take actions to minimize environmental impacts, evaluate and report to CPMB to receive support information from the CPMB and construction monitoring companies in the implementation of environmental management at site. Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 29/37

31 Participations of related parties at local in enviromental management 1. Local authorities at the place where the transmission line passes by also assign some experts to cooperate with CPMB and contractors to address the project activities to local people. Besides, supporting the contractors in compensation for land, assets...affected when the contractors hire the area surrounding the foundation, storage of construction materials PPC of communes/districts where the transmission line passes by requests contractors to return the surface of the roads, where contractors use to transport the construction materials, to the original condition after contractors complete the construction of each item. 3. The participation of community during the project implementation is also highly paid attention. 4.3 Mitigation compliance in operation phase 1. The expected adverse impacts during the operational phase of the 500kV Pleiku- My Phuoc- Cau Bong transmission line are generally related to the occupational and community health and safety issues. The impacts are reversible, manageable, and can be mitigated with oper engineering and management controls. Operations management units (PTC3 and PTC4) will be responsible for the operation of the 500kV transmission line and its ancillary services. 2. The actual survey on site along to 500kV Pleiku- My Phuoc- Cau Bong transmission line, shows that the operating units has complied with the EMP and well controlled the environmental safety measures during the period from the start of the operation so far. 3. In addition, the exchange of information with the operations management units, local authorities and the communities in the project area on the implementation of the environment safety measures shows that the coordination between the management and operation unit with the relevant departments and locals is well done. Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 30/37

32 4.4 Mitigation effectiveness 1. The environment monitoring has showed that most of mitigation measures in CEMP are strictly performed under the monitoring of transmission companies, CPMB and the experts of contractors. Criteria to implement the mitigation measures were set up as per ADB s instructions in EMP, which were stated in CEMP and monthly environmental compliance reports of the contractors to ensure that the EMP are followed during the construction. 2. In order to evaluate how the contractors have used the mitigation measures in EMP, CPMB has refered to the Minutes of checking and compliance reports stated above of the contractors, which are submitted to CPMB every month as well as to check at site. It can be seen from these reports that mitigation measures have been used quite well by the contractors such as: hanging alarm signs at site, limit the noise, dust for the residential areas, limit the erosion, land slide, mitigate the impacts on the water, mitigate the damages caused by trees cutting, impacts to the agricultual land, manage the waste during the construction; collect and storage the construction materials, restore the traffic roads The effectiveness of each contractors in the implementation mitigation measures are summarized in Table 6 below: Table 6: The summary of effectiveness of each contractor in mitigation compliance during the construction: Packages Contractors Effectiveness Evaluation ĐĐ-G6 and OHL feeder Power Construction Company Ltd No.4 Good Pac. 02 (G6-G13)& Pac. 03 Vietnam Electricity Construction (G13-G17) Company Good Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 31/37

33 Pac. 04 (G17-G21) Joint Venture of Power Construction Company Ltd No.4 and Viet Trung Joint Stock Company Good Pac. 05 (G21-G24) Joint Venture of Viet A Investment Commercial Industrial Company and Fair Dien Dia Phuong Ltd Co. Pac. 06 (G24-G30) INCO Company Fair Pac. 07 (G30-G36) Joint venture of Installation of Machines and Electricity Joint Stock Company and Electricity and Construction Joint Stock Company. Pac. 08 (G36-G45C) Joint Venture of Power Construction Company Ltd No.4, Alphanam Joint Stock Company and Song Da 12 Joint Stock Company Pac. 09 (G45C-G49)& Pac. 10 Song Da 11 Joint Stock Company (G49-G52) Pac. 11 (G52-G60)& Pac. 12 Song Da 11-Thang Long Joint stock (G60-G64) Company Pac. 13 (G64-G71) Power Construction Joint Stock Company No.1 Pac. 14 (G71-G79) Joint Venture of Power Construction Joint Stock Company No.1 and Thang Long Joint Stock Company Pac.15 (G79-G85) Power Construction Company Ltd No.2 - Section of 110kV & Pac. 16 G85-ĐC and OHL feeder) Good Good Good Good Good Good Fair 5. Status of reforestation activities: 5.1. In Dak Lak province: Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 32/37

34 a/ Affected forest square: 107,11ha b/ Compensation result: Compensated forest square: 107,11ha Compensated forest cost: VND, was transferred according to Decision No. 485/ QĐ-UBND dated 07/03/2014 of the People Committee of Dak Lak Province. Compensatory reforestation plan: is being appraising, after the People Committee of Dak Lak Province approves, CPMB will transfer the approved amount to Forest Protection and Development Fund of Dak Lak province. c/ The reforestation to now: not yet performed Place for reforestation: At plots 4,5/group 262, plots 2,4,7/subdivision 264 of Ea Lê commune, Ea Sup district and plots 3,6,7/subdivision 546, plots 5,6/subdivision 556 of Ea Kiet commune, Cư Mgar district. Square of reforestation: 107,11 ha. Time for reforestation: not yet performed Company who will be in charge of reforestation: Chu Ma Lanh Forestry Company Limited in Ea Sup district, Dak Lak province and Buon Ja Wam Company Limited at M'gar district, Dak Lak province In Gia Lai province: a/ Affected forest square: 28,7 ha b/ Compensation result: Department of Agricultural and Rural Development is submitting the cost for compensated forest to People Committee of Gia Lai Province for approval. Compensated forest square: 28,7 ha Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 33/37

35 Department of Agricultural and Rural Development is submitting the cost for compensated forest to People Committee of Gia Lai Province: VND Payment: Not yet been made. After People Committee of Gia Lai Province approves, CPMB will transfer this amount to Forest Protection and Development Fund of Gia Lai province c/ The reforestation to now: not yet performed Place for reforestation: at plot 6/subdivision 229, Hoa Phu commune, Chu Pah district, Gia Lai province. Square of reforestation: 28,7 ha. Time for reforestation: not yet performed Company who will be in charge of reforestation: Forest Protection Management Unit of North Sea Lake, Gia Lai province. 6. CONCLUSION Through the process of evaluation, management and monitoring the construction of project, CPMB found that most of the contractors were relatively in good compliance with the approved EMP. The problems exist in the construction period to the present time have been overcame. CPMB and all related parties will continue to troubleshoot if having any problems during the warranty period of the project. During construction and operation phase of 500kV Pleiku- My Phuoc- Cau Bong transmission line, all the related stakeholders have complied with the EMP, followed the progress plan and ensured the work quality and safety, which has minimized the environmental impacts to people life in the project area. The 500 kv Pleiku - My Phuoc - Cau Bong transmission line has been accepted and put into operation since May 05, CPMB has transferred the project for Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 34/37

36 Power Transmission Company 3 and 4 (PTC3 &PTC4) to directly manage and operate. These units are responsible for regularly checking each item in the warranty period (24 months since starting the operation) for the timely detection and report to the project owner to take solutions and enable the work going to stable and sustainable operation in the future. Initially, the monthly operation and maintenance of the Operation and Management Units have been strictly implemented and complied with the Government s regulations on the high-voltage safety as well as other legal documents of the electricity industry. Through the construction of 500 kv Pleiku - My Phuoc - Cau Bong transmission line, under ADB s guideline and the implementation of the project environmental management plan, CPMB and the units involved have learned out a lesson for future similar projects to be organized more well and thoroughly. Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 35/37

37 Figure 2: The local people have planted cassava inside the ROW of 500kV Pleiku- My Phuoc- Cau Bong transmission line in Binh Phuoc Province. Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 36/37

38 Figure 3: Cassavas are growing very well Enviromental Compliance Report, 500kV Pleiku My Phuoc Cau Bong TL, Tranche 2, MFF 37/37

VIE: Power Transmission Investment Program - Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line

VIE: Power Transmission Investment Program - Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line Environmental Monitoring Report 4th Quarterly Report February 2016 VIE: Power Transmission Investment Program - Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line Prepared by Southern

More information

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line Environmental Monitoring Report Quarterly Report October to December 2014 VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line Prepared by

More information

VIE: Power Transmission Investment Program, Tranche 1 220kV Song May Uyen Hung Transmission Line

VIE: Power Transmission Investment Program, Tranche 1 220kV Song May Uyen Hung Transmission Line Environmental Monitoring Report Quarterly Report October to December 2014 VIE: Power Transmission Investment Program, Tranche 1 220kV Song May Uyen Hung Transmission Line Prepared by the Southern Vietnam

More information

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Social Monitoring Report #1 Semestral Report Project Number: 46391-001 August 2017 VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Prepared by Ho Chi Minh Power Corporation for the

More information

VIE: Power Transmission Investment Program - Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line

VIE: Power Transmission Investment Program - Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line Environmental Monitoring Report Semestral Report July to December 2015 VIE: Power Transmission Investment Program - Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line Prepared by Southern

More information

VIE: Power Transmission Investment Program, Tranche 1 220kV Song May-Uyen Hung Transmission Line

VIE: Power Transmission Investment Program, Tranche 1 220kV Song May-Uyen Hung Transmission Line Environmental Monitoring Report Semestral Report July to December 2014 VIE: Power Transmission Investment Program, Tranche 1 220kV Song May-Uyen Hung Transmission Line Prepared by the Southern Vietnam

More information

VIE: Power Transmission Investment Program -Tranche 3

VIE: Power Transmission Investment Program -Tranche 3 Environmental Monitoring Report # Quarterly Report (Q2 2018) Jan 2019 VIE: Power Transmission Investment Program -Tranche 3 COVERING THE FOLLOWING SUBPROJECTS: (i) 500kV My Tho Duc Hoa transmission line,

More information

VIE: POWER TRANSMISSION INVESTMENT PROGRAM, TRANCHE 3 Loan: 3374-VIE

VIE: POWER TRANSMISSION INVESTMENT PROGRAM, TRANCHE 3 Loan: 3374-VIE ENVIRONMENTAL MONITORING REPORT Project Number: 42039-036 Period: April - June, 2017 VIE: POWER TRANSMISSION INVESTMENT PROGRAM, TRANCHE 3 Loan: 3374-VIE COVERING THE FOLLOWING SUBPROJECTS: (i) 500kV My

More information

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION 10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION 10.1 Objective The main objective is to confirm the implementation of mitigation measures recommended in

More information

VIE: Power Transmission Investment Program -Tranche 3

VIE: Power Transmission Investment Program -Tranche 3 Environmental Monitoring Report # Quarterly Report January March 2018 VIE: Power Transmission Investment Program -Tranche 3 COVERING THE FOLLOWING SUBPROJECT (i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix)

More information

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT. VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT. VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT Project Number: 46391-001 December 2017 VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Prepared by Ho Chi Minh City Power Corporation,

More information

Multitranche Financing Facility Socialist Republic of Viet Nam: Power Transmission Investment Program

Multitranche Financing Facility Socialist Republic of Viet Nam: Power Transmission Investment Program [VIE MFF0066 PFR2] POWER TRANSMISSION INVESTMENT PROGRAM Initial Environmental Examination July 2012 Multitranche Financing Facility Socialist Republic of Viet Nam: Power Transmission Investment Program

More information

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Environmental Monitoring Report # Semestral Report June 2018 VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Prepared by Ho Chi Minh City Power Corporation, Electricity of Viet Nam

More information

NORTHERN POWER TRANSMISSION EXPANSION PROJECT

NORTHERN POWER TRANSMISSION EXPANSION PROJECT SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT Project Number: 38196-013 Period: July- December 2013 NORTHERN POWER TRANSMISSION EXPANSION PROJECT Prepared by the Local Implementation consultant (LIC) for

More information

VIE: Mong Duong 1 Thermal Power Plant

VIE: Mong Duong 1 Thermal Power Plant 7 th Independent Monitoring Report September 2011 VIE: Mong Duong 1 Thermal Power Plant Prepared by the Development Research and Consultancy Center (DRCC) for Viet Nam Electricity (EVN) Thermal Power Project

More information

Republic of Croatia HRVATSKE AUTOCESTE (Motorway Maintenance Department) RIJEKA GATEWAY PROJECT Rehabilitation works on the big arch of Krk Bridge

Republic of Croatia HRVATSKE AUTOCESTE (Motorway Maintenance Department) RIJEKA GATEWAY PROJECT Rehabilitation works on the big arch of Krk Bridge Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Croatia HRVATSKE AUTOCESTE (Motorway Maintenance Department) RIJEKA GATEWAY

More information

Japanese ODA. Ex-ante Evaluation

Japanese ODA. Ex-ante Evaluation Japanese ODA Ex-ante Evaluation 1. Name of the Project Country: The Socialist Republic of Vietnam Project: Second Ho Chi Minh City Water Environment Improvement Project (I) (II) (III) L/A signed on: March

More information

VIE: Northern Power Transmission Expansion Sector Project

VIE: Northern Power Transmission Expansion Sector Project Environmental Monitoring Report Semestral Report July-December 2012 VIE: Northern Power Transmission Expansion Sector Project Prepared by the Local Implementation consultant (LIC), with information mostly

More information

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project ENVIRONMENTAL MONITORING REPORT Project Number: 46391-001 March 2018 VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Prepared by Hanoi City Power Corporation, Electricity of Vietnam

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

NORTH POWER CORPORATION Electric Network Project Management Board RESETTLEMENT PLAN (RP) SUBPROJECT:

NORTH POWER CORPORATION Electric Network Project Management Board RESETTLEMENT PLAN (RP) SUBPROJECT: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Sub-project: Improving grid medium, low voltage NORTH POWER COORATION Electric Network

More information

IN THE KYRGYZ REPUBLIC

IN THE KYRGYZ REPUBLIC Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NATIONAL ROAD REHABILITATION (OSH-ISFANA) PROJECT (NRRP)- WORLD BANK PPA Q 6240 CONSULTANCY

More information

Initial Environmental Examination. Multitranche Financing Facility Socialist Republic of Viet Nam: Power Transmission Investment Program

Initial Environmental Examination. Multitranche Financing Facility Socialist Republic of Viet Nam: Power Transmission Investment Program Power Transmission Investment Program (RRP VIE 42039) Initial Environmental Examination Project Number: 42039-034 November 2011 Multitranche Financing Facility Socialist Republic of Viet Nam: Power Transmission

More information

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Resettlement Due Diligence Report April 2016 VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Prepared by Ho Chi Minh City Power Corporation for the Asian Development Bank. Resettlement

More information

PROCUREMENT PLAN. Consulting Services

PROCUREMENT PLAN. Consulting Services PROCUREMENT PLAN Basic Data Project Name: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Project : 46391-001 Approval : 3161/8286 Country: Viet Nam, Socialist Republic of Executing Agency:

More information

Summary of Environmental and Social Consideration in Development Study (Preparatory Study)

Summary of Environmental and Social Consideration in Development Study (Preparatory Study) Summary of Environmental and Social Consideration in Development Study (Preparatory Study) 1. Full title of the Project The Study on Integrated Development Strategy for Danang City and Its Neighboring

More information

Ex-ante Project Evaluation

Ex-ante Project Evaluation Ex-ante Project Evaluation 1. Name of project Country: Socialist Republic of Vietnam Name of project: Hai Phong City Environmental Improvement Project (II) L/A signing date: March 31, 2009 Loan amount:

More information

VIE-7865 Secondary Cities Development Project

VIE-7865 Secondary Cities Development Project VIE-7865 Secondary Cities Development Project Tam Ky Buon Ma Thuot Ha Tinh Workshop on Enabling Inclusive Cities 28-29 October 2013 Sonia Chand Sandhu Sr. Environment Specialist SEUW VIE: 7856 Secondary

More information

Japanese ODA loan. Ex-ante Evaluation

Japanese ODA loan. Ex-ante Evaluation Japanese ODA loan Ex-ante Evaluation 1. Name of the Project Country: The Socialist Republic of Viet Nam Project: North-South Expressway Construction Project (Ben Luc Long Thanh Section)(II) L/A signed

More information

DRAFT FOR CONSULTATION OCTOBER 7, 2014

DRAFT FOR CONSULTATION OCTOBER 7, 2014 The Board has authorized the release of this document for consultation purposes to seek feedback on its content. It has not endorsed the content of the draft, and the Committee on Development Effectiveness

More information

VIETNAM ELECTRICITY TRUNGSON HYDROPOWER COMPANY LIMITED ENVIRONMENTAL MANAGEMENT PLAN

VIETNAM ELECTRICITY TRUNGSON HYDROPOWER COMPANY LIMITED ENVIRONMENTAL MANAGEMENT PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Subproject: Mai Chau 110 kv substation and 35 kv power line supply for construction of

More information

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT. VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT. VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT Project Number: 46391-001 October 2017 VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Prepared by Hanoi City Power Corporation, Electricity

More information

REGULATIONS OF ENVIRONMENTAL MANAGEMENT OF THE CONSTRUCTION PROJECTS Dr. Pham Van Bo Vice president Academy of Managers for Construction and Cities Ministry of Construction - Vietnam List of abbreviations

More information

VIE: Northern Power Transmission Expansion (Sector) Project

VIE: Northern Power Transmission Expansion (Sector) Project Environmental Monitoring Report Post-Evaluation Report January 2016 VIE: Northern Power Transmission Expansion (Sector) Project Prepared by the Local Implementation Consultant (LIC) for Northern Power

More information

CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN (EMP)

CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN (EMP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP)

More information

DECISION Approving a program to strengthen and upgrade the sea dyke system From Quang Ngai to Kien Giang

DECISION Approving a program to strengthen and upgrade the sea dyke system From Quang Ngai to Kien Giang PRIME MINISTER ------- No: 667/QD-TTg SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness -------------- Hanoi, 27 2005 2009 DECISION Approving a program to strengthen and upgrade the sea

More information

Water Pollution Control for Work in Sensitive Areas

Water Pollution Control for Work in Sensitive Areas Water Pollution Control for Work in Sensitive Areas 10-1. WATER POLLUTION CONTROL The Contractor is advised that failure to fully comply with the provisions of this Section, and all requirements listed

More information

Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT

Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT Environmental and Social Action Plan August 2016 Project: Bosnia and Herzegovina

More information

Sri: Sustainable Power Sector Support Project

Sri: Sustainable Power Sector Support Project Environmental Monitoring Report June 2015 Sri: Sustainable Power Sector Support Project Prepared by Ceylon Electricity Board for the Asian Development Bank. This environmental monitoring report is a document

More information

ENVIRONMENTAL MANAGEMENT PLAN (EMP)

ENVIRONMENTAL MANAGEMENT PLAN (EMP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized MINISTRY OF TRANSPORT DIRECTORATE FOR ROADS OF VIETNAM PROJECT MANAGEMENT UNIT 3 June

More information

THE GOVERNMENT. DECREES: Chapter I GENERAL PROVISIONS

THE GOVERNMENT. DECREES: Chapter I GENERAL PROVISIONS Search Maps THE GOVERNMENT Number: 39/2010/ND-CP SOCIALIST REPUBLIC OF VIET NAM Independence - Freedom - Happiness Ha Noi,day 07 month 04 year 2010 Decree No. 39/2010/ND-CP of April 7, 2010, on management

More information

Lam Du Son Vice President of EVN, Vietnam

Lam Du Son Vice President of EVN, Vietnam BRIEF INTRODUCTION TO ELECTRICITY SECTOR IN VIET NAM Lam Du Son Vice President of EVN, Vietnam I. OVERVIEW OF VIETNAM ELECTRICITY SECTOR. A. EVN Electricity of Vietnam Established in 994. Main responsibility

More information

Final Draft Environmental Management Programme (EMPr) for the Proposed Installation of a Gas Fired Heat Treatment Furnace at Scaw Metals High Chrome

Final Draft Environmental Management Programme (EMPr) for the Proposed Installation of a Gas Fired Heat Treatment Furnace at Scaw Metals High Chrome Final Draft Environmental Management Programme (EMPr) for the Proposed Installation of a Gas Fired Heat Treatment Furnace at Scaw Metals High Chrome Ball Plant in Germiston A Report For: Scaw South Africa

More information

Public Disclosure Authorized EXECUTIVE SUMMARY

Public Disclosure Authorized EXECUTIVE SUMMARY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized EXECUTIVE SUMMARY Introduction Georgia is an important transport corridor connecting

More information

Dust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation

Dust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation Energy Resilience for Climate Adaptation Project (ERCAP) Environmental Code of Practice (ECOP) for COMPONENT 2: Demonstration Measures to Enhance Resilience of Energy Sector (Pilot for Strengthening Transmission

More information

Japanese ODA. Ex-ante Evaluation

Japanese ODA. Ex-ante Evaluation Japanese ODA Ex-ante Evaluation 1. Name of the Project Country: The Socialist Republic of Vietnam Project: North-South Expressway Construction Project (Da Nang Quang Ngai Section) (I) (II) (III) L/A signed

More information

VIE: Power Transmission Investment Program Multi- Tranche Financing Facility Tranche 3

VIE: Power Transmission Investment Program Multi- Tranche Financing Facility Tranche 3 Initial Environmental Examination December 2015 VIE: Power Transmission Investment Program Multi- Tranche Financing Facility Tranche 3 Subproject: 500kV My Tho Duc Hoa Transmission Line Prepared by National

More information

Meeting Vietnam s Energy Demands in a Sustainable Way

Meeting Vietnam s Energy Demands in a Sustainable Way TRUNG SON HYDROPOWER PROJECT Meeting Vietnam s Energy Demands in a Sustainable Way Photo by: World Bank 1 Photo by: Mai Ky/World Bank, 2012 OVERVIEW Trung Son Hydropower Project (TSHPP) is a US$411.57

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5812 Project Name. Vietnam Industrial Pollution Control Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5812 Project Name. Vietnam Industrial Pollution Control Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5812 Project Name Vietnam

More information

Environmental Compliance Audit Report. MFF 0054-VIE: Water Sector Investment Program Tranche 2

Environmental Compliance Audit Report. MFF 0054-VIE: Water Sector Investment Program Tranche 2 Environmental Compliance Audit Report Project Number: 41456-033 June 2012 MFF 0054-VIE: Water Sector Investment Program Tranche 2 This environmental compliance audit report is a document of the borrower.

More information

Terms of Reference I. PROJECT MANAGEMENT SUPPORT AND CAPACITY DEVELOPMENT CONSULTANTS

Terms of Reference I. PROJECT MANAGEMENT SUPPORT AND CAPACITY DEVELOPMENT CONSULTANTS Terms of Reference I. PROJECT MANAGEMENT SUPPORT AND CAPACITY DEVELOPMENT CONSULTANTS A. Background 1. The Government of the Socialist Republic of Viet Nam, has requested a loan and grant from the Asian

More information

YUCE HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN

YUCE HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized YUCE HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT

More information

ENVIRONMENTAL MANAGEMENT PLAN (EMP)

ENVIRONMENTAL MANAGEMENT PLAN (EMP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ENVIRONMENTAL MANAGEMENT PLAN (EMP) BUILDING DISASTER/CLIMATE RESILIENCE IN COMMUNITIES

More information

A connection icon: Cao Lanh bridge. Mr. Phan Duy Lai Deputy General Manager Cuu Long CIPM

A connection icon: Cao Lanh bridge. Mr. Phan Duy Lai Deputy General Manager Cuu Long CIPM 1 2 A connection icon: Cao Lanh bridge Mr. Phan Duy Lai Deputy General Manager Cuu Long CIPM THE ICONIC CONNECTION PROJECT: CAO LANH BRIDGE 4 CONTENT 1. INTRODUCTION 2. PREPARATION OF THE PROJECT THE FIRST

More information

Chapter 13 Management and Monitoring

Chapter 13 Management and Monitoring Chapter 13 Management and Monitoring TABLE OF CONTENTS 13 MANAGEMENT AND MONITORING... 13-1 13.1 Introduction... 13-1 13.2 Construction Phase Roles and Responsibilities... 13-1 13.2.1 BP... 13-1 13.2.2

More information

VIE: Northern Power Transmission Expansion Project

VIE: Northern Power Transmission Expansion Project Environmental Monitoring Report Semi-Annual Report January-June 2014 VIE: Northern Power Transmission Expansion Project Prepared by the Local Implementation consultant (LIC) for the Northern Power Project

More information

Matrix of Environmental Management Plan, Rehabilitation of Lehumo Lake Embankments

Matrix of Environmental Management Plan, Rehabilitation of Lehumo Lake Embankments District Capitals Water Supply Project (RRP TIM 44130-02) Matrix of Environmental Management Plan, Rehabilitation of Lehumo Lake Embankments PRE-CONSTRUCTION ACTIVITIES Safety at Work Accidents Include

More information

CCSD#1 Stormwater Standards

CCSD#1 Stormwater Standards SECTION 6 EROSION CONTROL STANDARDS 6.1 INTRODUCTION The policies of this section shall apply during construction and until permanent measures are in place following construction as described herein, unless

More information

Prepared by State Joint Stock Company UzbekEnergo for the Republic of Uzbekistan and the Asian Development Bank.

Prepared by State Joint Stock Company UzbekEnergo for the Republic of Uzbekistan and the Asian Development Bank. Environmental Monitoring Report Semestral Report for July - December 2016 UZB: Samarkand Solar Power Project Prepared by State Joint Stock Company UzbekEnergo for the Republic of Uzbekistan and the Asian

More information

E767 May 2003 ISLAMIC REPUBLIC OF IRAN EARTHQUAKE EMERGENCY RECOVERY PROJECT. Objectives

E767 May 2003 ISLAMIC REPUBLIC OF IRAN EARTHQUAKE EMERGENCY RECOVERY PROJECT. Objectives Objectives ENVIRONMlENT AND SOCIAL SAFEGUARD FRAMEWORK ISLAMIC REPUBLIC OF IRAN EARTHQUAKE EMERGENCY RECOVERY PROJECT E767 May 2003 The environmental and social safeguards framework provides general policies,

More information

ENVIRONMENTAL MANAGEMENT PLAN (EMP)

ENVIRONMENTAL MANAGEMENT PLAN (EMP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized MINISTRY OF TRANSPORT DIRECTORATE FOR ROADS OF VIETNAM PROJECT MANAGEMENT UNIT 3 June

More information

Preparatory Study for Development Study (M/P or F/S)

Preparatory Study for Development Study (M/P or F/S) Preparatory Study for Development Study (M/P or F/S) 1. Title of the Cooperation Project and Name of the Project Proponent (1) Title of the Cooperation Project The Study for Groundwater Development in

More information

IMPLEMENTATION OF NATIONAL STRATEGY ON CLEAN WATER SUPPLY AND SANITARY IMPROVEMENT FOR THE RURAL AREA IN HO CHI MINH CITY, VIET NAM 1

IMPLEMENTATION OF NATIONAL STRATEGY ON CLEAN WATER SUPPLY AND SANITARY IMPROVEMENT FOR THE RURAL AREA IN HO CHI MINH CITY, VIET NAM 1 IMPLEMENTATION OF NATIONAL STRATEGY ON CLEAN WATER SUPPLY AND SANITARY IMPROVEMENT FOR THE RURAL AREA IN HO CHI MINH CITY, VIET NAM 1 FROM THE NATIONAL STRATEGY Clean water and a sanitary, healthy environment

More information

LAO PEOPLE S DEMOCRATIC REPUBLIC PEACE INDEPENDECE DEMOCRACY UNITY PROSPERITY WATER SUPPLY LAW

LAO PEOPLE S DEMOCRATIC REPUBLIC PEACE INDEPENDECE DEMOCRACY UNITY PROSPERITY WATER SUPPLY LAW LAO PEOPLE S DEMOCRATIC REPUBLIC PEACE INDEPENDECE DEMOCRACY UNITY PROSPERITY WATER SUPPLY LAW This draft approved by National Assembly in September 2009. (Unofficial English Translation) 1 TABLE OF CONTENTS

More information

Environmental Assessment and Review Framework. Lao People s Democratic Republic: Greater Mekong Subregion Health Security Project

Environmental Assessment and Review Framework. Lao People s Democratic Republic: Greater Mekong Subregion Health Security Project Environmental Assessment and Review Framework October 2016 Lao People s Democratic Republic: Greater Mekong Subregion Health Security Project Prepared by the Ministry of Health for the Asian Development

More information

E671 vol. 5. Lesson 11. Environmental Impact of Small-Scale Infrastructure Projects. November L&-~~A>f. Technical Support Staff Basic Training

E671 vol. 5. Lesson 11. Environmental Impact of Small-Scale Infrastructure Projects. November L&-~~A>f. Technical Support Staff Basic Training Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized -4L&-~~A>f Technical Support Staff Basic Training Training Documents (English Translations)

More information

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project ENVIRONMENTAL MONITORING REPORT Project Number: 46391-001 January 2018 VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Prepared by Hanoi City Power Corporation, Electricity of Vietnam

More information

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Ministry of Agriculture and Forestry No 0538/MAF Vientiane, Date 09/02/2011 Agreement of the Minister on Good Agriculture

More information

SRI : Dry Zone Urban Water and Sanitation Project (DZUW&SP) Chilaw & Puttalam Districts

SRI : Dry Zone Urban Water and Sanitation Project (DZUW&SP) Chilaw & Puttalam Districts Environmental Report Project Number 37381-013 Loan Numbers 2477-SRI (SF)/2977 SRI (SF) and Grant Numbers 0129-SRI(SF)/0130-SRI Semestral Report January to June 2015 SRI : Dry Zone Urban Water and Sanitation

More information

Initial Environmental Examination (Final Review) MFF 0054-VIE: Water Sector Investment Program Tranche 2

Initial Environmental Examination (Final Review) MFF 0054-VIE: Water Sector Investment Program Tranche 2 Initial Environmental Examination (Final Review) Project Number: 41456-033 April 2012 MFF 0054-VIE: Water Sector Investment Program Tranche 2 This initial environmental examination is a document of the

More information

Viet Nam: Central Region Small and Medium Towns Development Project

Viet Nam: Central Region Small and Medium Towns Development Project Draft and Monitoring Framework Project Number: 30286 July 2006 Viet Nam: Central Region Small and Medium Towns Development Project A design and monitoring framework is an active document, progressively

More information

Environmental Impact Assessment. GEO: East West Highway (Khevi Ubisa Section) Improvement Project

Environmental Impact Assessment. GEO: East West Highway (Khevi Ubisa Section) Improvement Project May 2018 Third Draft GEO: East West Highway (Khevi Ubisa Section) Improvement Project Section F2 of the Khevi Ubisa Shorapani Argveta Road (E60 Highway) Part 6 Appendices A D Prepared by JV IRD Engineering

More information

QUANG NGAI PROVINCE PEOPLE S COMMITTEE. Quang Ngai Provincial Project Management Unit of Construction Works for Agriculture & Rural Development

QUANG NGAI PROVINCE PEOPLE S COMMITTEE. Quang Ngai Provincial Project Management Unit of Construction Works for Agriculture & Rural Development SFG3446 V5 REV QUANG NGAI PROVINCE PEOPLE S COMMITTEE Quang Ngai Provincial Project Management Unit of Construction Works for Agriculture & Rural Development ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN (ESMP)

More information

FOREST LAND USE PLANNING AND FOREST LAND ALLOCATION IN DONG TAM COMMUNE - DONG PHU DISTRICT BINH PHUOC PROVINCE

FOREST LAND USE PLANNING AND FOREST LAND ALLOCATION IN DONG TAM COMMUNE - DONG PHU DISTRICT BINH PHUOC PROVINCE Page 1 of 10 Management Board of Project GCP/VIE/020/ITA Dong Phu District, Binh Phuoc Province REPORT ON FOREST LAND USE PLANNING AND FOREST LAND ALLOCATION IN DONG TAM COMMUNE - DONG PHU DISTRICT BINH

More information

TERM OF REFERENCE The analysis on selected agriculture and fishery value-chains in An Giang

TERM OF REFERENCE The analysis on selected agriculture and fishery value-chains in An Giang TERM OF REFERENCE The analysis on selected agriculture and fishery value-chains in An Giang 1. Background and Rationale Child labour (CL) is a challenge in Vietnam as well as in many countries. During

More information

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES SAND AND GRAVEL PERMIT APPROVING WORK SYSTEM AND RECLAMATION PROGRAM (Issued pursuant to Section 10 of the Mines Act R.S.B.C. 1996, C.293) Permit:

More information

Ex-ante Evaluation - 1 -

Ex-ante Evaluation - 1 - Ex-ante Evaluation 1. Name of the Project Country: The Socialist Republic of Vietnam Project: The North-South Expressway Construction Project (Ho Chi Minh City Dau Giay) (I) (Loan Agreement: March 31,

More information

Papua New Guinea: Pilot Border Trade and Investment Development Program

Papua New Guinea: Pilot Border Trade and Investment Development Program Environmental Monitoring Report Semiannual Report January June 2016 Papua New Guinea: Pilot Border Trade and Investment Development Program Prepared by Border Development Authority for the Government of

More information

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES Environmental / Social issue/ aspect/ activity Anticipated negative impact Management and mitigation

More information

ENVIRONMENTAL MANAGEMENT FRAMEWORK. For Vietnam Distribution Efficiency Project

ENVIRONMENTAL MANAGEMENT FRAMEWORK. For Vietnam Distribution Efficiency Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOCIALIST REPUBLIC OF VIETNAM VIETNAM ELECTRICITY ENVIRONMENTAL MANAGEMENT FRAMEWORK

More information

E1 687 Vol. 2 ENVIRONMENTAL ASSESSMENT FOR EXTENSITION OF RUNWAY FOR ZANZIBAR AIRPORT UNITED REPUBLIC OF TANZANIA

E1 687 Vol. 2 ENVIRONMENTAL ASSESSMENT FOR EXTENSITION OF RUNWAY FOR ZANZIBAR AIRPORT UNITED REPUBLIC OF TANZANIA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized UNITED REPUBLIC OF TANZANIA MINISTRY OF COMMUNICATION AND TRANSPORT (ZANZIBAR) ENVIRONMENTAL

More information

MOIT FiT Circular No. 02 Decision No. 39

MOIT FiT Circular No. 02 Decision No. 39 Renewable Energy Vietnam Client Alert January 2019 For further information, please contact: Fred Burke +84 28 3520 2628 frederick.burke@bakermckenzie.com Dang Chi Lieu +84 24 3936 9341 chilieu.dang@bakermckenzie.com

More information

TERMS OF REFERENCE FOR CONSULTING SERVICES FOR ENGINEERING AND CONSTRUCTION SUPERVISION CONSULTANT

TERMS OF REFERENCE FOR CONSULTING SERVICES FOR ENGINEERING AND CONSTRUCTION SUPERVISION CONSULTANT TERMS OF REFERENCE FOR CONSULTING SERVICES FOR ENGINEERING AND CONSTRUCTION SUPERVISION CONSULTANT 1. Background The Asian Development Bank (ADB) has assisted the Kyrgyz Republic in the rehabilitation

More information

Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani

Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani DESCRIPTION OF

More information

SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY. October Public Disclosure Authorized

SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY. October Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY Public Disclosure Authorized October 2015 Public Disclosure

More information

CIRCULAR GENERAL PROVISIONS

CIRCULAR GENERAL PROVISIONS MINISTRY OF CONSTRUCTION -------- SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness --------------- No. 10/2013/TT-BXD Hanoi, July 25, 2013 CIRCULAR ON CONSTRUCTION QUALITY MANAGEMENT Pursuant

More information

DOORNVALLEI EXT 5 & 6

DOORNVALLEI EXT 5 & 6 DOORNVALLEI EXT 5 & 6 Proposed township establishment on portion 107 the farm Doornkloof 391 JR Sewer Pipe Crossings - Sesmylspruit Construction Method Statement April 2016 Revision 3 PREPARED FOR: PREPARED

More information

E1712 VOL. 28 ENVIRONMENTAL MANAGEMENT PLAN ELECTRICITY OF VIETNAM POWER COMPANY I

E1712 VOL. 28 ENVIRONMENTAL MANAGEMENT PLAN ELECTRICITY OF VIETNAM POWER COMPANY I Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ELECTRICITY OF VIETNAM POWER COMPANY I COMPONENT: RD - 110KV THANH NONG - KIM BOI TRANSMISSION

More information

Environmental Guidelines for Construction Sites

Environmental Guidelines for Construction Sites Inspection Items Guidelines Remarks 1) Air Pollution Control 1a) Notification to EPD before Work Commencement If the work is classified as notifiable work such as site formation, reclamation, building

More information

E1184 v1. 6. Environmental Management Plan (EMP)

E1184 v1. 6. Environmental Management Plan (EMP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 6. Environmental Management Plan (EMP) This EMP reviews the potential negative impacts

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN An environmental management plan (EMP) has been prepared for the proposed construction of commercial project to minimize negative impacts and is formed on the

More information

E3072 v2. GEF Large City Congestion and Carbon Reduction Project. Environment Management Plan. Public Disclosure Authorized

E3072 v2. GEF Large City Congestion and Carbon Reduction Project. Environment Management Plan. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized E3072 v2 GEF Large City Congestion and Carbon Reduction Project Environment Management

More information

ENVIRONMENTAL MANAGEMENT PLAN (EMP)

ENVIRONMENTAL MANAGEMENT PLAN (EMP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized MINISTRY OF TRANSPORT DIRECTORATE FOR ROADS OF VIETNAM PROJECT MANAGEMENT UNIT 3 June

More information

ANNEX 6 PUBLIC CONSULTATION

ANNEX 6 PUBLIC CONSULTATION Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Environmental Assessment (EA) A6.1. Objective and Methodology A6.2. Identification of

More information

Environmental Monitoring Report. VIE: Song Bung 4 Hydropower Project. Semiannual Report July to December 2014

Environmental Monitoring Report. VIE: Song Bung 4 Hydropower Project. Semiannual Report July to December 2014 Environmental Monitoring Report Semiannual Report July to December 2014 VIE: Song Bung 4 Hydropower Project Prepared by Song Bung 4 Hydropower Project Management Board (SB4HPB) for Vietnam Electricity

More information

Doc. No H1 Rev. 0 - July 2011 APPENDIX C ENVIRONMENTAL AND SOCIAL ACTION PLAN

Doc. No H1 Rev. 0 - July 2011 APPENDIX C ENVIRONMENTAL AND SOCIAL ACTION PLAN APPENDIX C ENVIRONMENTAL AND SOCIAL ACTION PLAN APPENDIX C ENVIRONMENTAL AND SOCIAL ACTION PLAN Taking into account the findings of the ESDD, an Environmental and Social Plan (ESAP) has been developed

More information

COMMUNITY AGRICULTURAL RESOURCE MANAGEMENT AND COMPETITIVENESS PROJECT II PONENT 1: COMMUNITY PASTURE AND LIVESTOCK MANAGEMENT SYSTEM

COMMUNITY AGRICULTURAL RESOURCE MANAGEMENT AND COMPETITIVENESS PROJECT II PONENT 1: COMMUNITY PASTURE AND LIVESTOCK MANAGEMENT SYSTEM AGRICULTURAL PROJECT IMPLEMENTATION UNIT COMMUNITY AGRICULTURAL RESOURCE MANAGEMENT AND COMPETITIVENESS PROJECT II PONENT 1: COMMUNITY PASTURE AND LIVESTOCK MANAGEMENT SYSTEM ENVIRONMENTAL MANAGEMENT PLAN

More information

Lessons Learned: NAMA development in Vietnam

Lessons Learned: NAMA development in Vietnam Lessons Learned: NAMA development in Vietnam Dr. Huynh Thi Lan Huong Director of Climate Change Research Center Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment,

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized TABLE OF CONTENTS 1. INTRODUCTION... 5 2. LEGAL FRAMEWORKS... 5 2.1. Vietnamese Legislations...