1 INSTALLATION INSTRUCTIONS For Plynyl Brand W2W Flooring Products CONTRACT PAGE 1 OF 5 *Plynyl will deliver years of satisfactory service when installed and maintained properly. The following guidelines will assure a secure and proper installation. Consult for the latest installation instructions. 1. MAINTENANCE INSTRUCTIONS GENERAL 1.1 Product must be allowed to acclimate for a period of 48 hours at degrees Fahrenheit (20 24 C) prior to installation. 24 Hours before installation, unroll and smooth out wrinkles allowing Plynyl to relax. 1.2 DO NOT ROLL OR FOLD PLYNYL FACE-IN AS THIS WILL CAUSE WRINKLES AND MAY DAMAGE THE FABRIC. 1.3 Prior to installation, Plynyl must be inspected by installer and General Contractor. Any defects must be reported to Chilewich Sultan, LLC immediately at DO NOT INSTALL DEFECTIVE MATERIAL. Installation of material implies acceptance. If the material is deemed defective, Chilewich Sultan will replace it. Chilewich Sultan s liability is limited to the replacement of defective material only. Chilewich Sultan is not responsible for cost of removal or reinstallation. 1.4 As with woven products, colors may vary within singular or multiple production runs. Product colors may also differ from memo samples, swatch images on our website, and other offerings in the Chilewich line. 2. SUBSTRATE PREPARATION 2.1 General The installation of Plynyl begins with proper floor and substrate preparation Floors and substrates must be clean and dry, free of dirt, oil, grease, wax, old paints, cut back adhesives, powdery surface conditions or any other substance which will compromise the adhesion or ability of the product to stick to the substrate onto which it is being installed. Any contaminant on the sub-floor must be cleaned or neutralized before applying adhesive to bond the flooring material to it. Failure to clean contaminants from the sub-floor can cause adhesive failure and allow the flooring material to come loose. Do not use sweeping agents. Sub-floors should be swept, vacuumed and damp mopped to remove soils that may contaminate or compromise the installation Floor Flatness or Levelness. The surface flatness or levelness may affect the finished aesthetic appearance of Plynyl. Though the product will conform to undulations and irregularities in the substrate it is best to level and finish the substrate to minimize or eliminate severe conditions that may compromise the final appearance of the finished work product Residual Adhesives. All existing residual adhesive which would interfere with the adhesion of Plynyl and the new adhesive, must be removed or covered up Any sub-floor conditions which compromise the secure installation of Plynyl will be the responsibility of the general contractor or flooring contractor A primer/sealer must be used over gypsum or Portland Cement based floor leveling compounds. Chilewich Sultan will not be responsible for adhesive failure when a primer is not used. Allow floor leveling compounds to dry as recommended by their manufacturer Cover and protect Plynyl edges with vinyl or metal transition strips, when they abut another material.
2 PAGE 2 OF Concrete Concrete must be fully cured for 90 to 120 days or longer, depending on the type of concrete. Concrete must be structurally sound and free of curing or parting agents. Concrete should also be tested for porosity and alkalinity. Porosity test can be taken with droplets of water placed on the concrete. If the concrete absorbs the water immediately or within a short period of time, for example 60 seconds, a sealer should be applied to the concrete. Ph tests should be taken using industry acceptable testing criteria. If ph exceeds 9, notify the owner, as the floor should be treated for elevated ph condition before installation Any cracks 1/8 (.30cm) wide or greater, construction joints, control joints, depressions, grooves or other irregularities should be filled and leveled with a high quality, non-shrinking, latex fortified, hydraulic cement patching compound Moisture vapor emission in concrete is very common. High moisture levels must be remediated before installation. This can be accomplished with a number of moisture barrier products commonly used and available commercially. Even floors which seem dry, may have moisture passing through them, therefore all concrete subfloors, on or above grade, must be tested. Moisture vapor emission should be tested according to ASTM F Anhydrous Calcium Chloride Moisture Test using the Quantitative Method. This test should be conducted using the standard calcium chloride test kit. Moisture vapor emission rates shall not exceed 5 pounds/1,000 square feet within 24 hours using the anhydrous calcium chloride test. Remember that this test only indicates the condition of the concrete slab in the area tested and at the time of the test. Moisture vapor conditions can change over time for numerous reasons. In-situ Relative Humidity of the concrete slab should not exceed 85%. Some adhesive and primer/sealer manufacturers require lower moisture for their products. Their guidelines should be followed to ensure a secure bond over time Curing and Parting agents used on concrete sub-floors may not be compatible with the adhesive and may interfere with bonding. Therefore these products are not recommended. 2.3 Wood Sub-floors Wood floors should be level to prevent imperfections or irregularities from telegraphing through to flooring materials. Nails or other fastening devices in wood should be secure so as not to protrude above the floor surface. Fill any joints or seams with filler. It may be necessary to sand the floor until a smooth surface is secured Plywood underlayment, if used, must be APA rated Underlayment Exposure I with a sanded face. Follow all APA recommendations for preparation of underlayment where resilient floorings are specified. The use of any other type of plywood will void the warranty and is not recommended as it may have adverse effects on the adhesive and the installation. All edges, splits and gaps in the plywood must be filled with a hard, quicksetting filler. Allow the filler to cure completely and then sand smooth to eliminate any ridges. Ridges or gaps left in the plywood underlayment may telegraph through the flooring Follow the APA recommendations for fastening underlayment to the subfloor. Do not use construction adhesives to glue underlayment to subfloor as these may cause installation or staining problems with Plynyl Never install Plynyl over pressure treated wood products. 2.4 Other Types of Sub-floors Terrazzo, ceramic or other hard surface floors shall be treated in the same manner as a concrete sub-floor, with additional precautions. Surface coatings or sealers must be completely removed by light sanding or other suitably effective methods and shall be filled and leveled to obtain a smooth surface with a suitable leveling compound. Grout joints in ceramic tile installations must be leveled. Alterations in adhesive application and open time may need to be made due to the nature of the surfaces of these flooring materials. Follow adhesive recommendations and instructions.
3 PAGE 3 OF Metal Floors. Plynyl may be installed over metal or raised access flooring. To ensure proper installation, the metal flooring may need to be abraded to provide a surface where a maximum bond to the metal can be achieved. New metal floors are often coated with oils during their manufacture, and these oils must be removed to ensure effective adhesion If Plynyl is to be installed over resilient tile then all tile must be tight and securely attached to the sub-floor and any loose or broken tile replaced. 2.5 QTSCU underlayment If an underlayment for Plynyl w2w is required, Chilewich recommends Ecore International QTSCU underlayment. Chilewich is confident that our product will perform if our and Ecore International s guidelines are followed. We cannot guarantee products supplied by other companies or installations done by others but we will warranty our product if the following conditions are met: The QTSCU underlayment ( is installed as per the manufacturers installation instructions. The installation has to provide a smooth level surface E-Grip III or E-Grip Evolve should be used as recommended by E Core, for installing underlayment to the subfloor. Application of adhesive E-Grip Evolve or AAT675 can be made directly to the underlayment without the need for a skim coat. This application should be treated as a non-porous surface. Note: E-Grip III will require a skim coat An Ecore International representative must sign off on their installation before the installation of Plynyl w2w Plynyl flooring must be installed using AAT The final installation has to be allowed to cure 24 hours before traffic is allowed on-site Ecore International Contact Information Phone: ext 256 Web Address: Radiant Heated Floors Plynyl may be installed over radiant heated floors provided the temperatures do not exceed 85 degrees Fahrenheit (30 C). Make sure the heating system is off during installation since a heated floor will dry out the adhesive prematurely. 3. JOBSITE CONDITIONS 3.1 Installation of Plynyl should begin only after all other trades have completed their work. Realizing that this is often not the case, the flooring material should be protected using masonite covering or other covering materials which will not trap moisture or vapor from curing adhesive. Plastic coverings should not be used. The use of surface shields or protective film with self-adhering adhesive is prohibited. Any topical use of floor guards with adhesive or sticky plastic may cause rapid soiling and staining. The use of these materials with Plynyl brand products will void the warranty. Kraft paper or builder s felt may be used as a means of protecting the flooring if necessary. 3.2 THE WARRANTY WILL BE VOID IF PROPER PROTECTION IS NOT USED DURING CONSTRUCTION OPERATIONS. 3.3 WARRANTY WILL BE VOID IF PAINT, OR GYPSUM BOARD DUST AND DEBRIS, IS FOUND ON PLYNYL. 3.4 Dragging heavy or sharp objects across Plynyl will damage it. Rips and tears in Plynyl can t be repaired and must be replaced. 3.5 For installation in gyms, the additional placement of a floor mat under any cardiovascular training equipment (treadmill, elliptical, stair climber, etc.) is recommended. A Chilewich Plynyl custom mat may be used, or a mat of the client s own choosing, providing the backing does not contain rubber. The function of the mat is to disperse the weight and force from the front wheel mounts. A non-rubber mat of the customer s choosing can be used.
4 PAGE 4 OF 5 4. INSTALLATION PROCEDURES 4.1 General Installation of Plynyl flooring materials should be undertaken the same way one would install carpet relative to layout and starting points. See CRI 104 for standard industry specifications Installation of Plynyl should be in a direct glue down installation Plynyl has arrows and a logo on the back so the installer can keep the material aligned properly Maintain normal temperatures for hours after installation to allow time for adhesive to cure Wait 24 hours prior to a full move-in to allow adhesives to cure. 4.2 W2W Installation The seaming layout should be approved by the owner or architect/designer before installation is initiated. Avoid cross seams The weave of Plynyl w2w will not run parallel to the cut edge, therefore any wave, bow or skew in the product is normal due to the way Plynyl is woven. The tolerance for bow and skew is 1.5 in either direction. Some patterns will also exhibit a light and dark shading in the material, that is also normal. This shading may also be evident at the seams where two pieces of the same style may have a different shade The installer shall establish a straight line on the floor to establish where the seam will be for the first length. Plynyl comes a nominal 72 (182.9cm), but the roll width should be measured to determine the actual width since it may be wider by 1-2 (2.5cm-5cm) The selvedge edge of Plynyl has to be trimmed before installation. Trim material 1 +/- (2cm-3cm) in from edge. Trim should be made with metal straight edge and sharp utility knife. The face fabric is normally skewed and it may not be possible to follow a weave line in the fabric. It is critical that the cut seam be straight Roll the Plynyl back and apply the adhesive with the appropriate procedure/trowel based on the adhesive to be used. Use caution not to crease the Plynyl. Allow the adhesive time to develop tack but the adhesive should still transfer when touched. Do not allow the adhesive to skim-over or dry; this time will vary depending on the temperature and humidity of the area, wet-tacky adhesive. Note the adhesive should still be wet enough to transfer to the back of the flooring and allow it to move to positon for a smooth lay. The edges should align with the previous piece installed or the straight line drawn for flooring orientation The adjoining length shall be laid under the straight cut edge so that the overlap between the two is about 1 (2cm-3cm). Align the two lengths so that the fill direction of the Plynyl yarns are straight across the seam. Plynyl should not be mechanically stretched, though once set into the adhesive it can be pushed into place and made to align with the opposite edge of a seam Cut through the new length of Plynyl with the straight cut edge as a guide. Remove the selvedge edge. Spread adhesive under the next Plynyl length then press the seam together Repeat the procedure above, always cutting one edge of a seam with a metal straight edge, for the remainder of the lengths required for an installation Roll Plynyl after installation with a 35-pound (20kg) roller to insure full adhesion of Plynyl with the adhesive and to eliminate air pockets. A heavier roller will distort Plynyl and should not be used Trim white strands with scissors. These strands are exposed from cutting through the core of the yarn. These protrusions are normal to every Plynyl installation.
5 PAGE 5 OF 5 5. ADHESIVE RECOMMENDATIONS 5.1 Chilewich Sultan LLC recommends the following adhesives for all Plynyl installations. Installations using productsother than the approved ones will not be covered by the warranty. 5.2 For permanent direct glue down installations choose from full spread, aerosol and spray adhesives. Full spread adhesives with AAT 675 and Mapei 350 should be applied with a 1/16 x 1/16 x 1/16 U-notched trowel (0.16cm). This should result in a spread rate of 150ft/gallon. Full spread application of Uzin 222 should be applied according to the manufacturer s recommendations using a 1/16 x 1/16 x1/16 V notch trowel with coverage from 135 to 150 square feet per gallon. Aerosol adhesive manufacturer s instructions should be followed for XL Brands Stix Essential RES and SprayLock 6200 Aerosol adhesive and achieve near full coverage of the subfloor. With application dependent on the subfloor and flooring backing, XL Brands suggest coverage rates between 140 and 185 square feet per 22 oz. can and Spray-Lock suggest coverage rates between 150 and 185 Square feet per 22 oz. container. Contact information for adhesive suppliers - Advanced Adhesive Technologies (AAT): (800) Mapei : (800) XL Brands : (800) Spray-Lock : (423) UZIN WK 222: Use AAT #570 or Mapei Primer L as a primer/sealer over gypsum and Portland Cement based floor leveling compounds. AAT 570 spread rate: 350 square feet per gallon. Two coats are recommended to ensure coverage. Do not use for outdoor installations. 6. PURETHANE APPLICATION INSTRUCTIONS (OPTIONAL) 6.1 Instructions for application of Purethane coating onto Plynyl. 6.2 Surface preparation Plynyl must be thoroughly cleaned to remove all dust, dirt and debris from the surface. Surface must be dry. 6.3 Prepare the 2-part Purethane system as per manufacturer s recommendations. 6.4 Apply with a short nap paint roller. Allow to dry 2-3 hours before applying 2nd coat. Dries to the touch in minutes. Allow final coat to dry at least 48 hours before use. 6.5 A gallon should cover between square feet. 6.6 Do not apply on damp days or when surface temperature is below 40 degrees F. NOTE: All urethanes react with snow-melting salts. Clean flooring promptly after salt exposure.
CONTRACT PAGE 1 OF 5
INSTALLATION INSTRUCTIONS For Plynyl Brand Tile Flooring Squares - with Vinyl Backing CONTRACT PAGE 1 OF 5 *Plynyl tile will deliver years of satisfactory service when installed and maintained properly.
More informationCONTRACT PAGE 1 OF 6
CONTRACT PAGE 1 OF 6 INSTALLATION INSTRUCTIONS For Plynyl Brand Tile Flooring Squares - with BioFelt Backing *Plynyl will deliver years of satisfactory service when installed and maintained properly. The
More informationCONTRACT PAGE 1 OF 6
CONTRACT PAGE 1 OF 6 INSTALLATION INSTRUCTIONS For Plynyl Brand Tile Flooring Squares - with BioFelt Backing *Plynyl will deliver years of satisfactory service when installed and maintained properly. The
More informationContract Installation Instructions
Contract Installation Instructions Installation instructions for Vinyl-backed Wall-to-Wall. This product will deliver years of satisfactory service when installed and maintained properly. The following
More informationStrataWorx Tile. Installation Guidelines 1. CONDITION YOUR SITE AND TEST 2. PREPARE THE FLOOR
Notice: For best results, review the following guidelines prior to installation. Shaw will not be responsible for improper installation and failure to follow these guidelines may result in limiting warranty
More informationInstallation Guide LVP Glue Down
734 SOUTH RIVER STREET CALHOUN, GEORGIA 1.844.225.3100 www.encorehospitalitycarpet.com Installation Guide LVP Glue Down Materials Required for Installation: Tape Measure Square ruler Chalk line Utility
More informationInstallation ECOWORX / ECOLOGIX INSTALLATION 1. CONDITION YOUR SITE AND TEST 2. PREPARE THE FLOOR
ECOWORX / ECOLOGIX INSTALLATION Notice: For best results review the following guidelines prior to installation. Shaw will not be responsible for improper installation and failure to follow these guidelines
More informationInstallation Instructions for Hercules Rib 52
Page 1 of 5 Installation Instructions These instructions supersede any verbal or written instructions from connexus representatives, and must be followed in order for the warranty to be in effect. Delivery
More informationProduct Size Thickness Installation direction Seams treatment
INSTALLATION INSTRUCTIONS FOR GERFLOR SAGA 2, CREATION TILES AND PLANKS This document refers to the following products: Product Size Thickness Installation direction Seams treatment Creation Tiles See
More informationINSTALLATION MANUAL FULLY ADHERED INSTALLATIONS
SHOCKPAD BL41 MANUAL FULLY ADHERED S Manufactured in the U.S.A. by: Revised 07/08/2015 Supersedes all previous versions. Check website for updates. 866-795-2732 www.ecoreathletic.com 1 TABLE OF CONTENTS
More informationLOOSE LAY INSTALLATION GUIDE PAGE 1 of 6
INSTALLATION GUIDE PAGE 1 of 6 MATERIALS REQUIRED FOR INSTALLATION: Tape Measurer Square Ruler Utility Knife 100lb Roller (if using adhesive) ACCEPTABLE SUBFLOORS: Happy Feet International will not warrant
More informationLVP GLUE DOWN INSTALLATION GUIDE PAGE 1 of 6
INSTALLATION GUIDE PAGE 1 of 6 MATERIALS REQUIRED FOR INSTALLATION: Tape Measurer Square Ruler Chalk Line Utility Knife Hand/Seam Roller 100lb Roller ACCEPTABLE SUBFLOORS: Happy Feet International will
More informationSpecification and Installation
SHAW 5100 SPECIFICATION ADHESIVE FOR SHAW CARPET TILE Any variance from these procedures will become the responsibility of the installer and not the manufacturer. See Shaw s Modular Installation Guidelines
More informationbe installed while the adhesive is wet for better pattern matching capabilities. Concrete floors must be sealed if dusting or powdering exists. The fo
Installation of Commercial Broadloom Products lbs. per 1000 sq. ft. per 24 hours. Do not begin the installation if a higher moisture transmission rate is detected. Do not use other methods of moisture
More informationINSTALLATION GUIDELINES - ECOWORX PERFORMANCE BROADLOOM
INSTALLATION GUIDELINES - ECOWORX PERFORMANCE BROADLOOM Shaw is not responsible for any moisture related installation failures if these guidelines are not strictly followed. Notice Failure to follow these
More informationRESILIENT CORK TILE 3 PART SPECIFICATION #Z 624
3 PART SPECIFICATION #Z 624 THE FOLLOWING DOCUMENT IS A GUIDE FOR CREATING YOUR CSI FORMATTED 3-PART ARCHITECTURAL GUIDE SPECIFICATIONS. ZANDUR ACCEPTS NO LIABILITY FOR ANY DAMAGES RESULTING FROM THE USE
More informationBENTLEY ELEMENTS COLLECTION LVT
This document refers to the following products: Product Size Thickness Installation direction Seams treatment Elements Square See specifications 2.5mm 90 None Elements Plank See specifications 2.5mm Stair
More informationTechnical Service. INSTALLATION INSTRUCTIONS FOR TARAFLEX SPORT PRODUCTS over Gypsum base Products. This document refers to the following products:
INSTALLATION INSTRUCTIONS FOR TARAFLEX SPORT PRODUCTS over Gypsum base Products This document refers to the following products: Product Width Width Ft. Installation direction Seams treatment Taraflex Surface
More informationIVC US. Light Commercial Installation Guide - Sheet Vinyl. Leading the Way
IVC US Light Commercial Installation Guide - Sheet Vinyl Leading the Way v. 5/2013 IVC US Light Commercial Installation Guide - Sheet Vinyl Flooring IVC US recommends the following guidelines for preparation
More informationTufted and Woven Goods Direct Glue-Down
Tufted and Woven Goods Direct Glue-Down Installation Instructions Duraloc AIR Duraloc AIR Performance Unibond Flex Unibond Flex Bloc Unibond Laminate Unibond Plus Unibond Plus Bloc Weldlok Weldlok Bloc
More informationAmerican Guild Vinyl Flooring - Steadcrest Collection Installation Instructions
American Guild Vinyl Flooring - Steadcrest Collection Installation Instructions Recommended Adhesive: DuChâteau DUAG-58 Premium Resilient Flooring Adhesive Available in 1- and 4-gallon containers, DUAG-58
More informationINSTALLATION GUIDELINES The following instructions shall be reviewed prior to installation. Shaw will not be responsible for improper installation.
TECHNICAL SERVICES DEPARTMENT Installation of EcoWorx Broadloom and EcoWorx Performance Broadloom NOTICE: Failure to follow these guidelines can result in voiding the carpet warranty. LOOK BEFORE YOU CUT..
More informationMoisture Requirements Moisture testing must be performed. Patcraft requires the use of the following test methods:
Installation LokDots TM Ecoworx Tile Installation System Notice For best results review the following guidelines prior to installation. Shaw will not be responsible for improper installation and failure
More informationModular Carpet Tile Installation Instructions
Modular Carpet Tile Installation Instructions UltraSet Vinyl Back 160 South Industrial Blvd. Calhoun, GA. 30701 Dalton, GA 30721 www.mohawkflooring.com Technical Services Department 508 East Morris St.
More informationUNDERLAYMENT INSTALLATION INSTRUCTIONS
UNDERLAYMENT INSTALLATION INSTRUCTIONS Table of Contents BASE PREPARATION I. General Information... 3 II. Job Site Conditions... 3 III. Subfloor Requirements & Preparation...3 IV. Hazards... 4 V. Material
More informationSection RESILIENT TILE FLOORING INCLUDING VINYL COMPOSITION TILE
THIS DOCUMENT IS INTENDED AS A SUGGESTED GUIDE FOR CREATING, MODIFYING, OR EDITING YOUR CSI FORMATTED 3-PART ARCHITECTURAL GUIDE SPECIFICATIONS. TARKETT WILL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT OF
More informationELECTROSTATIC FLOORING Installation Instructions
ELECTROSTATIC FLOORING Installation Instructions Toro EL and Granit AS (Sheet and Tile) HANDLING AND STORAGE 1. Johnsonite Electrostatic Flooring and adhesives must be site conditioned at room temperature
More informationAccess Luxury Vinyl Flooring Installation Guidelines
GENERAL All recommendations are based on the most recent available information. The information on these sheets provides general guidelines. For additional details, visit our website at manningtoncommercial.com.
More informationSection STATIC DISSIPATIVE RESILIENT FLOORING
THIS DOCUMENT IS INTENDED AS A SUGGESTED GUIDE FOR CREATING, MODIFYING, OR EDITING YOUR CSI FORMATTED 3-PART ARCHITECTURAL GUIDE SPECIFICATIONS. TARKETT WILL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT OF
More informationInfinity Modular/Infinity Modular RE Carpet Tile Installation Guidelines
GENERAL Infinity Modular is a vinyl composite backing engineered for performance. Infinity RE offers similar performance characteristics to those of Infinity Modular, but Infinity RE also includes 30-percent
More informationCarpet Tile & Plank Direct Glue Down
Carpet Tile & Plank Direct Glue Down INSTALLATION EcoFlex ICT EcoFlex NXT EcoFlex AIR 160 South Industrial Blvd. Calhoun, GA. 30701 MohawkGroup.com Technical Services Department 508 East Morris St. Dalton,
More informationSECTION RESILIENT TILE FLOORING. A. Section includes vinyl composition floor tile and accessories indicated and as specified.
SECTION 09 65 19 RESILIENT TILE FLOORING PART 1 - GENERAL 1.1 SUMMARY A. Section includes vinyl composition floor tile and accessories indicated and as specified. 1.2 SUBMITTALS A. Product Data: Submit
More informationSignature Sports Flooring Installation Instructions. For SignaDeck Premium Rubber Tiles
Signature Sports Flooring Installation Instructions For SignaDeck Premium Rubber Tiles These instructions supersede any verbal or written instructions from Signature Sports Flooring representatives and
More informationSOUND REDUCER INSTALLATION MANUAL. Manufactured in the U.S.A. by: Ecore. Revised 08/28/2017 Supersedes all previous versions Check website for updates
SOUND REDUCER MANUAL Manufactured in the U.S.A. by: Ecore Revised 08/28/2017 Supersedes all previous versions Check website for updates 800-536-9007 www.centaurfloors.com 1 TABLE OF CONTENTS GENERAL INFORMATION
More informationSection RESILIENT TILE FLOORING INCLUDING ECONATURALS RUBBER FLOOR TILE
THIS DOCUMENT IS INTENDED AS A SUGGESTED GUIDE FOR CREATING, MODIFYING, OR EDITING YOUR CSI FORMATTED 3-PART ARCHITECTURAL GUIDE SPECIFICATIONS. TARKETT WILL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT OF
More informationFlexLok Adhesive Tabs for Carpet Tile
FlexLok Adhesive Tabs for Carpet Tile INSTALLATION EcoFlex ICT EcoFlex NXT 160 South Industrial Blvd. Calhoun, GA. 30701 MohawkGroup.com Technical Services Department 508 East Morris St. Dalton, GA 30721
More informationReplay Rubber Multi-functional and Sports Flooring
Replay Rubber Multi-functional and Sports Flooring Installation Instructions Introduction Johnsonite Replay Rubber Multi-functional and Sports Flooring is designed specifically for weight room, aerobic
More informationRubber Flooring Installation Guidelines
Rubber Flooring Installation Guidelines 10.12.18 The purpose of this manual is to provide general installations recommendations based on certain installation environments. If there are other questions
More informationInfinity RE / Infinity Cushion / Infinity Modular Carpet Tile Installation Guidelines
GENERAL Mannington adheres to basics of the Carpet and Rug Institute s (CRI) Installation Standard, which offers general minimum requirements. In addition to the minimums from CRI, this guide provides
More informationCommercial Resilient Sheet Flooring
Commercial Resilient Sheet Flooring INSTALLATION 160 South Industrial Blvd. Calhoun, GA. 30701 MohawkGroup.com Technical Services Department 508 East Morris St. Dalton, GA 30721 800.833.6954 product_tech@mohawkind.com
More informationSuggested Specification for Tri-Patch Versatile Concrete Patching Compound
Suggested Specification for Tri-Patch Versatile Concrete Patching Compound SURFACE PREPARATION for Interior and Exterior Floor-Covering Installations. (Vinyl Composition Tiles, Sheet Vinyl, Rubber, Indoor
More informationARCHITECTURAL GUIDE SPECIFICATIONS - DESCRIPTIVE
ARCHITECTURAL GUIDE SPECIFICATIONS - DESCRIPTIVE MANNINGTON COLORFIELDS SHEET RUBBER FLOORING Section 09 65 16 Sheet rubber Flooring (Thermoset Rubber) Created May 2012 Mannington Mills, Inc. P. O. Box
More informationSection RESILIENT SAFE-T VINYL SHEET FLOORING
RESILIENT SAFE-T VINYL SHEET FLOORING THIS DOCUMENT IS INTENDED AS A SUGGESTED GUIDE FOR CREATING, MODIFYING, OR EDITING YOUR CSI FORMATTED 3-PART ARCHITECTURAL GUIDE SPECIFICATIONS. TARKETT WILL NOT BE
More informationMARATHON & MARATHON PLUS RUBBER TILE
SITE CONDITIONS 1. Store the flooring and adhesive in the installation area. 2. The temperature must be kept between 18 C (65 F) and 24 o C (75 o F) for 48 hours before, during and after installation.
More informationMoisture barrier for protection of flooring assemblies up to 99.5% relative humidity
KOVARA MBX Moisture barrier for protection of flooring assemblies up to 99.5% relative humidity Product Description KOVARA MBX is a moisture barrier designed to be laid down above concrete floor slabs
More informationALETTE GLUE DOWN INSTALLATION INSTRUCTIONS
ALETTE GLUE DOWN INSTALLATION INSTRUCTIONS No floor covering is better than the subfloor over which it is installed. The finished appearance and performance of any floor covering will be affected by the
More informationInstallation Instruction. Plyboo Quiet Acoustical Underlayment
Installation Instruction Plyboo Quiet Acoustical Underlayment Table of Contents BASE PREPARATION I. General Information...3 II. Job Site Conditions...3 III. Subfloor Requirements & Preparation...3 IV.
More informationEXPANKO RESILIENT FLOORING PRE-INSTALLATION GUIDELINES
TECHNICAL SUPPORT 800.345.6202 These guidelines apply to the installation of all Expanko Resilient Flooring products. For instructions on the installation of specific Expanko products, please refer to
More informationModular Carpet. Installation Instructions. Ecoflex AIR Cushion Back Ecoflex ICT Vinyl Back Ecoflex NXT PVC Free Back
Modular Carpet Installation Instructions Ecoflex AIR Cushion Back Ecoflex ICT Vinyl Back Ecoflex NXT PVC Free Back 160 South Industrial Blvd. Technical Services Department Calhoun, GA. 30701 508 East Morris
More informationLUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR DRYBACK FLOORING
LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR DRYBACK FLOORING WARNING Prior to installation, please ensure that the product received is the correct style and color as well as to the customer s satisfaction.
More informationPry Bar or Pull bar Hammer Spacing Wedges Rubber Mallet Safety Equipment (Goggles and Mask)
strand at ease installation instructions strand at ease installation instructions: ECOFINISHES RECOMMENDS USING THE SERVICES OF A PROFESSIONAL HARDWOOD FLOORING INSTALLER. READ THESE INSTRUCTIONS THOROUGHLY
More informationAttainSilence & Attain
AttainSilence & Attain Attain 4.2mm Click over 1mm ECOsilence, Attain 4.2mm Click AttainSilence Click 4.2.1 & Attain Click 4.2 Technical Manual Installation Maintenance Warranty Manufactured in the U.S.A.
More informationProduct Width Thickness Installation direction Seam treatment. Taraflex Sport M Comfort Approximately mm + 5mm Same Heat Welded
INSTALLATION INSTRUCTIONS FOR TARAFLEX SPORT M COMFORT This document refers to the following product: Product Width Thickness Installation direction Seam treatment Taraflex Sport M Comfort Approximately
More informationMONDO MP 1000 ACRYLIC ADHESIVE DISCLAIMER: Refer to page 5 of this document.
MONDO MP 1000 ACRYLIC ADHESIVE DISCLAIMER: Refer to page 5 of this document. 1.1 DESCRIPTION Mondo MP 1000 is high performance, solvent free acrylic based adhesive, specially designed for the permanent
More informationFiberFloor Glueless and Full Spread Installation Instructions
TECHNICAL SERVICE FiberFloor Glueless and Full Spread Installation Instructions September 22, 2016 PRODUCTS All Tarkett Fiberglass reinforced material for residential application INSTALLATION SYSTEMS Glueless
More informationMats Inc. Installation Instructions for Extreme Traffic Wall-to-Wall Carpet Matting 9800
Page 1 of 5 Mats Inc. Installation Instructions These instructions supersede any verbal or written instructions from Mats Inc. representatives, and must be followed in order for the warranty to be in effect.
More informationCONDUCTIVE RESILIENT FLOORING
THIS DOCUMENT IS INTENDED AS A SUGGESTED GUIDE FOR CREATING, MODIFYING, OR EDITING YOUR CSI FORMATTED 3-PART ARCHITECTURAL GUIDE SPECIFICATIONS. JOHNSONITE WILL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT
More informationCONDUCTIVE RESILIENT FLOORING
THIS DOCUMENT IS INTENDED AS A SUGGESTED GUIDE FOR CREATING, MODIFYING, OR EDITING YOUR CSI FORMATTED 3-PART ARCHITECTURAL GUIDE SPECIFICATIONS. JOHNSONITE WILL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT
More informationBerkshires Glueless and Full Spread Installation Instructions
INSTALLATION INSTRUCTIONS Berkshires Glueless and Full Spread Installation Instructions March 22, 2012 PRIOR TO INSTALLATION Carefully check flooring material for any defects. Contact your supplier immediately
More informationUnion County Vocational - Technical Schools Scotch Plains, New Jersey
SECTION 096519 - RESILIENT TILE FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationLUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR LOCKING FLOORING
LUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR LOCKING FLOORING ACCLIMATION Acclimation is required prior to the installation of Luxury Vinyl Flooring (LVF). Store the UNOPENED BOXES in the room where
More informationSection RESILIENT TILE FLOORING INCLUDING SOLID VINYL FLOOR TILE
THIS DOCUMENT IS INTENDED AS A SUGGESTED GUIDE FOR CREATING, MODIFYING, OR EDITING YOUR CSI FORMATTED 3-PART ARCHITECTURAL GUIDE SPECIFICATIONS. TARKETT WILL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT OF
More informationThe following instructions should be reviewed prior to installation. Shaw Industries will not be responsible for improper installation.
Installation of Shaw Contract Group Modular Carpet (Ecoworx, Ecoworx ES, Ecologix, Ergoflex, Ergoflex ES) INSTALLATION GUIDELINES The following instructions should be reviewed prior to installation. Shaw
More informationLUXURY VINYL GENERAL INSTALLATION INSTRUCTIONS FOR LOOSE LAY FLOORING
LUXURY VINYL FOR LOOSE LAY FLOORING WARNING Prior to installation, please ensure that the product received is the correct style and color as well as to the customer s satisfaction. If there are any doubts,
More informationDO-IT-YOURSELF SELF ADHESIVE PLANK INSTALLATION
Woodland Creek Series Self-Adhesive Residential Vinyl Plank Pattern Numbers: Sku 725-6664 PLK1102 Sable Sku 725-6666 PLK1106 Gray Wolf DO-IT-YOURSELF SELF ADHESIVE PLANK INSTALLATION MATERIALS YOU MAY
More informationIVC US Residential Installation Guide - Sheet Vinyl. Leading the Way
IVC US Residential Installation Guide - Sheet Vinyl Leading the Way IVC US Residential Installation Guide - Sheet Vinyl Flooring There are three methods of installation suitable for IVC US residential
More informationPREMIUM LUXURY VINYL FLOORING LOOSE LAY INSTALLATION & MAINTENANCE
PREMIUM LUXURY VINYL FLOORING LOOSE LAY INSTALLATION & MAINTENANCE All instructions and recommendations are based on the most recent information available. If you receive a printed copy of these instructions,
More informationPrefinished Cork Flooring Installation and Maintenance SECTION I. INSTALLATION MANUAL SUB-FLOOR PREPARATION
6999.6999 Prefinished Cork Flooring Installation and Maintenance SECTION I. INSTALLATION MANUAL SUB-FLOOR PREPARATION Proper sub-floor preparation is critical. All guidelines contained in these instructions
More informationINSTALLATION BASICS FOR TUFTED BROADLOOM BACKING
BASICS Bentley has adopted the Carpet and Rug Institute s (CRI) Installation Standard, as a basic minimum industry guideline for the installation of Bentley carpet. Please note, however, that the instructions
More informationARDEX GUIDE SPECIFICATION ARDEX MRF Moisture-Resistant, Rapid-Drying, Skimcoat Patching Underlayment
ARDEX GUIDE SPECIFICATION ARDEX MRF Moisture-Resistant, Rapid-Drying, Skimcoat Patching Underlayment SECTION 03 01 30 Maintenance of Cast-In-Place Concrete PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings,
More informationINSTALLATION INFORMATION
INSTALLATION INFORMATION INTRODUCTION We have prepared the following recommendations and instructions that apply to most applications. Only factory-approved adhesives are to be used for the warranty to
More informationIVC US. Commercial Installation Guide - Sheet Vinyl. Leading the Way
IVC US Commercial Installation Guide - Sheet Vinyl Leading the Way IVC US Commercial Installation Guide - Sheet Vinyl Flooring IVC US recommends the following guidelines for preparation and installation
More informationComforTech Cushioned Rubber Sheet Flooring
ComforTech Cushioned Rubber Sheet Flooring Installation Instructions Introduction Johnsonite ComforTech Rubber flooring features an exclusive construction that enhances thermal insulation, sound absorption,
More information1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards.
WOOD FLOORING GENERAL INFORMATION 1.1 This section applies to factory finished wood strip flooring. 1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards. 1.3
More informationKINETICS INSTALLATION GUIDELINES ISOLayment QT-F (FLAT)
KINETICS INSTALLATION GUIDELINES ISOLayment QT-F (FLAT) ISOLayment QT-F sound control underlayment is a flat, resilient underlayment used directly under a variety of floor finishes including ceramic tile,
More informationPacific Rolled Rubber Flooring Installation Instructions
Pacific Rolled Rubber Flooring Installation Instructions Introduction Greatmats Pacific Rolled Rubber is designed specifically for weight room, aerobic, and other high impact applications. In addition,
More informationARDEX GUIDE SPECIFICATION ARDEX GS-4 Self-Leveling Repair Underlayment for Distressed Gypsum and Wood Subfloors
ARDEX GUIDE SPECIFICATION ARDEX GS-4 Self-Leveling Repair Underlayment for Distressed Gypsum and Wood Subfloors SECTION 03 54 13 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings, general provisions of
More informationFeatures. Specifications. VersaShield MBX slashes up to half the total cost with a quick and effective concrete moisture mitigation up to 99.5% RH.
VersaShield MBX slashes up to half the total cost with a quick and effective concrete moisture mitigation up to 99.5% RH. Features Protects against alkalinity and moisture in concrete up to 99.5% RH Reduces
More informationINSTALLATION BASICS FOR AFFIXX Tile TModula
BASICS Bentley Mills has adopted the Carpet and Rug Institute s (CRI) 104 as a basic minimum industry guideline for the installation of both broadloom and modular carpet. Please note; the installation
More informationText applicable to Parterre luxury vinyl tile, plank and resilient sheet flooring unless otherwise evident.
Updated September 2015 Text applicable to Parterre luxury vinyl tile, plank and resilient sheet flooring unless otherwise evident. PLEASE OBSERVE THE FOLLOWING ADVISORIES Specifier and Installer Advisory
More informationENGINEERED WATERPROOF FLOORING GENERAL INSTALLATION INSTRUCTIONS FOR VÄLINGE 2G LOCKING FLOORING
ENGINEERED WATERPROOF FLOORING GENERAL INSTALLATION INSTRUCTIONS FOR VÄLINGE 2G LOCKING FLOORING SITE CONDITIONS Always store the boxes of Engineered Waterproof Flooring (EWF) on a flat and level surface;
More information1. Division 09 Section "Rough Carpentry."
GREENSPOINT AND LAUDER RD. EC/PRE-KlK PAGE 1 SECTION 096400 - WOOD FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary
More informationSpecification and Installation
SHAW 5800 SPECIFICATION ADHESIVE FOR SHAW CARPET TILE Any variance from these procedures will become the responsibility of the installer and not the manufacturer. See Shaw s Modular Installation Guidelines
More informationTEXAS GRANITE COMMERCIAL VINYL TILES
SITE CONDITIONS 1. Store the flooring and adhesive in the installation area. 2. The temperature must be kept between 18 C (65 F) and 24 C (75 F) for 48 hours before, during and after installation. 3. Both
More informationTufted and Woven Goods Double-Stick
Tufted and Woven Goods Double-Stick Installation Instructions Unibond Flex Unibond Flex Bloc Unibond Plus Unibond Plus Bloc Weldlok Weldlok Bloc Weldlok Plus Woven 160 South Industrial Blvd. Technical
More informationInstallation Procedures Broadloom Carpet with
Broadloom Carpet with Table of Contents 1. Scope... 2 2. Carpet Roll Storage and Handling... 2 3. Planning... 3 4. Testing of Concrete Sub-floors... 4 5. Site Conditions... 5 6. Substrate Preparation.....
More informationIVC US Residential Installation Guide - LVT. Leading the Way
IVC US Residential Installation Guide - LVT Leading the Way IVC US Residential Installation Guide - LVT Click Materials Required for Installation: Tape Measure Square ruler Utility knife Chalk line Small
More informationINSTALLATION BASICS FOR TUFTED BROADLOOM BACKING
Basics Bentley Mills has adopted the Carpet and Rug Institute s Standard for Installation of Commercial Carpet, (CRI 104) (www.carpet-rug.org) as the basic minimum industry guideline for the installation
More informationB. Store products in dry spaces protected from the weather, with ambient temperatures maintained between 50 and 90 deg F (10 and 32 deg C).
SECTION 09651 - RESILIENT TILE FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationINSTALLATION INSTRUCTIONS FOR TARAFLEX SPORT PRODUCTS. Product Width Thickness Installation direction Seam treatment
INSTALLATION INSTRUCTIONS FOR TARAFLEX SPORT PRODUCTS This document refers to the following products: Product Width Thickness Installation direction Seam treatment Taraflex Multi-Use 6.2 Approximately
More informationInstallation and Maintenance Instructions VINYL FLOORING (Premium Resilient Tile (PRT) / Commercial Resilient Tile (CRT)
Installation and Maintenance Instructions VINYL FLOORING (Premium Resilient Tile (PRT) / Commercial Resilient Tile (CRT) NOTICE TO INSTALLER THIS BROCHURE CONTAINS IMPORTANT INSTALLATION, MAINTENANCE AND
More informationSECTION (09620) - RESILIENT ATHLETIC FLOORING
PART 1 GENERAL 1.01 SUMMARY SECTION 09 65 66 (09620) - RESILIENT ATHLETIC FLOORING A. Section Includes: 1. Resilient Athletic Flooring a. Adhesive and Accessories B. Related Sections: 1.02 REFERENCES 1.
More informationLINOLEUM SHEET FLOORING
THIS DOCUMENT IS INTENDED AS A SUGGESTED GUIDE FOR CREATING, MODIFYING, OR EDITING YOUR CSI FORMATTED 3-PART ARCHITECTURAL GUIDE SPECIFICATIONS. JOHNSONITE WILL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT
More informationInstallation Instructions. Distributed by:
Installation Instructions Distributed by: 2 Carpet Installation Check off List 1. Newly poured concrete floors generally will take 30 days per 2.54cm to cure. Moisture should not exceed 2.26kg /1000sf
More informationSECTION RESILIENT TILE FLOORING
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 09 65 19 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable
More informationL. W. Mountain, Inc. Floating Glue Installation Instructions *For use with engineered floors only*
L. W. Mountain, Inc. Floating Glue Installation Instructions *For use with engineered floors only* Inspect the job site carefully before you begin the installation. Some conditions require specific installation
More informationINDOOR RUBBER FLOORING INTERLOCKING INSTALLATION / MAINTENANCE GUIDELINES MARATHON SERIES. Four-Side Interlock Loose Lay Installation
INDOOR RUBBER FLOORING INTERLOCKING INSTALLATION / MAINTENANCE GUIDELINES MARATHON SERIES Four-Side Interlock Loose Lay Installation The following pages are guidelines only... please read this manual thoroughly
More informationMoisture barrier for protection of flooring assemblies up to 99.5% relative humidity
KOVARA MBX Moisture barrier for protection of flooring assemblies up to 99.5% relative humidity Product Description KOVARA MBX moisture barrier is designed to be laid down above concrete floor slabs and
More informationRESILIENT FLOORING: Hot and Heavy - Secoya
160 South Industrial Blvd. Calhoun, GA 30701 Section 096519 RESILIENT FLOORING: Hot and Heavy - Secoya This document is intended as a suggested guide for editing your architectural guide specification.
More information